Loading...
HomeMy Public PortalAbout08-0285 Hickox 1 111 t CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 06 -9 -2008 PERMIT #: 080285 WORK DESCRIPTION RELOCATE STRCTRE TO 30 MEDDIN WORK LOCATION 11 NAYLOR AVE OWNER NAME RODNEY HICKOX ADDRESS PO BOX 1903 CITY, ST, ZIP CLAYTON GA 30525 PHONE NUMBER 706 -782 -5176 CONTRACTOR NAME BRASWELL BROTHERS ADDRESS P 0 BOX 438 CITY STATE ZIP SWAINSBORO GA 304001 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 0.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $1,000.00 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: nitp P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT - . `J J d (fig• Location: lv Qy( � r L PIN # v � NAME ADDRESS TELEPHONE Owner T 0.5 S Afe;hiteet T � � 1 s (0 r 4, e +eer r; 46a) - Building 1; rctS c(t – - 418 Contractor ? r v S S. (Check all that apply) I Repair ❑ Residential ❑ Footprint Changes n Renovation El Single Family n Discovery Minor Addition n Duplex ❑ Demolition Substantial Addition n Multi - Family pi Other ❑ Commercial Details of Project: V e.' 0 < a- s f U C?`� 4 qieN+' S"--) ( 3o / \ ead:A. r ) Estimated Cost of Construction: $ Cons ction Type (Enter appro 'ate number) (1) Woad Frame (4) Masonry (6) Other (please specify) (2) Woos & Masonry (5) Steel asonry (3) Brick -neer Proposed use: Remarks: / ATTACH A COP ` OF THE ERTIFIED ELEVATION SURVEY OF LOT and complete the following information las-.y on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parki spaces Trees located & .fisted on site plan, Access: Driveway / (ft.) With lvert? With swale? Setbacks: ront Rear Sides (L) (R) # Stori s Height Vertical dist ce measured from the average adjacent grade f the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances. FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES Zoning Administrator Permit 6 Code Enforcement Officer Inspections Water /Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager t f 0,J r, n TOTAL p■e-,) b ��a WE OF �,FE HO UMA. MAN= ; tir GEORGIA Permit Acknowledgement of Asbestos/Environmental Notification to Georgia EPD for Proiects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Undersigned Date Printed Name Office Use Only: Project Address: Permit Number: Circa -1920s cottage to be a classroom for academic program at Tybee Light Station site a . , -144.14- i ,... ' ' '-'' ' ' = , 1 1 ro :se.* -4 %. - - E5 i . t, .. ' ' re) _ Photos by Richard Burkhart /Savannah Morning News Braswell Bros. House Movers, Swainsboro Ga., prepare to move an old cottage onto a foundation on the grounds of the Tybee Island Light Station on Wednesday morning. Long t time to travel a few blocks home BY CHUCK MOBLEY ` t4'`�r1 ' 't 912- 652 -0323 ' • , .f charles.mobley @savannahnow.com 1 e I - _ h , "Just a little bit! About an inch," f. _ - _ ' Hugh Braswell yelled, holding up his ` 10 10) 44 ,- fingers to show exactly how far he _- ' , \ . _ wanted the smoke - belching Mack _ _ _ truck to back up. - _ . . Once that was done, Braswell and the rest of his crew finished placing the ,. � i small cottage on a temporary rig. The a - humble, two -room wooden structure x 4 1 had sat on the sandy lot at the inter- " '' section of Naylor and Wilson avenues °-"'' . . on Tybee Island for several decades. l ' =:%` -' •' ?' But on Wednesda y morning, 41111111011111111.a ng, with a wave of Braswell's hand, directing ---- �- . the driver to go west on Naylor, the 10- foot by 24 -foot cottage slowly moved Mitch Tyner and Philip Cheek use their weight to tighten a jack as Hugh Braswell, toward a new address - the Historic center, and Bobby Eady prepare the old Tybee cottage for relocation from its Tybee Island Light Station, where Cul- corner lot on Wilson Street and Naylor Avenue Wednesday' morning. - len Chambers and Brent Armstrong awaited its arrival. Chambers, executive director of the Daufuskie- Geechee connection to added, and that represents a real Tybee Island Historical Society, said the people who lived in this cottage," opportunity for students in the Sayan- the cottaee once had been part of Fort Chambers said. nah- Chatham County Public School began, and after holding up cake for him," Chambers said Travel traffic and attracting a fair of Braswell, who has moved amount of tourist attention, several houses for the histori- FROM PAGE 1C the cottage arrived on the cal society. "That's the most grounds of the Light Station. trusted name in house -mov- the program, which allows "This was just a piece of ing." its participants to pursue col- lege credits while still in high school. It will be a "phenomenal" experience for the students, he said, allowing them to conduct research and undertake recon- struction work in the field. Lis) • All those hopes and plans • hinged, however, on Braswell's ›- c ability to safely squeeze the cot- < o tage through the narrow and winding streets of the old Fort j w Screven neighborhood. D After pulling onto Naylor, 2' Braswell directed an almost '— immediate right turn onto Moore Avenue, a gravel -lined thoroughfare that was just wide enough to accommodate the - cottage and the truck. There, eil l.1.111 4 the procession slowed to a crawl as it moved cautiously under overhanging wires, past pine -tree branches and around tight curves. 0 111111111111 1 None of this appeared to disturb or rattle Braswell, a deeply tanned, soft- spoken • man who said he had been moving houses for more than 50 years. 14 4 . "This is really just aggravat- ing more than anything else j ' because it'sso small," said Braswell, who runs a Swains- boro house - moving company with his brother. C 111111111 1 - . Finally, more than two hours after the procession E 0 U 3 0 = CA CO F • - I 0 ( ft f tit