HomeMy Public PortalAbout08-0285 Hickox 1 111 t
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 06 -9 -2008 PERMIT #: 080285
WORK DESCRIPTION RELOCATE STRCTRE TO 30 MEDDIN
WORK LOCATION 11 NAYLOR AVE
OWNER NAME RODNEY HICKOX
ADDRESS PO BOX 1903
CITY, ST, ZIP CLAYTON GA 30525
PHONE NUMBER 706 -782 -5176
CONTRACTOR NAME BRASWELL BROTHERS
ADDRESS P 0 BOX 438
CITY STATE ZIP SWAINSBORO GA 304001
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 0.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $1,000.00
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
nitp
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT -
.
`J J
d
(fig•
Location: lv Qy( � r L PIN #
v �
NAME ADDRESS TELEPHONE
Owner
T 0.5 S Afe;hiteet T � � 1 s (0 r 4, e +eer r; 46a) -
Building 1; rctS c(t – - 418
Contractor ? r v S S.
(Check all that apply)
I Repair ❑ Residential ❑ Footprint Changes
n Renovation El Single Family n Discovery
Minor Addition n Duplex ❑ Demolition
Substantial Addition n Multi - Family
pi Other ❑ Commercial
Details of Project: V e.' 0 < a- s f U C?`� 4
qieN+' S"--) ( 3o / \ ead:A. r )
Estimated Cost of Construction: $
Cons ction Type (Enter appro 'ate number)
(1) Woad Frame (4) Masonry (6) Other (please specify)
(2) Woos & Masonry (5) Steel asonry
(3) Brick -neer
Proposed use:
Remarks: /
ATTACH A COP ` OF THE ERTIFIED ELEVATION SURVEY OF LOT and complete the
following information las-.y on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parki spaces
Trees located & .fisted on site plan,
Access:
Driveway / (ft.) With lvert? With swale?
Setbacks: ront Rear Sides (L) (R)
# Stori s Height Vertical dist ce measured from the average adjacent
grade f the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances. FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit 6
Code Enforcement Officer Inspections
Water /Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
t f 0,J
r, n TOTAL
p■e-,)
b ��a
WE OF �,FE
HO UMA.
MAN= ; tir
GEORGIA
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Proiects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned Date
Printed Name
Office Use Only:
Project Address:
Permit Number:
Circa -1920s cottage to be a classroom for academic program at Tybee Light Station site
a . ,
-144.14-
i ,...
' ' '-'' ' ' = , 1 1 ro :se.* -4 %. - - E5 i . t, .. ' ' re) _
Photos by Richard Burkhart /Savannah Morning News
Braswell Bros. House Movers, Swainsboro Ga., prepare to move an old cottage onto a foundation on the grounds of the Tybee
Island Light Station on Wednesday morning.
Long t time to travel
a few blocks home
BY CHUCK MOBLEY ` t4'`�r1 '
't
912- 652 -0323 ' • , .f
charles.mobley @savannahnow.com 1 e I - _ h ,
"Just a little bit! About an inch," f. _ - _ '
Hugh Braswell yelled, holding up his `
10 10) 44 ,-
fingers to show exactly how far he _- ' , \ . _
wanted the smoke - belching Mack _ _ _
truck to back up. - _ . .
Once that was done, Braswell and
the rest of his crew finished placing the ,. �
i
small cottage on a temporary rig. The a -
humble, two -room wooden structure x 4 1
had sat on the sandy lot at the inter- " ''
section of Naylor and Wilson avenues °-"'' . .
on Tybee Island for several decades. l ' =:%` -' •' ?'
But on Wednesda y morning, 41111111011111111.a ng, with a wave of Braswell's hand, directing ---- �- .
the driver to go west on Naylor, the 10-
foot by 24 -foot cottage slowly moved Mitch Tyner and Philip Cheek use their weight to tighten a jack as Hugh Braswell,
toward a new address - the Historic center, and Bobby Eady prepare the old Tybee cottage for relocation from its
Tybee Island Light Station, where Cul- corner lot on Wilson Street and Naylor Avenue Wednesday' morning. -
len Chambers and Brent Armstrong
awaited its arrival.
Chambers, executive director of the Daufuskie- Geechee connection to added, and that represents a real
Tybee Island Historical Society, said the people who lived in this cottage," opportunity for students in the Sayan-
the cottaee once had been part of Fort Chambers said. nah- Chatham County Public School
began, and after holding up cake for him," Chambers said
Travel
traffic and attracting a fair of Braswell, who has moved
amount of tourist attention, several houses for the histori-
FROM PAGE 1C the cottage arrived on the cal society. "That's the most
grounds of the Light Station. trusted name in house -mov-
the program, which allows "This was just a piece of ing."
its participants to pursue col-
lege credits while still in high
school.
It will be a "phenomenal"
experience for the students, he
said, allowing them to conduct
research and undertake recon-
struction work in the field.
Lis) •
All those hopes and plans •
hinged, however, on Braswell's ›- c
ability to safely squeeze the cot- < o
tage through the narrow and
winding streets of the old Fort j w
Screven neighborhood. D
After pulling onto Naylor, 2'
Braswell directed an almost '—
immediate right turn onto
Moore Avenue, a gravel -lined
thoroughfare that was just wide
enough to accommodate the -
cottage and the truck. There,
eil l.1.111 4
the procession slowed to a
crawl as it moved cautiously
under overhanging wires, past
pine -tree branches and around
tight curves. 0 111111111111 1
None of this appeared to
disturb or rattle Braswell, a
deeply tanned, soft- spoken
•
man who said he had been
moving houses for more than
50 years.
14 4 .
"This is really just aggravat-
ing more than anything else
j '
because it'sso small," said
Braswell, who runs a Swains-
boro house - moving company
with his brother.
C 111111111 1 -
. Finally, more than two
hours after the procession
E
0
U
3
0
= CA
CO
F •
-
I
0
(
ft
f
tit