HomeMy Public PortalAbout20130925 - Agenda Packet - Board of Directors (BOD) - 13-23
REGULAR MEETING
BOARD OF DIRECTORS
MIDPENINSULA REGIONAL OPEN SPACE DISTRICT
Administrative Office
330 Distel Circle, Los Altos, CA 94022
Wednesday, September 25, 2013
REGULAR MEETING BEGINS AT 7:00 P.M.*
A G E N D A
7:00 REGULAR MEETING OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE DISTRICT
– OPEN SESSION
ORAL COMMUNICATIONS – PUBLIC
ADOPTION OF AGENDA
7:05 CONSENT CALENDAR
1. Approve Minutes of the Special and Regular Board Meetings –
September 10, 2013
September 11, 2013
2. Approve Revised Claims Report
3. Written Communications –
Pescadero Municipal Advisory Council
4. Resolution of the Board of Directors of the Midpeninsula Regional Open Space District Honoring
the Santa Clara County Open Space Authority for Twenty Years of Open Space Preservation – S.
Lewis
5. Authorization to Amend a Contract with Timothy C. Best, CEG, to Provide Engineering Geology
Consulting Services for the Hendrys Creek Stream Restoration Plan within the Cathedral Oaks
Area of Sierra Azul Open Space Preserve (R-13-74) – A. Roa
6. Authorization to Amend a Contract with John Northmore Roberts Associates, Landscape
Architectural Consultant, for Additional Design Services for the Mindego Gateway Staging Area
Project (R-13-84) – G. Coony
7. Authorization to Amend a Contract with Geocon Consultants, Inc., for Additional Geotechnical
Services for the Mount Umunhum Staging Area at Bald Mountain as part of the Mount
Umunhum Public Access Implementation Project (R-13-72) – L. Bankosh
Meeting 13-23
7:10 BOARD BUSINESS
8. Authorization to Amend a Contract with TKO General Engineering and Construction for
Revisions to the El Corte de Madera Creek Open Space Preserve Staging Area (R-13-87) – T.
Hugg
9. Authorization to Award a Contract to Strategy Research Institute to provide Ongoing
Professional Services to Support the District’s Public Outreach Program (R-13-88) – E. Cuzick
10. Proposed Changes to the Midyear Action Plan and Budget Process and Associated Budget
Authorities (R-13-86) – K. Drayson
INFORMATIONAL REPORTS – Reports on compensable meetings attended. Brief reports or announcements
concerning activities of District Directors and staff; opportunity to refer public or Board questions to staff for
factual information; request staff to report back to the Board on a matter at a future meeting; or direct staff to
place a matter on a future agenda.
A. Committee Reports
B. Staff Reports
C. Director Reports
ADJOURNMENT
* Times are estimated and items may appear earlier or later than listed. Agenda is subject to change of order.
TO ADDRESS THE BOARD: The President will invite public comment on agenda items at the time each item is considered by the Board of
Directors. You may address the Board concerning other matters during Oral Communications. Each speaker will ordinarily be limited
to three minutes. Alternately, you may comment to the Board by a written communication, which the Board appreciates.
Consent Calendar: All items on the Consent Calendar may be approved without discussion by one motion. Board members, the General
Manager, and members of the public may request that an item be removed from the Consent Calendar during consideration of the
Consent Calendar.
In compliance with the Americans with Disabilities Act, if you need assistance to participate in this meeting, please contact the District Clerk
at (650) 691-1200. Notification 48 hours prior to the meeting will enable the District to make reasonable arrangements to ensure accessibility
to this meeting.
Written materials relating to an item on this Agenda that are considered to be a public record and are distributed to Board members less than
72 hours prior to the meeting, will be available for public inspection at the District’s Administrative Office located at 330 Distel Circle, Los
Altos, California 94022.
CERTIFICATION OF POSTING OF AGENDA
I, Jennifer Woodworth, District Clerk for the Midpeninsula Regional Open Space District (MROSD), declare that the foregoing agenda for
the Regular Meeting of the MROSD Board of Directors was posted and available for review on September 20, 2013, at the Administrative
Offices of MROSD, 330 Distel Circle, Los Altos California, 94022. The agenda is also available on the District’s web site at
http://www.openspace.org.
Signed this 20th day of September, 2013, at Los Altos, California.
District Clerk
September 10, 2013
Board Meeting 13-21
SPECIAL MEETING
BOARD OF DIRECTORS
MIDPENINSULA REGIONAL OPEN SPACE DISTRICT
Elkus Ranch
1500 Purisima Creek Road
Half Moon Bay, CA 94019
September 10, 2013
DRAFT MINUTES
SPECIAL MEETING – STUDY SESSION
I. CALL TO ORDER
President Cyr called the Special Meeting of the Midpeninsula Regional Open Space
District Board of Directors to order at 4:01 p.m.
II. ROLL CALL
Members Present: Jed Cyr, Yoriko Kishimoto, Pete Siemens, Nonette Hanko, Larry
Hassett, and Cecily Harris
Members Absent: Curt Riffle (Recused due to potential conflict of interest)
Staff Present: General Manager Steve Abbors, Assistant General Manager Ana
Ruiz, Assistant General Manager Kevin Woodhouse, Assistant
General Counsel Hilary Stevenson, Natural Resources Manager
Kirk Lenington, Acting Planning Co-Manager Tina Hugg, Planner
III Lisa Bankosh, Real Property Manager Michael Williams, Real
Property Specialist Elaina Cuzick, Public Affairs Manager Shelly
Lewis, Area Superintendent Brian Malone, and District Clerk
Jennifer Woodworth
III. BOARD BUSINESS
Real Property Manager Mike Williams provided an overview of the site’s location as
well as a brief history on and past uses of the Event Center.
Meeting 13-21 Page 2
Natural Resources Manager Kirk Lenington described the riparian corridor along the
stretch of San Gregorio Creek that flows through the Event Center property, specifically
noting the presence of Coho salmon and steelhead trout.
Real Property Manager Mike Williams provided the staff presentation of the POST
(Driscoll) Event Center property explaining that the District does not own or manage the
property. Mr. Williams stated that the District has been studying the uses that have
occurred on the Event Center property and has held Coastside meetings to gather public
input. Mr. Williams described five categories of known prior uses of the Event Center
and their levels of intensity with regards to their impact on the land. Mr. Williams also
stated that an evaluation of what uses to allow on the property in the future must also take
into consideration constraints on District staff time and the use of District resources to
manage these events.
Director Hassett asked how the Event Center was operated by the previous owner and
requested more information on this topic from staff because he is unsure of how the
District would fund the types of events being described.
Director Harris inquired if the Lease and Management Agreement with POST would be
an annual lease. Real Property Manager Williams explained that the agreement may be
for multiple years.
Director Hanko commented that it would be helpful to know the attendance expected for
the proposed uses. Mr. Williams responded that staff will be observing the rodeo being
held at the Event Center on September 22nd to gather more information.
Director Kishimoto commented that the role of the District is changing as it acquires
more land. With this project the District must decide if it is going to operate as a
landowner acting as landlord, create partnerships with other agencies to operate the site,
or remain a preservationist agency with a hands-off approach.
Director Siemens expressed his concerns regarding the District’s potential liability and
insurance requirements for the proposed uses.
Public comment opened at 4:50 p.m.
Paul Barulich spoke in favor of combining the Event Center and the grazing operation on
the Preserve into a single Request for Proposals by the District.
Maria Fonseca, a member of the San Mateo County Horseman’s Association, spoke in
support of equestrian events being held at the Event Center.
Lyndall Erb, a member of Bay Area Farms and Trails, spoke regarding the historical
value of the Event Center.
Bob Meehan spoke in support of the other events held at the Event Center, such as
concerts, reunions, picnics. Mr. Meehan also spoke in favor of combining the Event
Center and the grazing operation into a single Request for Proposals by the District.
Meeting 13-21 Page 3
Charise McHugh, a resident of San Mateo County and chairman of the Half Moon Bay
Coastside Chamber of Commerce and Visitor’s Bureau, spoke in support of tourism in
the rural areas of the Coastside, and the role the Event Center plays in supporting
tourism.
Angelo Costanza, a member of the Woodside Mounted Patrol, spoke in favor of
combining the Event Center and the grazing operation into a single Request for Proposals
by the District.
Rebekah Witter spoke about the historical value of rodeos to California culture and the
need to preserve the horse culture.
Mike Bushue, a member of Equestrian Trail Riders’ Action Committee, spoke in support
of horse clinics, especially those held by 4-H clubs, because these do not require many
District resources to operate.
Carol Bridgeman, a member of San Mateo County Mounted Search and Rescue, said the
Event Center is integral to training their horses and described the types of training used
by her organization.
Doniga Markegard spoke in support of keeping the Event Center and grazing operation
separate. Ms. Markegard also spoke about cattle grazing and her family’s dependence on
the land.
Public comment closed at 5:16 p.m.
Director Hassett commented that he was uncomfortable with the idea of concerts,
reunions, and picnics being held at the Event Center because these types of events do not
depend on the Event Center to exist. Director Hassett asserted his belief that separate
Requests for Proposals for the Event Center and grazing operation are important because
combining these would otherwise limit the number of people who have the ability to
participate in the process. Director Hassett expressed his concerns about the District
financing some of the potential uses of the Event Center and the associated
environmental impact inherent in the high-intensity uses. Director Hassett voiced his
concern that the potential uses of the Event Center will strain District staff capacity and
resources that are already in short supply.
Director Hanko expressed her desire that the District capture the rural character of the
area and preserve it; however, she is open to partnerships in order to finance the project.
Directors Kishimoto and Siemens voiced their opinions that partnerships with
independent operators would be required for high-intensity uses.
Director Cyr stated that the decisions made regarding the Event Center could lead to a
major policy shift by the District to provide more activities on the land rather than
straightforward preservation.
Meeting 13-21 Page 4
Director Hassett commented that it is important for all aspects of the community to be
working together, including hotels, agricultural interests, community events, etc., and
noted the importance of tourism to the Coastside economy.
IV. ADJOURNMENT
President Cyr adjourned the Special Meeting of the Board of Directors of the
Midpeninsula Regional Open Space District at 5:41 p.m.
Jennifer Woodworth
District Clerk
September 11, 2013
Board Meeting 13-22
REGULAR MEETING
BOARD OF DIRECTORS
MIDPENINSULA REGIONAL OPEN SPACE DISTRICT
Administrative Office
330 Distel Circle
Los Altos, CA 94022
September 11, 2013
DRAFT MINUTES
I. CALL TO ORDER
President Cyr called the Regular Meeting of the Midpeninsula Regional Open Space
District Board of Directors to order at 7:03 p.m.
II. ROLL CALL
Members Present: Jed Cyr, Nonette Hanko, Cecily Harris, Larry Hassett, Yoriko
Kishimoto, and Pete Siemens
Members Absent: Curt Riffle
Staff Present: General Manager Steve Abbors, Assistant General Manager Ana
Ruiz, Assistant General Manager Kevin Woodhouse, General
Counsel Sheryl Schaffner, Administrative Services Manager Kate
Drayson, Natural Resources Manager Kirk Lenington, Acting
Planning Co-Manager Tina Hugg, Public Affairs Manager Shelly
Lewis, Real Property Manager Mike Williams, Operations
Manager David Sanguinetti, Planner III Gina Coony, Real Property
Specialist Allen Ishibashi, Planner II Zachary Alexander, and
District Clerk Jennifer Woodworth
III. ORAL COMMUNICATIONS
There were none.
IV. ADOPTION OF AGENDA
Motion: Director Kishimoto moved, and Director Harris seconded the motion to adopt
the agenda.
Meeting 13-22 Page 2
VOTE: 6-0-0 (Director Riffle absent)
V. CONSENT CALENDAR
Motion: Director Hanko moved, and Director Kishimoto seconded the motion to approve
the Consent Calendar.
VOTE: 6-0-0 (Director Riffle absent)
Agenda Item #1 – Approve Minutes of the Special and Regular Board Meetings
August 28, 2013
Agenda Item #2 – Approve the Revised Claims Report
Agenda Item #3 – Written Communications
None.
Agenda Item #4 – Authorization to Amend a Lease and Management Agreement
with Peninsula Open Space Trust for the Hendrys Creek Property located in the
Cathedral Oaks Area of Sierra Azul Open Space Preserve, at 20610 Aldercroft
Heights Road, Los Gatos, in unincorporated Santa Clara County (Santa Clara
County Assessor’s Parcel Numbers 558-27-007, 558-27-008, and 558-51-005) (R-13-
77)
VI. BOARD BUSINESS
Agenda Item #5 – Authorization to Award a Contract to Bianchi Construction to
Install Concrete Foundations for the Peters Creek Bridge Replacement Project at
Long Ridge Open Space Preserve (R-13-80)
Planner II Zachary Alexander presented the staff report summarizing the project.
Director Hanko inquired about the difference between the estimate and the amount of the
contract being awarded. Planner II Alexander explained that the variation is largely due
to the constraints inherent in the project site, including its remote location and the need to
retrofit the current bridge to allow for construction equipment access to the site. These
site specific issues were not addressed in the rough estimate. Assistant General Manager
Ana Ruiz provided information regarding the trend throughout the Bay Area of increased
costs of construction due to an upturn in the economy and the related difficulty in
soliciting interest from contractors at this time due to the remote location and small-scale
nature of District projects.
Director Siemens asked about the disposition of the existing Peters Creek Bridge.
Planner II Alexander explained that Skyline field staff will be removing the old bridge
once the new bridge is complete.
Public hearing opened at 7:14 p.m.
No speakers were present.
Meeting 13-22 Page 3
Public hearing closed at 7:14 p.m.
Motion: Director Hassett moved, and Director Siemens seconded the motion to
authorize the General Manager to enter into a contract with Bianchi Construction from
San Jose, CA, for a not-to-exceed amount of $63,600, which includes the bid amount of
$52,923.46 and a 20% contingency of $10,600, to install the Peters Creek bridge
foundation at Long Ridge Open Space Preserve.
VOTE: 6-0-0 (Director Riffle absent)
Agenda Item #6 – Authorization to Award a Contract to Randazzo Enterprises Inc.,
to Complete the Powell Demolition Project at Monte Bello Open Space Preserve (R-
13-82)
Real Property Specialist Allen Ishibashi provided the staff report describing the
demolition of six residential structures and five sheds and the remediation and removal of
numerous debris piles. Mr. Ishibashi described the restoration of the property, including
the re-contouring, de-compactingand installation of erosion control measures at the
property. If the contract is awarded to Randazzo, remediation is planned to begin at the
end of September, demolition during the middle of October and restoration in early
November.
Director Kishimoto inquired about the recycling and salvaging of materials from the site,
and asked whether the County of Santa Clara required this as a part of the demolition
permit. Planner III Gina Coony explained that to her knowledge, the County has no such
requirement. Ms. Coony explained that due to landfill charges, demolition contractors
recycle as much as they can to save cost. However, due to the very poor quality of
materials on this site, there is very little that will have recycle value. To the extent
possible, the contractor will be recycling non-treated wood (it can be ground up and used
as mulch) and grinding concrete for re-use on site.
Public hearing opened at 7:29 p.m.
No speakers were present.
Public hearing closed at 7:29 p.m.
Motion: Director Hanko moved, and Director Kishimoto seconded the motion to (1)
authorize the General Manager to enter into a contract with Randazzo Enterprises Inc., of
Castroville, CA, for a not-to-exceed amount of $331,111, which includes the base bid
amount of $211,310 for demolition, an add alternative of $89,700 for site restoration, and
a 10% contingency amount of $30,101, to complete the Powell Demolition Project at
Monte Bello Open Space Preserve; and (2) authorize the General Manager to reallocate a
portion of the Real Property Land Conservation and Property Management funds to cover
project costs.
VOTE: 6-0-0 (Director Riffle absent)
Meeting 13-22 Page 4
Agenda Item #7 – Authorization to Award a Contract to R&M Paving, General
Engineering Contractor for Construction Services for the Rancho San Antonio
Road Repair Project (Mora Trail) at Rancho San Antonio Open Space Preserve (R-
13-83)
Operations Manager David Sanguinetti presented the staff report describing the location
of the project and use of the road.
Public hearing opened at 7:35 p.m.
No speakers were present.
Public hearing closed at 7:35 p.m.
Motion: Director Harris moved, and Director Siemens seconded the motion to authorize
the General Manager to enter into a contract with R&M Paving for a not-to-exceed
amount of $115,170, which includes the bid amount of $104,700 and a 10% contingency
of $10,470, to complete road repairs and paving at Rancho San Antonio Open Space
Preserve.
VOTE: 6-0-0 (Director Riffle absent)
VII. COMMITTEE REPORTS
Director Cyr reported that the Board Appointee Evaluation Committee met on Monday
and Wednesday with the Board appointees. The Committee’s recommendations will be
before the Board at an upcoming meeting.
Director Kishimoto reported that the Action Plan & Budget Committee met regarding the
Mid-Year Budget Process, and their recommendations will be before the Board on
September 25.
VIII. STAFF REPORTS
Operations Manager David Sanguinetti reported that Ranger Brad Pennington discovered
and provided treatment for a hiker he discovered in medical distress at Windy Hill Open
Space Preserve. Evidence of mountain lions has been found at Skyline Open Space
Preserve and warnings have been posted at Skyline Ridge. The Ranger and Contingent
Project Manager recruitments are in process and should be completed soon.
Public Affairs Manager Shelly Lewis provided a brief update on the Founders’ Day
Event on Saturday and provided the Board with a copy of the scheduled events for the
day. Ms. Lewis provided a list of upcoming community events where the District will
have a booth.
Acting Planning Co-Manager Tina Hugg reported that demolition efforts at Mt.
Umunhum are scheduled to begin later this month. The Mindego Gateway construction
is on schedule for its opening on October 20. Ms. Hugg provided an update on the El
Meeting 13-22 Page 5
Corte de Madera staging area and notified the Board that an agenda item on this matter
will be before them at the next Board meeting.
General Manager Abbors reported he attended a meeting of the East Palo Alto Rotary
Club last week and showed the new District video. Mr. Abbors provided a list of
upcoming community meetings he will be attending. The League of Conservation Voters
will be presenting the District with an award commemorating the District’s 40th
Anniversary on October 23.
IX. DIRECTOR REPORTS
Director Siemens reported that he volunteered at the Nature Center and repaired the pond
display. He also attended the County Special District’s meeting and met Santa Clara
County Supervisor Cindy Chavez there.
Director Hanko reported that she attended the recent Community Advisory Committee
meeting and enjoys attending these meetings because the members are doing wonderful
work.
Director Kishimoto thanked staff for their work on the Lehigh Quarry issue and reported
her attendance along with several staff members at a Cupertino City Council Study
Session that was held on the topic.
General Counsel Schaffner notified the Board that a hearing on the Lehigh Quarry
litigation will be held on Friday.
Director Harris reported that she attended a Parks Forward meeting on Monday and
commented that there will be several meetings throughout the state in the coming weeks.
Director Hassett commented on Georgia Stigall’s recent photo stating it was taken near
his home.
Director Cyr reported that he attended a meeting on the Vision Plan at the District office
today and was impressed with District staff’s efforts.
The Board submitted their compensatory forms to the District Clerk.
X. ADJOURNMENT
President Cyr adjourned the Regular Meeting of the Board of Directors of the
Midpeninsula Regional Open Space District at 8:04 p.m.
Jennifer Woodworth
District Clerk
Claims No. 13-18
Meeting 13-23
Date 9/25/13
Midpeninsula Regional Open Space District
Amount
Name
Description
20917
20918
20919
20920
20921
20922
20923
20924
20925
20926
20927
20928
20929
20930
20931
20932
20933
20934
20935
20936
20937
$40,033.24
$25,500.00
$16,160.60 #
$10,452.75
$10,142.00
$8,190.00
$5,201.46
$4,945.00
$4,844.25
$3,360.00
$3,284.32
$3,100.00
$3,004.00
$2,951.01
$2,740.00
$2,657.61
$2,564.60
$2,322.22
$2,309.50
$2,287.50
$2,219.26 *2 First National Bank
Patsons Media Group
New World Systems
Knapp Architects
Design Concepts
John Northmore Roberts & Associates
Santa Clara County Communications
Department
LFR An ARCADIS Company
Bartel Associates
The Creative Group
Government Staffing Services
Simms Plumbing & Water Equipment
Garden Creamery
"1 Roxie Food Truck
Del Woods
Fall Creek Engineering
Sol's Mobile Service
*2 First National Bank
Ecological Concerns
John Northmore Roberts & Associates
Rosemary Cameron
20938 $1,890.48 *2 First National Bank
20939
20940
20941
20942
$1,835.65
$1,804.94
$1,700.00
$1,555.00
Copy Factory
"2 First National Bank
Butano Geotechnical Engineering
Alexander Atkins Design
20943 $1,449.88 *3 Design Concepts
20944 $1,439.59 "2 First National Bank
20945 $1,385.52 *2 First National Bank
Printing Services - Maps & Brochures For Various Preserves /
Business Cards / Factsheets / Stationary / Envelopes / Invitations
/ Posters / General Brochures / Summer & Fall Newsletters
Annual IAFS Software Service & Maintenance Fee
Historic Site & Structure Assessments - Hawthorn Property
Various Design Projects - Maps / Newsletter/ Poster / Invitations /
Dog Owners Brochure / Envelopes / Outdoor Activities / Preserve
Brochures
Design Development - Mt. Umunhum Staging Area
District Radio System Repairs At Various Towers
Engineering Services - ECDM Staging Area Surveying Work
Consulting Services - OPEB Actuarial Valuation
Temp - Web Administrator
Office Temp - Human Resources Technician
Replace Water Heater - Rental Residence / Clear Sewer Line -
SFO / Water Tank Repairs - Rental Residence
Ice Cream Truck For Founder's Day Festival
Food Truck For Founder's Day Festival
Consulting Services For Bear Creek Stables
Design Services For Pond DR08 At La Honda Creek
Vehicle Maintenance & Repairs
Conferences & Training Expenses - The National Land
Conservation Conference / California Public Employee Relations
Labor Association Conference / California Special District
Association Conference / CalPERS Educational Forum
Registration
Native Revegetation Maintenance & Monitoring - Skyline Ridge
Tree Farm Phase III
Construction Administration For Mindego Gateway Staging Area -
POST Funded
Consulting Services - Capital Finance Program
Computer, Website & Internet Expenses - Computer Supplies /
Wi-Fi For GM & General Counsel iPads / Email Service Provider
For Sending Email Blasts / Notebook Docking Station / Monitor
Stands / iPad Accessories / Dropbox Cloud File Storage Fee
Advertising, Subscriptions & Books - Media Communications
Supervisor Job Posting / SamTrans & Caltrain Advertising Cards /
Project Manager For Operations Department Job Posting / Bid
Request For Road Work At RSA / Ad For Founder's Day Event
Vision Plan Postcards / Founder's Day Materials / Resolution For
Sierra Club's 80th Anniversary / Newspaper Clippings
Event Supplies & Expenses - Supplies For Founder's Day Event /
Facility Deposit For Staff Recognition Event
Engineering Services - Geotech Services During Construction For
The Mindego Gateway Staging Area - POST Funded
Professional Design Services - Hispanic Heritage Month Flyer's &
Online Publication / Founder's Day Flyer / Out And About
Outreach Ad / Founder's Day Sign
Fans For Founder's Day Festival
Volunteer & Docent Events & Supplies - Volunteer Supplies /
Supplies For Volunteer Recognition Event / Gift Cards
Business Related Meals - Board Meetings / Staff Training Lunch /
Snacks For Staff / Staff Dinner For Vision Plan Meeting / Lunch
For Ranger & Volunteer Program Lead Interview Panels / Lunch
With Peninsula Open Space Trust
Page 1 of 3
Claims No. 13-18
Meeting 13-23
Date 9/25/13
Midpeninsula Regional Open Space District
Amount
Name
Description
20946
20947
20948
20949
20950
20951
20952
20953
20954
20955
20956
20957
20958
20959
20960
20961
20962
$1,374.10
$1,345.36
$1,280.10
$1,277.50
$1,269.06
$1,224.86
$1,165.99
$1,125.00
$1,050.00
$978.75
$962.78
$937.28
$694.63
$689.60
$608.16
$578.98
$531.22
McKowan, Paul
Communication Advantage
Brush Road Corporation
Timothy C. Best, CEG
Gou, Vicky
Hertz Equipment Rental
*2 First National Bank
Schafer Consulting
Pat O'Brien
ARC
CMK Automotive
Accountemps
Tires On The Go
The Mercury News
Office Team
Ascent Environmental
Fitzsimons, Renee
20963 $520.58 *2 First National Bank
20964
20965
20966
20967
$504.70
$500.00
$500.00
$486.10
California Water Service Company
Grossman Design Group
Jack Gescheidt
Pine Cone Lumber
20968 $473.92 Gardenland Power Equipment
20969 $449.37 Sunnyvale Ford
20970 $416.00 *4 Santa Clara County Planning Office
20971 $412.18 Green Waste
20972 $402.04 Norcal DJS
20973 $385.92 *2 First National Bank
20974 $353.44 *5 Commuter Check Services
20975 $345.00 Santa Clara County - Office Of The
Sheriff
20976 $342.83 Coastside Technical Service
20977 $325.00 Bassi Publishing
20978 $300.00 *6 Petty Cash
20979
20980
20981
20982
20983
20984
20985
$275.07
$245.61
$223.74
$197.33
$183.98
$175.00
$147.28
All Star Glass
Bendlin Fire Equipment Company
Chung, Jean
Mullen, Pamela
*2 First National Bank
Ernie Schneider
Recology South Bay
Reimbursement - Supplies For Volunteer Recognition Event &
Founder's Day Event
Consulting Services - On Camera Interviewing Skills Test For
Media Communication Supervisor Position
Annual Road Association Dues
Engineering Geologist Services For Mt. Umunhum Summit Trail
Reimbursement - Gift Bags For Volunteer Recognition Event
Equipment Rental - Replace Tractor Parts
Membership Dues - International City & County Management
Association
Integrated Accounting & Financial System Support Services
Consulting Services For Capital Finance Program
Printing Of Timeline Panels
Vehicle Maintenance & Repairs
Accounting Temp
Tires & Tire Repairs
Legal Advertisement - Invitation To Bid For Peters Creek Bridge
Foundation
Office Temp - Real.Property Administrative Assistant
CEQA Consulting Services For Mindego Use & Management Plan
Reimbursement - Supplies For Nature Day Camp Activities /
Office Supplies / National Association For Interpretation
Conference Registration Fee
Field Supplies / Spray Gun Repair Kit & Painting Tip / Plexiglass
For Pulgas Ridge Signboard / Diesel Hose / Hat Bands For
Rangers / Bicycle Helmet & Gloves / Chainsaw Supplies
Water Service - FFO / Rental Residences
Consulting Services - Mt. Umunhum Demolition Project
Construction Administration
Photographer For Group Photo At Staff Picnic
Lumber - Rental Residence Retaining Wall / Maintenance Storage
Rack / FFO Stock
Chainsaw & Blades
Vehicle Maintenance & Repairs
Building Permit Plan Review Fee For Powell Demolition
Garbage Service - SFO
Sound Mixing For "Brown Boys" Music At Founder's Day Festival
Office Supplies / Mounting Tape / Printer / Break Room Supplies
Commuter Check Program - Transit Passes
Fingerprinting Services
Dishwasher Repair - Rental Residence
Ad In My Out And About Magazine & Calendar Listing
Petty Cash To Give Change For Book Sales At The Founder's
Day Festival
Windshield Replacement For Patrol Truck
Safety Vest For Rangers
Reimbursement - Mileage
Snacks For Employee Training & Picnic
Vehicle Maintenance, Repairs & Supplies
Reimbursement - Slender False Brome Treatment
Garbage Service - Rental Residence
Page 2 of 3
Claims No. 13-18
Meeting 13-23
Date 9/25/13
Midpeninsula Regional Open Space District
Amount Name
Description
20986
20987
20988
20989
20990
20991
20992
20993
20994
20995
20996
20997
20998
20999
21000
21001
21002
21003
21004
21005
21006
21007
$145.41
$130.50 *7
$130.26
$129.34
$118.00
$117.50
$102.42 *2
$100.00
$100.00
$94.60
$87.00 *8
$85.22
$82.60
$63.66
$60.00
$52.80 #
$51.81
$43.36
$26.25
$21.17
$14.00
$10.25
Total $198,354.99
Gartside, Ellen
PSC Environmental Services Group
Priority 1 Public Safety Equipment
Silverman, Joel
U.S. Healthworks Medical Group
Mission Trail Waste Systems
First National Bank
Barresi, Chris
South Bay Regional Public Safety
Training Consortium
Montez, Amanda
San Mateo County EMS Agency
Koenig, Peggy
Amici's East Coast Pizzeria
Protection One
Metro Mobile Communications
California Water Service Company
Schaffner, Sheryl
Uline
Rayne Of San Jose
Fastenal
O'Reilly Auto Parts
ID Plus
Reimbursement - Volunteer & Volunteer Recognition Event
Supplies
Hazardous Waste Disposal
Code Three Light Repair On Patrol Truck
Reimbursement - Bay Area Open Space Council Meeting
Expenses / Central California Invasive Weed Symposium
Registration Fee
Employee Medical Services
Garbage Service - AO
Miscellaneous Expenses - Printing Of Historical Slides / Shipping
Costs For Occupancy Sensors / Fee For Federal
Communications Commission Database For District 2 -Way Radio
System
Reimbursement - Cell Phone
Radar Training Course
Reimbursement - Food & Supplies For Founder's Day Volunteers
EMT Recertification
Reimbursement - Founder's Day Supplies
Food For Vision Plan Meeting
Fire Inspection & Monitoring - AO
Patrol Truck Radio Repair
Water Service - Hawthorn Property
Reimbursement - Mileage & Parking For Lehigh Litigation
Key Tags
Water Service - Fremont Older
Accessory For Air Compressor
Vehicle Supplies
Name Tag
*1 Urgent check issued 9/18/13
*2 Urgent check issued 9/5/13
The total amount for First
National Bank is $13,663.28
*3 Urgent check Issued 9/18/13
*4 Urgent check issued 9/12/13
*5 Urgent check issued 9/18/13
*6 Urgent check issued 9/13/13
*7 Urgent check issued 9/18/13
*8 Urgent check issued 9/18/13.
# Hawthorn expenses
Page 3 of 3
To: Board of Directors
From: Stephen E. Abbors
Date: September 25, 2013
Re: Written Communications
P.O. Box 249, Pescadero, CA 94060
PESCADERO MUNICIPAL ADVISOR COUNCIL
Board of Directors
Midpeninsula Regional Open Space District
330 Distel Circle
Los Altos, CA 94022
Dear Directors,
The Pescadero Municipal Advisory Council formerly requests total support of the board of
Midpen to continue to permit and support operation of the Driscoll Ranch Events Center in the
LaHonda/San Gregorio/Pescadero communities. This facility is a major contributor to the local
South Coast economy and the general welfare of San Mateo County residents . The events staged
and hosted here are a major draw to tourism and visitors on an International level and should
continue to operate.
The Driscoll Ranch Events Center has sponsored and benefited the following worthy and
wonderful causes for the past 11 years:
ALS Benefit Christy Law
Ranch Day for La Honda /Pescadero School (introduction to / farm animals)
Ranch Day Jean Weinguard School for the Deaf (introduction to Agriculture /farm animals)
La Honda Fire Dept. (proceeds from Rodeo to purchase new fire truck Engine #357)
Mounted Search and Rescue (training exercise last 7yrars)
L.G.B.T Annual Rode (proceeds to La Honda Fire Dept.)
Annual Jugglers Race Team Picnic
Mounted Patrol G.P.S. of trail system
San Mateo Horsemen Association
San Francisco Horsemen Association
Bay Area Savvy Player Horse Clinic
Coast side Team Ropers Club (Tuesday/Thursday Roping Event)
Annual Audubon Bird Count (past 10 years)
First Coast side Ranch for Mid Pen to introduce cattle as a resource management tool
RFD TV show with Clinton Anderson for horse sensory training
Local cattle shipping and receiving area
P.O. Box 249, Pescadero, CA 94060
If the concern is the cost involved in the continued operation of the center it would appear that
this may be addressed by passing along the respective costs to each event staged therein.
Respectively submitted,
Rob Skinner
Corresponding Secretary,
Pescadero Mutual Advisory Council
CC: HMB Review, HMB Chamber of Commerce, San Mateo County Convention and Visitors
Bureau, San Mateo Times, Palo Alto Times, SF Chronicle .
September 20, 2013
Rob Skinner, Corresponding Secretary
Pescadero Municipal Advisory Council
P.O. Box 249
Pescadero, CA 94060
RE: Driscoll Ranch Event Center
Dear Mr. Skinner and Councilmembers:
Thank you for taking the time to submit your comments regarding the future use and
management of the Driscoll Ranch Event Center (Event Center). We have added you to our
notification mailing list for this item to ensure that you receive notices of upcoming meetings.
To begin, we would like to clarify that the Event Center property and associated ranch equipment
are not owned by Midpeninsula Regional Open Space District (District), nor do we have any
management control or responsibility for this property at this time. We are, however, currently
considering the possibility of entering into a Lease and Management Agreement with the current
landowner, Peninsula Open Space Trust (POST), who recently acquired the property from a
private landowner.
Ahead of making a decision on whether to enter into a lease and management agreement for the
property, the District’s Board of Directors (Board) asked staff to gather information about pre-
existing uses that have occurred at the Event Center to learn more about its past uses and its role
on the San Mateo Coast. Additionally, the Board requested information on what uses may be
considered compatible with the District’s mission and fit given known constraints about current
staff and management capacity. The data gathered was presented to the Board at a workshop on
September 10 held at Elkus Ranch on the coast.
Careful consideration was given to each pre-existing use that has occurred at the Event Center,
and although many of the uses are of much higher intensity than what is allowed on District
Preserves, staff proposed three Use Alternatives as part of the workshop. These Use Alternatives
(refer to Table 1) range in level of intensity, and therefore also range in the level of required
oversight and management from District administrative, patrol, and maintenance staff. Under
each Use Alternative, livestock staging and processing to facilitate a conservation grazing
operation on La Honda Creek Open Space Preserve would continue as well as using the site as
an emergency staging area.
Over thirty (30) members of the public attended the September workshop and offered comments
on the benefits of the Event Center including its role in supporting local tourism, maintaining the
rural character of the coast, and providing a valuable community resource. After reviewing the
Use Alternatives and hearing from the public, the Board commented on the proposed Use
Alternatives but made no decision at the workshop.
Draft Response Prepared by
Staff for Board Approval
Table 1: Use Alternatives Under Evaluation
Potential Uses
Alternative 1:
Compatible
Uses
Alternative 2:
Compatible
and Moderate
Intensity
Special Uses
Alternative 3:
Compatible
and High
Intensity
Special Uses
Comments
Staging for
Group and
Organized Trail
Rides
√ √ √
The District has issued permits and
accommodated trail rides on the Preserve in
the past; permitted group rides are typical
uses that are allowed at District Preserves
and are already included in the District’s
current use permit system.
Agricultural and
Environmental
Education
√ √ √ Education programs are consistent with the
District’s Mission and Basic Policy.
Horse Training
and Clinics √ √
Unique for the District as these recreational
uses are not provided elsewhere on District
Preserves. Uses would be considered on a
case-by-case basis and should not preclude
opportunities for general public recreation.
LGBT Rodeo √
A rodeo is a very high intensive use
involving organized equine and livestock
events, competition, and spectator
attendance. This use is not consistent with
the District’s Basic Policy of low intensity
public recreational use. Under this
alternative, rodeo use would be limited to the
LGBT Rodeo and its permit would be
evaluated on a year-to-year basis prior to
considering reissuance. LGBT is the only
known recent sponsor of a rodeo who has
held one annually for several years (next one
coming up on September 22). The Driscoll
Ranch Rodeo has not been held for the past
two years since 2011.
Based on the input received at the September 10 Board workshop, staff will further refine these
Use Alternatives and present a recommendation to the full Board at a future meeting later this
fall when the Board would consider and decide (1) whether to enter into a Lease and
Management Agreement with POST to manage the property, and if so, (2) what uses to allow at
the Event Center prior to undergoing a more extensive use and management planning process.
Any uses allowed on the property would be included as part of a Preliminary Use and
Management Plan for the Event Center.
I hope the Council will attend the upcoming Board meeting to offer further comment on this
coastal resource. Thank you again for your input. If you have any further questions, please feel
free to contact Assistant General Manager Ana Ruiz at (650) 691-1200 or aruiz@openspace.org.
Sincerely,
Jed Cyr
Board President
Draft Response Prepared by
Staff for Board Approval
RESOLUTION NO. ____
RESOLUTION OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA
REGIONAL OPEN SPACE DISTRICT HONORING THE SANTA CLARA COUNTY
OPEN SPACE AUTHORITY FOR TWENTY YEARS OF
OPEN SPACE PRESERVATION
WHEREAS, the Santa Clara County Open Space Authority (Open Space Authority),
which serves the Cities of Campbell, Milpitas, Morgan Hill, Santa Clara, and San Jose, and
unincorporated areas of Santa Clara County, was formed on February 1, 1993; and
WHEREAS, the Open Space Authority was founded by passionate, civic-minded
citizens to preserve the natural environment and formally created by the California Legislature
with the purpose of protecting sensitive lands, preserving natural communities, and managing
open space in ways that also promote agriculture and compatible recreation; and
WHEREAS, the Open Space Authority, in partnership with community members,
nonprofits, and other agencies, has conscientiously and selectively preserved over 16,000 acres
of critical open space lands in Santa Clara County, including mountain tops, rolling hills,
ranches, and farmland; and
WHEREAS, the Open Space Authority is responsible for the plants, animals, water and
soil resources, and cultural and recreational assets of its land as highlighted by its management of
Sierra Vista Open Space Preserve comprised of over 1,600 acres of vital watershed lands that
protect Penitencia Creek and provide habitat to red-legged frog, tiger salamander, golden eagle,
mountain lion, bobcat, and grey fox; and
WHEREAS, access to open space and healthy recreation is offered through multi-use
trails for hikers, bicyclists, and equestrians on Rancho Canada del Oro Open Space Preserve west
of Morgan Hill and Sierra Vista in the east foothills with trails open free of charge every day of
the year; and
WHEREAS, over the past twenty years, the Open Space Authority has invested millions
of dollars in local communities through its Urban Open Space Program to fund urban trails,
parks, greenbelt protection, and restoration projects, thus extending the benefits of nature to city
residents, and;
WHEREAS, the Open Space Authority remains a committed and effective advocate for
policies that protect our environment and offers volunteer opportunities for people to take an
active role as ambassadors of nature;
NOW THEREFORE, be it resolved that the Board of Directors of the Midpeninsula
Regional Open Space District does hereby commend and congratulate the Santa Clara County
Open Space Authority for its 20 years of contributing to the health and well-being of its
community with its common sense approach to urban growth balanced with the preservation of
public lands for generations to come, and extends its most sincere wishes and encouragement for
continued success.
* * * * * * * * * * * * * * * * * * *
R-13-74
Meeting 13-23
September 25, 2013
AGENDA ITEM 5
Authorization to Amend a Contract with Timothy C. Best, CEG, to Provide Engineering
Geology Services for the Hendrys Creek Stream Restoration Plan within the Cathedral Oaks
Area of Sierra Azul Open Space Preserve
GENERAL MANAGER’S RECOMMENDATION
Authorize the General Manager to amend an existing contract with Timothy C. Best, CEG, by
$20,000, for a total not-to-exceed amount of $55,000, to provide engineering geology services
for the Hendrys Creek Stream Restoration Plan.
SUMMARY
A contract for $35,000 was entered into with Timothy C. Best, CEG, (Best) in April 2012 to
prepare the Hendrys Creek Stream Restoration Plan (Plan). This Plan aims to address
sedimentation and water quality issues at the Peninsula Open Space Trust (POST) Hendrys
Creek property, which the District is currently managing under a Lease and Management
Agreement. A $20,000 contract amendment with Best is needed to generate final plans, prepare
a Storm Water Pollution Prevention Plan (SWPPP), assist with permitting and the public bidding
process, and provide engineering oversight during construction. The original scope of work did
not include services beyond site analysis and design alternatives. The affected contract with Best
is project-specific and wholly separate from the more general multi-year contract for on-call
engineering geology services.
DISCUSSION
Best’s September 2012 Draft Site Assessment Report for the Hendrys Creek property details the
conditions of existing roads and stream channels, focusing on 14 stream crossings and adjacent
drainages within the project area. This assessment includes recommended treatments for each
road and stream crossing to reduce sediment delivery to the aquatic environment and improve
channel conditions. A variety of potential alternatives to accomplish varying degrees of stream
channel restoration are provided for each crossing in addition to an environmental review and
evaluation of costs and maintenance needs.
Planning and Operations staff have reviewed the alternatives and have selected which treatments
would be the most appropriate from both an operational and environmental perspective. The
finished restoration work would allow for continued ranger patrol of the property via All Terrain
Vehicles (ATV).
R-13-74 Page 2
The recommended contract amendment would cover Best’s time to complete detailed design
plans and assist with permitting, contracting, and construction oversight to implement the work.
FISCAL IMPACT
The FY2013-14 budget for the Hendrys Creek Restoration Project includes sufficient funds to
cover the recommended contract amendment.
BOARD COMMITTEE REVIEW
No committee review is required.
PUBLIC NOTICE
Public notice of this Agenda Item was provided per the Brown Act. No additional notice is
required.
CEQA COMPLIANCE
Preparing plans for future implementation does not constitute a project under CEQA.
NEXT STEPS
Upon approval by the Board of Directors, the General Manager would execute a $20,000
contract amendment to bring the total contract agreement with Best to $55,000 to develop plans,
the SWPPP, and provide permitting, bidding, and construction oversight assistance for the
Hendrys Creek Restoration Project.
Attachment:
1. Property Location Map
Responsible Department Manager:
Meredith Manning, Acting Planning Co-Manager
Prepared by:
Alex Roa, Planner I
Contact person:
Meredith Manning, Acting Planning Co-Manager
H e n d r y s C r e e k
RylandRes.
R
o
a
d
Bridge
R o a d
H o o k e r
S i e r r a A z u l O p e n S p a c e P r e s e r v e
Rd.
Weaver S
prings
Soda
Road
A i r p o r t
Wea ve r
Alm
a
L ex in g t o nReservoir
San JoseWater Co.
O
l
d
S
a
n
t
a
C
r
u
z
H
w
y
Lupine Lodge Property
Los
G
ato
s
C
re
e
k
A
l
d
e
r
c
r
o
f
t
Heights Road
Midpen in s ula Reg i ona lOpen Sp ac e Di st r ic t
At t a c h m e n t 1 : P ro p er t y L o c a t i o n M a p
September, 2013
Path: G:\Projects\Sierra_Azul\HendrysCreek\HendrysCreek_PropLocation_Revised.mxd
Created By: mlanctot
!Los Gatos
0 2,0001,000Feet
I
(MROSD)
Area ofDetail
S i e r r aAzul
While th e District strives t o use the b est available d igital data, t his d at a d oe s not repr esen t a le gal survey and is mer ely a graphic illustr at ion of geographic fe at ures.
£¤17
£¤17
£¤35
Pr o j ect Lo c at i o n
Hendrys CreekProperty(117 Acres)
£¤17
H endr ys C r eek Wa t ersh ed MRO S D Op en Spac e Pr eser vesOther Pr o t ect ed O p en Sp a ceor Pa rk La nd s
Water shed L an d
Other Pub li c A ge ncy
Private Pr o per t y
Develo ped La nd
H e n d r y s C re e k P r o p e r t y, S i e r r a A z u l O p e n S p a c e P r e s e r v e
Di st ur be d Ro ad A re a
Exist i ng Ro ad O wn ed by O t her s
R-13-84
Meeting 13-23
September 25, 2013
AGENDA ITEM 6
Authorization to Amend a Contract with John Northmore Roberts Associates, Landscape
Architectural Consultant, for Additional Design and Engineering Services for the Mindego
Gateway Staging Area Project
GENERAL MANAGER’S RECOMMENDATION
Authorize the General Manager to amend an existing contract with John Northmore Roberts
Associates by an additional $15,000, for a total not-to-exceed amount of $91,117, to provide
additional design and engineering services for the Mindego Gateway Staging Area Project
(Project).
SUMMARY
In September 2011, the Board of Directors (Board) approved a total not-to-exceed contract
amount of $76,117 ($66,117 base and $10,000 contingency) with John Northmore Roberts
Associates (JRNA) to design the Mindego Gateway Staging Area Project (R-11-86). Over the
past two years, a number of unforeseen circumstances have arisen during the design and
permitting process requiring additional time and effort on the part of JNRA. The additional
services are anticipated to total no more than $25,000 (exceeding the original $10,000
contingency) and fall into three distinct categories: (1) higher than anticipated effort to address
regulatory review comments; (2) a project delay to process a Williamson Act amendment; and
(3) stringent design requirements and intense regulatory scrutiny of the storm run-off design and
calculations. For this reason, staff recommends increasing the original contract amount with
JRNA by $15,000. The total contract amount, including the recommended $15,000 contract
amendment, is fully reimbursable by Peninsula Open Space Trust (POST).
DISCUSSION
In September 2011, the District entered into contract with JNRA for design and engineering
services to produce four deliverable packages for the Mindego Gateway Staging Area Project:
Concept Design, Schematic Design, 90% Construction Documents, and 100% Construction
Documents. The contract also called for Bidding and Construction Administration. The cost for
permit processing was built into the design and engineering budget. The original project
schedule anticipated concept and design to be completed by the winter of 2011-12, permitting by
spring 2012, and project completion in fall 2012.
A number of factors have resulted in project delays and contributed to the need for JNRA to
provide additional services beyond what was originally anticipated for the Project:
R-13-84 Page 2
a) Rigorous Regulatory Review
JNRA met with San Mateo County Planning and Building in September 2011 to review
County permitting requirements ahead of submitting project plans. Even with this early
consultation, the County permitting process involved a high level of scrutiny throughout
permit review. To further complicate matters, the concurrent review by County Planning and
Building resulted in duplicative and conflicting comments, requiring JNRA to spend an
inordinate amount of time addressing a higher than anticipated volume of comments.
b) Williamson Act resolution.
In March 2012, San Mateo County indicated that an amendment to the Williamson Act
would be required before the Mindego Gateway Project could proceed. The Project was
postponed until the Williamson Act amendment was approved by the San Mateo County
Board of Supervisors in September 2012. The resulting ten-month delay prolonged
design and permitting, requiring JNRA to start and stop work, costing time, effort, and
money to re-engage once the Williamson Act issue was resolved.
c) National Pollution Discharge Elimination System (NPDES) requirements.
In December 2011, NPDES requirements were revised to affect projects that create more
than 10,000 square feet of impervious surface. The Project fell within these new
requirements, triggering the need to treat 100% of the run-off on site. Although this intensity
of design had not been originally anticipated, JNRA completed the drainage design and
calculations, and submitted these to the County. Despite the fact that the drainage design and
calculations were accurate and adequate, County Public Works issued three separate sets of
iterative review comments requesting additional details, testing, calculations and
modification of notes on the drawings. The drainage design had to be re-submitted to the
County three times before County sign-off on the Building permit. The level of effort
required to complete the design and obtain regulatory concurrence was far greater then JNRA
had anticipated in their original design fees.
Given the need for additional services rendered and anticipated in the last phase of work, staff
recommends increasing the original contract amount with JRNA by $15,000.
FISCAL IMPACT
The FY2013-14 budget for the Mindego Gateway Staging Area Project has sufficient funds to
cover the recommended contract amendment with JNRA.
BOARD COMMITTEE REVIEW
No committee review is required.
PUBLIC NOTICE
Public notice of this Agenda Item was provided per the Brown Act. No additional notice is
required.
R-13-84 Page 3
CEQA COMPLIANCE
Staff completed a Mitigated Negative Declaration for the Project, which the District Board of
Directors adopted on June 13, 2012 (R-12-37). A Notice of Determination was filed with the
San Mateo County Clerk Recorder on June 15, 2012.
NEXT STEPS
Upon approval by the Board of Directors, the General Manager would be authorized to increase
the total contract amount with JNRA by $15,000 fund additional design services for the Mindego
Gateway Project. The staging area is planned to be complete in October, 2013. Once County
“final” is issued, and once plant installation is completed by the Landscape Maintenance
contractor, the new staging area will be opened to the public, which is anticipated in mid-
November.
Responsible Department Manager:
Meredith Manning, Co-Acting Planning Manager
Prepared by:
Gina Coony, Planner III
Contact person:
Same as above
R-13-72
Meeting 13-23
September 25, 2013
AGENDA ITEM 7
Authorization to Amend a Contract with Geocon Consultants, Inc., for Additional Geotechnical
Services for the Mount Umunhum Staging Area at Bald Mountain as part of the Mount
Umunhum Public Access Project
GENERAL MANAGER’S RECOMMENDATION
Authorize the General Manager to amend an existing contract with Geocon Consultants, Inc., by
$20,000, for a total not-to-exceed amount of $44,000, to provide additional geotechnical
engineering services for the Mount Umunhum Staging Area at Bald Mountain.
SUMMARY
The first phase of the Mount Umunhum Public Access Project includes construction of a parking
lot and staging area at the Bald Mountain trailhead. Additional geotechnical investigations are
required from Geocon Consultants, Inc., (Geocon) to inform the design of the parking lot’s
stormwater drainage system. Specifically, the contract amendment includes additional soil test
pits to confirm infiltration rates within the proposed drainage basin, geotechnical analysis of a
drainage outfall slope, and construction oversight. The additional services require a $20,000
contract amendment, bringing the total contract to a total not-to-exceed amount of $44,000.
Funds for this contract amendment are available from budget savings of other Planning projects.
DISCUSSION
In February 2012, the District entered into a $24,000 contract with Geocon (which was within
the General Manager’s budget authority) to conduct a topographical survey and geotechnical
investigation to inform the design of the Bald Mountain Staging Area Project (Project; see
Attachment A). The consultants first developed a conceptual site plan to sketch the potential
layout of the stormwater drainage system and location of drainage basins to determine where to
conduct soil infiltration tests. The contract included excavation of several soil test pits to
determine water infiltration rates for the basins. The testing results led to a redesign of the
preliminary stormwater drainage plan for the parking area, including moving the drainage basins
to a different location. This iterative approach is typical of a site design process. At this time,
additional test pits and percolation tests to further characterize soil drainage are recommended
for the new basin location. Although the stormwater drainage calculations for the parking lot are
conservative and assume a relatively slow infiltration rate (as is required by Santa Clara
County’s stormwater treatment regulations), additional excavations to better inform the drainage
design would minimize the potential for unanticipated changes during grading and construction.
R-13-72 Page 2
In light of recent stormwater drainage issues at the El Corte de Madera Creek staging area, this
conservative approach is desirable.
The new drainage design also includes use of an existing roadside drainage ditch and ditch relief
culvert to carry stormwater overflows. The ditch and culvert are located outside of the original
survey area. The contract amendment would include a survey of the culvert location and a
reconnaissance-level investigation of slope stability at the culvert outfall. Staff anticipates the
culvert will be replaced and additional slope protection installed at the outfall. The investigation
may also confirm staff’s initial assessment that additional flow within and downstream of the
culvert will not cause erosion or otherwise impact downstream resources. A natural
topographical swale at the culvert location eventually joins the main stem of Guadalupe Creek,
which flows entirely through District land until it reaches the Guadalupe Reservoir
approximately two miles downstream.
Lastly, the contract amendment also provides for adequate field time for Geocon engineers to
provide oversight and inspection services during project construction.
FISCAL IMPACT
The Planning FY2013-14 Budget currently includes sufficient funds to cover the original
$24,000 contract with Geocon. Savings from the Bay Trail Implementation Project would cover
the additional $20,000 that is being requested as part of the recommended contract amendment.
BOARD COMMITTEE REVIEW
No committee review is required.
PUBLIC NOTICE
Public notice of this Agenda Item was provided per the Brown Act. No additional notice is
required.
CEQA COMPLIANCE
Staff completed an Environmental Impact Report for the Project, which the Board adopted on
September 19, 2012 (R-12-91). A Notice of Determination was filed with the San Mateo County
Clerk Recorder on September 24, 2012.
NEXT STEPS
Upon approval by the Board, the General Manager would execute a $20,000 amendment to the
contract with Geocon for additional geotechnical services for the Mount Umunhum Staging Area
Project at Bald Mountain.
Responsible Department Manager:
Meredith Manning, Co-Acting Planning Manager
Prepared by:
Lisa Bankosh, Planner III
Contact person: Same as above
Existing Culvert
RoadsideParking
PermitParking
MTUMUNHU M R O A D
T OMO U N TUMUNH U MSUMMIT
T O B A L D M O U N T A I N
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP,swisstopo, and the GIS User Community
Midpeninsula RegionalOpen Space District
0 0.03Miles
September 2013
I
Path: G:\Projects\Sierra_Azul\Bald_Mountain\BaldMtn_CAD.mxd
While the District strive s to use t he best availab le digit al data, this d at a d oes not repr esen t a leg al survey and is merely a graphic illust ration of geograph ic feat ures.
S I E RR A A Z ULOPEN S PA C E P R E S E RV E
Attachment A - Bald Mountain Staging Area: Schematic Parking Lot Design
Bald MountainStaging Area
Sierra AzulOSP
R-13-87
Meeting 13-23
September 25, 2013
AGENDA ITEM 8
AGENDA ITEM
Authorization to Amend a Contract with TKO General Engineering and Construction for
Revisions to the El Corte de Madera Creek Open Space Preserve Staging Area
GENERAL MANAGER’S RECOMMENDATION
Authorize the General Manager to amend an existing contract with TKO General Engineering
and Construction (TKO) by $235,000, for a total not-to-exceed amount of $854,000, to construct
drainage revisions at the El Corte de Madera Creek Open Space Preserve staging area.
SUMMARY
On July 25, 2012 (R-12-69), TKO was awarded a contract to construct the staging area and
connector trail at El Corte de Madera Creek Open Space Preserve (Preserve). The project was
completed in October, 2012, but subsequent winter storms in December resulted in a storm water
drainage system failure that caused flooding to a neighboring property. Emergency repair work
was necessary to halt overflows from the staging area’s three bioretention basins. District staff
expected ARCADIS, the then engineer of record, to evaluate the issue and submit a long-term
redesign fix, and worked with them over several months toward that end. However, with time
running out to get the corrective work done before the 2013 rainy season, and no acceptable
solution presented by ARCADIS by the end of June, 2013, the District proceeded to work with a
new engineer, Balance Hydrologics, Inc., (Balance) to design the fix (R-13-61). Design
revisions were submitted to San Mateo County at the end of August and the building permit
obtained two weeks later. Revisions to the drainage system total $335,000. Approximately
$100,000 remains on TKO’s current contract. Therefore, staff recommends increasing the
contract by $235,000 to cover the remaining construction costs. Funds for this contract
amendment are available from budget savings of other Planning projects.
DISCUSSION
Since December, 2012, District staff had been working with ARCADIS, the then project
engineer of record, to attempt to solve the ongoing drainage problems at the staging area. By the
end of June, 2013, no solution was yet imminent, and the District proceeded with Balance to
design a fix as quickly as possible and submit design revisions to San Mateo County for its
review and approval. Balance began coordinating immediately with TKO, Caltrans, the County,
and California Water Service Company to prepare a design fix that includes a fourth storm water
R-13-87 Page 2
detention basin north of the driveway entrance and a pipe outflow to the west of the site that will
direct water away from Skyline Boulevard and into the interior of the Preserve. These changes
will reduce the amount of the water draining towards the neighboring property to less than 0.5
cubic foot per second, well below the calculated pre-project flows of 1.46 and 2.67 cubic feet per
second for the 25-year, 24-hour and 100-year, 24-hour design storms. Two on-site meetings
with County staff were held to clarify and gain approval of the drainage revision concept.
The drainage fix includes the following:
1. Constructing a large, new basin located north of the driveway.
2. Enlarging both upper basins at the top of the site.
3. Filling in the lower basin, which adds little to the drainage capacity of the system, is very
deep, and potentially hazardous.
4. Capping and abandoning the existing piping from the upper basins.
5. Installing new storm drainage infrastructure (new piping, outflow control structures,
trench drain across the driveway).
6. Trenching and piping across the upper parking lot pavement to connect the two upper
basins and to install a pipe outflow to the west.
TKO Contract
TKO’s contract was amended on January 9, 2013 (R-13-12) to allow the contractor to implement
any further emergency work needed through the 2012 winter and to begin work as soon as a
solution was designed. The January amendment of $125,000 was set as roughly 25% of the then
construction budget ($493,000), which included the original base bid of $389,688 and a
contingency amount of $104,312.
The cost breakdown for the $854,000 total contract amount is as follows:
1. Base bid $389,688
2. Original contingency $104,312 (covered Change Orders 1 – 4)
3. Amendment in January, 2013 $125,000 (covered emergency work, $100,000
remains for drainage fix)
4. Current requested amendment $235,000
Cost Analysis
TKO’s estimate for the current drainage system revisions is $335,000 due to the following
reasons:
1. The extent of work necessary to implement the fix, including grading needed for all three
existing basins and the new fourth basin, cutting of existing pavement, new piping and
storm water structures, new fencing, temporary removal and reinstallation of existing
structures to allow access, and landscaping. Little of the site will remain untouched by
the new work.
2. The scarcity of construction workers available due to the boom in the Bay Area’s
construction industry.
3. The constraint of working around and protecting the parking lot’s newly built features.
4. The need to finish as quickly as possible.
Time is of the essence given the coming winter months. Staff recommends amending the
existing contract amount with TKO by an additional $235,000 to complete the drainage system
fixes before the rains begin in earnest.
R-13-87 Page 3
FISCAL IMPACT
The Planning FY2013-14 Budget contains $275,000 for costs associated with this project. Most
of this budget is already encumbered; therefore, a mid-year budget adjustment would be required
to cover the $235,000 contract amendment. Savings from the Administrative Office (AO) and
AO2 Move, Ancient Oaks Trail, Cooley Landing, and Mindego Hill Trail projects will be
reallocated towards the unbudgeted project costs.
BOARD COMMITTEE REVIEW
No Board Committee review is required for this portion of the Project.
PUBLIC NOTICE
Public notice of this Agenda Item was provided per the Brown Act. No additional notice is
required.
CEQA COMPLIANCE
Staff completed a Mitigated Negative Declaration for the Project, which the Board of Directors
adopted on February 10, 2010. A Notice of Determination was filed with the San Mateo County
Clerk Recorder on February 16, 2010. The Board of Directors adopted an Addendum to the
Mitigated Negative Declaration on March 14, 2012. The planned work at the site is consistent
with the findings of the Mitigated Negative Declaration.
NEXT STEPS
Upon approval by the Board of Directors, the General Manager would amend the contract with
TKO to construct the fix for the staging area project. Work is scheduled to begin in September,
2013 and is expected to last approximately two months. Staff will prepare a request to extend
the construction season past October 1st for the County’s review and approval.
Moreover, General Counsel will bring a case evaluation to you in closed session to discuss
options for pursuing recovery of the costs for these repairs, once complete.
Attachments:
1. Site Plan
Responsible Department Head:
Tina Hugg, Co-Acting Planning Manager/Planner III
Prepared by:
Tina Hugg, Co-Acting Planning Manager/Planner III
Contact person:
Tina Hugg, Co-Acting Planning Manager/Planner III
Attachment 1
R-13-88
Meeting 13-23
September 25, 2013
AGENDA ITEM 9
AGENDA ITEM
Authorization to Award a Contract to Strategy Research Institute to provide Ongoing
Professional Services to Support the District’s Public Outreach Program
GENERAL MANAGER’S RECOMMENDATION
Authorize the General Manager to enter into a contract with Strategy Research Institute of
Fullerton, CA, for a not-to-exceed amount of $45,000, to provide ongoing professional services
to support the District’s Public Outreach Program at a monthly retainer of $3,000 per month.
SUMMARY
In early 2013, Strategy Research Institute (SRI) was contracted by Peninsula Open Space Trust
(POST) to conduct a benchmark study to assess likely voter opinion regarding the District’s
Vision Plan and related themes, as well as the feasibility of placing a successful funding measure
on the local ballot in the near future. The collective values and expectations of the District’s
constituents as represented by that survey have since been used to conduct a broad public
outreach effort to raise public awareness of the District and to engage the public in the Vision
Plan. As the District moves ahead with the Vision Plan, it is essential that the District’s broad-
based outreach efforts are based on statistically correct analysis of constituent values and
expectations. Dr. G. Gary Manross of SRI is uniquely suited to provide expertise in this area
given his familiarity with the District’s mission, range of projects, goals, and constituent base
while conducting POST’s benchmark study.
DISCUSSION
Background
In early 2013, POST and SRI conducted a benchmark study to assess likely voter opinion
regarding the District’s Vision Plan and related themes, as well as the feasibility of placing a
successful funding measure on the local ballot in the near future. POST shared the results of the
survey with the District. In April, Dr. Manross presented to the Board (R-13-42) a summary of
the survey, provided valuable input related to voter values and expectations for the Vision Plan,
and provided added clarity for the District’s Public Outreach Program. This outreach program
was put into place to raise public awareness of the District and gather public perspectives on
potential District projects and the overall vision for the next 40 years. The Board of Directors
are committed to continue raising public awareness of the District so that all constituents,
R-13-88 Page 2
regardless of their voting propensity, are aware of the services the District provides and
understand how to engage with their open space district. The survey information gathered to
date indicates that more work is needed in this area.
The District’s Public Outreach Program has accelerated in the last six months and as the outreach
program moves forward, it will be important to target key constituent groups based on
statistically correct data and analysis. In support of this effort, SRI would provide great
assistance by working with the Public Affairs department to ensure outreach materials (physical
and electronic) address public values and expectations for the District, creating any specialized
public outreach graphics, presenting at District/partner/public meetings as needed, and providing
additional consulting services to assist the outreach program as necessary.
Additionally, should the District move forward with a ballot measure, SRI is uniquely suited to
provide assistance with the writing of ballot language, as well as handling the data management
and statistical analysis of District public surveys.
SRI would provide these services to the District at a monthly retainer of $3,000 per month
through November of 2014, totaling a not-to-exceed amount of $45,000.
Consultant Selection
Dr. Manross is intimately familiar with the District’s mission, range of projects, goals, and
constituency. Through his work with POST, Dr. Manross has developed an understanding of
District needs and issues. To seek consulting services elsewhere would unnecessarily incur
additional expense and delay outreach efforts to bring another consultant up to speed to become
adequately familiar with the District and its unique mission and goals.
FISCAL IMPACT
The Public Affairs FY2013-14 outreach budget contains $21,000 to cover the costs associated
with this work in this fiscal year. An additional $24,000 will be budgeted in FY2014-15.
BOARD COMMITTEE REVIEW
No Board Committee review is required for this portion of the Project as the Board has been
regularly updated on the District’s public outreach program.
PUBLIC NOTICE
Public notice of this Agenda Item was provided per the Brown Act. No additional notice is
required.
CEQA COMPLIANCE
Retention of professional services to provide ongoing support as outlined in this report does not
constitute a project under CEQA as it will not result in a direct physical change in the
environment [CEQA Guidelines Section 15060(c)(2)].
R-13-88 Page 3
NEXT STEPS
Upon approval by the Board of Directors, the General Manager would enter into a contract with
SRI. The General Manager would continue to update the Legislative, Finance, and Public
Affairs Committee on the District’s Public Outreach Program.
Responsible Department Head:
Ana Ruiz, Assistant General Manager
Prepared by:
Elaina Cuzick, Real Property Specialist
Contact person:
Elaina Cuzick, Real Property Specialist
R-13-86
Meeting 13-23
September 25, 2013
AGENDA ITEM 10
AGENDA ITEM
Proposed Changes to the Midyear Action Plan and Budget Process and Associated Budget
Authorities
GENERAL MANAGER’S RECOMMENDATION
Approve the proposed changes to the Midyear Action Plan and Budget process and associated
budget authorities as contained in this report.
SUMMARY
In response to Board direction during the Fiscal Year (FY) 2012-13 Midyear Action Plan and
Budget Review to evaluate options for streamlining the Midyear process to increase administrative
efficiencies, staff is recommending approval of the proposed Midyear Action Plan and Budget
procedural and reporting changes as outlined in this report, as well as associated changes to the
General Manager’s budget authority.
DISCUSSION
Background
Staff prepares the annual District Action Plan, starting in November, in accordance with the
District’s mission, strategic direction, and Board priorities. Each key project is listed in the Action
Plan by Department with information regarding purpose, scope, schedule, and budget. Staff builds
the annual District budget by line item each fiscal year to support the Action Plan while remaining
consistent with a specific percentage of the projected property tax revenues as provided by the
Controller. The Action Plan and Budget are then reviewed by the General Manager, presented to
the Action Plan and Budget Committee (ABC), adjusted as needed, and then presented to the full
Board twice, once in detail and a second time for final adoption. The entire Action Plan and Budget
development process takes approximately four to five months to complete. Any budget variances
that occur during the year reflect only those items that allow the District to be responsive, efficient
and/or effective in meeting District and public needs, such as unanticipated events or circumstances,
or new obligations. Those variances that affect the Board-approved budget or exceed the General
Manager's authority are presented to the Board for approval via individual Board reports or during
the Midyear Budget amendment process.
The current workload to complete the Midyear Action Plan and Budget process is very similar to
the annual process: for the Action Plan, staff reviews each project and makes adjustments to scope,
R-13-86 Page 2
schedule, and budget, as applicable and, for the budget, reviews and adjusts the line item budgets in
response to changing circumstances or information. The entire process takes approximately three to
four months to complete and involves multiple employees from all departments, diverting staff time
that would otherwise be available to work on core functions and key projects.
As part of the Fiscal Year (FY) 2012-13 Midyear Action Plan and Budget, the Board directed staff
to review the annual budget cycle and reports, with special attention to the Midyear process, to
identify appropriate adjustments to the frequency and level of detail of reporting cycles (R-12-121).
This recommendation was generated by a concern over the amount of staff time spent on Action
Plan and Budget analysis and preparation, as well as the recognition of the District’s history of
excellent financial management, as evidenced by its consistent annual expenditure savings. Given
that staff has always remained within or under budget, the Board expressed the sentiment that the
level of detail currently presented to the Board for approval at Midyear may not be necessary.
Current Budget Authorities
Section 5549 of the Public Resources Code (PRC) 5500, the District’s governing legislation, states
that the General Manager shall prepare and submit the District’s annual budget to the Board of
Directors for approval. Beyond that requirement, the Board may determine the level of budget
authority granted to the General Manager. The District has the following three levels of budget
accounts (see Attachment 1 for a full Glossary of Terms):
• Level 1: Budget Categories – The District budget is divided into five budget categories:
Salaries and Benefits, Services and Supplies, Land and Associated Costs, Capital and
Fixed Assets (non-land purchases), and Debt Service.
• Level 2: Account Families – The District budget contains numerous line item accounts
which are organized into groupings of similar expense types within a budget category.
For example, Professional Services, Utilities, and Travel are Account Families in the
Services and Supplies Budget Category.
• Level 3: Line Item Account – Individual but related accounts, each with a designated
account number within an account family. For example, Electricity, Water, and Garbage
are line item accounts within the Utilities Account Family.
As part of the current Budget Control Procedures Administrative Policy (Attachment 2), the
General Manager may authorize net zero shifts between line item accounts but must receive Board
approval for shifts between Account Families or Budget Categories, which typically occur at
Midyear.
Proposed Changes to the Midyear Action Plan and Budget Review
In response to Board direction to review the Midyear budget to streamline the process and reduce
associated staff time, staff explored various options and recommends the Board approve the
following proposed changes. If approved, these changes will result in more concise Midyear Board
reports and presentations that will cover similar information as they do now, but in less detail.
1. Controller’s Update – The Controller will provide an update on the District’s balance sheet
as compared to the most recent audit and will include information regarding the District’s
cash balance, debt service, and revenues.
R-13-86 Page 3
2. State of the District – The General Manager will provide an update on the District’s Adopted
Action Plan and a summary of the overall financial condition of the District.
Action Plan – Only major changes to the scope, schedule, or budget of Action Plan Key
Projects would be discussed, as outlined below:
• Completed Projects – the names of projects that have been completed by Midyear
will be listed;
• New Projects – Projects added after the Action Plan was adopted will be listed with a
brief description of the scope, schedule, and budget;
• Schedule Changes – Only projects that are newly deferred or whose completion is
delayed to a future fiscal year will be listed;
• Budget Changes – Project increases of $50,000 or 10% of adopted budget,
whichever is greater, will be listed;
• Scope Changes – Significant changes in scope due to unforeseen circumstances that
impact schedule or budget as described above.
Budget – The financial overview would provide a high level summary of year-to-date
expenditures as of September 30 in the following key expenditure areas:
• Operating Budget
• Capital Projects
• Land Expenditures
No budget adjustments between Budget Categories or Account Families would occur at Midyear
unless expenses are projected to exceed the budget of one of the key expenditure areas listed above.
Any unanticipated changes that result in a shift between or increase to the Operating, Capital, or
Land budgets would be presented to the Board for approval as part of the State of the District
Report.
Reducing the level of detail reported to the Board at Midyear will significantly increase the amount
of staff time available for other activities such as core functions and key projects and will continue
to provide the Board with the financial information it needs to effectively oversee the District’s
budget.
Proposed Changes to the General Manager’s Budget Authority
As discussed above, to prepare the Midyear Budget, staff currently conducts a detailed analysis of
each department’s Line-Item Accounts. At the same time, the Administrative Services Department
analyzes existing vacant positions and estimated hiring dates in order to revise the salaries and
benefits budget. In some instances, savings in salaries and benefits may be needed to cover
projected increases in services and supplies costs. When this occurs, staff proposes these shifts as
part of the Midyear Budget for review and approval by the Board.
The current Budget Controls Procedures Administrative Policy states that the General Manager may
approve over-expenditure of a Line-Item Account as long as it is offset by savings in another Line-
Item Account in the same Account Family. The General Manger, under current policy, may not
approve over-expenditures or budget changes in Account Families or Budget Categories without
Board approval.
In the absence of a detailed budget analysis at Midyear, the ability to shift funds between Account
Families and Budget Categories is needed to pay expenses and provide the General Manager the
R-13-86 Page 4
flexibility to manage the budget in order to best implement the District’s annual Action Plan. To
accomplish this, staff recommends the Board expand the General Manager’s budget authority as
outlined below (see also Attachment 3). The District’s General Counsel has reviewed PRC 5500
and other applicable legislation and determined the Board has the authority to delegate the
responsibilities detailed below to the General Manager. Additionally, these proposed changes are
consistent with current government best practices based on staff’s research of twelve local
government agencies. Typically, once a City Council or Board has adopted the annual budget, the
City Manager or General Manager is charged with implementing the agency’s work plan and has
the authority to shift money among departments, budget categories, projects, etc. as long as there is
no increase to the overall budget. All cities require Council approval to shift monies between
different funds. Attachment 4 provides more detail on the local government agency survey results.
When staff presented the proposed changes to the Midyear process and policies to the ABC in May
2013, the Committee expressed the desire to more closely monitor certain expenses which it felt
were more sensitive to public scrutiny, such as travel and conferences. In response, staff
recommends expenditures greater than 5% in specific Account Families, as listed under number two
below, be called out separately and reported to the Board for clear transparency and added
oversight.
Recommendation
Expand the General Manager’s authority to manage District expenditures as follows:
1. Allow the General Manager to approve expenditure overages in Budget Categories, Account
Families, Line-Item Accounts, or Departments as long as they are offset by savings in other
areas, with the following restrictions:
• The General Manager may not approve any expenditures that permanently increase
the District’s budget; any permanent budget increases must be approved by the
Board of Directors.
• The General Manager may authorize temporary positions, as needed, as long as
expenses remain within the adopted budget. The Board must approve the addition of
any new permanent positions.
2. Require the General Manager to report overages greater than 5% in the following Account
Families to the Board:
• 5300 – Election Expenses/Annexation
• 5500 – Special Agreements
• 6000 – Insurance
• 6300 – Travel Expenses
• 6600 – Personnel Development
3. The General Manager has the discretion to present specific expenditures to the Board as
appropriate.
4. The General Manager may not approve any overages that cause expenditures to exceed the
adopted budget in the categories below; the Board must approve any increases to the budget.
• Operating Budget
• Capital Budget
• Land Acquisition
• Debt Service
• Special Funds (e.g., Hawthorns)
R-13-86 Page 5
5. The General Manager may delegate his/her expenditure approval authority through an
Administrative Policy that sets out specific limits, by position, and is consistent with the
parameters and financial controls outlined above.
Alternative
Rather than granting the General Manager the authority to approve expenditures to exceed budgeted
amounts in Account Families or Budget Categories as long as there are offsetting budget savings
elsewhere, the Board could grant the General Manager the authority to increase the budget in an
Account Family or Budget Category as long as there is an offsetting budget reduction elsewhere.
This alternative is not recommended for the following reasons:
1. It does not develop the organization’s budget discipline and accountability to manage
expenditures.
2. It would require staff to manually enter adjustments into the Integrated Accounting and
Finance System (IAFS) for each budget change, regardless of amount.
3. The recommended option accomplishes the same outcome without the staff workload
impact.
Proposed Changes to the Annual Budget Presentation Format
The current format of the Midyear Budget Report compares the Adopted Budget to the Proposed
Midyear Budget. The new State of the District Report will compare the Adopted Budget to year-to-
date actual expenditures. To provide consistency, it is recommended that the Proposed Annual
Budget provide a comparison to actual expenditures as well. This change would modify the current
format, which compares the proposed budget to the current year adopted budget and midyear
budget, to compare the proposed budget to the current year adopted and the prior year year-end
actuals. The proposed new format would provide three years of information rather than just two,
providing a better historical comparison of District budget and expenses. The current and proposed
formats are shown below.
Current Format:
13/14 13/14 14/15 $ Change % Change
Adopted Midyear Proposed from 13/14 from 13/14
Budget Category Budget Budget Budget Adopted Adopted
Proposed New Format:
12/13 13/14 14/15 $ Change % Change
Actual Adopted Proposed from 13/14 from 13/14
Budget Category Expenditures Budget Budget Adopted Adopted
FISCAL IMPACT
Approval of these recommendations will not increase the District’s adopted budget.
R-13-86 Page 6
BOARD COMMITTEE REVIEW
The Action Plan and Budget Committee reviewed the proposed Midyear process and associated
policy changes on May 31, 2013and September 4, 2013. The Committee recommends the Board
approve the proposed changes outlined in this report.
PUBLIC NOTICE
Public notice was provided as required by the Brown Act. No additional notice is required.
CEQA COMPLIANCE
This proposed action is not a project under the California Environmental Quality Act and no
environmental review is required.
NEXT STEPS
If the Board approves the recommended changes, staff will prepare the Fiscal Year 2013-14
Midyear Action Plan and Budget Review as outlined in this report. Staff recommends the revised
Midyear Budget process and change in the General Manager’s budget authority be reviewed in one
year and adjustments made, if needed.
Attachment(s)
1. Glossary of terms
2. Budget Control Procedures Administrative Policy
3. Chart of Accounts Structure and Proposed Budget Authorities
4. Budget Authorities in Select Other Agencies
Responsible Department Manager:
Kate Drayson, Administrative Services Manager
Prepared by:
Kate Drayson, Administrative Services Manager
Contact person:
Same as above.
ATTACHMENT 1:
Glossary of Terms
Account Family: The District budget contains numerous line item accounts which are organized into groupings of
similar expense types within a budget category. For example, Professional Services, Utilities, and Travel are
Account Families in the Services and Supplies Budget Category.
Appropriation: Legal authorization by the governing body (e.g., City Council, Board of Directors) to make
expenditures and to incur obligations for specific purposes.
Budget: The financial plan for the operation of a program or organization that includes an estimate of proposed
expenditures for a given period of time and the proposed means of financing those expenditures.
Budget Categories: The District budget is divided into five budget categories: Salaries and Benefits, Services and
Supplies, Land and Associated Costs, Capital and Fixed Assets (non-land purchases), and Debt Service.
Capital Budget: A financial plan of proposed capital projects and equipment. District projects typically improve
assets such as buildings, trails, culverts, and other infrastructure components. Capital projects often span more than
one fiscal year.
GLOSSARY OF TERMS
Capital Projects: Significant infrastructure improvements that have a useful life of one year or more and selected
expenses (e.g., CEQA, permits) related to such activities that are expected to lead to a capital project. Examples
include constructing a new trail, parking lot, and building improvements.
Debt Service: Annual principal and interest payments owed on money the District has borrowed.
GLOSSARY
Department: An organizational unit comprised of divisions or programs. The District has six departments:
Administration, Natural Resources, Operations, Planning, Public Affairs, and Real Property
Enterprise Funds: Funds established to account for the total costs of those governmental facilities and services that
are operated in a manner similar to private enterprise (e.g., water utility services). These programs are entirely or
predominately self-supporting. The District has no enterprise funds.
Expenditure: The cost of goods received or services rendered for the government unit.
Fiscal Year: A 12-month period of time to which an annual operating budget applies. The District fiscal year is
April 1 through March 30.
Fund: A self-balancing set of accounts. Governmental accounting information is organized into funds, each with
separate revenues, expenditures and fund balances. The use of monies in a given fund are restricted to the fund’s
specific purpose. The District currently has only two funds: the General Fund and the Hawthorns Fund.
General Fund: The primary fund of the District or City used to account for all revenues and expenditures not
required to be accounted for in another fund.
Line Item Account: Individual but related accounts, each with a designated account number within an Account
Family. For example, Electricity, Water, and Garbage are line item accounts within the District’s Utilities Account
Family.
Operating Budget: The financial plan for the operation of a program or organization that includes an estimate of
proposed expenditures for a given period of time and the projected means of financing those expenditures.
Salaries and Benefits: A budget category, which accounts for full-time and part-time employee salaries, benefits,
overtime expenses, shift differential, etc.
Services and Supplies: This budget category accounts for all non-personnel and non-capital expenses (e.g., building
maintenance, contract services, equipment maintenance, office supplies, and utility costs).
GLOSSARY
Variances: An expenditure amount above or below the budgeted amount.
1
Policy AP-05-01
Date 4/1/05
Supersedes AP-83-6
AP-78-10
Amendments None
Administrative Policy
BUDGET CONTROL PROCEDURES
Purpose:
The purpose of this policy is to ensure that District expenditures adhere to the Board-
approved budget. This policy outlines the roles of the General Manager, Assistant General
Manager and Department Managers in responding to expected variances between
expenditures and budgeted amounts. This policy also provides guidelines for Department
Managers in the event that expenditures are anticipated to exceed budgeted amounts by line
item and/or account category within their Department’s budget.
Definitions:
1. Budget Categories – The District budget is divided into four budget categories:
Salaries and Benefits, Services and Supplies, Fixed Assets and Debt Service.
2. Account Categories – The District budget contains numerous line item accounts
which are organized into groupings of similar expenses within a budget category such
as Contract Services, Utilities or Structures and Improvements.
3. Line Item Account – A single account with a designated account number within an
account category. Examples include: Planning Consultant, Electricity and Signs.
4. Variances – Refers to an amount above or below the budgeted amount for a specific
line item account, account category or budget category.
Background:
Each fiscal year (April 1 – March 31) staff builds a District budget by line item, based upon
the Action Plan and what staff projects to be sufficient funding for the entire year. The
budget is then presented to the Administration and Budget Committee (a standing committee
of the Board), adjusted, reviewed by the District Controller and then presented to the full
Board twice, once in detail and a second time for final adoption. Any variances that occur
during the year should reflect only those items that allow the District to be responsive,
efficient and/or effective in meeting the District and public needs, such as unanticipated
events or circumstances, or new obligations. Those variances that affect the Board-approved
budget or exceed the General Manager's authority are presented to the Board for approval via
individual Board reports or during the mid-year budget amendment process. Sound
accountability procedures are required to ensure that District expenditures stay within the
budget and that the General Manager and Controller stay informed by Department Managers
regarding the status of District expenditures throughout any given fiscal year.
ATTACHMENT 2
2
Procedures:
The following budget control procedures will assist the General Manager in monitoring
expenditures and in ensuring that the District adheres to the Board-approved budget:
1. Department Managers have responsibility for regularly reviewing their budget to
ensure that expenditures for the fiscal year do not exceed the amount budgeted for
each line item in their detailed department budget.
2. When a Department Manager anticipates an over-expenditure in a line item account,
h/she shall notify the Assistant General Manager. Department Managers may not
incur an unfavorable variance greater than 10% of the amount budgeted for a line
item account, but not more than $500, whichever amount is less, without first
receiving approval from the General Manager. The Department Manager is
responsible for offsetting this unfavorable variance with a favorable variance in
another line item account within that account category, unless the General Manager
proposes a mid-year adjustment or other means of addressing the over-expenditure
with the Board. The General Manager will consider sustaining an unfavorable
balance in any account category only in cases of urgent or unanticipated but required
expenses.
3. Changes in the total amount to be spent for each of the budget categories or account
categories are permissible only when the General Manager receives prior Board
approval to change these amounts or to shift funds from one budget category to
another.
4. Department Managers shall review expenditures for their department’s budget on a
monthly basis at a minimum to monitor spending and progress on completing
department goals. Department Managers should meet with staff responsible for
specific line item accounts on at least a monthly basis to ensure spending is kept
within budget and to anticipate any budget variances and possible Broad-approved
amendments that may be needed at mid-year. To improve accuracy in projected
expenditures and to prepare for the following year’s budget, Department Managers
should propose adjustments in line item accounts at mid-year if a line item account is
anticipated to be $500 over or under budget.
5. The General Manager will hold quarterly budget reviews with each Department
Manager. Department Managers should seek approval for variances noted above as
soon as possible and should not wait for a quarterly meeting to discuss them with the
General Manager. The purpose of the quarterly meeting is to review the overall
budget and discuss any anticipated over or under expenditures, as well as the progress
of the department toward its budgeted goals.
Approved:
Date:
L. Craig Britton, General Manager
ATTACHMENT 3:
Chart of Accounts Shift of Funds Authority
9/19/2013 12:40 PM
Salaries & Benefits - 4000 Accounts Services & Supplies - 5000, 6000, 7000 Accts Land Expenditures - 8100 Accounts Structures & Improvements - 8200 Accounts Debt Service - 9100, 9200 Accts
4100 Salaries 5000 Outside Services 8101 Previous Land Commitments 8201 Structures - Exterior/Interior 9101 Interest - Notes - Individuals
4300 Retirement 5200 Professional Services 8102 New Land Purchases - Land Acquisition 8202 Structures - Exterior/Interior - AO#2 9102 Interest - Notes - Bonds
4400 Group Insurance 5300 Election Expenses 8103 Appraiser - Land Acquisition 8203 Structures & Imprv - Electrical 9201 Principal - Notes - Individuals
4500 Mandated Insurance 5400 Dues Subscriptions 8104 Site Engineering - Land Acquisition 8204 Structures & Imprv - Water 9202 Principal - Notes - Bonds
4700 Director Fees 5500 Special Agreements 8105 Legal Fees - Land Acquisition 8205 Structures & Imprv - Sewer/Septic
5600 Rents & Leases 8107 Title Insurance - Land Acquisition 8206 Structures & Imprv - Heating
5700 Utilities 8108 Negotiation Consultants - Land Acquisition 8207 Structures & Imprv - Staging Area/Parking Area
5800 Postage 8109 Misc. Site Acquisition 8209 Structures & Imprv - Trails & Roads
5900 Printing 8110 Site Condition Studies 8210 Structures & Imprv - Signs
6000 Insurance 8111 Option Fees & Land Bank Payment 8211 Structures & Imprv - Protective Barriers
6100 Advertising 8112 Resource Management 8212 Structures & Imprv - Resource Management
6200 GIS Data 8113 Demolition 8213 Structures & Imprv - Demolition
6300 Travel Expenses 8215 Structures & Imprv - Site Planning
6400 Vehicles 8299 Structures & Imprv - Unanticipated CIP/Misc
6600 Personnel Development
6700 Equipment Maint/Repairs Office Equipment & Furniture - 8300 Accounts
6800 Information Technology 8301 Furniture
6900 Office Equipment & Supplies 8302 Machines
7000 Field Supplies 8303 Computer Equipment
7200 Taxes and Fees 8304 Communications Equipment
7300 Contingency
7500 Web/Special Projects/Events Field Equipment - 8400 Accounts
7600 Volunteer Programs 8401 Field Equipment
8402 Fire Equipment
8408 Radio Equipment
8410 Machinery
Vehicles - 8500 Accounts
8501 Vehicles
8504 Supplemental Vehicle Equipment
Requires Board approval to shift funds between these expenditure categories
General Manager may authorize fund shifts between these Level 1 budget categories
General Manager may authorize fund shifts between Level 2 and 3 accounts
OpEx Land & Associated Costs CapEx (Non-Land Purchases)Debt Service
ATTACHMENT 4:
Budget Authorities of Selected Other Agencies
Agency
General Fund
Budget /
Total Budget
Full-Time
Equivalent
Employees
Level 1
Shifts
Level 2
Shifts
Level 3
Shifts Notes
East Bay Regional Parks
District
$100.8 M
$171.3 M
728
Yes - up to
$25,000
(within the
same fund)
Yes Yes
The GM may, by notice in writing to the CFO/Controller,
adjust operating funds, expenditure categories, and
capital accounts by amounts which do not exceed $25,000
or conflict with the intentions or directives of the Board.
Board action is required to make budget adjustments in
the following cases: 1) a total increase in appropriations;
2) a budget transfer from one fund to another; 3)
transfers of the Board contingency funds exceeding
$5,000.
Livermore Area Recreation
and Park District
$16.2 M
N/A
~ 100
+ PT staff
Yes Yes Yes
GM may make adjustements within the final Operating
Budget that do not exceed the total appropriations
approved by the Board of Directors. The Board must
approve increases to the appropriated budget.
Fulton-El Camino
Recreation and Park
District
$1.5 M
$3.1 M
14 Yes Yes Yes GM can approve shifts at Level 1 and reports to the Board
but does not need advance approval.
City of Saratoga
$16.6 M
$34.1 M
61
Yes
(within the
same fund)
Yes Yes
The City Manager is authorized to implement the City's
workplan as approved in the adopted budget. Within a
specific fund, the City Manager may transfer
appropriations between categories, departments,
programs and projects as needed to implement the
adopted budget, provided no change is made to the total
appropriation amount provided for any one fund.
ATTACHMENT 4:
Budget Authorities of Selected Other Agencies
Agency
General Fund
Budget /
Total Budget
Full-Time
Equivalent
Employees
Level 1
Shifts
Level 2
Shifts
Level 3
Shifts Notes
City of San Carlos
$29.2 M
$36.3 M *
*excludes
enterprise
funds
92
Yes
(within the
same fund)
Yes Yes
Budgetary control is maintained at the
Department/Division level. The City Manager may approve
transfers of appropriation from one program, activity or
line-item within or across departments. However, total
appropriations within a fund may only be increased with
Council approval.
City of Los Altos
$29.8 M
$40.1 M
130
Yes
(within the
same fund)
Yes Yes
Once the budget is adopted by Council, everything is
under the purview of the City Manager, within the
limitations of Memorandums of Agreement and
contractual obligations.
Town of Los Gatos
$23.1M
$55.3M
149
Yes
(within the
same fund)
Yes Yes
The Town Manager is authorized to implement the
programs as approved in the adopted budget. Within a
specific fund, the Town Manager may transfer
appropriations between categories, departments, projects
and programs as needed to implement the adopted
budget.
City of Cupertino
$49.3 M
$86.2 M
161
Yes
(within the
same fund)
Yes Yes
Departments can transfer within their divisions provided it
is in the same fund as long as the transfer is not from
salary and benefits. If they want to use salary and benefit
savings, City Manager’s approval is required.
City of El Cerrito
$28.5 M
$45.8 M
174
Yes
(within the
same fund)
Yes Yes
Once the budget is approved by Council, the City Manager
has the authority to shift between all accounts within the
same fund as long it does not increase the overall budget.
ATTACHMENT 4:
Budget Authorities of Selected Other Agencies
Agency
General Fund
Budget /
Total Budget
Full-Time
Equivalent
Employees
Level 1
Shifts
Level 2
Shifts
Level 3
Shifts Notes
City of Mountain View
$101.9 M
$214.4 M
615
Yes
(within the
same fund)
Yes Yes
Department Managers can transfer money within salaries
and benefits or services and supplies within the same
fund.
City of Redwood City
$84.4 M
$99.3 M *
*excludes
enterprise
funds
515 Yes Yes Yes
During the fiscal year, the City Manager may approve
transfers between major object categories (Employee
Costs, Supplies and Services, and Capital Outlay) within a
single subprogram. The City Council approves transfers
between subprograms and requests to establish new
appropriations from unappropriated fund balances.
City of Palo Alto
$152.8 M
$250.3 M*
*excludes
enterprise
funds
657 *
*excludes
enterprise
funds
Yes
(within the
same fund)
Yes Yes
Changes greater than $5,000 must have CFO approval.
Changes greater than $10,000 must have City Manager
approval. City Manager can adjust budgets within
departments but cannot transfer dollars between
departments or funds. Council must authorize budget
transfers between departments/funds.