HomeMy Public PortalAbout10-0248 Rearon CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 05 -17 -2010 PERMIT #: 100248
WORK DESCRIPTION MECHANICAL - A/C
WORK LOCATION 6 SECOND AVE
OWNER NAME ROBERT REARON
ADDRESS 109 DUTCH ISLAND DR
CITY, ST, ZIP SAVANNAH GA 31406 -3222
PHONE NUMBER
CONTRACTOR NAME CLIMATECH AIR INC
ADDRESS 121 W DERENNE AVE
CITY STATE ZIP SAVANNAH GA 31405
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 75.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $6,000.00
TOTAL BALANCE DUE: $ 75.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether Local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: 0/L
v i -
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
a
;f I
4
,/
CITY OF TYBEE ISLAND
BUILDING & ZONING DEPARTMNET
P.O. Box 2749
Permit Number Tybee Island, GA 31328
kr-) - co 4 T Phone (912) 786 -4573 • Fax (912) 786 -9539
MECHANICAL PERMIT APPLICATION
Date - 1-7 - /Q
Location of work (street address) Itt ( A 04 Ave
Contractor 0 \ _i. ..,.,. TX [' I); t?
Address of Contractor J'\ 1 -A-D . „pck. 4 1€
Telephone number of Contractor (4 VA ■ 3.5. - Q
Name of Property Owner Fe -mr j
Mailing address of Property Owner
Telephone number of Property Owner
Date work will be ready for inspection, if known
Estimated cost of construction (e) e -,n0
New Work .-
Oil Gas -' Electric
Absorption Unit Heat Pump ‘
Air Conditioning Unit Oil Burner
Boiler - Complete Refrigeration System
Conversion Burner 1 Space Heater (Vented)
Distribution System Unit Heater
Exhaust Hood Wall Heater
Floor Furnace Warm Air Furnace
Gas Dryer Water Heater
Gas Piping Distribution Other
1 1 1 S.,