HomeMy Public PortalAbout2022-01-13 packetNotice of Meeting & Tentative Agenda City of Jefferson Public Works & Planning Committee Thursday, January 13, 2022 7:30 a.m. John G. Christy Municipal Building, 320 East McCarty Street Boone/Bancroft Room (Upper Level) ➢ Note: VIRTUAL and IN -PERSON MEETING To join virtually: https://ieffersoncity.webex.com/ieffersoncity/a.php?MTID=maO95b6O845778fe23dfl99d4e81 5faf2 To join virtually call -in available at 1-404-397-1516 Meeting number (access code): 2485 511 0680 Meeting password: 1234 TENTATIVE AGENDA 1) Introductions 2) Approval of the October 28, 2021 Committee meeting minutes 3) New Business 1. Disabled Aircraft Removal (Eric Bowers) 2. Concrete Street Repair (Britt Smith) 3. Transit and Central Maintenance Facilities Master Plan (David Bange) 4. Capital Improvement Update (David Bange) 5. Airport Capital Improvement Update (Britt Smith) 4) Citizen opportunity to address Council/Staff on Stormwater and Other Public Works Issues 5) Adjourn NOTES Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as required under the Americans with Disabilities Act. Please allow three business days to process the request. Please call (573) 634-6410 with questions regarding agenda items. MINUTES JEFFERSON CITY PUBLIC WORKS AND PLANNING COMMITTEE Wastewater Treatment Plan, 401 Mokane Road Conference Room and Virtual October 28, 2021 Committee Members Present: Ron Fitzwater (virtually) David Kemna Mike Lester Scott Spencer Committee Members Absent Mark Schreiber Staff Present. - Matt Morasch, Director of Public Works Don Fontana, Stormwater Engineer Britt Smith, Operation Division Director Eric Seaman, Wastewater Division Director Clara Haenchen, Wastewater Treatment Plant I Eric Bowers, Airport Manager Sonny Sanders, Director of Planning and Protective Services Matt Schofield, Fire Chief Ryan Moehlman, City Counselor Brenda Wunderlich, Administrative Supervisor Attendance 6 of 6 6 of 6 6 of 6 4 of 6 5 of 6 Chairman Fitzwater called the meeting to order at 11:45 a.m. A quorum was present at this time. The following guests attended the meeting: Mayor Carrie Tergin; Penny Smith with Front Line Events, and Michael Shine with News Tribune. 1) Introductions Introductions were made at this time. Chairman Fitzwater requested Item 3.3. Air Show item be moved to the top of the agenda. 3) New Business 3. Air Show (Britt Smith) Mr. Smith explained staff was approached by a local group (Front Line Events) wishing to bring an airshow to Jefferson City. Staff request the Committee to support to continue negotiation and coordination with the local group. There was discussion among Committee members, staff and those present regarding the preliminary stages including a site use agreement and DD2535 Request for Military Aerial Support, and planning for a date in September 2022 after Labor Day. Minutes/Jefferson City Public Works and Planning Committee October 28, 2021 2 Councilman Spencer moved and Councilman Kemna seconded to refer a resolution to the City Council to authorize the City Administrator to sign the agreement, motion carried. 2) Approval of the August 12, 2021 Committee meeting minutes Councilman Lester moved and Councilman Schreiber seconded to approve the August 12, 2021 minutes, motion carried. 3) New Business 1. Sewer Bond Issue (Eric Seaman) Mr. Seaman explained staff recommends authorizing"",""referendum for April 5, 2022 for $44M in sewage revenue bonds. This will all tkle to borrow low interest loan money for sewer system improvements. There was discussion among Comm Wastewater needs, keeping the City having compliance issues. Councilman Spencer moved and Councilma ordinance to the City Council with recommendation 2. Proposed Revisions System (Eric Sea Mr. Seaman e) • Adding definitic and Abbreviati • Changing d4fe, Definitions and lbers and staff ble wastewater in 29. Perta ing the known �r seconded to refer the rove, motion carried. to the Sanitary Sewer ained the seven items that need revisions including: s for Dental Amalgam and Dental Discharger (29-1 Definitions s) on of Significant Noncompliance reporting period. (29-1 • Upd, F Fide to c W nnarntained pray erl %U.still hanging Poilbe protect • Ad}t"st ng time that 101Tecords, inf( • Kequinng! rules. (29- • Specifying Violation) reviations) arify need for grease and oil equipment and that they are r (29 94 Interceptors) imit 6r Iron to better reflect industry standard. The new limit 6 of water quality. (29-96 Specific Pollutant Limitations). records are kept by industrial users to reflect federal law (29- 4f . ation, etc., from industrial users.) er' dental amalgam compliance report to comply with federal cords, information, etc., from industrial users.) e action in response to a Notice of Violation (29-108 Notice of A second draft bill increases surcharges for high strength wastes (Biochemical Oxygen Demand and Total Suspended Solids). These rates have not changed since 1987. The rate study by Rafetilis Financial Services recommends incremental increases to the surcharges over a six -year period. Minutes/Jefferson City Public Works and Planning Committee October 28, 2021 9 These charges increase revenue nominally but are intended to incentivize reduction of loading to the treatment facilities and extend the life of the facilities. Councilman Kemna moved and Councilman Lester seconded to forward the revisions to the City Council with recommendation to approve, motion carried. 4. Parking Garage Scope (Britt Smith) Mr. Smith explained staff request the Committee support to bring a consultant contract with Structural Engineering Association of Kansas City for the parking garage renovation project. Staff is working to develop a final project scope and fee which is anticipated to be ready to present to Council in Decembers` There was discussion among Committee members and staff regarding the need for renovations of the current garage, this being,a "critical issue, and''soIme store owners leaving the downtown area due to the parking issues. 5. Private Project to Enhance Flood "Protection (Matt Morasch) Mr. Morasch gave a slide presentation on how the property owners of 2101 Marilyn Drive have worked to take care of their own"flooding problems,including bricking up the garage and basement door in order to avoid floodind. • `Chairman Fitzwater stated he like the Committee to consider cancelling the November mee g since this meeting was held late in October. Committee members agreed. 5) Adi Councilman Kemtta moved and Councilman Lester seconded to adjourn the meeting at this time, 1:05 p.m., motion carried. 6) Opportunity for Wastewater Plant Tour and Airport Office Tour Several Committee members and those present toured portions of the Wastewater Plant and Airport. Department of Public Works Memorandum 320 E. McCarty Street • Jefferson City, Missouri 65101 • P 573-634-6410 • F 573-634-6562 • www.*effcitymo.org Date: November 5, 2021 To: Public Works and Planning Committee From: Eric Bowers Subject: Disabled Aircraft Removal Staff and the Airport Advisory Board recommends the Public Works and Planning Committee move this ordinance forward to the City Council for approval. When there is an accident or incident that leaves an aircraft disabled on the runway, airport staff is responsible for clearing the aircraft and debris from the runway and returning it to service as quickly as possible. This can be as simple as hooking up a tug and pulling it to the ramp, or as complicated as calling for a tow truck and crane. While opening the runway and helping the aircraft owner/pilot arrange these services is the responsibility of the airport, paying for them is not. Airport staff is also not responsible for damage that happens during the process of moving the aircraft. The intent of the ordnance and release form is to protect the city from liabilities related to the removal of aircraft during this type of incident. Public Works CORE - improve the Community - take Ownership — deliver Results — Empathize with the customer BILL NO. 20- SPONSORED BY COUNCILMAN ORDINANCE NO. AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, ADDING AN ORDINANCE TO ADDRESS FINANCIAL RESPONSIBILITY OF REMOVAL OF DISABLED AIRCRAFT. NOW BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: Section 1. Chapter 34 (TRANSPORTATION) Article IV (MUNICIPAL AIRPORT) Division 1 (Generally) is amended by adding a new definition to Section 34-48 to read as follows: Section 34-48. — Definitions. For the purpose of this chapter, the following words and phrases shall have the meaning respectively ascribed to them by this section: Abandoned aircraft means an aircraft left in a wrecked, inoperative, or partially dismantled condition at an airport; or an aircraft that has remained in an idle state at an airport for 45 consecutive calendar days without a contractual agreement between the owner or operator of the aircraft and the airport for use of the airport premises. Airport charter means an on -demand flight from one point to another, as requested by the customer. These flights are operated under 49 CFR Part 135, and require certification by the FAA. Aircraft rental means any arrangement between the tenant and a customer that involves the rental of an aircraft for any use (travel, testing, instruction, etc.). Aircraft sales means the selling, buying for resale, or brokering the sale of an aircraft through facilities located on the airport as part of a tenants' services offered to customers. Aircraft service and maintenance means anyone that maintains an aircraft for their customers. This includes minor and major repair to the airframe or power plant. Service also includes topping off oil, tires, and washing the aircraft. Aircraft storage means any under roof or otherwise concealed storage of a customer's aircraft. This does not apply to land lease holders that are storing their own aircraft. Fuel sales means any sale of fuel to any person or entity. Monthly aircraft parking space means any aircraft with a current annual inspection certificate that is parked outside on the airport for longer than two weeks. Aircraft must have current annual inspection certificate. Student instruction means the instruction to people of how to fly an aircraft, preparing them for the FAA exam, or the conducting of ground school. This includes any instruction covered by 49 CFR Part 91 and 145. Disabled Aircraft means any aircraft that is unable to move under its own power without the assistance of another vehicle. Section 2. Chapter 34 (TRANSPORTATION) Article IV (MUNICIPAL AIRPORT) Division 1 (Generally) is amended by adding a new Section 34-49 to read as follows: Sec. 34-49. — Disabled Aircraft. A. Any aircraft landing at the Jefferson City, Missouri Municipal Airport that becomes disabled and is interfering with runway traffic or creates a dangerous condition for runway traffic shall be removed by the aircraft owner or pilot at the owner's expense within a reasonable amount of time, as determined by the Airport Manager. Reasonable time determinations made by the Airport Manager shall be done so in consideration of the current demand on the airport for runway use and traffic. 1. If the aircraft owner or pilot is unable to remove the disabled aircraft within a reasonable amount of time, as determined by the Airport Manager, then the Airport Manager shall have the disabled aircraft removed and the financial liability and liability for any damage to the aircraft caused by that removal shall be the responsibility of the aircraft owner. Section 3. This Ordinance shall be in full force and effect from and after the date of its passage and approval. Passed: Presiding Officer ATTEST: Approved: Carrie Tergin, Mayor APPROVED AS TO FORM: City Clerk City Attorney 1/10/2022 Concrete Repair Program Works and Planning Commi, January 13, 2022 Concrete Street by Condition _: � z31 �: ,... •�i...:�..i ICJ .1:��.. Sa[isfa[[ory P I ♦t1 C.dar Cdy55 C i �I w 5 u -_ �♦ v.ry naor . wT.SRn city �i,� to -. w 4j- • d N4�ylp 1 1/10/2022 Concrete Street with a PCI Less than 75 Wain-ight S-11 PCI Centerline Miles Overlay Cost 75 and above 59.3 84% Below 75 11.7 16% $2,555,990 Concrete Street Repair N 1/10/2022 Concrete Panels Needing Full Replacement 3 1/10/2022 During Repair Repair Complete M 1/10/2022 Concrete Joint Spall Repair Concrete Joint Repair Preparation 5 1/10/2022 Concrete Joint Repair Completed Completed Street Section Department of Public Works Memorandum 320 E. McCarty Street • Jefferson City, Missouri 65101 • P 573-634-6410 • F 573-634-6562 • www.aeffcitymo.org Date: January 11, 2022 To: Public Works and Planning Committee From: Matt Morasch, P.E., Director of Public Works Subject: Transit/Central Maintenance Facility Study The purpose of this item is to update the committee on work being done by our consultant (Dake Wells Architecture) relating to the facility planning study for transit and central maintenance. The current facility is approximately 40 years old and is a shared use facility that was constructed utilizing Federal Transit Administration grant funding. That facility is now beyond its original life expectancy and has begun requiring frequent and costly repairs, such as doors, lighting, roofs, lifts, etc. This study will help the City begin to look for grant opportunities for its replacement. The study started in July and costs approximately $50,000. It is primarily funded with Campo Planning Funds ($40k) and '/z Cent Capital Improvement sales funds allotted for Transit ($10k). Attached are two documents prepared by the Consultant during the process. The first is an inventory of existing facilities and space analysis for the needs of these facilities. That information was then converted to building footprints and arranged on current City properties in the second document. Each of these have pros and cons. One of the biggest issues is that they displace existing facilities of other City Departments including Streets and Fire. They also present different operational challenges (shuttling equipment and/or personnel). The next part of the study will look at relocation of the facilities to improve these issues as well as develop planning level costs. At the meeting City staff will provide an overview of the process and take any questions you may have at this point. Upon completion of the consultants work both the Council and CAMPO board will be asked to accept the study. This will allow staff to utilize the study in future grant applications as they arise. Please let me know if you have any questions. Thanks. Public Works' CORE Mission and Values improve the Community - take Ownership — deliver Results — Empathize with the customer City of Jefferson Transit Facilities Feasibility Study Programming Summary 3 Sept. 2021 IV, 4: JEFP�'Ar, RAN f e DAKE I WELLS 41WEL ENGINEERS architecture ARCHITECTS Table of Contents 1 Introduction.................................................................................. 4 2 Project Imperatives............................................................... 6 3 Divisional Connections........................................................... 8 4 JEFFTRAN Facility Needs Analysis ..............................•••••• 10 5 Bus Barn Needs Analysis........................................................14 6 Central Maintenance Needs Analysis ..............................•. 18 7 Fuel Island Needs Analysis ................................................•••• 24 8 Wash Bay Needs Analysis...................................................... 26 9 Site Flows 10 Site Surveys W 30 11 Space Standards: Offices and Amenities ..................••••• 34 12 Space Standards: Vehicle and Equipment Bays ••••.••. 58 1 - Introduction 1.1 Background Information The City of Jefferson's Public Works Department serves the residents of the Jefferson City metropolitan area. As a State Capitol with a population of 43,079 (2010 census) in 17,278 households, Jefferson City combines the lifestyle of a smaller community with the municipal expectations of a much larger city. The Public Works Department is comprised of four main Divisions: Engineering, Wastewater Utilities, Operations and Transit. In February 2021, the City released an RFQ for a Transit Facilities Feasibility Study, to explore Field Operations improvements in two of these Divisions: Operations and Transit. A team led by Cook, Flatt and Strobel Engineers and Dake Wells Architecture was retained to complete the Transit Facilities Feasibility Study. The ultimate goal of the Study was to improve the operation of the Transit Division facilities, the Central Maintenance Garage, and two Municipal facilities (Fueling Island and Wash Bay) all of which currently occupy a challenging site at the intersection of E. Miller Street and Chestnut Street. Matt Morasch, PE, Director ENGINEERING DIVISION OPERATIONS DIVISION , — TRANSIT DIVISION David Bange, City Engineer I Britt E. Smith, PE, Division Director Point of contact for study I WASTEWATER DIVISION I I I CENTRAL_ MAINTENANCE ( I I II I — — — — — — — — — — — — I — — — — — — — — — — — — — — I „ Scope of the Transit Facilities Feasibility Study �I I The Transit Division — otherwise known as JEFFTRAN — has been I I providing fixed -route transportation since 1974. It also offers I I Handi-wheels, an origin to destination service. I STREETS I The Central Maintenance Garage provides service and repair to the entire fleet of City owned equipment — including JEFFTRAN's fleet. I Maintenance Staff are responsible for day to day preventative I I maintenance services, as well as detailed large scale repairs, I I PARKING I I including repairs of specialized equipment. I ` — — — — — — — — — — — — — - The scope of work included in the Transit Facilities Feasibility Study Not covered in this study. I included needs analysis and concept design for five new structures: I Transit Division Administration Building, incorporating a few spaces currently located outside the existing facility, including a waiting area for riders and a support area for drivers. I Transit Division Bus Barn I Central Maintenance Garage Municipal Wash Bay (serving multiple Divisions) Public Works Org.. Chart Municipal Fueling Island (serving multiple Divisions) i -------- -------------------- 4 1 A 1.2 Critical Facility Issues. 1. Administration Building. The facility is undersized and aging, with ADA issues. Spaces inside do not communicate the values of JEFFTRAN, or support an efficient operational flow. 2. Transit shelter. The waiting area for riders lacks basic amenities found in typical municipal waiting areas in Transfer Facilities. 3. Transfer area. Buses for the 5 fixed routes queue up at the curb, but there is no way -finding to help riders know what routes the different buses serve. 4. Bus Barn. The facility is undersized for the current fleet, and lacks proper infrastructure and support facilities to safely shelter the fleet into the future. Its size results in some buses needing to be stored in the garage at times. Additionally, site restraints require tight turns to get into the facility. 5. Fuel Island. The Fuel Island serves vehicles from multiple Divisions — not just Transit. As is the case with other structures on site — its current size and layout are inefficient, and do not align with best practices. Its location on the site contributes to overall traffic congestion and increases the likelihood of accidents. 6. Wash Bay. Similar to the Fuel Island, the Wash Bay serves multiple Divisions. It is currently undersized, and its location and operation result in over -spray affecting adjacent areas. Aside from being a nuisance to mechanics at the Central Maintenance Garage and riders waiting for buses, the over -spray can freeze during cold temperatures, creating safety issues. 7. Central Maintenance Garage. The garage is undersized and does not allow for pass -through operation, resulting in vehicles needing to back up. Its size and location on the site is not in alignment with best practices for such a key municipal operation. 8. Municipal Yard. The site north of E Miller St serves multiple uses, including bulk material storage for the Streets Division, and operational storage for multiple other Jefferson City Divisions. Unless a new location can be found for the bulk materials, this site is off limits to development for Transit Division needs. 9. Historic Lodge. On the west edge of the site is an historic structure that once served as a mason lodge. This building must be protected. It is currently in a state of disrepair and will require significant improvements, but has recently been re -roofed. 10. Pedestrian Traffic. The current site design has created several unsafe pedestrian traffic conditions. Workers often travel from the admin. facility across the street to the parking lot to the west to park, and often travel across Miller Street during breaks, crossing in front of bus traffic. Also, the current arrangement of the transit facility does not have protected pedestrian routes away from the path of the buses. 1 5 2 - Project Imperatives On, July 1, 2021 the design team met with the divisional leadership of the Jefferson City Public Works Department to kickoff the Transit Facilities Feasibility Study. At this meeting, the design team surveyed the needs, wants and goals for master - planning study and the individual facilities studied within. From the information and insight collected from the Jefferson City Public works leadership, a set of 8 project imperatives was developed that will serve as guiding principles for the feasibility study. Throughout the study, the project imperatives will be referenced to ensure the project is following the overall wants, needs, and goals established by the city and design team. 6 2.1 Project Imperatives 1. Design for change. Consider current needs in context of predicted future industry trends and design to create facilities that are flexible enough to adapt. Consider trends in city population growth and its affect on vehicle counts and types. 2. Design for customer experience. Designing with the customer in mind will allow the facility to serve as an amenity for the community that will greatly improve their commuting experience. 3. Design for worker health and well-being. Design facilities with an awareness that the occupants are essential workers. Focus on glare free daylighting, acoustic controls, access to ventilation and fresh air, and offer environmental components and spaces that contribute to workers feeling healthy and productive. 4. Design for achievability. Design pragmatically with solutions to programmatic needs that take into consideration implications on cost, operability, and time frame to ensure a realistic, achievable development. Design for public safety and accessibility. Consider the diversity and different abilities of the community that the transit facilities serve and create inclusive spaces that are easy, enjoyable, and intuitive to access and use. Ensure that pedestrians are protected from vehicular traffic and other facility operations. 6. Design to improve operational functionality. Conditions of the current facilities and their site arrangements do not meet current standards in regard to operation, ventilation, safety, and size. It is imperative that the project provides spaces and site arrangements that allow the functions of the transit facility, bus barn, and central maintenance garage staff to operate in an efficient and safe way. Design spaces with everyday practicality in mind, and provide intuitive spaces that contribute to the efficiency of the staff. 7. Embrace Sustainable Design. Understand the implications of baseline and "code minimum" thinking and consider strategies that prioritize resource efficiency and carbon reduction. Plan spaces that are prepared for the change to electric vehicles and other alternative energy sources. 8. Design for Resiliency. Design to maintain continuous operation in the midst of the aftermath of disasters. Design to adapt should future emergencies dictate temporary uses for the facilities. Design spaces within the facility that can be used as storm shelters, and provide spaces that can be adapted to meet the requirements of future pandemics. 1 7 3 - Divisional Connections 3.1 Divisional Connections The current location of the facilities being studied is well suited to their operations. It is situated in close proximity to the community it serves, and is in a central location to all of its destination. However it the current location is too tight to allow for proper, safe operation and future expansion to respond to growth or new needs. The Transit Facilities Feasibility Study will look into which operations must remain adjacent, and which can be relocated to another site. Existing facilities will be studied to see if they can be effectively re -purposed. The goal is that the operation of JEFFTRAN and Central Maintenance reflect current and projected future best practices, and that the facilities are located in strategic locations with regard to inter -divisional connectivity. 3.2 Divisional Adjacency Diagram PUBLIC STAFF ---------------------- MUNICIPAL _ FUEL ISLAND I I I � I � WASH BAY(S) - — I � I I ------------------------ I ••• Is •: JEFFTRAN Routes I , I , I I I JEFFTRAN Public Functions I � t I , JEFFTRAN I , Staff Functions JEFFTRAN BUILDING t , t , t , t ' I ' t ' I ' t I , I , I I TRANSIT BUS BARN ----------------------- If CM is located at a different site than the Transit facilities, it should have access to an adjacent wash bay CENTRAL MAINTENANCE GARAGE Demarcation between public and staff spaces Direct adjacency required Direct adjacency preferred (i.e. single campus) ""........a Direct adjacency optional ----------- ----------- Critical groupings for optional operational flow n O 1 9 4 - JEFFTRAN Facility Needs Analysis 4.1 Operational Summary Transit Division leadership and key staff were I • • • • 0 interviewed to determine the needs of a new , I I JEFFTRAN Routes , Administration Building. It will house critical staff PUBLIC operations functions, as well as serving as the public interface for JEFFTRAN by combining the existing STAFF Administrative and Transfer Facilities' functions . , JEFFTRAN I , BUILDING I Spaces will include administrative offices, staff I , gathering and training spaces, support spaces, "day ` I MiUNIGIPttI a drivers' room', public restroom, ticketing I PUiAkO TELIS and waiting aces. These last two will focus on g s P ' TRANSIT I . I I J I BUS BARN I ° creating a comfortable environment for customers WASH 9# t% T I � f. , ,---____-_- ° to purchase bus passes, transfer from one route to--------' another, and wait for the bus. Bringing this function I into the Administration Building will give it a sense of • • ° permanence, predictability and comfort. Clear lines CENTRAL MAINTENANCE of sight from the public windows through the space GARAGE are critical for the safety and security of JEFFTRAN's passengers. The needs analysis factored in growth projections to allow for future flexibility. View of administrative facility from E Miller St. 10 1 4.2 Images of Existing Facility F- View of public restroom and transfer shelter from E Miller Street. Front office. Break room / meeting room / fitness area. Dispatch office Vestibule and public access windows. Transit Division Director's office. 1 11 4.3 Space Needs Summary - See Section 11: Space Standards for room plan examples Administrative Spaces # Size Idiv. SF TOTAL SF Notes Vestibule 1 10'x10 100 100 Transit Director's Office 1 1 12'x16' 10'x15' 192 192 Operations Supervisor Office 150 150 Operations Assistant Office 1 10'x12' 120 120 Future Supervisor Office 1 10'02' 120 120 Training Shared Office 1 14'xl6' 224 224 Dispatch Office / Window 1 12'xl6' 192 192 for 2 people; one public, one private Admin Assistant Office / Window 1 10'xl2' 120 120 adjacent to disp., but sound separated Small Conference/ Meeting Room 1 12'xi 6' 192 192 up to 6 people Training Room 1 24'x32' 768 768 seats 24-30 Break Room 1 24'x32' 768 768 up to 36 people General Storage 1 10'x20' 200 200 Wellness Room 1 10'xl5' 150 150 with excercise equipment Mothers Room 1 10'00' 100 100 Driver Lounge 1 16'x2S' 400 400 with tv, computer work area, seating It Room 1 10'x1 o' 100 100 desk for cameras Spare Uniform Storage 1 10,A 0' 100 100 Secure File Storage 1 101x10' 100 100 Office Storage 1 10'x10' 100 100 Work Room 1 10'x12 120 120 copier, central but quiet location Janitor Closet 1 8'x8' 64 64 with mop sink, cleaning supplies, shelving Mans Locker and Restroom 1 TBD 800 800 one locker per worker, next to restrooms, 30 Total workers Womens Locker and Restroom 1 TBD 800 800 one locker per worker, next to restrooms, 30 total workers Universal Locker/ Shower Room 2 10'x10' 100 200 Mechanical/ Stormsafe area 1 Flexible 1 1,331 1,331 with generator, must hold more than staff l Transfer Facility Sp aces Public Waiting Room Public Restrooms # Size Idiv. SF TOTAL SF Notes 1 25'x20 750 l 750 for up to 12 people 2 T-3"xlV 135 270 Interior Subtotal SF 1 8,531 Grossing Factor 25% 2,133 INTERIOR TOTAL SF 10 664 Outdoor Areas # Size Idiv. SF TOTAL SF Notes Outdoor Waiting Area Outdoor Break Area --_.._.. _.. ..._.. _.. _.-------"-`f 1 1 25'x30' -'-------'---..—._ Flexible 750 Soo 750 ._........_...----- ..-_-..._.....__..._ 500 for up to 12 (per owner) up to 50 (per route max totals) .................-------' — near offices, sf based on area available Bus Parking 5 70'-8 1/2- X 8' + 30' lane 2,371 11,855 with canopy and signage, saw tooth recommended Employee Parking 40 9' x 18' + 112 of 27' drive 1 1 1 S'xl 5' 270 10,800 1 per each employee on largest shift Trash / Recycling Area 225 225 size may vary Exterior Subtotal SF 24,130 Site circulation 150% 36,195 EXTERIOR TOTAL SF 60,325 TOTAL AREA SF 70,989 OPERATIONS ADMINISTRATIVE Gerry Stegernan, Glenna Vernon, Supervisor Assistant Maurice Burnley, Assistant 2 Dispatchers, Comrn Operators 12 1 BUS DRIVERS SERVICE WORKERS 20 Bus Drivers 3 Bus Barn Staff TRANSIT DIVISION 1 Mark Mehmert, Director Transit Division Org. Chart 4.4 Adjacency Diagram NO i— — — — — — — — — — — — — — — — — — — — — — i ( Transit Stops (x5) I I TBD ---- — — — — — — — — — — — — — — — — — — — — — -- Public Entry I Outdoor Waiting TBD PUBLIC STAFF To Bus Barn Asst. Super. ♦-- 0 Super 150 sf 120 St Director's Mech/ Office Storm 200 sf TBD Future Office Office Sto. 120 sf 100 Sf I l I Secure IOutdoorl I Break l TBD I I l I l I l i jbic l Public Waiting l 750 sr I 1 Public 1 1 Windows 1 — — — — — A Admin. Dispatch Assist A - — — i 2: si 100 sf I i I 1 I Smaii Work Dispatch Conf.Ro I I V J 120m 200 sf I I W IT LL. 100 Sf Training I LL. Office i H I O File ° 225 st: 100 sf � I I Break Room 0 Training Room 750 sf 750 sf Driver Lounge 400 sf Womens Locker 800 sf I W i I Z LLJ Jan. I Gen. Univ. 04 sf Wellness Stor. Stor. 1 150 sf 200 sf 100 sf I Q LL< LL, Mother's 100 sf I Shower Mens Locker 100 sf 800 sf I Univ. Shower 100 sf 1 13 5 - Bus Barn Needs Analysis 5.1 Operational Summary Transit Division leadership and key staff were interviewed to determine the needs of a new Bus Barn, which will remain dedicated to the Transit Division. The interviewees expressed a need for the facility to be upsized by 20% and for a secure office for counting fares; needs analysis revealed that more storage and support space is needed to properly house the fleet and provide minor maintenance. Final recommendations were determined using growth projections and industry standards / best practices. The new facility should be flexible enough to allow for shifting vehicle sizes and eventual adoption of electric vehicles. 5.2 Vehicle Inventory Summary ---------, •00 t0,: I JEFFTRAN Routes , PUBLIC I , I STAFF I I I JEFFTRAN I I BUILDING I I I rva �nvcir-AL lu _ t I ®.I FUEL ISLAND 1 TI I I I I I J I TRANSIT BUS BARN I 1 AY(ti) ►T l — — — —• CENTRAL ®. . MAINTENANCE GARAGE L Bus Barn Storage Vehicle Count ( Number based on growth projections) Vehicle Type 0 yr/ Current 10 year 30 year 50 year Large Vehicles (15'x40') 12 13 13 13 Medium Vehicles 15'x32' 10 11 11 11 Small Equipment 10'x20' 8 8 8 8 Total 30 32 32 32 View from the southeast. 14 1 r N 5.4 Bus Barn Space Needs Summary Bus Barn Interior # Size ��iv. TOTAL SF Notes Secure Office 1 10'x12' 120 120 for fare count and repairs Secure Storage 2 10'x20' 200 400 Restrooms 2 10'X10' 100 200 Mechanical/ Storm Safe 1 1 O'x2O' 200 200 Storm Shelter 1 1O'x10' 100 100 Bus Storage - Large 13 15'x40' 600 7,800 20% more, currently have 20 spaces, 24 desired Bus Storage - Medium 11 15'x32' j 480 j 5,280 Bus Storage - Small 8 10'x20' 200 1,600 Mezzanine Storage 1 TBD TBD TBD I Maximum 1/3 of open storage area (IBC) Interior Subtotal SF 15,700 Circulation @ 25% 3,925 INTERIOR TOTAL SF 19,625 Bus Barn Exterior Exterior # Size SF TOTAL SF Notes Storage Tanks Fuel Island Wash Bay 3 1 1 1 O'x20' 200 600 30'X50' 1,500 1,500 52'x136' 7,072 7,072 Employee Parking 10 9' x 18' +1/2 of 24' Drive 270 2,700 Trash/ Recvlinci Area 1 15'x15' 225 225 Exterior Subtotal SF 12, 997 --- c _............: Site circulation @ 150k 18,146 EXTERIOR TOTAL SF 30,243� TOTAL AREA SF 49,868 OPERATIONS ADMINISTRATIVE Gerry Stegeman, Glenna Vernon, Supervisor Assistant Maurice Burnley, Assistant i 2 Dispatchers, v Comm Operators 16 1 BUS DRIVERS SERVICE WORKERS 20 Bus Drivers 3 Bus Barn Staff TRANSIT DIVISION 1 Mark Mehmert, Director 40-0k, .JANITOR Transit Division Org. Chart 5.5 Adjacency Diagram ------� � Mezzanine � General Storage Stor. Above — 200 sf A A 0 0 Secure Storm Stor. 100 sf 200 sf A 0 0 A To Employee Parking Mech. Univ. Univ. Secure TBD RR RR Office 100 sf 100 sf 1 B A A A B A A B To Fuel Island C B C C B C C B C C B C C B C -iim iL A: Large Vehicle Parking Q 600 sf ea. x 13 = 7,800 sf total B: Medium Vehicle Parking Q 480 sf ea x 11 = 5,280 sf total C: Small Vehicle Parking @200sfeax8 = 1,600 sf 1 17 6 - Central Maintenance Needs Analysis 6.1 Operational Summary Central Maintenance is a highly specialized operation that services vehicles from multiple Jefferson City Divisions, including Transit, Fire, Police, Streets and others. Interviews were completed with Central Maintenance leadership to determine current and future needs. The operation has been performing admirably in its existing location, but a number of factors related to the facilities location on the site are counter to best practices. Central Maintenance has a need for large and small vehicle service bays. The number of each bay and final size would be based on workflow and maintenance practices, number of maintenance staff and organization of those staff, and overall count of serviced vehicles. Specialized equipment storage, parts and material storage, as well as personal tool storage, is required to support the primary activity of each service bay. Certain specialized bays such as welding and tire service are also needed. Final recommendations were determined using growth projections and industry standards / best practices. See Section 12 for methodology calculating number and sizes of vehicle bays. View of garage from the northwest. 18 Central Maintenance staff need to be provided with administrative and personnel support spaces. These include private offices and a tech desk area, a break room with training facilities, restrooms and locker rooms based on current and projected staff make-up, and other function support spaces such as IT closet, general storage, janitorial and building mechanical equipment room that may double as a storm safe room. PUBLIC STAFF I I , I I •o• 60a , JEFFTRAN Routes I , I , I I I I I I , ! J[=Fnaar! I BUILDING I I , I I J I TRANSIT I BUS BARN I `__— ,, . . C:rNTRAL bi :!NT=PlilNCE 3ARAC;r 6.2 Images of Existing Facility Interior view of CM garage. CM supervisor's office. CM parts tech's office. Misc. CM storage CM garage mezzanine Tech Service desk CM Parts room. i CM break room / meeting room 1 19 6.3 Requested Adjacency Diagram I Univ. Womens Break Room Super Locker Locker & RR Outdoor 500 sf 80 sf 100 sf 385 sf Break:: TBD IT Office Jan. Univ. Mens Locker I 48 sf Sto. 100 sf Locker & RR I ` 100 sf 100 sf 435 sf .------------------ ! Parts Storage Mech/ Storm 1500 sf Safe Room ' I TBD ' Loading Dock I ---R . Fluids Parts Tech Storage Office Desk Tire Storage 375 sf 1K si 120 sf 800 sf A: Large Service Shops A I @ 1,456 sf ea. x 8 i = 11,648 sf total R B: Tire Service Bay i I = 800 sf C: Welding & Service Bay I i = 2,560 sf i Total building sf = ----- 68,008 sf Tool General General Mezzanine I I Stor. Stor. Stor. Storage I ! 200 sf 200 sf 200 sf ; Above I I ) I Drive Thru Indoor Wash Bay 7,072 sf 1 20 1 To 6nployee Parking 6op"l-'e have, 3140 : ci!amarnatically All hays hall To Vehicle Staging Drive Thru 6.4 Recommended Adjacency Diagram Univ. Womens I V Break Room Super Locker Locker & RR W Outdoor 50C sl 180 sf 100 sf 385 sf ( U Break BD i To Employee Parking IT Office Jan. Univ. Mens Locker LL 48 sf Sto. 100 100 sf Locker 100 sf & RR O sf 435 sf i Parts Storage 1500 sf I I Loading � Dock � Fluids Storage 1 375 sf A: Large Service Shops @ 1.456 sf ea. x 10 = 14,560 sf total B: Small Service Shops @704sfeax8 = 5,632 sf total C: Tire Service Bay = 800 sf D: Welding & Service Bay = 2,560 sf Total building sf = 79,621 Tool Stor. 200 sf Drive Thn. A A A A A A A W Mech/ Storm Safe Room TBD sk Tire Storage 800 sf C General General i4 ezzanine Stor. Stor. I Storage 200 sf 200 sf Above Indoor Wash Bay 7,072 sf M TOT To Vehicle Staging V Drive Thru 1 21 6.5 Central Maintenance Requested Space Needs Summary Administrative Spaces # Size Idiv. TOTAL SF Notes Vestibule 1 10'x10' 100 100 Supervisor Office 1 12'x15' 180 180 up to 4 people in office Parts Room 1 30'x50' 1,500 1,500 with loading dock to outside and forklift access Parts Office 1 10112' 120 120 potentially with tech service desk Tech Service Area 1 10'02' 120 120 could be in parts office or separated area Janitor 1 10'x10' 8'x6' 100 100 IT 1 48 48 Break Room 1 20'X25' 500 500 for 10-20 people, training, muster ect. Mens Locker Room 1 TBD 435 435 for 12 Men Womens Locker Room 1 TBD 385 385 for 5 Women Universal Locker Room 2 10`X10' 100 200 General Storage/ Supply 1 10'x10' 100 100 -- 7Idi I Service Bays # Size "IV SF Notes Welding and ga Fabrication Bay ; 20'x40' 1,456 12,368 5 drive thru, 14'-1 6'doors, 2 bays w/ stationary 1 w/.pit lift Large Service Bays 8 26 x52 2,560 2560 y 800 800 Indoor Wash Bay 1 I 52xl 36' 7,072 7,072 power washer, degreaser, parts cleaner, solvent barrel capture I Shop Storage # Size SFry TOTAL SF Notes Bulk Fluids Storage 1 15'x25' 375 375 - adjacent to parts room ----'----- Tire Storage '— 1 ---._. _____ ._.._-- 20 x40' 800 ------ . ..----_ _. .. _. .._......_....-- 800 I could be in mezzanine, adjacent to parts room and dock Tool Storage General Storage 1 2 10'x20' 10'x20' 200 200 200 - 400 jack storage, AC machine storage - Mezzanine Storage 1 TBDI TBD TBD w/ compressors; max 1 /3 of open storage area (IBC) Mechanical/Stormsafe area 1 TBD TBD 5,329 15%of supported Interior Subtotal SF 1 33,692 Circulation @ 25%1, 8,423 INTERIOR TOTAL SF 42,115 Exterior Areas # Size Idiv'SF TOTAL SF Notes Outdoor Break Area 1 TBD TBD _ _ 500 near offices, sf based on area available Employee Parking 15 9' x 18' +1/2 of 24' Drive 270 4,050 1 per each employee on largest shift + 5 visitor -------L-a---- — -----------.. -----. __ Stagng Packing -Large Spaces 4 20'x45' 900 3,600 Staging Parking -Medium 4 12'x24' 288 1,152 Staging Parking -Pick-up 4 10'x20' 200 800 Trash/ Recyling Area '� 1 ' 15'x15' 225 225 at can vary Exterior Subtotal SF 10327 Site circulation @ 150% J 15,491 EXTERIOR TOTAL SF 25,818 TOTAL AREA SF 67,933 22 1 OPERATIONS DIVISION 1 Britt E. Smith, PE, Division Director 1 CENTRAL MAINTENANCE I Shawn Stumpe, Supervisor I MECHANICS PARTS STORAGE Keith Haslag, Keith Rademan, Lead Mechanic Parts Clerk a 5 - 6 Mechanics Central Maintenance Org. Chart 6.6 Central Maintenance Recommended Space Needs Summary Administrative Spaces # Size Idly SF TOTAL SF Notes Vestibule 1 10'x10 1 100 100 Supervisor Office 1 12'x15' 180 180 up to 4 people in office Parts Room 1 30'x50' 1,500 1,500 with loading dock to outside and fork lift access Parts Office 1 10'x12' 120 120 potentially with tech service desk Tech Service Area 1 10'x1 T 120 120 could be in parts office or separated area Janitor 1 10'x10' 100 100 IT 1 8'x6' 48 48 - Break Room 1 20'X25 500 500 for 10-20 people, training, muster ect. with kitchenette Mans locker Room 1 TBD 435 435 for 12 Men Womens Locker Room 1 TBD 385 385 for 5 Women Universal Locker Room 2 10'Xlo, 100 200 General Storage/ Supply 1 10'x10' 100 100 Service Bays # Slza Idiv. SF TOTAL SF Notes -------------- --I— --- do--------------wi Large Service Bays 10 28'z52' 1,456 14,560 5 drive thru, 14'-16' doors, 2 bays w/ stationary lifts, 1 w/pit lift Small Service Bays 8 22'x32' 704 5,632 Welding and Fabrication Bay - 1 - 32'z80' 2,560 --2,560 - - TireServiceBay 1 - -- 20k40'800 Indoor Wash Bay 1 52'xl36' 7,072 7,072 power washer, degreaser, parts cleaner, solvent barrel capture Shop Storage # size Idiv SF TOTAL SF 1 Notes Bulk Fluids Storage 1 15'x25' 375 20'x40' _ 800 375 800 adjacent to parts room could be in mezzanine, adjacent to parts room and dock ck storage, AC machine storage / compressors; max. 1/3 of open storage area (IBC) -- %o(supported Tire Storage 1 Tool Storage General Storage 1 10'x20 200 10'z20 200 TBD TBD _ 47011a 2 Mezzanine Storage 1 Mechanical/Stormsafe area 1 TBD TBD • Interior Subtotal SF 42,983 Circulation@25% 10,746 INTERIOR TOTAL SF 1 53,729 Exte ron A are s # Size Idiv. SF TOTAL SF Notes Outdoor Break Area 1 TBD TBD 500 near offices, sf based on area available Employee Parking 15 9' x 18' /2/2 of 24' Drive 270 4,050 1 per each employee on largest shift + 5 visitor Staging Parking - Large Spaces 4 20'x45' 900 3,600 Staging Parking - Medium q 12'x24' 288 1,152 Staging Parking -Pick-up q 10'x20' 200 800 Trash/ Recyling Area 1 15'xl 5' 225 225 sf can vary Exterior Subtotal SF 10,327 OPERATIONS _ Site circulation @ 150% 15,491 DIVISION EXTERIOR TOTAL SF 25,818 1 r TOTAL AREA SF 79,546 Britt E. Smith, PE, Division Director 1 CENTR.L'L MAINTENANCE 1 Shawn Stumpe, Supervisor MECHANICS I PARTS STORAGE Keith Haslag, Keith Rademan, Lead Mechanic Parts Clerk e 5 - 6 Mechanics Central Maintenance Org. Chart 1 23 7 - Fueling Station Needs Analysis 7.1 Operational Summary Jefferson City has two fueling stations, one at the E. Miller site and one at the Hyde Park site. A needs analysis revealed that a new Fueling Station would benefit from longer spacing between pumps. Further discussion in future phases will inform whether tanks are above or below -ground, and what types of products will be made available, i.e. unleaded gasoline, diesel, clean diesel, biodiesel and DEF. 7.2 Image of Existing Facility �-y ------------ View from the southeast. 24 ----------� I JEFFTRAN Routes I PUBLIC I I STAFF I I I JFFFTRAN I I BUILDING I I I I MUNICIPAL I - I • I FUEL ISLAND %I l+', I I I TRANSIT ' I WASHBAY(,Sj I J I BUS BARN I I �• \ 1 \ T �---------- CENTRAL MAINTENANCE GARAGE 7.3 Fuel Storage Tank Diagrams Below Ground Tank Typical Notes: • Fuel accommodated on both sides of the island. • Tank venting integrated into canopy. • All piping and connections are underground. • Leak detection and spark protection fully integrated. Above Ground Tank � 28'-0" I I I_ J • Electrical power source from main building. • Emergency shut off no closer than 20', no further than 100'. Typical Notes: • Location must be reviewed with fire authority. • If located within 20' of a building, double wall CO rated tanks and building rated walls are required. • Emergency shut off is integrated with tanks, unless tanks are more than 100' from dispensing. 1 25 8 - Wash Bay Needs Analysis 8.1 Operational Summary The needs analysis for the Wash Bay revealed that a new facility will need to be constructed to properly wash vehicles. The Wash Bay will serve multiple Divisions, and will need to have controlled access, with after-hours access. Future discussions will help determine if additional functionality should be included, including an area for minor maintenance and fluids check. If Central Maintenance is located at a different site than the Transit facilities, both shall need a dedicated wash bay. 8.2 Image of Existing Facility v�r%• View from the northwest. 26 1 JEFFTRAN Routes I I 1 PUBLIC ' r STAFF I I I I aEFFTRAN I BUILDING 1 I I 1 1 1 1 I MUNICIPAL I I I FUEL ISLAND 7_1 M + I I i i TRANSIT I WASH BAY(S) Y r , BUS BARN / \ / �_'--------- CENTRAL MAINTENANCE GARAGE 8.3 Wash Bay Space Needs Diagram 30'-0" 41 Ilk Automated Wash system: Touchless system illustrated, a touchless system is required if accommodating multiple vehicles. Length can be reduced if driving directly into storage. Wash Equipment Room: Location forwash equipment and building equipment with in floor heat boilers, pressure wash units, and dedicated electrical panels. Equipment room should have forklift access for delivery of chemicals. Automated wash equipment shown. Pre -Wash: Critical space if utilized by any vehicles other than buses. Allows for hand washing and large volume/ high pressure to clear off ice and dirt. Dual want, trolley guided washing in this area. 45' pre - wash recommended to accommodate buses, but can be shortened if only for other vehicles. This space will include a wide and deep trench drain to collect sediment before flammable waste trap and sanitary exit. Automated dryer Automated wash tire guides Automated wash rinse arch Automated secondary arch activation wand or in floor loop Automated undercarriage/ chassis wash Automated secondary arch activation wand or in floor loop Automated wash overhead rinse and detergent dispensing arch Automated wash activation or in floor loop 1 27 �A! 9 - Site Flows 9.1 Site Flow Summary Initial flow analysis of fleet vehicles and public interaction suggest that locating the Administration Building, Bus Barn, Fuel Island and Wash Bay on a single campus is beneficial. It is not critical that the Central Maintenance be located on the same campus provided that they have access to a Wash Bay of their own. 28 1 9.2 Divisional Site Flow Diagram JEFFERSON CITY I I I i I I PUBLIC I STAFF i i i I I I I I MUNICIPAL I ; FUEL ISLAND 1 � 1 ---------------- ••• ••0 JEFFTRAN Routes I I I I I JEFFTRAN — — Public Functions I JEFFTRAN Staff Functions 1 JEFFTRAN BUILDING I I I I I I I I I ' I I 1 TRANSIT BUS BARN , I ------------------ ENTRAL MAINTENANCE GARAGE Public flow - purchasing bus passes, waiting, and outdoor Bus Transfer. n Transit daily flow — leaving Bus Barn, picking up riders at Bus Transfer Area, running routes, returning at end of day, fueling, washing and storage in Bus Barn. Transit maintenance flow — buses' intermittent trips to the Central Maintenance Garage. Municipal Fueling / Washing flow — municipal vehicles requiring fueling and/or washing. Municipal Maintenance flow —municipal vehicles receiving maintenance/repairs (many times after awash.) 1 29 10 - Site Surveys r r r i sxv� r t � PL.v t t t •t --------------------—------- ----- -- --- Pa ,x M Wh[6n P";Y, 10.1 E Miller Site East Miller Street cuts through the site splitting it into north and south lots. On the southern lot, the existing Administrative Facility, Central Maintenance Garage, Transit Shelter, Transfer Waiting area, and fuel island are all housed. Just south of the street and sidewalk is a large retaining wall that surrounds the yard and drive for the Central Maintenance Garage and Bus Barn, and their accessory functions, resulting in ground level being 10' -15' below the grade of the sidewalk and street. The Administrative Facility is connected to the Maintenance Garage, and can be accessed through it or via E. Miller street (it is below street grade and must be accessed by ramp or stair.) The current grades prevent easy street access, and belittle the facilities' street presence. 30 0 lu I MAINf�4NC i� , ,1.1111 I -4s+_iiCoi2. FIN, F-. II C, IS � ` I'.Illtll'III III I I J I I I I I Ili Ija IIlillllllllll ` I I.II Illjl�llll�ij I i� � ��.,i�Y� 'IIIIIIIIIIII II III �I I III - � - SW •� \ill'lll IIII l'lllll I IIpI ry �. '❑ III II I1111111111 a I II IIII IIII III 'll IIII --------- - � I i I I'll II I I III I II11j11 __------- illilt i�lf ii li IIJI II ,[II bid = TO to 50DI)w mom, xi- GREw-CF-Me. lal ENor'sllc M7l DE %ABED ti 1�*.IALL M y, .,, GRADING PI .AN SCALE, "-20�4' T.S. The land to the north of E. Miller Street serves as a municipal yard for multiple divisions of Jefferson City Public Works including bulk material storage for the Streets Division, and operational storage for other Jefferson City Divisions. However, the east portion of this area is under-utilized, and if all the storage bins and other streets functions could be relocated to a proposed location approved by the city, the site could be utilized for this study. This portion of the site is mostly flat, and is bordered by a retaining wall to the north and east. On the western edge of this area is a historic structure that currently functions as a mason lodge. This building must be protected and has been proposed in previous studies to be remodeled and used for municipal administration functions, but that presents several challenges, mainly ADA. 1 31 I �s 10.2 Hyde Park Site The site at Hyde Park houses multiple municipal division spaces including the Streets Division facilities, the Sewer Division facilities, and Fire Department training and storage facilities. The north of this site is dedicated to the Streets and Sewer division buildings and their site storage, and those facilities are newer and well suited to their needs. The site is located in a strategic area of the city, and is effective for the divisions that use it. The southern part of the site is a large concrete pad that the fire department uses for training, with a large 2 story brick burn tower at the edge. Adjacent to this pad are several zones of training equipment, such as simulated trenches and confined space simulators. While this site is currently used by the fire department, the large concrete pad has been suggested as a potential location for the Central Maintenance Garage if it were to be relocated away from the E. Miller site. Legend 1. Concrete Pad -Used for fire department training, but has been suggested as a possible location for Central Maintenance Garage 2. Streets Division Facility - This facility houses the various divisional operation spaces for the Streets Division. It is a newer facility, and well suited for their needs. 3. Wastewater Division Facility - This facility houses the various divisional operation spaces for the Sewer Division. It is a newer facility, and well suited for their needs. 4. Fire Department Apparatus Storage Building 5. Fire Department Burn Tower - This building is a 2 story brick building that is used for training by the fire department. It has been suggested that this could be removed and relocated. 6. Retention Basin - This area currently serves as a retention area, but can be regraded and reused for other functions. 7. Greenway Trails 8. Fire Department Training Zones 9. Flood Plain 10.3 FEMA Flood Plain J f�1 i [il PROR-= 6ASE6 s JE AE RYDE PARK RD 11 1. NE I f, 1 33 Jefferson City Transit Facilities Feasibility Study Task 3 Test Fits 11 Oct. 2021 JEFP. DAKE I WELLS architecture E Miller Site 0 4,9 . 14 1 Administration Building 8 2. Transit shelter 3. Transfer area 4. Bus barn 5. Fuel Island 6. Wash Bay 7. Central Maintenance Garage 8. Municipal Yard 9. Historic Lodge 10. Pedestrian Traffic WIWI W-1 - MW 14 t IV I m uj qw 0 Existing i CID� Cow LODGE ------L= I EXIST. FUEL 1.331 sa ft i EXIST. BUS BARN 11,264 sq ft i , EXIST. BINS EXIST. BINS 3,793 sq ft 5,369 sq ft EXIST. GARAG ,212sgft I I SALINE TANKS EXIST. SHED 6,599 sq ft MST. WASH , 1,331 sq ft EXIST. CW JEFF TRAN 12,040 sq ft "Note: Lodge appears to utilize a drive lane that extends beyond its property line. More I I direction needed as to what the requirements are for Lodge operation. 0 20' 50' 100' JeffTran Program Adm,nrstraove Spaces a Sae Idiv. 5F TOTAL SF Noms Vestibule 1 10'.10' 10D 100 . tMet D'uec ,Once 1 12'x16 192 192 -- .. - OpraEms $uperveer ORire t 10'x15' 150 150 I Operabwo AseiMm Office 1 10'.12' 120 120 ,I Futum Supervisor Ogcv 1 10'n12' 120 120 —_. I Troinkg Shared OlRce 1 141x16' 224 224 ! Deptch O(fiw / Wawlow 1 12'.16 192 192 for 2 people one plelic, private Ad— Aepstanl Off- /Window 1 10'.12 120 120 djacertw dsp., but somdsep rated -' SmaO Gonlann<eI Meat rg Room 1 12'.16 192 192 up to 6 p pl T Ng Room I 24'.32 1. 168 seats 24 30 I Bteai[ Room 24'.32 768 768 up to 36 pople G I Storage t 10'..20- 20D I 200 i�elfnea Room 1 10•.15 _ 50 150 with excercrsc equ pment - Mot .Room I 10'.10 1000 �Lravtge t 76.25 400 4W 1whh W.compularwarkarea,saating- ! It R .. I -- 10'.10 100 100 desk for camerea -_Spa U .form Storage 1 10'.10 106 Sec F.I.Storage 1 1&10 Office Storage 1 10'.10 llq, work Roont f 10'a12. 120 _.._ 720i �apar. rxntral but quint loco,,. Closet 1 1I-,— _ 8'.8 --- -. 64 wlr mop k cbanng pPl holy g 64 R _._ _ -- mem bdtar and Rvatsoom I TBD 800 8W na locks p le. morm, 30 ToW worka_n-1 Wonwm Led ,,d Restroan 1 TBD am 800 cafe locker per worker, nen to restrooms. 30 total workers _ Universal laded Shower Room 2 _ 10'.10_ 100 - Mechanical/ Stom4afe area 1 Flexible! _ 1.331 /,331 .with gasreromr. mart held moro then stag J Transfer FacWW Spaces a Sloe Idv.SF TOTAL SF Notes Pvbiic W-,ng Room 1 25'x20 750 750 for vp t0 12 people Public Resvooms 2 9' 3'.18' _ 135 270 I medv Subtotal SF 8.531 -- Gmssfng Factw25% 2,133 INTERIOR TOTAL SF 10,664 Otldoor Areas a Sae Id, SF TOTALSF Notes j Ouodow Waiting Area 1 25'.30' 750 750 for vp to 121pr owner) up w 50 (jeer route max totalel Oudeor Brook Amer I Fie.ible 500 n r-Tks-, sf based on area available Btn Parking - - 5 70'.8 112' X 8' . 30' 1... 2,371 _500 11.111 w4h canopy and sig,,eq, saw tooth romm—rded - _�°y"eParting_ 40 9'x 18'-1/2 of 27'drivc 270 10,800 lper each employee on largort ship_ Trish /Recycling Area 1 15'.15' 225 225 sae may vary . E#ehw Subtotal SF 24.130 Site circulation O 150% 36.195 EXTERIOR TOTAL SF 46 F"tc ET'y PUBLIC STAFF TOTAL AREA SF 70,989 TO -- --- ---- — - - firm tier. .---- -- -------- --- -- - - -, Transit Stops f157 I I rya I TED I li W �----------- - - - - - - - - - - i I z Otndoor Waiting aD i I Y. 1 PtriOo 1 Sup x t1s—i 15C a' W 1 Dirsptot'. 11AwW Offlce Storrs) ,Go of Flmtev Office'' Office Sto. File 120 mi 100 of 100 tf I I Settee 1 IOutdo� I Break I TBD I Break Room 50 of �� WeWteea LDunge 150 21 4W 8f Womens Locker a-0 3f Mother's 10n a1 Univ. Shower 0w f Univ. Shower . cf I I VJ I I //W�� 1 V i Ia LL ! 0 I 7 i I Training Roan I I I Jan. 1 Gen. Univ. Sw Star_ SR^. of 11Jn e1 , I I I . I Mane Locker I 800 xa I I I V/ W f W Q LL (LL V/ a Bus Barn Program Barnenine Bus Barn Interior N Size Idiv. TOTAL SF Notes Yea CiWearHl SwumSF Sr-;n: rb;c ( Storage n. Stor_ Styr. Secure Office 1 10'x12' 120 120 for fare count and repairs p I 1 .. T== / 200 of Secure Storage 2 10'x20' 200 400 Restrooms 2 10'X70' 100 200 Mechanical/ Storm Safe 1 10'x20' 200 - 200 Storm Shelter 1 10,00' 100 100 Bus Storage • Large 13 15'x40' 600 7.800 20% more, currently have 20 spaces, 24 desired Bus Storage •Medium 111 15'x32' 5,280 Bus Storage - Small 8 10'x20' _480 200 1,600 - _ 11 A A B Mezzanine Storage 1 TBD TBD TBD Maximum 113 of open storage area (IBC) Interior Subtotal SF 15,700 A A B Circulation 0 25% 3,925 INTERIOR TOTAL SF 19,625 A A B Bus Bam Exterior N Size SFry TOTAL SF Notes Storage Tanks 3 10'x20 200 600 Fuel Island 1 30'X50' -52'xl36' 1,500 - — 1,500 A /t B !"l Wash Bay 1 7,072 7.072 Employee Parking 10 9' x 18' ai/2 of 24' Dnve 270 2,700 Trash/ Recyling Area 1 15'xl5' 225 225 A - A Exterior Subtotal SF 12,097 Site circulation 0 150% 18.146 EXTERIOR TOTAL SF 30,243 BUS STORAGE TC Pi/Bl laland :ev— mys nt-- o u,—ww c Lv All TOTAL AREA SF 49,868 gat: rmvne-.-e11—Itru—I t lay To F_nlployae Pur,Jng Uni, F;i RF A B C B C B C C B C B C A: Laage venicla Parxtng OBWar0&xis 7.8W of total 8: Medium Vettlole Patktng 0490 at ea 11 = 5,2110 of total C: SM211 Veniole Panting 0200at eax8 = 1.BW a1 E. Miller Opti • CM at hyde park • Bus barn, Jefftran facility (transfer facility and admin) on south side of E Miller • Bulk Bins rearranged on N E Miller -Fuel Island and wash bay on N E Miller -Property Lines of lodge needs to be verified -Verify lodge access to east -Staff parking and bus barn operations would need to be coordinated -Power will need to be buried for sawtooth bus parking -Minimum street width needs to be verified WASH BAY 5,081 sq ft FUEL ISLAND SALINE m� TANKS STRTS BULK BINS STRTS BUILDING 6,968 sq ft 0 20' 50' 100' E. Miller Option 1 --� $Fr�ft - Bus Circulation ® t 1. End of day path 2. Fuel 3. Wash 4. To bus barn 5. Exit bus barn next day W= = 0- � FUEL ISLANDct) q Ln — _ _ -SA�IPdE� O r j ago �J TANKS X n I __j II STRTS BUILDING 1 1 — 6,968 sq It 1 1 LODGE ------------�___ 0--�--y----------------------�,- 1 *----------- - - - - -- 5 BUS BARN- 17,480 sq ft STRTS BULK BINS JEFFTRAN ABOVE 10,580 sq ft PARKING BELOW 0 20' 50' 100' E. Miller Option 1: Turning Radius Study WASH BAY 5,081 sq ft FUEL ISLAND -f SALINE o { TANKS �J STRTS r- - -� 0 BULK BINS STRTS BUILDING 6,968 sq ft 0 20' 50' 100' E. Miller Option 1 Staff Vehicle Route WASH BAY 5,081 sq ft FUEL ISLAND SALINE TANKS 0 � STRTS BUILDING 6,968 sq ft 1 � Z ----------------------- I BUS BARN I - 17,480 sq ft N STRTS BULK BINS JEFFTRAN ABOVE 10,580 sq ft PARKING BELOW 0 20' 50' 100' E. Miller Option 1: Streets Vehicle Route o _Cr ► cn cn) 1 i Cnac w LO ► T 1 I WASH BAY 5,081 sq ft FUEL ISLAND SALINE TANKS STRTS BULK _ BINS ► I STRTS BUILDING � — — — 1 6,968 sq ft I 1 (' (n I 1 LODGE ,1 ► I 1 1 I I I BUS BARN 17,480 sq ft \1 JEFFTRAN ABOVE 10,580 sq ft PARKING BELOW 0 20' 50' 100' E. Miller Option 2: • CM at hyde park • Bus transfer facility and admin on south side of E Miller -Move bus barn to north side of road • move bulk bins to south side of the road -Requires costs associated with Streets operation relocated to south of Miller -Power will need to be buried for sawtooth bus parking -Minimum street width needs to be verified ®Alternatively if we couldn't park to the east of jell tran we could do an arrangement similar to Option 1, but that does mix Streets vehicles and staff parking WASH BAY 5,081 sq ft m FUEL ISLAND LODGE::] BUS BARN 16,800 sq ft 0 20' 50' 100' E. Miller Option 2: Bus Circulation 1. End of day path 2. Fuel 3. Wash 4. To bus barn 5. Exit bus barn ne) (31-- WASFLBAY-- ---► 5,081 sq ft 1J ` � I FUEL ISLAND 5 I LODGE -- "—— -- — BUS BARN 16,800 sq ft 0 20' 50' 100' F- (r) E. Miller Option 2: Turning Radius Study WASH BAY 5,081 sq ft - r IFUEL ISLAND BUS BARN 16,800 sq ft LODGE 0 20' 50' 100' E. Miller Option 2: Staff Circulation WASH BAY 5,081 sq ft FUEL ISLAND Uj LODGE n BUS BARN 16,800 sq ft 0 20' 50' 100' m E. Miller Option 2: Streets Vehicle Circulation WASH BAY 5,081 sq ft ----------------- RELOCATED STREETS 20,312 sq ft BUS BARN 16,800 sq ft E. MILLER -- -- -r-T _.- JEFFTRAN 10,580 sq ft 0 20' 50' 100' 10 0 E. Miller Option 4: - WASHBAY _ _ _ _ _-®-- - 3� 5,081 sq ft Bus Circulation Fuel Island I SHIPCm I O D 1 25,525 sq It SERVICE SPACE 4,000 sq ADMIN. ABOVE 1 _ i 1 LODGE j 0 ' E. MILLL. - -----+------ - - - - - ' _ 1. End of day path ' __ _--_�--,--_-_--------.-------T---, � 2. Fuel ! ♦ �� .- 3. Wash 4. To bus barn , BUS BARN 5. Exit bus barn next day . , - 17,480 sq ft JEFFTRAN ABOVE 10,580 sq ft PARKING BELOW 0 20' 50' 100' E. Miller Option 4: Turning Radius Study WASH BAY 5,081 sq ft Fuel Island Gua LODGE CM 25,525 sq ft SERVICE SPACE 4,000 sq ADMIN. ABOVE E. MILLFP 0 20' 50' 100' E. Miller Option 4: CM Vehicle Circulation 1. 2. 3. 4. To Maintenance Bay Fuel Wash Exit UAsi BAw 5,081 sq ft `� I♦ Fuel Island u _ 0 0 CM 25,525 sq ft SERVICE SPACE LODGE 4,000 sq ADMIN. ABOVE 0 20' 50' 100' E. Miller Option 4:LZ SH BAY 81 sq ft Staff Circulation Fuel island i CM 25,525 sq It SERVICE SPACE 4,000 sq ADMIN. ABOVE i W i U ua ---- _._ _ LODGE `- JEFFTRAN ABOVE 10,580 sq ft PARKING BELOW 0 20' 50' 100' Hyde Park Site 1. Concrete Pad 2. Streets Division Facility 3. Wastewater Division Facility 4. Fire Department Apparatus Storage Building 5. Fire Department Burn Tower 6. Retention Basin 7. Greenway Trails 8. Fire Department Training Zones 9. Flood Plain (shown approx.) 10. Existing Fueling Station I J J j f 'L CM Program AdmMLpafive Speon t s Size Vestibule i Supervtsor office 1 Parts Roam 1 Parts Office 1 Tech Service Area 1 JeNtor 1 IT 1 . Break Room ILocker Idle SF TOTAL SF Notes 10'x101001 100 12'x15' 180 180 up to 4 people in office 30'x50' 1,500 1,500 with loading dock to outside and fork lift access 1702' 120 120 potentially with tech service desk 10'xl2' 120 120 could be in parts office or separated area 10'x10' 100 7W .__--_-_-- _8'x6' 48 48 18'x 20' 360 360 up to 16 people, training, musts act. with kitchenette Room 1 TBD 470 470 max 24 kickers - - - - Shower Rooms 6 9'6'x7' 67 399 General Stora"pply- 7 1 10'xl0' 100 100 Service Bays size -_ Idi, SF TOTAL SF 'Notes Large Service Bays 8 28x52' 1.456 nt 56 11,648 5 drive th, 1N-16' doors, 2 bays w/ stationary lifts, 1 w/ ph lift Small Service Bays 8 22'x32' 704 5,632 Welding and Fabrication Bay 1 32'x80' 2,560 Z560 Tire Service Bay 1 20'x40' 800 800 Indoor Wash Bay 1 52'x136' 7,072 7,072 ,power washer, degreaser, parrs cleaner, solvent barrel Capture Shop Storage a Size to,, SF TOTAL SF Notes Bulk Fluids Storage 1 15x25 375 375 adjacent to parts room _ Tire Storage 1 __.. _ 20'x40 800 800 could be in mezzanine, adjacent to parts roam and dodo Tod Storage 1 -- --- --- -- — 10'z20 ' 200 200 storage I� 2 achine storage tOTBD Mezzanine Storage 1 TBD TBD w//ccompressors mines.1/3 of open storage wee (IBC) Mechanical / Stomisafe area I TBD TBD 6,796 1 15%of supported Interior Subtotal SF 39,780 INTERIOR TOTAL SF 9,725 49,725 , ExleriorAreas I C Size Idiv. SF TOTAL SF Notes Outdoor Break Area 1 TBD TBD 500 near offices, at based cnarea available J Employee Parking 15 T x 18' - ♦in of 24' Drive 270 4,050 1 per each employee on largest shift + 5 visitor Staging Parking - Large Spaces j 4 20'x45' 900 3,600 !aging Parking -Medium 4 12'x24' 288 1.152 1 Staging Parking -Pict -up 4 10'x20' -200 800 rash/ Recyling Area 1 15'x15' 225 225 sf can r i Exterior Subtotal SF 10,327 _ J Site circulation @ 150% 15.491 FF4 EXTERIOR TOTAL SF 25,818 TOTAL AREA SF 75,543 I I I I Outdoor I Break I -ao I I I I I I I I I I I I I Loading Dock I I I I � A: Large Serv.c, 'It 1,4%si ea , = 11,648 sl 101a1 B: Smell Service- Strop= 0 f04S1asxB 5.632 sf total C: I". S—c. B.y = 800 Sf D: Warding 85r, , - 2.560 Sf Total building s1- 79,621 Drive Thru ------------------- IT Super Jan. ShowerRoom3 48 s 13 (3;s} 100 sf fi, sf xG I Ui i Roan Porte Office Office Locker Room Sto. 470 of I Tech Fluids Desk Storage e—a Parts Storage 120sf 375.4; .. Mech/ Storm Safe Room r Tire Storage -E� A 1 I I I C A I B I A B A B A I B A I B I A B A B I D B Tool General Stor. Stor. General I'iVleuanine�I Stor. I Storage 200 si 200. st- 4V sl Above Indoor Wash Bay 7.077 n. I Employee Parking IBB�I Hyde Park CM Option 1:--, t-) WASH BAY 5,081 sq It Z CM eCM facility with 8 large o� 36,273 sq fl bays, 8 small/ medium r,W 2: Small sarvlce Bay W.Wing anG Fat. ca;.. Bay 1.4W ae It2.560 s4 h bays, 41,000 sq. ft. total 3 U W- Z W 2a Small Sennce Say ( including wash bay) > ',aOBsg" St ,IWch -Double loaded with _ �s �� Bay - 1,920 5q'1 interior drive er large Service Bay 2r Small Servce Bay 2880 sq " -Some fire training IAWS°" ------ apparatus to be a'eoo�' ,,Blr 2. Large Sarv;ca Bay relocated 8 �" G eo'aage �_ N _ 2.eso sa" -Curbs removed on East FIRE DEPT DELIVERY Pans Storage 7W Sluraga 282 sq O WER end of site STORAGE DOCK 9W aq a Pa}y��pce '80 `" 2. Large San— Bay 2,8W qft BUILDING - - - A°m'a. 40'-OB 3,0001-0" 2. Large Service Bay 2.880 sq n EMPLOYEE PARKING Trash 00 n Fuel Island 0 20' 50' 100' N Hyde Park CM Option CM Vehicle Circulation � 1 � ♦ WASH BAY — _ — — ��� 0 0 I — — 5,081 Sq ft ♦ 1 1 c7 — _——— — �---��----�'---_� Q36,273 sq ft 1 n Fuel Island w CAP I 1. To Maintenance Bay 2. Fuel 3. Wash 4. Exit 3; W 2x Small Service Bay U ,.408 sq n W- 2 W 2x Small Service Bay ,.408 sq tt -- 2x Small Service Bay 1.408 sq tt 2.Small Service Bay 1.408 $q h 1 Welcfing and Fabrication Bay 1 2.SW sq ft 1 1 Stnrr Meth. 1,920 sq ft I 1 2x Large Service Bay zeeo w n 1 _2x large Service Bay FWids Gen. Storage 8 2 sgft. 480-son _. FIRE DEPT Tooisf«�ge DELIVEgy Pans Storage 2B2 a9 tt STORAGE DOCK 9Bo egtt atee -)WER 2x La2 B80A Bay BUILDING - :. Admen. 401_011 3,000 aq tt 2. Largo Sorvice Bay 2.BBo Bog" EMPLOYEE PARKING Trash U l� 1 I I I 1 0 20' 50' 100' ' V Hyde Park CM Option 1:1) � Turning Radius Study WASH BAY 5,081 sq ft z cm -CM facility with 8 large � c7 36,273 sq ft bays, 8 small/ medium oU) w� J 2% Small Service Bay Welding and Fabricauan Say 1.408 aq 8 2,560 aq Itbays, 41,000 sq. ft. total W= Z W 2% Small Serv�ca Bay ( including wash bay) > 408Sqtt So„W -Double loaded with 2%Small Sery;ceBay 1,408 5G Itinterior drive Large Say 2. Smau Sa—e Bay ap8 W ,I ire Service Bay 800 sq ftIyI 2%Large Service Bay FWldra t Gen. Stoge n 2.880 sq It 82 w 1, 480 sq 11 y FIRE DEPTTeal Sgftn (,Tp""s'282 sq tt _ STORAGE q ft 98o sqtt P 180 It IW ER j eo It 2% Large Sarvice Bay 2.880 5q It BUILDING sq sq m. A00 sq 40'-011 3,000 n 2% Lar o Service Bay �eao sg n EMPLOYEE PARKING Trash :iiIIIIC� it i n Fuel Island 0 20' 50' 100' Hyde Park CM Option 2:,, __j ki -CM facility with 8 large bays, 8 small/ medium bays, 41,000 sq. ft. total ( including wash bay ) -Double loaded with interior drive -Some fire training apparatus to be relocated -Curbs removed on north end of site -Lack of queuing space for wash bay FIRE DEPT STORAGE BUILDING HASH BAY 5.081 sq ft m m O 9 m 3 CM 36,273 sq ft ai m m m oe�Ne�S ii g s,000 sq n E N.- N' EMPLOYEE PARKING 0 20' 50' 100' N Hyde Park CM Option 2:1-., U v CM Vehicle Circulation ------------- 1. To Maintenance Bay 2. Fuel 3. Wash 4. Exit FIRE DEPT STORAGE BUILDING i,-- - - - - -- � � ''► Fuellsland WASH BAY 3I 0 20� 50' 100' 5,081 sq k �' x ``J �� ► _ -- I �z I N I cm I 36,273 sq ft — W � r r m Qw v m m m m EQ��asm W S c - 3,000 sq N N� E- E' E'" i:g agv _ _ ` ti ti A gym � I I EMPLOYEE PARKING 1 Hyde Park CM Option 2:,.,, Turning Radius Study -CM facility with 8 large m r r bays, 8 small/ medium _ bays, 41,000 sq. ft. total WASH BAY ( including wash bay) s,os1 sq n -Double loaded with interior drive CM Z a 36,273 sq ft FIRE DEPT N$g mF c Admin. a,000sgn STORAGE - N^ �' - =qv N' N' BUILDING tn' EMPLOYEE PARKING o � n Fuel Island 0 20' 50' 100' N Hyde Park CM Option 3:1) "� 1 1: ' -CM facility with 8 large bays, 6 small/ medium bays, 34,000 sq. ft. total ( including wash bay ) -Admin. On upper level above storage necessary -Smaller overall facility -No central drive lane, so less diagnosis area, less flexibility FIRE DEPT STORAGE BUILDING VEHICLE STAGING CM 25,525 sq ft Admen N� m m m m m m "m a� n 3 EMPLOYEE PARKING o l= n Fuel Island 0 20' 50' 100' Hyde Park CM Option 3 CM Vehicle Circulation `� C 1. To Maintenance Bay 2. Fuel 3. Wash 4. Exit FIRE DEPT STORAGE BUILDING VEHICLE STAGING t I Fuel Island I 0 20' 50' 100' CM o 25,525 sq ft 9 N tD ZJ m� fD tv 19 �F Lv f0 = m �C my m A� m m 41 �m a 3 1 ' U 1 EMPLOYEE PARKING Hyde Park CM Option 3:,, Turning Radius Study -CM facility with 8 large bays, 6 small/ medium bays, 34,000 sq. ft. total ( including wash bay ) -Admin. On upper level above storage necessary FIRE DEPT STORAGE BUILDING VEHICLE STAGING CM 25,525 sq ft Ad— Abo 4.021 aq n �g 9$ 2 m ! ayV' LLN� EMPLOYEE PARKING 0 0 n Fuel Island Memorandum 320 East McCarty Street • Jefferson City, Missouri 65101 • P: 573.634.6410 • F: 573.634.6562 . www.ieffersoncitymo.gov Date: January 10, 2022 To Public Works and Planning Committee From: David Bange P.E., City Engineer Subject: Capital Improvement Program, Projects Remaining in Sales Tax G City Staff would like to update the Committee on the status of the remaining projects within Sales Tax G. The projects are organized by the various categories listed in the sales tax. City/County Joint Projects • MSP The MSP project will see to the construction of Chestnut Street from Capitol Avenue to the northern end of the prison property and the development of building pads in addition to connecting to the private hotel/conference center development occurring on the property. The start of design is awaiting the outcome of the negotiations with the State and the hotel developer. • Grant Street This project is set to go out for bid on January 24th. The project includes the sidewalks along Grant Street from McCarty to Edwards Street and a continuation of the sidewalk to the trail system at the pool. It also includes the replacement and addition of stormwater inlets and the reprofiling of the street to correct drainage problems at Hough Street. All of Grant Street will receive an asphalt overlay and it will be widened to allow of a central island on the approach to the park. Construction is projected to begin in March. Stormwater • Norris Drive A box culvert is being built to replace two large diameter pipes that were collapsing under the street. The project started in November and is planned to be complete in the spring. This project is being partly funded by a $243,750 grant through the SEMA. • Pipelining This project is under contract and we are awaiting the necessary weather conditions to undertake this work. It includes the rehabilitation of pipes on Meier, Castle, Allen and Lincoln Streets. We will also be proposing a change order to this contract to add pipes on Amazonas Drive and Alameda Court. U:\PublicWorks\Engineering\dbange\PUBLIC WORKS & PLANN I NG\2022\1 -2022\S ales Tax H CIP plan.docx Memorandurn • Douglas Davis Design is complete and when the system is constructed will collect and divert water away from the properties in the 100 block of Douglas and Bolton which have experienced floding. We are awaiting the approval of the contract document from DNR who is participating in this project through a $124,019 grant. • Major and Isom This project would replace deteriorating stormwater systems in two locations on Major Drive and one on Isom. These projects would look to address street stability and home flooding issues • Southwest and Edgewood The existing pipes are failing under Southwest Boulevard at Edgewood. In order to preserve the street this piping system would be replaced. Sidewalk • Adams Street Brought about by discussions of safety of pedestrians on their way to and from the Hickory Street Park and Thorpe Gordon School this project will look to construct and reconstruct sidewalks on Adams Street from Dunklin to the new JC High School athletic facilities near Union Street. Funding for this project is primarily coming through CDBG dollars and will be supplemented by sidewalk monies within the sales tax. We look to have this project under construction by this summer. • Vieth Drive We are completing the design of a sidewalk along sections of Vieth Drive between Southridge Drive and Plymouth Rock. This project takes advantage of the sidewalks built by Water District #2 along their property frontage and will complete the sidewalk connection from Southridge Drive to Cedar Hill School. We look for this project to be completed by summer's end. Local Roads • JC Loop With the funds remaining within this category we look to add the pavement marking and wayfinding signage needed to complete the JC Bike Loop. Agreements with MoDOT and with Cole County will be required as the route runs along portions of Route C which is controlled by the State, and Southridge Drive and County Park Road which are in the County. We would look to have this in place by the fall. If you have any questions or concerns I can be reached at 634-6433. UAPublic Works\Engineering\dbange\PUBLIC WORKS & PLANNING\2022\1-2022\Sales Tax H CIP plan.docx 1/7/2022 Jefferson City Memorial Airport CIP Update Public Works and Planning Committee January 13, 2022 Airport Five Year Capital Improvement Program (CI P) Five - Year Capital Improvement Program (CIP) Aup-N— 1EFFEIt5OA' CTTYNILMORLAL AOTPORT TelryL:cr S: 5?3.6316450 Dare F.eP. e4 N-..be 30. 2021 Pr..le<r D—,,pu. FweLce Sour F5' 202_ FV 2023 F7' 2021 FY 2025 F1. 2026 An TraBK Control Taxer - Land Federal 5 I4. ib 68 Acquodlon and Ennronmenlal Sate Local S 15.940.56 Ass ....e 1 Total S 5 S Federal S 4,300,12159409.648 00 Ae TraBK Control Tower State Local S 477,792.00 Total S 4,777,920.00 S S S 5 Federal S 3,412,34801 Tazrway A South Reconstruction State and Taarway A North Lghting Local S 381.372.00 Total 5 S 3.813.720.00 S 5 5 Federal Construct SRE I ARFF Bwlding State Local S 169.SIM 00 Tool S S S I698.800OD S 5 Federal 5 54,171,DO Runway 12 REILs Replacement State Local $ 6,019.00 Total 5 5 $ 60. 190.00 S S Federal $ 488. .00 Runway 9-27 Threshold State Reldcatm (Design) Local $ 54.280.00 Total S 5 S S 542.80000 5 Federal $ 5.471.424.00 Runway 9.27 Threshold State Relocation (Constructan) Local S 6D7.936.00 Total 5 5 S $ S 6.079.360.00 ederal 5 4.443.596.68 S 3.432.348.00 S 1.58 . 1.00 5 488.520.00 5 SA71.424.00 TOTALS Stare 5 - S - S . 5 - S Local 5 491.732.96 $ 381,37100 S 175.899.00 S 54.280.00 S 607.936.00 Taal 5 4.93'.329-64 S 3.813.720.00 S 1.758.990.00 S 542.800.00 S 6-079.360.00 1 1/7/2022 Funding Opportunities • Half Cent Capital Improvement Sales Tax (Used for Matching Dollars) • Grant Opportunities • FAA Airport Improvement Program —JEF allocations is $150,000/ year (90%/10%) • FAA Apportionment Funds — Competitive (90%/10%) • Bipartisan Infrastructure Law (BIL) funding Bipartisan Infrastructure Law (BIL) Aviation Portion How the FAA Will Invest the Funding AIRPORT TERMINALS $15B AIRPORT To replace aging terminals, increase terminal energy INFRASTRUCTURE efficiency and accessibility, and more. For airport projects that increase safety and expand capacity. $rJB AIR TRAFFIC FACILITIES To replace facilities and equipment and improve safety, security, and environmental standards. P) 1/7/2022 Jefferson City's Yearly Allotment of the $1513 Airport Infrastructure First -Year Airport Infrastructure Grant Funding Amounts for FY22, $2.89 billion has been made available to U.S. airports around the nation. �rnorial Potential Control Tower Funding Opportunity Bipartisan Infrastructure Law - Air Traffic Facilities Air Traffic Facilities $5B & Equipment The Bipartisan Infrastructure Law provided $5 billion to replace Air Traffic facilities, update and upgrade equipment including Iand inp, and navigational aids, and improve safety, security, and environmental standards at facilities. Moliav Stay tuned for more information or subxribe for the latest updates. 3 1/7/2022 Bipartisan Infrastructure Law - Airport Terminals Through the Bipartisan Infrastructure Law, $5 billion has been granted to provide competitive grants for airport terminal development projects that address the aging infrastructure of the nation's airports. This grant program would be for on -airport rail access projects and projects for relocating, reconstructing, repairing, or improving an airport -owned air traffic control tower, to projects that increase capacity and passenger access; projects that replace aging infrastructure; projects that achieve compliance with the Americans with Disabilities Act and expand accessibility for persons with disabilities; projects that improve airport access for historically disadvantaged populations; projects that improve energy efficiency, including upgrading environmental systems, upgrading plant facilities, and achieving Leadership in Energy and Environmental Design (LEED) accreditation standards; projects that improve airfield safety through terminal relocation; and projects that encourage actual and potential competition. Airport Five Year Capital Improvement Program (CIP) =irst Priority �I for BIL Funding -*I Five - Year Capital Lrq)roveuient Prograui (C-IP) JEFFERSON CITE' NILMORIAL AIRPORT T<kphoa<N. 573434-6450 Due N p,a N—b<r M 20:1 Prq<cr D<. y". F-1- S- Fy'20`_ Fy'20.3 F7':02J F1'20_`5 FS-2026 A., TraBq Control Tower - LanU octant s 14_ a Acgwsdlon and Ema nn tal Stale Local S Assessment Total ederal 9.940.56 S 169409.64 s S 5 4.300.128.00 Ab Trail. T.—tale Control owl S 477.792,00 otal $ 4.777.920.00 $ S s S Mewl 3.432.348 00 Ta<rway A Saulh RaconsWction Slate and Taxiway A North Lgh4rg Local s 381,372.00 Total S S 3.813.720.00 S S S Moral Construct SRE / ARFF Bnddmg tale owl S 169.880.00 otal S S s 1.698.800.00 s S Runway 12 REILs Replacement " 'al Slate Lowl 6 54.171,00 5 6.01900 To1a1 S S S 60,19000 $ S ad.,. S 488,52D00 Runway 9-27 Threshold Slate Relocation (Design) Local $ 54.280.00 Total S s s 542.80000 S Federal S 5.471424.00 Runway 9.27 Threshold Slate Relocation (C—tructwn) Local S 607.936.00 Total S s s S S 6.079.36000 ederal S 4,443.59668 3.432.348.00 1.583.091.00 S 498.520.00 S 5.471.424.00 TOTALS state S . s . 5 . 5 - s Local S 493,732.96 S 381.372.00 s 175.899.00 s 54.280.00 S 607.93"o Total S 4,937,329.64 S 3,813,720.00 S 1.758.990.00 S 542.800.00 S 6.079.360.00 4