HomeMy Public PortalAboutr 05:284
- ¿Ré£wlutian af t~é ~arau£11 af @nrtéret1 tJ + 3J +
No.
05-284
Date of Adoption
September 22, 2005
1\
AUTHORIZING A PROFESSIONAL SERVICES
CONTRACT FOR ENGINEERING SERVICES
WITH T &M ASSOCIATES
WHEREAS, the Borough of Carteret is in need of professional engineering
services related to the preparation of a Redevelopment Traffic Impact Analysis
Industrial Road Transportation Master plan, Phase II; and
WHEREAS, the Borough's consulting engineers, T & M Associates possess the
requisite experience and expertise to provide said services; and
WHEREAS, T & M Associates has submitted a proposal to provide said services
at a total cost not to exceed $26,435.00; and
WHEREAS, the Mayor and Council have reviewed said proposal; and
WHEREAS, the Chief Financial Officer has certified that funds are or will be
available for said purpose.
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the
Borough of Carteret, County of Middlesex, State of New Jersey, as follows:
1. The proposal from T & M Associates for engineering services
delated to the preparation of a Redevelopment Traffic Impact
Analysis Industrial Road Transportation Master plan, Phase II,
at a total cost not to exceed $26,435.00, at the hourly rate set
forth in its existing contract with the Borough is hereby
approved;
2. This action is approved as an award of a professional services
contract.
-I
Adopted this 22nd day of September, 2005
and certified as a true copy of the
original on September 23,2005.
KATHLEEN M. BARNEY, RMC, CMC
Municipal Clerk
LINDA A. RIVERA,
. . .
~
- COUNCILMAN YES NO NV A.B. COUNCILMAN YES NO NV ,~
BELLINO X NAPLES X
DlAZ X RIOS X -- -.
KRUM v SITARZ X - - -'
x - Indicate Vole A B - Absent NY - Not Voting XOR - Indicates Vote to Overrule Velo
Adopted at a meeting of the Municipal Council September 22, 2005
C§Z~ o. ~
(hø;t. CLERK
RECORD OF COUNCIL VOTE
~J.Jrau£11 af <!1xrf£ná
MIDDLESEX COUNTY
;Nrfu ;¡¡ rrsr~
TEL (732) 511';3800
FAX (732) 541-8925
OFFICE OF
\THLEEN l\1. BARNEY. HMC/CJ\IC
]\IUNICIPAL CLERI{
61 COOKE AVENUE
CAltTERET, NEW JERSEY 07008
Datc_S~temb~.L20, 2005
TO: Patrick J. DeBlasio, Treasurer
Borough of Carteret
REQUEST FOR CERTIFICA TION OF A V AILABLE FUNDS:
--[4- f1
For: Professional Engineering Services, Re: Services related to the preparation of
Rørløvølnpm..nt Tr1'lffi" ImQact __Analvsis_''rndustriBl Road Master Plan, Phase IT
Name of Account: ÓS -..< ["'/
A )UNT TO BE ENCUMBERED:
$26,435.00
~91~()
/KA: HLEEN M BARNEY,
Municipal Clerk
--
CERTIFICATION OF AVAILABILITY OF FUNDS
I, Treasurer of the Borough of Carteret, do hereby certifY that there are sufficient funds available in the current
budget to enable the Municipal Council to authorize the entering into a contract between the Borough of Carteret
and:
--1~""
A'~",-,
The funds available for this contract are in the Budget, in the account of:
--(- I :S - :S b - '3 '{ (, - ')...<' b
in :h<. amount of:
')- ¡, '-n'-;:p-
I '
By'This certification, I have hereby encumbered the above named accou
Date: Cì / J-ol?c
KMB/
f2/ j 1 t
EL~EVEN TlhjD,l\l_L RO,Ä.D, r\¡1ID[)~,=TO\VN, r\JJ 07748-2792
(732) 67-1-6,-100 * fax 671. "/365 - \V\,.\'V'.i tandmassociates.corTì
~~~
-eM
ASSOCIATES
CART-01270
sePtem~, 2005
ç ;1
'\,
-
:2.(, ,4 3,S
Mayor Daniel J. Reiman
Borough of Carteret
61 Cooke Avenue
Carteret, New Jersey 07008
, '
.
Re: Redevelopment Traffic Impact Analysis
Industrial Road Transportation Master Plan, Phase II
Dear Mayor Reiman:
As requested, we have prepared the following Scope of Work for the extra work requested. We
have reviewed the potential redevelopment sites and have reviewed the Traffic Study, Five
Intersections on Roosevelt Avenue, dated July 31,2001.
The purpose of this extra work is to assess the traffic impacts of the redevelopment areas in the
vicinity of Roosevelt Avenue and determine the impact to the Roosevelt Avenue bridge over the
NJ Turnpike, in relation to the Industrial Road connection to the Turnpike.
Scope of Work
The following tasks describe the Scope of Work involved in:
Task I - Define the Studv Area Boundaries/Develop Base Map
The area of focus of the work will include:
· Roosevelt Avenue (between Driftway and the Woodbridge border)
· Minue Street from Roosevelt Avenue to Federal Boulevard
· Federal Boulevard from Blair Street to Minue Street
· Blair Street from Federal Boulevard to Roosevelt Avenue
The following intersections will be included in our analysis:
· Roosevelt A venue with Minue Street
· Roosevelt A venue with Pekola Terrace/Frederick Street
· Roosevelt Avenue with Orchard Street
· Roosevelt A venue with Blair Road
· Minue Street with Bryla Street/Federal Boulevard
· Blair Road with Federal Boulevard/Omar Avenue
· Blair Road with Milik Street
--------~-_._-.--_.-------~---~--.---,--------_._---_.--~.._-"'
"." ".-.--.-- --_._-~---
-----------...---- .
S~P-19-2005 15:21
T M RSSOCIATES
7326715400
P.02/02
-aM
AssOelATF.I;
Sheet 2 of 5
CART-01270
September 15,2005
Le; Mayor Daniel Reiman
Borough of CartéTet
Re: Rede~elopment Traffie Impaet Analysis
Industrial Road T=portation Mæter Plan, Phase II
Diagrams will be drawn for use in summarizing the traffic data and identify the potential
development sites within the study area,
Deliverable: A digital image of the most recent aerial photograph of the study area will bc used
to establish the street names, existing properties, existing traffic control devises and identify he
boundary of the study area. This aerial photograph will be developed àS the "'bàSe map" and
used throughout the study to summarize appropriate information.
Task 2 - Review of Existim! Reports and Plans
Reports and/or plans provided by the Borough will be reviewed in order to assess the future
traffic condition along the study roadways. The future conditions wi]] be based upon the
following redevelopment parcels:
. 5-Acre Site on Roosevelt between Orchard and Pekola
, 55-Acre Site on Roosevelt between Pek.ola and Minue - Shopping Center (550 KSF Retail)
-. 90-Acre Site along Federal from Minue to Blair - 1,400-UlÚt, age-restricted vi1lage with 9-
hole golf course or a pharmaceutical campus
. 33-Acre Saint Gobain Site
No new traffic data will be collected under this project. The data containcd within available
reports wiJl be summarized in graphical fonn to be used in developing the future traffic
conditions.
Deliverable: A chapter of the final report will be prepared with tables and figures to summarize
the information gathered in this task, This chapter will be prepared in draft fonn for review and
comment and ultimately incorporated as a chapter in the final report.
Task 3 - Review Existinlz Transtlortation Deficiencies
The existing transportation operational analyses of the capacity of the existing transportatíoJ1
infrastructure as prepared by others for various studies throughout the study roadway network
will be reviewed. We will SUInII1IIrize the existing capacity and accessibility of the corridor. The
recommended capacity improvements at various locations throughout the study roadway network
ill be identitied. Our focus will be on the Roosevelt Bridge over the NJ Turnpike and the
-mtersection of RooseveltIMinue/Post. We will detennine the capacity deficiencies of these parts
of the intÌ'astructure.
Deliverable: A chapter of the report will be prepared to summarize the findings of this task. A
draft will be prepared for review and comment. The final version will address comments and be
included as a chapter in the final report document.
TOTAL P.02
-nM
ASSOCIATES
Sheet 3 of 5
CART-01270
September 15,2005
Le: Mayor Daniel Reiman
Borough of Carteret
Re: Redevelopment Traffic Impact Analysis
Industrial Road Transportation Master Plan, Phase 11
Task 4 - Traffic Impacts of Future Development Scenario
The traffic impacts of the future development scenario will be assessed. We will meet with the
Planner, Beacon, to discuss the proposed redevelopment scenarios and gather and review
information about the planned and proposed developments in the study area. The information
that will be summarized from these reports will include proposed square footage by land use
type, number of residential units, proposed completion year, any proposed traffic operation
modifications or improvements, trip distribution, and vehicular trip generation reductions due to
other transportation modes. We will use the Institute of Transportation Engineers 7'h Edition of
the Trip Generation manual to determine the weekday AM and PM peak hour trips generated by
each site. We will distribute the trips generated by each of the developments along the study
roadway network.
Deliverable: The findings of this task will be prepared in draft format for review and comment.
The final version will address comments and be included as a chapter in the final report
document.
Task 5 - Adiacent Development Impacts
Other developments outside the immediate study area that wouJd create a traffic impact on the
future traffic conditions within the study area will be identified. In order to account for these
developments, a background growth factor will be applied to the existing traffic volumes to
account for other development trips passing through the study area. This background growth
factor would be applied to the through traffic along study roadways to account for the trips from
these adjacent developments outside the study area passing through on Roosevelt Avenue.
Deliverable: The findings of this task will be prepared in draft format for review and comment.
The final version will address comments and be included as a chapter in the final report
document.
Task 6 - Future Roadwav Access Scenario
The planned and proposed roadway improvements within the study area will be identified. This
will include the proposed improvements to the Turnpike interchange. We will analyze futurc
traffic with these improvements. Based upon our analysis ofthc future traffic under these interim
,- improvement conditions, additional recommendations will be made for the configuration and
traffic control of the study interscctions.
Proposed roadway and intersection improvements will impact the overall circulation and traffic
distribution patterns within thc study area. Thcse improvements will be accounted for in thc
future traffic conditions. Traffic flow diagrams will bc created to show the distribution of the
trips by the planncd and proposcd developments under thc future roadway configurati ons addcd
to thc cxisting base traffic conditions.
-aM
ASSOCIATES
Sheet 4 of 5
CART-01270
September 15, 2005
Le: Mayor Daniel Reiman
Borough of Carteret
Re: Redevelopment Traffic Impact Analysis
Indusrrial Road Transportation Master Plan, Phase 11
Deliverable: The findings of this task will be prepared in draft format for review and comment.
The final version will address comments and be included as a chapter in the final report
document. Traffic flow diagrams will be prepared. These diagrams will summarize the future
traffic volumes for the weekday AM and PM peak hours.
Task 7 - Recommendations
Based upon the results of the previous tasks, we will develop and prioritize the recommended
improvements based upon the traffic demand. The proposed improvements will be categorized
into "near-term" and "long-term" solutions. The "near-term" solutions will be those
recommended improvements that are already approved, funded and designed, but will not be
completed within the next 5 years. The "long-term" solutions are considered to be completed in
more than 10 years and may require right of way acquisition and may require special permits.
We will use tax maps provided by the Borough to evaluate the available roadway widths and
designate which properties will be impacted. We will quantify these improvements by category.
The impacts of each category of improvement on the overall roadway network will be quantified
with a Level of Service analysis. The analysis developed for this project will be limited to the
weekday AM and PM peak hours. Traffic flow diagrams will be created to summarize the
existing traffic volumes for the typical weekday AM and PM peak hours. The result of this task
will be a compilation of the "near-term" and "long-term" transportation solutions and the
impacts of these improvements on the overall transportation circulation network.
The benefits of the recommendations will 1) serve the transportation demand, 2) balance system
capacity with travel demand, and 3) provide effective connections to the required transportation
system.
Deliverable: A report chapter summarizing the findings of this task will be prepared in draft
format for review and comment. The final version will address comments and be included as a
chapter in the final report document.
Task 8 - Cost Estimates
We will develop cost estimates for the proposed improvements recommended in the report. The
cost estimates will be based upon our knowledge and past experience with similar types of
projects. Percentage of the entire cost estimate will be used to estimate the cost of right of way
acquisition, drainage, design, permits, site clearing and utility relocation.
Deliverable: A chapter of the report including the cost estimate tables summarizing this task will
be prepared in draft format for review and comment. The final version will adàress comments
and be included as a chapter in the final report document,
~M
I~
ASSOCIATES
Sheet 5 of 5
CART-01270
September 15, 2005
Le: Mayor Daniel Reiman
Borough of Carteret
Re: Redevelopment Traffic Impact Analysis
Industrial Road Transportation Master Plan, Phase 11
Task 9 - Develop Report
The product of the work effort described in this Scope of Work will be summarized in the report.
The report will contain summaries of the data collected and analyzed as well as the findings and
recommendations. The report will contain graphics, which show the existing conditions and the
recommended improvements. A draft report will be prepared for review and comment. The
final report will address the comments. We will meet with the Borough representatives to
discuss and finalize the document.
Deliverable: The previously prepared technical memorandum will be formatted as chapters in the
final report document. Twelve hard copies of the final report and 20 copies of a CD-ROM with
the portable document format (PDF) files will be prepared for distribution.
Fee and Schedule
The estimated fee to complete this Scope of Work will not exceed $26,435. We propose to
invoice the work on a monthly basis and bill on an hourly basis in accordance with our annual
contract rate schedule.
We anticipate that the work outlined in this Scope of Work will be completed within three
months of receiving authorization to proceed.
If you have any questions concerning the above outlined Scope of Work and Fee Proposal,
please call.
Very truly yours,
T &M A~OCIA T(? .
f) ){to--i, ~--~c.-:t-
DONALD J. NORBUT, PE, CME
CARTERET BOROUGH ENGINEER
LDK:sef
cc: Patrick DeBlasio. CFO
Kathleen Barney, Clerk
Robert Bergen, Attorney
H:\Cart\O 1270\Com:spondcncc\LDKlndustrRd _ WCar! _ Redcvel_ Extm.doc
Affidavit of Publication
Publisher's Fee $14.96
Affidavit Charge $25.00
State of New Jersey} 55.
MIDDLESEX COUNTY
Personally appeared
ANNETTE MADAMA
of the Home News Tribune, a newspaper printed In Freehold, NJ and published In NEPTUNE, In said
County and State, and of general circulation In said county, who being duly sworn, deposeth and salth
that the advertisement of which the annexed Is a true copy, has been published In the said newspaper
1 lONE) times, once In each Issue, as follows
9130105.
MY COl.
'~T,~ :v
A.D., 2005
,¡Ff.~! 0 .lnfw~n~1
sworn and subscribed before me this
30th day of september, A.D., 2005
BOROUGH Of CARTERET
NOTICE OF
CONTRACT AWARDED
The Borough of Carteret
has awarded a contract
without competitive bid-
ding as a professional
service pursuant to
N.J_SA 40A:11-5 (1) (a).
This contract and the
~~~ol~~~rabi~t?~~iZ~~tli~
Inspection in the office
of the Municipal Clerk.
Awarded to:
T&M Associates
Services: Professional
Engineering Serviçes,
Re: Services related to
the preparation of Rede-
A~I~I~~:n:"~~~~:falm¡f~;d
~raa~s~h~;:tlfn Master
Resolution # 05-284
Cost: Not to Exceed
$26,435.00
Kathleen M. Barney,
Certified Municipal
Clerk
(S14.96) 54663
BOROUGH OF CARTERET
20 COOKE AVENUE
CARTERET, NEW JERSEY ()7008
,,>
THIS AGREEMENT: made this 22nd of September 2005
By and between: T &M Associates
II Tindall Road
Middletown, NJ 07748
And the Borou2h of Carteret, a municipal corporation, having its
Principal office at the Borough Hall 61 Cooke Avenue, Carteret, New Jersey,
As per Resolution Number 05-284.
THE CONTRACTOR does hereby agree to perform the tollowing
PROFESSIONAL SERVICE FOR RELATED PREPARATION REDEVELOPMENT
FOR INDUSTRIAL ROAD TRANSPORTATION MASTER PLAN, PHASE II
TRAFFIC IMPACT SERVICE.
NOT TO EXCEED $26,435.00.
according to the terms set forth in RESOLUTION.
THE BOROUGH does hereby agree to pay the Contractor the sum set
forth in Resolution.
IN WITNESS WHEREOF, the parties hereto have hereunder set their hands and seals or
caused these presents to be signed by their proper corporate officers and their corporate
seals to be hereto affixed, the day and year written above.
BY 1) \~~
WITNESSETH BY:
Fo"h, 7I¿5( 9
~~
BOROU,GH OF CARTERET
TITLE:
BY:
~
$I~
at leen M. Barney U
Municipal Clerk