HomeMy Public PortalAbout08-0211 Lee 1 !
■
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 04 -30 -2008 PERMIT #: 080211
WORK DESCRIPTION REPAIR CARPORT& HOUSE /SHUTTERS/DR
WORK LOCATION 211 JONES
OWNER NAME SHAREN LEE
ADDRESS 211 JONES AVE
CITY, ST, ZIP TYBEE ISLAND GA 31328 -9676
PHONE NUMBER
CONTRACTOR NAME SHAKEN LEE
ADDRESS 211 JONES AVE
CITY STATE ZIP TYBEE ISLAND GA 31328 -9676
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 25.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $1,000.00
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
r 1) ,16.3.
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.ong
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location: l i `3 0 V\-P- S PIN #
NAME ADDRESS TELEPHONE
2i) Cc-)
Owner SKv,1r
— Ix n5 }s 33 - -/)=
Architect
or Engineer
Building
Contractor
(Check all that apply)
EM Repair al, Residential n Footprint Changes
❑ Renovation n Single Family ❑ Discovery
❑ Minor Addition ❑ Duplex n Demolition
❑ Substantial Addition ❑ Multi- Family
n Other ❑ Commercial
Details of Project: N im'✓ Y 24D Q 0 ✓ S cuit4 ai 7A ,
Y p
bDIovYG s -to KoNp ° i s c r r , ( L aD o ✓'
Estimated Cost of Construction: $ 1000 d 0
Cons ction Type (Enter appropriate number)
(1) W d Frame (4) Masonry (6) Other (please specify)
(2) Woo & Masonry (5) Steel & Masonry
(3) Brick neer
Proposed use.
Remarks: /
ATTACH A COP OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following informal' .► based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area / Living space (total sq. ft.)
# Off - street p 'ng space
Trees located & listed on sit lan
Access:
Driveway / (ft.) With culvert? With swale?
Setbacks: ront Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme hi point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning . ts, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by 51r\o 1 (2. _—by means of t v kL 1r.---
I understand that I must comply with zoning, flood damage control, building, fire, shore
Protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: O y ?An Signature of Applicant: S--ntnA,R iy\___, kL __
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
A,
Access to building site V`
Distance to water main tap site L,
Distance to sewer stub site r \„\
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator /2V 4 , Permit °-
Code Enforcement Officer (r41-/D -, Z2 --m/ Inspections
Water /Sewer U Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
DEPT OF •,FE a 4
MURAL
mamas .y � F4 \
Rr.
�3L Y
GEORGIA o '
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Proiects Involving Demolition. Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned Date
Printed Name
Office Use Only:
Project Address:
Permit Number: