HomeMy Public PortalAboutTetra Tech Change Order #2Via E-mail May 6, 2013 TETRA TECH Tt No. 200-08540-12001 Wayne Steele Public Services Director City of Crestview 715 N. Ferdon Blvd. Crestview, Florida 32536 Subject: Old Bethel Road Part I Change Order No. 2 Dear Mr. Steele: Enclosed, please find Change Order No. 2 from Speegle Construction, Inc. We have reviewed the proposed changes to the Contract and find them acceptable. The Change Order amounts to a deduct of $4,112 and is related to the revision of the Yard Piping configuration on the well site. Should you have questions or need additional information, please call. Sincerely, Michael B. Bomar, PE Vice President Cc: Tim Vanderwalker, PE, Tetra Tech Fred Cook, PE, City of Crestview OPEATEk> e Tetra Tech, Inc. 12815 Emerald Coast Parkway, Suite 110, Destin, FL 32550 850.837.9278 Fax 850.837.7269 www.tetratech.com P:\2011\Crestview Well and Tank \Constructionaeview-Approval\ContractorCOs\Part I\Part I Change Order No. 2.docx. SECTION 00843 CHANGE ORDER FORM Project: City of Crestview Part I - Well No. 9 and Elevated Storage Tank DATE OF ISSUANCE: EFFECTIVE DATE: OWNER'S CONTRACT NO.:200-08540-12001 CHANGE ORDER NO, 02 CONTRACTOR: Speegle Construction, Inc. ENGINEER: Tetra Tech The following changes are hereby made to the Contract Documents: CHANGE IN CONTRACT PRICE: Original Contract Price $ 1,965,660.00 CHANGE IN CONTRACT TIMES: Original Contract Times Substantial Completion: 12/23/2013 Ready for final payment: amo or 61511 Net changes from previous Change Orders No. 1 to No. 1 $ (4,275.00) Net change from previous Change Orders No. 1 to No. 1 0 d,y, Contract Price prior to this Change Order $ 1,961,385.00 Contract Times prior to this Change Order Substantial Completion: 12/23/2013 Ready payer dem or d,w Net Impasse decrease of this Change Order $ (4,112.00) Net Increase (decrease) of this Change Order 0 dss, Contract Price with all approved Change Orders $ 1,957,273.00substantial Contract Times with all approved Change Orders Fiction: 12J23/2013 Ready for fmal payment d ss or dais MAD/s1m/specs/s-1/00843 Tt #200-08540-12001 00843-1 050412 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The General Conditions, Supplementary Conditions, Specifications and all parts of the Project Manual listed in Article 1, Definitions, of the General Conditions apply to and govern all work under this change order. Change Order No. 02 i II. REQUIRED CHANGES: Sheet M-101, Revision 2, dated 4/25/2013; reconfigure yard piping as shown, resulting in deletion of 10° DIP inlet piping and associated fittings, one sample tap (location #1 ) and one bacteriological test connection at the riser. III. JUSTIFICATION: As requested. IV. PAYMENT: MAD/slm/specs/s-1 /00843 Tt#200-08540-12001 00843-2 050412 V. APPROVAL AND CHANGE AUTHORIZATION: Acknowledgments: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. Change Order Request by: Change(s) Ordered by: RECOMMENDED BY: -\-re... -1—e c-t-1 (Engineer) (Contractor) ACCEPTED BY: Speegle Construction, Inc. 5/6/2013 ) (Date) President APPROVED BY: City of Crestview, Florida B (Owner) 6 —/3—/g (Au + orized Signature (Date) END OF SECTION (Title) MAD/slm/specs/s-1 /00843 Tt#200-08540-12001 00843-3 050412 may' dab panao COO a°a�°u SCONSTRUCTION INC. CCC-06I469 PEEGLE Speegle Construction, Inc. Tel: (850) 729-2484 210 Government Avenue Fax: (850) 729-1993 Niceville, Florida 32578 www.speegleconstrucdon.com May 3, 2013 Dan Cerrut i Project Manager Mr. Tim Vanderwaiker Tetra Tech 12815 Emerald Coast Pkwy, Suite 110 Destin, FL 32550 Dear Sir, RE: Crestview Well No. 9 COR 1002-002 - M-101 Revision 2, dated 4/25/2013 Speegle Construction, Inc. respectfully submits the attached credit for changes associated with the revised M-101 (dated 4/25/2013), which includes the reconfiguration of the individual inlet and outlet pipes modified to a single pipe which will serve as both inlet and outlet. This revised sheet M-101 also results in the deletion of the 10" DIP inlet piping & associated fittings, one (1) sample tap (location #1) and one (1) bacteriological test connection at the riser. Total credit owed back to the City of Destin is ($4,112.00). Backup Information is attached. Should you require any additional information, please do not hesitate to contact Dan Carruth at 850-729-2484 or email dcamuth@speegleconstruction.com Sincerely. Dan Camith cc: file Project Manager ��t ISCONSTRUCT1ON INC. CYiC4o6240 PEEGLE REQUEST for CHANGE ORDER SUMMARY DESCRIPTION: M-101 Revision, inlet pipe reconfiguration REASON FOR CHANGE: request by owner ARCH RFP# SCI RCOtx QUOTE DATE 002 1002-02 5/3/2013 DIV SCOPE DESCRIPTION NOTES LABOR MAIL EQUIPT SUBCONT TOTAL 1 General Conditions $ 25.00 $ - $ - $ - $ 25.00 2 Skework & Demolition $ (774.001 $ (2,742.38) $ - $ - $ (3,516.38) 3 Concrete $ - $ - $ - $ _ $ _ 4 Masonry $ - $ - $ - $ - $ - 5 Steel $ - $ - $ - $ - $ - 6 Carpentry, Wood & Plastic $ - $ - $ - $ - $ - 7 Thermal & Moisture Protection $ - $ - $ - $ - $ - 8 Openings $ - $ - $ - $ - - 9 Finishes $ - $ - $ - $ - $ - 10 Specialties $ - $ - $ - $ - $ - 11 Equipment $ - $ - $ - $ - $ - 12 Furnishings $ - $ - $ - $ - $ - 13 Special Construction $ - $ - $ - $ 525.00 $ 525.00 14 Hoisting & Conveying $ - $ - $ - $ - $ _ 15 Fire Sprinklers $ - $ - $ - $ - $ - Plumbing $ - $ - $ - $ (409.00) $ (409.00) HVAC & Controls $ - $ - $ - $ - $ - 16 Electrical $ - $ - $ - $ - $ - 17 Commissioning $ - $ _ $ - $ _ $ _ SubTotals $ (749.00) $ 0,742.38) $ " $ 116.00 $ (3,37$28) Payroll Bunsen 45% $ (337.05), - $ (337.05) Sales Tax 6%: $ (164.54)I $ - $ (164.54) Sub Bond 2.00% ; ,: " $ 2.32 $ L32 SubTotals $ (1,086.05)I $ (2,906.90 $ - $ 118.32 $ (3,874.65) General Liability Insurance 0.4200% of Subtotal $ (16.27) Property (Builder's Risk) insurance 0.6500% of Subtotal $ (25.19) P & P Band 0.000051, of Subtotal $ - Gross Receipts Tax (City Bus Lic) 0.0000% $ - SUBTOTAL $ (3,916.11) Overhead/Profit 5.00% $ (195.81) SUBTOTAL $ K1121 $ - GRAND TOTAL $ K112) $ - t3dended General Overhead $ - $ (4,112) me Exoensron *This Proposal Is for only the work Identified by the above change description. " See reservation of rights language on the Detail backup. 0 ender days DETAIL PROPOSED CHANGE ORDER ESTIMATE DIRECT COST ASSOCIATED WITH CHANGE ORDER DESCRIPTION: M-101 Revision, Inlet pipe reconfiguration REASON: request by owner ARCH RFP iI002 SCI RCO911002-02 N3/2013 CODE, 1 SCOPE DESCRIPTION QUANI' tuts L / U.P. LABOR M / U.P. MAIL EQUIPMENT l SUBCONT TOTAL GENERAL CONDITIONS Project Manager $ - $ - $ - Estimating $ - $ - $ - Superintendent $ - $ - $ - Quality Control $ - $ - $ - T6nekeeper/Clerk $ - $ - $ - Watohmen $ - $ - $ - Foreman(COimplementation) $ - $ - $ - MEP Coordinator I $ - $ - $ - Safety Director & equl ent $ - $ - $ Asbuilt documentation( 1 hr 25.00 $ 25.00 $ - $ 25.00 Out of Town Housing $ - $ - $ - Out of Town Per Dams $ _ $ - $ - Truck & Fuel $ - $ - $ - RFP Preparation $ - $ - $ - RFP Administration $ - $ - $ - Travel Expense $ - $ - $ - Blueprinting & drawings $ - $ - $ - Copying & Specifications $ - $ - $ - Mail & Express Postage $ - $ - $ - Layout & Field Engineering at pond $ - $ - $ - Crane & Hoisting $ - $ - $ - Schedule study & Modification $ - $ - $ - Prepare Fragnet $ - $ - $ - Maferial Handling Equipment $ - $ - $ - Safety $ - $ - $ - Clean-up & Debris Handling $ - $ - $ - Durnpster Pulse $ - $ - $ - Equipment Rental $ - $ - $ - Tniddng & Hauling $ - $ - $ - Small Tools $ - $ - $ - Otter $ - $ - $ - Field coordination $ $ - $ - $ - i - $ - $ - $ - $ - Divislon 1 Subtotal $ 25.00 $ - $ - i - $ 25.00 2 SITEWORK & DEMOLITION 10" DIP -78 LF 8.00 $ (624.00) 27.21 $ (2,122.38) $ - $ (2,746.38) $ (456.00) $ (189.00) 10" DIP45's -4 EA 26.00 $ (loam 89.00 $ (356.00) $ - 10" DIP Tae'S I -1 EA 25.00 $ (26.00) 164.00 $ (164.00) $ - Bacteriological test connection at riser -1 EA 25.00 $ (25.00) 100.00 $ (100.00) $ (125.00) $ (3,516.38) Division 2 Subtotal $ (774.00) $ (2,742.38) i • $ - 3 CONCRETE 0 EA 0.00 $ - $ - $ - $ $ - $ - Division 3 Subtotal $ - $ - i - $ - $ - 4 MASONRY & STONE $ - $ - $ - $ - $ - $ - Divislon 4 Subtotal $ - i - i - i • $ - 5 STEEL & METALS EA $ - $ - i - i - $ - $ - Divtsion 5 Subtotal $ - $ - $ - $ - $ - 6 WOOD & PLASTICS $ - $ - $ - i - i - $ - $ - Divlslon 6 Subtotal $ - $ - $ - $ - $ - 7 THERMAL & MOIST PROTECT $ - $ - $ - $ - $ - i - Divlaion 7 Subtotal $ - $ - $ - i - $ - 6 OPENINGS DESCRIPTION: REASON: DETAIL PROPOSED CHANGE ORDER ESTIMATE DIRECT COST ASSOCIATED WITH CHANGE ORDER M-101 Revision, inlet pipe reconfiguration ARCH RFP x SCI Nom QUOTE DATE 002 1002-02 request by owner 5/3/2013 CODA SCOPE DESCRIPTION QUANT units L / U.P. LABOR M / U.P. MAT'L EQUIPMENT SUBCONT TOTAL $ - $ - $ - $ - $ - $ - Divislon 8 Subtotal $ • $ - $ - $ - $ - 9 FINISHES $ - $ - $ - $ - -$ - $ - Division 9 Subtotal $ - $ - $ - $ - $ • 10 SPECIALTIES $ - S - S - $ - $ - $ - Division 10 Subtotal $ - $ - $ - $ - $ - 11 EQUIPMENT- " a a - $ - $ - $ - $ - Division 11 Subtotal $ - $ - $ - $ - $ - 12 FURNISHINGS $ - S - $ - $ $ - $ - Dlvision 12 Subtotal $ - S - $ - S - $ - 13 SPECIAL CONSTRUCTION Phoenbc Febricatma (see quote) $ - - $ 525.00 $ 525.00 Division 13 Subtotal $ - _ : - $ - $ 525.00 $ 626.00 14 HOISTING & CONVEYING $ - $ - $ - $ - $ - $ - Division 14 Subtotal $ - $ - $ - $ - $ - 15 FIRE PROTECTION $ - $ - $ - $ - $ - $ - Division 16 Fire Subtotal $ - $ - $ - $ - $ - 15 PLUMBING Sample Tap, Location 1: Pre -Tank (see quote) $ - $ - $ (409.00) $ (409.003 $ - $ - $ - Divieton 16 Plumb Subtotal S - $ - $ - S (409.00) S (409.00) 16 MECHANICAL ✓4 HVAC $ - $ - $ - $ - $ - $ - $ - Divlsion 15 HVAC Subtotal $ - S - $ - $ - S - 16 ELECTRfCAL _ $ - $ - $ - $ $ DTvlafon 16 Subtotal - $ $ - $ a $ 17 COMMISSIONING $ - $ - $ - Dlvision 17Subtotal $ - $ - $ - $ - $ - SubTotafs __. $ (749.00) $(2,742.35) $ - S 116.00 $ (1375.38) Dan Carruth From: Mike Adams <MikeAdams@phoenixtank.com> Sent: Friday, May 03, 201312:29 PM To: Dan Carruth Cc: Terry Fitzpatrick subject•. RE Crestview Well No. 9 - CO request for pricing Cost breakdown as follows: Base plate, fabrication, painting and installation cost $1500 Sleeve was custom cut for this application, no credit 10" Stubout no credit, we were cutting a full joint of pipe and cutting It half. We can Install 1 full joint In place of 2 haves. Either way the cost is the same. Fitting and base elbow credit $ $975. Total cost difference $525 to switch to one Inlet/outlet pipe. Please let me know as soon as possible, David is ready to go on this. Thanks, Mike From: Dan Carruth(maiito:ccartruthtilsoeealeconsbruction.romj Sent: Tuesday, April 30, 2013 1:56 PM To: Mike Adams Cc: Terry Fitzpatrick Subject: Crestview Well No. 9 - CO request for prdng Mike, As previously discussed, see attached revised M-101 depicting the deletion of the Inlet line running to the tank. Please prepare a detailed change order estimate of all costs (rework of the base plate, etc.) and credits (deletion of the DIP inlet pipe stubout & fittings, sleeve, etc.) associated with this revision for the Owner's approval. This is not a notice to proceed with this work; however, I Intend to request a quick approval from the AE to ensure our schedule is not delayed. Thanks, Dan Carruth Speegle Construction, Inc. 850-729-2484 t (b 6£$) 00'9£ 6- 00'9L 6- (66£$) 00'9£6- (00'L3) 8 00'9L6- (00'9L3) I. Be (.# uonsooi de3 eidwes 6unapp Jo; pnpea L (oL) lt/101 3Nn (6) S1S00 le33ula N3H10 0) 1H101 (4 311/21 30Y213Ad (s) SA vaNvIY S21nOHM11N (9) 1V101 (t) 11Nn (s) kuusrdno (a) 3anSV3W 30 11Nn (L) W311 'ON 3NI1 S1300 2109K1 12001V1H31HYV 6# HAM MalArileJ3 NOU.H001 NNOM a3ewnN 103P021d N39wnN 123n03213SVH021nd (sot$) :13npaa OCR/ T1101 033S0d0Nd del eidweg Enema (pauuapad aq of 3110M) and 13VHIN00 £9SZ£ ld 'meals mno `Aem ped eze918 MO LS09 SS32100H uepead NOIVJ211N00 NMOCINV32�8 31dWIlS31S0o NOIlof1uisN0o e1rJaW 4eoN a uepeed 31/11VN W2113 JaGeuevialold :31111 £ 6074719 Gay 1V1O1 %OL @7lldONd %M.@ aV31-1213A0 -minims %OZ @7 N3a21f19 U0E1 1 S1S00 2:109V11V101