HomeMy Public PortalAbout2023-04-06 packet
Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as
required under the Americans with Disabilities Act. Please allow three business days to process the request.
Please call (573) 634-6410 with questions regarding agenda items.
Technical Committee
Thursday, April 6, 2023 at 10:00 a.m.
Meeting Location: Boone-Bancroft Room, John G. Christy Municipal Building
320 E. McCarty, Jefferson City, MO 65101 - Enter through Main Lobby
THIS MEETING IS AVAILABLE VIRTUALLY
TO JOIN VIRTUALLY:
CALL-IN AVAILABLE AT: 1-404-397-1516
MEETING NUMBER: 2485 825 8464 MEETING PASSWORD: 1234
TENTATIVE AGENDA
1. Call to order, roll call, and determination of a quorum
2. Public comment
3. Adoption of the agenda as printed or amended
4. Approval of the minutes from the meeting of March 2, 2023
5. Communications Received
6. Old Business
7. New Business
A. 2024-2028 Transportation Improvement Program (TIP)
Action Requested: Review, discussion, and recommendation to Board of Directors.
Staff Report: The TIP is a 5-year financial program of transportation projects to be implemented within the
Metropolitan Planning Area (MPA), which are funded by the Federal Highway Administration (FHWA) and Federal
Transit Administration (FTA), or are deemed ‘regionally significant. The TIP is updated annually by CAMPO in
cooperation with local jurisdictions, the Missouri Department of Transportation (MoDOT), and local public
transportation operators. See attached staff report and draft document.
B. FY 2024 Unified Planning Work Program (UPWP)
Action Requested: Review, discussion, and recommendation to Board of Directors.
Staff Report: The UPWP is CAMPO’s annual statement of work identifying the budget, planning priorities, and
activities to be carried out for the year (November 1 to October 31). The UPWP contains many ongoing activities
required to perform the essential functions of CAMPO, as well as, periodic and one-time activities. The UPWP serves
as the basis for funding agreements with the Missouri Department of Transportation (MoDOT). See attached staff
report and draft document.
C. MoDOT Unfunded Needs
Action Requested: Review, discussion, and recommendation to Board of Directors.
Staff Report: Staff are initiating discussion regarding transportation project priorities to be submitted to MoDOT in
the upcoming Unfunded Needs planning process.
8. Other Business
A. Capital Area Active Transportation Plan
B. Status of Current Work Tasks
C. Member Updates
9. Next Meeting Date
Thursday, May 4, 2023 at 10:00 a.m. - Boone-Bancroft Room, City of Jefferson City Hall
10. Adjournment
Capital Area Metropolitan
Planning Organization
Room 120 320 E. McCarty, Jefferson City, MO 65101 Phone 573.634.6410 Fax 573.634.6457
https://jeffersoncity.webex.com/jeffersoncity/j.php?MTID=m0e9e135bbba293ab0d8477e8fbb5d332
MINUTES
TECHNICAL COMMITTEE
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
March 2, 2023
VOTING MEMBERS PRESENT
Cole County: Shannon Kliethermes
Eric Landwehr for Matt Prenger, Vice Chairman
Jefferson City: David Bange, Chair
Eric Barron
Britt Smith, Jefferson City
Gerry Stegeman, Jefferson City
Bike/Ped Interest: Kevin Schwartz
MoDOT: Kim Tipton for Steve Engelbrecht
Mike Henderson
Daniel Roeger
Wardsville: Rachel Busche
VOTING MEMBERS ABSENT
Paul Winkelmann, Callaway County
Mark Tate, Holts Summit
Matt Morasch, Jefferson City
EX-OFFICIO MEMBERS PRESENT
Jason Branstetter, Heartland Port Authority
Dan Weitkamp, Federal Highway Administration
EX-OFFICIO MEMBERS ABSENT
Eva Steinman, Federal Transit Administration
STAFF PRESENT (Non-Voting)
Katrina Williams, Planner
Lisa Dittmer, Administrative Assistant
GUESTS PRESENT
Cameron Gerber-News Tribune
Eric Bowers-City of Jefferson
1. Call to order, roll call, and determination of a quorum
Mr. Bange called the meeting to order at 10:00 a.m. and asked Ms. Dittmer to call roll. A quorum
of 11 voting members were present.
2. Public comment
None
3. Adoption of the agenda as printed or amended
Mr. Smith moved and Mr. Kliethermes seconded to approve the agenda as printed. The motion
passed unanimously.
4. Approval of the minutes from the meeting of February 2, 2023.
Mr. Smith moved and Mr. Henderson seconded to approve the minutes from the meeting of
February 2, 2023 as written. The motion passed unanimously.
Minutes/Capital Area Metropolitan Planning Organization Technical Committee
March 2, 2023 Page 2
5. Communications Received
No communication received
6. Old Business
No old business
7. New Business
A. 2024-2028 Transportation Improvement Program (TIP) Development.
Ms. Williams stated development of the 2024-2028 TIP has started, TIP is a 5-year financial
program that is updated annually by CAMPO in cooperation with local jurisdictions. Ms.
Williams discussed the draft document included in the meeting packet. There are currently 44
projects in the TIP: 11 bridge projects, 9 road projects, 6 scoping/enforcement projects, 8
bike/ped projects, and 10 transit projects. The current project list total is estimated at $55 million,
MoDOT project cost estimates have not been received yet. Ms. Williams will provide an update
when MoDOT estimates are received. Ms. Williams plans to bring an updated draft back to the
technical committee for recommendation to the CAMPO Board at the next meeting.
B. FY 2024 Unified Planning Work Program (UPWP)
Ms. Williams stated staff has begun work on the FY2024 UPWP, which is expected to be adopted
by May 2023. In the past, there were five work elements, a sixth work element, Safe/Accessible
Transportation Planning, was added in 2022 and no local match is required. The anticipated
budget is $238,833, 80% of the budget is paid by the consolidated planning grant, 15% is paid
by City of Jefferson, and 5% is paid by Cole County. The budget includes a 3% salary increase
and $30,000 for potential professional services, that may be needed for development of the
Metropolitan Transportation Plan. Major tasks in FY2024 include development of the UPWP and
TIP, technical assistance, Metropolitan Transportation Plan Update, Urbanized Area/Planning
Area review, and Functional Classification Review. Staff will provide a draft at the next meeting.
8. Other Business
A. Capital Area Active Transportation Plan
Ms. Williams told members to expect a virtual steering committee meeting this month to review
the data provided from the recent prioritization survey. Based on comments received, the top
sidewalk priorities are repairing existing sidewalks, providing connections, and completing
disconnected sections. For the bike/ped system, the top priorities are enhancing safety for
pedestrians and bicyclists, completing connections, recreational opportunities and extending
existing trails and paths. The plan is expected to be completed by Fall 2023.
B. Status of Current Work Tasks
• 2024-2028 Transportation Improvement Program (TIP) Development.
Discussed earlier in the meeting.
• FY 2024 Unified Planning Work Program (UPWP) Development.
Discussed earlier in the meeting.
• Capital Area Active Transportation Plan.
Discussed earlier in the meeting.
• Title VI Program Update.
A public hearing will be held March 20th during a regularly scheduled City of
Jefferson City Council Meeting. Pending City Council approval, the CAMPO
Board of Directors can take action on the document in April.
Minutes/Capital Area Metropolitan Planning Organization Technical Committee
March 2, 2023 Page 3
JEFFTRAN Transit Facility Feasibility Study.
A final document has been completed and is under review by the Federal Transit
Administration and Jefferson City Public Works Staff.
• GIS/Technical Assistance.
Staff continues to provide technical assistance regarding GIS data and mapping to
member jurisdictions for various projects.
• US Census Bureau Urban Area Designation and Boundary review.
A staff report and presentation on the 2020 Decennial Census data release will be
given at the April Technical Committee Meeting.
• Statewide Planning Partners Meeting Recap
Mr. Henderson stated Congressman Sam Graves and MoDOT Director Patrick
McKenna gave a presentation. The PowerPoint presentation is posted on the
MoDOT website.
• TAP Awards
Mr. Barron stated four projects were selected for the Central District, including
the Falcon Lane Pedestrian Improvements project in Wardsville. The next round
of TAP Funding will be due in July 2023. $8 million dollars will be available in
the Central District with a two-year call.
• Unfunded Needs
Mr. Barron stated MoDOT is putting their Unfunded Needs planning process on a
different yearly calendar. CAMPO submitted a list in late 2022, staff will review
the current list and bring it back to the technical committee at the next meeting
and submit to MoDOT in May. Mr. Barron reminded members to share any new
projects they may want added to the next unfunded needs list.
C. Member Updates
MoDOT
--Mr. Henderson had nothing to add.
--Mr. Roeger advised the Maries County 63 resurfacing project begins March 12, 2023. As
of last week, MoDOT hasn’t received a two week notice from the contractor to begin work
on the 54/50/Missouri Blvd resurfacing project. This project will have nightly lane closures
from 7pm-6am. The Truman Bridge rehab project is planned to close the bridge for 91 days
this summer, no exact start date has been set yet. Drivers will be able to turn right at all of
the stop lights, but will not be able to turn left to cross the bridge.
--Mr. Engelbrecht was not present.
--Ms. Tipton reminded members that July 2023 will be the call for a two-year TAP for
2024-2025 funding. BRO funding will go out for a one-year call in May 2023. TEAP
studies are limited to $10,000 and usually occur in the fall.
Cole County
--Mr. Kliethermes had nothing to add.
--Mr. Landwehr advised the Algoa Rail Spur Extension and Transload Facility Project is
out to bid, the pre-bid meeting was March 1st, 2023. This is a public/private partnership
with Capital Oil Terminals. Cole County has received grants and are searching for
additional grants to help cover the costs. This is also a City/County Cooperative Project.
Staff received two responses and have reviewed qualifications for an operator for the rail
spur. Summer projects include the Loesch Road gravel road upgrade, subdivision overlays,
stormwater and curb/gutter replacement in the Arden Drive, Northport and Westport Drive
Minutes/Capital Area Metropolitan Planning Organization Technical Committee
March 2, 2023 Page 4
area. Cole County received funding from MoDOT for 2025 construction on Tanner Bridge
Road, Cole County plans to replace the box culvert at Friendship Road as well. The county
received a TEAP grant and an ADA transition grant for sidewalks. The Wildwood and
Militia Drive extension projects are moving forward, county and city staff are working
together to develop alignments for Militia Drive. A meeting is scheduled next week about
Wildwood Drive to discuss funding recommendations to take to the county commission.
Jefferson City
--Mr. Bange advised the Jefferson City Bike Loop signing is near completion. The city
hopes to start the TAP crosswalk project at Southwest/Lafayette sometime this summer.
Staff had a kickoff meeting with consultants for the High Street Viaduct. Staff will discuss
the cities stance on the Highway 54 north of the river project at the next Public Works and
Planning Committee meeting.
--Mr. Smith advised staff is currently working on the annual street resurfacing and surface
maintenance for the year. Staff plans to extend the concrete repairs contract. Staff is still
heavily involved in planning for the parking garage. The control tower project has partial
funding, staff is working to get full funding on the project.
--Mr. Barron advised Clint Smith is the new Director with Planning & Protective Services,
His start date is April 3, 2023.
--Mr. Morasch was not present.
--Ms. Williams had nothing to add.
--Mr. Spalding was not present.
--Mr. Stegeman advised the token transit app is working, customers can now buy passes
on their phone. JEFFTRAN is still dealing with a driver shortage.
--Mr. Bowers had nothing to add.
Callaway County
--Mr. Winkelmann was not present.
Holt Summit
--Mr. Tate was not present.
Private Interest
Vacant
Bike/Ped Interest
--Mr. Schwarz had nothing to add.
Heartland Port Authority
--Jason Branstetter had nothing to add.
Federal Highway Administration
--Mr. Weitkamp stated the carbon reduction program guidance will come out soon.
Wardsville
--Ms. Busche expressed excitement for the Falcon Lane TAP project being selected.
9. Next Meeting Date – Thursday, April 6, 2023 at 10:00 a.m. in the Boone/Bancroft Room #200.
10. Adjournment
The meeting adjourned at 10:53 a.m.
Respectfully submitted,
Lisa Dittmer, Administrative Assistant
Agenda Item 7A
CAMPO Technical Committee Staff Report
2024-2028 Transportation Improvement Program Update
April 6, 2023
Summary
The Transportation Improvement Program (TIP) is a 5-year financial program of transportation projects to be implemented
within the Metropolitan Planning Area (MPA). Projects in the program are funded by the Federal Highway Administration
(FHWA) and Federal Transit Administration (FTA), and are deemed ‘regionally significant.’ The TIP is updated annually
by CAMPO in cooperation with local jurisdictions, the Missouri Department of Transportation (MoDOT), and local public
transportation operators.
The CAMPO TIP year runs from July 1, 2023 to June 30, 2028. The draft 2024-2028 TIP currently includes 49 projects that
total over $96.9 million dollars. Fiscal constraint, the availability of local matching funds to federal funds, is demonstrated
using updated financial data from local jurisdictions.
Other important components of the TIP include:
• Protocol for TIP Development: Public Participation, Project Selection, Amendments, and Modifications
• CAMPO Federal Performance Measures: Performance Measures and targets uses system information to make
investment and policy decisions to achieve national goals. The CAMPO Technical Committee and Board of
Directors reviews and approves these performance measures and targets at regular intervals, per federal
guidelines.
• Financial Plan: Each year staff works with local jurisdictions to collect required financial data. This financial
data, used to illustrate fiscal constraint, includes general tax revenue, local operating assistance, operations and
maintenance estimates, and transportation grants. This data provides for creating current and forecasted totals of
available and programmed funds. The 5-year 2024-2028 total of available funds is approximately $228.7 Million
dollars, while the estimated programmed funds total approximately $96.9 Million. This includes funds from
MoDOT, FHWA, FTA, and local jurisdiction budgets. These totals are subject to change during the month of
April if new project costs estimates are received.
• Fiscally Constrained Transportation Projects: The list of fiscally constrained projects includes all projects
programmed for construction or scoping that utilize federal transportation funds. Most projects in the CAMPO
TIP are MoDOT sponsored and are also listed in the Statewide Transportation Improvement Program (STIP).
The 2024-2028 CAMPO TIP includes fourteen (14) Bridge Projects, eight (8) Road Projects, four (4)
Other/Enforcement Projects, six (6) Scoping/Design Projects, seven (7) Pedestrian/Bicycle Projects, and ten (10)
Public Transit Projects.
• JEFFTRAN Program of Projects: The Program of Projects, federally required for public transportation agencies,
is an illustrative list of projects and estimated costs.
A draft 2024-2028 CAMPO TIP is attached.
Staff Recommendation
Staff recommends approving and forwarding the Draft 2024-2028 Transportation Improvement Program to the Board of
Directors for review and approval.
Public Comment
If recommended for approval by the Technical Committee, a 25-day public comment period will be opened April 19th and
closed at the Board of Directors meeting on May 17th.
Recommended Form of Motion:
Motion to forward the Draft 2024-2028 Transportation Improvement Program to the CAMPO Board of Directors for
review and approval.
DRAFT
Transportation Improvement Program
Program Years 20 24-2028
July 1, 2023 – June 30, 2028
Adopted May 17, 2023
The preparation of this report was financed in part by the U.S. Department of Transportation, Federal Highway Administration,
and Federal Transit Administration in cooperation with the Missouri Department of Transportation. The opinions, findings, and
conclusions expressed in this report are not necessarily those of the Federal Highway Administration, Federal Transit
Administration, or the Missouri Department of Transportation.
Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as
required under the Americans with Disabilities Act. Please allow three business days to process the request.
DRAFT
Table of Contents
Introduction ............................................................................................................................................. 1
Public Participation ................................................................................................................................. 2
Project Selection ...................................................................................................................................... 2
TIP Development ..................................................................................................................................... 2
TIP Amendments and Administrative Modifications ............................................................................... 3
Previous Projects ................................................................................................................................. 3
Annual Listing of Obligated Projects ...................................................................................................... 3
Air Quality Designation .......................................................................................................................... 3
Environmental Justice ............................................................................................................................. 3
Federal Performance Measures ............................................................................................................... 4
Financial Plan ......................................................................................................................................... 6
Forecast Revenue Available for Transportation Funding .................................................................... 6
Operations and Maintenance .............................................................................................................. 8
Financial Constraint .............................................................................................................................. 10
Demonstration of Fiscal Constraint - Municipalities .......................................................................... 11
Demonstration of Fiscal Constraint – Public Transportation Providers .............................................. 12
Fiscally Constrained Transportation Projects – Bridges ..................................................................... 13
Fiscally Constrained Transportation Projects - Roadways ................................................................ 18
Fiscally Constrained Transportation Projects - Other ........................................................................ 21
Fiscally Constrained Transportation Projects – Scoping and Design Projects .................................... 23
Fiscally Constrained Transportation Projects - Pedestrian & Bicycle Projects .................................... 25
Fiscally Constrained Transportation Projects – Public Transportation Projects .................................. 28
Project Locations ............................................................................................................................... 32
Program of Projects ........................................................................................................................... 33
Multimodal Projects .............................................................................................................................. 34
Regionally Significant Projects ............................................................................................................. 34
Appendix 1 – Amendments and Administrative Modifications ............................................................ 35
Appendix 2 – Federal Funding Sources ................................................................................................ 36
Appendix 3 – Policies and Procedures ................................................................................................. 37
Appendix 4 – Definitions ...................................................................................................................... 40
CAMPO Title VI Nondiscrimination Policy
The Capital Area Metropolitan Planning Organization is committed to the policy that no person shall be excluded from participation in, be denied
the benefits of, or be otherwise subjected to discrimination under any program or activity on the grounds of ra ce, color, or national origin, in
accordance with Title VI of the Civil Rights Act of 1964, and the Civil Rights Restoration Act of 1987 (P.L. 100.259).
Administration of the Capital Area MPO is provided by the City of Jefferson
Department of Planning and Protective Services
Room 120 John G. Christy Municipal Building
320 East McCarty St., Jefferson City, Missouri 65101
Phone: (573) 634-6410 Fax: (573) 634-6457
http://www.jeffersoncitymo.gov/campo
DRAFT
CAMPO 2024-2028 Transportation Improvement Program i
LIST OF ABBREVIATIONS
FTA 5303 Metropolitan & Statewide Planning and Non-Metropolitan Transportation Planning
FTA 5307 Urbanized Area Formula Grants
FTA 5310 Enhanced Mobility of Seniors and Individuals with Disabilities
FTA 5339 Bus and Bus Facilities
Adv. Con. Advanced Construction
AM Asset Management (Replaces TCOS in 2022)
CAMPO Capital Area Metropolitan Planning Organization
CO Carbon Monoxide (vehicle emissions)
EPA Environmental Protection Agency
FAST Fixing America’s Surface
Transportation Act
FHWA Federal Highway Administration
FTA Federal Transit Administration
FY Fiscal Year
HSIP Highway Safety Improvement Program
MAP-21 Moving Ahead for Progress in the 21st Century
MoDOT Missouri Department of Transportation
MPO Metropolitan Planning Organization
MTP Metropolitan Transportation Plan
NHFP National Highway Freight Program
NHPP National Highway Performance
Program
NO2 Nitrogen Dioxide
ONE DOT Collaboration between FHWA and FTA
PBPP Performance Based Planning and Programming
PM-2.5 Small Particulate Matter Lead
POP Program of Projects
PY Program Year
SO2 Sulfur Dioxide
STIP State Transportation Improvement Program
STBG Surface Transportation Block Grant Program
TAP Transportation Alternatives
TCOS Taking Care of the System
TERM Transit Economic Requirements Model
TDM Travel Demand Model
TIP Transportation Improvement Program
TPM Transportation Performance Management
VMT Vehicle Miles of Travel
DRAFT
CAMPO 2024-2028 Transportation Improvement Program ii
Resolution
DRAFT
CAMPO 2024-2028 Transportation Improvement Program iii
MTP Process Certification
DRAFT
CAMPO 2024-2028 Transportation Improvement Program iv
Lobbying Certificate
DRAFT
CAMPO 2024-2028 Transportation Improvement Program v
Capital Area Metropolitan Planning Organization
Board of Directors
Chair – Ron Fitzwater, City Council Member, City of Jefferson
Vice-Chair –Jeff Hoelscher, Eastern District Commissioner, Cole County
City of Jefferson
Jack Deeken, City Council Member
Jon Hensley, City Council Member
Mike Lester, City Council Member
Clint Smith, AICP, Director, Planning & Protective Services
Gerry Stegeman, Interim Transit Manager
Matt Morasch, PE, Director, Public Works
Cole County
Eric Landwehr, PE, Director, Public Works
Doug Reece, City Administrator, St. Martins
Callaway County
Roger Fischer, Western District Commissioner
Holts Summit
Brandon Ruediger, City Administrator, City of Holts Summit
Missouri Department of Transportation (MoDOT)
Machelle Watkins, PE, District Engineer
Ex-Officio Members
Luke Holtschnieder, Jefferson City Regional Economic Partnership
Eva Steinman, Federal Transit Administration, Region VII
Christy Evers, MoDOT Transit Administrator
Vacant, Missouri Office of Administration
Michael Henderson, AICP, MoDOT, Transportation Planning
Dan Weitkamp, Federal Highway Administration, Missouri Div.
Tamara Tateosian, Callaway County Economic Development
Technical Committee
Chair – David Bange, PE, City Engineer, Public Works, City of Jefferson
Vice-Chair – Matt Prenger, PE, County Engineer, Public Works, Cole County
City of Jefferson
Clint Smith, AICP, Director, Planning & Protective Services
Todd Spalding, Director, Parks, Recreation & Forestry
Matt Morasch, PE, Director of Public Works
Gerry Stegeman, Interim Transit Manager
Eric Barron, AICP, Transportation Planner
Britt Smith, PE, Operations & Maintenance
Cole County
Matt Prenger, PE, County Engineer
Shannon Kliethermes, Senior Planner
Callaway County
Paul Winkelmann, PE, County Highway Administrator
Small City Representative - Callaway
Mark Tate, Streets Department, City of Holts Summit
Small City Representative - Cole
Paul Stonner/Brian Schrimpf, Alderman, Wardsville
Missouri Department of Transportation (MoDOT)
Steve Engelbrecht, PE, District Planning Manager
Michael Henderson, AICP, Transportation Planning Specialist
Daniel Roeger, PE, Area Engineer
Private Transportation Interest
Joe Scheppers, N.H. Scheppers Distributing Company.
Pedestrian or Biking Interest
Kevin Schwartz, JC Parks Outdoor Recreation Program Manager
Ex-Officio Members:
Eva Steinman, Federal Transit Administration, Region VII
Daniel Weitkamp, Federal Highway Administration, Missouri Div.
Jason Branstetter, Heartland Port Authority Representative
- February 2023
CAMPO Staff
Clint Smith – Director, Planning & Protective Services
Eric Barron, AICP - Planning Manager
Katrina Williams, GISP, AICP – Senior Planner
Vacant - Planner
Lisa Dittmer – Administrative Assistant
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 1
Introduction
The Capital Area Metropolitan Planning Organization (CAMPO) is the designated metropolitan planning
organization for the Jefferson City, Missouri Urban Area. CAMPO’s purpose is to carry out a continuing,
cooperative, and comprehensive long-range transportation planning process. As part of this process CAMPO
updates the Metropolitan Transportation Plan (MTP) with the latest program year TIP, to address the current and
future transportation needs for the Metropolitan Planning Area (MPA). The MPA includes a southern portion of
Callaway County, northeastern portion of Cole County, the communities of Holts Summit, Jefferson City, St. Martins,
Taos, and Wardsville.
Figure 1 – The CAMPO Planning Area
The Transportation Improvement Program (TIP) is a 5-year financial program of transportation projects to be
implemented within the MPA. The projects are funded by the Federal Highway Administration (FHWA) and Federal
Transit Administration (FTA), or are deemed “regionally significant.” Each project or project phase included in the
TIP is consistent with investment strategies discussed in the MTP and is part of the process of applying for funds
from the FHWA and FTA. Certain capital and non-capital transportation projects using funding under 23 U.S.C.
and 49 U.S.C. Chapter 53 or regionally significant projects requiring action by the FHWA or the FTA are required
to be included in the TIP. The TIP is updated annually by CAMPO in cooperation with the Missouri Department of
Transportation and local public transportation operators.
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 2
Public Participation
CAMPO seeks active and meaningful involvement of the public and interested parties in the development and
update of transportation plans and programs, including the TIP. All meetings of the CAMPO Technical Committee
and Board of Directors are open to the public. All meeting agendas and minutes are available on the City of
Jefferson website at www.jeffersoncitymo.gov or upon request. CAMPO provides all interested parties and the
public with a reasonable opportunity to comment on the proposed TIP as required by federal law. Reasonable
opportunity to comment and participate on the proposed TIP is made following the policies in the CAMPO Public
Participation Plan located on the CAMPO website at https://www.jeffersoncitymo.gov/campo. The approved TIP
is available for review at several locations throughout the CAMPO planning area as outlined in the Public
Participation Plan.
The FTA allows a grantee, e.g. JEFFTRAN and OATS, Inc., to rely on locally adopted public participation plans for
the submittal of their projects in lieu of a separate “Program of Projects” (POP) if the grantee has coordinated with
CAMPO and has ensured that the public is aware that the TIP and the Public Participation Plan are being used to
satisfy the POP public participation requirements. JEFFTRAN is the public transit provider for the City of Jefferson
and OATS, Inc. is a not-for-profit 501(c)3 corporation providing specialized transportation for senior citizens,
people with disabilities and the rural general public in 87 Missouri counties. Federal Transit Administration
recipients of certain categories of funds, JEFFTRAN and OATS, Inc. must follow a public participation plan. Both
JEFFTRAN and OATS, Inc. meet this coordination and public awareness criteria.
Project Selection
Transportation projects, funded by direct allocation of Federal funds to a project sponsor, award of Federal funds
via competitive grant, or wholly funded by the sponsor, are selected by the agency having jurisdiction over the
project using their own criteria and submitted to the CAMPO Board of Directors for inclusion in the TIP.
Transportation projects included within the TIP should be consistent with investment strategies discussed in the MTP.
CAMPO does not receive any discretionary funding for infrastructure projects. If such funds again become
available, the following prioritization process is in place.
Transportation projects, funded by sub-allocated Federal funds directly to CAMPO or otherwise made available
for programming at the discretion of CAMPO, are selected based on competitive process approved by the CAMPO
Board of Directors. This process involves a call for projects, ranking based on CAMPO priorities by staff, and
review by the CAMPO Technical Committee, prior to being forwarded to the CAMPO Board of Directors for a vote
of approval. The ranking process has unique evaluation criteria for different categories of projects –
roadway/intersection, bridge, non-motorized, transit, and ‘other.’
TIP Development
The TIP document is updated every year and covers a 5-year period starting July 1 of each year. TIP development
begins with a verification of status of projects in the current TIP, solicitation of new projects, and request for budget
information from local jurisdictions. Local transit providers are also requested to provide information needed to
develop their “Program of Projects” for inclusion in the TIP. CAMPO staff develops the financial plan, project
listings, maintenance and operations, and other components of the TIP with support from the Technical Committee,
member jurisdictions, MoDOT, FHWA, and FTA.
Once the draft TIP is developed, it is presented to the Technical Committee for review and recommendation to the
Board of Directors. A 25-day public comment period will open and be held prior to the Board of Directors
approval of the TIP. The Board then requests approval of the TIP by the Governor and ONE DOT (consisting of
FHWA and FTA).
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 3
TIP Amendments and Administrative Modifications
Between TIP updates, if projects need to be added, removed or changed, the TIP can be changed either by
amendment or administrative modifications. Definitions of an amendment or an administrative modification, and
information about public participation, notifications, and other procedures regarding amendments and
administrative modifications, can be found in Appendix 3 – Policies and Procedures of this document. Appendix 1
contains a listing of amendments and administrative modifications that have occurred to this document.
Previous Projects
The TIP will include a listing of major projects from the previous TIP that were implemented and identify any
significant delays in the planned implementation of major projects. Major projects are defined as transportation
improvement projects receiving Federal financial assistance with an estimated total cost of $500 million or more or
that have been identified by the FHWA as being a major project.
No major projects were implemented, and no significant delays or projects from the previous TIP have been
identified. No work on a federally funded project can begin until the scope of work has been authorized and the
federal funds obligated in the FHWA Financial Management Information System (FMIS).
Annual Listing of Obligated Projects
The Fixing America’s Surface Transportation Act (FAST Act) requires that CAMPO publish an annual listing of
federally obligated projects. The Annual Listing of Projects is an index of projects which used Federal funds that
were obligated in the preceding TIP program year. Obligated projects are consistent with the funding categories
identified in the TIP.
An obligation is the Federal government’s legal commitment to pay the Federal share of a project’s cost. An
obligated project is one that has been authorized and funds have been obligated by a Federal agency. Obligated
projects are not necessarily initiated or completed in the program year, and the amount of the obligation will not
necessarily equal the total cost of the project. For Federal Transit Administration projects, obligation occurs when
the grant is awarded. For Federal Highway Administration projects, obligation occurs when a project agreement is
executed and the State/grantee requests that the funds be obligated.
CAMPO publishes the Annual Listing of Obligated Projects yearly within 90 days of the previous TIP’s program
year. The Annual Listing of Obligated Projects is posted on the CAMPO website at:
http://www.jeffersoncitymo.gov/campo
Air Quality Designation
The United States Environmental Protection Agency has designated the CAMPO Metropolitan Planning Area as
being in attainment for Ozone, Carbon Monoxide (CO), Nitrogen Dioxide (NO2), Small Particulate Matter (PM-
2.5) Lead, and Sulfur Dioxide (SO2). If the air quality in a geographic area meets or is cleaner than the national
standard, it is called an attainment area; areas that don't meet the national standard are called nonattainment
areas.
Environmental Justice
Executive Order 12898 requires agencies receiving federal funding to meaningfully address low-income and
minority populations in their plans, programs, policies, and activities. CAMPO strives to include all people, including
protected classes, in planning activities. The CAMPO Title VI Program addresses this topic. Additionally, CAMPO
staff expects project sponsors to identify and mitigate any disproportionately high and adverse effects of federal
transportation programs.
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 4
Federal Performance Measures
In the passage of the Moving Ahead for Progress in the 21st Century Act (MAP-21). FHWA defines Transportation
Performance Management (TPM) as a strategic approach that uses system information to make investment and
policy decisions to achieve national performance goals. The FAST (Fixing America’s Surface Transportation) Act
and Infrastructure Investment and Jobs Act both provided for continuation of these goals.
Another requirement, Performance Based Planning and Programming (PBPP), refers to the application of
performance management principles within the planning and programming processes of transportation agencies to
achieve desired performance outcomes for the multimodal transportation system.
To comply with these requirements, the CAMPO Board of Directors adopts targets for the five performance areas
listed below. These measures and corresponding targets can be found in the System Performance Report located
in Appendix C of the Metropolitan Transportation Plan (MTP). CAMPO usually adopts the state targets when they
are updated.
Transit Asset Management Measures
MoDOT collected and evaluated existing buses and facilities to be included in the State Transit Asset Management
Plan and used this information to set targets, which will be evaluated on an annual basis as inventory changes.
JEFFTRAN participates in the State Transit Asset Management Plan.
There is approximately $20,469,897 in project funding programmed into this TIP that may be utilized for bus
replacement and other capital projects to help transit agencies move toward these targets.
Safety Measures
The Federal Highway Administration established five performance measures to assess performance and carry out
the Highway Safety Improvement Program: (1) number of fatalities, (2) rate of fatalities per vehicle mile traveled
(VMT), (3) number of serious injuries, (4) rate of serious injuries per VMT, and (5) number of combined non-motorized
fatalities and non-motorized serious injuries.
MoDOT established the statewide safety targets in 2021, which were adopted by CAMPO. These targets are
updated annually. These targets can be found in the System Performance Report located in Appendix C of the
Metropolitan Transportation Plan (MTP).
There are a number of projects programmed for safety in the TIP, totaling $122,005,066, all sponsored by the
Central District of MoDOT, to help the State move towards these targets. CAMPO staff also actively participates
in the Central District Coalition of Roadway Safety, which works to implement Missouri’s Show-Me Zero ultimate
goal of zero fatalities on Missouri roadways, and participates in the annual Highway Safety and Traffic Blueprint
Conference.
Pavement and Bridge Measures
The Federal Highway Administration established 6 performance measures to assess pavement and bridge
conditions: (1) percent of interstate pavements in Good condition, (2) percent of interstate pavements in Poor
condition, (3) percent of non-interstate national highway system (NHS) pavements in Good condition, (4) percent of
non-interstate NHS pavements in Poor condition, (5) percent of NHS bridges by deck area classified as Good
condition, and (6) percent of NHS bridges by deck area classified as Poor condition. There are no interstate
highways in the CAMPO region, so those targets are not addressed.
MoDOT established statewide pavement and bridge targets in 2018, and revised in 2020, which shows the targets
set by MoDOT and adopted by CAMPO. These targets may be updated every other year. These targets can be
found in the System Performance Report located in Appendix C of the Metropolitan Transportation Plan (MTP).
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 5
Many projects in the TIP address Asset Management, a major priority for MoDOT. There is currently $72,545,001
in project funding in the TIP that addresses road and/or bridge maintenance or scoping.
Travel Time Reliability and Freight Reliability
The Federal Highway Administration established 3 performance measures to assess travel time reliability and
freight movement on the interstate system: (1) Percent of Reliable Person-Miles Traveled on the Interstate, (2)
Percent of Reliable Person-Miles Traveled on the Non-Interstate NHS, and (3) Truck Travel Time Reliability Index.
There are no interstate highways in the CAMPO region.
MoDOT established the travel time reliability targets in 2018, which was adopted by CAMPO. This target may
be updated every other year. These targets can be found in the System Performance Report located in Appendix
C of the Metropolitan Transportation Plan (MTP).
There are currently no projects programmed into the TIP with the sole purpose of improving travel time reliability.
Several of the projects within the TIP address this target indirectly, which will help the state move toward this target.
Transit Safety Measures
The Federal Transit Administration requires that each Public Transportation Agency establish a Public Transportation
Agency Safety Plan (PTASP). This plan utilizes existing agency safety practices and industry best practices to meet
the new regulations set in 49 CFR Part 673 of the Federal regulations. The PTASP includes formal documentation
to guide the agency in proactive safety management policy, safety risk management, safety assurance, and safety
promotion. The goal is to provide management and labor with a comprehensive and collaborative approach to
managing safety. The plan includes the process and schedule for an annual review of the plan to review the safety
performance measures and update processes that may be needed to improve the organization’s safety practices.
There is currently $352,719 in project funding in the TIP that addresses road and/or bridge maintenance or
scoping. Other projects within the TIP address these targets indirectly, which will help transit agencies move toward
these targets.
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 6
Financial Plan
The TIP includes a financial plan that demonstrates how the approved TIP can be implemented, and indicates
resources from public and private sources that are reasonably expected to be made available to carry out the
TIP. CAMPO, MoDOT, and public transportation operators cooperatively develop estimates of funds that are
reasonably expected to be available to support TIP implementation. Only projects for which construction or
operating funds can reasonably be expected to be available may be included. In developing the financial plan,
CAMPO takes into account all projects and strategies funded under Title 23 U.S.C., Title 49 U.S.C. Chapter 53,
and other federal funds, and regionally significant projects that are not federally funded. For purposes of
transportation operations and maintenance, the financial plan shall contain system-level estimates of costs and
revenue sources that are reasonably expected to be available to adequately operate and maintain Federal -aid
highways (as defined by Title 23 U.S.C. 101(a)(5) and public transportation (as defined by Title 49 U.S.C. Chapter
53).
Forecast Revenue Available for Transportation Funding
Federal funding forecasts, provided by MoDOT based on published notices in the Federal Register, estimate fiscal
year authorization levels by the FHWA and FTA under the current highway act. Appendix 2 briefly describes most
of the Federal transportation programs which could fund projects in the CAMPO planning area.
For Federally-funded projects, the TIP must identify the appropriate “matching funds” by source. The matching
funds are usually provided by state and local governments. State revenue forecasts are also provided by MoDOT
based on historical data of the State Fuel Tax, State Vehicle Sales and Use Tax and General Revenue.
Local revenue forecast from the County Aid Road Trust (State Fuel Tax and State Vehicle Sales and Use Tax) for
each jurisdiction are based on past distributions and are assumed to continue a trend of a two percent inflation
rate. The City of Jefferson has a ½ cent sales tax to support its Capital Improvement Program and a ½ cent sales
tax for Parks and Recreation, which supports greenways and other non-motorized transportation activities. The
City of Jefferson has provided its own future revenue projections from these sources. St. Martins has a one-cent
sales tax for parks and streets. Cole County has a ½ cent sales tax to support its Capital Improvement Program
and a real property tax levy of $0.27 earmarked for Road & Bridges. All small cities get $100,000 every five
years from Cole County, which comes from the aforementioned sales tax. Callaway County has a real property
tax levy of $0.2466 earmarked for Road & Bridges.
Figure 2 shows the total programmed project funds and available project funds by source. The project costs have
inflation factored in by each project sponsor. The instructions on the form used to submit a project for inclusion in
the TIP reminds the project sponsor to take inflation into account when estimating the project’s cost. Since the last
iteration of the MTP, the inflation factor for the TIP has been set as two percent.
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 7
Figure 2 – Programmed Funds and Available Project Funds by Source
2024 2025 2026 2027 2028 Total
FHWA AC - STBG $237,600 $5,481,600 $1,098,400 $2,419,200 $0 $9,236,800
FHWA NHPP $28,897,600 $1,979,200 $164,800 $2,097,600 $700,800 $33,840,000
FHWA HSIP $0 $0 $0 $0 $0 $0
FHWA STBG $0 $0 $0 $0 $0 $0
FHWA TAP $1,782,136 $0 $0 $0 $0 $1,782,136
FHWA SAFETY $51,200 $51,200 $51,200 $0 $0 $153,600
FHWA BRO $83,336 $968,897 $0 $0 $0 $1,052,233
FHWA BFP $51,226 $102,863 $0 $0 $0 $154,089
FHWA RTP $128,850 $0 $0 $0 $0 $128,850
FTA 5307 $2,124,018 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,894,620
FTA 5310 $172,000 $172,000 $270,000 $182,000 $270,000 $1,066,000
FTA 5311 $0 $0 $0 $0 $0 $0
FTA 5329 $0 $0 $0 $0 $0 $0
FTA 5339 $954,953 $10,175 $0 $0 $0 $965,128
$34,482,919 $9,872,771 $2,746,578 $5,919,087 $2,252,101 $55,273,456
MoDOT STATE $11,859,414 $6,982,014 $4,780,014 $5,844,214 $4,626,614 $34,092,270
$11,859,414 $6,982,014 $4,780,014 $5,844,214 $4,626,614 $34,092,270
$0 $0 $0 $0 $0 $0
$5,438 $102,863 $0 $0 $0 $108,301
$62,500 $0 $0 $0 $0 $62,500
$1,609,806 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,380,408
$311,100 $30,544 $28,000 $28,000 $28,000 $425,644
$127,078 $0 $0 $0 $0 $127,078
$0 $0 $0 $0 $0 $0
$105,909 $0 $0 $0 $0 $105,909
$60,000 $60,000 $92,000 $70,000 $92,000 $374,000
$2,281,831 $1,300,243 $1,282,178 $1,318,287 $1,401,301 $7,583,840
$48,624,164 $18,155,028 $8,808,770 $13,081,588 $8,280,016
$96,949,566
2024 2025 2026 2027 2028 Total
FHWA AC - STBG $237,600 $5,481,600 $1,098,400 $2,419,200 $0 $9,236,800
FHWA NHPP $28,897,600 $1,979,200 $164,800 $2,097,600 $700,800 $33,840,000
FHWA HSIP $0 $0 $0 $0 $0 $0
FHWA STBG $0 $0 $0 $0 $0 $0
FHWA TAP $1,782,136 $0 $0 $0 $0 $1,782,136
FHWA SAFETY $51,200 $51,200 $51,200 $0 $0 $153,600
FHWA BRO $83,336 $968,897 $0 $0 $0 $1,052,233
FHWA BFP $51,226 $102,863 $0 $0 $0 $154,089
FHWA RTP $128,850 $0 $0 $0 $0 $128,850
FTA 5307 $2,124,018 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,894,620
FTA 5310 $172,000 $172,000 $270,000 $182,000 $270,000 $1,066,000
FTA 5311 $0 $0 $0 $0 $0 $0
FTA 5329 $0 $0 $0 $0 $0 $0
FTA 5339 $954,953 $10,175 $0 $0 $0 $965,128
$34,482,919 $9,872,771 $2,746,578 $5,919,087 $2,252,101 $55,273,456
MoDOT STATE $11,859,414 $6,982,014 $4,780,014 $5,844,214 $4,626,614 $34,092,270
$11,859,414 $6,982,014 $4,780,014 $5,844,214 $4,626,614 $34,092,270
$6,147,498 $6,270,448 $6,395,857 $6,523,774 $6,654,250 $31,991,827
$6,115,901 $6,238,219 $6,362,983 $6,490,243 $6,620,048 $31,827,395
$1,797,162 $1,833,105 $1,869,767 $1,907,162 $1,945,305 $9,352,501
$7,565,284 $7,716,590 $7,870,922 $8,028,340 $8,188,907 $39,370,044
$4,957,247 $3,465,951 $3,553,208 $3,654,250 $3,759,055 $19,389,711
$420,412 $428,820 $437,397 $446,145 $455,068 $2,187,842
$504,619 $514,712 $525,006 $535,506 $546,216 $2,626,059
$345,704 $352,618 $359,670 $366,864 $374,201 $1,799,057
$120,000 $120,000 $228,000 $140,000 $228,000 $836,000
$27,973,827 $26,940,463 $27,602,811 $28,092,284 $28,771,050 $139,380,435
$74,316,160 $43,795,248 $35,129,403 $39,855,585 $35,649,765
$228,746,160Total Available Funds
Yearly Totals
Local Totals
Total Programmed Total
Available Funds
Federal
Toas
State
Local
Callaway County
Cole County
Wardsville
Oats
Programmed Funds
Federal
Holts Summit
State
Federal Totals
State Totals
Local
Federal Totals
Oats
Yearly Totals
Local Totals
JEFFTRAN
St. Martins
Taos
Wardsville
Callaway County
Cole County
Holts Summit
City of Jefferson
State Totals
City of Jefferson
JEFFTRAN
St. Martins
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 8
Operations and Maintenance
MoDOT
Maintenance costs for MoDOT includes salaries, materials and equipment needed to deliver the roadway and
bridge maintenance programs. This category includes basic maintenance activities like minor surface treatments
such as: sealing, small concrete repairs and pothole patching; mowing right of way; snow removal; replacing signs;
striping; repairing guardrail; and repairing traffic signals. Performing these activities requires employees; vehicles
and other machinery; and materials such as salt, asphalt and fuel. Maintenance operations expendi tures are
provided annually by MoDOT. Maintenance operations expenditures are expected to increase 1.5% annually.
MoDOT’s cost per lane mile is $5,323, ($5,323 per lane mile x 344.8 lane miles = $1,835,370 annual cost), and
can be seen in Figure 4.
Local Government
Local revenue sources for operations and maintenance include state fuel tax, state vehicles sales/use tax, local
sales taxes, franchise fees, license and permit fees, property taxes, and other revenue sources that provide
significant resources for local general fund and specific funding of transportation. Not all taxes and fees go to
transportation, so the local jurisdiction usually will identify a budget specifically for transportation purposes, such
as capital improvements, Road and Bridge funds, transit operating subsidies, road and street budgets, or operations
and maintenance budgets. Maintenance operations expenditures are expected to increase 1.5% annually.
The operations and maintenance costs for local governments include salaries, fringe benefits, materials, and
equipment needed to deliver the street and bridge maintenance programs. This category includes basic
maintenance activities like minor surface treatments such as sealing, small concrete repairs, pothole patching,
mowing, snow removal, replacing signs, striping, and repairing traffic signals. These activities may be performed
in-house or outsourced.
Local government operations and maintenance on federal aid roads calculated for the system wide average of
operations & maintenance per centerline mile is determined below in Figure 4. As a further demonstration of fiscal
constraint, another requirement is that municipalities report their operations and maintenance budget. Reported
below are Cole and Callaway Counties, Holts Summit, Jefferson City, St. Martins, and MoDOT. The municipalities
of Taos and Wardsville do not have any locally maintained roadways that are eligible for federal-aid and have
not been included.
There are 546.67 miles of Federal-Aid eligible roadway in the CAMPO region. MoDOT is responsible for the
maintenance of all “State System” roadways (344.8 miles) while “Off System” roadways are the responsibility of
the local governments (201.88 miles), shown in Figure 3.
Figure 3 - Federal Aid Eligible Road Mileage by Jurisdiction.
Jurisdiction MoDOT
Lane Miles
Local
Lane Miles
Total
Lane Miles
Callaway County 31.14 10.98 42.12
Holts Summit 17.04 14.37 31.4
Jefferson City 16.79 1.64 18.43
Cole County 117.58 28.46 146.04
Jefferson City 135.87 142.04 277.91
St. Martins 10.11 4.39 14.5
Taos 8.66 0 8.66
Wardsville 7.61 0 7.61
Total 344.8 201.88 546.67
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 9
Figure 4 – Locally Owned Federal-aid System Mileage and Operations and Maintenance Costs by Jurisdiction
Transit
In addition to the local government operations and maintenance previously discussed , JEFFTRAN expenses also
cover fleet repair/maintenance, repairing/replacing bus shelters, bus washing, bus maintenance facilities, public
restrooms, and fuel. Figures 5 and 6 show the estimated expenditures for transit operations and maintenance for
JEFFTRAN and OATS, respectively.
Operations and Maintenance revenue and expenditures are based on the most recently available budgets.
Figure 5 - JEFFTRAN Estimated Expenditures for Operations & Maintenance.
Figure 6 – OATS Estimated Expenditures for Operations & Maintenance.
Cost/Lane Mile Local
Lane Miles
Local
O&M Cost
$6,458 10.98 $70,909
$4,778 14.37 $68,660
$7,209 1.64 $11,823
$6,935 28.46 $197,370
$7,209 142.04 $1,023,966
$7,146 4.39 $31,371
$5,291 0 $0
$5,291 0 $0
201.88 1,404,099$
Cost/Lane Mile State System
Lane Miles
MoDOT
O&M Cost
$5,323 344.8 $1,835,370
Jurisdiction
St. Martins
Taos
Wardsville
Total
Callaway County
Jefferson City
Holts Summit
Jefferson City
Cole County
State System
MoDOT
Locally owned federal-aid system lane miles for each jurisdiction were developed by MoDOT
Source: MoDOT
Personnel Services (1,800,000)$ (1,836,000)$ (1,872,720)$ (1,910,174)$ (1,948,378)$
Materials and Supplies (305,000)$ (311,100)$ (317,322)$ (323,668)$ (330,142)$
Contractual Services (320,000)$ (326,400)$ (332,928)$ (339,587)$ (346,378)$
Utilities (30,000)$ (30,600)$ (31,212)$ (31,836)$ (32,473)$
Repairs and Maintenance (550,000)$ (561,000)$ (572,220)$ (583,664)$ (595,338)$
Total (3,005,000)$ (3,065,100)$ (3,126,402)$ (3,188,930)$ (3,252,709)$
FY 2027 FY 2028FY 2026ExpenditureFY 2024 FY 2025
Personnel Services (111,500)$ (111,500)$ (129,000)$ (129,000)$ (129,000)$
Materials and Supplies (2,500)$ (2,500)$ (4,000)$ (4,000)$ (4,000)$
Repairs and Maintenance (6,000)$ (6,000)$ (7,000)$ (7,000)$ (7,000)$
Total (120,000)$ (120,000)$ (140,000)$ (140,000)$ (140,000)$
FY 2028FY 2025 FY 2026FY 2024Expenditure FY 2027
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 10
Financial Constraint
To exhibit financial constraint, a financial plan should address three questions:
1) What will the needs for transportation in the CAMPO planning area cost?
The needs are identified by project in the following section and costs are summarized by funding source in
Figure 2.
2) What revenues are available that can be applied to the needs?
Specific revenues available to meet the needs are identified in the Demonstration of Fiscal Constraint tables
- Forecast Revenue for Transportation projects, Operations and Maintenance, by jurisdiction and source.
3) Are the revenues sufficient to cover the costs?
As shown in Figure 2 – Programmed by Source, programmed fund amounts equal available fund amounts.
For many jurisdictions as shown in Figure 2, available funds exceed the amounts of revenues required to
fund programmed projects.
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 11
Demonstration of Fiscal Constraint - Municipalities
Source 2024 2025 2026 2027 2028 Total
CART 1,897,498$ 1,935,448$ 1,974,157$ 2,013,640$ 2,053,913$ 9,874,657$
Taxes 4,250,000$ 4,335,000$ 4,421,700$ 4,510,134$ 4,600,337$ 22,117,171$
Total Available Revenue 6,147,498$ 6,270,448$ 6,395,857$ 6,523,774$ 6,654,250$ 31,991,827$
Operation & Maintenance Costs (70,909)$ (71,973)$ (73,052)$ (74,148)$ (75,260)$ (365,342)$
TIP Commitment Totals -$ -$ -$ -$ -$ -$
Total Costs (70,909)$ (71,973)$ (73,052)$ (74,148)$ (75,260)$ (365,342)$
Remaining Financial Capacity 6,076,589$ 6,198,475$ 6,322,805$ 6,449,626$ 6,578,989$ 31,626,485$
Callaway County Demonstration of Fiscal Constraint
Revenue
Costs
Source 2024 2025 2026 2027 2028 Total
CART 1,315,901$ 1,342,219$ 1,369,063$ 1,396,445$ 1,424,374$ 6,848,002$
Taxes 4,800,000$ 4,896,000$ 4,993,920$ 5,093,798$ 5,195,674$ 24,979,393$
Total Available Revenue 6,115,901$ 6,238,219$ 6,362,983$ 6,490,243$ 6,620,048$ 31,827,395$
Operation & Maintenance Costs (197,370)$ (200,331)$ (203,336)$ (206,386)$ (209,481)$ (1,016,903)$
TIP Commitment Totals -$ -$ -$ -$ -$ -$
Total Costs (197,370)$ (200,331)$ (203,336)$ (206,386)$ (209,481)$ (1,016,903)$
Remaining Financial Capacity 5,918,531$ 6,037,889$ 6,159,648$ 6,283,858$ 6,410,567$ 30,810,492$
Cole County Demonstration of Fiscal Constraint
Revenue
Costs
Source 2024 2025 2026 2027 2028 Total
CART 161,192$ 164,415$ 167,704$ 171,058$ 174,479$ 838,847$
General Revenue 1,635,970$ 1,668,689$ 1,702,063$ 1,736,104$ 1,770,827$ 8,513,654$
Total Available Revenue 1,797,162$ 1,833,105$ 1,869,767$ 1,907,162$ 1,945,305$ 9,352,501$
Operation & Maintenance Costs (68,660)$ (69,690)$ (70,735)$ (71,796)$ (72,873)$ (353,755)$
TIP Commitment Totals -$ -$ -$ -$ -$ -$
Total Costs (68,660)$ (69,690)$ (70,735)$ (71,796)$ (72,873)$ (353,755)$
Remaining Financial Capacity 1,728,502$ 1,763,415$ 1,799,032$ 1,835,366$ 1,872,432$ 8,998,746$
Holts Summit Demonstration of Fiscal Constraint
Revenue
Costs
Source 2024 2025 2026 2027 2028 Total
CART 1,965,284$ 2,004,590$ 2,044,682$ 2,085,576$ 2,127,287$ 10,227,419$
Taxes 5,600,000$ 5,712,000$ 5,826,240$ 5,942,765$ 6,061,620$ 29,142,625$
Total Available Revenue 7,565,284$ 7,716,590$ 7,870,922$ 8,028,340$ 8,188,907$ 39,370,044$
Operation & Maintenance Costs (1,035,789)$ (1,051,326)$ (1,067,096)$ (1,083,102)$ (1,099,349)$ (5,336,661)$
TIP Commitment Totals (1,110,630)$ (1,172,836)$ (1,228,178)$ (1,286,287)$ (1,347,301)$ (6,145,232)$
Total Costs (2,146,419)$ (2,224,162)$ (2,295,274)$ (2,369,389)$ (2,446,650)$ (11,481,893)$
Remaining Financial Capacity 5,418,865$ 5,492,428$ 5,575,648$ 5,658,951$ 5,742,257$ 27,888,150$
Costs
City of Jefferson Demonstration of Fiscal Constraint
Revenue
Source 2024 2025 2026 2027 2028 Total
CART 52,006$ 53,047$ 54,108$ 55,190$ 56,293$ 270,644$
General Revenue 368,406$ 375,774$ 383,289$ 390,955$ 398,774$ 1,917,198$
Total Available Revenue 420,412$ 428,820$ 437,397$ 446,145$ 455,068$ 2,187,842$
Operation & Maintenance Costs (31,371)$ (31,842)$ (32,319)$ (32,804)$ (33,296)$ (161,632)$
TIP Commitment Totals (82,967)$ -$ -$ -$ -$ (82,967)$
Total Costs (114,338)$ (31,842)$ (32,319)$ (32,804)$ (33,296)$ (244,599)$
Remaining Financial Capacity 306,074$ 396,979$ 405,078$ 413,341$ 421,772$ 1,943,243$
St. Martins Demonstration of Fiscal Constraint
Revenue
Costs
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 12
Demonstration of Fiscal Constraint – Public Transportation Providers
Source 2024 2025 2026 2027 2028 Total
CART 40,054$ 40,855$ 41,673$ 42,506$ 43,356$ 208,444$
General Revenue 464,565$ 473,856$ 483,333$ 493,000$ 502,860$ 2,417,615$
Total Available Revenue 504,619$ 514,712$ 525,006$ 535,506$ 546,216$ 2,626,059$
Operation & Maintenance Costs -$ -$ -$ -$ -$ -$
TIP Commitment Totals -$ -$ -$ -$ -$ -$
Total Costs -$ -$ -$ -$ -$ -$
Remaining Financial Capacity 504,619$ 514,712$ 525,006$ 535,506$ 546,216$ 2,626,059$
Taos Demonstration of Fiscal Constraint
Revenue
Costs
Source 2024 2025 2026 2027 2028 Total
CART 68,704$ 70,078$ 71,479$ 72,909$ 74,367$ 357,538$
General Revenue 277,000$ 282,540$ 288,191$ 293,955$ 299,834$ 1,441,519$
Total Available Revenue 345,704$ 352,618$ 359,670$ 366,864$ 374,201$ 1,799,057$
Operation & Maintenance Costs -$ -$ -$ -$ -$ -$
TIP Commitment Totals -$ -$ -$ -$ -$ -$
Total Costs -$ -$ -$ -$ -$ -$
Remaining Financial Capacity 345,704$ 352,618$ 359,670$ 366,864$ 374,201$ 1,799,057$
Costs
Wardsville Demonstration of Fiscal Constraint
Revenue
Source 2024 2025 2026 2027 2028 Total
CARES Act Funds (Distributed as FTA 5307)207,170$ -$ -$ -$ -$ -$
FTA Section 5307 (reallocation from other agency)1,053,363$ -$ -$ -$ -$ -$
FTA Section 5307 (not including CARES)1,054,130$ -$ -$ -$ -$ -$
FTA Section 5307 Sub-Total 2,314,663$ 1,106,836$ 1,162,178$ 1,220,287$ 1,281,301$ 7,085,265$
FTA Section 5310 112,000$ 112,000$ 112,000$ 112,000$ 112,000$ 560,000$
FTA Section 5339 954,953$ 10,175$ -$ -$ -$ 965,128$
Sales Tax - 1/2% Capital Improvement 80,000$ 80,000$ 80,000$ 80,000$ 80,000$ 400,000$
City of Jefferson-Local Operating Assistance 1,035,000$ 1,705,000$ 1,739,100$ 1,773,882$ 1,809,360$ 8,062,342$
MoDOT State Operating Assistance 52,414$ 52,414$ 52,414$ 52,414$ 52,414$ 262,070$
Farebox and Reimbursements 391,692$ 399,526$ 407,516$ 415,667$ 423,980$ 2,038,381$
Total Available Revenue 4,940,722$ 3,465,951$ 3,553,208$ 3,654,250$ 3,759,055$ 19,373,186$
Personnel Services (1,800,000)$ (1,836,000)$ (1,872,720)$ (1,910,174)$ (1,948,378)$ (9,367,272)$
Materials and Supplies (305,000)$ (311,100)$ (317,322)$ (323,668)$ (330,142)$ (1,587,232)$
Contractual Services (320,000)$ (326,400)$ (332,928)$ (339,587)$ (346,378)$ (1,665,293)$
Utilities (30,000)$ (30,600)$ (31,212)$ (31,836)$ (32,473)$ (156,121)$
Repairs and Maintenance (550,000)$ (561,000)$ (572,220)$ (583,664)$ (595,338)$ (2,862,222)$
Operation & Maintenance Totals (3,005,000)$ (3,065,100)$ (3,126,402)$ (3,188,930)$ (3,252,709)$ (15,638,141)$
TIP Commitments
TIP Commitment Totals (311,100)$ (30,544)$ (28,000)$ (28,000)$ (28,000)$ (425,644)$
Remaining Financial Capacity 1,624,622$ 370,307$ 398,806$ 437,320$ 478,346$ 3,309,401$
JEFFTRAN Demonstration of Fiscal Constraint
Revenue
Operation & Maintenance
Source 2024 2025 2026 2027 2028 Total
FTA Section 5310 60,000$ 60,000$ 158,000$ 70,000$ 158,000$ 506,000$
Farebox and Reimbursements 4,500$ 4,500$ 5,250$ 5,250$ 5,250$ 24,750$
Local Contracts 55,500$ 55,500$ 64,750$ 64,750$ 64,750$ 305,250$
Total Available Revenue 120,000$ 120,000$ 228,000$ 140,000$ 228,000$ 836,000$
Personnel Services (51,500)$ (51,500)$ (59,000)$ (59,000)$ (59,000)$ (280,000)$
Materials and Supplies (2,500)$ (2,500)$ (4,000)$ (4,000)$ (4,000)$ (17,000)$
Repairs and Maintenance (6,000)$ (6,000)$ (7,000)$ (7,000)$ (7,000)$ (33,000)$
Operation & Maintenance Totals (60,000)$ (60,000)$ (70,000)$ (70,000)$ (70,000)$ (330,000)$
TIP Commitments
TIP Commitment Totals (60,000)$ (60,000)$ (92,000)$ (70,000)$ (92,000)$ (374,000)$
Remaining Financial Capacity -$ -$ 66,000$ -$ 66,000$ 132,000$
Operation & Maintenance
OATS Demonstration of Fiscal Constraint
Revenue
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 13
Fiscally Constrained Transportation Projects – Bridges
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $298,400 $511,200 $809,600
MoDOT STATE $74,600 $127,800 $202,400
TIP #2022-03 Local $0
MoDOT#5S3458 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $3,033,600 $3,033,600
MoDOT STATE $758,400 $758,400
Local $0
Other $0
Total $373,000 $4,431,000 $0 $0 $0 $0 $0 $4,804,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $16,800 $42,400 $339,200 $398,400
MoDOT STATE $4,200 $10,600 $84,800 $99,600
TIP #2022-07 Local $0
MoDOT#5P3523 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $1,403,200 $1,403,200
MoDOT STATE $350,800 $350,800
Local $0
Other $0
Total $21,000 $53,000 $2,178,000 $0 $0 $0 $0 $2,252,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $1,600 $17,600 $19,200
MoDOT STATE $400 $4,400 $4,800
TIP #2022-08 Local $0
MoDOT#5P3451 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $160,800 $160,800
MoDOT STATE $40,200 $40,200
Local $0
Other $0
Total $2,000 $223,000 $0 $0 $0 $0 $0 $225,000
Project
Name:
Bridge Rehabilitation over Rte. 54
(Routes 94, H, and W). E
N
G
Description & Location: Bridge rehabilitation
over Rte. 54 includes Rte. 94, Rte. H and Rte.
W.
R
O
W
MoDOT Funding Prior
Funding
State Program Year - July 1 to June 30
MoDOT Funding Prior
Funding
State Program Year - July 1 to June 30
Comments: Bridges A3508, A4635, and twin
bridges A3539.
Total Project Cost: $4,804,000
C
O
N
S
T
Description & Location: Bridge improvement
over Vetter Lane. Includes Bolivar Street over
Rte. 50.
R
O
W
C
O
N
S
T
Comments: Bridge A1420 and twin bridges
A0722.
Total Project Cost: $2,252,000
Project
Name:
Bridge Improvement on Rte. 50 over
Vetter Lane & Bolivar. E
N
G
MoDOT Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
Bridge washing On US 54 over
Missouri River. E
N
G
Description & Location: Bridge washing over
Missouri River. R
O
W
C
O
N
S
T
Comments: Bridges A4497 and L0550.
Total Project Cost: $225,000
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 14
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $132,000 $321,600 $453,600
MoDOT STATE $33,000 $80,400 $113,400
TIP #2022-09 Local $0
MoDOT#5P3467 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $1,551,200 $1,551,200
MoDOT STATE $387,800 $387,800
Local $0
Other $0
Total $165,000 $2,341,000 $0 $0 $0 $0 $0 $2,506,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $17,600 $89,600 $490,400 $597,600
MoDOT STATE $4,400 $22,400 $122,600 $149,400
TIP #2022-10 Local $0
MoDOT#5P3525 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $2,105,600 $2,105,600
MoDOT STATE $526,400 $526,400
Local $0
Other $0
Total $22,000 $112,000 $3,245,000 $0 $0 $0 $0 $3,379,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $80,800 $104,000 $428,000 $612,800
MoDOT STATE $20,200 $26,000 $107,000 $153,200
TIP #2022-11 Local $0
MoDOT#5P3560 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $1,780,800 $1,780,800
MoDOT STATE $445,200 $445,200
Local $0
Other $0
Total $101,000 $130,000 $2,761,000 $0 $0 $0 $0 $2,992,000
Total Project Cost: $3,379,000
MoDOT Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
Bridge Improvement On US 54 over
Neighorn Branch E
N
G
Description & Location: Bridge improvement
over Neighorn Branch.
Comments: Bridges A1415, A1309 and twin
bridges A1305, A1307 and A1672.
R
O
W
C
O
N
S
T
Comments: Bridge K0760.
Total Project Cost: $2,992,000
State Program Year - July 1 to June 30
Project
Name:
Bridge Improvements On US 54
over Bus. 50 and others. E
N
G
Description & Location: Bridge improvement
over Bus. 50, Linden Drive, Moreau Overflow,
and Stadium Boulevard. Includes Madison
Street Ramp over Rte. 54.
R
O
W
C
O
N
S
T
Total Project Cost: $2,506,000
MoDOT Funding Prior
Funding
Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
MoDOT Funding
Bridge rehabilitation on US 54 over
McCarty Street and Rte. 50 E
N
G
Description & Location: Bridge rehabilitation
over McCarty Street and Rte. 50. R
O
W
C
O
N
S
T
Comments: Bridges A1416 and A1417.
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 15
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $21,600 $48,800 $70,400
MoDOT STATE $5,400 $12,200 $17,600
TIP #2022-12 Local $0
MoDOT#5S3464 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $241,600 $241,600
MoDOT STATE $60,400 $60,400
Local $0
Other $0
Total $27,000 $363,000 $0 $0 $0 $0 $0 $390,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $50,400 $246,400 $296,800
MoDOT STATE $12,600 $61,600 $74,200
TIP #2022-13 Local $0
MoDOT#5S3526 Other $0
FHWA NHPP $4,000 $4,000
MoDOT STATE $1,000 $1,000
Local $0
Other $0
FHWA NHPP $940,000 $940,000
MoDOT STATE $235,000 $235,000
Local $0
Other $0
Total $68,000 $1,483,000 $0 $0 $0 $0 $0 $1,551,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $800 $800 $14,400 $21,600 $161,600 $199,200
MoDOT STATE $200 $200 $3,600 $5,400 $40,400 $49,800
TIP #2023-01 Local $0
MoDOT#CD0072 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $743,200 $743,200
MoDOT STATE $185,800 $185,800
Local $0
Other $0
Total $1,000 $1,000 $18,000 $27,000 $1,131,000 $0 $0 $1,178,000
MoDOT Funding Prior
Funding
State Program Year - July 1 to June 30
State Program Year - July 1 to June 30
Total Project Cost: $390,000
Project
Name:
Funding Prior
Funding
Project
Name:
Bridge rehabilitation On RT B over
Moreau River E
N
G
Description & Location: Bridge rehabilitation
over Moreau River.R
O
W
C
O
N
S
T
Comments: Bridge A3618.
MoDOT
R
O
W
C
O
N
S
T
Total Project Cost: $1,178,000
State Program Year - July 1 to June 30
Project
Name:
Bridge Improvement On S. Summit
Drive over Rte. 54 E
N
G
MoDOT Funding Prior
Funding
Bridge Rehabilitation On Rt D over
North Moreau Creek E
N
G
Description & Location: Bridge rehabilitation
over North Moreau Creek.R
O
W
C
O
N
S
T
Comments: Bridge A1470.
Total Project Cost: $1,551,000
Description & Location: Bridge improvement
over Rte. 54.
Comments: Bridge A3521.
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 16
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA AC-STBG $800 $800 $20,000 $21,600
MoDOT STATE $200 $200 $5,000 $5,400
TIP #2023-03 Local $0
MoDOT#CD0075 FHWA $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA AC-STBG $152,800 $152,800
MoDOT STATE $38,200 $38,200
Local $0
MoDOT $0
Total $1,000 $1,000 $216,000 $0 $0 $0 $0 $218,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $800 $800 $800 $13,600 $161,600 $177,600
MoDOT STATE $200 $200 $200 $3,400 $40,400 $44,400
TIP #2024-01 Local $0
MoDOT#CD0140 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $539,200 $539,200
MoDOT STATE $134,800 $134,800
Local $0
Other $0
Total $0 $1,000 $1,000 $1,000 $17,000 $876,000 $0 $896,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $1,600 $14,400 $116,000 $921,600 $1,053,600
MoDOT STATE $400 $3,600 $29,000 $230,400 $263,400
TIP #2024-02 Local $0
MoDOT#CD0139 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $3,327,200 $3,327,200
MoDOT STATE $831,800 $831,800
Local $0
Other $0
Total $0 $2,000 $18,000 $145,000 $5,311,000 $0 $0 $5,476,000
State Program Year - July 1 to June 30
State Program Year - July 1 to June 30
Prior
Funding
Project
Name:
Bridge (Overpass) Removal on Tri-
Level over US 50
Total Project Cost: $896,000
Project
Name:
Bridge improvements On US 50
over Osage River. E
N
G
Description & Location: Bridge improvements
over Osage River. Project involves bridges
A5552 and A0506.
R
O
W
C
O
N
S
T
MoDOT
Description & Location: Bridge removal on tri-
level over US 50.R
O
W
C
O
N
S
T
Comments: Bridge A1418.
E
N
G
MoDOT Funding Prior
Funding
MoDOT Funding Prior
Funding
Comments: Bridges A5552 and A0506
State Program Year - July 1 to June 30
Project
Name:
Bridge improvements On US 54/63
over Missouri River. E
N
G
Description & Location: Bridge improvements
over Missouri River. Project involves bridge
A4497.
R
O
W
C
O
N
S
T
Comments: Bridges A4497
Total Project Cost: $5,476,000
Total Project Cost: $218,000
Funding
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 17
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $11,200 $143,200 $154,400
MoDOT STATE $2,800 $35,800 $38,600
TIP #2024-03 Local $0
MoDOT#CD0157 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $546,400 $546,400
MoDOT STATE $136,600 $136,600
Local $0
Other $0
Total $0 $14,000 $862,000 $0 $0 $0 $0 $876,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA BRO $83,336 $83,336
MoDOT BFP $51,226 $51,226
TIP #2024-04 Local Cole County $5,438 $5,438
MoDOT#BRO-R026(25)Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA BRO $1,576,241 $1,576,241
MoDOT BFP $968,897 $968,897
Local Cole County $102,863 $102,863
Other $0
Total $0 $140,000 $2,648,001 $0 $0 $0 $0 $2,788,001
Project
Name:
Bridge Improvement On US 54 over
Neighorn Branch E
N
G
Total Project Cost: $876,000
State Program Year - July 1 to June 30MoDOTFundingPrior
Funding
Description & Location: Bridge improvement
over Neighorn Branch.R
O
W
C
O
N
S
T
Comments: Bridge G0302.
Total Project Cost: $2,788,001
Cole County Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
Tanner Bridge Road bridge
replacement over Moreau River E
N
G
Description & Location: Replacement of bridge
on Tanner Bridge Road over the Moreau River.
Bridge #0780025
R
O
W
C
O
N
S
T
Comments:
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 18
Fiscally Constrained Transportation Projects - Roadways
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA AC-STBG $12,800 $68,000 $80,000 $187,200 $348,000
MoDOT STATE $3,200 $17,000 $20,000 $46,800 $87,000
TIP #2020-12 MoDOT $0
MoDOT#5S3418 Other $0
FHWA AC-STBG $86,400 $86,400
MoDOT STATE $21,600 $21,600
Local $0
Other $0
FHWA AC-STBG $910,400 $910,400
MoDOT STATE $227,600 $227,600
Local $0
Other $0
Total $16,000 $85,000 $208,000 $1,372,000 $0 $0 $0 $1,681,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $220,000 $210,400 $430,400
MoDOT STATE $55,000 $52,600 $107,600
TIP #2022-01 Local $0
MoDOT#5P3497 MoDOT $0
FHWA NHPP $461,600 $461,600
MoDOT STATE $115,400 $115,400
Local $0
MoDOT $0
FHWA NHPP $2,326,400 $2,326,400
MoDOT STATE $581,600 $581,600
Local $0
MoDOT $0
Total $852,000 $3,171,000 $0 $0 $0 $0 $0 $4,023,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA AC-STBG $1,600 $800 $135,200 $137,600
MoDOT STATE $400 $200 $33,800 $34,400
TIP #2022-23 Local $0
MoDOT#5P3487 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA AC-STBG $1,977,600 $1,977,600
MoDOT STATE $494,400 $494,400
Local $0
Other $0
Total $2,000 $1,000 $2,641,000 $0 $0 $0 $0 $2,644,000
State Program Year - July 1 to June 30
Funding
R
O
W
C
O
N
S
T
Comments:
Total Project Cost: $1,681,000
MoDOT Prior
Funding
C
O
N
S
T
Comments:
Total Project Cost: $4,023,000
Funding
Total Project Cost: $2,644,000
Project
Name:
Guard Cable & Guardrail Repair in
Northern Central District E
N
G
Description & Location: Job Order Contracting
for guard cable and guardrail repair on various
routes in the northern portion of the Central
District.
R
O
W
C
O
N
S
T
Comments:
Description & Location: Roadway
improvements from West McCarty Street to
Rte. 63 north of Missouri River Bridge in
Jefferson City.
R
O
W
State Program Year - July 1 to June 30
Project
Name:
Roadway Improvements on US 54/
Missouri River Bridge. E
N
G
Description & Location: Intersection
improvements at South Ten Mile Drive (South
Outer Road 50) in Jefferson City.
Funding Prior
Funding
Project
Name:
Intersection Improvements at South
Ten Mile Drive in Jefferson City. E
N
G
MoDOT
Prior
Funding
State Program Year - July 1 to June 30MoDOT
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 19
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA AC-STBG $800 $800 $800 $800 $146,400 $149,600
MoDOT STATE $200 $200 $200 $200 $36,600 $37,400
TIP #2023-04 Local $0
MoDOT#CD0004 FHWA $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA AC-STBG $2,272,800 $2,272,800
MoDOT STATE $568,200 $568,200
Local $0
FHWA $0
Total $1,000 $1,000 $1,000 $1,000 $3,024,000 $0 $0 $3,028,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $160,000 $1,529,600 $1,689,600
MoDOT STATE $40,000 $382,400 $422,400
TIP #2023-05 Local $0
MoDOT#CD0100 FHWA $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA NHPP $17,708,000 $17,708,000
MoDOT STATE $4,427,000 $4,427,000
Local $0
FHWA $0
Total $200,000 $24,047,000 $0 $0 $0 $0 $0 $24,247,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $800 $800 $800 $26,400 $257,600 $286,400
MoDOT STATE $200 $200 $200 $6,600 $64,400 $71,600
TIP #2023-06 Local $0
MoDOT#CD0106 FHWA $0
FHWA $0
MoDOT $0
Local $0
FHWA $0
FHWA NHPP $3,277,600 $3,277,600
MoDOT STATE $819,400 $819,400
Local $0
FHWA $0
Total $1,000 $1,000 $1,000 $33,000 $4,419,000 $0 $0 $4,455,000
Prior
Funding
State Program Year - July 1 to June 30
MoDOT Funding
Total Project Cost: $4,455,000
MoDOT Funding
Description & Location: Pavement improvement
from west of Shamrock Road to east of Stoney
Gap Road. Includes westbound Rte. 50 from
west of Maries River to east of Mari Osa Delta
Lane and from west of Osage River to Moreau
River. C
O
N
S
T
Comments:
State Program Year - July 1 to June 30
Prior
Funding
State Program Year - July 1 to June 30
Prior
Funding
MoDOT Funding
R
O
W
Project
Name:Pavement Resurfacing on US 54 E
N
G
Description & Location: Pavement resurfacing
from County Road 147 north of Kingdom City
to Missouri River bridge. Includes high friction
surface treatment.
R
O
W
C
O
N
S
T
Comments:
Total Project Cost: $24,247,000
Project
Name:Pavement Improvement on US 50 E
N
G
Project
Name:
Guard Cable & Guardrail Repair in
Northern Central District E
N
G
Description & Location: Job Order Contracting
for guard cable and guardrail repair on various
routes in the northern portion of the Central
District.
R
O
W
C
O
N
S
T
Comments:
Total Project Cost: $3,028,000
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 20
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA AC-STBG $800 $800 $12,000 $13,600
MoDOT STATE $200 $200 $3,000 $3,400
TIP #2023-08 Local $0
MoDOT#CD0040 FHWA $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA AC-STBG $196,800 $196,800
MoDOT STATE $49,200 $49,200
Local $0
FHWA $0
Total $1,000 $1,000 $261,000 $0 $0 $0 $0 $263,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA AC-STBG $800 $5,600 $65,600 $72,000
MoDOT STATE $200 $1,400 $16,400 $18,000
TIP #2023-09 Local $0
MoDOT#CD0043 FHWA $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA AC-STBG $1,109,600 $1,109,600
MoDOT STATE $277,400 $277,400
Local $0
Other $0
Total $1,000 $7,000 $1,469,000 $0 $0 $0 $0 $1,477,000
Funding
Description & Location: Pavement improvement
on RT H from RT E to end of state
maintenance; RT BB from MO 17 to RT. H; and
RT CC from RT C to US 54.
Comments: This project includes three routes
(H, BB, and CC).
Total Project Cost: $1,477,000
MoDOT
Total Project Cost: $263,000
MoDOT Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
Pavement Improvement on RT E
from US 54 to RT B E
N
G
Description & Location: Pavement
improvement on RT E from US 54 to RT B.R
O
W
C
O
N
S
T
Comments:
Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
Pavement Improvement on Routes
H, BB, and CC. E
N
G
R
O
W
C
O
N
S
T
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 21
Fiscally Constrained Transportation Projects - Other
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA SAFETY $800 $800
MoDOT STATE $200 $200
TIP #2023-11 Local $0
MoDOT#5P3521 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA SAFETY $50,400 $50,400
MoDOT STATE $12,600 $12,600
Local $0
Other $0
Total $0 $64,000 $0 $0 $0 $0 $0 $64,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA SAFETY $800 $800
MoDOT STATE $200 $200
TIP #2023-12 Local $0
MoDOT#CD0006 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA SAFETY $50,400 $50,400
MoDOT STATE $12,600 $12,600
Local $0
Other $0
Total $0 $0 $64,000 $0 $0 $0 $0 $64,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA SAFETY $800 $800
MoDOT STATE $200 $200
TIP #2024-07 Local $0
MoDOT#CD0141 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA SAFETY $50,400 $50,400
MoDOT STATE $12,600 $12,600
Local $0
Other $0
Total $0 $0 $0 $64,000 $0 $0 $0 $64,000
Description & Location: On-call work zone
enforcement at various locations in the Central
District.
R
O
W
C
O
N
S
T
Comments:
Total Project Cost: $64,000
Prior
Funding
State Program Year - July 1 to June 30Funding
Project
Name:On-Call Work Zone Enforcement
MoDOT
E
N
G
State Program Year - July 1 to June 30
Project
Name:On-Call Work Zone Enforcement E
N
G
Comments:
Total Project Cost: $64,000
R
O
W
C
O
N
S
T
Description & Location: On-call work zone
enforcement at various locations in the Central
District.
MoDOT Funding Prior
Funding
Total Project Cost: $64,000
MoDOT Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:On-Call Work Zone Enforcement E
N
G
Description & Location: On-call work zone
enforcement at various locations in the Central
District.
R
O
W
C
O
N
S
T
Comments:
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 22
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA $0
MoDOT $0
TIP #2024-08 Local $0
MoDOT#5B0800T Other $0
FHWA $0
MoDOT STATE $107,000 $107,000
Local $0
Other $0
FHWA NHPP $0
MoDOT STATE $57,989,000 $4,399,000 $4,399,000 $4,399,000 $4,399,000 $4,399,000 $79,984,000
Local $0
Other $0
Total #########$4,399,000 $4,399,000 $4,399,000 $4,399,000 $4,399,000 $0 $80,091,000
MoDOT State Program Year - July 1 to June 30
Project
Name:
Payback for Safe and Sound
bridges in the Central District. E
N
G
Description & Location: Payback beginning in
SFY 2008 for Safe and Sound bridges in the
Central District.
R
O
W
C
O
N
S
T
Comments:
Total Project Cost: $80,091,000
Funding Prior
Funding
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 23
Fiscally Constrained Transportation Projects – Scoping and Design Projects
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA AC-STBG $44,000 $800 $2,400 $47,200
MoDOT STATE $11,000 $200 $600 $11,800
TIP #2013-16 Local $0
MoDOT#5S2234 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
Total $55,000 $1,000 $3,000 $0 $0 $0 $0 $59,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $227,200 $40,000 $267,200
MoDOT STATE $56,800 $10,000 $66,800
TIP #2022-27 Local $0
MoDOT#5P3588 Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
Total $284,000 $50,000 $0 $0 $0 $0 $0 $334,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA NHPP $800 $1,600 $2,400
MoDOT STATE $200 $400 $600
TIP #2024-09 Local $0
MoDOT#CD0159 Other $0
FHWA NHPP $0
MoDOT STATE $0
Local $0
Other $0
FHWA NHPP $0
MoDOT STATE $0
Local $0
Other $0
Total $0 $1,000 $2,000 $0 $0 $0 $0 $3,000
MoDOT Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
Dix Road - Scoping for bridge
improvements over US 50. E
N
G
Description & Location: Scoping for bridge
improvements over Rte. 50. R
O
W
C
O
N
S
T
Comments: Project involves bridge A1187
C
O
N
S
T
Comments:
Total Project Cost: $334,000
State Program Year - July 1 to June 30
Project
Name:
Scoping for Interchange
Improvements at Truman Blvd and E
N
G
Total Project Cost: $59,000
Prior
Funding
Description & Location: Scoping for
intersection improvements at Routes M and
Route W in Wardsville.
R
O
W
C
O
N
S
T
Scoping Routes M, B, & W
Comments:
Description & Location: Scoping for
Interchange Improvements at Truman Blvd and
Country Club Drive.
R
O
W
MoDOT Funding
MoDOT Funding
E
N
G
Total Project Cost: $3,000
Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 24
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA AC-STBG $40,000 $800 $1,600 $42,400
MoDOT STATE $10,000 $200 $400 $10,600
TIP #2024-12 Local $0
MoDOT#CD0052 Other $0
FHWA AC-STBG $0
MoDOT $0
Local $0
Other $0
FHWA AC-STBG $0
MoDOT STATE $0
Local $0
Other $0
Total $50,000 $1,000 $2,000 $0 $0 $0 $0 $53,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA AC-STBG $100,000 $40,000 $800 $140,800
MoDOT STATE $25,000 $10,000 $200 $35,200
TIP #2024-13 Local $0
MoDOT#CD0065 Other $0
FHWA AC-STBG $0
MoDOT $0
Local $0
Other $0
FHWA AC-STBG $0
MoDOT STATE $0
Local $0
Other $0
Total $125,000 $50,000 $1,000 $0 $0 $0 $0 $176,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA AC-STBG $80,000 $320,000 $400,000
MoDOT STATE $20,000 $80,000 $100,000
TIP #2024-14 Local $0
MoDOT#CD0168 Other $0
FHWA AC-STBG $0
MoDOT $0
Local $0
Other $0
FHWA AC-STBG $0
MoDOT STATE $0
Local $0
Other $0
Total $0 $100,000 $400,000 $0 $0 $0 $0 $500,000
MoDOT Funding Prior
Funding
State Program Year - July 1 to June 30
Scoping for bridge improvements at
the Tri-level.
Total Project Cost: $176,000
Total Project Cost: $53,000
MoDOT Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
VARIOUS - Traffic safety studies
at vairous locations in Central E
N
G
Description & Location: Traffic safety studies
at vairous locations in Central District.R
O
W
C
O
N
S
T
Comments:
MoDOT Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
VARIOUS - Scoping for curve
chevron and object markers. E
N
G
Description & Location: Scoping for curve
chevron and object marker installation at
vrious locations in the Central District.
R
O
W
C
O
N
S
T
Comments:
Comments: Bridges A1419, A4826, A4827 and
A4828.
Project
Name: E
N
G
Total Project Cost: $500,000
Description & Location: Scoping for bridge
improvements at intersection of Rte. 50, Rte.
63, and Rte. 54 in Jefferson City.
R
O
W
C
O
N
S
T
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 25
Fiscally Constrained Transportation Projects - Pedestrian & Bicycle Projects
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA AC-STBG $9,600 $800 $320,000 $330,400
MoDOT STATE $2,400 $200 $80,000 $82,600
TIP #2020-16 Local $0
MoDOT#CD0126 Other $0
FHWA AC-STBG $38,400 $38,400
MoDOT STATE $9,600 $9,600
Local $0
Other $0
FHWA AC-STBG $1,000,000 $1,000,000
MoDOT STATE $250,000 $250,000
Local $0
Other $0
Total $12,000 $49,000 $1,650,000 $0 $0 $0 $0 $1,711,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA RTP $17,350 $17,350
MoDOT $0
TIP #2023-14 Local St. Martins $27,650 $27,650
MoDOT#Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA RTP $128,850 $128,850
MoDOT $0
Local St. Martins $44,111 $44,111
Other Donation $574 $574
Total $45,000 $173,535 $0 $0 $0 $0 $0 $218,535
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA TAP $18,750 $18,750 $37,500
MoDOT $0
TIP #2023-18 Local St. Martins $6,250 $6,250 $12,500
MoDOT#Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA TAP $231,151 $231,151 $462,302
MoDOT $0
Local St. Martins $76,717 $76,717 $153,434
Other $0
Total $332,868 $332,868 $0 $0 $0 $0 $0 $665,736
Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:St. Martins Trail
Comments:
Updating Pedestrian Facilities
C
O
N
S
T
Description & Location: Transportation
Alternatives Program Grant, bike-ped lanes
along business 50.
R
O
W
C
O
N
S
T
Comments: TAP
Comments: Recreational Trail Program Grant
awarded November 2022.
Total Project Cost: $218,535
St. Martins
Description & Location: Recreational Trails
Grant, 7' ADA trail extension from Niekamp
Park to Traci Dr.
R
O
W
C
O
N
S
T
Total Project Cost: $1,711,000
MoDOT
St. Martins Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
St. Martins Business 50 bike/ped
path extension
O
P
E
R
E
N
G
Total Project Cost: $665,736
Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name: E
N
G
Description & Location: Upgrade pedestrian
facilities to comply with the ADA Transition
Plan in Jefferson City, Taos, Wardsville, and
Frankenstein.
R
O
W
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 26
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA TAP $79,500 $79,500
MoDOT $0
TIP #2023-17 Local Holts Summit $62,500 $62,500
MoDOT#Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA TAP $420,500 $420,500
MoDOT $0
Local Holts Summit $62,500 $62,500
Other $0
Total $142,000 $483,000 $0 $0 $0 $0 $0 $625,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA TAP $0
MoDOT $0
TIP #2023-15 Local City of Jefferson $0
MoDOT#Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA TAP $222,744 $222,744
MoDOT $0
Local City of Jefferson $55,686 $55,686
Other $0
Total $0 $278,430 $0 $0 $0 $0 $0 $278,430
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA TAP $0
MoDOT $0
TIP #2023-16 Local City of Jefferson $0
MoDOT#Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA TAP $500,000 $500,000
MoDOT $0
Local City of Jefferson $483,465 $483,465
Other $0
Total $0 $983,465 $0 $0 $0 $0 $0 $983,465
Project
Name:
Wears Creek Greenway Extension
Bypassing MO 179
O
P
E
R
Description & Location: Transportation
Alternatives Program Grant, includes
extension of the Wears Creek Greenway
along Tree Valley Lane, bypassing MO 179.
R
O
W
C
O
N
S
T
Comments: TAP
State Program Year - July 1 to June 30
State Program Year - July 1 to June 30
Description & Location: Transportation
Alternatives Program Grant, includes
improvements to greenway crosswalks.
R
O
W
C
O
N
S
T
Comments: TAP
Total Project Cost: $983,465
Total Project Cost: $278,430
City of Jefferson
C
O
N
S
T
Comments: TAP
Holts Summit Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
Holts Summit Sidewalk construction
along S. Summit Drive
O
P
E
R
Description & Location: Transportation
Alternatives Program Grant, Sidewalk
installation along S. Summit Drive from Holt
Lane to Ellsworth Drive.
R
O
W
Funding Prior
Funding
Total Project Cost: $625,000
City of Jefferson Funding Prior
Funding
Project
Name:
Greenway crosswalks at
Southwest Blvd and Lafayette St.
O
P
E
R
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 27
Source Category 2024 2025 2026 2027 2028 Future Totals
FHWA TAP $361,874 $361,874
MoDOT $0
TIP #2024-15 Local Wardsville $98,526 $98,526
MoDOT#Other $0
FHWA $0
MoDOT $0
Local $0
Other $0
FHWA TAP $27,117 $27,117
MoDOT $0
Local Wardsville $7,383 $7,383
Other $0
Total $0 $494,900 $0 $0 $0 $0 $0 $494,900
Wardsville Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
Falcon Lane Pedestrian
Improvements
O
P
E
R
Description & Location: Construction of
approximately 1400 feet of 8ft wide sidewalks
along Falcon Lane to accommodate
pedestrians and bicycle users.
R
O
W
C
O
N
S
T
Comments: TAP
Total Project Cost: $494,900
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 28
Fiscally Constrained Transportation Projects – Public Transportation Projects
Source Category 2024 2025 2026 2027 2028 Future Totals
Other Pass. Fares $521,590 $391,692 $468,886 $478,264 $487,829 $497,585 $2,845,846
MoDOT State Operating $11,500 $52,414 $52,414 $52,414 $52,414 $52,414 $273,570
TIP #2011-04 Local City of Jefferson $821,916 $1,070,655 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,663,173
MoDOT#FTA 5307 $821,916 $1,070,655 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,663,173
Total $2,176,922 $2,585,416 $2,734,972 $2,855,034 $2,980,817 $3,112,601 $0 $16,445,762
Source Category 2024 2025 2026 2027 2028 Future Totals
Other $0
MoDOT $0
TIP #2022-21 Local General Fund $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $168,000
MoDOT#FTA 5310 $112,000 $112,000 $112,000 $112,000 $112,000 $112,000 $672,000
Total $140,000 $140,000 $140,000 $140,000 $140,000 $140,000 $0 $840,000
Source Category 2024 2025 2026 2027 2028 Future Totals
Other Pass. Fares $0
MoDOT State Operating $0
TIP #2020-18 Local General Fund $35,500 $35,500
MoDOT#FTA 5339 $131,553 $131,553
Total $0 $167,053 $0 $0 $0 $0 $0 $167,053
Comments:
Total Project Cost: $167,053
Update Bus Wash Facility O
P
E
R
State Program Year - July 1 to June 30
Project
Name:
Description & Location: This project would
replace JEFFTRAN's antiquated bus wash
facility. Jefferson City, MO.
Prior
Funding
Funding
Total Project Cost: $16,445,762
Total Project Cost: $840,000
City of Jefferson - JEFFTRAN
Project
Name:
Description & Location: Operating Assistance
for JEFFTRAN service within Jefferson City
limits (A 3% annual inflation factor applied.)
JEFFTRAN Operating Assistance O
P
E
R
Comments:
City of Jefferson - JEFFTRAN Funding Prior
Funding
State Program Year - July 1 to June 30
Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:JEFFTRAN Operating Assistance O
P
E
R
Description & Location: Section 5310 Grant
Program for acquiring new paratransit buses.
Providing mobility needs for seniors and
persons with disabilities.
Comments:
City of Jefferson - JEFFTRAN
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 29
Source Category 2024 2025 2026 2027 2028 Future Totals
Other Pass. Fares $0
MoDOT State Operating $0
TIP #2020-22 Local General Fund $8,000 $2,544 $10,544
MoDOT#FTA 5339 $32,000 $10,175 $42,175
Total $0 $40,000 $12,719 $0 $0 $0 $0 $52,719
Source Category 2024 2025 2026 2027 2028 Future Totals
Other Pass. Fares $0
MoDOT State Operating $0
TIP #2022-24 Local General Fund $57,600 $57,600
MoDOT#FTA 5339 $230,400 $230,400
Total $0 $288,000 $0 $0 $0 $0 $0 $288,000
Source Category 2024 2025 2026 2027 2028 Future Totals
Other Pass. Fares $0
MoDOT State Operating $0
TIP #2022-26 Local General Fund $7,000 $7,000
MoDOT#FTA 5339 $28,000 $28,000
Total $0 $35,000 $0 $0 $0 $0 $0 $35,000
Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:Repair Bus Barn Roof
City of Jefferson - JEFFTRAN Funding Prior
Funding
State Program Year - July 1 to June 30
Total Project Cost: $35,000
City of Jefferson - JEFFTRAN
Project
Name:
Replace Security Systems in Transit
Facilities
O
P
E
R
O
P
E
R
Description & Location: This project would
repair the bus barn roof, which is leaking.
Comments:
Description & Location: This project would
replace outdated security cameras and entry
systems in transit facilities. Jefferson City,
MO. And add solar lighting to select bus
shelters.
Comments:
Total Project Cost: $52,719
City of Jefferson - JEFFTRAN Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
Replacement of Two Low-Floor
Buses
O
P
E
R
Description & Location: This project would
purchase 2 replacement low-floor buses.
Comments:
Total Project Cost: $288,000
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 30
Source Category 2024 2025 2026 2027 2028 Future Totals
FTA 5307 $1,053,363 $1,053,363
MoDOT $0
TIP #2022-30 Local General Fund $115,000 $115,000
MoDOT#FTA 5339 $293,000 $293,000
Total $0 $1,461,363 $0 $0 $0 $0 $0 $1,461,363
Source Category 2024 2025 2026 2027 2028 Future Totals
FTA $0
MoDOT $0
TIP #2022-31 Local General Fund $60,000 $60,000
MoDOT#FTA 5339 $240,000 $240,000
Total $0 $300,000 $0 $0 $0 $0 $0 $300,000
Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:JEFFTRAN Hybrid Gillig Buses O
P
E
R
City of Jefferson - JEFFTRAN
City of Jefferson - JEFFTRAN Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:
AVL/AVA/APC/Infotainment
Replacement Equipment and
O
P
E
R
Description & Location: Replacement of AVL
and related equipment and supporting
services.
Comments:
Total Project Cost: $300,000
Description & Location: This project would
allow the purchase of 2 hybrid gillig buses.
Comments: This money stems from a
reallocation of unspent funds from another
agency.
Total Project Cost: $1,461,363
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 31
Source Category 2024 2025 2026 2027 2028 Future Totals
FTA 5310 $88,000 $88,000 $176,000
MoDOT $0
TIP #2018-10 Local $0
MoDOT#Other OATS $22,000 $22,000 $44,000
Total $0 $0 $0 $110,000 $0 $110,000 $0 $220,000
Source Category 2024 2025 2026 2027 2028 Future Totals
FTA 5310 $60,000 $60,000 $70,000 $70,000 $70,000 $330,000
MoDOT $0
TIP #2018-11 Local $0
MoDOT#Other OATS $60,000 $60,000 $70,000 $70,000 $70,000 $330,000
Total $0 $120,000 $120,000 $140,000 $140,000 $140,000 $0 $660,000
OATS
OATS Operating Assistance O
P
E
R
Description & Location: Within the Jefferson
City MPO Region-Section 5310-Seniors and
Individuals with Disabilities.
Comments: Other Funding - OATS, Inc.
Total Project Cost: $660,000
Funding Prior
Funding
Project
Name:
OATS
Description & Location: Requesting
replacement/expansion vehicles to provide
service in Jefferson City and surrounding
area.Comments: Other Funding - OATS, Inc.
Total Project Cost: $220,000
State Program Year - July 1 to June 30
Funding Prior
Funding
State Program Year - July 1 to June 30
Project
Name:OATS Operating Assistance O
P
E
R
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 32
Project Locations
Figure 7 - Map of Fiscally Constrained Transportation Projects
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 33
Program of Projects
Figure 8 – JEFFTRAN Program of Projects
No.Description Est. Total
Funding by
Others Local
1 Replace paratransit widebody cutaway buses 600,000$ $ 480,000 120,000$
2 Replace low-floor minivan support vehicle 40,000$ 32,000$ 8,000$
3 Upgrade/replace fare card system 150,000$ 120,000$ 30,000$
4 Transit facility repairs & improvements 50,000$ 40,000$ 10,000$
5 Security upgrades for transit facilities 30,000$ 24,000$ 6,000$
6 Update/revise Transit facilities feasability study 50,000$ 40,000$ 10,000$
7 Upgrade transit transfer facilities 150,000$ 120,000$ 30,000$
8 Purchase and install bus shelters and amenities at various locations in Jefferson City 30,000$ 24,000$ 6,000$
9 Update Bus Wash facility 175,000$ 140,000$ 35,000$
10 Purchase back-up generator & switches for transit and CM facilities 200,000$ 160,000$ 40,000$
11 Replace low-floor route buses 6,000,000$ 5,400,000$ 600,000$
12 Construct replacement transit/central maintenace/bus barn/bus wash facilities 40,000,000$ 32,000,000$ 8,000,000$
13 Transit admin facility rehab 50,000$ 40,000$ 10,000$
14 Purchase and install additional transit traveler kiosks (each)15,000$ 12,000$ 3,000$
15 Add bike racks/benches at passenger transfer facilities and selected bus stops 25,000$ 20,000$ 5,000$
16 Charging systems/electrical upgrades for buses 600,000$ 480,000$ 120,000$
17 Add crosswalks and supporting bike/ped amenities to transit bus shelters 60,000$ -$ 60,000$
18 Rehabilitate/replace bus wash components 100,000$ 80,000$ 20,000$
19 Add solar lighting/occupancy indicators for selected bus shelters 35,000$ 28,000$ 7,000$
20 Replace floor scrubber for bus barn 18,000$ 14,400$ 3,600$
21 Replace mobile column lifts for buses 100,000$ 80,000$ 20,000$
22 Add vehicle electric charging stations and associated infrastructure 30,000$ 24,000$ 6,000$
23 Time-tracking software for transit employees 15,000$ 12,000$ 3,000$
24 Upgrade/replace AVL/AVA/APC systems on fixed routes 300,000$ 240,000$ 60,000$
25 Passenger Engagement/Bus infotainment system, including digital displays 250,000$ 200,000$ 50,000$
26 Pre-trip inspection software 30,000$ 24,000$ 6,000$
Total 49,103,000$ 39,834,400$ 9,268,600$
JEFFTRAN 2024 Program of Projects
Illustrative Projects
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 34
Multimodal Projects
In 2015, CAMPO met with federal and state planning partners in a formal planning process review. Within
two recommendations made, CAMPO was urged to include more multi-modal projects into the TIP. CAMPO
staff sent out written requests and reminders at CAMPO meetings for projects, including those not using
federal dollars. As of the writing of this document, no projects have been submitted.
However, there are a number of factors why these projects are limited. These types of projects are usually
incorporated into new road projects. Many of these types of projects are highly dependent on grants, which
may or may not be annually awarded. Projects are usually decided each budget year. There are several
bicycle or pedestrian projects in the MTP illustrative list, but projects are not constrained and funds are not
obligated.
Regionally Significant Projects
A regionally significant project means a transportation project (other than projects that may be grouped in
the TIP and/or STIP or exempt projects as defined in EPA’s transportation conformity regulation (40 CFR
part 93) that is on a facility which serves regional transportation needs (such as access to and from the area
outside the region; major activity centers in the region; major planned developments such as new retail malls,
sports complexes, or employment centers; or transportation terminals) and would normally be included in the
modeling of the metropolitan area’s transportation network. At a minimum, this includes all principal arterial
highways and all fixed guideway transit facilities that offer a significant alternative to regional highway
travel.
US 54 & US 63 Improvements
The TIP currently contains a project to improve traffic congestion and safety in northern Jefferson City (TIP
#2022-01). The project scope is still being defined as of the development of the TIP and STIP documents in
April 2023. The project would potentially include the construction of additional lanes and potential
adjustments to ramp configurations and signage just north of the Missouri River Bridge.
I-70 Rocheport Bridge
In 2020, MoDOT secured funding for the replacement of the Rocheport Bridge over the Missouri River. The
bridge is located on Interstate 70 and crosses the Missouri River between Boone and Howard Counties. For
the duration of this project, travel inside the CAMPO region may see some minor impacts.
This project may cause minor increases in volume on US Routes 40, 36, 63, and 50, but the anticipated
effects are minimal. The project is nearing completion.
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 35
Appendix 1 – Amendments and Administrative Modifications
Amendments
TIP No. Project Description Project
Sponsor Project Cost Board
Approval
OneDOT
Approval
Administrative Modifications
TIP No. Description of Modification Date
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 36
Appendix 2 – Federal Funding Sources
On November 15, 2021, President Biden signed the Infrastructure Investment and Jobs Act (IIJA), also known as the
“Bipartisan Infrastructure Law”) into law. The Bipartisan Infrastructure Law (BIL) provides $550 billion over fiscal
years 2022 through 2026 in new Federal investment in infrastructure, including in roads, bridges, and mass transit,
water infrastructure, resilience, and broadband.
As under the FAST Act, the BIL authorizes a single, combined amount for each fiscal year for all apportioned highway
programs combined. That amount is first apportioned among the States, and then each State’s apportionment is
divided among the individual apportioned programs.
The BIL also appropriates funding from the General Fund for three other formula-based programs separate and apart
from the apportioned amount described above (and the formula described below): (1) the Bridge Formula Program,
(2) the National Electric Vehicle Infrastructure Formula Program, and (3) the Appalachian Development Highway
System Program.
Federal-aid Highway Apportioned Programs
The BIL authorizes a total combined amount ($52.5 B for fiscal year (FY) 2022, $53.5 B for FY23, $5 4.6 B for FY24,
$55.7 B for FY25, and $56.8 B for FY26) in Contract Authority from the Highway Account of the Highway Trust Fund
to fund 8 highway apportioned programs (including certain set -asides):
• National Highway Performance Program (NHPP)
• Surface Transportation Block Grant Program (STBG)
• Highway Safety Improvement Program (HSIP)
• Congestion Mitigation and Air Quality Improvement Program (CMAQ)
• National Highway Freight Program (NHFP)
• Metropolitan Planning (PL)
• Carbon Reduction Program (CRP) NEW
• Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation (PROTECT)
Formula Program NEW
More information can be found at: https://www.fhwa.dot.gov/bipartisan-infrastructure-law/funding.cfm
Federal Transit Administration Funding
The Bipartisan Infrastructure Law authorizes up to $108 billion to support federal public transportation programs,
including $91 billion in guaranteed funding. More information can be found at:
https://www.transit.dot.gov/funding/grants/grant-programs
FTA Programs Eligible Activities
Section 5307 Urbanized Area
Formula Grants
This program provides grants to Urbanized Areas (UZA) for public transportation
capital, planning, job access and reverse commute projects, as well as operating
expenses in certain circumstances.
Section 5310 Enhanced Mobility
of Seniors and Individuals with
Disabilities
This program is intended to enhance mobility for seniors and persons with
disabilities by providing funds for programs to serve the special needs of transit-
dependent populations beyond traditional public transportation services and
Americans with Disabilities Act (ADA) complementary paratransit services.
Section 5311 Formula Grants for
Rural Areas
This program provides capital, planning, and operating assistance to states to
support public transportation in rural areas with populations less than 50,000,
where many residents often rely on public transit to reach their destinations.
Section 5329 Transit Safety &
Oversight
This section requires FTA to implement and maintain a national public
transportation safety program to improve the safety of all public transportation
systems that receive federal funding. The safety program includes a national
public transportation safety plan, a safety certification training program, a public
transportation agency safety plan, and a state safety oversight p rogram.
Section 5339 Bus and Bus
Facilities
Provides capital funding to replace, rehabilitate and purchase buses and related
equipment and to construct bus-related facilities.
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 37
Appendix 3 – Policies and Procedures
Amendments
An amendment involves a major change to a project and requires approval by the Board of Directors and
Governor. An amendment is a revision that requires public review, allowance of comment, possible re-
demonstration of fiscal constraint, and includes at least one of the following:
• Addition or deletion of a project using FHWA or FTA funds (except as allowed as an administrative
modification),
• Major changes affecting project cost from FHWA or FTA sources (changes exceeding 20% of FHWA
or FTA sources of the existing project cost or changes over $2,000,000),
• Major changes in a project phase initiation date (greater than 12 months), or
• Major changes in design concept or design scope, such as changing project termini (more than 1/2
mile or 10% of the total length of the project, whichever is greater) or changing the number of
through traffic lanes that also includes a substantial increase in Federal cost.
Amendments will be initiated by the project sponsor. Amendments to delete a project can simply be made
via written correspondence identifying the project and why it is to be removed from the TIP. Amendments
to include a new project can be made on the TIP Project Form for the current TIP with a cover letter or remark
in the comment section requesting inclusion in the TIP as an amendment. Amendments for existing projects
can be made on the TIP Project Form for the current TIP with a cover letter or remark in the comment section
highlighting the change in the project and providing the CAMPO TIP Number.
After an Amendment has been requested the process as follows:
• Staff will review the amendment for accuracy and to verify if an amendment is required or if the
change qualifies as an administrative modification. Staff may consult with MoDOT and FHWA if
necessary.
• The amendment will be placed on the next Technical Committee (TC) meeting agenda for review.
• The Technical Committee is an advisory board to the board of directors. Regardless of whether the
Technical Committee recommends approval of a project, does not recommend approval of a project,
or is unable to make a recommendation, the project shall still proceed to the Board of Directors to
make a final decision.
• If approval is recommended by the TC to the Board of Directors, staff will post the amendment
notice on the website, initiating a minimum 7 calendar day public comment period, send notices to
the appropriate parties, and place the amendment on the next Board of Directors meeting agenda.
• At the Board of Directors Meeting, they will close the public comment period and a vote for approval
will be held.
If the project sponsor indicates an emergency situation upon submitting the amendment, staff will:
• Initiate the public comment period
• Post the amendment notice on the website, initiating the 7 calendar day public comment period
• Send notices to the appropriate parties
• Place the amendment on the next Board of Directors meeting agenda.
The Board will close the public comment period at the next Board of Directors Meeting and hold a vote for
approval. If this is not adequate to meet the emergency situation, a special Board of Directors meeting may
be called and proceed as outlined in the Public Participation Plan.
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 38
Administrative Modifications
Revisions to the TIP and TIP projects that do not meet the criteria of an Amendment will be considered
administrative modifications including: minor changes to project/project phase costs, minor changes to
funding sources of previously-included projects, and minor changes to project/project phase initiation dates.
An administrative modification is a revision that neither requires committee action, public review and
comment, nor redemonstrates fiscal constraint.
An administrative modification will be initiated by the project sponsor by written communication to CAMPO
staff describing the change (phase cost, funding sources, or phase initiation date) warranting the
modification. Staff will review the administrative modification for accuracy and to verify qualification as an
administrative modification. Staff may consult with MoDOT and FHWA if necessary.
Upon CAMPO staff confirmation of the administrative modification requirements being met, staff will modify
the TIP appropriately, including noting the administrative modification in Appendix 1 of the TIP and making
changes to the project listing in the body of the TIP; notify the Board of Directors, Technical Committee,
MoDOT, FTA, and FHWA via email; draft a staff memo for the next Board of Directors and Technical
Committee meeting; and post the modified TIP notice on the CAMPO website for a minimum of 7 calendar
days.
Combining or Splitting Projects
Splitting a project into two or more projects or combining two or more projects can provide benefits to
project scheduling, cost, and logistics. A split or combination can be made via an administrative modification
to the TIP, if the project does not trigger a major change to the project as described in the amendment
section and the overall scope of work does not change.
When combining two or more projects, the financial and description information will be rolled up into the
project which was in the TIP originally and use the previous MPO TIP number. When splitting a project into
two or more projects, the financial and descriptive information will be separated appropriately into several
(two or more) projects using the same MPO TIP number, but the additional projects will include alphabetic
suffixes. The process for splitting or combining projects will follow the procedures of either an amendment
or administrative modification.
Compliance with Metropolitan Transportation Plan
For a project to be eligible for the TIP, it first must be included in the adopted MTP. Large capital projects,
roadway capacity, and/or general purpose roadway projects must be individually listed or clearly part of
a larger project included in the fiscally‐constrained component of the plan. Certain projects seeking to
improve safety, increase multi‐modal opportunities, or enhance the existing transportation system may be
programmed in the TIP without individual identification in the regional plan, so long as they are consistent
with the established goals and objectives of the plan.
Project Delay Policy
The goal of the Project Delay Policy for the Transportation Improvement Program is to maximize the federal
funding obligated each fiscal year and to enable the MPO to redirect funds to different projects if any are
inactive or otherwise limited from making progress. The Delay Policy applies to projects funded through the
programs for which CAMPO has oversight of project selection.
The intent of the Delay Policy is to provide an incentive for local agency sponsors to develop their projects
according to a detailed schedule and, thereby, to obligate the federal funds assigned to each project within
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 39
the timeframes initially shown in the TIP. The Delay Policy is primarily focused on projects that involve
construction or provide transportation improvements that are handled through purchasing procedures.
In the context of this Delay Policy, a “delay” occurs when a construction-related project phase does not get
advertised within six months of the TIP program year in which its construction phase funding was originally
programmed, or changed with an amendment, in the TIP. For non-construction projects and programs, a
“delay” occurs when the “Notice to Proceed” is not issued within two months of the TIP program year in which
its implementation was originally funded in the TIP. The consequence of a delay may be the withdrawal of
its Federal funds from the TIP or other action by the Board.
Project Funding Information
When a new project is submitted for inclusion to the TIP, either during the initial development of the TIP or
as an amendment, the project sponsor is required to provide information regarding the local funding sources
in order to show fiscal constraint. The specific source of revenue, anticipated future, and any other financial
information needed to show fiscal constraint will be required.
Project Selection
The CAMPO Board of Directors adopted (Resolution 2010-04) a project prioritization and selection process.
This process involves a call for projects, ranking based on CAMPO priorities by staff and reviewed by the
CAMPO Technical Committee, prior to being forwarded to the CAMPO Board of Directors for a vote of
approval. The Board of Directors may modify the project selection if deemed necessary.
Project Sponsor Commitment to Projects
Project sponsors hold ultimate responsibility for ensuring that project information contained in the TIP is
correct, that it accurately represents the scope of work being performed, and that the amount of funding
being requested is correct. The sponsor is responsible for providing CAMPO with an honest accounting of
project details including: costs, implementation schedules, and local matching fund sources, at the time of the
application for federal funds and anytime such details change. The project sponsor is also responsible for
reviewing the TIP after a project is included or modified to ensure correctness.
Scriveners’ Error
Errors made the in the ministerial functions of creating and maintaining the TIP, such as cartography,
typographical, spelling, minor word omissions, mathematical, and other error’s which do not alter the inten t
of the TIP and have little or no impact can be performed by staff and shall not be considered a revision to
the TIP.
DRAFT
CAMPO 2024-2028 Transportation Improvement Program 40
Appendix 4 – Definitions
Attainment area means any geographic area in which levels of a given
criteria air pollutant (e.g., ozone, carbon monoxide, PM10, PM2.5, and
nitrogen dioxide) meet the health-based National Ambient Air Quality
Standards (NAAQS) for that pollutant. An area may be an attainment area for
one pollutant and a nonattainment area for others. A maintenance area (see
definition below) is not considered an attainment area for transportation
planning purposes.
Available funds means funds derived from an existing source dedicated to or
historically used for transportation purposes. For Federal funds, authorized
and/or appropriated funds and the extrapolation of formula and
discretionary funds at historic rates of increase are considered available. A
similar approach may be used for State and local funds that are dedicated to
or historically used for transportation purposes.
Conformity means a Clean Air Act (42 U.S.C. 7506(c)) requirement that
ensures that Federal funding and approval are given to transportation plans,
programs and projects that are consistent with the air quality goals established
by a State Implementation Plan (SIP). Conformity, to the purpose of the SIP,
means that transportation activities will not cause new air quality violations,
worsen existing violations, or delay timely attainment of the NAAQS. The
transportation conformity rule (40 CFR part 93) sets forth policy, criteria, and
procedures for demonstrating and assuring conformity of transportation
activities.
Cooperation means that the parties involved in carrying out the transportation
planning and programming processes work together to achieve a common goal
or objective.
Coordination means the cooperative development of plans, programs, and
schedules among agencies and entities with legal standing and adjustment of
such plans, programs, and schedules to achieve general consistency, as
appropriate.
Design concept means the type of facility identified for a transportation
improvement project (e.g., freeway, expressway, arterial highway, grade
separated highway, toll road, reserved right-of-way rail transit, mixed-traffic
rail transit, or busway).
Design scope means the aspects that will affect the proposed facility’s impact
on the region, usually as they relate to vehicle or person carrying capacity and
control (e.g., number of lanes or tracks to be constructed or added, length of
project, signalization, safety features, access control including approximate
number and location of interchanges, or preferential treatment for high
occupancy vehicles).
Financial Plan means documentation required to be included with a
metropolitan transportation plan and TIP (and optional for the long-range
statewide transportation plan and STIP) that demonstrates the consistency
between reasonably available and projected sources of Federal, State, local,
and private revenues and the costs of implementing proposed transportation
system improvements.
Financially Constrained or Fiscal Constraint means that the metropolitan
transportation plan, TIP, and STIP includes sufficient financial information for
demonstrating that projects in the metropolitan transportation plan, TIP, and
STIP can be implemented using committed, available, or reasonably available
revenue sources, with reasonable assurance that the federally supported
transportation system is being adequately operated and maintained. For the
TIP and the STIP, financial constraint/fiscal constraint applies to each program
year. Additionally, projects in air quality nonattainment and maintenance
areas can be included in the first two years of the TIP and STIP only if funds
are available or committed.
Illustrative Project means an additional transportation project that may (but is
not required to) be included in a financial plan for a metropolitan
transportation plan, TIP, or STIP if reasonable additional resources were to
become available.
Maintenance Area means any geographic region of the United States that the
EPA previously designated as a nonattainment area for one or more pollutants
pursuant to the Clean Air Act Amendments of 1990, and subsequently
redesignated as an attainment area subject to the requirement to develop a
maintenance plan under section 175A of the Clean Air Act, as amended.
Major Projects - These transportation improvements are defined as projects
receiving Federal financial assistance 1) with an estimated total cost of $500
million or more or 2) that have been identified by the FHWA as being a Major
Project. The designated projects may include those: 1) that require a
substantial amount of a State Transportation Agency's program resources, 2)
that have a high level of public or congressional attention, or 3) that have
extraordinary implications for the national transportation system.
Metropolitan Planning Area (MPA) means the geographic area determined
by agreement between the metropolitan planning organization (MPO) for the
area and the Governor, in which the metropolitan transportation planning
process is carried out.
Metropolitan Transportation Plan (MTP) means the official multimodal
transportation plan addressing no less than a 20-year planning horizon that is
developed, adopted, and updated by CAMPO through the metropolitan
transportation planning process.
Nonattainment area means any geographic region of the United States that
has been designated by the EPA as a nonattainment area under section 107 of
the Clean Air Act for any pollutants for which an NAAQS exists.
Obligated projects means strategies and projects funded under title 23 U.S.C.
and title 49 U.S.C. Chapter 53 for which the supporting Federal funds were
authorized and committed by the State or designated recipient in the
preceding program year, and authorized by the FHWA or awarded as a
grant by the FTA.
Program of Projects (POP) is a list of projects to be funded in a grant
application submitted to FTA by a designated recipient. The POP lists the
subrecipients and indicates whether they are private non-profit agencies,
governmental authorities, or private providers of transportation service,
designates the areas served (including rural areas), and identifies any tribal
entities. In addition, the POP includes a brief description of the projects, total
project cost, and Federal share for each project.
Project selection means the procedures followed by MPOs, States, and public
transportation operators to advance projects from the first four years of an
approved TIP and/or STIP to implementation, in accordance with agreed upon
procedures.
Project sponsor must be a city, county, state, or other transportation related
government agency eligible to receive federal funding from the Federal
Highway or Federal Transit Administrations. All other entities must partner with
a city, county, or state agency to apply for and/or administer a transportation
project.
Public transportation operator means the public entity which participates in
the continuing, cooperative, and comprehensive transportation planning process
in accordance with 23 U.S.C. 134 and 135 and 49 U.S.C. 5303 and 5304,
and is the designated recipient of Federal funds under title 49 U.S.C. Chapter
53 for transportation by a conveyance that provides regular and continuing
general or special transportation to the public, but does not include school bus,
charter, or intercity bus transportation or intercity passenger rail transportation
provided by Amtrak.
Regionally significant project means a transportation project (other than
projects that may be grouped in the TIP and/or STIP or exempt projects as
defined in EPA’s transportation conformity regulation (40 CFR part 93)) that is
on a facility which serves regional transportation needs (such as access to and
from the area outside the region; major activity centers in the region; major
planned developments such as new retail malls, sports complexes, or
employment centers; or transportation terminals) and would normally be
included in the modeling of the metropolitan area’s transportation network. At
a minimum, this includes all principal arterial highways and all fixed guideway
transit facilities that offer a significant alternative to regional highway travel.
Statewide transportation improvement program (STIP) means a statewide
prioritized listing/program of transportation projects covering a period of four
years that is consistent with the long-range statewide transportation plan,
metropolitan transportation plans, and TIPs, and required for projects to be
eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53.
Transportation Improvement Program (TIP) is a document prepared by a
metropolitan planning organization that lists projects to be funded with
FHWA/FTA funds for the at least next one- to three-year period.
Unified Planning Work Plan (UPWP) is the management plan for the
(metropolitan) planning program. Its purpose is to coordinate the planning
activities of all participants in the planning process.
Agenda Item 7B Page 1 of 2
CAMPO Technical Committee Staff Report
FY2024 Unified Planning Work Program (UPWP)
April 6, 2023
Summary
Staff has begun work on the FY2024 UPWP. This annual process starts very early due to the City of Jefferson’s
budget process. The FY2024 UPWP is anticipated to be adopted by May 2023.
The UPWP is CAMPO’s annual statement of work identifying the budget, planning priorities, and activities to be
carried out for the year (November 1 to October 31). The UPWP contains many ongoing activities required to
perform the essential functions of CAMPO, as well as, periodic and one-time activities. The UPWP serves as the
basis for funding agreements with the Missouri Department of Transportation (MoDOT).
Input from the Technical Committee, Board of Directors, stakeholders, and the general public are used throughout
the process.
UPWP activities are categorized into six work elements:
• Work Element 521 - Program Support & Administration
• Work Element 522 - General Development and Comprehensive Planning Coordination
• Work Element 524 - Short Range Transportation Planning & Programming
• Work Element 525 - Long Range Transportation Planning
• Work Element 526 - Public Transportation Planning
• Work Element 527 – Safe/Accessible Transportation Planning (New in FY 2023)
Anticipated major activities in FY2024, developed thus far, include:
• Development of the FY2025 UPWP (Annual)
• Development of the 2025-2029 Transportation Improvement Program (Annual)
• Technical assistance (i.e mapping, data development/management, grants) (Continuous)
• Metropolitan Transportation Plan Update (every 5 years)
• Urbanized Area/Planning Area review
• Functional Classification review
The estimated draft budget for FY2024 is approximately $241,955 with $195,119 (~80%) funded through the
Consolidated Planning Grant (CPG). The CPG fund includes a combination of funds from the Federal Highway
Administration (FHWA) and Federal Transit Administration (FTA). A local match requirement (~20%) is provided
by Jefferson City and Cole County. Of the 20% local match requirement, Jefferson City provides 75% and Cole
County provides 25%. On some projects other stakeholders or jurisdictions may contribute to the matching funds.
UPWP changes with the 2021 Bipartisan Infrastructure Law (BIL)
In previous years the CPG fund existed as a 80% federal grant that required a 20% local match. This has changed
slightly with the passing of the 2021 Bipartisan Infrastructure Law (BIL). The 2021 BIL requires each MPO to use
at least 2.5% of FHWA Planning Funds (PL Funds), on specified planning activities related to Safe and Accessible
Transportation Planning. This portion of the CPG fund is 100% federal and does not require a local match. PL
funds constitute 80% of total CPG funds.
The allocation estimate of 2.5% of the 80% PL funds is approximately $3,824 annually. The FY2024 allocation
estimate will not be available until June 2023. If not expended in FY2023, it is estimated that CAMPO will have a
little more than $7,000 available in this work element. More detail on the eligible projects for this work element
are located in the attached draft document.
Agenda Item 7B Page 2 of 2
Based on the anticipated FY2023 expenditure and estimated FY2024 draft budget, it is projected that CAMPO will
have a balance of aproximately $479,410 in unprogrammed CPG funds at the end of FY2024. This amount may
increase if funds are not expended. The following chart details the estimated trajectory of the CAMPO Consolidated
Planning Grant balance. All of these totals are subject to change during the development of the UPWP.
Staff Recommendation
Staff recommends approving and forwarding the Draft FY2024 Unified Planning Work Program to the Board of
Directors for review and approval.
Public Comment
If recommended for approval by the Technical Committee, a 25-day public comment period will be opened April
19th and closed at the Board of Directors meeting on May 17th.
A draft FY 2024 UPWP is attached. Please refer questions or comments to Katrina Williams at 573-634-6536 or
by email at kawilliams@jeffersoncitymo.gov.
Recommended Form of Motion:
Motion to forward the Draft FY2024 Unified Planning Work Program to the Board of Directors for review and
approval.
CPG Balance for end of FY2022 $520,816 Verified 12/06/2022
FY 2023 CPG Allocation*$193,832 Estimate - Based on 2022 Allocation
FY 2023 UPWP CPG Expenditure - Anticipated -($233,951)Board approved budget
CPG Balance for end of FY2023 - Anticipated* Subtotal $480,697$0
FY 2024 CPG Allocation - Estimated per MoDOT's FY22 SPR Work Program $193,832
FY 2024 CPG Programmed Expenditure - Anticipated -($195,119)includes 3% cost of living increase
Remaining Unprogrammed CPG Funds Anticipated at end of FY 2024 $479,410
Consolidated Planning Grant Balance
DRAFT
Unified
Planning
Work
Program
The preparation of this report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, and Federal Transit
Administration in cooperation with the Missouri Department of Transportation. The opinions, findings, and conclusions expressed in this report are not
necessarily those of the Federal Highway Administration, Federal Transit Administration, or the Missouri Department of Transportation.
FY 2024
November 1, 2023 to October 31, 2024
Adopted - Pending
Administration of the Capital Area MPO is provided by the City of Jefferson
Department of Planning and Protective Services
Room 120 John G. Christy Municipal Building
320 East McCarty St., Jefferson City, Missouri 65101
Phone: (573) 634-6410
http://www.jeffersoncitymo.gov/campo
DRAFT
Table of Contents
Introduction......................................................................................................................................................... 1
Major Tasks Completed in FY 2023 .......................................................................................................................... 1
Tasks Carried Over from FY 2023 ............................................................................................................................ 1
Priorities for FY 2024 ...................................................................................................................................... 1
UPWP Development ......................................................................................................................................... 2
UPWP Modification and Amendment Process ............................................................................................. 2
Public Participation ........................................................................................................................................... 2
Air Quality Planning ......................................................................................................................................... 3
Safe and Accessible Transportation Planning ............................................................................................. 3
Financial Support for CAMPO ....................................................................................................................... 3
Transportation Planning Factors ..................................................................................................................... 4
Required Documents Timeline ......................................................................................................................... 4
Work Element 521 - Program Support & Administration ......................................................................... 6
Work Element 522 - General Development and Comprehensive Planning Coordination ................. 7
Work Element 524 - Short Range Transportation Planning & Programming ....................................... 8
Work Element 525 - Long Range Transportation Planning ...................................................................... 9
Work Element 526 - Public Transportation Planning ............................................................................... 10
Work Element 527 - Safe and Accessible Transportation Planning ..................................................... 11
Appendix A – Financial Summary ............................................................................................................... 12
Anticipated Expenditures & Revenue ...................................................................................................................... 12
Table 1: FY 2024 CAMPO Budget* ...................................................................................................................... 12
Table 2: FY 2024 Work Element Funding Summary - Consolidated Planning Grant and Local Funds ... 13
Table 3: FY 2024 Local Match by Jurisdiction .................................................................................................... 13
Table 4: Anticipated Available Federal Consolidated Planning Grant (CPG) Balance Revenue ............ 13
Appendix B – CAMPO Boundary Map ...................................................................................................... 14
Appendix C - Modifications and Amendments ......................................................................................... 15
DRAFT
Insert Adoption Resolution
DRAFT
Insert Planning Process Certification
DRAFT
Insert Certification of Restrictions on Lobbying
Capital Area Metropolitan Planning Organization
Board of Directors
Chair – Ron Fitzwater, City Council Member, City of Jefferson
Vice-Chair –Jeff Hoelscher, Eastern District Commissioner, Cole County
City of Jefferson
Jack Deeken, City Council Member
Jon Hensley, City Council Member
Mike Lester, City Council Member
Clint Smith, AICP, Director, Planning & Protective Services
Gerry Stegeman, Interim Transit Manager
Matt Morasch, PE, Director, Public Works
Cole County
Eric Landwehr, PE, Director, Public Works
Doug Reece, City Administrator, St. Martins
Callaway County
Roger Fischer, Western District Commissioner
Holts Summit
Brandon Ruediger, City Administrator, City of Holts Summit
Missouri Department of Transportation (MoDOT)
Machelle Watkins, PE, District Engineer
Ex-Officio Members
Luke Holtschnieder, Jefferson City Regional Economic Partnership
Eva Steinman, Federal Transit Administration, Region VII
Christy Evers, MoDOT Transit Administrator
Vacant, Missouri Office of Administration
Michael Henderson, AICP, MoDOT, Transportation Planning
Dan Weitkamp, Federal Highway Administration, Missouri Div.
Tamara Tateosian, Callaway County Economic Development
Technical Committee
Chair – David Bange, PE, City Engineer, Public Works, City of Jefferson
Vice-Chair – Matt Prenger, PE, County Engineer, Public Works, Cole County
City of Jefferson
Clint Smith, AICP, Director, Planning & Protective Services
Todd Spalding, Director, Parks, Recreation & Forestry
Matt Morasch, PE, Director of Public Works
Gerry Stegeman, Interim Transit Manager
Eric Barron, AICP, Transportation Planner
Britt Smith, PE, Operations & Maintenance
Cole County
Matt Prenger, PE, County Engineer
Shannon Kliethermes, Senior Planner
Callaway County
Paul Winkelmann, PE, County Highway Administrator
Small City Representative - Callaway
Mark Tate, Streets Department, City of Holts Summit
Small City Representative - Cole
Paul Stonner/Brian Schrimpf, Alderman, Wardsville
Missouri Department of Transportation (MoDOT)
Steve Engelbrecht, PE, District Planning Manager
Michael Henderson, AICP, Transportation Planning Specialist
Daniel Roeger, PE, Area Engineer
Private Transportation Interest
Joe Scheppers, N.H. Scheppers Distributing Company.
Pedestrian or Biking Interest
Kevin Schwartz, JC Parks Outdoor Recreation Program Manager
Ex-Officio Members:
Eva Steinman, Federal Transit Administration, Region VII
Daniel Weitkamp, Federal Highway Administration, Missouri Div.
Jason Branstetter, Heartland Port Authority Representative
- February 2023
CAMPO Staff and FTE (Full-Time Employee) apportionment
Clint Smith, AICP– Director, Planning & Protective Services FTE – 0*
Eric Barron, AICP - Planning Manager FTE - 0.3
Katrina Williams, GISP, AICP –Planner II FTE – 1
Vacant – Planner I FTE – 1**
Kortney Bliss – Planner I FTE – 0**
Lisa Dittmer – Administrative Assistant FTE - .10
* The MPO Executive Director is also the Director of the Jefferson City Department of Planning and Protective Services. This full-
time position is not funded by the MPO and does not appear in the CAMPO Budget. MPO activities are only a portion of the
Director’s job duties.
**The Planner I position may work on MPO and/or City of Jefferson planning activities depending on work flow. Both Planner I
salaries are the same and CAMPO will not seek reimbursement for more than the equivalent of one full-time Planner I.
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 1
Introduction
The Capital Area Metropolitan Planning Organization (CAMPO) is responsible for long-range transportation
planning for the defined Metropolitan Planning Area (MPA), which includes the Jefferson City urbanized area.
Planning activities are carried out in a continuing, cooperative, and comprehensive manner. The Fiscal Year 2024
Unified Planning Work Program (UPWP) defines tasks and anticipates funding requirements for the metropolitan
planning activities performed by CAMPO with federal funds provided by the Federal Highway Administration
(FHWA) and the Federal Transit Administration (FTA) under title 23 U.S.C . and title 49 U.S.C. Chapter 53.
CAMPO staff, unless otherwise identified, performs all work. The UPWP defines activities for all public officials
and agencies that contribute resources to the transportation planning process. The UPWP covers one fiscal year,
November 1 to October 31. The UPWP outlines activities funded through the Consolidated Planning Grant and
local funds and serves as the basis for funding agreements with the Missouri Department of Transportation
(MoDOT). The UPWP also serves as a management tool for scheduling, budgeting, and monitoring the local
planning activities.
The MPA boundary was delineated by the CAMPO Board of Directors and approved by the Governor in 2013
(see Appendix B). The MPA includes the jurisdictions of Holts Summit, Jefferson City, St. Martins, Taos,
Wardsville, and portions of unincorporated, non-urbanized areas within Cole and Callaway Counties.
Note: In January 2023, new “Urban Area” boundaries using new criteria were released by the US Census
Bureau. These new boundaries and criteria stem from the results of the 2020 Decennial Census. This new
data may impact the implementation of the UPWP and may result in a modification or amendment.
The CAMPO Board of Directors is composed of elected and appointed officials from local jurisdictions, selected
state agencies, and Federal transportation representatives serving as ex-officio members. The CAMPO Technical
Committee consists of representatives from member jurisdictions’ professional staff and acts in an advisory
capacity to the Board of Directors. A memorandum of understanding between members identifies the City of
Jefferson as the administrator of CAMPO, and as such, the City provides staffing. For FY2024, the City of
Jefferson will provide staff consisting of a full-time Planner, full-time Senior Planner, and part time support from
the Director of Planning and Protective Services, a Planning Manager, and an Administrative Assistant.
Major Tasks Completed in FY 2023
• Annual update of the Unified Planning Work Program and the Transportation Improvement Program.
• Staff assistance in planning the 2023 Active Transportation Summit.
• Update of System Performance Report.
• Update of Crash Analysis Report for the CAMPO area.
• Completion of JEFFTRAN Transit Feasibility Study.
• Update of Title VI Program, including the Public Participation Plan, and Language Assistance Plan.
• Completion of Capital Area Active Transportation Plan (formerly Pedestrian and Bicycle Plan)
• Update of regional databases, including; sidewalks, greenway, bike trails/lanes and local roads.
Tasks Carried Over from FY 2023
• Review of US Census Bureau Urbanized Area data.
• Update of the CAMPO 2045 & Beyond Metropolitan Transportation Plan
• Continued work on any technical assistance projects as they arise.
Priorities for FY 2024
• Implementation of the Metropolitan Transportation Plan.
• Implementation of the Active Transportation Plan.
• Provide technical assistance in mapping, data development, and land use planning to local jurisdictions.
• Continue implementation of FAST Act performance measures and targets.
• Review of Urbanized Area/Planning Area boundary.
• Review of Federal Functional Classification of Urban Area roads.
• Update of CAMPO 2045 & Beyond Metropolitan Transportation Plan.
• Update of Coordinated Public Transit Human Services Transportation Plan (late FY 2024).
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 2
UPWP Development
The UPWP is developed in accordance with 23 CFR 450.308 and 23 CFR part 420. CAMPO staff reviewed
previous years’ time required for activities to determine time allocations for this UPWP. Because the MPO is
administered by the City of Jefferson, CAMPO accommodates the city’s budgeting process/schedule and
execution of the Consolidated Planning Grant agreement and must begin the development of the UPWP several
months prior to the fiscal year for which the UPWP covers. CAMPO presents a draft UPWP to the Board of
Directors in April, prior to the beginning of the fiscal year. This early start presents difficulties in assuming future
tasks which may surface after adoption of the UPWP and in documenting activities occurring in the previous year.
UPWP Modification and Amendment Process
Modification: A change in language or content that does not result in a budget increase. This change may
consist of a change to a Work Element’s objectives, activities, or products. Modifications are communicated by
staff to the Technical Committee and Board of Directors at the next regularly scheduled meeting.
Amendment: A change in language or content which results in a budget increase or major change in a work
element. An amendment is necessary if a budget increase is needed which impacts the funding reimbursement
agreed upon between the Missouri Highway and Transportation Commission and the City of Jefferson.
Amendments must be approved by the Board of Directors, FTA, and FHWA. Some modifications may also go
through an official approval by the Board of Directors as deemed appropriate by staff.
Modifications and Amendments are documented in Appendix C.
Public Participation
Federal law requires CAMPO to develop a public involvement program to involve the community early and
continuously in the transportation planning process. A proactive public program which provides information,
timely public notice, and public access to key decisions is included in the CAMPO Public Participation Plan. During
the development of the FY 2024 UPWP, the document is scheduled to be discussed at monthly Board of Directors
and Technical Committee meetings from February to May, and concludes with a public comment period. Draft
copies of the UPWP, as part of the meeting agendas and meeting minutes regarding UPWP development, are
available to view on the CAMPO website. In accordance with the CAMPO Title VI Policy, any and all documents
produced by CAMPO, may be requested in other formats by contacting CAMPO staff at City Hall or by calling
(573)634-6410.
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 3
Air Quality Planning
According to 23 CFR 420.111(e), State DOTs and MPOs are also encouraged to include cost estimates for
transportation planning, research, development, and technology transfer related activities funded with other
Federal or State and/or local funds; particularly for producing the FHWA-required data specified in paragraph
(b) of §420.105, for planning for other transportation modes, and for air quality planning activities in areas
designated as non-attainment for transportation-related pollutants in their work programs. The MPOs in TMAs
must include such information in their work programs.
Federal standards have been established through extensive scientific review, that set allowable concentrations
and exposure limits for certain pollutants. Air quality standards have been established for six criteria pollutants:
• ozone (or smog)
• carbon monoxide
• particulate matter
• nitrogen dioxide
• lead
• sulfur dioxide
The CAMPO Planning Area is in “attainment”. A geographic area with monitored levels that meet or do better
than the primary standard for each of these pollutants is called an attainment area; areas that do not meet the
primary standard for any one or more of these pollutants are called nonattainment areas. In Missouri, MoDOT is
responsible for implementing the conformity regulation for transportation actions in attainment and nonattainment
areas.
Safe and Accessible Transportation Planning
§ 11201; 23 U.S.C. 134 - The Bipartisan Infrastructure Law (BIL) requires each MPO to use at least 2.5% of its PL
funds (and each State to use 2.5% of its State Planning and Research funding under 23 U.S.C. 505) on specified
planning activities to increase safe and accessible options for multiple travel modes for people of all ages and
abilities. [§ 11206(b)]
A State or MPO may opt out of the requirement, with the approval of the Secretary, if the State or MPO has
Complete Streets standards and policies in place, and has developed an up-to-date Complete Streets
prioritization plan that identifies a specific list of Complete Streets projects to improve the safety, mobility, or
accessibility of a street. [§ 11206(c) and (e)]
For the purpose of this requirement, the term “Complete Streets standards or policies” means standards or
policies that ensure the safe and adequate accommodation of all users of the transportation system, including
pedestrians, bicyclists, public transportation users, children, older individuals, individuals with disabilities,
motorists, and freight vehicles. [§ 11206(a)]
CAMPO, as detailed in this UPWP, is in the process of developing a new Pedestrian and Bicycle Plan that will
incorporate Complete Streets standards and/or policies and result in a prioritized list of projects. CAMPO
adopted the Capital Area Pedestrian & Bicycle Plan in 2016, which includes the CAMPO Livable Streets Policy.
The term “Livable Streets” will be converted to “Complete Streets” in the next update cycle.
Financial Support for CAMPO
CAMPO receives 80% of funding from the Federal Highway Administration (FHWA) and Federal Transit
Administration (FTA) 5303 funds through the Missouri Department of Transportation (MoDOT) via the
Consolidated Planning Grant (CPG) and 20% via local funding. The 20% in local matching funds is provided by
the City of Jefferson and Cole County. Of the 20% local funding, Jefferson City contributes 75% and Cole
County contributes 25%.
The total CAMPO budget for FY 2024 is $233,291. Appendix A provides more detailed breakdown of
financial details.
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 4
Transportation Planning Factors
The Fixing America’s Surface Transportation Act (FAST Act), passed into law in 2015, identifies ten planning
factors required for consideration in any MPO planning activities, including in the development of the UPWP,
MTP, and TIP. Figure 1 provides an overview of those planning factors and how they are addressed by each
work element in the UPWP. A detailed overview of each work element is provided in the following pages.
Figure 1: Planning Factors as addressed by work elements
Planning Factor
Work Program Element Work Element 521 - Program Support & Administration Work Element 522 - General Development and Comprehensive Planning Coordination Work Element 524 - Short Range Transportation Planning & Programming Work Element 525 - Long Range Transportation Planning Work Element 526 - Public Transportation Planning Work Element 527 – Safe & Accessible Transportation Planning A. Support the economic vitality of the metropolitan
area, especially by enabling global competitiveness,
productivity, and efficiency.
B. Increase the safety of the transportation system for
motorized and nonmotorized users.
C. Increase the security of the transportation system for
motorized and nonmotorized users.
D. Increase the accessibility and mobility of people and
for freight.
E. Protect and enhance the environment, promote energy
conservation, improve the quality of life, and promote
consistency between transportation improvements and
State and local planned growth and economic
development patterns.
F. Enhance the integration and connectivity of the
transportation system, across and between modes, for
people and freight.
G. Promote efficient system management and operation.
H. Emphasize the preservation of the existing
transportation system.
I. Improve the resiliency and reliability of the
transportation system and reduce or mitigate stormwater
impacts of surface transportation.
J. Enhance travel and tourism.
Required Documents Timeline
Figure 2 outlines the general timeline for updating most of the federally required MPO plans and documents.
The fiscal year runs from November 1 through October 31 and quarters are as follows:
Quarter 1 – November 1 – January 31
Quarter 2 – February 1 – April 30
Quarter 3 – May 1 – July 31
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 5
Quarter 4 – August 1-October 31
Figure 2: Timeline for updating required MPO plans and documents
MTP - Metropolitan Transportation Plan Expires May 2024
TIP – Transportation Improvement Program Approved in May (Expires in June)
UPWP – Unified Planning Work Program Approved in May (Expires in October)
CPTHSTP – Coordinated Public Transit-Human Services Transportation Plan Update Required December 2024-2025
Title VI Program –Title VI of the Civil Rights Act of 1964. Update Required March 2026
LAP – Language Assistance Plan Update Required March 2026
PPP – Public Participation Plan Update Required March 2026
MPA / Functional Class Review Occurs every 10 years
Year
Qtr
MTP TIP UPWP CPTHSTP Title VI LAP PPP
MPA /
Functional
C lass Review
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
2028
2023
2024
2025
2026
2027
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 6
Work Element 521 - Program Support & Administration
This task covers the activities necessary to carry out the daily activities of CAMPO in support of the transportation
planning process. These include meeting preparation, UPWP development, public outreach activities, reporting,
and professional development activities.
Objectives / Activities
• Manage CAMPO activities in order to comply with Federal and State administrative requirements and
guidance. Support the operations of the Board of Directors and Technical Committee, communicate and
coordinate with Federal and State agencies on MPO activities, and support day-to-day operations.
• Develop the annual budget and Unified Planning Work Program along with the preparation and
submittal of UPWP quarterly progress reports, billings, and invoices. Modify UPWP as needed with
approval from the necessary authority.
• Facilitate public participation such as public meetings, hearings and workshops, as needed and in
accordance with the Public Participation Plan. Provide access to CAMPO activities through maintenance
and updating of the CAMPO website.
• Fulfill program update and reporting requirements related to Title VI, Public Participation Plan,
Language Assistance Plan, Disadvantage Business Enterprise requirements, project obligation, and other
topics as required.
• Professional Development activities, including attendance at relevant training sessions, educational
seminars, meetings, and conferences.
FY 2023 Accomplishments
• Facilitation of Board of Directors and Technical Committee monthly meetings as required.
• FY 2024 UPWP updated.
• Quarterly progress reports, billings, and invoices completed.
• Disadvantaged Business Enterprise (DBE) Commitments Semi-Annual reports completed.
• Staff participated in various professional development activities, including MoDOT sponsored events,
webinars, and other training opportunities.
• Completed update of Title VI Program, including Language Assistance Plan and Public Participation Plan
as federally required for both JEFFTRAN and CAMPO
FY 2024 Products
• Board of Directors and Technical Committee meetings administration/facilitation support.
• Meeting agendas, minutes, presentations, reports, and other support material.
• FY 2025 UPWP.
• End of year report, quarterly progress reports, billings, and invoices.
• DBE Commitments Semi-Annual reports.
• Participation in professional development activities and maintain pertinent professional certifications.
Responsible Party: CAMPO staff
Funding: This work element includes labor costs and direct costs.
Work Element Cost Type
Federal
CPG Funds 80%
Local
Match 20% Total
Percent of Work
Program Budget
521 Labor $26,945 $6,736 $33,681 14%
Direct $16,320 $4,080 $20,400 8%
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 7
Work Element 522 - General Development & Comprehensive Planning Coordination
Not all of the CAMPO member organizations have planning staff or current comprehensive planning
documents in place. In order to facilitate transportation planning by incorporating the vision and goals
for the member organizations and the public, CAMPO will provide assistance in the crafting of the
transportation component of local comprehensive planning documents, as practical. This task may
include the development and maintenance of related spatial and non-spatial data collection and
analysis; examples include land use, demographic data, housing, human services, environmental/natural
resources, recreation/open space, and public facilities.
Objectives / Activities
• Provide technical planning assistance to CAMPO members in the development of the
transportation component of comprehensive and other planning documents, including geospatial
analytical support, local ordinances, and databases.
• Assist jurisdictions in the acquisition and use of Geographic Information Systems (GIS) and other
data for use in plans, transportation grant applications, measuring performance, and forecasting
provided by the US Census, MoDOT and others.
FY 2023 Accomplishments
• Provided technical assistance in various grant application processes in the CAMPO area.
• Provided assistance in the development of local comprehensive plans of member organizations.
• Provided geospatial analysis/data (elevations, demographic, sidewalk, bicycle facilities, street
right-of-way, etc.) to support development, and grant application activities.
FY 2024 Products
• Various inputs for comprehensive planning documents - ongoing for multiple years.
• Various GIS databases.
• Continue providing technical assistance for the transportation component of local planning
documents.
• Assist member jurisdictions with development of local ordinances that may facilitate corridor
preservation and improve efficient network connectivity.
Responsible Party: CAMPO staff and local jurisdictions. Local jurisdictions have ultimate responsibility
for the development and publishing of their planning documents.
Funding: This work element includes only labor costs.
Work Element Cost Type
Federal
CPG Funds 80%
Local
Match 20% Total
Percent of Work
Program Budget
522 Labor $13,655 $3,414 $17,069 7%
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 8
Work Element 524 - Short Range Transportation Planning & Programming
Identify and address immediate or short-term transportation needs which may include non-motorized planning
activities, complete streets planning, freight planning, bicycle/pedestrian planning, safety planning, operations
and management planning, transportation security planning, or wayfinding activities.
Objectives / Activities
• Provide support for short-range transportation planning by CAMPO and its members.
• Participate in regional activities regarding freight, safety, security, bicycle/pedestrian, non-motorized,
and other related planning activities.
• Review and maintain the goals and strategies outlined in adopted CAMPO plans:
o CAMPO 2045 & Beyond Metropolitan Transportation Plan and Major Thoroughfare Plan
o Capital Area Active Transportation Plan
o Coordinated Public Transit-Human Services Transportation Plan
o Public Participation Plan
o Regional Wayfinding Plan
• Maintain the current TIP through the Amendment and Modifications process that meets statutory
requirements, maintain fiscal constraint, and support changing priorities and project scope.
• Continue analysis of safety data to be used in the implementation of recommended improvements and
strategies as outlined in the MTP.
• Be a resource for local jurisdictions seeking to develop an ADA Transition Plan or seeking to improve
mobility and access.
• Develop and adopt the FY2025-2029 TIP.
• Develop and publish the Annual List of Obligated Projects (ALOP) for the prior year TIP.
• Update the Capital Area Pedestrian and Bicycle Plan through use of a consultant.
FY 2023 Accomplishments
• Participated in activities, meetings and conferences including Missouri Coalition for Roadway Safety
Conference, MoDOT Unfunded Needs List, and STIP project review/discussions.
• Completed Program Year 2023 – 2027 TIP and any necessary amendments.
• Developed 2024-2028 TIP.
• Provided assistance to member jurisdictions in the completion of grant applications.
• Updated Crash Analysis Report.
• Continued update of Capital Area Pedestrian and Bicycle Plan.
FY 2024 Products
• TIP amendments and administrative modifications as necessary
• Development of the Program Year 2025-2029 TIP.
• Update Crash Data Report.
• Provide guidance and assistance to local jurisdictions in the transportation component of their ADA
Transition Plan development work efforts.
• Annual List of Obligated Projects from the previous program year.
• Assist with planning and possibly hosting of Active Transportation Summit in cooperation with Missouri
Bicycle and Pedestrian Federation.
• Implement Capital Area Active Transportation Plan
Responsible Party: CAMPO staff
Funding: This work element includes only labor costs
Work Element Cost Type
Federal
CPG Funds 80%
Local
Match 20% Total
Percent of Work
Program Budget
524 Labor $16,968 $4,242 $21,210 9%
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 9
Work Element 525 - Long Range Transportation Planning
Provide for long-range transportation planning activities, studies, and plans supporting the
transportation planning process out to a minimum of 20 years, for the CAMPO metropolitan planning
area, and may include both system level planning activities and project level activities.
Objectives / Activities
• Keep the MTP current by maintaining and amending components of the plan such as major land
use changes, major road changes, process improvements, funding, or new regulations and
legislation; and any projects to be included into the TIP that are not already listed in the MTP.
• Involve key stakeholders, business community and advocacy groups, environmental
organizations, and the public in long range transportation planning activities to achieve the
long-term transportation goals and vision of the MTP.
• Report MPO performance targets in relation to performance measures for the MTP and TIP.
• Implement the recommendations and strategies as identified in the MTP.
• Update the CAMPO 2045 & Beyond MTP. This activity may include the use of consultant
services in the review of project specific components of the Illustrative List and/or Travel
Demand Model (TDM)
FY 2023 Accomplishments
• Staff, working with MoDOT, continued setting federal performance measures for the TIP and
MTP. Performance measures and targets are included in the System Performance Report.
• Worked with the Technical Committee and Board of Directors to implement the MTP strategies.
• Began update of the CAMPO 2045 & Beyond Metropolitan Transportation Plan
• Update of the Crash Analysis Report.
• Staff continues development of GIS data and resources to assist jurisdictions with plan
development and implementation.
FY 2024 Products
• Implementation of the MTP strategies and improvements
• Assist member jurisdictions in implementing recommended improvements outlined in the MTP.
• Maintain the Thoroughfare Plan.
• Amendments to the MTP as necessary.
• Report MTP and TIP performance measures and targets.
• Annual Review of Illustrative List of Projects
• Review of Urbanized Area/Planning Area Boundary and Federal Functional Classification
• Complete review and update of Metropolitan Transportation Plan as federally required.
Responsible Party: CAMPO staff and consultant.
Funding: This work element includes direct costs and labor costs.
Work Element Cost Type
Federal
CPG Funds 80%
Local
Match 20% Total
Percent of Work
Program Budget
525 Labor $56,061 $14,015 $70,077 29%
Direct $24,000 $6,000 $30,000 12%
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 10
Work Element 526 - Public Transportation Planning
Assist public transportation and transit providers in fulfilling State, Local, and Federal requirements for
coordination and cooperative transportation planning through assistance with plan development,
technical assistance, mapping, data, and GIS functions.
Objectives / Activities
• Continue to assist JEFFTRAN with the maintenance of Route and Schedule Guide, individual route
maps and other tools to serve JEFFTRAN patrons.
• Provide JEFFTRAN mapping, demographic, GIS, planning and other technical assistance in
support of reporting requirements and evaluating possible changes in types of transit services
offered.
• Participate in transit and mobility management planning activities that support the goals and
objectives laid out in the Coordinated Public Transit-Human Services Transportation Plan.
• Continue collaboration with other regional transit providers to improve efficiency and access in
Mid-Missouri.
• Update and maintain the Coordinated Public Transit-Human Services Transportation Plan.
FY 2023 Accomplishments
• Provided assistance to JEFFTRAN in the update of route guides.
• Completed review and update of JEFFTRAN Title VI Program. JEFFTRAN and CAMPO
documents were combined into one product.
FY 2024 Products
• Update route and schedule guide as needed.
• Maps, demographics, GIS analytics.
• Improved service to patrons of JEFFTRAN.
• Collaboration with regional transit providers and human service agencies to meet shared goals.
Responsible Party: CAMPO staff.
Funding: This work element includes only labor costs.
Work Element Cost Type
Federal
CPG Funds 80%
Local
Match 20% Total
Percent of Work
Program Budget
526 Labor $33,396 $8,349 $41,745 17%
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 11
Work Element 527 - Safe and Accessible Transportation Planning
Engage in specified planning activities to increase safe and accessible options for multiple travel modes
for people of all ages and abilities, including pedestrians, bicyclists, public transportation users,
children, older individuals, individuals with disabilities, motorists, and freight vehicles.
Objectives / Activities
• Implement CAMPO Complete Streets standards and policies as defined in the adopted Livable
Streets (Complete Streets) Policy.
• Developed and maintain a Complete Streets prioritization plan that identifies projects to
improve the safety, mobility, or accessibility of a street.
• Participation in the Missouri Complete Streets (MOCS) Advisory Committee
• Educate jurisdictions and stakeholder about Complete Streets standards and policies.
FY 2023 Accomplishments
• Participated in activities, meetings and conferences including Missouri Coalition for Roadway
Safety.
• Began development of a prioritized list of projects as part of the update of the Capital Area
Pedestrian and Bicycle Plan.
• Facilitated stakeholder meetings to develop a bicycle education program within Jefferson City
Public Schools.
• Provided assistance to Missouri Pedestrian and Bicycle Federation in planning and/or hosting the
2023 Active Transportation Summit.
FY 2024 Products
• Host a Complete Streets Training or other similar safety/accessibility training that meets the
requirements outlined in 23 U.S.C. 134 §11201 and §11206.
• Implement the safety related goals and strategies as developed as part of the Capital Area
Active Transportation Plan.
• Provide assistance to Missouri Pedestrian and Bicycle Federation in planning and/or hosting the
2024 Active Transportation Summit.
• Provide assistance to jurisdiction in the pursuit of funding for safety initiatives, infrastructure,
and/or programing
Responsible Party: CAMPO staff.
Funding: This work element includes only labor costs.
Work Element Cost Type
Federal
PL Funds 100%
Local
Match 20% Total
Percent of Work
Program Budget
527 Labor $7,774 $0 $7,774* 3%
* The 2021 Bipartisan Infrastructure Law (BIL) requires each MPO to use at least 2.5% of its PL funds on specified planning
activities related to Safe and Accessible Transportation Planning (Work Element 527). PL funds constitute ~80% of CPG
funds and the FY 2023 2.5% estimate is $3,824. The FY 2024 estimate will not be available until June 2023.
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 12
Appendix A – Financial Summary
Anticipated Expenditures & Revenue
CAMPO receives funding from the FHWA (PL) and FTA (5303) through the Consolidated Planning Grant (CPG)
administered by MoDOT. Funding consists of 80% federal and 20% local matching funds; Jefferson City
contributes 75% and Cole County contributes 25% except where noted differently.
Table 1: FY 2024 CAMPO Budget*
*Rounded to the nearest whole number.
** The City of Jefferson covers all the Utility and Capital Purchases expenses, except for some specific software licenses used for
publishing or mapping.
Cost Category Federal - CPG (80%) Local (20%) Total (100%)
Advertising $2,080 $520 $2,600
Postage $240 $60 $300
Printing $160 $40 $200
Copies $160 $40 $200
Office Supplies $800 $200 $1,000
Food $240 $60 $300
Operational Supplies $800 $200 $1,000
Subtotal $4,480 $1,120 $5,600
Dues & Publications $1,200 $300 $1,500
Training and Education $3,600 $900 $4,500
Tuition Reimbursement $2,400 $600 $3,000
Professional Services - MTP Update $24,000 $6,000 $30,000
Subtotal $31,200 $7,800 $39,000
Equipment Maintenance $0 $0 $0
Vehicle Wash $0 $0 $0
Maintenance Agreement $1,920 $480 $2,400
Subtotal $1,920 $480 $2,400
Equipment/software $2,720 $680 $3,400
Subtotal $2,720 $680 $3,400
Total Direct Costs $40,320 $10,080 $50,400
Labor Costs - CPG (80%)Federal - CPG (80%) Local (20%) Total (100%)
Salaries plus benefits (CPG Funds)$147,025 $36,756 $183,781
Labor Costs - PL (100%)Federal - PL (100%)No Match Total (100%)
Salaries plus benefits (PL Funds - Safety)$7,774 $0 $7,774
Total Labor Costs $154,799 $36,756 $191,555
Federal Funds Local Match Total (100%)
$195,119 $46,836 $241,955
Direct Costs
Materials & Supplies
Other Contracted Services
Equipment Repair and Maintenance
Capital Purchases and Utilities**
Total MPO Budget
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 13
Table 2: FY 2024 Work Element Funding Summary - Consolidated Planning Grant and Local Funds
*Numbers are rounded to the nearest whole number. Staff salaries are based on an hourly rate (base + fringe). Staff time allocations
are subject to change as planning activities fluctuate. The MPO Executive Director position is full-time, but is not funded by the MPO and
does not appear in the table above. The MPO Director is the Director of the Jefferson City Department of Planning and Protective
Services, MPO activities are only a portion of the Director’s job duties. Note: The 2021 Bipartisan Infrastructure Law (BIL) requires each
MPO to use at least 2.5% of its PL funds (the FHWA portion of the CPG) on specified planning activities related to Safe and Accessible
Transportation Planning (Work Element 527). **The annual allocation approximately $3,824. The FY 2024 estimate will not be available
until June 2023.
Table 3: FY 2024 Local Match by Jurisdiction
Table 4: Anticipated Available Federal Consolidated Planning Grant (CPG) Balance Revenue
*The final amount of the FY 2023 CPG Allocation will not be released by MoDOT until May of 2023. This UPWP will have been adopted
before this information is made available. Additionally, the MoDOT FY2023 SPR Work Program is also not available until after adoption
of this document. CAMPO staff may make modifications to totals in Table 4 after these allocation amounts are made available.
CAMPO may over-program or under-program annual CPG or PL allocations in order to maintain a CPG balance
to provide flexibility in accommodating large scale planning efforts that may require added staff or consultant
services. Some years may require more funding than others in order to meet MPO planning goals and federal
requirements.
Work Element Planning Manager (.30 FTE)Planner, Senior (1 FTE)Planner (1 FTE)Admin. Asst. (.10 FTE)Sub-Total
Total
Federal
CPG Funds
80%
Total
Local
Match
20%Total Percent of Work Program BudgetLabor Costs*
521-Program Support & Administration $27,274 $6,407 $33,681 $26,945 $6,736 $33,681 14%
522-General Develop. and Comp. Planning $8,593 $8,476 $17,069 $13,655 $3,414 $17,069 7%
524-Short Range Transportation Planning $4,910 $16,300 $21,210 $16,968 $4,242 $21,210 9%
525-Long Range Transportation Planning $4,959 $39,690 $25,428 $70,077 $56,061 $14,015 $70,077 29%
526-Public Transportation Planning $24,141 $17,604 $41,745 $33,396 $8,349 $41,745 17%
Subtotal $32,233 $77,334 $67,807 $6,407 $183,781 $147,025 $36,756 $183,781
Labor Costs Utilizing 100% PL Funds**
527-Safe/Accessible Transportation Planning $7,774 $7,774 $7,774 $0 $7,774 3%
Labor Costs (Base + Fringe) Subtotal $32,233 $85,109 $67,807 $6,407 $191,555 $154,799 $36,756 $191,555 79%
$20,400 $16,320 $4,080 $20,400 8%
$30,000 $24,000 $6,000 $30,000 12%
$50,400 $40,320 $10,080 $50,400 21%
$195,119 $46,836 $241,955 100%
Direct Costs Subtotal
Total*
521-Direct Costs - Program Support and Administration
525-Direct Costs - Metropolitan Transportation Plan Update
Direct Costs*
Category Jefferson City 75%Cole County 25%Total
Labor Costs (excludes work element 527 - Safety)$27,567 $9,189 $36,756
521-Direct Costs - Program Support and Administration $3,060 $1,020 $4,080
525-Direct Costs - MTP Update $4,500 $1,500 $6,000
Total $35,127 $11,709 $46,836
CPG Local Match
CPG Balance for end of FY2022 $520,816
FY 2023 CPG Allocation*$193,832
FY 2023 UPWP CPG Expenditure - Anticipated -($233,951)
CPG Balance for end of FY2023 - Anticipated* Subtotal $480,697$0
FY 2024 CPG Allocation - Estimated per MoDOT's FY22 SPR Work Program $193,832
FY 2024 CPG Programmed Expenditure - Anticipated -($195,119)
Remaining Unprogrammed CPG Funds Anticipated at end of FY 2024 $479,410
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 14
Appendix B – CAMPO Boundary Map
The CAMPO Metropolitan Planning Area (MPA) Boundary was approved by the CAMPO Board of
Directors January 16, 2013 and was approved by the Governor of Missouri March 12, 2013. The MPA
includes the jurisdictions of Holts Summit, Jefferson City, St. Martins, Taos, Wardsville, and portions of
unincorporated, non-urbanized areas within Cole and Callaway Counties.
DRAFT
Capital Area Metropolitan Planning Organization FY 2024 UPWP 15
Appendix C - Modifications and Amendments
No modifications or amendments have been made at this time.
Agenda Item 7C - Page 1 of 8
CAMPO Technical Committee Staff Report
Unfunded Needs Review
April 6, 2023
Summary
CAMPO Staff are requesting a review of the unfunded needs lists and guidance from the Technical Committee
and Board of Directors on the 2023 process.
Timeline
MoDOT has moved the annual Unfunded Needs list review to a spring/summer timeline (previously a fall/winter
timeline) in order to better align the yearly Unfunded Needs review with the annual development of the STIP.
CAMPO unfunded needs submittals are due to Central District MoDOT (in April).
MoDOT High Priority Unfunded Needs
The purpose of the unfunded needs exercise is to identify and prioritize known transportation needs as a
preliminary part of a larger process of “scoping” projects and incorporating them into the Statewide
Transportation Improvement Program (STIP).
Tiers
The road and bridge unfunded needs are divided into “tiers” based on a combination of priority and ability to
deliver the project within a general timeframe.
Tier 1 – Urgent Needs, projects must be deliverable within the timeline of the current STIP
Tier 2 – Remaining needs, projects should be deliverable within 10 years.
Tier 3 – Remaining needs, deliverable in future years.
Multimodal needs are grouped together within a single category, and include rail, air, river, transit, and
bicycle/pedestrian categories of projects.
Placement of projects within the tiered list is ultimately a function of MoDOT. Project lists are submitted to
Central District by the MPO’s and RPC’s, where the list is finalized in consultation with planning partners (MPO’s
and RPC staff). The District list is then sent to MoDOT Central Office, and ultimately presented to and adopted
by the Missouri Highway and Transportation Commission.
Guidance
For the Unfunded Needs planning exercise, MoDOT has issued a list of capacity targets for each district divided
between the Tier 1, 2, 3 Road and Bridge categories and the Multimodal category. See Attachment A.
Central District targets are:
Tier 1 – $56 Million
Tier 2 – $225 Million
Tier 3 – $225 Million
Multimodal – $113 Million
Existing Unfunded Needs List
CAMPO unfunded needs discussion and development of list/submittals to MoDOT occurred in Summer/Fall of
2022, with the list being finalized at the statewide level by MoDOT in January of 2023.
The current statewide unfunded needs document is available online at: https://www.modot.org/unfundedneeds
An excerpt of the document showing projects within each Tier for the Central District is provided in
Attachment B.
An overview list of projects from the CAMPO area is attached as Attachment C.
Agenda Item 7C - Page 2 of 8
Staff Proposed Unfunded Needs Submittal to MoDOT
Staff propose to use the prioritized project lists approved by the Board of Directors in last years cycle for this
round of the Unfunded Needs consideration, with the removal of any projects that have been funded and addition
of projects as noted below.
Road and Bridge Projects:
1. Highway 50 and Truman Blvd/Country Club Drive Interchange
2. Rex Whitton Expressway Improvements
3. Tri-level Interchange and approaches to the Missouri River Bridge
4. Highway 54 and Southwest/Ellis Blvd Interchange
5. Missouri Boulevard Corridor Study
6. Highway 50 and Dix Road Interchange
7. Hwy 50/63 and Clark Avenue Interchange
8. Route B Corridor-Ashbury Way/Friendship Rd.
9. Highway 54 and South Summit Drive Interchange
10. Highway 179 and Industrial Drive/Truman Blvd, with turn lanes on MO 179
11. Highway 54 and Center Street Interchange
12. Route B and Tanner Bridge Road, with widening of Route B (center turn lane)
13. Route M and Y shoulders near Taos
Multimodal Projects:
1. Airport - Air Traffic Control Tower
2. JEFFTRAN – Transit Facilities
3. Port Facility
4. Airport – Runway 12/30
5. Airport – ARFF/SRE Facility (firefighting/snow removal)
6. Airport – Runway 9/27
7. Sidewalk – Missouri Boulevard Sidewalks
8. Sidewalk – South Summit Drive Sidewalks
9. Greenway – Jefferson City Greenway Extensions
Replace with priorities developed by Consultant within Active Transportation Plan
10. Transload Facility at Algoa Industrial Park (previously considered fully funded, but has a funding gap)
- Amtrak Station (considered fully funded)
Staff Recommendation
Staff is bringing this project list forward to the Technical Committee for review and comment.
Staff requests forwarding the list, with any additions, deletions, or commentary, to the Board of Directors for final
review.
Recommended Form of Motion:
Motion to forward the proposed unfunded needs project submittal list to the Board of Directors
for review.
Agenda Item 7C - Page 3 of 8
Attachment A
2023 Unfunded Needs Prioritization Guidelines
With the expansion of the unfunded needs list to include the addition of a third tier and a multimodal listing, districts
will need to work with planning partners from April through May to remove any delivered needs from the list,
validate the remaining existing needs and to prioritize any new needs that must be considered for inclusion. Each
district will be provided an estimate of available capacity between the current list with delivered needs removed and
an overall target for each tier (1, 2, 3 and MO). The goal of the unfunded needs list is to be able to react quickly
with deliverable projects to any identified or secured funding and to provide a list of needs which represent where
additional funding could be used.
Road and Bridge: The $4.5 billion of needs for road and bridges will be categorized as follows:
1. Tier 1 ‐ $500 million urgent needs
a. Projects to address the need must be deliverable (awarded) within the timeline of the current
STIP if funds become available.
2. Tier 2 ‐ $2 billion of remaining needs
a. Projects to address the need should be deliverable in any of the next 10 years, (2024‐2033) if
funds would come available.
3. Tier 3 ‐ $2 billion of remaining needs
a. Remaining needs deliverable in future years if funds become available.
Multimodal: The $1 billion future funding for Multimodal will be categorized as follows:
1. Needs may include all modes of Multimodal transportation.
2. The identified needs can address infrastructure improvements, operation assistance and
capital maintenance.
List Capacity (millions)
Region Road and Bridge Multimodal
District Distribution1 $500 Million
Tier 1
$2 Billion
Tier 2
$2 Billion
Tier 3 Total $1 Billion
NW 4.648% $23 $93 $93 $209 $46
NE 4.694% $23 $94 $94 $211 $47
KCR 3.168% $16 $63 $63 $143 $32
KCU 17.984% $90 $360 $360 $809 $180
CD 11.265% $56 $225 $225 $507 $113
SL 34.510% $173 $690 $690 $1,553 $345
SWR 9.044% $45 $181 $181 $407 $90
SWU 5.896% $29 $118 $118 $265 $59
SE 8.791% $44 $176 $176 $396 $88
Total Dist. 100% $500 $2,000 $2,000 $4,500 $1,000
1 Capacity apportioned based upon the MHTC’s FY24 system improvements funding formula.
Agenda Item 7C - Page 4 of 8
Attachment B
Agenda Item 7C - Page 5 of 8
Attachment B
Agenda Item 7C - Page 6 of 8
Tier 1 – Central District Project Locations
Tier 2 – Central District Project Locations
Tier 3 – Central District Project Locations
Attachment B
Agenda Item 7C - Page 7 of 8
Attachment C
April 2023 - Missouri Unfunded Needs List Update
Summary
MoDOT has finalized the January 2023 High-Priority Unfunded Needs document, which the CAMPO Board,
Technical Committee, and staff were heavily involved in. The finalized document is available on the MoDOT
website at: https://www.modot.org/unfundedneeds
Current STIP System Expansion Projects
Interchange Improvements at Simon Boulevard and Route OO
Budgeted at $3,410,000
Planned Award in 2023
Intersection Improvements at South Ten Mile Drive and Missouri Boulevard
Budgeted at $1,643,000
Planned Construction in 2025
Improvements to Missouri River Bridge approaches.
Budgeted at $4,104,000
Planned Construction in 2024
Unfunded Needs List (Road and Bridge Needs)
Tier 1
Hwy 50/Truman Boulevard/Country Club Drive Interchange (Phase 1 – NW Quadrant of Interchange)
Estimated Funding Needed: $8 million
Current Status: Scoping Project by MoDOT consultant complete
Tier 2
Rex Whitten Expressway Improvements
Estimated Funding Needed: $53 million
Current Status: EIS document completed in 2009
Tri-level Interchange Improvements
Estimated Funding Needed: $40 million
Hwy 54/Ellis Boulevard/Southwest Boulevard Interchange
Estimated Funding Needed: $18.7 million
Current Status: Scoping Project underway by MoDOT consultant
Missouri Boulevard Traffic Study (Corridor Study)
Estimated Funding Needed: $280,000
Dix Road/Hwy 50 Intersection Improvements
Estimated Funding Needed: $8.8 million
Tier 3
No projects from CAMPO in Tier 3
Agenda Item 7C - Page 8 of 8
Unfunded Needs List (Multimodal Needs)
Airport
Construct New Air Traffic Control Tower
Estimated Funding Needed: $5.3 million
Runway and Taxiway Improvements for Runway 12/30
Estimated Funding Needed: $18.4 million
Aircraft Rescue and Firefighting Building
Estimated Funding Needed: $2 million
Transit
Bus Facility Replacement
Estimated Funding Needed: $12.5 million (partial funding entry for $29 million project)
Rail
None. Amtrack Station and Transload Facility considered fully funded.
Port
Property Acquisition for North and South Port Sites
Estimated Funding Needed: $73,000
Extend Utility Services into South Side Port
Estimated Funding Needed: $99,000
Bridge and Road Infrastructure into South Side Port
Estimated Funding Needed: $9.8 million
Pedestrian
Sidewalks on Missouri Boulevard
Estimated Funding Needed: $3.3 million
Sidewalks on South Summit Drive in Holts Summit
Estimated Funding Needed: $0.6 million
Agenda Item 8A
CAMPO Technical Committee Staff Report
Capital Area Active Transportation Plan
April 6, 2023
Summary
Staff, along with consultants Crafton Tull and LaneShift, are continuing development of the Capital Area Active
Transportation Plan. The planning process will integrate the Capital Area Pedestrian & Bicycle Plan (2016),
Jefferson City’s Sidewalk Plan (2010) and Greenway Master Plan (2007), and the Holts Summit Pedestrian, Bicycle,
and Transit Plan (2014). The Capital Area Active Transportation Plan covers all CAMPO communities and is
expected to be completed by early Fall 2023. The plan will generally include the following:
• comprehensive set of strategies to ensure better options for biking, walking, and transit
• recommendations for prioritizing infrastructure improvements
• outline recommendations for new policies, processes, and infrastructure
• base recommendations on a robust public and stakeholder involvement campaign
Funding for this project totals $125,000 and is provided via the CAMPO Consolidated Planning Grant ($100,000),
with the required 20% match provided by JC Parks ($25,000).
Phase 1 – Public Survey and Engagement
A public survey was disseminated in August and more than 800 responses were received. The survey was made
available in English and Spanish. Three public meetings were held in September inviting the public to comment on
the current bike/ped network and what barriers and opportunities they see in the region. Staff also gave multiple
presentations to various community groups, committees, and commissions requesting comment. During the first
round of public engagement, staff and consultants engaged with the steering committee and several stakeholder
groups, including the following; Public Safety, Healthcare, Education, Small Communities, Advocates/Transit
Providers, and Business Owners.
Phase 2 – Public Survey/Engagement, Draft Network Development, Prioritization Survey
A second round of engagement occurred on December 1st and 2nd, including a steering committee meeting, a public
meeting, three walk-audits, and an outreach booth at Downtown #JCMO Living Windows. Invitations to participate
were disseminated to all member communities and stakeholders. During this phase a prioritization survey was
released asking the public and stakeholders how the draft network should be prioritized. More than 115 survey
responses were received. A summary of the survey responses will be provided at the Technical Committee
meeting.
Draft Network Plan
A draft network plan has been developed and is available for comment here:
https://storymaps.arcgis.com/stories/dfab3f90e1284f93b88d6ba048897142
Within this project website there are descriptions of the project, proposed facility types, survey results, interactive
maps, and additional survey questions requesting input on how to prioritize the projects. There are two interactive
web maps depicting a sidewalk plan and bike/ped plan.
Phase 3 – Public Engagement, Probable Cost Estimates, Phasing, Code Reform Recommendations
During the months of February and March consultants and staff reviewed prioritization survey results and finalized
network changes and prioritization criteria. A steering committee meeting and public meeting is being scheduled for
the 2nd and 3rd of May. A more finalized schedule will be sent out in early April. Phase 3 will include discussion of
costs, phasing, and potential municipal code and policy changes.
More information about the project is available on the CAMPO Active Transportation webpage at:
https://www.jeffersoncitymo.gov/campo.
Agenda Item 8B
CAMPO Technical Committee Staff Report
Status of Current Work Tasks
April 6, 2023
Summary
The following list includes work tasks that are currently in progress or have been completed since the previous
meeting:
• 2024-2028 Transportation Improvement Program (TIP) Development. See staff report.
• FY 2024 Unified Planning Work Program Development. See staff report.
• Capital Area Active Transportation Plan. See staff report.
• MoDOT Unfunded Needs. See staff report.
• 2022 Supplemental TAP Project Review and Ranking. Staff responded to requests by Central
District MoDOT for participation in the review and ranking of TAP grant submittals in the Central
District.
• Title VI Program Update. A public hearing was held March 20th during a regularly scheduled City
of Jefferson City Council Meeting. No public comment was received and the City Council adopted
the updated document. Adoption of the updated Title VI Program will appear as an agenda item on
the April CAMPO Board of Directors meeting agenda.
• JEFFTRAN Transit Facility Feasibility Study. A final document has been completed and is under
review by Federal Transit Administration and Jefferson City Public Works Staff. An updated
presentation will be given to the Technical Committee at a future meeting.
• GIS/Technical Assistance. Staff continues providing technical assistance regarding GIS data
and mapping to member jurisdictions for various projects, including:
o JEFFTRAN Transit Route Guides - Updates
o Zoning Map – Wardsville
o Zoning Map – St. Martins
o Zoning Map – Taos (in progress)
o Zoning and Address Map – Holts Summit (in progress)
o Crash data
o Active Transportation Plan data (sidewalks, trails, and other analysis layers as requested by
consultants
• US Census Bureau Urban Area Designation and Boundary review. Staff is in the process of
reviewing the recently released urban area boundary changes stemming from the 2020 Decennial
Census. A staff report and presentation on the data release will be given at the next Technical
Committee meeting.