Loading...
HomeMy Public PortalAbout08-0361 Parker .4., jivi „, , ,,,,„,......04 CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 08 -6 -2008 PERMIT #: 080361 WORK DESCRIPTION REPAIR ROOF WORK LOCATION 1311 -1313 MILLER AVE OWNER NAME JAMES & JOAN PARKER ADDRESS 809 BETZ CREEK RD CITY, ST, ZIP SAVANNAH GA 31410 -2618 PHONE NUMBER CONTRACTOR NAME CATSKILL BUILDERS, INC. ADDRESS 210 CATALINA DR. CITY STATE ZIP TYBEE ISLAND GA 31328 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 59.00 PROPERTY IDENTIFICATION # PROJECT VALUATION 55,500.00 TOTAL BALANCE DUE: $ 59.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether Local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: (.�'/\, / " �...� g g P a U® 1 P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org MAYOR Ili CITY MANAGER Jason Buelterman � Diane Schleicher CITY COUNCIL " Y CLERK OF COUNCIL Shirley Sessions, Mayor Pro Tem Vivian 0. Woods Wanda D. Doyle r A Bill Garbett ` CITY ATTORNEY Frank Schuman, Sr. ' Edward M. Hughes Kathryn Williams r`+k` Paul Wolff TED 000 CITY OF TYBEE ISLAND Joan W Parker 1311 aka 1313 Miller Avenue Tybee Island, GA 31328 Date: October 13, 2011 Telephone Number - N/A Reference: Address Change / Correction: It has come to our attention that there is an Address Numbering problem in the block in which you reside. This causes a Public Safety problem for the 911 dispatch of Emergency Services (Fire, Police and EMS). Therefore it is necessary to change / correct your address. Please be advised that effective immediately your address will be changed: FROM: #1311 aka # 1313 Miller Avenue TO: #1313 A Miller Avenue Tybee Island Code of Ordinance Section 54 -2 Building Number Placement: All building numbers shall be placed on the outside of the building in a conspicuous place with open view to the public. Please attach the correct number on the outside of your house so it can be clearly seen from the street. We will notify the following: Tax Assessor, Water Department, Planning & Zoning Department, Electric Company, Fire and Police Departments 13 3 jk `l ex- Q 123-B ** PLEASE NOTE: A Landline Phone Number is required to change the address within the 911 Emergency Dispatch Systems. If there is a Landline Phone at this residence and is either not listed above or incorrect please contact me. Please notify your Insurance Company, Phone Company and any other agencies you deem necessary. We regret any inconvenience this change may cause you but we know you will recognize the importance of this change / correction. Jimmy Brown 0 ( 3 G icbrown @citvoftybee.org PO Box 2749 Tybee Island, GA 31328 912 - 786 -4573 X 112 / FAX - 912 - 786 -5330 *** P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749 * Certified (866) 786 -4573 — FAX (866) 786 -5737 , City of , ' Ethics r www.cityoftybee.org •t �� -,� CITY OF TYBEE ISLAND, GEORGIA D K . 0 5'6 f APPLICATION FOR BUILDING PERMIT 411 , f Location: r 7 /( PIN # NAME ADDRESS TELEPHONE Owner ,' f? 809 ie-12 Cie •r ,-e. G -ire / 1 1 : 1 -1' t- ' , .yry Architect or Engineer i ✓ h f r %�,� Building C4:51cr - 6'695 Ze e, C:4r4 -4 .I2 Contractor c. i 5yer I- � Gg 3/ 32 i -7gc' -6/2 7 (Check all that apply) El Repair Residential El Footprint Changes ❑ Renovation [0 Single Family El Discovery ❑ Minor Addition El Duplex ❑ Demolition ❑ Substantial Addition ❑ Multi- Family fyi Other r?t • /errNAter %r ❑ Commercial Details of Project: /200F %Z-nr - f ' c T_ 5c-ii- ,40.,r A- Estimated Cost of Construction: $ grec), c.) Construction Type / (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: e;.2w - is r L Remarks: 44 / ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms ,.i `"` # Lot Area " - °-- - Living space (total, q:-f ) ""° # Off - street parking spaces'° ° Trees located & listed on site plan --- -- Access: .---,- Driveway (#f.) "` With culvert? With Swale? Setbacks: Front "" Rear ,'----, Sides (L) (R) _ kStories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through :, On -site waste and debris containers will be provided by C64;`r °-E Construction debris will be disposed by CP by means of i)c,'p -- I understand that I must comply with zoning. flood damage control. building. fire. shore protections and wetlands ordinances. FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 0.5- _ Le, tde? t' Signature of Applicant: - Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site L, Distance to sewer stub site ,1 ' Water meter size Storm drainage Approvals: Signature Date FEES j Zoning Administrator j , / Permit Code Enforcement Officer /A /P,� / e , , g — jo - p � Inspections 1 tp, a� Water /Sewer 0 Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL 69. UMW MURAL MOMS '1"6t GEORGIA Permit Acknowledgement of Asbestos/Environmental Notification to Georgia EPD for Proiects Involving Demolition. Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. - CV 6 2‘.7.- Undersigned Date Printed Name Office Use Only: Project Address: Permit Number: