Loading...
HomeMy Public PortalAbout2015.02.27 Special MinutesMINUTES McCall City Council Special Meeting Legion Hall - McCall City Hall (Lower Level) February 27, 2015 Agenda Call to Order Work Session Adjournment CALL TO ORDER AND ROLL CALL Mayor Aymon called the Special meeting of the McCall City Council to order at 9:05 a.m. Mayor Aymon, Councilor Giles, and Councilor Swanson were present. Councilor Scott and Councilor Witte were absent. City Staff present were Gene Drabinski, City Manager; Peter Borner, Public Works Director; Erin Roper, Communications Coordinator; Nathan Coyle, Airport/Special Projects Manager; and BessieJo Wagner, City Clerk. WORK SESSION City Clerk Annual Department Report BessieJo, City Clerk, presented the City Clerk Annual Report to Council. She covered the main points of the operations of the Clerk's Department and challenges. The Clerk's office is primarily service driven and does not generate much revenue It is an ongoing challenge to justify having 3 full time employees (FTE). With the added funds from the Local Option Tax a portion of the cost of one FTE is supplemented. Having this full time position as opposed to the previous half time position has created more time for the City Clerk to work on other projects such as code amendments and contract development. As the Clerk's Department looks toward the future, there will be continued focus on inventory and destruction of files. The Clerk's office plans to complete the rewrite of McCall City Code Title 4 — Business Regulations. As the ADA Coordinator, the City Clerk will look for additional training as it relates to Title VI of the Civil Rights Act of 1964 and Title II (State and Local Government Services) of the Americans with Disabilities Act. The Clerk's office continues to work with all departments in the City to ensure positive working relationships and continues to be a resource for people within and outside the organization. Local Option Tax Annual Department Report BessieJo, City Clerk, presented the Local Option Tax Annual Report to Council. She covered the main points of what the Local Option Tax is and how it is used throughout the community. Fiscal Year 14 had the largest LOT revenue since the tax was approved by voters in 2005. The revenue McCall City Council Special Meeting Page 1 of 5 February 27, 2015 was more than 18% above the prior 5 year average. For Fiscal Year 14, the Clerks' office received 35 LOT fund applications requesting a total of $567,646 of the LOT funds. Of the 35, 23 received priority budgeting, 8 projects were on the contingency list, and 9 projects were eliminated. Based on the successful FY14 LOT revenue, the FY15 budget was set at $279,620, which was $23,754 higher than the previous year. Contingency projects were set at $61,315. Council approved the LOT Commission's project recommendations with few changes. The Local Option Tax has gone through much scrutiny during FY14. The Council will give direction to the LOT Commission on the direction they would like for LOT to fund going forward. The LOT Funding Applications are due by 5:00 p.m. on April 30, 2015. The LOT Commission will receive direction from the Council in May and then in June the Commission will hear from each of the LOT Applicants. The Commission will then present their recommendation to Council in June. Public Works Annual Department Reports for: Streets Department Peter Borner, Public Works Director, presented the Streets Department Annual report to Council. He covered the operations and accomplishments of the Streets Department. He covered the following points for Maintaining & Improving City Streets: Street & ROW Maintenance: Street and Right -of -Way maintenance is the primary function of the Public Works Department. Public Works crews maintain over 50 miles of asphalt and gravel streets all year long. During the winter the primary activity is snow removal. When it isn't snowing, crews cut snow floors and widen roads. During the spring, crews make sure drains are working properly and repair roads damaged by spring breakup. During the busy summer season, crews paint traffic lines and crosswalks, repair or chip -seal streets, grade and apply dust control oil to gravel streets. In the fall, crews are preparing for snow operations. Snow Removal: The City of McCall utilizes loaders, graders and a plow truck for snow removal within the City. Public Works has also implemented the use of "snow -gates". The snow -gates work well under most snowfall conditions. However, during large storms their effectiveness is limited and the snow -gates only reduce the severity of snow berms, not eliminate them. Pavement Management System: Pavement Management is a program for improving the quality and performance of pavements and minimizing costs through good management practices. The City of McCall completed its first complete condition assessment of all asphalt and gravel streets in 2011. In 2013 a complete reevaluation was performed on all of the asphalt and gravel streets. In two years the average Remaining Service Life dropped by 2.5 years. For every dollar of preventative maintenance that is not done, eventually costs the City an additional $8 to $9 in street reconstruction. Sign Inventory: The City of McCall has completed a sign inventory of all regulatory, street, and informational signs within the City. All regulatory signs are required to maintain a minimum reflectivity standard. Those signs that do not meet those standards are required to be replaced. McCall City Council Special Meeting Page 2 of 5 February 27, 2015 Street signs are now required to meet new standards for uniform type, size, and style of lettering to make them more visible and easier to read. Fleet Management: The City of McCall has implemented a fleet management system to assure that all City vehicles and equipment receive the proper maintenance in a timely manner. All maintenance, repair, and fuel usage costs for each vehicle or piece of equipment are tracked. The fleet management system is used to maintain and keep reliable the City's fleet of vehicles and equipment in a cost-efficient manner. Asset Management: Is the practice of managing the entire life cycle (design, construction, operating, maintaining, repairing, modifying, and replacing) of physical and infrastructure assets such as buildings, water and waste treatment facilities, water distribution and wastewater collection networks, street systems, fleet, and other physical assets. In the fall, the City purchased the "Elements" Asset Management software from Novotx, LLC. Implementation occurred in April of 2014 and has been in use regularly since that time Water Department Peter Borner, Public Works Director, presented the Water Department Annual report to Council. He covered the operations and accomplishments of the Water Department. He covered the following points for improving the City Water System: Water Master Plan Update: It has been five (5) years since the Water Master Plan was updated. Much has happened since 2008 and a number of improvements have been made to the City's water system and the growth rate has slowed considerably. These improvements are also necessary to meet state and federal regulatory requirements. The purpose of updating the Water Master Plan is to determine if the planned improvements are still necessary and are those improvements in the right order. He also expressed the importance of updating the engineering and construction costs associated with each of the identified improvements to appropriately plan future budget needs. With these considerations in mind, Public Works undertook an update to the Water Master Plan. That update is in the process of being finalized, with input from IDEQ being required. Water Model: The City of McCall's Water Model is a computerized analysis of the entire city water system. It is used to identify deficiencies where volume or pressure improvements are warranted. These improvements can be as simple as modifying pressure settings at the City's Pressure Reducing Valve (PRV) stations or as complex as installing new water mains, water tanks, and booster pump stations. The Water Model was updated as part of the Water Master Plan update. New deficiencies were located in several areas of the city. These deficiencies are addressed in the Water Master Plan Update. Pumping Station Relocation: The City of McCall currently utilizes two locations for pumping of raw water to the Water Treatment Plant. These are at Legacy Park and Davis Beach. The Legacy Park pump station is in dire need of an upgrade. The Davis Beach pump station is problematic in that the site is difficult to access during the winter and there is no backup power to utilize the newer pumps located within the building. Public Works will again look at relocating both of these pump stations to one location to consolidate pumps and to cleanup both locations. McCall City Council Special Meeting Page 3 of 5 February 27, 2015 Water Line/Hydrant Replacement: The City continues with its systematic line replacement program to replace aging cast iron water mains (also lead -jointed pipe and asbestos cement pipe) and old fire hydrants within the City. Allowing these pipes and hydrants to remain in the system will lead to potential catastrophic failures. A full inventory of fire hydrants will take place in the summer of 2015. Utility Rate Study: A utility rate study is in progress to review existing water rates. The last rate study conducted was in 2006. An analysis of existing rates is needed to determine the impact to continuing deferred capital and maintenance needs. Water Valve Exercise: Exercising water valves is an important operations and maintenance function. First, it is important that all water valves work. In the case of an emergency such as a water main break, being able to isolate the problem to the smallest possible area is important to minimize the disruption of water service to those not affected by the break. Second, water valves are contained within a valve box from 4 to 6 feet below the road surface. These boxes become filled with debris and need to be cleaned. Wastewater Department Peter Borner, Public Works Director, presented the Wastewater Department Annual report to Council. He covered the operations and accomplishments of the Wastewater Department. He covered the following points for Improving the City Sewer Collection & Treatment System: Inflow & Infiltration Study: The City of McCall completed an Inflow & Infiltration (I&I) Study in 2012. A number of suggested improvements have been made each year such as the Park Street Sewer Main Replacement. Even with the repairs, I&I continues to be a significant issue that leads to increased treatment and power costs, shortened pump life, and increased flow to the Winter Storage Pond. Several variants of manhole inserts will also be placed on a number of manholes to reduce the amount of I&I that enters the sewer system. Lift Stations: The City has many lift stations that are reaching the end of their life. All lift stations should be evaluated to determine their current life expectancy, probable replacement cost and to determine if any of these lift stations can return to a gravity sewer system. The construction of Lift Station 7 started in the fall of 2014 and it is expected that construction will be substantially complete by the end of March 2015 and online in April. Wastewater Collection System: A capacity and pipe rating study needs to be performed on the City's entire wastewater collection system to determine long term planning horizons for improvements. It is impossible to determine the overall health of the collection system without these two items being performed. Some sewer mains may need to be replaced due to age or conditions. Some sewer mains may need to be increased in size to handle increased flows. Wastewater Treatment Plant: There are a number of needs at the Waste Water Treatment Plant. First and foremost, each lagoon needs to have the sludge removed and the aeration equipment replaced. The lagoons may need to have synthetic liners installed due to the possibility of the clay liner failing after sludge removal. A proper head -works building needs to be constructed McCall City Council Special Meeting Page 4 of 5 February 27, 2015 where adequate screening can take place prior to effluent entering the treatment lagoons. The entire facility should be fenced to provide proper security. The Winter Storage Pond also has leaking issues that need to be addressed by Groundwater Monitoring and Analysis. Reuse Permit: The City and the PLRWSD agreed on a Memorandum of Understanding on the development of a contract for disposal of recycled water. That contract is expected to be complete in early 2015. The PLRWSD received in 2014 a "pre -draft" Reuse Permit to be able to work with the irrigators/farmers and the City on the contents of the potential Reuse Permit. Once a contract for disposal services between the City and the PLRWSD is approved and the contracts between the District and the irrigators are approved, the Reuse Permit can be finalized. The largest issue looming for the City is the possible relocation of the mixing station. ADJOURNMENT Without further business, Mayor Aymon adjourned the meeting at 10:53 a.m. ATTEST: BessieJo Wagn y ,40111111111811104. .�`�,� OV McC'44 It, 4 ` 'r $ * SEAL 9 • x_ ler • McCall City Council Special Meeting Page 5 of 5 February 27, 2015