HomeMy Public PortalAbout08-0307 Schroder B YE.
ei4 s^
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 06 -24 -2008 PERMIT #: 080307
WORK DESCRIPTION TILE /DOORS /PAVER DRIVEWAY/MOLDING
WORK LOCATION 14 CHU TERRACE
OWNER NAME MARK SCHRODER
ADDRESS 110 PUTTENHAM CROSSING
CITY, ST, ZIP POOLER GA 31322
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 95.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $10,000.00
TOTAL BALANCE DUE: $ 95.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
C;(4/hlt
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
I .
•rdrif i. OM
j:.'1,:: • • 1: ,'. City of Tybee Island . Community Development_ Dept.
5: :4
-...."."::::, ::'.-; ., inspection Report
4
,,..... ...„
403 BiLitier Ave. • P.O. BOY 2149 . Tybee Island, GA 31328
Phone 912,785.573 ext. 114 • Fax 912.7815.9539 ..-5.-•.1..,,,`;:i.,
Permit llo. 1 0 C (.1.3 . - (---) .3 0 - 7 2 2 9 1 3
Date Reque.sted ."-- , -
- c_.
-' - 30 — ( C
1.3verier's Mame . s) r -\ I - er Date Needed
Gen. Contractor Subcontractor
Contact Information
Project Addre.ss ) 1 4 - T -
i i ID C2. Q Cr
1 . ,
/ , ..-) -- . ( 0 t.-1 V C I
.,
/ ,, _.-,3 / i
;. Inspector / 9/ ( 4 Date of Inspection \ , 0
'
1 Inspection 'Thc-, -,..i_e_., 4 -1:: r. c). _ Pass Fail 0 Fee
/ / . ■,_,.,-,
\)6) ,::---- • -1;4-73Ci-. l
Inspect Pass 0 Fail 0 Fee
.,,
i
! .
Inspectiorl Pass 0 Fail 0 Fee
• Inspection Pass Ej Fail El Fee
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
..88 al 4 4+6
1 d 1
Location: 1 L1 s c, k u
` 1 r (\ rc_ e_ -e PIN #
NAME ADDRESS TELEPHONE
11 b cei -co 2 t3 0
Owner � t�,� �. � be-141 p en � Ye A c „ a r 1otAt- `0 O ck i : 2 'S^ Ca --- , 5
Architect n
or Engineer J* - - �,
Building pl btN t � �2.t,.5r�, �, i 'e ^ 5 '\ Stall h i `3 � + , : e
Contractor iC 9 C r ,� — T r 1 t3 i it *� d J 3 1 A -- `7 0 7t C et 1
Chec all that apply)
.. a-7 a_ OLD O
(
R air n Residential ❑ Footprint Changes
enovation ❑ Sin 1 Family ❑ Discovery
❑ Minor Addition uplex ❑ Demolition
❑ Substantial Addition ❑ Multi - Family
❑ Other ❑ Commercial
Details of Project: c' e Di C c_ �. [ ; e_ a v' l c� c it o f e r h.,d \ i.
Si U to !1e- rKtet . is t- cl r5 1 6) : bdclitAo - 5e
E Cost of Construction: $ j D , pd. C ?)
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # B roo ' s # Bathrooms
Lot Area Li ng ce (total sq. ft.) ,�-...
# Off -stree . :. 'ng spaces A 7
Trees to , ated & fisted on si a s ,
i
Acce , :
Dri `-way (ft.) (Wi With swale?
Set D acks: Front Re Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through [ W
On-site waste and debris containers will be provided by C' o , ,± e^ Lfi c C
Construction debris will be disposed by Can' (' (-1 r by means of `T' 4 c IL_
I understand that I must comply with zoning. flood damage control. building. fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: (c> '3.M \ dS Signature of Applicant: /511 r ,
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site , 1(,)
Distance to water main tap site (c `)r v
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator ��j , d Permit �5!
Code Enforcement Officer ( 6 -046-OS/ Inspections
Water /Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
x_ s d ve
t7 o S�r� � � ar W �
C, �r..► („ k g-ct , TOTAL
IWW.F 4 4
RICIOURCES
GEORGIA`'
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Proiects Involving Demolition. Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned Date
cl\K -ble (—
Printed Name,
Office Use Only:
Project Address:
Permit Number: