DEPARTMENT OF THE ARMY
WALLA WALLA DISTRICT, CORPS OF ENGINEERS
BOISE REGULATORY OFFICE
304 NORTH EIGHTH STREET, ROOM 140
BOISE, IDAHO 83702-5820
May 10, 2002
Operations Division
SUBJECT: NWW No. 022100320
Mr. Dan Pillard
City of McCall
216 East Park Street
Mc Call, ID 83638-1065
Dear Mr. Pillard:
Your proposed discharge of fill material into 0.49 acre of
wet meadow wetlands to improve the City of McCall golf course is
authorized under the terms and conditions of Department of the
Army Nationwide Permit (NWP) Number 42 (33 CFR 330, Appendix A).
This authorization requires that your project is constructed as
shown on the enclosed drawings and complies with the enclosed
nationwide permit and the special conditions listed below. Your
project is located in Sec. 10, T.18N., R.3E., B.M., Valley
County, ID.
a. Mitigation shall be constructed concurrent with project
construction.
b. Applicant will provide detailed mitigation construction
drawings, which show the bottom elevation the mitigation areas
are proposed to be graded down to. These drawings shall be
provided to the Boise Regulatory Office 30 days prior to any
ground disturbance activities.
c. Applicant shall provide a detailed plan describing how
the mitigation area is to be protected over the long term (i.e.,
deed restrictions, covenants etc.) and managed. The plan shall
include those practices which are prohibited and those that the
city would like to be able to do within the mitigation area. The
plan shall address how weeds are to be controlled until the
wetland vegetation becomes established. This plan shall be
provided to us by July 31, 2002.
d. A monitoring report shall be provided to us at the end of
the first growing season and for the next two consecutive years
by December 31 of each calendar year. The monitoring report
shall include a minimum of those items described in the
Mitigation Plan dated April 2002 and a summery describing how the
mitigation areas are progressing towards meeting the established
-2-
success criteria. At the end of the third growing season, a
field review shall be conducted to determine if additional
monitoring is required or if changes are necessary to ensure
success.
Please carefully review these conditions, including the Water
Quality Certification conditions. If you cannot meet these
conditions, this NWP verification is not valid. Your project
must comply with the Idaho Water Quality Standards as stated in
IDAPA 58.01.02. If you have any questions about the Water
Quality Certification conditions, please contact Jack Gantz, at
208-373-0599. If you change the project description in your
permit application, this NWP may not be valid and you should
contact us before starting work. We have enclosed a Compliance
Certification for you to sign and return when you have completed
your project.
This verification is valid for 2 years from the date of this
letter. If you start or are under contract to start this
activity before this date, you will have an additional 12 months
to complete the activity under the present terms and conditions
of this NWP.
This authorization applies only to Department of the Army
permits administered by the Corps of Engineers. Your project may
also require permits from other Federal, state, and local
agencies.
If you have any questions concerning this authorization or
Corps jurisdiction, please feel free to contact me at (208)
345-2154. A copy of this letter is being sent to: Jim Fronk,
Secesh Engineering Inc., 335 Deinhard Lane, Suite 1, McCall, ID
83638; Stephen E. West, Regional Administrator, Idaho Department
of Environmental Quality, 1445 North Orchard, Boise, Idaho
83706.
Enclosures
Sincerely,
Greg r . Martinez
Regulatory Project Manager