PREAPPLICATION DATA SHEET
McCALL MUNICIPAL1 OF 1APRIL 2007
AIRPORT:
LOCAL PRIORITY:UPDATED:
WORK ITEM (s):
LPV SURVEY/RUNWAY REHABILITATION
RUNWAY REHABILITATION
JUSTIFICATION:
1. AN LPV APPROACH WILL IMPROVE THE SAFETY AND UTILITY OF THE AIRPORT BY PROVIDING
ENHANCED GPS CAPABILITY AND POTENTIALLY LOWER APPROACH MINIMUMS.
2. REHABILITATION OF RUNWAY 16-34 WILL EXTEND THE LIFE OF THE PAVEMENT WHICH IS SHOWNING
SIGNS OF OXIDATION. CRACKS WILL BE FILLED TO PREVENT WATER FROM INFILTRATING BASE
MATERIALS. RE-MARKING THE RUNWAY WILL BE REQUIRED AFTER REHABILITATION IS COMPLETE.
SPONSOR SIGNATURE:DATE:
BILL ROBERTSON, MAYOR
COST ESTIMATE:
ADMINISTRATIONLANDCONSTRUCTION
ENGINEERINGINSTALLATIONCONTINGENCIES
CONTINGENCIESTOTAL COST
INSPECTION
ADO USE:
FAA
NPIASWORK
GRANT
PREAPP
NO:NO:CODE:CODE:PRIOR:FED.