HomeMy Public PortalAbout08-0366 Pierce • o
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 08 -8 -2008 PERMIT #: 080366
WORK DESCRIPTION REPLACE WOOD UNDER CARPORT
WORK LOCATION 1517 MILLER AVE
OWNER NAME DENNIS F. PIERCE
ADDRESS PO BOX 1892
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME DENNIS F. PIERCE
ADDRESS PO BOX 1892
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 41.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $2,200.00
TOTAL BALANCE DUE: $ 41.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether Local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: T 1016
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
1 I
inspect:on Report
city
f Ty'bee Lbd
P�. f;i33 Butiev Ave.
Box 2749 -
Tvhee
Isid GA 313W
Pitone; (912) 7513-1.573 ext. 114
Fax; (911) 786-9°
0 3 ( Pmr _) - .0VD 1.3.3tf
Owner 's fi e. t- n Flec-tded cm
Gen, Cor;tractor Si;I:Pco . 1trac to r
C. 1‘ 7 ( 3 7 0 ontact ;lumber e Lk -
0
5 7 ,\ er- t-ve)
Lefcatio )
" /
inspecto r of L5/ oa
)
Type (A inspection
■ •
Pass fg
F E
1
Irisne-ction Report ,:\i\
-
City ol Tybee 'Island
4,D3 B,Idiez-- Ave.
2149
Tybee-, isialoi, GA 3132
Oilloae. (912) 7itk5-4573 ext. 114
Fax: t9V) 7115-9539
fli or t 11 0 3
Pftriklit ti . ( _ 1 Date
p ,
owner's %awe . C11_42-,_______ o & .
Gn, Contractor Subcontractor
-----.7) ------,
Y
Contact NI.; el tnter
1- ----7—?-0
f '\ ,.
"I Location
irvqpector '7/t9 _ Date 01
"T1,9pe ot Inspection
1 ‘;',() ,_____CLC.,(-1.../ \ 3-i- j jc), j___(_)___- 3.j.. -- _
1
17;1\ 0 --:-- f--,01
--\''
‘ .....,.., Lk\i_k\A„ - - 77 -0:41 • --- rt.:R cp - ii!,,eik , p-e..
tmt
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
053'-0340k
I
location: IS l7 et, A v c PIN #
NAME ADDRESS TELEPHONE
Owner � J� - y��z
n ni ■s c> roc o K<A 1 F 9 R_ I <? e
Architect
or Engineer
uilding � ���
Contractor
(Check all that apply)
(g] Repair ❑ Residential ❑ Footprint Changes
❑ Renovation ❑ Single Family ❑ Discovery
❑ Minor Addition El Duplex ❑ Demolition
❑ Substantial Addition ❑ Multi- Family
❑ Other ❑ Commercial
Details of Project: 1` c-A .e,n, Co 00a C r c.ml e r �k y,g
ar�n r°
mated Cost of Construction: $ 22 ()0
Construction Type { I) (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units #13:4 r , ms # Bathrooms
Lot Area Li • i 2, sp. e (total sq. ft.)
# Off - street parkin!. spac
Trees located & lis ed or si t L V
4p
Access:
Driveway .) With cu ert? With Swale?
Setbacks: Front Re. Sides (L) (R) _
# Stories Height is s ce measured from the average adjacent
grade of the building to the extreme '1, � o',111 building, exclusive of chimneys, heating
units, ventilation ducts, air conditio ators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through gx i s�-
On-site waste and debris containers will be provided by ,,,.
Construction debris will be disposed by `f - R-t4c 1. by means of - t- R,,A { .
I understand that I must comply with zoning. flood damage control. building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
�-Ha - F- OS 'Signature of Applic t: l-/
�v v
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site •
Distance to water main tap site ,
Distance to sewer stub site X I) 1 ) ! ,
Water meter size v ��
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator , „ Permit
Code Enforcement Officer Y R, g- 0 Inspections t
Water /Sewer D Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL �f
DEKOF
NUOURCall
va i
GEORGIA
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day `Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned Date
Printed Name
Office Use Only:
Project Address:
Permit Number: