Loading...
HomeMy Public PortalAboutRES-CC-2019-26A CITY OF MOAB RESOLUTION NO.26-2019 A RESOLUTION SETTING TEMPORARY WATER AND WASTEWATER CONNECTION FEES PENDING COMPLETION OF A MASTER FEE ORDINANCE The following describes the intent and purpose of this resolution: a. The City is making changes to Subchapter 13.08 of the municipal code pertaining to culinary water and wastewater connection procedures. b. The changes to Subchapter 13.08 are intended to make connection fees more predictable and transparent for the public by specifying that installations from the building to the point of connection are to be undertaken by private parties, rather than City personnel. c. The City has undertaken to develop a master fee ordinance compiling all fees assessed by City departments. The master fee ordinance is not final at this time. d. The City is enacting this fee resolution to establish connection fees in conjunction with the ordinance amending Subchapter 13.08, with the intention that this resolution will continue until the master fee ordinance is adopted. e. The City finds that these fees are reasonable, necessary, and proportionate, as much as possible, to the City's actual costs of providing the specified services. Now therefore, the City of Moab resolves as follows: Water Connection Fees/Impact Fees 1. Residential and Commercial- Non -lodging Within City ERU Meter Size Capacity Fee Connection Impact Fee Total Fee 518" X 3/4" 1.0 $1,840.00 $478.00 $2,318.00 1" 3.7 $2,305.00 $1,769.00 $4,074.00 11/2" 11.0 $2,485.00 $5,285.00 $7,743.00 2" 22.9 $2,785.00 $10,946.00 $13,731.00 4" NIA $4,555.00 Calculated under lodging rate NIA Outside City 5/8" X 3/4" 1.0 $1,925.00 $478.00 $2,403.00 1" 3.7 $2,045.00 $1,769.00 $3,814.00 11/2" 11.0 $2,325.00 $5,285.00 $7,583.00 2" 22.9 $2,965.00 $10,946.00 $13,911.00 4" N/A $4,915.00 Calculated under lodging rate N/A 2. Lodging (including motels, inns, bed & Within City/outside City Lodging without a restaurant Connection Fee: Impact Fee: Lodging with a restaurant Connection Fee: Impact Fee: breakfast establishments, and hotels) Based on Meter Size $229 X # of Rooms Based on Meter Size $330 X # of Rooms Sewer Connection Fees Within City 4" sewer 6" sewer Outside City 4" 6" Sewer Connection Fees/ Impact Fees* *(Connection Fee + Impact Fee = Total Fee) $500.00 $600.00 $550.00 $650.00 Sewer Impact Fee - see Sewer Impact Fee Schedule PASSED AND APPROVED by a majority of the City Council, this 23rd day of April, 2019 By: v Emily S. Niehaus, Mayor Attest: By: VZ 3 fi S Date 4 2 Sommar Johnson, Recorder Date