HomeMy Public PortalAbout08-0428 Burke 1111
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 10 -8 -2008 PERMIT #: 080428
WORK DESCRIPTION REPAIR PORCH
WORK LOCATION 817 FIRST ST F2
OWNER NAME WM. & NICK BURKE
ADDRESS 4 7T11 ST
CITY, ST, ZIP TYBEE ISLAND GA 31328 -8742
PHONE NUMBER
CONTRACTOR NAME WM. & NICK BURKE
ADDRESS 4 7T11 ST
CITY STATE ZIP TYBEE ISLAND GA 31328 -8742
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 80.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $ 500.00
TOTAL BALANCE DUE: $ 80.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, includi
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must e
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted �, 0
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided /
unless work has begun within six months of the date of issuance. e
�0
Signature of Building Inspector or Authorized Agent: A.Shwo• 1 �
11
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
JLEEk
City of bee Island • Community Develik-„,aent Dept. ISIEW
Inspection Report mum
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 solumri
7rERZIONAL
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODECOUNCIL
MEMBER
Permit No. ncRe- e 4 2.9 Date Requested
Owner's Name Date Needed
Gen. Contractor Subcontractor
Contact Information
Project Address #") FT r s 4- -I-. F
Scope of Work E e r
1 Inspector /kg Date of Inspection 101(-1
■■■
Inspection f T) r (P( no 1 Pass El Fail la
2,4
friz_
Inspection Pass Fail Fee
Inspection Pass Fail El Fee
Inspection Pass Fail Fee
Brannyn G. Allen
From: Chuck Bargeron
Sent: Monday, October 13, 2008 8:39 AM
To: Brannyn G. Allen
Subject: RE: Burke permit - Salt Pines
Brannyn, This is how I remember this issue and agree with your statement.
Chuck
From: Brannyn G. Allen
Sent: Monday, October 13, 2008 8:28 AM
To: Chuck Bargeron
Subject: Burke permit - Salt Pines
Chuck —
I have been asked about the permit situation with the Burkes at Salt Pines. Following is what I understand to be where
we stand — please let me know if this is correct:
On September 29 Hodad visited the site after a complaint was called in regarding work being done without a permit.
He visited the site and sent a brief email /report to you and Dianne. According to his email, he saw substantial work
underway and delivered a permit application to the contractor. Knowing that he was leaving for a class in Athens, he
left the situation with you.
Two days later you returned from vacation and Hodad was at a class in Athens. You visited the site, did not see what
you felt was enough work to warrant a permit, and decided to hold off of further action until you could talk with Hodad
when he returned on October 7th
As I understand things from our conversation on October 8 you visited the site after talking with Hodad and told Mr.
Burke that the work did not appear to be more than $500 but just to be safe, he needed to get a permit. A permit
application was completed stating that the estimated cost of construction is $499.00. When Jay Burke came to pick up
the permit and Dianne charged him a double permit fee (as is customary when a contractor /homeowner has been
caught working without a permit) some confusion arose because you told Jay that the permit would be $40. There was
some confusion and disagreement about whether a double permit fee — or a permit fee at all - should be assessed
because the estimated cost of construction is below the dollar amount which requires a permit.
Please let me know if this is accurate.
Thanks -
Brannyn
Brannyn G. Allen
Planning and Economic Development Director
City of Tybee Island
403 Butler Avenue
P.O. Box 2749
Tybee Island, Georgia 31328
Phone: 912.786.4573 ext. 107
Fax: 912.786.9539
htto://www.cityoftybee.org/
1
Dianne Otto
From: Warren Millikan
Sent: Monday, September 29, 2008 4:33 PM
To: Dianne Otto
Cc: Chuck Bargeron
I spoke with Jay Burke's contractor @ unit F 2 in Salt Pines. They are replacing deck boards, a handrail, and a partition
wall. I took them a building permit application and explained the procedure. The contractor called Jay and will bring in the
completed application to settle up in the morning. The work is being done on Jay's brother Billy Burke's unit.
1
O.
fi
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 10 -8 -2008 PERMIT #: 080428
WORK DESCRIPTION REPAIR PORCH
WORK LOCATION 817 FIRST ST F2
OWNER NAME WM. & NICK BURKE
ADDRESS 4 7TH ST
CITY, ST, ZIP TYBEE ISLAND GA 31328 -8742
PHONE NUMBER
CONTRACTOR NAME WM. & NICK BURKE
ADDRESS 4 7TH ST
CITY STATE ZIP TYBEE ISLAND GA 31328 -8742
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 80.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $ 500.00
TOTAL BALANCE DUE: $ 80.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
.-J s5-..r. Ice U`C`t 7 % j V
40 60 – 3W2- CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT t,t),,e w ‘, ,Z--wr,
N - (at t. \ 0....o----e_ -'e-r 5'GC w•-,'�
DF-0 42? l'‘..o.,,,,, iliVP
Location: 5,A/1 e "? /7 / PIN #
NAME ADDRESS TELEPHONE
Owner 311/,,Boa S. /i/" /ti 7
Architect
or Engineer 4
Building /f` 841,2J17. ��� Contractor ` / / //'�
(Check all that apply) 7c(2 —
[ Repair ❑ Residential ❑ Footprint Changes t
❑ Renovation ❑ Single Family ❑ Discovery 12...1 rice_.
❑ Minor Addition ❑ Duplex n Demolition
❑ Substantial Addition ❑ Multi- Family
❑ Other ❑ Commercial
,
Detail fProject: ,e fA/ i,d., -Rec5, od 7 ' / ,. 9tWe
Estimated Cost of Construction: $ 499 t -----
Construction Type / (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED RLEVATION SURVEY OF LOT and complete the
following information based on the construe ion drawings and site plan:
# Units #l3edrocros A # Bathrooms
Lot Area Li ving space of 1 sq. ft.)
# Off - street parking spaces
Trees located & listed on site r
Access: 1
Driveway (ft.) With cul With swale?
Setbacks: Front 9 Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through /(/'®
On -site waste and debris containers will be provided by
Construction debris will be disposed by by means o
I understand that I must comply with zoning. flood damage control, building, fire, shore
protections and wetlands ordinances. FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction. `
Date: Tr -195 KSignature of Applicant: ' ' y ( ,
Note: A permit normally takes 7 to 10 days to process. �J
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site 1 r, _
Distance to sewer stub site Cx-1 ST ) )u ` \
Water meter size r
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator � Inspections Permit 25_
Code Enforcement Office w .,��t�r Water Ta p
Water /Sewer
Storm/Drainage Sewer Stub
Inspections Aid to Const. /
City Manager '
WOr << 5 d L1:4 ✓- f��`'`f'
TOTAL 40. LL^
� Z �J
NATURAL
i4
ACES
��.]{{] a
����LLLL h -
GEORGIA «.0'
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Proiects Involvins Demolition. Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
73e
t?rdersigned /) Date
Printed le
Office Use Only:
Project Address:
Permit Number: