HomeMy Public PortalAbout08-0142 Dowell CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 04 -1 -2008 PERMIT #: 080142
WORK DESCRIPTION SHEETROCK/INSULATION/WINDOWS
WORK LOCATION 1 SALT MEADOWS
OWNER NAME BILL DOWELL
ADDRESS 1 SALT MEADOWS
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME CATSKILL BUILDERS, INC.
ADDRESS 210 CATALINA DR.
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 48.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $3,500.00
TOTAL BALANCE DUE: $ 48.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. if this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: liCl/r)-14,se)
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
MAYOR CITY MANAGER
Jason Buelterman � ,- 46 Diane Schleicher
CITY COUNCIL CLERK OF COUNCIL
Shirley Sessions, Mayor Pro Tern ' A Vivian 0. Woods
Wanda D. Doyle
Bill Garbett '"' / CITY ATTORNEY
Frank Schuman, Sr. r Edward M. Hughes
Kathryn Williams r °ry t + . ,
Paul Wolff ° - ----
CITY OF TYBEE ISLAND
William A & Kaye Cowart Dowell
PO Box 10133
Savannah, Georgia 31412
Date: August 8, 2011 Telephone Number - 912 - 786 -5567
Reference: Address Change / Correction: # 706 Polk Street
It has come to our attention that there is an Address Numbering problem in the block in which you
reside. This causes a Public Safety problem for the 911 dispatch of Emergency Services (Fire, Police and
EMS).
Therefore it is necessary to change / correct your address.
Please be advised that effective immediately your address will be changed:
From: # 706 Polk Street aka # 4 Old Highway 80 aka # 2 Woodbine TO: #307 Polk Street
Tybee Island Code of Ordinance Section 54 -2 Building Number Placement:
All building numbers shall be placed on the outside of the building in a conspicuous place with open
view to the public. Please attach the correct number on the outside of your house so it can be clearly
seen from the street.
We will notify the following:
Tax Assessor, Water Department, Planning & Zoning Department, Electric Company, Fire and Police
Departments
** PLEASE NOTE: A Landline Phone Number is required to change the address within the 911 Emergency
Dispatch Systems. If there is a Landline Phone at this residence and is either not listed above or incorrect
please contact me.
Please notify your Insurance Company, Phone Company and any other agencies you deem necessary.
We regret any inconvenience this change may cause you but we know you will recognize the importance
of this change / correction.
fi g_ 42.
Jimmy Brown
icbrown @citvoftvbee.org �� ' O ®0 Z
PO Box 2749
Tybee Island, GA 31328
912 - 786 -4573 X 112
FAX - 912 - 786 -5330
* **
P.O. Box 2749 — 403 Butler Avenue, Tybee island, Georgia 31328 -2749 * Certified
(866) 786 -4573 — FAX (866) 786 -5737 , City of ,
www.cityoftybee.org �,t�� LL
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
OF W
Location: I Sa. I+ d o PIN #
NAME ADDRESS TELEPHONE
Owner No. Q, .e i t S 0+ 5
Architect
or Engineer
Building
6:6-5\c,,\ \>
Contractor
(Check all that apply)
Repair ❑ Residential n Footprint Changes
n Renovation ❑ Single Family n Discovery
H Minor Addition n Duplex ❑ Demolition
n Substantial Addition ❑ Multi- Family
H Other ❑ Commercial
Details of Project: few' ov-e_ (0-) O % a S ao c &- 4 .a„ .s 4 -. flee( .
4(e_ w t 62 e �f
�17 II c� (LeekGCc- taw-,s C.c+r ' + Po-e t�.. 10 S+--et S
e i t A 'E'^1( omiS W t-AL. O,P. 5'D A.ow
r •
Estimated Cost of Construction: $ 35 co
Construction Type '2_ (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer _
Proposed use: (t-c
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms 3 # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking spaces L
Trees located & listed on site plan
Access: x , )
Driveway N' NJ (ft.) With culvert? 4- With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories 9 Height ti Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by (I ac4-o by means of -O lit dump 4 r - ; (,
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: I -- Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit 33 ,
Code Enforcement Officer Inspections S .
Water /Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL mod,
WT. OF
NATU . FEE 1%
Ri&Ct»7CE$
totl" ,
GEORGIA
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Proiects Involving Demolition. Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
DA
Undersigned( ( Date
Printed Name / p
Office Use Only:
Project Address:
Permit Number: