Loading...
HomeMy Public PortalAboutAB 07-85 att - Pre Application Data Sheet Pre Application Sheet 1 (1) PREAPPLICATION DATA SHEET McCALL MUNICIPAL1 OF 1APRIL 2007 AIRPORT: LOCAL PRIORITY:UPDATED: WORK ITEM (s): LPV SURVEY/RUNWAY REHABILITATION RUNWAY REHABILITATION JUSTIFICATION: 1. AN LPV APPROACH WILL IMPROVE THE SAFETY AND UTILITY OF THE AIRPORT BY PROVIDING ENHANCED GPS CAPABILITY AND POTENTIALLY LOWER APPROACH MINIMUMS. 2. REHABILITATION OF RUNWAY 16-34 WILL EXTEND THE LIFE OF THE PAVEMENT WHICH IS SHOWNING SIGNS OF OXIDATION. CRACKS WILL BE FILLED TO PREVENT WATER FROM INFILTRATING BASE MATERIALS. RE-MARKING THE RUNWAY WILL BE REQUIRED AFTER REHABILITATION IS COMPLETE. SPONSOR SIGNATURE:DATE: BILL ROBERTSON, MAYOR COST ESTIMATE: ADMINISTRATIONLANDCONSTRUCTION ENGINEERINGINSTALLATIONCONTINGENCIES CONTINGENCIESTOTAL COST INSPECTION ADO USE: FAA NPIASWORK GRANT PREAPP NO:NO:CODE:CODE:PRIOR:FED. I:\\06229\\Acaddwg\\SHEET\\Pre Application Data Sheet.dwg