Loading...
HomeMy Public PortalAbout08-0323 Smalls Ad v. Vey 4 f CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 07 -8 -2008 PERMIT #: 080323 WORK DESCRIPTION PLYWOOD & STUCCO GARAGE AREA WORK LOCATION 8 BREWERS LANDING OWNER NAME DAVID SMALLS ADDRESS 8 BREWER'S LANDING CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME BARRY A BROWN CONSTRUCTION CO ADDRESS 1106 E 59TH ST CITY STATE ZIP SAVANNAH GA 31404 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 71.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $6,800.00 TOTAL BALANCE DUE: $ 71.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. if this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: i . _,..6 P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT fie. O5' -o 323 5 Location: 8 Dde etv e,2'r 1 ri rv.171 PIN # i NAME ADDRESS TELEPHONE Owner P14viDtt CAeaty, # S $,Qewc.es .t0.1r,,ehty 0 15 - 7 - 5z3L SA all s Architect or Engineer ,,Vi Building 54/2s2r 19. lygo.vi, ,, D 4 E. sP m S T, 97 Z - 552 - 2/43 Contractor Cf. • Co, .z'• . 5 Pai Awem -h to (Check all that apply) ❑ Repair Residential Footprint Changes El Renovation XI 111 Single Family ❑ Discovery ❑ Minor Addition ❑ Duplex ❑ Demolition ❑ Substantial Addition ❑ Multi - Family 11 Other ❑ Commercial Details of Project: TEA u v r i y &, t NJ 94. ec, d 4ve.�o s c cA.At:t,( / 0/y urard • d-,S jvice o. Estimated Cost of Construction: $ "4. gob, 0 6 Construction Type „t (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: OA -R "lg& Remarks: V / ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the constructi rawings and site plan: # Units ; : -d oom: # Bathrooms Lot Area i space (to sq. .) # Off - street parking spaces Trees located & listed on site p / Access: Driveway (ft.) W cult' t? With swale? Setbacks: Front Rear Sides (L) (R) L # Stories Height Vertic 1 dist ce measured from the average adjacent grade of the building to the extreme hi • the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through r;oS S ,/ , On -site waste and debris containers will be provided by eem. -feitctcti,2 • Construction debris will be disposed by 0 i6A,. by means of T,e,c* I understand that I must comply with zoning, flood damage control, building, fire. shore - protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. 1 accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. ��jj Date: 6- 2(- p �' Signature of Applicant , 4A ,, i - __ ;t�� . Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site ) Distance to water main tap site _, A ) t �� Distance to sewer stub site F Al Water meter size Storm drainage Approvals: Signature Date FEES .� 5- Zoning Administrator Z--)0 Permit Code Enforcement Officer (t�r r- 7 y--ox Inspections ,,1 . Water /Sewer (J Water Tap Stoun/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL