Loading...
HomeMy Public PortalAbout2022-07-07 packet Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as required under the Americans with Disabilities Act. Please allow three business days to process the request. Please call (573) 634-6410 with questions regarding agenda items. Technical Committee Thursday, July 7, 2022 at 10:00 a.m. Meeting Location: Boone-Bancroft Room, John G. Christy Municipal Building 320 E. McCarty, Jefferson City, MO 65101 - Enter through Main Lobby THIS MEETING IS AVAILABLE VIRTUALLY TO JOIN VIRTUALLY: https://jeffersoncity.webex.com/jeffersoncity/j.php?MTID=m52216b3c2e474c7b8fa9a22888b98fc5 CALL-IN AVAILABLE AT: 1-404-397-1516 MEETING NUMBER: 2496 123 2596 MEETING PASSWORD: 1234 TENTATIVE AGENDA 1. Call to order, roll call, and determination of a quorum 2. Public comment 3. Adoption of the agenda as printed or amended 4. Approval of the minutes from the meeting of April 7, 2022 5. Communications Received A. Email from Doug Reece, City of St. Martins, supporting CAMPO Safety Action Plan grant application. B. ONE DOT Approval Letter – CAMPO FY2023 Unified Planning Work Program C. ONE DOT Approval Letter – CAMPO FY 2023-2027 Transportation Improvement Program and Annual Self Certification 6. Old Business 7. New Business A. Illustrative List Priorities Action Requested: Review, discussion, and recommendation to the Board of Directors. Staff Report: Staff are requesting a review of the Illustrative list and CAMPO area transportation priorities in anticipation of upcoming MoDOT unfunded needs discussions. B. MoDOT Unfunded Needs Action Requested: Review, discussion, and recommendation to the Board of Directors. Staff Report: Staff are initiating discussion regarding transportation project priorities to be submitted to MoDOT in the upcoming Unfunded Needs planning process. 8. Other Business A. Capital Area Active Transportation Plan B. Safety Action Plan Grant Opportunity – USDOT Safe Streets and Roads for All (SS4A) C. Status of Current Work Tasks D. Member Updates 9. Next Meeting Date – Thurs., August 4, 2022 at 10:00 a.m. - Boone-Bancroft Room, City of Jefferson City Hall 10. Adjournment Capital Area Metropolitan Planning Organization Room 120 320 E. McCarty, Jefferson City, MO 65101 Phone 573.634.6410 Fax 573.634.6457 MINUTES TECHNICAL COMMITTEE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION April 7, 2022 VOTING MEMBERS PRESENT Cole County: Shannon Kliethermes Matt Prenger Jefferson City: Sonny Sanders, Chairman David Bange, Vice Chairman Eric Barron Mark Mehmert Britt Smith Matt Morasch MoDOT: Mike Henderson Steve Engelbrecht Holts Summit: Mark Tate Private Transportation: Joe Scheppers Bike/Ped Interest: Kevin Schwarz VOTING MEMBERS ABSENT Paul Stonner, Wardsville Bob Lynch, MoDOT Paul Winkelmann, Callaway County JJ Gates, Jefferson City EX-OFFICIO MEMBERS ABSENT Brad McMahon, Federal Highway Administration Eva Steinman, Federal Transit Administration STAFF PRESENT (Non-Voting) Katrina Williams, Planner Lee Bowden, Planner Beth Sweeten, Administrative Assistant GUESTS PRESENT Jennifer Bowden, Mid-Missouri Regional Planning Commission Kortney Bliss, City of Jefferson 1. Call to order, roll call, and determination of a quorum Mr. Sanders called the meeting to order at 10:02 a.m. and asked Ms. Sweeten to call roll. A quorum of 12 voting members or their designee was present. 2. Public comment None 3. Adoption of the agenda as printed or amended Mr. Mehmert moved and Mr. Kliethermes seconded to approve the agenda as printed. The motion passed unanimously. 4. Approval of the minutes from the meeting of March 3, 2022 Mr. Smith moved and Mr. Prenger seconded to approve the minutes from the meeting of March 3, 2022 as written. The motion passed unanimously. 5. Communications Received No Communication was received Minutes/Capital Area Metropolitan Planning Organization Technical Committee April 7, 2022 Page 2 6. Old Business A. 2023-2027 Transportation Improvement Program (TIP) Mr. Bowden gave a presentation on the TIP. He explained a 25-day public comment period will be opened by April 20th and closed by the Board of Directors meeting on May 18th, after which the TIP can be approved. Staff has worked extensively with local jurisdictions, public transportation providers, and MoDOT to demonstrate fiscal constraint and show projects in the CAMPO region for the next five program years. All jurisdictions active with CAMPO have consulted with staff to ensure financial details and projects are correct and appropriate. Staff recommends motion to forward the Draft 2023-2027 Transportation Improvement Program to the Board of Directors for review and approval. Mr. Sanders asked if this dollar amount for the TIP was the highest there has been. Mr. Bowden said it was the largest since he has been here. Mr. Lynch said there is a preliminary draft online Mr. Smith moved and Mr. Prenger seconded to forward the Draft 2023-2027 Transportation Improvement Program to the Board of Directors for review and approval. The motion passes unanimously. B. FY 2023 Unified Planning Work Program (UPWP) Ms. Williams gave a presentation on the UPWP. She went over the draft that as provided in the packet. She stated the estimated draft budget for FY2023 is approximately $292,939 with $234,351 (80%) funded through the Consolidated Planning Grant (CPG) and $58,588 (20%) funded through local match. The 20% local match is provided by Jefferson City (75%) and Cole County (25%). Based on the anticipated FY2022 expenditure and estimated FY2023 draft budget, it is projected that CAMPO will have a balance of approximately $414,627 in unprogrammed CPG funds at the end of FY2023. She pointed out that all of these totals are subject to change during the development of the UPWP. She stated A 25-day public comment period will be opened by April 20th and closed by the Board of Directors at a meeting on May 18th. Staff recommends approving and forwarding the Draft FY2023 Unified Planning Work Program to the Board of Directors for review and approval. Mr. Morasch expressed interest about using the remaining planning funds be used to start a study on the expressway and tri-level. Mr. Englebrecht said they would have to look at the proposal. Mr. Morasch stated he just needs direction on what to do next. He asked that we receive an update from MoDOT at the next meeting. Mr. Smith moved and Mr. Prenger seconded to forward the Draft FY2023 Unified Planning Work Program to the Board of Directors for review and approval. The motion passes unanimously. 7. New Business No new business 8. Other Business A. Transit Feasibility Study Update- Ms. Williams stated the study was completed. Mr. Bange said they interviewed and looked at existing spaces. They developed a draft based on that information. They decided that the current facility at East Miller was not big enough. They looked at other options at Hyde Park and Heisinger Road. He stated they will review the plan and get back to the contractor with some changes. They hope to have that completed in the next month. B. Status of Current Work Tasks – Ms. Williams stated that the following topics had already been touched on earlier in the meeting. • FY 2023 Unified Planning Work Program (UPWP) development • 2023-2027 Transportation Improvement Program (TIP) development. • JEFFTRAN Transit Facility Feasibility Study • GIS Assistance Minutes/Capital Area Metropolitan Planning Organization Technical Committee April 7, 2022 Page 3 • Capital Area Pedestrian & Bicycle Plan C. Member Updates- MoDOT --Mr. Henderson had nothing to announce. --Mr. Lynch gave an update on bridge formulas and lists, and budget. --Mr. Englebrecht had nothing to add Cole County --Mr. Kliethermes had nothing to add. --Mr. Prenger gave an update on Tanner Bridge, Woods Crossing subdivision, chip seal bid, stormwater improvements and asphalt overlay. Jefferson City --Mr. Gates was not present. --Mr. Mehmert gave an update on new busses. --Mr. Bange provided an update on Grant Street, stormwater on Douglas and Davis and sidewalks on Dunklin and Adams. --Mr. Smith gave an update on parking garage study, airport ramp project, airport control tower, surface contracts, pavement rating, and Amtrak improvements. --Mr. Barron gave an update on MoDOT scoping projects for major intersections and designee forms. --Mr. Sanders had nothing to announce. --Mr. Morasch gave an update on the viaduct project. Holt Summit --Mr. Tate was not present. Private Interest -- Mr. Scheppers had nothing to add Bike/Ped Interest --Mr. Schwarz had nothing to add Mr. Bange stated that the Traffic and Safety Commission met this morning and stated they decided to not no longer support the bike signs in the county. Mr. Lynch said they have to address homeless encampments in MoDOT Right of Way. In order for MoDOT to pursue movement, they need to be an imminent threat to structure or safety. Mr. Barron stated that there has been a new ex-officio spot added to the Technical Committee for the Heartland Port Authority 8. Next Meeting Date - Thursday, May 5, 2022 at 10:00 a.m. in the Boone/Bancroft Room #200. 9. Adjournment The meeting adjourned at 11:04 Respectfully submitted, Beth Sweeten, Administrative Assistant Sanders, Sonny From: Doug <rdoug48@gmail.com> Sent: Tuesday, June 21, 2022 4:25 PM To: Sanders, Sonny Cc: Williams, Katrina Subject: SS4A Hi Sonny, On behalf of St Martins, I would like to express support for applying for the Safe Streets for All grant. If funded, it would be great to at least extend the opportunity to participate to Wardsville, Taos, & St Martins. Thanks for your consideration of this request. Doug Reece Small Cities Board Member Rep Sent from my iPhone i June 9, 2022 Mr. Patrick McKenna, Director Missouri Department of Transportation P.O. Box 270 Jefferson City, Missouri 65102 RE: FY 2023 Unified Planning Work Program (UPWP) for Capital Area Metropolitan Planning organization (CAMPO) Dear Mr. McKenna: The Federal Transit Administration (FTA) and the Federal Highway Administration (FHWA) have reviewed the FY 2023 Unified Planning Work Program (UPWP) for the Jefferson City metropolitan planning area, that you transmitted to us in your May 20, 2022, letter. CAMPO’s Board of Directors adopted the FY 2023 UPWP on May 18, 2022. Based on our review, we are approving the UPWP as an adequate description of activities to support FHWA and FTA funded technical studies and grant activities. The FY 2023 UPWP period is for November 1, 2022, through October 31, 2023. If you have any questions or need additional information, please contact Eva Steinman, FTA, at (816) 329-3931 or Brad McMahon, FHWA, at (573) 638-2609. Sincerely, Mokhtee Ahmad For: Kevin W. Ward, P.E. Regional Administrator Division Administrator Federal Transit Administration Federal Highway Administration cc: Eric Curtit, MoDOT Mike Henderson, MoDOT Steve Engelbrecht, MoDOT Central District Eric Barron, CAMPO Katrina Williams, CAMPO Llans Taylor, MoDOT Dana Kaiser, MoDOT Christy Evers, moDOT Federal Transit Administration Federal Highway Administration 901 Locust Street, Room 404 3220 W. Edgewood, Suite H Kansas City, MO 64106 Jefferson City, MO 65109 816-329-3920 573-636-7104 816-329-3921 (fax)573-636-9283 (fax) U.S. Department of Transportation May 23, 2022 Mr. Patrick McKenna, Director Missouri Department of Transportation P.O. Box 270 Jefferson City, Missouri 65102 RE: FHWA/FTA Approval of Amendment to the Missouri FY 2022-2026 STIP Amendment to incorporate the Capital Area Metropolitan Planning Organization (CAMPO) FY 2023-2027 Transportation Improvement Program (TIP) and the CAMPO and MoDOT’s Annual Self Certification Dear Mr. McKenna: The Federal Highway Administration (FHWA) has reviewed the Missouri Department of Transportation’s (MoDOT) request to incorporate the Capital Area Metropolitan Planning Organization (CAMPO) FY 2023-2027 Transportation Improvement Program (TIP), as further described in your letter of May 23, 2022, as an amendment to the FY 2022-2026 Missouri Statewide Transportation Improvement Program (STIP). This TIP includes transit, street, highway, and enhancement projects that are compatible with the metropolitan area’s long-range transportation plan. The CAMPO Board of Directors approved the FY 2023-2027 TIP on May 18, 2022. The Missouri Governor approved the CAMPO TIP on May 20, 2022. In accordance with 23 CFR 450.218(b), we have determined that this STIP amendment is based on a transportation planning process that substantially meets the requirements of 23 U.S.C 134 and 135, 49 U.S.C. 5303 and 5304 and 23 CFR 450 Subparts A, B, and C. Based on our review, this STIP amendment request is approved. The CAMPO’s FY 2023-2027 TIP includes the CAMPO and the MoDOT’s Annual Self-Certification of the Jefferson City metropolitan planning area transportation planning process as required under 23 CFR 450.334. The CAMPO Board of Director’s approved the Annual Self-Certification on May 18,2022. Based on our 2018 ONE DOT Listening Session, the 2015 ONE DOT Planning Process Review and our planning work product reviews and monitoring activities throughout the year, we concur that the CAMPO’s planning process meets all applicable Federal requirements outlined in the executed annual self-certification statement. If you have any questions, please contact Mr. Brad McMahon at FHWA (573) 638-2609 or Eva Steinmann at FTA Region VII (816) 329-3931. Sincerely, Mokhtee Ahmad For: Kevin W. Ward, P.E. Regional Administrator Division Administrator Federal Transit Administration Federal Highway Administration Federal Transit Administration Federal Highway Administration 901 Locust, Room 404 3220 W. Edgewood, Suite H Kansas City, MO 64106 Jefferson City, MO 65109 816-329-3920 573-636-7104 816-329-3921 (fax)573-636-9283 (fax)U.S. Department of Transportation cc: Eric Curtit, MoDOT Llans Taylor, MoDOT Mike Henderson, MoDOT Steven Engelbrecht, MoDOT Central District Sonny Sanders, CAMPO Katrina Williams, CAMPO Eric Barron, CAMPO Sharon Monroe, MoDOT Agenda Item 7A CAMPO Technical Committee Staff Report Illustrative Projects List Review Site Specific Projects July 7, 2022 Summary Staff are bringing the Illustrative List Projects forward for review by the Technical Committee and Board. Staff try to bring the list up for review on a regular basis (preferably annually). The Illustrative List of Road and Bridge Projects was last reviewed by the Board of Directors at their January 20, 2021, meeting after review and recommendation by the Technical Committee. The Multimodal list of projects was last reviewed by the Board of Directors at their July 21, 2021, meeting after review and recommendation by the Technical Committee. Illustrative List Contents 1. Programmatic Illustrative Projects – Approved by the Board of Directors and Technical Committee as broad regional or statewide needs. 2. Illustrative Site Specific Projects –Projects in this list were developed by a stakeholder workgroup and then reviewed and approved by Technical Committee and Board of Directors using the Tier system outlined below. 3. JEFFTRAN Program of Projects – An Illustrative list of transit projects that may be completed in the next 5 to 10 years dependent upon the Jefferson City annual budget and availability of federal funds. 4. Future Roads –CAMPO Major Thoroughfare Plan Site Specific Projects Projects contained in the Site Specific Illustrative List are separated into different “Tiers” based on the impact or underlying need of the project, as follows: (Projects are not prioritized within each Tier) Tier 1 – Regionally Significant projects that are supported by the travel demand model and recognized as a high priority by the Board of Directors, stakeholders, and the general public. Tier 2 – Projects with a more localized area of impact that are (mostly) supported by the travel demand model and recognized as a high priority by the Board of Directors, stakeholders, and the general public Tier 3 – Projects recognized as a need by stakeholders and the general public and may or may not be supported by the travel demand model. Site Specific Projects are also classified by type as follows: System Performance – Typically vehicle oriented Highway/Roadway and intersection projects. Multi-Modal – Transit, Airport, Rail, and River projects. Pedestrian and Non-Motorized – Sidewalk, crosswalk, bicycle, and greenway projects. The following are attached for review by the Techincal Committee: A. Complete List of Illustrative Projects - excerpt pages 97-104 from the 2045 MTP. B. Report focused on System Performance (Road and Bridge) Projects, categorized by type of project (8 categories) and including maps, traffic counts, crashes, and generalized cost estimates. Agenda Item 7A Staff Recommended Changes Additions: Addition of Transload Facility (proposed within the Algoa Industrial Park) to the list of Multimodal Needs. Staff recommend addition of recommended projects and forwarding to the Board of Directors for review (along with any other project additions or deletions that are recommended by the Committee). Recommended Form of Motion: Motion to forward the Illustrative list, with recommended changes, to the Board of Directors for review. CAMPO 2045 & BEYOND METROPOLITAN TRANSPORTATION PLAN 100 ILLUSTRATIVE PROJECTS For illustrative purposes, the financial plan includes additional projects that could be completed if additional resources beyond those identified in the financial plan were to become available. Some items on these lists have cost estimates or cost ranges associated with them. This section of the MTP includes: 1. Programmatic Illustrative Projects – Approved by the Board of Directors and Technical Committee as broad regional or statewide needs. 2. Illustrative Site Specific Projects –Projects in this list were developed by a stakeholder workgroup and then reviewed and approved by Technical Committee and Board of Directors using the Tier system outlined below. 3. JEFFTRAN Program of Projects – An Illustrative list of transit projects that may be completed in the next 5 to 10 years dependent upon the Jefferson City annual budget and availability of federal funds. 4. Future Roads – Please refer to the CAMPO Major Thoroughfare Plan (Adopted 08/19/2021), located in Appendix J. Additional illustrative projects can be found in the other adopted CAMPO plans in the appendices. Most of the illustrative items found in those plans are reflected in the lists below. Other plans that have identified potential illustrative projects include: • 2021 CAMPO Major Thoroughfare Plan – Appendix J • 2016 Capital Area Pedestrian and Bicycle Plan - Appendix F • 2017 Coordinated Public Transit-Human Services Transportation Plan - Appendix G • 2015 CAMPO Regional Wayfinding Plan - Appendix I PROGRAMMATIC ILLUSTRATIVE PROJECTS In addition to the site specific projects listed later in this section, there are other projects that have been identified as a need in the region that may require a shift in funding allocation at the state or local level. Figure 6.6 provides a list of programmatic illustrative projects. Figure 6.6 Programmatic Illustrative Projects Category Project Pedestrian & Non- Motorized Increase funding to support safety improvements to pedestrian and bicycle infrastructure at the local level. System Performance Fund the upgrade of US 50 to four lanes to provide an alternative route to Interstate 70. System Performance Fund expansion and improvements to Interstate 70 including replacement of the Rocheport bridge over the Missouri River. System Performance Fund expansion of shoulders (min 2’ – 4’) on Missouri numbered and lettered routes. System Performance/ Pedestrian & Non- Motorized Create/fund a safety improvement program for small cities with population of less than 5,000. The program would support small cities making safety (sidewalks, curb/gutter, crosswalk, signage, etc.) improvements along state highways that run through their town. Multi-Modal Transit Capital and Operating Program – maintain and/or increase current level of service for urban and rural public transportation. System Performance Increase funding for roadway and bridge maintenance to keep infrastructure good and safe condition. Agenda Item 7A - Attachment A CAMPO 2045 & BEYOND METROPOLITAN TRANSPORTATION PLAN 101 ILLUSTRATIVE SITE SPECIFIC PROJECTS This site specific list of illustrative projects were developed by a stakeholder workgroup and then reviewed and approved by Technical Committee and Board of Directors using the Tier system outlined below. Note: The reference numbers used in the following tables and maps do not denote priority. This number is just a reference number. •Regionally Significant: Impacting network users from outside the region and having major impacts on freight movement moving through the region •Recognized as a high priority by Board of Directors, stakeholders, and public •Supported by the 2045 Travel Demand Model •Supports increased motorized and non-motorized safety and system performance •Intersections and interchanges with high numbers of crashes TIER 1 •Recognized as a high priority by Board of Directors, stakeholders, and public •Most projects in this Tier are supported by the Travel Demand Model •Supports increased motorized and non-motorized safety and system performance •Intersections and interchanges with high numbers of crashes TIER 2 •Designated as a need by stakeholders and general public •Some projects in this tier are supported by the Travel Demand Model •Projects in this tier may be completed in phases, dramatically changing cost and date of completion •Supports increased motorized and non-motorized safety and system performance •Intersections and interchanges with high numbers of crashes TIER 3 Agenda Item 7A - Attachment A CAMPO 2045 & BEYOND METROPOLITAN TRANSPORTATION PLAN 102 Figure 6.7A Illustrative Projects – System Performance Source: CAMPO Figure 6.7B Illustrative Projects – System Performance – Tier 1 System Performance - Tier 1 # Jurisdiction Location Project Description Term Cost Range 1 Jefferson City US 54 / 63 / 94 (Bluff Rd) Construct direct connector for northbound-to-westbound movement to improve capacity; widen US 54/63 to provide 3 continuous through lanes in each direction (in addition to auxiliary/acceleration/deceleration lanes) Long-Term 10 years< $10M< 2 Jefferson City US 50/63, US 54 to Lafayette St Implement major capacity improvements, which could include mainline widening, grade separations, and/or outer roads Long-Term 10 years< $10M< 3 Jefferson City US 50 / 63 /54 (Tri-Level) Reconfigure interchange to provide non- conflicting system-to-system movements Long-Term 10 years< $5M-$10M Agenda Item 7A - Attachment A CAMPO 2045 & BEYOND METROPOLITAN TRANSPORTATION PLAN 103 Figure 6.7C Illustrative Projects – System Performance – Tier 2 System Performance - Tier 2 # Jurisdiction Location Project Description Term Cost Range 4 Callaway County US 54 / S. Summit Dr. Ramps Addition of ramps to westbound and eastbound US 54 completing the S. Summit Dr. overpass Long-Term 10 years< $1M-$5M 5 Jefferson City US 50 / Dix Rd Reconfigure interchange and Dix Rd approaches to address capacity issues including lack of left-turn lanes; consider dumbbell roundabout interchange; widen Dix Rd to provide center turn lane and pedestrian access from US 50 to Missouri Blvd Near-Term 5-10 years $5M-$10M 6 Jefferson City West Edgewood @ Stadium Install roundabout to improve intersection capacity Near-Term 5-10 years $500k-$5M 7 Jefferson City Missouri Blvd, Eastern Lowe's entrance to S 10 Mile Dr Address access management along the corridor, including turn restrictions, additional traffic control, and safety. Near-Term 5-10 years $1M-$10M 8 Jefferson City W. Truman Blvd @ Scott Station Rd Signalize or otherwise enhance capacity Near-Term 5-10 years < $500k 9 Jefferson City US-54 NB Ramps / Christy Dr / Stadium / Jefferson St Install roundabouts at both hook ramp intersections to improve operations and address offsets/angles Near-Term 5-10 years $1M-$10M 12 Wardsville Route B, Ashbury Way to Route M Install roundabout at Rte B / Falcon / Ashbury and intersection improvements to Rte B / Rte M/ Rte W. Near-Term 5-10 years $1M-$5M 13 Jefferson City US 54 / Ellis Blvd / Southwest Blvd Reconfigure interchange to address capacity and close spacing of outer roads. Create pedestrian connection on Southwest/Ellis Blvd from Ford St to Southridge Dr Near-Term 5-10 years $5M-$10M 14 Jefferson City Southwest Blvd @ Stadium Install roundabout to improve intersection capacity Near-Term 5-10 years $500k-$5M 15 Jefferson City Ellis Bl / Green Berry Rd Install roundabout to improve intersection capacity Near-Term 5-10 years $500k-$5M 16 Jefferson City Bald Hill Rd / Seven Hills Rd Install roundabout to improve intersection capacity Near-Term 5-10 years $500k-$5M 17 Jefferson City US 50 / Truman Bl / Country Club Dr Reconfigure interchange to address close outer road spacing; widen westbound off-ramp to improve capacity; incorporate pedestrian facilities into the interchange Near-Term 5-10 years $5M-$10M 21 Jefferson City West Edgewood @ Creek Trail Install roundabout to improve intersection capacity Near-Term 5-10 years $500k-$5M 22 Jefferson City Missouri Blvd, Country Club Dr to Howerton Widen to 5 lanes; including right turn lane at Howerton Ct. Long-Term 10 years< $5M-$10M 23 Jefferson City Country Club Dr, Truman Blvd to Rainbow Dr Widen to provide left-turn lanes at existing and future access points Long-Term 10 years< $1M-$5M 25 Holts Summit US 54 / Route OO / Simon Blvd Reconfigure interchange to address close outer road spacing and capacity issues (may involve roundabouts); incorporate pedestrian facilities crossing US 54 Long-Term 10 years< $5M-$10M 26 Jefferson City Missouri Blvd, Stoneridge Pkwy to US 50 Improve access management along Missouri Blvd, including improvements to intersections, restrictions to turning movements, and improvements to pedestrian safety. Long-Term 10 years< $5M-$10M Agenda Item 7A - Attachment A CAMPO 2045 & BEYOND METROPOLITAN TRANSPORTATION PLAN 104 Figure 6.7D Illustrative Projects – System Performance – Tier 3 System Performance - Tier 3 # Jurisdiction Location Project Description Term Cost Range 29 Jefferson City Madison Street, Dunklin St to US-54 Ramps Add a center turn lane via a combination of widening and parking removal; address unusual stop control configuration at Madison Atchison Near-Term 5-10 years $1M-$5M 30 Jefferson City US 50/63 / Clark Ave Reconfigure interchange to address ramp terminal capacity (likely roundabouts); include modifications to Clark/Miller and Clark/Dunklin intersections to improve corridor operations Near-Term 5-10 years $1M-$10M 31 Holts Summit US 54 / Center St Improve interchange capacity and east-side outer road spacing with roundabouts at terminals Long-Term 10 years< $1M-$10M 32 Cole County Rock Ridge Rd / Wildwood Dr extension Add left-turn lane on Rock Ridge to improve capacity after completion of extension Long-Term 10 years< $1M-$5M 33 Jefferson City MO 179, Industrial Dr to Sue Dr Add left-turn lanes at Sue Dr, Cherry Creek Ct, and Fire Station north driveway Long-Term 10 years< $500k-$5M 34 Jefferson City MO 179 and Truman Blvd Reconfigure intersection with roundabout Long-Term 10 years< $1M-$5M 35 Cole County Bridge Replacement / Tanner Bridge Rd Bridge Replacement on Tanner Bridge Rd. over Moreau River Near-Term 5-10 years $1M-$5M 36 Wardsville Route B, Tanner Bridge Rd to Friendship Rd Install roundabouts at two locations to improve capacity: Rte B / Falcon / Ashbury, Rte B / Rte M; widen to four lanes in each direction on Rte B for several hundred feet south of Tanner Bridge Rd and reconfigure intersection; Widen Rte B to provide TWLT Near-Term 5-10 years $5M-$10M 39 Jefferson City Swifts Hwy / Jefferson St Reconfigure to fix sight distance issues; widen Swifts Hwy approach Long-Term 10 years< $50K-$100k 40 Holts Summit S. Summit Dr / Perrey Dr / Hibernia Ln / Holt Ln Redesign intersection to address offset and sight distance Near-Term 5-10 years N/A 41 Holts Summit Spalding Rd/ Park Install drainage improvements. Curb and gutter could cause surface flooding for adjoining properties. Near-Term 5-10 years N/A 42 Holts Summit N. Summit Dr and Mars St Intersection Install drainage improvements -box culvert. Near-Term 5-10 years N/A 43 Holts Summit Van Horn Rd / Julie Ln Redesign intersection to address offset and sight distance Near-Term 5-10 years N/A 47 St. Martins Route T/D & Bus 50 W Intersection Reconfigure intersection with roundabout Near-Term 5-10 years $500k-$1M 48 Holts Summit Nieman Rd / Halifax Rd / Major Terr Address offset and skew by installing roundabout or realigning east leg Near-Term 5-10 years N/A 49 Holts Summit E Simon Blvd Replace undersized culvert. Install new bridge ~0.4 mi east of Jefferson Rd Near-Term 5-10 years N/A 57 Taos Routes M and Y shoulders Install minimum 2 ft. shoulders along state routes M and Y in Taos Near-Term 5-10 years $500k-$1M 60 Jefferson City High St. viaduct rehabilitation Rehabilitation of the High St. viaduct over Missouri Blvd. Long-Term 10 years< $5M-$10M Agenda Item 7A - Attachment A CAMPO 2045 & BEYOND METROPOLITAN TRANSPORTATION PLAN 105 Figure 6.8A Illustrative Projects – Multi-Modal Source: CAMPO Agenda Item 7A - Attachment A CAMPO 2045 & BEYOND METROPOLITAN TRANSPORTATION PLAN 106 Figure 6.8B Illustrative Projects – Multi-Modal – Tier 2 Multi-Modal - Tier 2 # Jurisdiction Location Project Description Term Cost Range 18 Jefferson City JEFFTRAN Transit Facilities Construction of a new facilities for JEFFTRAN that would provide better accommodations for transit riders and staff, including, but not limited to; a bus barn, washing bays, central maintenance facilities, and administrative offices Near-Term 5-10 years $5M-$10M 19 Jefferson City Jefferson City Amtrak Station Renovation or replacement of the Amtrak Train Station in Jefferson City Long-Term 10 years< <$100M 20 Jefferson City/ Cole County/ Callaway County Missouri River Port Construction of a port facility in either Callaway County or Cole County as specified in the Central Missouri Multimodal Port Feasibility Study. Near-Term 5-10 years $10M< 27 Jefferson City Jefferson City Memorial Airport Reconstruction of Runway 9/27 Near-Term 5-10 years $1M-$5M 28 Jefferson City Jefferson City Memorial Airport Construction of new air traffic control tower. Near-Term 5-10 years $1M-$5M 61 Jefferson City Jefferson City Memorial Airport Rehabilitate Facility Housing ARFF/SRE Equipment Near-Term 5-10 years $500k-$1M 62 Jefferson City Jefferson City Memorial Airport Reconstruction of Taxiway A. Near-Term 5-10 years $5M-$10M Figure 6.8C Illustrative Projects – Multi-Modal – Tier 3 Multi-Modal - Tier 3 # Jurisdiction Location Project Description Term Cost Range 37 Jefferson City Jefferson City Memorial Airport - Runway 9 and 9/27 Relocate Runway 9 and Extend Runway 9/27 at the Jefferson City Memorial Airport. Long- Term 10 years< $5M-$10M 38 Jefferson City Jefferson City Memorial Airport - Runway 12/30 Extension and Widening of runway 12/30 at the Jefferson City Memorial Airport. Long- Term 10 years< $10M< Agenda Item 7A - Attachment A CAMPO 2045 & BEYOND METROPOLITAN TRANSPORTATION PLAN 107 Figure 6.9A Illustrative Projects – Pedestrian and Non-Motorized Source: CAMPO Agenda Item 7A - Attachment A CAMPO 2045 & BEYOND METROPOLITAN TRANSPORTATION PLAN 108 Figure 6.9B Illustrative Projects – Pedestrian & Non-Motorized – Tier 2 Pedestrian & Non-Motorized - Tier 2 # Jurisdiction Location Project Description Term Cost Range 10 Holts Summit S. Summit Drive, Simon to Center Install sidewalks with some curb and gutter and drop inlets Long- Term 10 years< $500K-$1M 11 Jefferson City Missouri Blvd, W. Main St. to Stadium Blvd. Complete connectivity between segments of sidewalk and install crosswalks/pedestrian refuges as needed. Near- Term 5- 10 years $1M-$5M Figure 6.9C Illustrative Projects – Pedestrian & Non-Motorized – Tier 3 Pedestrian & Non-Motorized - Tier 3 # Jurisdiction Location Project Description Term Cost Range 24 Jefferson City Bolivar St. Greenway Design and construct a greenway extension from the Dunklin St. Trailhead to McCarty St. Near-Term 5-10 years $500k-$1M 44 Jefferson City Southwest Blvd & Dix Rd Intersection Install pedestrian-activated beacon or similar warning device Near-Term 5-10 years < $50K 45 Jefferson City Dix Road, W. Main to Missouri Blvd Improve bicycle and pedestrian facilities along the corridor Near-Term 5-10 years < $500k 46 St. Martins/ Cole County Route T, Bus 50 to Elston Install shoulders to accommodate cyclists and pedestrians. Near-Term 5-10 years $5M-$10M 50 Holts Summit Karen Dr, Center to Thompson Install sidewalk and crosswalks Near-Term 5-10 years $500K-$1M 51 Holts Summit Halifax Rd, Center to Nieman Install sidewalk and crosswalks Near-Term 5-10 years $500K-$1M 52 St. Martins/ Cole County Route T, Henwick Ln to Bus 50 W Install curb, gutter & sidewalk in each direction Near-Term 5-10 years N/A 53 CAMPO Bike lane installation in CAMPO Region Continue expansion of bike lanes in the downtown area. Near-Term 5-10 years $50K-$100k 54 CAMPO CAMPO Greenway Connectivity Continue to expand greenways to connect cities in the CAMPO Region Long-Term 10 years< $10M< 55 Jefferson City Jefferson City Greenway Projects Locations may include; Fairgrounds Acres to County Park, South Country Club Drive to Turtle Creek subdivision, Ellis-Porter Riverside Park connector from St. Louis Road, Wears Creek to East Branch Connector, Frog Hollow Phase 4, Creek Trail to W. Edgewood Near-Term 5-10 years $50k-$1M 56 Jefferson City Missouri Blvd and S. Ten Mile, Stoneridge Pkwy to S. Country Club Install Sidewalks and crosswalks along route with pedestrian accesss over MO 179 provided via a pedestrian bridge connecting S. Ten Mile east and west segments. Near-Term 5-10 years $1M-$5M 58 Taos Sidewalk expansion Extend sidewalk along Route M north and south of existing sidewalk. Near-Term 5-10 years $1M-$5M 59 Taos Trail Connectivity Create sidewalk/trail connection between Route M sidewalk and Countryside Park trail. Near-Term 5-10 years < $500k Agenda Item 7A - Attachment A CAMPO 2045 & BEYOND METROPOLITAN TRANSPORTATION PLAN 109 JEFFTRAN PROGRAM OF PROJECTS Figure 6.10 outlines an Illustrative list of transit projects that may be completed in the next 5 to 10 years dependent upon the Jefferson City annual budget and availability of federal funds. Figure 6.10 Program Projects JEFFTRAN Program of Projects Description Total Cost Other Funding Local Funding 1 Replace paratransit wide body cutaway buses $150,000 $120,000 $30,000 2 Replace paratransit software and associated hardware $30,000 $24,000 $6,000 3 Replace low-floor minivan support vehicle $40,000 $0 $40,000 4 Replace transit administration vehicle $30,000 $30,000 5 Upgrade/replace fare card system $300,000 $240,000 $60,000 6 Repair Transfer Facility Roof (Bus Transfer Shelter) $12,000 $0 $12,000 7 Transit facility improvements--ridge cap/flashing replacements/roof repair on bus barn $50,000 $40,000 $10,000 8 Security upgrades for transit facilities $30,000 $24,000 $6,000 9 Replace outdated bus security camera systems $60,000 $48,000 $12,000 10 Update/revise Transit facilities feasibility study $150,000 $0 $150,000 11 Purchase and install bus shelters at various locations in Jefferson City $30,000 $24,000 $6,000 12 Transit facility improvements, including replace overhead doors and door operators $95,000 $76,000 $19,000 13 JEFFTRAN lighted signs for exterior of transit facilities $15,000 $12,000 $3,000 14 Purchase emergency back-up generator & switches for transit and CM facilities $100,000 $80,000 $20,000 15 Replace low-floor route buses $3,000,000 $2,400,000 $600,000 16 Construct new transit facilities and central maintenance facilities $7,000,000 $5,600,000 $1,400,000 17 Transit admin facility rehab $50,000 $40,000 $10,000 18 Purchase and install additional transit traveler kiosks (each) $15,000 $12,000 $3,000 19 Add bike racks at passenger transfer facilities and selected bus stops $5,000 $0 $5,000 20 Enhance/replace security systems for buses and transit facilities $20,000 $16,000 $4,000 21 Charging systems/electrical upgrades for buses $100,000 $80,000 $20,000 22 Add crosswalks to various locations around the city $60,000 $0 $60,000 23 Rehabilitate/replace bus wash facility $100,000 $80,000 $20,000 Source: JEFFTRAN March 2019 FUTURE ROADS Please refer to the CAMPO Major Thoroughfare Plan, located in Appendix J. Agenda Item 7A - Attachment A Major Thoroughfare Plan Appendix J CAMPO 2045 & Beyond Metropolitan Transportation Plan Adopted August 18, 2021 The preparation of this report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, and Federal Transit Administration in cooperation with the Missouri Department of Transportation. The opinions, findings, and conclusions expressed in this report are not necessarily those of the Federal Highway Administration, Federal Transit Administration, or the Missouri Department of Transportation. Agenda Item 7A - Attachment A Note: Updates to the Metropolitan Transportation Plan and Major Thoroughfare Plan can be found on our website at www.jeffersoncitymo.gov/campo Produced by the Capital Area Metropolitan Planning Organization Consultant services for the development of the Travel Demand Model provided by HDR, Inc. and City Explained, Inc. MPO Administration is provided by the City of Jefferson Department of Planning and Protective Services/ Planning Division Room 120 John G. Christy Municipal Building 320 East McCarty Jefferson City, Missouri Telephone 573-634-6410 http://www.jeffersoncitymo.gov/campo/ Agenda Item 7A - Attachment A WHAT IS THE MAJOR THOROUGHFARE PLAN? The CAMPO Major Thoroughfare Plan is a component (Appendix J) of the CAMPO 2045 & Beyond Metropolitan Transportation Plan (MTP). The Major Thoroughfare Plan was developed after the 2019 completion of the MTP and the 2021 completion of Active Jefferson City 2040, the City of Jefferson’s Comprehensive Plan. Recommendations from an updated 2019 Travel Demand Model (TDM), MTP, Comprehensive Plan, and additional stakeholder input was used to produce the Major Thoroughfare Plan. The Major Thoroughfare Plan details expansions of existing major roads, proposed federal functional classification upgrades, and delineates future major roads that are necessary to accommodate the anticipated 20-year growth projections of the CAMPO Planning Area. The goals of the Major Thoroughfare Plan are as follows: •Provide for the efficient movement of vehicular traffic into and throughout the Region. •Consider right-of-way needs to accommodate a proposed thoroughfare. •Ensure adequate roadways to serve existing and proposed developments. •Assist in identifying Capital Improvement Program needs. •Reduce the traffic volumes in residential areas by ensuring adequate arterials. •Serve as a planning tool and assist coordination with other agencies. The Major Thoroughfare Plan is composed of two elements: 1)Federal Functional Class Map - a map showing the current Federal Functional Classification for all CAMPO roads. (Figure 2) 2)Major Thoroughfare Plan Map - a map and list showing major upgrades to existing roads and general locations of future roads and connections. (Figure 3) Generally, the Major Thoroughfare Plan Map excludes minor collector and local street projects. The Major Thoroughfare plan includes system performance projects (Tier 1 and 2) as identified in the CAMPO 2045 & Beyond MTP Illustrative List of Projects. The Plan does not contain all projects listed in the MTP Illustrative List of Projects. The Plan does not include detailed traffic studies, crash data, or other condition statistics as those are available in the CAMPO TDM, CAMPO MTP, or in studies conducted by individual jurisdictions. Amendments and Modifications The CAMPO Major Thoroughfare Plan is a component (Appendix J) of the CAMPO 2045 & Beyond MTPand may be changed through an amendment or administrative modification as described in in Section 3 of the MTP. CAMPO 2045 & BEYOND MTP AND 2019 TRAVEL DEMAND MODEL (TDM) In 2019 CAMPO adopted an updated MTP that included an updated TDM. The MTP and TDM utilized the several local planning documents along with multi-modal plans such as the Holts Summit 2014 Pedestrian, Bicycle, and Transit Plan, 2017 Capital Area Pedestrian and Bicycle Plan, and the 2021 Coordinated Public Transit - Human Services Transportation Plan. The TDM resulted in a list of recommended improvements that were based on stakeholder needs, current land use, future land use projections, and population and housing projections. The TDM was used to support the MTP’s Implementation Plan and Illustrative List of Projects. The Illustrative List of Projects outlined in the MTP directly supports the development of the CAMPO Major Thoroughfare Plan. CAMPO Major Thoroughfare Plan 1 Agenda Item 7A - Attachment A FUNCTIONAL CLASSIFICATION Functional classification, governed by federal guidelines, is the process by which roads, streets and highways are grouped into classes according to the character of service they are intended to provide. It defines the role that any particular road or street should play in serving the flow of trips through a highway network. Functional classification progresses from a lower classification handling short, local trips to a higher classification as the trips become longer and connect regional and inter-regional traffic generators. Functional classifications are periodically reviewed by MoDOT and local representatives, but are usually updated every ten years, coinciding with decennial U.S. Census revisions of urban boundaries. The Functional classification changes are submitted to FHWA for review and approval. The Major Thoroughfare Plan provides support for federal functional classification changes. The CAMPO functional classification system was last reviewed and revised in early 2013. Functional classification is used in transportation planning, roadway design and determining the funding eligibility of transportation projects. Private roads are not included in the CAMPO functional classification network nor are interstate highways, tribal lands roadways, or federal lands roadways. Functionally classed roadways in the CAMPO network include US highways, state highways, county roads, and some municipal roads/streets. These roadways are divided into urban and rural, and are further classified as local, collector, or arterial as seen in Figure 1. Figure 1 Federal System for Functional Classifications Source: FHWA Functional Classification Guidelines FEDERAL-AID HIGHWAY PROGRAM The Federal-Aid Highway Program supports State highway systems by providing financial assistance for the construction, maintenance, and operations of the Nation's 3.9 million-mile highway network, including Interstates, primary highways and secondary local roads. FHWA is charged with implementing the Federal-Aid Highway Program in cooperation with the States and local governments. Nationally, local governments own and operate about 75 percent of the Nation's highway network. The Program applies to all “functionally classed” roads, with the exception of Minor Collectors or Local. CAMPO Major Thoroughfare Plan 2 Agenda Item 7A - Attachment A £¡50 £¡54 £¡63 £¡63 £¡50 ¹ ¬¬179 ¬¬94 ""C Missouri River Taos O sageR iverC o le C o u n tyCallawayCounty Wardsville £¡63 £¡54 ""J ""M ""B ""B ""E ""W ""T ""D ""D ""OO ""AA ""BB Jefferson CitySt. Martins HoltsSummit City Limits MPO Boundary Federal Functional Classification 0 3 61.5 Miles Freeway/ExpresswayPrinicipal ArterialMinor ArterialMajor CollectorMinor CollectorLocal CallawayCountyBooneCountyCAMPO Federal Functional Classification System Figure 2 CAMPO Major Thoroughfare Plan 3 Agenda Item 7A - Attachment A £¡50 £¡54 £¡63 £¡63 £¡50 ¹ ¬¬179 MissouriRiver Taos Cole County Callaway County Wardsville £¡54 ""M ""B ""W ""T Jefferson CitySt. Martins 0 1 2 3 40.5 Miles !14 !3 !4 !5 !8 !18 !1 !19 !16 !17 !15 !2 !6 !7 Schotthill Woods Drive Extension Bald Hill Rd. (Eastland Dr. to Roling Rd.)Safety improvements: shoulder widening, horizontal and vertical alignment improvements, right-of-way clearing for better sight distance, and improved signing. FFFC: Minor CollectorTanner Bridge Rd. (Route B to Friendship Rd.) Rainbow Dr. (Paradigm Dr. to Binder Lake Rd.) Henwick Ln. (Rainbow Dr. to Gary Ln.) Scott Station Rd. (city limits to Willowbrook Dr.) Construction of a curb and gutter, stormwater improvements, and new pavement. FFFC: Major Collector US 50/63 Rex Whitton Expressway US 50/54/63 Tri-Level US 63/54 north of the Missouri River Bridge Mission Drive extension to Rock Ridge Road Wildwood Drive extension (Phase 2) Wildwood Drive extension (Phase 1) Militia Drive extension S. Summit Drive ramp additions Stoneridge Parkway extension Upgrades to Existing Roads Future Roads Project Description Reconfiguration of Tri-Level interchange to provide non-conflicting system-to-system movements. Capacity and traffic control improvements between US 54 and Lafayette St. Creation of a third eastbound and westbound lane, between the Missouri River Bridge and the divergence of US 63/54. The project would likely include a re-configuration of Route W overpass. FFFC: Freeway/Expressway FFFC - Future Federal Functional Classification are based on a 20 year planning horizon. !9 !20 Improve capacity, reconfigure intersections, widening. FFFC: Minor ArterialRoute B (Tanner Bridge Rd. to Route W) Connection between MO 179 and proposed Wildwood Dr. extension. Project identified in the 2019 Travel Demand Model. This project would likely occur in phases. FFFC: Collector Southern extension from W. Edgewood Drive to Rock Ridge Road (Phase 1) and then extension to Route C (Phase 2) FFFC: Collector Southern extension of Militia Drive from US 63 to Liberty Road. FFFC: Collector Construction of east bound and west bound ramps connecting US 54 to S. Summit Drive in Callaway County. The ramps would complete the existing overpass. FFFC: Freeway/Expressway Southern extension from the roundabout to W. Edgewood Dr., including four lanes with intermittent landscaped medians and center turn lanes, similar to the existing northern portion. FFFC: Collector Eastern extension from its current terminous to Schott Road. FFFC: Collector CAMPO Major Thoroughfare Plan !1!2 !3 !4 !5 !6 !7 !8 !9 !14!15 !20 !16 Area Enlarged Figure 3 !10 !11 !12 !17 !18 !19 !11 !10 !12 Missouri Blvd. (S. Country Club to Howerton Ct.) Missouri Blvd. Corridor Improvements Monroe Street Widening Widen to 5 lanes with right-turn lane at Howerton Ct. FFFC: Principal Arterial Address access management including turn restrictions, traffic controls, safety. Possible addition of turning lanes at S. Ten Mile Dr. FFFC: Principal Arterial !13 !13 Widening of Monroe St. from Woodlawn to E. Atchison St. FFFC: Collector CAMPO Major Thoroughfare Plan 4 Agenda Item 7A - Attachment A Page 0 Illustrative Projects List Review This report is designed to take a more focused look at the Illustrative Projects – System Performance list. This list is broken down into the following categories. 1.Regionally Significant (Tier 1) Projects 2.Highway Interchange Projects 3.Missouri Boulevard Projects 4.Intersection Arterial Projects 5.Intersection Collector Projects 6.Street Widening / Turn Lane Projects 7.Other / Misc. Projects 8.Future Roads Agenda Item 7A - Attachment B Page 1 Regionally Significant (Tier 1) Projects Num Tier City / County Location Project Est. Cost Traffic Counts Crashes 1 1 Jefferson City US 54 / 63 / 94 (Bluff Rd) Construct direct connector for northbound-to- westbound movement to improve capacity; widen US 54/63 to provide 3 continuous through lanes in each direction (in addition to auxiliary/accel/decel lanes) $10M<54100 352 2 1 Jefferson City US 50/63, US 54 to Lafayette St Implement major capacity improvements, which could include mainline widening, grade separations, and/or outer roads $10M<41350 572 3 1 Jefferson City US 50 / 63 /54 (Tri- Level) Reconfigure interchange to provide non-conflicting system-to-system movements $5M- $10M 79968 234 Agenda Item 7A - Attachment B Page 2 Highway Interchange Projects Num Tier City / County Location Project Est. Cost Traffic Counts Crashes 4 2 Callaway County US 54 / S. Summit Dr. Ramps Addition of ramps to westbound and eastbound US 54 completing the S. Summit Dr. overpass $1M-$5M 28451 31 5 2 Jefferson City US 50 / Dix Rd Reconfigure interchange and Dix Rd approaches to address capacity issues including lack of left-turn lanes; consider dumbbell roundabout interchange; widen Dix Rd to provide center turn lane and pedestrian access from US 50 to Missouri Blvd $5M- $10M 35714 116 9 2 Jefferson City US-54 NB Ramps / Christy Dr / Stadium / Jefferson St Install roundabous at both hook ramp intersections to improve operations and address offsets/angles $1M- $10M 15212 53 13 2 Jefferson City US 54 / Ellis Bl / Southwest Bl Reconfigure interchange to address capacity and close spacing of outer roads. Create a pedestrian connection along Southwest Bl / Ellis Bl from Ford St to Southridge Dr $5M- $10M 19448 222 17 2 Jefferson City US 50 / Truman Bl / Country Club Dr Reconfigure interchange to address close outer road spacing; widen westbound off-ramp to improve capacity; incorporate pedestrian facilities into the interchange $5M- $10M 19576 160 25 2 Holts Summit US 54 / Route OO / Simon Bl Reconfigure interchange to address close outer road spacing and capacity issues (may involve roundabouts); incorporate pedestrian facilities crossing US 54 $5M- $10M 7652 45 30 3 Jefferson City US 50/63 / Clark Ave Reconfigure interchange to address ramp terminal capacity (likely roundabouts); include modifications to Clark/Miller and Clark/Dunklin intersections to improve corridor operations $1M- $10M 9692 57 31 3 Holts Summit US 54 / Center St Improve interchange capacity and east-side outer road spacing with roundabouts at terminals $1M- $10M 3636 28 Agenda Item 7A - Attachment B Page 3 Missouri Boulevard Projects Num Tier City / County Location Project Est. Cost Traffic Counts Crashes 7 2 Jefferson City Missouri Blvd, Eastern Lowe's entrance to S 10 Mile Dr Address access management along the corridor, including turn restrictions, additional traffic control, and safety. $1M- $10M 22620 85 22 2 Jefferson City Missouri Blvd, Country Club Dr to Howerton Ct Widen to 5 lanes; including right turn lane at Howerton Ct. $5M- $10M 9669 26 26 2 Jefferson City Missouri Blvd, Stoneridge Pkwy to US 50 Impove access management along Missouri Bld, including improvments to intersections, restrictions to turning movements. and improvemnts to pedestrian safety $5M- $10M 22193 927 Agenda Item 7A - Attachment B Page 4 Intersection -Arterial Projects Num Tier City / County Location Project Est. Cost Traffic Counts Crashes 6 2 Jefferson City West Edgewood @ Stadium Install roundabout to improve intersection capacity $500k- $5M 5680 18 8 2 Jefferson City W. Truman Blvd / Scott Station Rd Signalize or otherwise enhance capacity < $500k 8553 5 14 2 Jefferson City Southwest Blvd @ Stadium Install roundabout to improve intersection capacity $500k- $5M 10707 24 15 2 Jefferson City Ellis Bl / Green Berry Rd Install roundabout to improve intersection capacity $500k- $5M 8128 7 16 2 Jefferson City Bald Hill Rd / Seven Hills Rd Install roundabout to improve intersection capacity $500k- $5M 3359 2 21 2 Jefferson City West Edgewood @ Creek Trail Install roundabout to improve intersection capacity $500k- $5M 4866 12 34 3 Jefferson City MO 179 and Truman Blvd Reconfigure intersection with roundabout $1M-$5M 9570 76 39 3 Jefferson City Swifts Hwy / Jefferson St Reconfigure to fix sight distance issues; widen Swifts Hwy approach $50K- $100k 7126 5 40 3 Holts Summit S. Summit Dr / Perrey Dr / Hibernia Ln / Holt Ln Redesign intersection to address offset and sight distance N/A 3472 1 47 3 St. Martins Route T/D & Bus 50 W Intersection Reconfigure intersection with roundabout $500k- $1M 8456 5 Agenda Item 7A - Attachment B Page 5 Intersection -Collector Num Tier City / County Location Project Est. Cost Traffic Counts Crashes 12 2 Wardsville Route B, Ashbury Way to Route M Install roundabout at Rte B / Falcon / Ashbury and intersection improvment to Rte B / Rte M/ Rte W. $1M-$5M 5456 34 36 3 Wardsville Route B, Tanner Bridge Rd to Friendship Rd Install roundabouts at two locations to improve capacity: Rte B / Falcon / Ashbury, Rte B / Rte M; widen to four lanes in each direction on Rte B for several hundred feet south of Tanner Bridge Rd and reconfigure intersection; Widen Rte B to provide TWLTL $5M- $10M 5818 42 43 3 Holts Summit Van Horn Rd / Julie Ln Redesign intersection to address offset and sight distance N/A 2494 0 48 3 Holts Summit Nieman Rd / Halifax Rd / Major Terr Address offset and skew by installing roundabout or realigning east leg N/A 2150 2 Agenda Item 7A - Attachment B Page 6 Street Widening / Turn Lanes Num Tier City / County Location Project Est. Cost Traffic Counts Crashes 23 2 Jefferson City Country Club Dr, Truman Bl to Rainbow Dr Widen to provide left-turn lanes at existing and future access points $1M-$5M 6790 95 29 3 Jefferson City Madison Street, Dunklin St to US-54 Ramps Add a center turn lane via a combination of widening and parking removal; address unusual stop control configuration at Madison Atchison $1M-$5M 10572 60 33 3 Jefferson City MO 179, Industrial Dr to Sue Dr Add left-turn lanes at Sue Dr, Cherry Creek Ct, and Fire Station north driveway $500k- $5M 4943 50 36 3 Wardsville Route B, Tanner Bridge Rd to Friendship Rd Install roundabouts at two locations to improve capacity: Rte B / Falcon / Ashbury, Rte B / Rte M; widen to four lanes in each direction on Rte B for several hundred feet south of Tanner Bridge Rd and reconfigure intersection; Widen Rte B to provide TWLTL $5M- $10M 5818 42 57 3 Taos Routes M and Y shoulders Install minimum 2 ft. shoulders along state routes throughout Taos Install minimum 2 ft. shoulders along state routes M and Y in Taos $500K- $1M 1432 33 Agenda Item 7A - Attachment B Page 7 Other / Misc. Projects Num Tier City / County Location Project Est. Cost Traffic Counts Crashes 32 3 Cole County Rock Ridge Rd / Wildwood Dr extension Add left-turn lane on Rock Ridge to improve capacity after completion of extension $1M-$5M 2166 3 35 3 Cole County Bridge Replacement / Tanner Bridge Rd Bridge Replacement on Tanner Bridge Rd. over Moreau River $1M-$5M 4011 2 41 3 Holts Summit Spalding Rd/ Park Install drainage improvements. Curb and gutter could cause surface flooding for adjoining properties. N/A 2 42 3 Holts Summit N. Summit Dr and Mars St Intersection Install drainage improvements – box culvert. N/A 8280 5 49 3 Holts Summit E Simon Blvd, ~0.4 mi east of Jefferson Rd Replace undersized culvert. Install new bridge N/A 3576 3 60 3 Jefferson City High St. viaduct replacement Replace High St. viaduct over Missouri Blvd.$5M- $10M 5730 1 Agenda Item 7A - Attachment B Page 8 Future Roads Num Location 1 Wildwood Extension to Rock Ridge Road 2 Mission Drive Extension to Rock Ridge Road 3 Schotthill Woods Drive Extension to Schott Road 4 Missouri State Penitentiary Parkway 5 Mission Drive to Stadium Boulevard Connection 6 Stonerider Parkway extension to W. Edgewood Drive 7 S. Summit Drive Ramp Additions 8 Militia Drive Extension to Liberty Road Agenda Item 7A - Attachment B Agenda Item 7B CAMPO Technical Committee Staff Report Unfunded Needs Review July 7, 2022 Summary MoDOT is anticipated to begin their yearly review and reestablishment of High Priority Unfunded Needs this summer. CAMPO Staff are requesting a review of the 2021 submittals for unfunded needs and guidance from the Technical Committee and Board of Directors on the 2022 process. MoDOT High Priority Unfunded Needs Purpose The purpose of the unfunded needs exercise is to identify and prioritize known transportation needs as a preliminary part of a larger process of “scoping” projects and incorporating them into the Statewide Transportation Improvement Program (STIP). Guidance MoDOT has not yet issued guidance to their Planning Partners on the upcoming round of Unfunded Needs Discussion. Guidance was issued last year, and included funding targets for each of the three tiers and multimodal categories separated by MoDOT District. It is anticipa ted by CAMPO staff that the guidance issued to MoDOT Districts and Planning Partners will be similar to last years guidelines. See attached Attachment A - 2021 Unfunded Needs Project Prioritization Guidelines. Funding Targets In 2021, MoDOT districts were given maximum dollar amounts for project lists within each Tier. Central District had 2021 financial targets of: Tier 1 – $56 Million Tier 2 – $225 Million Tier 3 – $225 Million Multimodal – $112 Million Tiers The unfunded needs are divided into “tiers” based on a combination of priority and ability to deliver the project within a general timeframe. Tier 1 – Urgent Needs, projects must be deliverable within the timeline of the current STIP Tier 2 – Remaining needs, projects should be deliverable within 10 years. Tier 3 – Remaining needs, deliverable in future years. Placement of projects within the tiered list is ultimately a function of MoDOT, with recommendations from the MoDOT districts being sent to MoDOT Central Office, where the lis t is finalized, and ultimately presented to and adopted by the Missouri Highway and Transportation Commission. Agenda Item 7B Existing (Jan 2022) Unfunded Needs List An unfunded needs list was initially published in Fall of 2021. This list only included Tier 1 and Tier 2 Road and Bridge Projects. Tier 3 and Multimodal projects were added to the document, via a second round of unfunded needs discussions, and published in January of 2022. The full statewide unfunded needs document is available online at: https://www.modot.org/unfundedneeds An excerpt of the document showing projects within each Tier for the Central District is provided in Attachment B. An overview list of projects from the CAMPO area is attached as Attachment C. CAMPO Unfunded Needs Project Submittals CAMPO submitted a list of Road and Bridge Projects (in two batches) and a list of Multimodal Projects to MoDOT as part of the unfunded needs planning process. Initial Road/Bridge Project Submittal - Corridor Improvements at the Missouri River Bridge on Callaway County side. - Rex Whitton Expressway Improvements - Highway 54/Simon Boulevard interchange in Holts Summit - Highway 54 and Southwest/Ellis Blvd Interchange - Highway 50 and Truman Blvd/Country Club Drive Interchange - Tri-level Interchange and approaches to the Missouri River Bridge Follow-up (Tier 3) Road/Bridge Project Submittal - Tri-level Interchange and approaches to the Missouri River Bridge - Highway 50 and Dix Road Interchange - Missouri Boulevard Corridor Study - Hwy 50/63 and Clark Avenue Interchange - Route B Corridor-Ashbury Way/Friendship Rd. Projects discussed but not submitted by CAMPO - Highway 54 and South Summit Drive Interchange - Highway 54 ramps at Jefferson/Christy - Highway 54 and Center Street Interchange Multimodal Project Submittal - Airport - Air Traffic Control Tower - JEFFTRAN – Transit Facilities - Amtrack Station - Port Facility - Airport – Runway 12/30 - Airport – ARFF/SRE Facility (firefighting/snow removal) - Airport – Runway 9/27 - Sidewalk – Missouri Boulevard Sidewalks - Sidewalk – South Summit Drive Sidewalks - Greenway – Jefferson City Greenway Extensions Agenda Item 7B Staff Proposed Unfunded Needs Submittal to MoDOT Staff propose to submit the same list of projects to MoDOT for 2023 Unfunded Needs consideration, with the removal of any projects that have been funded or placed in the STIP and the addition of one multimodal project as follows: - Removal of Corridor Improvements at the Missouri River Bridge on Callaway County side. (project funded within 2023-2027 STIP) - Removal of Highway 54/Simon Boulevard interchange in Holts Summit (project funded within 2023-2027 STIP) - Addition of Transload Facility (rail transfer) at Algoa Industrial Park. (pending addition to CAMPO Illustrative list) Projects from the “discussed but not submitted” list would fill out any vacant slots, resulting in the following prioritized project list. Road and Bridge Projects: 1. Rex Whitton Expressway Improvements 2. Highway 54 and Southwest/Ellis Blvd Interchange 3. Highway 50 and Truman Blvd/Country Club Drive Interchange 4. Tri-level Interchange and approaches to the Missouri River Bridge 5. Highway 50 and Dix Road Interchange 6. Missouri Boulevard Corridor Study 7. Hwy 50/63 and Clark Avenue Interchange 8. Route B Corridor-Ashbury Way/Friendship Rd. 9. Highway 54 and South Summit Drive Interchange 10. Highway 54 ramps at Jefferson/Christy 11. Highway 54 and Center Street Interchange Multimodal Projects: 1. Airport - Air Traffic Control Tower 2. JEFFTRAN – Transit Facilities 3. Amtrack Station 4. Port Facility 5. Airport – Runway 12/30 6. Airport – ARFF/SRE Facility (firefighting/snow removal) 7. Airport – Runway 9/27 8. Sidewalk – Missouri Boulevard Sidewalks 9. Sidewalk – South Summit Drive Sidewalks 10. Greenway – Jefferson City Greenway Extensions 11. Transload Facility at Algoa Industrial Park Staff Recommendation Staff is bringing this project list forward to the Technical Committee for review and comment. Staff requests forwarding the list, with any additions, deletions, or commentary, to the Board of Directors for final review. Tabling the discussion for additional review and consideration until the August meeting may also be appropriate. Recommended Form of Motion: Motion to forward the proposed unfunded needs project submittal list to the Board of Directors for review. 2021 Unfunded Needs Project Prioritization Guidelines  With the expansion of the unfunded needs list to include the addition of a third tier and a  multimodal listing, Districts will need to work with Planning Partners now through September to  validate the existing project listing (tiers 1 and 2) and to develop a the additional needs listings for  tier 3 and multimodal. Each district will identify projects totaling their portion of future funding in  the amount of $2 billion for Tier 3 road and bridge projects and $1 billion in Multimodal projects.   The goal of the unfunded needs list is to be able to react quickly with deliverable projects to any  identified or secured funding and to provide a list of projects which represent where additional  funding could be used.    Road and Bridge: The $4.5 billion of needs for road and bridges will be categorized as follows:  1.Tier 1 ‐ $500 million urgent needs a.Projects must be deliverable (awarded) with in the timeline of the current STIP. 2.Tier 2 ‐ $2 billion of remaining needs a.Projects should be deliverable in any of the next 10 years, 2023‐2032. 3.Tier 3 ‐ $2 billion of remaining needs a.Remaining needs deliverable in future years Multimodal: The $1 billion future funding for Multimodal will be categorized as follows:  1.Projects may include all modes of Multimodal transportation. 2.The identified needs can address infrastructure improvements, operation assistance and capital maintenance. General Guidance:  Due to the need to have projects that can be located easily (as might be required to show projects within congressional districts) projects are required to be landed in TMS, and as such Various/Various for route and county cannot be used. Additionally, each project location must be landed under separate entries.  Grouped routes of similar treatments must be separated into individual entries with specific costs and location data. Estimates should be in today’s dollars.  During each review cycle, costs can be reviewed and revised if necessary. Agenda Item 7B - Attachment A  Once formally published, needs are not deleted.  When a project is no longer a regional  priority and removed from the list or if a need is formally committed in the STIP, specific  fields in the Unfunded Needs List TMS application are updated to reflect the disposition.  Only erroneous TMS entries incorrectly identifying an added need which occurred during the  unfunded needs development should be deleted.   o When a need is formally added to the STIP   Added to STIP is updated to Yes   STIP Cycle Added is updated to reflect the STIP Cycle in which the project was  added   Job Number is updated to reflect the project Job Number added to the STIP   o When a project which was previously a need is delivered   Delivered is updated to Yes   Year Delivered is updated to the award year  o When a project is no longer regionally supported and is removed from the list   Removed by Dist. Without Adding to STIP is updated to Yes.    While reviewing the existing unfunded needs the following fields should not be significantly  changed without discussion with CO TP (Minor adjustments which tweak a project location  or clarify the anticipated work are acceptable)  o Description  o Location (TW ID, Route, Begin Log, End Log or County Name)  Potential Future Funds (millions)  Region Road and Bridge Multimodal  District Distribution1 $500 Million  Tier 1  $2 Billion  Tier 2  $2 Billion  Tier 3 Total $1 Billion  NW 4.64% $23.22  $92.89  $92.89  $208.99  $46.44   NE 4.68% $23.39  $93.56  $93.56  $210.52  $46.78   KCR 2.80% $14.02  $56.09  $56.09  $126.20  $28.04   KCU 18.37% $91.85  $367.38  $367.38  $826.61  $183.69   CD 11.27% $56.34  $225.38  $225.38  $507.10  $112.69   SL 34.58% $172.90  $691.61  $691.61  $1,556.12  $345.80   SWR 9.56% $47.81  $191.26  $191.26  $430.33  $95.63   SWU 5.30% $26.49  $105.97  $105.97  $238.43  $52.98   SE 8.79% $43.97  $175.87  $175.87  $395.70  $87.93   Total Dist. 100% $500  $2,000  $2,000  $4,500  $1,000   1 Distributed based upon the MHTC’s FY23 system improvements funding formula.  Timeline:  The due date for the high priority unfunded projects to SharePoint is September 30th .    List submittal:  A TMS application has been built to manage the unfunded needs list.  A separate  document is provided which offers guidance on using the application and required data needs.   Agenda Item 7B - Attachment A Agenda Item 7B - Attachment B Agenda Item 7B - Attachment B Tier 1 – Central District Project Locations Tier 2 – Central District Project Locations Tier 3 – Central District Project Locations Agenda Item 7B - Attachment B March 2022 - Missouri Unfunded Needs List Update – Presented to CAMPO Technical Committee Summary MoDOT has finalized the 2022 High-Priority Unfunded Needs document, which the CAMPO Board, Technical Committee, and staff were heavily involved in. The finalized document is available on the MoDOT website at: https://www.modot.org/sites/default/files/documents/2022-01%20FINAL%20High- Priority%20Unfunded%20Needs.pdf Staff are providing this update of projects contained within the current MoDOT STIP and the Unfunded Needs list for the purpose of discussion. MoDOT intends to update the unfunded needs list on an annual basis and plans to begin that process this summer. 2022-2026 STIP Improvements to Missouri River Bridge approaches on Callaway County side. Budgeted at $4.2 million Planned Award in 2024 Interchange Improvements at Simon Boulevard and Route OO Budgeted at $4.6 million Planned Award in 2023 Unfunded Needs List (Road and Bridge Needs) Tier 1 No project in CAMPO area Tier 2 Hwy 54/Ellis Boulevard/Southwest Boulevard Interchange Estimated Funding Needed: $24 million Current Status: Scoping Project underway by MoDOT consultant Hwy 50/Truman Boulevard/Country Club Drive Interchange Estimated Funding Needed: $11.8 Million Current Status: Scoping Project underway by MoDOT consultant Rex Whitten Expressway Improvements Estimated Funding Needed: $47 million Current Status: EIS document completed Tier 3 Dix Road/Hwy 50 Intersection Improvements Estimated Funding Needed: $8 million Missouri Boulevard Traffic Study (Corridor Study) Estimated Funding Needed: $250,000 Tri-level Interchange Improvements (Cole County Missouri River Bridge approaches) Estimated Funding Needed: $40 million Missouri Boulevard Improvements at South Ten Mile Drive Estimated Funding Needed: $980,000 Agenda Item 7B - Attachment C Unfunded Needs List (Multimodal Needs) Airport Construct New Air Traffic Control Tower Estimated Funding Needed: $4.7 million Runway and Taxiway Improvements for Runway 12/30 Estimated Funding Needed: $16.4 million Aircraft Rescue and Firefighting Building Estimated Funding Needed: $1.75 million Transit Bus Facility Replacement Estimated Funding Needed: $9 million Rail Replace or Rebuild Amtrak Station Estimated Funding Needed: $15 million Port Property Acquisition for North and South Port Sites Estimated Funding Needed: $73,000 Design for Infrastructure at South Side Port Estimated Funding Needed: $98,000 Extend Utility Services into South Side Port Estimated Funding Needed: $99,000 Bridge and Road Infrastructure into South Side Port Estimated Funding Needed: $8.75 million Pedestrian Sidewalks on Missouri Boulevard Estimated Funding Needed: $3 million Sidewalks on South Summit Drive in Holts Summit Estimated Funding Needed: $1.2 million Agenda Item 7B - Attachment C Agenda Item 8A CAMPO Technical Committee Staff Report Capital Area Active Transportation Plan July 7, 2022 Summary Staff, along with consultants Crafton Tull and LaneShift, have kicked-off the planning process for the Capital Area Active Transportation Plan. This process will update and incorporate the Capital Area Pedestrian & Bicycle Plan (2016), Jefferson City’s Sidewalk Plan (2010) and Greenway Master Plan (2007), and the Holts Summit Pedestrian, Bicycle, and Transit Plan (2014). The Capital Area Active Transportation Plan covers all CAMPO communities and take place over the next 12 to 15 months. The plan will generally include the following: • comprehensive set of strategies to ensure better options for biking, walking, and transit • recommendations for prioritizing infrastructure improvements • outline recommendations for new policies, processes, and infrastructure • base recommendations on a robust public and stakeholder involvement campaign A detailed scope of services and timeline is attached. Funding for this project totals $125,000 and is provided via the CAMPO Consolidated Planning Grant ($100,000), with match provided by JC Parks ($25,000). __________________________________________________________________________________________ www.craftontull.com 1 Exhibit “A” Scope of Basic Services For: Project: CAMPO Active Transportation Plan Client: Capital Area Metropolitan Planning Organization Location of Project: City of Jefferson, MO Discipline: Planning Discipline Manager: Julie Luther Kelso Project Manager: Julie Luther Kelso Proposal Date: 03/23/22 Billing Type: Fixed Fee Fee/Estimate: $125,000 Description of the Planning Project: Active Transportation Planning Services TASK 1: PROJECT KICK-OFF, EXISTING FACILTIES, VISIONING, AND ONGOING COORDINATION At the outset of the project, Crafton Tull (Consultant) will work with the Capital Area Metropolitan Planning Organization (Client) to refine the overall project strategy and initiate coordination with past or ongoing studies and projects in the study area. Task 1.1 Virtual Kick-off Meeting and Project Management The CTA Team will begin the project with a virtual kick-off meeting with the Client to confirm the objectives for the project. As necessary, the kick-off meeting will address the following key project issues: 1. Provide a forum for meeting participants to identify opportunities and challenges that this project will face, and to establish the objectives that must be accomplished through this work. 2. Discuss the project schedule, including the key milestones, deliverables and meetings. 3. Discuss the availability of GIS and/or other base data and plan documents that will be needed for the project. It is understood that CAMPO staff will subsequently meet with individual jurisdictions to present the project process and timeline. Task 1.2 Ongoing Project Coordination Throughout the project, Crafton Tull will coordinate progress, decision points, and next steps with the client or client team. Monthly project update meetings will be held to discuss these and any project issues as they arise. __________________________________________________________________________________________ www.craftontull.com 2 Task 1.3 Public Engagement Plan Crafton Tull will outline a public engagement plan based on this scope of services that specifies workshop agendas, focus groups, and outreach efforts that may be completed by the consultant team or client throughout the planning process. Task 1.4 Previous Plans Review and Assessment The CTA Team will review all previous plans relevant to this study and assess major themes, identify areas of consensus and areas of contradiction, and compile a summary document to be utilized during the visioning process with the steering committee and the public to confirm which components have been achieved, which ones carry forward with continued relevance, and which ones no longer apply. This assessment will determine the framework of the consolidated Active Transportation Plan. The Crafton Tull Team will conduct a virtual meeting with the client to review the assessment and key outcomes of existing plans. Task 1.5 Collect Existing GIS Data and Develop Base Maps To conduct the analyses described in this scope, the Consultant will need a wide variety of GIS and base data, including street attribute data, built and natural environment components, planning and parcel data, and analytical and planning outputs from previous planning efforts. The following GIS data is requested to conduct the project: • Roadway centerline files with road name, classification, posted speed limit, ADT, number of travel lanes, lane widths and overall roadway width, direction (one-way vs. two way) • Existing bicycle and pedestrian traffic counts • Locations and descriptions of planned transportation infrastructure improvements • Existing and planned trails and greenways, sidewalks, and on- and off-road bicycle facilities • Right of way extents • Bicycle and pedestrian crash data over the past 5 years • Travel Demand Model and Scenario Planning Outputs • Analysis data previously completed for this project • Locations of signalized intersections • Transit routes and stops • Contours • Locations of physical barriers such as sidewalk disconnects, major highways, rail lines, rivers and streams, steep terrain, and other barriers • On-street parking restrictions • Parcel layers indicating public or private land ownership • Major employment and activity centers • Locations of major bicycle and pedestrian destinations (including schools, colleges, libraries, parks and open spaces, senior centers, social service sites, community centers, sporting venues, tourist destinations, hospitals, and other activity centers) • Locations of planned residential or commercial development • Land use (current and proposed) __________________________________________________________________________________________ www.craftontull.com 3 • Zoning • Population, employment, and travel data (by census block group and traffic analysis zone) • Aerial photography of the study area Under guidance of the Client, Crafton Tull will use data provided by Client and request additional data through contact with planning, transportation, park and/or public data management. Task 1.6 Existing Facilities and Existing Conditions Analysis Using the base data obtained in Task 1.5, Crafton Tull will develop or revise a map of existing on- and off-road bicycle (not including unpaved trails) and pedestrian facilities across the study area (to the extent data is available). The map will show locations and types of facilities, and will include supplementary information such as locations of parks, schools, transit routes and other key generators of bicycling and walking trips. Road suitability analysis maps as well as trip generator analysis maps will also be produced, which assist in the determination of future network recommendations. Task 1.7 Sidewalk Inventory CAMPO staff will provide an inventory of existing sidewalks within the study area, including locations of continuous existing sidewalks in good or suitable condition, locations of deteriorating sidewalks or major sidewalk gaps, and completeness of the sidewalk on one or both sides of the street as generalized on a per-block basis. Task 1.8 WORKSHOP 1: Envisioning the Future The Crafton Tull Team will conduct a three-day workshop with the steering committee, stakeholders, and the public to confirm previous public engagement outcomes as well as identify new goals and strategies that will be carried forward through the CAMPO Active Transportation Plan. The Crafton Tull Team will be responsible for developing meeting materials, handouts and presentations. The Client will be responsible for arranging the meeting venue and logistics, as well as distributing meeting notifications. • Client and Consultant Site Tour The Crafton Tull Team will participate in a half day site tour with CAMPO staff to visit key locations within the study area. These may include recent infrastructure projects, areas of concern, key destinations within the community, major connectivity barriers, and/or areas of high pedestrian or bicycle use. CAMPO staff will be responsible for organizing this overview. • Steering Committee Meeting 1: Vision & Goals The Crafton Tull Team will conduct a visioning session with the Project Steering Committee to define the overall vision and goals for bicycling and walking in the CAMPO region, including existing and desired routes for active transportation and important destinations within the community. During this discussion, the Steering Committee will help the Consultant understand the City’s transportation policy, land use policy, development patterns, existing programs and other factors that will contribute to a high quality bicycle and pedestrian environment in the community. Crafton Tull will develop the draft vision and goals statement based on this discussion. __________________________________________________________________________________________ www.craftontull.com 4 • Stakeholder Group Meetings The Crafton Tull Team will conduct four stakeholder groups over a period of one morning and one afternoon to discuss opportunities and barriers to walking and cycling, efforts to build a culture of walking and bicycling, existing efforts underway that affect the active transportation network, and desired outcomes of the project as well as the network. It is anticipated that these groups will include: • Healthcare • Education • Public Safety • Chamber/CVB and Business Owners • Bicycle/Pedestrian Advocates • Elected Officials & Government Staff • Public Meeting 1 The first Public Meeting will be used to gather insight from the general public and interested stakeholders. The meeting will have the following objectives: • Provide an overview to the benefits of providing a culture for active transportation • Provide input into the vision/goals for walkability, bikeability, and trails in the community, including those identified in previous planning efforts • Solicit input on issues and concerns regarding pedestrian access, bicycle connectivity, and safety throughout the City • Offer an opportunity for participants to document bicycle and pedestrian issues they are aware of in their community or routes they currently travel or would like to travel • Discuss important current and future destinations in the community Task 1 Deliverables: • Kick-off meeting materials • Draft Vision and Goals for the project • Existing Facilities map(s) • Public Meeting 1 maps, graphics, presentation, and outcomes TASK 2: PRELIMINARY NETWORK, CONDITIONS ASSESSMENT, AND RECOMMENDATIONS This task includes an assessment of existing infrastructure, as well as plan to establish a baseline for active transportation across the study area considering both on-street facilities, sidewalks, and paved trails. Task 2.1 Develop Study Network Crafton Tull will define a preliminary network for field assessment based upon the analysis and input received in Task 1. The Consultant will identify critical gaps in the community bicycle and pedestrian network. This analysis will include: __________________________________________________________________________________________ www.craftontull.com 5 • locations where bike and pedestrian facilities end prior to key destinations, or do not sufficiently connect to other facilities (such as trail entrances) • relevant locations in the study area that are not currently served by the pedestrian and bicycle network, • existing pedestrian and bicycle locations where a significant safety issue exists, • major barriers to bicycle and pedestrian travel, such as wide arterial streets, rail lines, water bodies, etc. Task 2.2 Assess Study Network Crafton Tull will evaluate the route network to define barriers and opportunities as well as general connectivity issues throughout the study area. The Consultant will assess connectivity in the proposed network through detailed field assessments and documentation. Crafton Tull will develop specific recommendations to create an active transportation network. The Project Team will incorporate the findings from the field work into a project database. Maps will be developed illustrating recommended facility types. Task 2.3 Preliminary Active Transportation Network Development Based on the information gathered in previous task, field work, and review of relevant local and regional plans, Crafton Tull will develop recommendations for the active transportation network. These recommendations will consist of the following: • key linkages for bicycle and pedestrian connectivity, • major bicycle and pedestrian facilities (including paved off road trails, greenways, etc.), • any other facilities that have been determined to be of significance • specific facility type recommendations for each proposed route • general intersection treatments necessary to accommodate the active transportation network Task 2.4 Client Review of Preliminary Network The Crafton Tull Team will conduct a virtual meeting with the Client to review the preliminary network. Task 2.5 Workshop 2: The Path Forward The Crafton Tull Team will conduct a second workshop to present the preliminary active transportation network and gather feedback, and conduct walk audits with the steering committee and stakeholders to evaluate walkability in key areas of the CAMPO region. The Crafton Tull Team will be responsible for developing meeting materials, handouts and presentations. The Client will be responsible for arranging the meeting venue and logistics, as well as distributing meeting notifications. • Steering Committee Meeting The Steering Committee will meet to review Network Recommendations as well as Case Study alternatives and provide input for developing prioritization criteria and action steps. __________________________________________________________________________________________ www.craftontull.com 6 • Walk Audits The Crafton Tull Team will conduct a series of three interactive walk audits (one in conjunction with the steering committee, one with stakeholders, and one with elected officials) to develop placemaking concepts and solutions for circulation (vehicular, pedestrian and bicycle), parking, universal access, low impact development concepts, wayfinding, beautification, and community character improvement. A brief summary of the walk audits will be prepared that includes a list of opportunities and constraints identified at the event. • Public Meeting 2 The second meeting will be used to share the preliminary active transportation network. The meeting will have the following objectives: • Discuss best practices in facility type selection, design, and application and how these practices are applied within the CAMPO study area • Educate local citizens and stakeholder groups about successful solutions to common pedestrian an d bicycle deficiencies • Share information discovered during analysis and field assessments, and discuss bicycle and pedestrian concepts for a communitywide network • Present the draft active transportation network for public feedback Task 2 Deliverables: • Study network map • Field assessment of critical connections in the study area • Map(s) of draft network and associated databases • Summary of the draft network • Steering Committee meeting materials • Walkshop summary • Public Meeting 2 maps, graphics, and presentation TASK 3: PRIORITIZATION AND IMPLEMENTATION PLAN Crafton Tull will develop an implementation plan that identifies short-, medium- and long-term projects, as well as a methodology for project prioritization, and general opinions of probable cost. Task 3.1 Preliminary Estimates of Probable Cost (Planning-level) Crafton Tull will develop a spreadsheet-based cost estimate to determine planning level costs for various improvements (i.e. cost per foot of sidewalk). Total project estimates will not be provided, as bike & pedestrian components are often only one part of an overall infrastructure project (i.e. a roadway design project that include bike lanes but costs for road design options may vary). This task is intended to provide a comparison of order of magnitude costs for specific routes or route segments. __________________________________________________________________________________________ www.craftontull.com 7 Task 3.2 Project Prioritization Methodology Crafton Tull will create a list of prioritized projects based on need, cost, ease of implementation, completing network gaps, and other community-specific goals, as prioritized by the steering committee. The Consultant will work with Client to develop criteria that will be used to determine project priority. Factors that could be considered for prioritizing projects may include: • Project feasibility/ease of implementation • Relative planning-level costs • Safety • Completing gaps within the active transportation network • Potential to improve access in areas with high user volumes and other key activity locations • Public support (improvements suggested by citizens in the public meetings, Client input, and Steering Committee discussions) • Opportunities to provide facilities as a part of previously planned or upcoming projects (repaving and reconstruction projects) • Other priorities as identified during the public input process Task 3.3 Implementation Strategy The pedestrian and bicycle recommendations from Task 2 will be scored and prioritized into short-, intermediate-, and long-term projects based on the prioritization methodology established in Task 3.2. Projects will be phased, and potential funding sources will be outlined. This approach provides guidance for sequenced project rollout, while allowing flexibility to adapt as implementation opportunities arise. Task 3.4 Policy Development and Code Reform Recommendations The Crafton Tull Team will provide recommendations on municipal policies and code regarding sidewalk, greenway, and other active transportation modes, including development triggered construction requirements. Policy and program recommendations will also be provided that encourage the use of walking, biking, and transit as viable modes of transportation. These may include, but are not limited to, complete streets as well as bicycle and pedestrian accommodation policies for last-mile connectivity. Task 3.5 Virtual Client and Steering Committee Review (see Additional Services for a third in-person workshop) The Crafton Tull Team will conduct virtual meetings with staff and the Steering Committee to review project prioritization, implementation strategies, as well as code and policy recommendations. Task 3 Deliverables: • Project cost estimating tool for unit prices • Project prioritization • Implementation strategies • Steering Committee meeting materials • Public Meeting 3 maps, graphics, and presentation __________________________________________________________________________________________ www.craftontull.com 8 TASK 4: MASTER PLAN DOCUMENTATION The Crafton Tull Team will prepare draft and final versions of the CAMPO Active Transportation report. The final report for the project will pull together the findings and public input generated in Tasks 1 through 3. Task 4.1 Draft Report Development The Draft Active Transportation Plan document will include written sections as well as maps that show the locations of proposed projects. It will outline outcomes and recommendations from each of the tasks listed above, and will include data on safety, accessibility, and efforts to increase use. The report will be illustrated with graphic maps, photographs, charts and drawings as needed to support the text. It is anticipated that a local map and project list for each community will be provided as part of the document. Task 4.2 Client Review The Draft Report will be made available for Client and Steering Committee review. If desired, a virtual meeting will be held to review the plan document. Task 4.3 Public Comment The CAMPO Active Transportation Plan will be available for public comment. CAMPO staff will review comments and indicate what sentiments should be reflected in the final plan. Task 4.3 Final Report Development Upon approval of the draft by the Client and Steering Committee, including comments from the public as directed by CAMPO staff, the Crafton Tull Team will revise the draft document per such comments and prepare a Final Report. Task 4.4 Virtual Presentation to the CAMPO Board of Directors (Adoption Hearing) Once the final plan has been completed, the Crafton Tull Team will prepare and deliver a virtual presentation for City Council for plan adoption. The presentation will incorporate major themes, key highlights and summarize plan recommendations. Task 4.5 Local Jurisdiction Adoption CAMPO staff will complete the Active Transportation Plan process by presenting the document to local jurisdictions for adoption. Task 4 Deliverables: • Draft plan report with network maps (digital copies) • Final plan report and executive summary (digital copies and 10 printed copies) • Adoption presentation materials __________________________________________________________________________________________ www.craftontull.com 9 ADDITIONAL SERVICES The following tasks can be provided as additional services for the fees indicated. Task 3.5 Workshop 3: Building Success – IN PERSON (Additional $5,000) The Crafton Tull Team will conduct the third and final workshop to review the active transportation plan recommendations. The Crafton Tull Team will be responsible for developing meeting materials, handouts and presentations. The Client will be responsible for arranging the meeting venue and logistics, as well as distributing meeting notifications. • Steering Committee Meeting The Steering Committee will meet to review project prioritization and implementation strategies. • Public Meeting 3 This final public meeting will be used to garner feedback on the active transportation network and its affiliated implementation strategies and phasing. NOTE: No construction plans or details are included in this contract. Construction documents can be provided as an Additional Service or as part of a separate contract. Boundary and topographic surveys may be completed as an additional service if adequate information is unavailable. Should there be additions to this scope of services, those services shall be compensated for additional fee. Effective January 1, 2022 Hourly Hourly Category Rate Category Rate ARCHITECTURE LANDSCAPE ARCHITECTURE VICE PRESIDENT OF ARCHITECTURE ……………..185$ SR. LANDSCAPE ARCHITECT ………………………………..145$ DIRECTOR OF ARCHITECTURE ……………………….175$ PROJECT LANDSCAPE ARCHITECT ……………………..110$ SR. PROJECT MANAGER ……………………………….160$ LANDSCAPE ARCHITECT INTERN II ……………………….85$ PROJECT MANAGER ………………………………………150$ LANDSCAPE ARCHITECT INTERN I ……………………….75$ SR. PROJECT ARCHITECT ……………………………….140$ LANDSCAPE ARCHITECTURE DESIGNER ………………………..80$ PROJECT ARCHITECT …………………………………130$ PLANNING INTERN ARCHITECT III …………………………………..100$ PLANNING MANAGER …………………………………..170$ INTERN ARCHITECT II ………………………………………90$ SR. PLANNER ………………………………………………..155$ INTERN ARCHITECT I ………………………………………..80$ PROJECT PLANNER …………………………………….120$ SR. DESIGNER …………………………………………………….120$ PLANNER II …………………………………………………..100$ DESIGNER III …………………………………………………105$ PLANNER I ………...……………………………………………..85$ DESIGNER II ……………………………………………..85$ INSPECTION DESIGNER I ……………………………………………….75$ SR. INSPECTOR …………………………………………..110$ BIM COORDINATOR III …………………………………..70$ INSPECTOR II …………………………………………………….95$ BIM COORDINATOR II ………………………………………55$ INSPECTOR I ………………………………………………….65$ BIM COORDINATOR I …………………………………….45$ SURVEYING CIVIL ENGINEERING PROFESSIONAL SURVEYOR PRINCIPAL ……………………………190$ ENGINEERING PRINCIPAL ……………………………..210$ SR. PROFESSIONAL SURVEYOR ……………………………150$ SR. ENGINEERING MANAGER …………………………195$ PROFESSIONAL SURVEYOR ………………………….120$ ENGINEERING MANAGER ………………………………..175$ SURVEY PROJECT MANAGER ………………………..115$ SR. PROJECT ENGINEER ……………………………….155$ SURVEY COORDINATOR ……………………………………95$ PROJECT ENGINEER …………………………………….130$ SURVEYOR INTERN ………………………………………..85$ ENGINEER INTERN III ……………………………………..120$ SURVEY PARTY CHIEF II …………………………………………..85$ ENGINEER INTERN II ……………………………………..110$ SURVEY PARTY CHIEF I …………………………………………..75$ ENGINEER INTERN I ……………………………………….100$ SURVEY TECHNICIAN III …………………………………..65$ SR. ENGINEERING DESIGNER …………………………..140$ SURVEY TECHNICIAN II ……………………………………..55$ ENGINEERING DESIGNER III …………………………….110$ SURVEY TECHNICIAN I ……………………………………..45$ ENGINEERING DESIGNER II ……………………………..90$ GEOGRAPHIC INFORMATION SYSTEMS ENGINEERING DESIGNER I ………………………………80$ GIS MANAGER ………………………………………………..110$ ENGINEERING CAD TECHNICIAN III ………………………..75$ GIS ANALYST …………………...……………………………..90$ ENGINEERING CAD TECHNICIAN II ……………………..65$ GIS TECHNICIAN II ………………………………………………65$ ENGINEERING CAD TECHNICIAN I ………………………50$ GIS TECHNICIAN I ……………………………………………50$ ENVIRONMENTAL REIMBURSABLE EXPENSES ENVIRONMENTAL MANAGER ……………………….185$ GPS Equipment………...….....….………..…....$35/Hour SR. ENVIRONMENTAL SCIENTIST ……………………….145$ Robotic Survey Equipment…….………........…$20/Hour PROJECT ENVIRONMENTAL SCIENTIST …………120$ LiDAR Scanning Equipment ……………….…..$35/Hour ENVIRONMENTAL SCIENTIST II ……………………….100$ UAV …………………………………….………$1000/Unit ENVIRONMENTAL SCIENTIST I ……………………….80$ Job Related Mileage……….....................……$0.58/Mile ADMINISTRATIVE Per Diem for Out of Town Crews…..Per GSA Allowable ADMINISTRATIVE PRINCIPAL ……………………………….185$ Airfare and other travel related expenses……….At Cost ADMINISTRATIVE MANAGER ………………………………..145$ Black and white 8.5"x11" Copies ….…....... $0.15/sheet ADMINISTRATIVE IV ………………………………………..100$ Color 8.5"x11" Copies …….…….…...….…. $1.50/sheet ADMINISTRATIVE III …………………………………………..80$ Photo Paper Color Plan Sheet Copies …... $0.75/sq. ft. ADMINISTRATIVE II …………………………………………..55$ Reproducible Plan Copies (Vellum) …........ $1.50/sq. ft ADMINISTRATIVE I …………………………………………….45$ Reproducible Plan Copies (Bond) …......…. $0.35/sq. ft. All rates are subject to change without notice. Exhibit "B" Standard Hourly Rate Schedule EXHIBIT C PROJECT SCHEDULE CAMPO Active Transportation Plan C-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Task 1 Kickoff, Existing Facilities, Visioning, Coordination 1.1 Virtual Kickoff Meeting 1.2 Ongoing Coordination 1.3 Public Engagement Plan 1.4 Previous Plans Review & Assessment 1.5 Data Collection & Base Mapping 1.6 Existing Facilities & Existing Conditions Analysis 1.7 Sidewalk Inventory (by CAMPO) 1.8 Workshop 1:Site Tour, Steering Committee Meeting, (6) Stakeholder Group Meetings, Public Meeting WS 1 Task 2 Preliminary Network, Assessment, Recommendations 2.1 Develop Study Network 2.2 Assess Study Network 2.3 Preliminary Network Development 2.4 Client Review 2.5 Workshop 2: Steering Committee, Walk Audits, Public Meeting 2 WS 2 Task 3 Prioritization & Implementation Plan 3.1 Preliminary Estimates of Probable Cost 3.2 Project Prioritization 3.3 Implementation Strategy 3.4 Policy Development & Code Reform Recommendations 3.5 Virtual Client & Steering Committee Review Task 4 Master Plan Documentation 4.1 Draft Report Development 4.2 Client Review 4.3 Public Comment 4.4 Final Report Development 4.5 Virtual Adoption Hearings (CAMPO, City of Jefferson, City of Holt's Summit 4.6 Other Local Jurisdiction Adoption (by CAMPO) Months from Notice to Proceed Agenda Item 8B CAMPO Technical Committee Staff Report Safe Action Plan Grant Opportunity – USDOT Safe Streets and Roads for All (SS4A) July 7, 2022 Summary The Bipartisan Infrastructure Law (BIL) established the new Safe Streets and Roads for All (SS4A) discretionary program with $5 billion in appropriated funds over the next 5 years. In fiscal year 2022 (FY22), up to $1 billion is available. The SS4A program funds regional, local, and Tribal initiatives through grants to prevent roadway deaths and serious injuries. The SS4A program supports the National Roadway Safety Strategy and the USDOT’s goal of zero deaths and serious injuries on our nation’s roadways. At the May 18 Board of Directors meeting staff was asked to look into this grant program and provide more information to the Technical Committee and Board of Directors on CAMPO’s eligibility to apply. SS4A provides funding for either creation of a Safety Action Plan or implementation of an existing plan. CAMPO does not have an existing plan and would only be eligible for the development of a plan. A Safety Action Plan would consist of the following components: • Leadership commitment and goal setting that includes a goal timeline for eliminating roadway fatalities and serious injuries. • Planning structure through a committee, task force, implementation group, or similar body charged with oversight of the Action Plan development, implementation, and monitoring. • Safety analysis of the existing conditions and historical trends that provides a baseline level of crashes involving fatalities and serious injuries across a jurisdiction, locality, Tribe, or region. • Engagement and collaboration with the public and relevant stakeholders, including the private sector and community groups, that allows for both community representation and feedback. • Equity considerations developed through a plan using inclusive and representative processes. • Policy and process changes that assess the current policies, plans, guidelines, and/or standards to identify opportunities to improve how processes prioritize transportation safety. • Strategy and project selections that identify a comprehensive set of projects and strategies, shaped by data, the best available evidence and noteworthy practices, as well as stakeholder input and equity considerations, that will address the safety problems described in the Action Plan. • Progress and transparency methods that measure progress over time after an Action Plan is developed or updated, including outcome data. Once a plan is in place a jurisdiction is eligible to apply for implementation funds to achieve the following: • Additional analysis • Expanded data collection and evaluation using integrated data • Testing Action Plan concepts before project and strategy implementation • Feasibility studies using quick-build strategies that inform permanent projects in the future (e.g., paint, plastic bollards) • Follow-up stakeholder engagement and collaboration • Targeted equity assessments • Progress report development • Complementary planning efforts such as speed management plans, accessibility and transition plans, racial and health equity plans, and lighting management plans Applications are due September 15th and require a 20% local match. For Action Plan Grants, award amounts are based on estimated costs, with an expected minimum of $200,000 for all applicants, an expected maximum of $1,000,000 for a State or a federally recognized Tribal government, and an expected maximum of $5,000,000 for an MPO or a joint application comprised of a multijurisdictional group of entities that is regional in scope. Staff has attended USDOT webinars and is in the process of exploring an application. More information on the SS4A grant fund can be found in the attached on the USDOT website at https://www.transportation.gov/grants/SS4A. Staff will provide regular updates. Agenda Item 8C CAMPO Technical Committee Staff Report Status of Current Work Tasks July 7, 2022 Summary The following list includes work tasks that are currently in progress or have been completed since the previous meeting: • FY 2023 Unified Planning Work Program (UPWP) amendment/modification. The FY2023 UPWP was adopted by the Board of Directors in May 2022. Since that adoption, Jefferson City’s City Council has been begun a process to look into increasing employee salaries. This may impact with CAMPO budget and FY2023 UPWP. Staff will provide an update to the Board of Directors and Technical Committee if and when a modification or amendment may be needed in the future. • 2023-2027 Transportation Improvement Program (TIP) amendment. Staff has been notified that an amendment is pending for August. • JEFFTRAN Transit Facility Feasibility Study. A final document has been completed and is under review by Federal Transit Administration and Jefferson City Public Works Staff. An updated presentation will be given to the Technical Committee at a future meeting. • GIS Assistance. Staff continues providing technical assistance regarding GIS data and mapping to member jurisdictions for various projects. Staff will be attending the virtual ESRI Conference in July. • Capital Area Active Plan. See staff report. • SS4A (Safety Action Plan) Grant Application. See staff report. • BRO Funding Rankings. Planning partners will be asked to rank applications within their areas after all applications have been received. Applications are due July 27th. Rankings may occur in August. See attached flyer on changes to the BRO program. • TAP Funding Rankings. Planning partners will be asked to rank applications within their areas after all applications have been received. Applications are due July 15th. Rankings may occur in August. Four applications are anticipated within the CAMPO region. OFF-SYSTEMLOCAL BRIDGE 1 The off-system local bridge replacement program (BRO) has changed to a distribution of money based on the area of poor condition bridge deck, rather than a distribution based upon bridges being deficient. Additional money was made TABLE 1 BRO Program Amounts per MoDOT Districtavailable for the BRO program with the passage of the Infrastructure Investment and Jobs Act (IIJA) in late 2021. Under IIJA, the minimum allocation percentage for the BRO program was increased from 15% to 20%, which is estimated to add approximately $7 million to the annual BRO allocation. Table 1 shows a summary of these changes from 2021 to 2022. IIJA also allocates new funding for the bridge replacement, rehabilitation, preservation, protection, and construction program (hereafter, Bridge Formula Program (BFP)). The BFP requires that 15% of available funds be spent on off-system bridges with no local match requirement (funded at 100%). FHWA has recommended that funding be allocated based on the percentage of poor deck area, which would be 20.35% on the off-system. TABLE 2 Bridge Formula Program Off-System For federal fiscal year 2022-2024, $15.7 million has been allocated for the off-system BFP. For federal fiscal year 2025 and 2026, $29.7 million will be allocated for the off-system BFP, which brings the total allocation for the 5 year program to 20.35% for local bridges. The funds for the BFP program will be distributed in the same manner as the BRO program. Table 2 shows how the funding would be allocated to each MoDOT District. It is anticipated that the amounts available for 2023 thru 2026 will be allocated in a similar manner, making the total amount available for the off-system BFP approximately $106.5 million. Distribution by county has resulted in the accumulation of large unspent balances for the BRO program and will continue even with the increase in BRO funds from the passage of IIJA. Moving forward, the BRO program will be modernized to distribute the funding on a regional (per MoDOT District) basis using the total deck area of poor bridges in the region. Federal fiscal year 2022 (current year) will be used as a transition year in which all existing negative county balances will be cleared before the statewide funds are distributed to a region. Counties will be allowed to carry existing positive balances forward into the regional program. Regions will be required to honor all existing project commitments within the region prior to distributing any regional funds to new projects. JUNE 2022 TABLE 4 BRO Allocations 2023 and Beyond 2 TABLE 3 2022 BRO Transition Year TABLE 5 Summary of Funds Available for Projects Initially, applications for three years of funding will be requested from the local entities. Regional committees will be established to make the final determination of bridges selected for the initial three year schedule. The bridge schedule will then be updated and added to on a yearly basis. The soft match credit program will continue to be available. The net result of the funding increases in IIJA means that around $214 million will be available over the next five years for bridge projects on the off-system. Table 5 provides a summary of the total funds available for each of the upcoming federal fiscal years. O F F -S Y S T E MLOCAL BRIDGE Table 3 shows how the transition year will look on a regional basis. Table 4 shows the anticipated future (FFY 2023 and beyond) BRO funding distribution. J U N E 2 0 2 2