Loading...
HomeMy Public PortalAbout2023-04-19 packet Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as required under the Americans with Disabilities Act. Please allow three business days to process the request. Please call (573) 634-6410 with questions regarding agenda items. Board of Directors Wednesday, April 19, 2023 at 12:00 p.m. Meeting Location: Boone-Bancroft Room, John G. Christy Municipal Building 320 E. McCarty, Jefferson City, MO 65101 - Enter through Main Lobby THIS MEETING IS AVAILABLE VIRTUALLY TO JOIN VIRTUALLY: https://jeffersoncity.webex.com/jeffersoncity/j.php?MTID=m5bcd5dcab549e58e5711bb96a0cf90ee CALL-IN AVAILABLE AT: 1-404-397-1516 MEETING NUMBER: 2497 455 6632 MEETING PASSWORD: 1234 TENTATIVE AGENDA 1. Call to order, roll call, and determination of a quorum 2. Public comment 3. Adoption of the agenda as printed or amended 4. Approval of the minutes from the meeting of February 15, 2023 5. Communications Received 6. Old Business A. 2023 Title VI Program Action Requested: Adoption of 2023 Title VI Program Staff Report: Recipients of Federal Transit Administration (FTA) funding are federally required to report certain general information to determine compliance with Title VI of the Civil Rights Act of 1964, including a Public Participation Plan and Language Assistance Plan. New in 2023 is the development of a combined Title VI Program for CAMPO and JEFFTRAN, Jefferson City’s transit division. CAMPO and JEFFTRAN are both recipients of FTA funding and are required to update the Title VI Program every three years. A 45-day public comment period concluded on March 20th with the City of Jefferson City Council adopting the document. See the attached staff report. 7. New Business A. 2024-2028 Transportation Improvement Program (TIP) Action Requested: Review, discussion, and opening of a 25-day public comment period. Staff Report: The TIP is a 5-year financial program of transportation projects to be implemented within the Metropolitan Planning Area (MPA), which are funded by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), or are deemed ‘regionally significant. The TIP is updated annually by CAMPO in cooperation with local jurisdictions, the Missouri Department of Transportation (MoDOT), and local public transportation operators. See attached staff report and draft document. B. FY 2024 Unified Planning Work Program (UPWP) Action Requested: Review, discussion, and opening of a 25-day public comment period. Staff Report: The UPWP is CAMPO’s annual statement of work identifying the budget, planning priorities, and activities to be carried out for the year (November 1 to October 31). The UPWP contains many ongoing activities required to perform the essential functions of CAMPO, as well as, periodic and one-time activities. The UPWP serves as the basis for funding agreements with the Missouri Department of Transportation (MoDOT). See attached staff report and draft document. Capital Area Metropolitan Planning Organization Room 120 320 E. McCarty, Jefferson City, MO 65101 Phone 573.634.6410 Fax 573.634.6457 Agenda/Capital Area Metropolitan Planning Organization Page 2 Technical Committee C. MoDOT Unfunded Needs Action Requested: Review, discussion, and approval of updated priorities. Staff Report: Staff are initiating discussion regarding transportation project priorities to be submitted to MoDOT in the upcoming Unfunded Needs planning process. See attached staff report. 8. Other Business A. Capital Area Active Transportation Plan B. Status of Current Work Tasks C. Announcements 9. Next Meeting Date Wednesday, May 17, 2023 at 12:00 p.m. - Boone-Bancroft Room, City of Jefferson City Hall 10. Adjournment Minutes/Capital Area Metropolitan Planning Organization Board of Directors February 15, 2023 1 MINUTES Board of Directors CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION February 15, 2023 12:00 p.m. BOARD MEMBERS PRESENT Ron Fitzwater, Chairman, Jefferson City Sonny Sanders, Jefferson City Mike Lester, Jefferson City Matt Morasch, Jefferson City (arrived at 12:05 p.m.) Gerry Stegeman, Jefferson City Jeff Hoelscher, Vice Chairman, Cole County Eric Landwehr, Cole County Brandon Ruediger, Holts Summit Doug Reece, St. Martins, Small Cities Representative Machelle Watkins, MoDOT (Virtual) Roger Fischer, Callaway County BOARD MEMBERS ABSENT Jack Deeken, Jefferson City Jon Hensley, Jefferson City EX-OFFICIO MEMBERS PRESENT (Non-Voting) Luke Holtschneider, Jefferson City Regional Economic Partnership EX-OFFICIO MEMBERS ABSENT (Non-Voting) Eva Steinman, FTA Vacant, Missouri Office of Administration Tamara Tateosian, Callaway County Chamber of Commerce Dan Weitkamp, FHWA CAMPO STAFF PRESENT (Non-Voting) Lisa Dittmer, Administrative Assistant Katrina Williams, Planner Eric Barron, Planning Manager GUESTS Christopher Scott, Holts Summit Community Betterment Association David Bange, City of Jefferson Jennifer Bowden (Virtual), Mid-Missouri Regional Planning Commission (RPC) Cameron Gerber, News Tribune 1. Call to order, roll call, and determination of a quorum. Chairman Fitzwater called the meeting to order at 12:02 p.m. Ms. Dittmer took roll call. A quorum was present with 10 of 13 members or their designee present. Mr. Morasch arrived at 12:05 p.m. making 11 of 13 voting members or designees present. 2. Public Comment None Minutes/Capital Area Metropolitan Planning Organization Board of Directors February 15, 2023 2 3. Adoption of the agenda as printed or amended Mr. Lester moved and Mr. Landwehr seconded to approve the agenda as amended. The motion passed unanimously. 4. Approval of the minutes from the meeting of January 18, 2023 Mr. Sanders moved and Mr. Lester seconded to approve the minutes from the Regular Meeting of January 18, 2023 as printed. The motion passed unanimously. 5. Communications Received None 6. Old Business No Old Business 7. New Business A. Transportation Alternative Program Grant Rankings Mr. Barron stated MoDOT has tasked CAMPO with ranking the four grant applications within the CAMPO boundaries. Central District received nine applications totaling $5.2 million in requested funding, but only $1.1 million dollars is available in grant funding this round. Within the MoDOT review process, applications are analyzed based on a points system. The minimum grant amount is $100,000 and the maximum grant amount rewarded will be $500,000 per project. Mr. Barron provided a brief overview of each project followed by additional information provided by representatives of each project. Mr. Landwehr provided an overview of the Rainbow Drive Sidewalk project. This is a continuation of a previously funded project thru the state, known as the safe routes to schools’ program. This project would be a continuation of that project from 2015, where sidewalks were installed in front of Pioneer Trail School from Business 50 to Hunters Run and will connect to a subdivision that goes into the city and would provide sidewalk access into the city. Ms. Bowden discussed the Falcon Lane Pedestrian Improvements project. When Blair Oaks has a sporting event, Falcon Lane is closed down during the event, because of the use of the high school parking lot for the events. The ditch lines on the side of the road are extremely steep, making it impossible for anyone to walk in the grass. The hope is for this sidewalk project and the road widening to all occur at the same time to minimize construction delays and closures for the school and area. Mr. Bange advised the Boggs Creek project will connect the Greenway to Riverside Park, which may help with the lack of parking in the area of the new Amphitheater. This would also provide a nice way around the large hill that exists between St. Louis Road and Grant Street. There is a 13-acre parcel that is in the process of being donated to the Parks Department, this project would serve as the connection to the new 13-acre property. Two easements would still be needed for this project. Mr. Bange provided information on the Stadium and Satinwood Project. This plan would include road improvements including a roundabout to improve roadway alignment and new box culverts to help with flooding problems in the area. Another component of this project is to create ADA access across and thru the intersection. After a brief discussion, Mr. Lester moved and Mr. Ruediger seconded a motion for approval of the ranking order (1. Falcon Lane Pedestrian Improvements, 2. Boggs Creek Greenway, 3. Rainbow Drive Sidewalk, and 4. Stadium and Satinwood Pedestrian Improvements) and instruct staff to forward the ranking order to MoDOT. The motion passed unanimously. Minutes/Capital Area Metropolitan Planning Organization Board of Directors February 15, 2023 3 B. Title VI Program – Draft Ms. Williams gave an overview of the Title VI Program and advised this will be the first year that CAMPO and JEFFTRAN will submit a joint City of Jefferson Title VI Program to meet the requirements for both agencies. Both agencies receive federal transit administration funds and are required to submit an updated Title VI Program every three years. 8. Other Business A. 2024-2028 Transportation Improvement Program (TIP) Ms. Williams stated development of the 2024-2028 TIP has started, TIP is a 5-year financial program of transportation projects to be implemented within the Metropolitan Planning Area (MPA). The TIP is updated annually by CAMPO in cooperation with local jurisdictions. Ms. Williams requested that jurisdiction contact CAMPO staff with any projects they have pending that will utilize federal transportation funds. B. FY2024 Unified Planning Work Program (UPWP) Ms. Williams stated staff has begun work on the FY2024 UPWP, which is expected to be adopted by May 2023. This annual process starts very early due to the City of Jefferson’s budget process. The estimated draft budget for FY2024 is approximately $238,833m which includes an estimate for salary increases and $30,000 for professional services to use on the Metropolitan Transportation Plan Update if needed. Ms. Williams directed members to contact her with any questions, comments, or input on possible projects. C. Capital Area Active Transportation Plan Ms. Williams stated the plan is moving into phase three. A draft network plan is available online and the prioritization survey has closed, with over 120 survey responses. Another steering committee meeting is expected to be scheduled in March of 2023. Any comments on the draft network can be sent to Ms. Williams. D. Status of Current Work Tasks • 2024-2028 Transportation Improvement Program (TIP) Development. Discussed earlier in the meeting. • FY 2024 Unified Planning Work Program Development. Discussed earlier in the meeting. • Capital Area Active Transportation Plan. Discussed earlier in the meeting. • Title VI Program Update. Discussed earlier in the meeting. • JEFFTRAN Transit Facility Feasibility Study. A final document has been completed and is under review by the Federal Transit Administration and Jefferson City Public Works Staff. • GIS/Technical Assistance. Staff continue to provide GIS and technical assistance to member jurisdictions. • US Census Bureau Urban Area Designation and Boundary Review. Staff is in the process of reviewing the urban area boundary changes received from the 2020 Decennial Census. A staff report and presentation will be given at the March Technical Committee meeting. Minutes/Capital Area Metropolitan Planning Organization Board of Directors February 15, 2023 4 E. Announcements Mr. Fitzwater presented Mr. Sanders with a certificate of appreciation. Members thanked Mr. Sanders for his service to the city and CAMPO. This is Mr. Sanders last CAMPO Board meeting, he is retiring from the City of Jefferson February 16, 2023. Mr. Landwehr stated the multimodal transload facility bids are due March 15, 2023, the project is estimated to be in the $5 million-dollar range. The State Transportation Planning Partners Meeting is February 23, 2023. 9. Next Meeting Date – Wednesday, March 15, 2023 at 12:00 p.m. in the Boone-Bancroft Room, City of Jefferson City Hall 10. Adjournment Meeting was adjourned at 12:46 p.m. Respectfully Submitted, Lisa Dittmer, Administrative Assistant Agenda Item 6A CAMPO Board of Directors Staff Report Title VI Program Update April 19, 2023 Summary The Federal Transit Administration (FTA) requires recipients to report certain general information to determine compliance with Title VI of the Civil Rights Act of 1964. The collection and reporting of this information constitutes a recipient’s Title VI Program. To ensure compliance with 49 CFR Section 21.9 (b), the FTA requires that all recipients document their compliance with this chapter by submitting a Title VI Program to the FTA’s regional civil rights officer once every three years. As subrecipients, the Capital Area Metropolitan Planning Organization submits the information contained in this plan to their primary recipient, MoDOT, on a schedule to be determined by the primary recipient, and is to be included as part of their Title VI Program. JEFFTRAN has a similar requirement. The 2023 Title VI Program will look different from previous iterations. CAMPO staff and JEFFTRAN staff will submit a joint City of Jefferson Title VI Program to meet the requirements for both agencies. FTA staff and MoDOT staff have agreed to this joint submission. The plan consists of copies of many of our documents along with our activities involving civil rights: • Title VI annual certifications and assurances • Title VI Notice to the Public • Title VI Complaint Procedures • Title VI Complaint Form • List of Transit-Related Title VI Investigations, Complaints, and Lawsuits • Public Participation Plan • Language Assistance Plan • Committee Membership • Demographic Profile of CAMPO & Maps • Responses to several Title VI questions The draft document is included with this staff report and is available on the CAMPO webpage at. https://www.jeffersoncitymo.gov/campo. Technical Committee Recommendation and City of Jefferson City Council Adoption The Technical Committee recommended opening a 45-day public comment period and review of the draft document by the CAMPO Board of Directors in February. Due to the nature of creating a joint agency document, staff has vetted the draft Title VI Program through the CAMPO Technical Committee, City of Jefferson Public Transit Advisory Committee, City of Jefferson Public Works and Planning Committee, and City of Jefferson City Council. The final document needs approval by both the CAMPO Board of Directors and City of Jefferson City Council. A public hearing was held March 20th at 6:00pm during a regularly scheduled City of Jefferson City Council Meeting. No public comments were received and the adopted the document via resolution. Any comments should be forwarded to Katrina Williams at 573-637-6536 or kawilliams@jeffcitymo.org. Recommended Form of Motion: Motion to adopt the 2023 Title VI Program for CAMPO and JEFFTRAN City of Jefferson Title VI Program For CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO) & JEFFTRAN Date filed with MoDOT Transit Section: ____Approved by City of Jefferson – Pending CAMPO Approval____ Click or tap to enter a date. The preparation of this plan was financed in part by the U.S. Department of Transportation, Federal Highway Administration, and Federal Transit Administration in cooperation with the Missouri Department of Transportation. The opinions, findings, and conclusions expressed in this report are not necessarily those of the Federal Highway Administration, Federal Transit Administration, or the Missouri Department of Transportation. City of Jefferson Title VI Nondiscrimination Policy The City of Jefferson is committed to the policy that no person shall be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity on the grounds of race, color, or national origin, in accordance with Title VI of the Civil Rights Act of 1964, and the Civil Rights Restoration Act of 1987 (P.L. 100.259). Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as required under the Americans with Disabilities Act. Please allow three business days to process the request. MPO Administration is provided by the City of Jefferson Department of Planning and Protective Services/Planning Division 320 East McCarty Jefferson City, Missouri Telephone 573-634-6410 http://www.jeffersoncitymo.gov/campo JEFFTRAN Administration is provided by the City of Jefferson Department of Public Works/ Transit Division 320 East McCarty Jefferson City, Missouri Telephone 573-634-6410 http://www.JEFFTRAN.org Resolution – CAMPO Board of Directors CONTENTS Title VI Program Requirements ............................................................................................... 1 General Requirements (Chapter III) Checklist ..................................................................................................................... 1 Requirements of Transit Providers (Chapter IV) Checklist - JEFFTRAN ...................................................................... 1 Requirements of MPOs (Chapter VI) Checklist - CAMPO ............................................................................................... 1 Title VI Assurances ................................................................................................................... 2 Title VI Notice to the Public ................................................................................................... 3 Title VI Complaint Procedures & Complaint Form ............................................................... 5 List of transit-related Title VI investigations, complaints, and lawsuits ............................ 10 Title VI Compliance Report Submission Process ................................................................. 10 Documenting Evidence of Agency Staff Title VI Training ................................................... 10 Agency Information ............................................................................................................... 11 General Program Responsibilities ........................................................................................................................................... 11 Responsibilities of the Title VI Coordinator ........................................................................................................................ 11 Responsibilities of Other Staff Members .............................................................................................................................. 12 JEFFTRAN Overview .............................................................................................................. 12 JEFFTRAN Service Standards ................................................................................................................................................... 14 Service Policies ............................................................................................................................................................................ 14 CAMPO Overview ................................................................................................................... 15 CAMPO Board of Directors Membership ........................................................................................................................... 16 Demographic Profile of the Metropolitan Planning Area ................................................... 18 A note on U.S. Census data. .................................................................................................................................................... 18 Minority Populations .................................................................................................................................................................. 19 Low-Income (Poverty) Populations ........................................................................................................................................ 20 Elderly Populations ..................................................................................................................................................................... 21 Identifications of Mobility Needs of Minority Populations .................................................. 22 Disparate Impact Analysis ...................................................................................................... 22 JEFFTRAN Public Participation Plan .................................................................................... 23 Goal ........................................................................................................................................... 23 Identification of Stakeholders ................................................................................................ 23 Targeted Public Participation Plan for Minority, Low-Income and LEP Populations ...... 24 Jefftran Public Comment Procedures ................................................................................... 25 Transit Notice Posting and Publishing ................................................................................................................................... 25 Public Comment .......................................................................................................................................................................... 27 Response to Public Input .......................................................................................................................................................... 27 Access to Records ...................................................................................................................................................................... 29 Title VI Outreach Best Practices ........................................................................................... 29 2023 – 2026 Title VI Program Public Engagement Process ................................................ 30 Summary of 2019-2023 Public Outreach Efforts .................................................................. 30 Proposed Fare Increase Public Engagement 2022-2023 ................................................................................................... 30 Example public Notices .......................................................................................................... 31 CAMPO Public Participation Plan ....................................................................................... 33 Desired Outcomes ................................................................................................................... 34 Evaluation of Effectiveness ..................................................................................................... 34 Survey Results .......................................................................................................................... 35 2023 Board of Directors and Technical Committee Survey ........................................................................................... 35 2019 Public Participation Survey Results .............................................................................................................................. 36 2022 City of Jefferson Citizen Participation Plan ................................................................................................................ 36 Participation Policies ............................................................................................................... 38 Public Notice & Accessibility ................................................................................................................................................... 38 Emergency Meetings ................................................................................................................................................................... 39 Effective Communication & Visualization ............................................................................................................................. 39 Outreach & Engagement ........................................................................................................................................................... 39 Coordination ................................................................................................................................................................................ 40 Public Comment Procedures ................................................................................................. 41 Plan Specific Procedures ......................................................................................................... 44 Metropolitan Transportation Plan .......................................................................................................................................... 44 Transportation Improvement Program ................................................................................................................................. 45 Coordinated Public Transit-Human Services Transportation Plan ................................................................................ 47 Title VI Program, Public Participation Plan, & Language Assistance Plan ..................................................................... 48 Unified Planning Work Program ............................................................................................................................................. 49 Special Accommodations .......................................................................................................................................................... 50 Non-discrimination Policy ........................................................................................................................................................ 50 City of Jefferson/CAMPO Limited English Proficieny Plan ................................................. 52 Service Area Description .......................................................................................................................................................... 52 Four Factor Analysis ............................................................................................................... 52 Subrecipient Assistance ......................................................................................................... 57 Subrecipient Monitoring ....................................................................................................... 57 Equity Analysis of Facilities ................................................................................................... 57 Requirement to Collect and Report Demographic Data* .................................................. 57 Requirement to Monitor Transit Service* ........................................................................... 57 Service and Fare Equity Analysis*......................................................................................... 57 City of Jefferson Title VI Program 2023 – Title VI Program Requirements 1 TITLE VI PROGRAM REQUIREMENTS The following checklist, derived from Chapters III, IV, VI, and Appendix A of FTA Circular 4702.1B, denotes required elements included in this program. If an element is not required or included in this plan, an explanation is provided. More information about these requirements can be found at: https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/FTA_Title_VI_FINAL.pdf GENERAL REQUIREMENTS (CHAPTER III) CHECKLIST  Title VI Annual Certifications and Assurances.  Title VI Notice to the Public, including a list of locations where the notice is posted.  Title VI Complaint Procedures (i.e., instructions to the public regarding how to file a Title VI discrimination complaint).  Title VI Complaint Form.  List of transit-related Title VI investigations, complaints, and lawsuits.  Public Participation Plan, including information about outreach methods to engage minority and limited English proficient populations (LEP), as well as a summary of outreach efforts made since the last Title VI Program submission.  Language Assistance Plan for providing language assistance to persons with limited English proficiency (LEP), based on the DOT LEP Guidance.  A table depicting the membership of non-elected committees and councils, the membership of which is selected by the recipient, broken down by race, and a description of the process the agency uses to encourage the participation of minorities on such committees.  [Not Applicable] Primary recipients shall include a description of how the agency monitors its subrecipients for compliance with Title VI, and a schedule of subrecipient Title VI Program submissions.  [Not Applicable] A Title VI equity analysis if the recipient has constructed a facility, such as a vehicle storage facility, maintenance facility, operation center, etc.  A copy of board meeting minutes, resolution, or other appropriate documentation showing the board of directors or appropriate governing entity or official(s) responsible for policy decisions reviewed and approved the Title VI Program. For State DOT’s, the appropriate governing entity is the State’s Secretary of Transportation or equivalent. The approval must occur prior to submission to FTA.  Additional information as specified in chapters IV, V, and VI, depending on whether the recipient is a transit provider, a State, or a planning entity (see Chapter VI – Requirements of MPOs below). REQUIREMENTS OF TRANSIT PROVIDERS (CHAPTER IV) CHECKLIST - JEFFTRAN All Fixed Route Transit Providers must submit:  All requirements set out in Chapter III (General Requirements)  Service standards o Vehicle load for each mode o Vehicle headway for each mode o On time performance for each mode o Service availability for each mode  Service Policies o Transit Amenities for each mode o Vehicle Assignment for each mode REQUIREMENTS OF MPOS (CHAPTER VI) CHECKLIST - CAMPO  All requirements set out in Chapter III (General Requirements)  [Not Applicable] The requirements set out in Chapter IV (Transit Provider) if the MPO is a provider of fixed route public transportation.  Demographic profile of the metropolitan area.  A description of the procedures by which the mobility needs of minority populations are identified and considered within the planning process.  Demographic maps that show the impacts of the distribution of State and Federal funds in the aggregate for public transportation projects.  Analysis of the MPO’s transportation system investments that identifies and addresses any disparate impacts.  [Not Applicable] Description of the procedures the agency uses to ensure nondiscriminatory pass-through of FTA financial assistance (if requested).  [Not Applicable] Description of the procedures the agency uses to provide assistance to potential subrecipients in a nondiscriminatory manner (if requested).  Title VI Compliance Report Submission Process. City of Jefferson Title VI Program 2023 – Title VI Assurances 2 TITLE VI ASSURANCES In accordance with Title VI of the Civil Rights Act of 1964, as amended, 42 U.S.C. 200d et seq., and with U.S. DOT regulations, “Nondiscrimination in Federally-Assisted Programs of the Department of Transportation – Effectuation of Title VI of the Civil Rights Act,” 49 CFR part 21, the City of Jefferson agrees to comply with all provisions prohibiting discrimination on the basis of race, color, or national origin. The City of Jefferson assures that no person shall, as provided by Federal and State civil rights laws, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity. The City of Jefferson further ensures every effort will be made to ensure non- discrimination in all programs and activities, whether those programs and activities are federally funded or not. The City of Jefferson meets the objectives of the FTA Master Agreement which governs all entities applying for FTA funding, including the City of Jefferson and its third-party contractors by promoting actions that: A. Ensure that the level and quality of transportation service is provided without regard to race, color, or national origin. B. Identify and address, as appropriate, disproportionally high and adverse effects of programs and activities on minority populations and low-income populations. C. Promote the full and fair participation of all affected Title VI populations in transportation decision making. D. Prevent the denial, reduction, or delay in benefits related to programs and activities that benefit minority populations or low-income populations. E. Ensure meaningful access to programs and activities by persons with Limited English Proficiency (LEP). City of Jefferson Title VI Program 2023 – Title VI Notice to the Public 3 TITLE VI NOTICE TO THE PUBLIC The notice to the public is posted at the locations list below. • CAMPO main webpage at www.jeffersoncitymo.gov/CAMPO • JEFFTRAN main webpage at https://www.jeffersoncitymo.gov/government/transit/index.php • All Transit Vehicles • Key Transit Stops (as staff availability allows) • City of Jefferson, Missouri: City Hall Bulletin Board, Main Level John G. Christy Municipal Building-City Hall 320 E. McCarty Street Jefferson City, Missouri 65101 • JEFFTRAN Administrative Office: Customer Service Window Charles G. Robinson Transit Facility 820 E. Miller Street Jefferson City, Missouri 65101 • At all public meetings A sample notice is provided in Figure 1. City of Jefferson Title VI Program 2023 – Title VI Notice to the Public 4 FIGURE 1 – TITLE VI PUBLIC NOTICE City of Jefferson Title VI Program 2023 – Title VI Complaint Procedures & Complaint Form 5 TITLE VI COMPLAINT PROCEDURES & COMPLAINT FORM Instructions to the public regarding filing a Title VI discrimination claim (Figure 2) and an example of the complaint form (Figure 3) are included in the following pages. Hard copies of the publication “Title VI Complaint Procedures and Complaint Form” are available at the following locations: • City of Jefferson, Missouri: In the “forms” array on the lower level of City Hall 320 E. McCarty Street Jefferson City, Missouri 65101 • JEFFTRAN Administrative Office: Customer Service Window Charles G. Robinson Transit Facility 820 E. Miller Street Jefferson City, MO 65101 • CAMPO Public Meetings • Electronically via the Transit webpage and the following link: http://www.jeffersoncitymo.gov/government/transit/title_vi.php • Electronically via the CAMPO webpage and the following link: www.jeffersoncitymo.gov/CAMPO City of Jefferson Title VI Program 2023 – Title VI Complaint Procedures & Complaint Form 6 FIGURE 2 - TITLE VI COMPLAINT PROCEDURES City of Jefferson Title VI Program 2023 – Title VI Complaint Procedures & Complaint Form 7 City of Jefferson Title VI Program 2023 – Title VI Complaint Procedures & Complaint Form 8 FIGURE 3 – TITLE VI COMPLAINT FORM City of Jefferson Title VI Program 2023 – Title VI Complaint Procedures & Complaint Form 9 City of Jefferson Title VI Program 2023 – List of transit-related Title VI investigations, complaints, and lawsuits 10 LIST OF TRANSIT-RELATED TITLE VI INVESTIGATIONS, COMPLAINTS, AND LAWSUITS All Title VI complaints will be entered and tracked in City of Jefferson’s complaint log, Figure 4. Active investigations will be monitored for timely response on the part of all parties. The agency’s Title VI Coordinator shall maintain the log. During the reporting period (May 1 2019 – March 1 2023), the City of Jefferson had 0 Title VI Complaints. FIGURE 4 - TRANSIT-RELATED TITLE VI INVESTIGATIONS, COMPLAINTS, AND LAWSUITS Date complaint filed Complainant Basis of complaint R-C-NO Summary of allegation Pending status of complaint Actions taken Closure Letter (CL) Letter of Finding (LOF) Date of CL or LOF TITLE VI COMPLIANCE REPORT SUBMISSION PROCESS On an annual basis, JEFFTRAN and CAMPO staff complete and submit separate Title VI Surveys/Questionnaires to MoDOT. The survey/questionnaire includes questions about complaints, employee trainings, planning activities, actions taken to promote Title VI compliance, contracts awarded, public involvement activities, and related Title VI public interactions. DOCUMENTING EVIDENCE OF AGENCY STAFF TITLE VI TRAINING JEFFTRAN and CAMPO staff are given Title VI training, and the City of Jefferson can answer affirmatively to all the following questions: 1. Are new employees made aware of Title VI responsibilities pertaining to their specific duties? 2. Do new employees receive this information via employee orientation? 3. Is Title VI information provided to all employees and program applicants? 4. Is Title VI information prominently displayed in the agency and on any program materials distributed, as necessary? City of Jefferson Title VI Program 2023 – Agency Information 11 AGENCY INFORMATION The City of Jefferson administers funding and operation of JEFFTRAN, the City’s transit agency, and the Capital Area Metropolitan Planning Organization (CAMPO). Both JEFFTRAN and CAMPO are partially funded by the Federal Transit Administration (FTA). CAMPO is a sub-recipient via MoDOT of FTA funding. JEFFTRAN is a direct recipient of FTA funding. GENERAL PROGRAM RESPONSIBILITIES 1. Data Collection. Statistical data on race, color, national origin, income level, language spoken, and sex of participants in, and beneficiaries of federally funded programs will be gathered for use in planning and program analysis. Upon request by the Title VI Coordinator, CAMPO staff will prepare reports from data available from the Census Bureau and other readily available sources. CAMPO will assist JEFFTRAN with preparation of surveys and other data collection tools needed to prepare plans and reports. 2. Annual Report and Update. An Annual Report and Update is to be submitted to the MoDOT Office of Civil Rights and the FTA in April of each year. The Title VI Coordinator is responsible for gathering information from appropriate staff members and consolidating this information into the final document. The final document is to include: a. A report on the previous year’s Title VI-related activities and efforts, including accomplishments and program changes; b. An update on Title VI-related goals and objectives for the upcoming year. 3. Annual Review of the Title VI Program. Each year, in preparing for the Annual Report and update, the Title VI Coordinator will review the Title VI program to assure compliance. In addition, they will review agency operational guidelines and publications, including those for contractors, to ensure that the Title VI language and provisions are incorporated, as appropriate. 4. Dissemination of Information Related to the Title VI Program. Information on the City of Jefferson’s Title VI Program is to be disseminated to JEFFTRAN employees, contractors, and beneficiaries, as well as to the public, and in other languages when needed. 5. Resolution of Complaints. Any individual may exercise their right to file a complaint with JEFFTRAN, CAMPO, or the City of Jefferson, Missouri, if that person believes that they or any other program beneficiaries have been subjected to unequal treatment or discrimination, in their receipt of benefits/services or on the grounds of race, color, or national origin. The City of Jefferson will make a concerted effort to resolve complaints as put forth in the Title VI Complaint procedure, as shown in Appendix B. RESPONSIBILITIES OF THE TITLE VI COORDINATOR The City Administrator has been designated as the Title VI Coordinator for the City of Jefferson. The City Administrator reports directly to the City Council of the City of Jefferson, Missouri. The City Administrator may delegate responsibilities to department directors or other management staff needed. The Title VI Program Coordinator is responsible for coordinating staff activities pertaining to Title VI regulations and procedures set forth in federal guidance and in accordance with the City’s Title VI Procedures Manual. In support of this the Title VI Coordinator will: • Identify, investigate, and work to eliminate discrimination when found to exist. • Process Title VI complaints received. • Meet with appropriate staff members to monitor and discuss progress, implementation, and compliance issues related to the Title VI program. • Periodically review the Title VI program to assess if administrative procedures are effective, staffing is appropriate, and adequate resources are available to ensure compliance. • If a federal funding recipient is found to not be in compliance with Title VI, work with affected staff and the recipient to resolve the deficiency status and write a remedial action if necessary. City of Jefferson Title VI Program 2023 – Agency Information 12 • Review important Title VI-related issues, as needed, with the City Administrator, Mayor, and City Council. • Assess communications and public involvement strategies to ensure adequate participation of impacted Title VI protected groups and address additional language needs when needed. RESPONSIBILITIES OF OTHER STAFF MEMBERS At times other staff members will be asked to accept or share responsibility for day-to-day administration of the Title VI program, including implementation of the plan and Title VI compliance, program monitoring, reporting, and education within an applicable program area, as described in the “Program Area Responsibilities” section of this document. In addition, some staff members may be asked to accept responsibility for drafting text for an assigned section of the Annual Title VI Report and Update, and maintaining the data and documentation necessary for that report. These responsibilities may include reviewing guidelines and procedures for the assigned Title VI Program Area, and incorporating Title VI-related language and provisions into agency documents, as appropriate. Staff responsible for CAMPO and JEFFTRAN’s public involvement is responsible for compliance with Title VI requirements in all aspects of the public involvement process. These staff members will: • Ensure that all communications and public involvement efforts comply with Title VI. • Develop and distribute information on Title VI, CAMPO, and JEFFTRAN programs to the general public. • Provide information in languages other than English, as needed. • Disseminate information to media, post on social media, and disseminate information to minority/ethnic/gender related organizations in order to ensure social, economic, and ethnic interest groups are represented in the planning process. The following two sections provide an overview of each agency. JEFFTRAN OVERVIEW JEFFTRAN (also known as the Transit Division) is a direct operator of fixed route and demand response public transportation service in Jefferson City, Missouri, and is a direct recipient of Federal Transit Administration funds and does not have any sub-recipients. JEFFTRAN currently has twelve fixed route buses and ten paratransit buses. Nine buses operate in peak service on the fixed routes and eight do so for paratransit bus service. JEFFTRAN is organized as a division in the Department of Public Works within the City of Jefferson, a municipal corporation. JEFFTRAN’s Director reports to the Director of Public Works. The Director of Public Works reports to the City Administrator, who in turn, reports to the Mayor and City Council of the City of Jefferson, Missouri. City of Jefferson Title VI Program 2023 – Agency Information 13 FIGURE 5 – JEFFTRAN ROUTES FIGURE 5 - MEMBERSHIP OF JEFFTRAN RELATED COMMITTEES AND COUNCILS BY RACE Committee African American Asian American Caucasian Latino Total Public Transit Advisory Committee 1 0 6 0 7 Public Works & Planning Committee 0 0 5 0 5 City Council and Mayor 11 11 City of Jefferson Title VI Program 2023 – Agency Information 14 JEFFTRAN SERVICE STANDARDS VEHICLE LOAD STANDARDS The average of all loads during the peak operating period should not exceed vehicles’ achievable capacities, which are 30 passengers for a 25-foot mini-bus, 48 passengers for low-floor 29-foot buses and 55 passengers for low- floor 35-foot buses. VEHICLE HEADWAY STANDARDS Service operates on regular route schedule on weekdays with 40 minute or better service intervals which should begin no later than 6:40 a.m. and continue until 6:00 p.m. Scheduling involves the consideration of a number of factors including: ridership productivity, transit/pedestrian friendly streets, density of transit-dependent population and activities, land use connectivity, and transportation demand management. ON-TIME PERFORMANCE STANDARDS On average, ninety (90) percent of the JEFFTRAN’s transit vehicles will complete their established runs no more than 5 minutes early or 10 minutes late in comparison to the established schedule/published timetables. SERVICE AVAILABILITY STANDARDS JEFFTRAN distributes transit service so that 81.5% of all residents in the service area are within a ¼ mile of the bus route. SERVICE POLICIES VEHICLE ASSIGNMENT POLICY All fixed route vehicles are low-floor, ramp equipped, with air conditioning. Buses feature AVL and AVA services with an average age of 11 years. Bus assignments take into account the operating characteristics of buses of various lengths, which are matched to the operating characteristics of the route. Local routes with lower ridership may be assigned 29-foot buses rather than the 35-foot buses. Some routes requiring tight turns on narrow streets are operated with 29-foot rather than 35-foot buses. Transportation vehicles assigned to routes will not be determined on the basis of race, color or national origin. TRANSIT AMENITIES POLICY Installation of transit amenities along bus routes are based on the number of passenger boardings/alightings at stops along those routes. City of Jefferson Title VI Program 2023 – Agency Information 15 CAMPO OVERVIEW The Capital Area Metropolitan Planning Organizations (CAMPO) is the designated metropolitan planning organization for the Jefferson City, Missouri Urbanized Area whose purpose is to carry out a continuing, cooperative, and comprehensive long-range transportation planning process. CAMPO, formally established in March of 2003, has an estimated population of 74,000, according to the 2020 US Decennial Census. The CAMPO planning area includes the jurisdictions of Holts Summit, Jefferson City, St. Martins, Taos, Wardsville, and portions of unincorporated, non-urbanized Cole and Callaway Counties. The CAMPO boundary, based on US Census data, was created by the CAMPO Board of Directors and approved by the Governor. The most recent boundary was approved in 2013. Figure 1 provides a map of the CAMPO Planning Area. Figure 6 - CAMPO Planning Area City of Jefferson Title VI Program 2023 – Agency Information 16 The core functions of CAMPO include the following: • To establish and manage a fair and impartial setting for effective regional decision making in the metropolitan planning area. • Evaluate transportation alternatives, scaled to the size and complexity of the region, to the nature of its transportation issues, and to the realistically available options. • Develop and update a Metropolitan Transportation Plan for the planning area covering a planning horizon of at least 20 years that fosters (1) mobility and access for people and goods, (2) efficient system performance and preservation, and (3) quality of life. • Develop a Transportation Improvement Program based on the Metropolitan Transportation Plan and designed to serve the area’s goals, using spending, regulating, operating, management, and financial tools. • Involve the general public and all the significantly affected sub-groups in the four essential functions listed above. CAMPO is comprised of a Board of Directors and a Technical Committee consisting of representatives from jurisdictions within the planning area, Federal and State transportation agencies, and economic development representatives. A full list of current members of the Board of Directors and Technical Committee can be found in Appendix C document. A memorandum of understanding between members identifies the City of Jefferson as the administrator of CAMPO, and as such, provides staffing for CAMPO. The City of Jefferson provides staff consisting of two full time transportation planners, who are housed within the Planning Division within the Department of Planning and Protective Services. The Director of Planning and Protective Services stands as the CAMPO Administrator. CAMPO BOARD OF DIRECTORS MEMBERSHIP CAMPO is governed by a Board of Directors and Technical Committee consisting of representatives from jurisdictions within the planning area, Federal and State transportation agencies, and economic development representatives, with some serving as ex-officio (non-voting) members. Membership is not selected by CAMPO staff. Local jurisdictions and participating agencies make their own selections for representation. CAMPO membership has previously included minority members, but as of February 2020 there are no self-identified minority representatives on either body. CAMPO actively encourages the participation of minorities on such committees, but has no control over a jurisdiction’s selection of representation. The Board of Directors is responsible for providing official action on federally required plans, documents, and programs. The Board is also responsible for changes in the bylaws and changes to the MPO boundary. The Technical Committee consists of representatives from a member jurisdiction’s professional staff and acts in an advisory capacity. There are 17 voting members of the CAMPO Technical Committee. City of Jefferson Title VI Program 2023 – Agency Information 17 The CAMPO Board of Directors is responsible for appointing two voting members to the Technical Committee; one is the private/freight transportation interest representative and the other a pedestrian or biking interest representative. FIGURE 8 - MEMBERSHIP OF CAMPO COMMITTEE/BOARD BY RACE Committee Caucasian Latino African American Asian American Total CAMPO Technical Committee 17 0 0 0 17 CAMPO Board of Directors 13 0 0 0 13 City of Jefferson Title VI Program 2023 – Agency Information 18 DEMOGRAPHIC PROFILE OF THE METROPOLITAN PLANNING AREA Table 1 shows the populations for municipalities and unincorporated areas within the CAMPO planning area and Adjusted Urbanized Area (2013). It should be noted that following the 2020 US Decennial Census, new “Urban Area” criteria was approved in March 2022. Urban Area geographies and calculations are scheduled to be available in May 2023. A NOTE ON U.S. CENSUS DATA. While Figure 9 and Figure 10 were derived from 2020 U.S. Decennial Census data, which is the most accurate data based on jurisdiction, the following maps use data from the 2020 Decennial Census and the 2016-2020 5- Year American Community Survey (ACS). ACS 1-, 3-, and 5-year estimates are period estimates, meaning they represent the characteristics of the population and housing over a specific data collection period. Data sets are combined to produce 12 months, 36 months or 60 months of data (referred to as 1-year, 3-year and 5-year data.) The population of a city or county determines whether the ACS will collect data for a 1-, 3-, or 5-year estimate. Most of the CAMPO region falls into the 5-year estimate category. Figure 9 - CAMPO Population by Jurisdiction Metropolitan Planning Area Population Adjusted Urban Area Population* Persons Percent Persons Percent Unincorporated Callaway County 3,153 4.26% 1,051 1.73% Unincorporated Cole County 19,234 25.99% 10,911 17.93% Holts Summit 4,458 6.02% 4,458 7.32% Jefferson City 43,228 58.41% 43,228 71.03% St. Martins 1,191 1.61% 1,191 1.96% Taos 1,150 1.55% 0 0% Wardsville 1,599 2.16% 0 0% Totals 74,013 100% 60,861 100% Source: U.S. Census Bureau - 2020 Decennial Census * The Adjusted Urban Area, otherwise known as the Adjusted Census Urban Boundary (ACUB) is an area that determines the official urban designation for a road. The ACUB is subject to Federal Highway Administration (FHWA) approval. The CAMPO ACUB was approved in 2013. Following the 2020 US Decennial Census, new “Urban Area” criteria was approved in March 2022. Urban Area geographies and calculations are scheduled to be available in May 2023. Figure 10 – CAMPO Racial/Hispanic Makeup by Jurisdiction Total One Race Two or More Races Hispanic White Black or African American American Indian and Alaska Native Asian Native Hawaiian and Other Pacific Islander Some Other Callaway Co. 44,283 38,771 1,974 157 226 30 403 2,722 965 Cole Co. 77,279 62,241 8,123 257 975 70 1,013 4,600 2,661 Holts Summit 4,458 3,816 214 12 25 10 63 318 162 Jefferson City 43,228 32,130 6,841 131 786 43 566 2,731 1,554 St. Martins 1,191 1,088 25 3 7 3 8 57 27 Taos 1,150 1,084 3 1 2 0 2 58 35 Wardsville 1,599 1,503 15 2 4 1 6 68 20 CAMPO MPA* 74,013 58,663 8,339 258 1,006 67 1,048 4,629 2,741 Source: U.S. Census Bureau - 2020 Decennial Census * The CAMPO MPA population was calculated using block level redistricting data. City of Jefferson Title VI Program 2023 – Agency Information 19 MINORITY POPULATIONS For purposes of Title VI and Environmental Justice, who is considered to be a “Minority”? The updated DOT and FHWA environmental justice orders define five minority groups as follows: • Black (a person having origins in any of the black racial groups of Africa); • Hispanic or Latino (a person of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish culture or origin, regardless of race); • Asian American (a person having origins in any of the original peoples of the Far East, Southeast Asia, the Indian subcontinent); • American Indian and Alaskan Native (a person having origins in any of the original people of North America, South America, including Central America, and who maintains cultural identification through tribal affiliation or community recognition); and • Native Hawaiian or Other Pacific Islander (people having origins in any of the original peoples of Hawaii, Guam, Samoa, or other Pacific Islands). Figure 11 shows the distribution of minority population within the CAMPO planning area. The core of Jefferson City has the highest density of minorities. Figure 11 – Percent of Minority Populations by Census Block Group City of Jefferson Title VI Program 2023 – Agency Information 20 LOW-INCOME (POVERTY) POPULATIONS Low-income or poverty is determined by the federal poverty guidelines and are represented by individuals living below 185% of the poverty line, which are generated annually based on family size and composition. Figure 12 depicts the percent of low-income populations within the CAMPO planning area. The inner core of Jefferson City has block groups with higher percentages, 21% to 31%, of persons living below the poverty line than in the outlying area. Figure 12 - Percent of Low-Income (Poverty) Populations by Census Tract City of Jefferson Title VI Program 2023 – Agency Information 21 ELDERLY POPULATIONS Figure 13 shows the distribution of the elderly population within the CAMPO planning area. The Jefferson City inner core has significantly fewer elderly individuals than in the surrounding area. The western portion of the planning area and much of the surrounding rural area has higher percentages of elderly individuals. Figure 13 – Percent of Elderly (65 Years and Older) Population by Census Block Group City of Jefferson Title VI Program 2023 – Agency Information 22 IDENTIFICATIONS OF MOBILITY NEEDS OF MINORITY POPULATIONS CAMPO strives to include all people, including protected classes, in planning activities. During the development of all planning documents, CAMPO seeks out and considers the needs of those traditionally underserved, including minority households. Racial and Hispanic/Latino minorities make up approximately 9.9% of the CAMPO population, with the majority located in the core of the Jefferson City in close proximity to City Hall, where the majority of the CAMPO public meetings and events are held. CAMPO maintains a list of interested parties, which includes minority representatives, who are included in outreach and engagement activities. Meetings are also held at a times and places served by public transportation. The Board of Directors includes many elected officials which represent minority constituents. Currently, CAMPO has no minority representation on the Board of Directors or Technical Committee. Board and Committee members are chosen by their respective jurisdictions. DISPARATE IMPACT ANALYSIS Most federally funded transportation projects occur in the core area of the CAMPO region. Projects may not have well defined locations and may extend into and out of the MPO boundary. Specifically, projects along US highways 50, 54, and 63 do include large scale improvement or maintenance projects that extend across a county. Based on the maps in the previous section, there is an obvious correlation between the location of the majority of protected classes located in MPO and majority of transportation system investment being spent. It can concluded that there are no disparate impacts as a result of MPO decisions in transportation investments. CAMPO only has decision making authority on the annual allocation of approximately $180,000 in Consolidated Planning Grant funds (CPG). This allocation was increased in FY 2022 from the previous annual allocation and $163,000. These funds can only be used for planning activities, not capital projects. Annually, approximately 96% of CPG funds are spent on salaries and minor administrative direct costs. How funds are spent is determined by the CAMPO Board of Directors, and ultimately approved by FHWA, FTA, and MoDOT via the annual Unified Planning Work Program. Unspent CPG funds are allowed to roll-over build up allowing for their use on larger consultant led planning projects or documents. Between 2019 and 2022 two such projects were undertaken using CPG funds : • JEFFTRAN Transit Facility Feasibility Study - $50,000 • Capital Area Active Transportation Plan - $130,000 The JEFFTRAN project was focused on the inner core of Jefferson City and CAMPO, with direct implications for the protected classes. The Capital Area Active Transportation Plan is a region-wide plan with a broad focus on access, safety, and mobility for all users. Previous funding sources, such as sub-allocated Small Urban Surface Transportation Block Grant Program (STBG) funds were historically used for capital projects. As of July 1, 2016, the Missouri Highway and Transportation Commission ceased providing these funds to MPOs with populations under 200,000. However, unobligated balances were spent down through FY 2019. This information was documented in the previous iteration of the CAMPO Title VI Program in 2020. City of Jefferson Title VI Program 2023 – JEFFTRAN Public Participation Plan 23 JEFFTRAN PUBLIC PARTICIPATION PLAN JEFFTRAN and the City of Jefferson follow a public involvement process that addresses the following issues: participation, access to meetings, access to information, notice of hearings, public hearings, public comments. It is the intent of the City Council of the City of Jefferson, Missouri, to encourage the receipt of public comments as part of the decision-making process. This plan recognizes that as the elected governing body of City of Jefferson, the City Council has the ultimate responsibility and authority for adoption and implementation of policies affecting JEFFTRAN. GOAL The goal of the Public Engagement Plan is to have significant and ongoing public involvement, by all identified audiences, in the public participation process for major agency outreach efforts. Objectives • To understand the service area demographics and determine what non-English languages and other cultural barriers exist to public participation. • To provide general notification of meetings and forums for public input, in a manner that is understandable to all populations in the area. • To hold public meetings in locations that are accessible to all area stakeholders, including but not limited to minority and low-income members of the community. • To provide methods for two-way communication and information and input from populations which are less likely to attend meetings. • To convey the information in various formats to reach all key stakeholder groups. IDENTIFICATION OF STAKEHOLDERS Stakeholders are those who are either directly or indirectly affected by an outreach effort, system or service plan, or recommendations of that plan. Stakeholders include but are not limited to the following: • Jefferson City Residents/Citizens • Minority and low-income populations • Persons with Limited English Proficiency • Elderly, disabled, and persons with limited mobility • Residents of public and assisted housing developments • Agencies serving persons with transportation needs • Community organizations with an interest in public transportation • Major Employers and Businesses whose customers ride JEFFTRAN • Local government stakeholders • Public Transit Advisory Committee City of Jefferson Title VI Program 2023 – JEFFTRAN Public Participation Plan 24 • Public Works and Planning Committee • Jefferson City Council • JEFFTRAN riders and clients • Partner agencies All citizens, including stakeholders named above, are encouraged to participate. Meetings are open to the public and are scheduled at times and locations convenient to transit riders with accommodations for persons with disabilities and assistance for persons with Limited English Proficiency available as needed. • Bi-monthly Transit Advisory Committee meetings hosted by JEFFTRAN staff. All transit patrons and others interested in transit are invited to attend. Meetings dates/time are posted on the Transit website and Facebook page. • Annual Program of Projects (part of the Transportation Improvement Program or TIP) published through the Capital Area Metropolitan Planning Organization (CAMPO). Transit patrons may also remain engaged and informed in the following ways: • Automatic Vehicle Location Application: Since 2013, an application has been available so that patrons may track the locations of their buses via cell phone. • Press Releases: Press releases are sent to local news media when coverage of specific events or decisions is warranted. • Opportunities for public comment: The City of Jefferson routinely offers several ways for people to comment on activities, programs and decisions made. Comments are accepted via an online comment form, by phone, fax, email and in person at City Council meetings or at Transit Advisory Committee meetings. • Formal public comment periods/hearings: Formal public comment periods are used to solicit comments on major service reductions and fare increases. • Staff: Staff is accessible in person, or phone, email, mail, fax, or by online comment forms. Contact information is provided on the JEFFTRAN webpage and Facebook page. • Website: The City’s homepage and JEFFTRAN websites includes “Announcements” that are updated regularly. The JEFFTRAN webpage includes information on programs, publications, press releases, contact information for staff, a search function, Plans, including the Title VI Plan and complaint procedures. • Social Media: JEFFTRAN has a presence on both Facebook, and actively posts information which is relevant to transit and transit patrons. TARGETED PUBLIC PARTICIPATION PLAN FOR MINORITY, LOW-INCOME AND LEP POPULATIONS Minority, low-income and LEP persons are made aware of JEFFTRAN activities and events that have an impact on JEFFTRAN services through notification of agencies serving these persons, and by making announcements available in a variety of formats, including print, broadcast media, social media and internet announcements. Activities and meetings are held in accessible buildings located on JEFFTRAN bus routes. Times of open houses or meetings are scheduled to span late afternoon and early evening hours. Comments are also taken by mail, email, fax, telephone, and in person. JEFFTRAN seeks input from community leaders and organizations. To facilitate involvement of traditionally underserved populations, community leaders and organizations that represent these groups are consulted about how to most effectively reach their members. Relationships with these groups are maintained for future partnerships in the planning process. Provide services for the disabled: Upon advance notice, deaf interpreters, translators and Braille documents can be provided for public meetings. Notifications of opportunities for public involvement will include contact City of Jefferson Title VI Program 2023 – JEFFTRAN Public Participation Plan 25 information for people needed these or other special accommodations. Requests must be made at least three (3) business days in advance. Sensitivity to diverse audiences: At public meetings, staff will endeavor to communicate effectively, and avoid technical jargon. Staff will dress and conduct themselves appropriately. JEFFTRAN PUBLIC COMMENT PROCEDURES It is necessary to establish a public participation plan that includes an outreach plan to engage minority and limited English proficient (LEP) populations. TRANSIT NOTICE POSTING AND PUBLISHING • Printed notices are posted in English and Spanish at the following locations: o In all buses o Major bus shelters – this includes the transfer bus shelter and other high ridership bus shelters. Posting in all shelters is dependent upon available staff. o Housing Authority’s Housing Office at 1020 Myrtle Street, Lower Level o Dulle-Hamilton Towers at 10 Jackson Street and 12 Jackson Street o Veteran’s Administration Clinic o Missouri River Regional Library • Transit notices are also provided by mail or email to: o Division of Family Services o Central Missouri Community Action Agency (CMCA) o Samaritan Center o El Puente o Schools ( public, private, and special learning centers) o Local chapter of the NAACP o Capitol Projects o Central Connections, Inc. o Compass Health o Day Solutions o Jefferson City Housing Authority o Dulle/Hamilton Towers o Salvation Army o Cole County Health Department o Jefferson City VA Clinic o Missouri River Regional Library o RACs o Wipro o Department of Social Services - Broadway State Office Building o Landmark Recovery Center o New Horizons o Cole County Residential Services o Community Health Center City of Jefferson Title VI Program 2023 – JEFFTRAN Public Participation Plan 26 • Media notices. JEFFTRAN shall notify the general public of Transit-related issues and events through notification of print and broadcast media, through established methods, including a media email group, which includes the News Tribune newspaper, KWOS radio, KBIA radio, KRCG-TV, KMIZ-TV, KOMU-TV, the City of Jefferson website, JEFFTRAN website and the JEFFTRAN Facebook page. Annual Program of Projects (POP) As a provider of transit services and recipient of FTA Section 5307 funds, JEFFTRAN complies with the public participation requirements of Section 5307(c)(1) through 5307(c)(7). Each grantee is required to develop, publish, afford an opportunity for a public hearing on, and submit for approval a Program of Projects (POP). JEFFTRAN coordinates with the Capital Area Metropolitan Planning Organization (CAMPO) to satisfy the POP public hearing requirements. When the CAMPO develops a Transportation Improvement Program (TIP) publication of the POP is included, and the Program of Projects is developed concurrently with the TIP. A minimum 25-day public comment period is open prior to the final adoption of the POP and TIP. CAMPO City of Jefferson - Department of Planning and Protective Services 320 E. McCarty Street Jefferson City, MO 65101 Phone: 573-634-6410 campo@jeffersoncitymo.gov Procedure for Involving the Public When Contemplating Major Transit Service Changes A. Major service changes, including fare increases and major transit service reductions, as defined below are subject to public hearings before the City Council. Major Transit Service Reductions also require the preparation of “A Level and Quality of Service Analysis.” The Level and Quality of Service Analysis shall be provided to the City Council prior to the Council’s public hearing. B. Public Meeting/Hearing Notices and Corresponding Public Comment Period Requirements. (1) Required Notices. (a) Public Meeting Notices (that are not public hearings) shall be published in the News Tribune advertising the subject, date, time, and place of the public meeting. The notice shall include instructions on how to direct written comments prior to the meeting date. The notice shall be published at least 15 calendar days in advance of the public meeting. (b) Public Hearing Notices shall be published in the public notice section the News Tribune advertising the subject, date, time, and place of the City Council’s public hearing. The notice shall include instructions on how to direct written comments prior to the hearing date. The notice shall be published at least 15 calendar days in advance of the public hearing. City of Jefferson Title VI Program 2023 – JEFFTRAN Public Participation Plan 27 (c) Notice of the public hearing shall be forwarded to the City Clerk for posting concurrently with publication of the legal notices. (d) Printed notices shall be posted at the locations and in the manner provided for in Section IV, above. (e) Public Comment Periods may vary based on the subject being undertaken by JEFFTRAN. Public comment shall be accepted at regular Public Transit Advisory Committee meetings or Public Works and Planning Committee meetings prior to City Council meetings and/or hearings. (f) Other notices. Other notices may be provided to individuals and groups. PUBLIC COMMENT a. Formal public comment periods are used to solicit comments on major public involvement efforts around an agency service or system change. b. Comments are accepted through various means: i. Dedicated email address. ii. Website. iii. Regular mail. iv. Forms using survey tool for compilation. v. Videotaping. vi. Phone calls to Customer Service Center [phone] RESPONSE TO PUBLIC INPUT A. All public comments are provided to the Board of Directors prior to decision making. A publicly available summary report is compiled, including all individual comments. a. Public Hearing. The Council shall hold at least one public hearing at a Council meeting. The public hearing shall be held at City Hall, 320 E. McCarty Street, Jefferson City, MO 65101 or as specified within public hearing notice(s). Public hearings shall be conducted according to the Council’s Rules of Procedures, and shall include receipt of public comments. b. Other Outreach activities may include the following: i. Open house events ii. Rider forums/outreach events iii. Focus groups iv. Surveys c. Public input derived from these activities will be provided to the City Council and duly considered in the decision-making process. d. All public events such as public meetings and/or open houses shall be held at accessible locations such as City Hall, schools, churches, libraries and other non-profit locations easily accessible to public transit and compliant with the Americans with Disabilities Act. B. Major Transit Service Reductions. Major Transit Service Reductions require the preparation of “A Level and Quality of Service Analysis” that contains the elements outlined in Paragraph E. City of Jefferson Title VI Program 2023 – JEFFTRAN Public Participation Plan 28 C. The Level and Quality of Service Analysis shall be provided to the City Council prior to the public hearing on the matter. Major Transit Service Reduction includes the following: a. Elimination or reduction in service that affects 5 or more passengers; b. Elimination of routes or system wide route restructuring; c. Any aggregate reduction of 25 percent or more of the number of transit REVENUE MILES of a route computed on a daily basis for the day of the week for which the change is proposed; d. Level of service changes which may result in a disproportionately high and adverse impact to minority communities as referenced in FTA Circular 4702.1, even though they do not meet the threshold for a major service reduction. Such changes are subject to a Level of Service Review as described in Paragraph E. e. EXCEPTIONS. The following service variations do not constitute major service reductions and may be implemented without public hearings. Every effort will be made to provide as much advance notice as possible to transit patrons through the news media, and notice procedures described in Section IV. f. Standard seasonal variations, including implementation of pre-established snow routes; g. Emergency service changes, including changes in routes or service frequencies necessitated by street closures, the ability of transit vehicles to travel on public streets or a disaster which severely impairs public health or safety. D. Fare Increases. The following fares and amendments are subject to public hearing: a. Any increase in charges or fees assessed to transit riders for use of public transit services including cash fares, ticket fares, pass fares and transfer fares; b. Amendments to eligibility for fare categories; except that reduced fares or promotional fare adjustments shall not be subject to public hearings. "Promotional fares" shall include modifications to fare structures which are established on a short-term basis for the specific purpose of promoting service and encouraging ridership. E. Level and Quality of Service Change Analysis. A Level and Quality of Service Analysis shall be provided for the Major Service Reductions listed above. a. The service to minority communities shall be evaluated in terms of overall system standards to determine if a proposed change would result in disproportionately high and adverse impacts to minority communities. b. This analysis shall include the identification of minority census tracts for purposes of comparing outcomes in those areas to transit service provided in other areas of the City. Not all service changes will result in adverse impacts, however. For example, eliminating a route that runs every 30 minutes from a street that already has service every 30 minutes and otherwise meets the system standards would not warrant further analysis. c. Evaluation criteria. The Level and Quality of Service Analysis shall utilize the following evaluation criteria. For purposes of comparison the three most traveled routes and destinations shall constitute the standard by which the proposed changes are to be evaluated. The evaluation should identify and compare any changes in the following criteria within the standard routes and the affected minority neighborhoods: i. Number of riders affected ii. Travel time iii. Number of transfers City of Jefferson Title VI Program 2023 – JEFFTRAN Public Participation Plan 29 iv. Service frequency v. Span of service vi. Walk distance to bus route vii. Average peak hour travel time to destination viii. Total cost of trip to destination d. Mitigation of Impacts. Service changes that would result in adverse or disproportionate impacts on minority communities shall be reported in the Analysis. This report shall provide a description of the mitigations, options and alternatives to be considered in conjunction with the proposed service change, such as: i. Alternatives to the service proposal that would have fewer negative impacts and the rationale for not selecting them; ii. Transit options that would be available for riders who would be negatively affected; and iii. Measures to avoid, minimize or mitigate the negative impacts of the proposed service change in the affected area. ACCESS TO RECORDS The City of Jefferson shall provide citizens, public agencies, and other interested parties with reasonable and timely access to information and records relating to JEFFTRAN and the City’s use of FTA funding. Copies of the adopted budget and Consolidated Annual Financial Reports that include information on JEFFTRAN are maintained by the Finance Department and available for public inspection Monday through Friday, 8:30 a.m. – 4:30 p.m. or on the City’s webpage at http://www.jeffersoncitymo.gov/government/finance.php. TITLE VI OUTREACH BEST PRACTICES City of Jefferson ensures all outreach strategies, communications and public involvement efforts concerning JEFFTRAN comply with Title VI. The JEFFTRAN Public Engagement Plan proactively initiates the public involvement process and makes concerted efforts to involve members of all social, economic, and ethnic groups in the public involvement process. Aligned with the above referenced communication tactics, the City of Jefferson provides the following: a. Public notices published in non-English publications (if available). b. Title VI non-discrimination notice on agency’s website. c. Agency communication materials in languages other than English (subject to Safe Harbor parameters). d. Services for Limited English Proficient persons. Upon advance notice, translators may be provided. City of Jefferson Title VI Program 2023 – JEFFTRAN Public Participation Plan 30 2023 – 2026 TITLE VI PROGRAM PUBLIC ENGAGEMENT PROCESS This process includes Community Meetings to seek input, provide education, and highlight key components of the Title VI Plan. Materials have been created to explain Title VI policies as well as provide education on how they relate to minority populations. JEFFTRAN staff provides briefings to the Public Transit Advisory Committee, Public Works and Planning Committee, and City Council as necessary. JEFFTRAN provides a 45-day public comment period to provide opportunities for feedback on the 2023-2026 Title VI Program. SUMMARY OF 2019-2023 PUBLIC OUTREACH EFFORTS PROPOSED FARE INCREASE PUBLIC ENGAGEMENT 2022-2023 In late 2022 a increase in JEFFTRAN Fares was proposed to City Council. The increase in fares was approved by City Council in January 2023. This process included the following: • Public Survey • Two Public Meetings • Newspaper, Email, and Social Media Advertisements announcing meetings, surveys, and public hearing • Meeting announcements advertised on busses and bus stops. • Review and recommendations by transit sub-committees: o Public Transit Advisory Committee (two public meetings) o Public Works and Planning Committee (multiple public meetings) • City of Jefferson City Council (two public meetings) o Public Hearing City of Jefferson Title VI Program 2023 – JEFFTRAN Public Participation Plan 31 EXAMPLE PUBLIC NOTICES City of Jefferson Title VI Program 2023 – JEFFTRAN Public Participation Plan 32 City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 33 Accessibility Communication EngagementOutreach Coordination CAMPO PUBLIC PARTICIPATION PLAN The CAMPO Public Participation Plan (PPP) defines the process for providing the entities listed below with reasonable opportunities to be involved in the metropolitan transportation planning process. • Individuals • Affected public agencies • Representatives of public transportation employees • Public ports • Freight shippers • Providers of freight transportation services • Private providers of transportation (including intercity bus operators, employer-based commuting programs, such as carpool program, vanpool program, transit benefit program, parking cash-out program, shuttle program, or telework program) • Representatives of users of public transportation • Representatives of users of pedestrian walkways and bicycle transportation facilities • Representatives of the disabled • Other interested parties CAMPO’s goal is to foster genuine, inclusive, responsive, and transparent communication between the MPO and the residents, transportation users, and stakeholders in the planning area. The Public Participation Plan includes the following policy objectives as they relate to meeting this goal. 1. Public Notice & Accessibility 2. Effective Communication & Visualization 3. Outreach & Engagement 4. Coordination Meaningful public participation is important so that the concerns of a diverse community of stakeholders and general public can be represented in the transportation planning process. The Capital Area Metropolitan Public Participation City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 34 Planning Organization (CAMPO) is committed to proactively involving the public in identifying and addressing transportation issues. This plan is intended to ensure that public participation is an integral and effective part of CAMPO activities and that decisions are made with the benefit and consideration of a wide range of public perspectives. Regular public participation enables CAMPO to make informed decisions, improve quality through collaborative efforts, and build mutual understanding and trust between with the public it serves. DESIRED OUTCOMES Through the implementation of specific participation policies CAMPO hopes to reach the following desired outcomes: • Adequate and timely public notice. • Use of a range of visualization techniques to describe all planning products. • Public information is made available in accessible formats. • Public meetings are held at convenient and accessible locations and times. • Explicit consideration and response to public input received on all planning products. • Proactive consideration of the needs of those traditionally underserved by existing transportation. systems, such as low-income and minority households. • Coordination with the statewide and regional transportation planning public involvement and planning processes. • Periodic review of procedures and strategies to ensure a full and open participation process. EVALUATION OF EFFECTIVENESS As required by statute (23 CFR 450.316) CAMPO periodically reviews “the effectiveness of the procedures and strategies contained in the participation plan to ensure a full and open process.” CAMPO is constantly evaluating the effectiveness of our public participation policies and methods. Since 2015, at least ten planning documents have been updated or developed. Each time a planning document is updated or developed the required policies outlined in the PPP are followed and re-evaluated. Since the last iteration of the PPP, CAMPO has utilized social media more and works more closely with local stakeholders to encourage public input. After each planning process ends CAMPO staff reviews the public input received and holds regular discussion both internally and with Board of Directors and Technical Committee members about how the process can be improved. Public engagement during the development of the 2016 Pedestrian and Bicycle Plan and the 2017 JEFFTRAN Operations Analysis saw marked increases in survey responses and attendance at public meetings. Because of these successes, planning staff worked to use similar techniques to increase participation in the development of the Metropolitan Transportation Plan in 2018 and 2019. City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 35 SURVEY RESULTS As part of the update process three survey processes were used. The feedback received from these surveys was used in the update of the PPP. 2023 BOARD OF DIRECTORS AND TECHNICAL COMMITTEE SURVEY As part of an annual process to measure staff performance a six-question survey was sent to members of the Board of Directors and Technical Committee to gather input on how CAMPO staff can improve internal processes. Eighteen responses were received. Survey results highlighted a need for CAMPO staff to increase engagement at local events and festivals, provide more presentations to stakeholder groups, and utilize social media more. The questions and results are as follows: 1. Which MPO-related body are you a member of? Board of Directors 66.67% 12 Technical Committee 33.33% 6 2. How would you rate your satisfaction with staff's facilitation of CAMPO planning processes? Excellent 72.22% 13 Very Good 27.78% 5 Good 0.0% 0 Fair 0.0% 0 Poor 0.0% 0 3. How would you rate CAMPO staff assistance with decision-making processes? Excellent 72.22% 13 Very Good 27.78% 5 Good 0.0% 0 Fair 0.0% 0 Poor 0.0% 0 4. The CAMPO Public Participation Plan outlines how CAMPO will engage with the public and stakeholders. Staff are currently updating the plan. In what areas can CAMPO improve outreach and engagement? Quantity of public meetings 0.0% 0 Quality of public meetings 0.0% 0 Presentations to interested groups 16.67% 3 Social Media outreach 16.67% 3 Better website content 5.56% 1 Location of public meetings 0.0% 0 Engagement as part of local events/festivals 22.22% 4 No improvement needed 66.67% 12 City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 36 5. What other suggestions do you have for how CAMPO members and/or staff can better engage with the public? (9 People skipped this question) Jan 20 2023 11:53 AM I think they do a great job. Jan 19 2023 12:11 PM None Jan 19 2023 10:47 AM It is often hard to capture the attention of the public when they do not understand or see the end results or ramifications of the planning effort. Jan 19 2023 09:42 AM Not sure at this time Dec 21 2022 12:34 PM It is hard to get community feedback on planning related items. A good option would be to go to the civic group meetings like Lions Club, Optimist Club, etc. Dec 20 2022 02:04 PM keep meetings short and concise Dec 20 2022 07:48 AM None at this time. Dec 20 2022 05:56 AM Katrina does a great job. My only suggestion is that she could use more help. Dec 16 2022 09:44 AM Nothing at this time 6. Do you have any suggestions for performance improvement of CAMPO staff or the CAMPO planning process? Jan 20 2023 11:53 AM None at this time. Keep up the good work. Jan 19 2023 12:11 PM No Jan 19 2023 10:47 AM It takes many hours of time to gain the attention of the public and explain why they should in interested in these planning efforts. It would be good to have additional staff so that this could be possible. Jan 19 2023 09:42 AM No Jan 19 2023 09:39 AM I have only been a part of the process for a few months. The staff seems to do their jobs well and the process seems good. Dec 21 2022 12:34 PM No. CAMPO staff does a good job and is great to work with. Dec 20 2022 07:48 AM None at this time. Dec 20 2022 05:56 AM Great job. Dec 16 2022 09:44 AM No, they seem to being a very good job. 2019 PUBLIC PARTICIPATION SURVEY RESULTS As part of the 2020 Title VI Program update process, a six-question public survey was disseminated to the general public to gather input on how CAMPO can improve outreach and engagement in the region. The survey was sent out via email, Facebook post, and via the CAMPO webpage. Thirty-three responses were received. The survey was helpful in providing CAMPO with information on where respondents live and work, how they would like to receive information, and how engagement can be improved. This survey also highlighted a need to increase in-person engagement and presentations. 2022 CITY OF JEFFERSON CITIZEN PARTICIPATION PLAN A public survey was not released in 2023 due to multiple surveys about other planning processes being released by the City of Jefferson and CAMPO during the development of the 2023 Title VI Program. The City of Jefferson Neighborhood Services Division updated the City of Jefferson Citizen Participation Plan in 2022. The City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 37 Citizen Participation Plan provides a guide for public input and participation in identifying housing, community development and public service needs, and the funding priorities for programs and target populations to be served through resources for the City of Jefferson. The City of Jefferson’s Neighborhood Services Division is responsible for developing and implementing a citizen participation plan with the other plans and reports required by HUD. The purpose of this Citizen Participation Plan is to encourage citizen participation in the decision-making process with particular emphasis on the participation of low-to-moderate income persons for whom CDBG funds are proposed to be used. City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 38 PARTICIPATION POLICIES The policies outlined in this section are strategies that CAMPO staff, Technical Committee, and Board of Directors will undertake in meeting the goal of “genuine, inclusive, responsive, and transparent” public engagement. PUBLIC NOTICE & ACCESSIBILITY In addition to the listed policies, Tables 1 and 2 on the following pages provides more detail on protocol and procedures. Policy 1.1 – Notices and/or agendas for all regularly scheduled meetings, public comment periods, other public meetings, other major planning activities, and notification of publications available for public access shall be posted at the following locations: • City of Jefferson City Hall • CAMPO webpage: www.jeffersoncitymo.gov/campo Policy 1.2 - The following entities shall be notified via email and/or form letter of the above listed meetings, comment periods, major planning activities, and publication availability: • CAMPO Technical Committee Members • CAMPO Board of Directors Members • Interested Parties Email List • Local Media Email List • City Clerk, City of Jefferson • County Clerk, Cole County • City Clerk, Holts Summit • City Clerk, St. Martins • County Clerk, Callaway County • City Clerk, Taos • Village Clerk, Wardsville • Missouri River Regional Library • OATS, Inc. Policy 1.3 – Meeting agendas shall be made publicly available at least five days before the scheduled meeting. Policy 1.4 - Notices of major planning activities and/or comment periods should be promoted via social media. Policy 1.5 – Notices for the development of planning documents or changes to the documents will contain: • Notice that documents are being developed or amended, and how they may be accessed; • the duration of the public comment period; • instructions for submitting comments; and • the date, time, and location of public meetings. Policy 1.6 – A legal notice regarding public comment periods related to the updates to the Metropolitan Transportation Plan, Transportation Improvement Program, Program of Projects, Title VI Program, and Public Participation Plan shall be published in the Jefferson City News Tribune. Policy 1.7 - CAMPO shall adhere to the requirements of the Missouri Sunshine Law and provide a minimum of 24-hour notice before the meeting. City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 39 Policy 1.8 - The Metropolitan Transportation Plan, Transportation Improvement Program, and all other plans will incorporate charts, graphs, photographs, maps, and any other tool or resource necessary to communicate with the public and stakeholders. Policy 1.9 - Public meetings shall be held at locations compliant with the Americans with Disabilities Act. Policy 1.10 – Public meetings should be held in locations that are accessible by public transit. Meetings should be held with enough time for transit users to arrive, provide input, and use transit to leave. Policy 1.11 – Notices of major planning activities should be disseminated to stakeholders that cater to the needs of low-income and minority households, and those who may face challenges accessing employment and other services. EMERGENCY MEETINGS Policy 1.12 - In the event that an emergency meeting is necessary, the Chairman of the Board of Directors, or the Vice-Chair in the absence of the Chairman, is authorized to call a special meeting. In the unlikely event it is necessary to hold a meeting with notice of less than twenty-four hours, the nature of the good cause justifying that departure from the normal requirements shall be stated in the minutes. A quorum of members is required to be physically present at the meeting location, but additional members may participate and vote via telephone, facsimile, Internet, or any other voice or electronic means. In the event the emergency meeting is considered a “closed meeting” under the Missouri Sunshine Law, members who are not physically present may vote as if they are present. In all cases the nature of the emergency of the public body justifying the departure from the normal requirements shall be stated in the minutes of the meeting. EFFECTIVE COMMUNICATION & VISUALIZATION Policy 2.1 – Upon request, staff will be available to meet with local officials, interested groups, or the public to discuss or present the Metropolitan Transportation Plan (MTP), Transportation Improvement Program (TIP), Unified Planning Work Program (UPWP) or other plans, programs, and activities. Policy 2.2 – The CAMPO webpage will be maintained and updated with planning documents produced by CAMPO and local jurisdictions to provide the most current and accurate transportation planning information available. Policy 2.3 - The CAMPO webpage shall contain public notices, meeting agendas, meeting minutes, Board of Director members, Technical Committee members, plans, studies, and other information for the public’s benefit. Policy 2.4 – CAMPO shall actively participate in social media activities to supplement traditional public outreach activities. Policy 2.5 – CAMPO shall promote events of planning partners, when appropriate. Policy 2.6– CAMPO shall proactively use targeted media campaigns to engage with individuals and groups that may be impacted by activities or have expressed interest in being contacted. OUTREACH & ENGAGEMENT Policy 3.1 – CAMPO encourages local jurisdictions to include public participation in the planning of projects and programs. CAMPO will collect information on the public participation process used by the project sponsors as part of the project application review process. Policy 3.2 – CAMPO will maintain brochures and other educational materials to provide information on the metropolitan transportation planning process, the responsibilities of CAMPO, and the public participation process. The brochure will be available at all public meetings and events and accessible on the CAMPO webpage. City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 40 Policy 3.3 – CAMPO staff will actively make the effort to go out into the public, whether by invitation to go to meetings make presentations, or to attend meetings with relevance to transportation, transit, pedestrian, or bicycle themes, rail, or other related topics. Policy 3.4 – CAMPO will make every effort to reach out to community organizations, advocacy groups, and underserved populations. Policy 3.5 – CAMPO shall maintain and regularly update a database of stakeholders and interested individuals. Listed below are the broadly defined stakeholder groups that CAMPO interacts with: • Elected Officials • Emergency Service Providers • Transportation Providers • Freight Service Providers • Economic Development • Business Community • Tourism • Government (Local, State, Federal) • Non-Motorized • Community Organizations • Protected Class Advocates • Environmental Policy 3.6 - CAMPO shall engage the public in the transportation planning process according to the policies contained in this public participation plan and to the requirements of state and federal laws through timely information, public notification of activities and documents, accessible public meetings, and availability for questions and queries. Policy 3.7 - CAMPO shall solicit the needs of those traditionally underserved by existing transportation system, such as elderly, disabled, low income, and minority households who may have difficulty accessing or participating in community planning activities, through its public participation process. COORDINATION Policy 4.1 – CAMPO will coordinate with state and local agencies, and officials responsible for planning activities within the Metropolitan Planning Area that are affected by transportation. Policy 4.2 – State, Regional, and Local stakeholders will be consulted in the development of the Metropolitan Transportation Plan (MTP) and the Transportation Improvement Program (TIP) to the maximum extent practicable. Many of these entities, such as local entities involved with planned growth, economic development, environmental protection, and airport operations or freight transportation, are represented on either the CAMPO Board of Directors or Technical Committee. Policy 4.3 – Per Section 14.5 of the CAMPO Memorandum of Understanding, local governments have responsibilities to: • Participate in the development of the MTP and other plans, by making available to CAMPO local transportation plans, comprehensive plans or other information as needed, which may include land use, zoning or GIS databases. • Review the MTP as it is being drafted. • Participate in the development of the TIP, and the Unified Planning Work Program. • Review and comment of these documents as they are being drafted. • Assist in planning and executing public involvement activities. • Actively participate in the planning process through various meeting and activities, such as the Board of Directors and Technical Committee meetings. City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 41 PUBLIC COMMENT PROCEDURES Figure 14 outlines required public comment procedures. Figure 15 shows the general overview of public engagement activities for specific federally required documents and plans. Public comment periods are initiated by staff and are concluded at Board of Directors meeting before final adoption or approval. Participation procedures for specific plans can be found in the following section. FIGURE 14 – CAMPO PUBLIC COMMENT PROCEDURES PUBLIC NOTICE Regularly Scheduled Meetings - Meeting notices and agendas for Technical Committee or Board of Directors are posted on the CAMPO webpage at www.jeffersoncitymo.gov/CAMPO, sent to members, interested parties, and to a media contact list at least 5 days before a meeting. The media list is maintained by the Jefferson City Clerk and includes all major TV, radio, and print news outlets that serve the Mid-Missouri area. Additionally, the list includes media contacts in St. Louis and Kansas City. Other Public Meetings – Meeting announcements and/or agendas for other planning activities not related to regularly scheduled meetings are advertised on the CAMPO webpage at www.jeffersoncitymo.gov/CAMPO , on the CAMPO Facebook page, and sent to members, interested parties, and to a media contact list at least 7 days prior to the meeting. At a minimum, a newspaper advertisement shall be placed in the Sunday addition Jefferson City News Tribune prior to the date of the meeting. Depending on the activity staff may choose to advertise in other local media resources. Staff should also make every attempt to advertise public meetings via posters, emails, stakeholder newsletters, and any other media resource deemed helpful in increasing public engagement. The public meeting notice shall include: • a brief sentence describing the plan or project • time, date, and location of the upcoming public meeting • a web link to the draft document and/or survey tool • a contact email and/or phone number Notice of Public Comment Periods - Public comment periods are advertised on the CAMPO webpage at www.jeffersoncitymo.gov/CAMPO , sent to members, interested parties, and to a media contact list. If applicable (see Table 2), a legal notice is placed in the Jefferson City News Tribune at the opening of the public comment period. Depending on the activity, staff may choose to additionally advertise using other local media resources. The end of a public comment period will be concluded by the Board of Directors at a regularly scheduled meeting to provide final opportunity to comment. An example public notice can be found on the following page. The public comment notice shall include: • a brief sentence describing the plan or project • a sentence stating the opening of a public comment period • time, date, and location of the meeting where final opportunity for public comment will be provided and approval is anticipated. • a web link to the draft document location • a list of locations where the draft document may be found • a contact email, address, and phone number PUBLIC MEETING LOCATIONS Public meetings are held at times and locations convenient to all segments of the public. A central location accessible to transit users is required. Reasonable accommodations will be made for persons with limited English proficiency and for people with disabilities. Public meetings will are generally held at John G. Christy Municipal Building (City Hall), 320 E. McCarty Street, Jefferson City, MO 65101, or as specified within public comment notice(s). Locations may change based on the nature of the planning process or product. PUBLIC REVIEW During public comment periods, copies of proposed plans will be made available for public review on the Jefferson City Website at www.jeffersoncitymo.gov/CAMPO, Jefferson City Clerk’s Office, and the Missouri River Regional Library. Reasonable accommodations for persons with limited English proficiency and for people with disabilities will be made upon request. PUBLIC COMMENTS Comments on proposed plans may be made in writing or in person at a regularly scheduled meeting of the Technical Committee or Board of Directors. Written comments should be directed to the CAMPO Division, Planning and Protective Services, 320 E. McCarty Street, Jefferson City, MO 65101, or sent electronically to campo@jeffersoncitymo.gov. CAMPO staff will present comments to the CAMPO Board of Directors before adoption or approval of any plan. City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 42 FIGURE 15 – CAMPO PUBLIC ENGAGEMENT OVERVIEW BY PLAN DOCUMENT FREQUENCY REQUIRED PUBLIC MEETINGS MINIMUM PUBLIC COMMENT PERIOD REQUIRED NOTIFICATION ACTIVITIES METROPOLITAN TRANSPORTATION P LAN (MTP) 5-YEAR UPDATE 5 YEARS TECHNICAL COMMITTEE M EETINGS BOARD OF DIRECTORS MEETINGS THREE ADDITIONAL PUBLIC MEETINGS (AT LEAST ONE HELD IN HOLTS SUMMIT) 25 DAYS • WEBSITE POST • NEWS P APER ADVERTISEMENTS • STAKEHOLDER NEWSLETTERS • PRESENTATIONS TO M EMBER JURISDICTIONS’ COUNCIL MEETINGS • PRESENTATIONS TO STAKEHOLDER GROUPS • EMAIL DISTRIBUTION LISTS • NOTICE SENT TO MEMBER JURISDICTIONS • NOTICE POSTED AT CITY HALL * METROPOLITAN TRANSPORTATION P LAN (MTP) AMENDMENTS AS NEEDED TECHNICAL COMMITTEE M EETINGS BOARD OF DIRECTORS MEETINGS 7 DAYS • WEBSITE POSTS • NOTICE SENT TO MEMBER JURISDICTIONS • NOTICE POSTED AT CITY HALL * COORDINATED PUBLIC TRANSIT- HUMAN S ERVICES TRANSPORTATION P LAN 4-5 YEAR UPDATE 3 YEARS TECHNICAL COMMITTEE M EETINGS BOARD OF DIRECTORS MEETINGS TWO ADDITIONAL PUBLIC MEETINGS 25 DAYS • WEBSITE POST • NEWS P APER ADVERTISEMENTS • STAKEHOLDER NEWSLETTERS • PRESENTATIONS TO M EMBER JURISDICTIONS’ COUNCIL MEETINGS • PRESENTATIONS TO STAKEHOLDER GROUPS • EMAIL DISTRIBUTION LISTS • NOTICE SENT TO MEMBER JURISDICTIONS • NOTICE POSTED AT CITY HALL * TRANSPORTATION IMPROVEMENT PROGRAM ANNUAL UPDATE ANNUAL TECHNICAL COMMITTEE M EETINGS BOARD OF DIRECTORS MEETINGS 25 DAYS • WEBSITE POST • NEWS P APER ADVERTISEMENTS • NOTICE SENT TO MEMBER JURISDICTIONS • NOTICE POSTED AT CITY HALL * TRANSPORTATION IMPROVEMENT PROGRAM AMENDMENTS AS NEEDED TECHNICAL COMMITTEE M EETINGS BOARD OF DIRECTORS MEETINGS 7 DAYS • WEBSITE POST • NOTICE SENT TO MEMBER JURISDICTIONS • NOTICE POSTED AT CITY HALL * TITLE VI PROGRAM, PUBLIC PARTICIPATION PLAN (PPP), & LANGUAGE ASSISTANCE PLAN (LAP) 3-YEAR UPDATE 3 YEARS TECHNICAL COMMITTEE M EETINGS BOARD OF DIRECTORS MEETINGS 45 DAYS • WEBSITE POST • NEWS P APER ADVERTISEMENTS • NOTICE SENT TO MEMBER JURISDICTIONS • NOTICE POSTED AT CITY HALL * UNIFIED PLANNING W ORK PROGRAM ANNUAL UPDATE ANNUAL TECHNICAL COMMITTEE M EETINGS BOARD OF DIRECTORS MEETINGS 7 DAYS • WEBSITE POST • NOTICE SENT TO MEMBER JURISDICTIONS UNIFIED PLANNING W ORK PROGRAM AMENDMENTS AS NEEDED TECHNICAL COMMITTEE M EETINGS BOARD OF DIRECTORS MEETINGS 7 DAYS • WEBSITE POST • NOTICE SENT TO MEMBER JURISDICTIONS ANNUAL LISTING OF OBLIGATED PROJECTS (ALOP) ANNUAL UPDATE ANNUAL THE ALOP IS UPDATED BY STAFF. THE TECHNICAL COMMITTEE AND B OARD OF DIRECTORS ARE NOTIFIED OF THE DOCUMENT’S POSTING AND THE PUBLIC MAY COMMENT DURING THOSE MEETINGS. • WEBSITE POST • NOTIFICATION OF BOARD OF DIRECTORS AND TECHNICAL COMMITTEE OTHER PLANS AND PROJECTS AS NEEDED TECHNICAL COMMITTEE M EETINGS BOARD OF DIRECTORS MEETINGS ADDITIONAL PUBLIC M EETINGS AS NEEDED AS NEEDED • WEBSITE POST • NOTICE SENT TO MEMBER JURISDICTIONS • NOTICE POSTED AT CITY HALL * * Notices and/or agendas are posted at City of Jefferson City Hall at 320 E. McCarty Street City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 43 FIGURE 16 – EXAMPLE CAMPO PUBLIC NOTICE City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 44 PLAN SPECIFIC PROCEDURES METROPOLITAN TRANSPORTATION PLAN The Metropolitan Transportation Plan (MTP), also referred to as a Long-Range Transportation Plan, assesses regional transportation needs over a twenty-year planning horizon. The MTP sets goals and defines policies, programs, strategies, and projects to meet the transportation needs of the CAMPO region. The MTP is central to the MPO planning process and addresses all transportation modes, including; surface transportation (roads and bridges), pedestrian and non-motorized, transit, air, waterways & ports, freight, rail. Updates and amendments to the TIP follow the procedures outlined in Tables 1 and 2 of the previous section. 5-YEAR UPDATE PROCESS The 5-year update of the MTP should include two phases of engagement. The first phase includes outreach to member jurisdictions, stakeholders, and the general public to gather information on changes to needs and demands in the region. The second phase of engagement includes reviewing data, goals, strategies, and modeling with these same member jurisdictions, stakeholders, and the general public. The second phase concludes with the draft document going through a multi-stage process of review by the Technical Committee, Board of Directors, and public before approval or adoption. The MTP is presented to the Technical Committee for review and recommendation to the Board of Directors for approval. The draft document is then presented to the Board of Directors for review and staff opens a 25- day public comment period. A final opportunity for public comment will be provided at the next scheduled Board of Directors meeting where the Board may choose to approve or adopt the plan. The Board of Directors will close the public comment period. During the public comment period, a notice will be placed on the CAMPO webpage and a legal notice will be placed in the newspaper as specified in Table 1. An example Notice is provided in this document. Amendment Process The MTP may be changed through an amendment or administrative modification. An amendment to the MTP is subject to a 7-day public comment period after being reviewed by the Technical Committee and before being approved by the Board of Directors. If staff conducts an administrative modification, notice will be provided to the Board of Directors either prior to or immediately following the modification. Amendments and administrative modifications are documented in the appendix of the MTP. Definitions of an amendment or administrative modification, according to 23 CFR §450.104, are as follows: Administrative modification means a minor revision to a long-range statewide or metropolitan transportation plan, Transportation Improvement Program (TIP), or Statewide Transportation Improvement Program (STIP) that includes minor changes to project/project phase costs, minor changes to funding sources of previously included projects, and minor changes to project/project phase initiation dates. An administrative modification is a revision that does not require public review and comment, a redemonstration of fiscal constraint, or a conformity determination (in nonattainment and maintenance areas). Amendment means a revision to a long-range statewide or metropolitan transportation plan, TIP, or STIP that involves a major change to a project included in a metropolitan transportation plan, TIP, or STIP, including the addition or deletion of a project or a major change in project cost, project/project phase initiation dates, or a major change in design concept or design scope (e.g., changing project termini or the number of through traffic lanes or changing the number of stations in the case of fixed guideway transit projects). Changes to projects that are included only for illustrative purposes do not require an amendment. An amendment is a revision that requires public review and comment and a redemonstration of fiscal constraint. If an amendment involves “non-exempt” projects in nonattainment and maintenance areas, a conformity determination is required. City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 45 TRANSPORTATION IMPROVEMENT PROGRAM The Transportation Improvement Program (TIP) is the document identifying transportation projects to be programmed and funded with FHWA and/or FTA funds for the metropolitan planning area over the next five years. Updates and amendments to the TIP follow the procedures outlined in Tables 1 and 2 of the previous section. ANNUAL UPDATE PROCESS The TIP is updated every year and covers a 5-year period starting July 1 of each year. TIP development begins with a verification of status of projects in the current TIP, solicitation of new projects, and request for budget information from local jurisdictions. Local transit providers are also requested to provide information needed to develop their “Program of Projects” for inclusion in the TIP. CAMPO staff develops the financial plan, project listings, maintenance and operations, and other components of the TIP with support from the Technical Committee, member jurisdictions, MoDOT, FHWA, and FTA. The TIP is presented to the Technical Committee for review and recommendation to the Board of Directors for approval. The draft document is then presented to the Board of Directors for review and staff opens a 25- day public comment period. A final opportunity for public comment will be provided at the next scheduled Board of Directors meeting where the Board may choose to approve or adopt the plan. The Board of Directors will close the public comment period. During the public comment period, a notice will be placed on the CAMPO webpage and a legal notice will be placed in the newspaper as specified in Table 1. An example Notice is provided in this document. The Board of Directors then requests approval of the TIP by the Governor and ONE DOT(consisting of FHWA and FTA). AMENDMENT PROCESS The TIP may be changed through an amendment or administrative modification. An amendment to the TIP is subject to a 7-day public comment period after being reviewed by the Technical Committee and before being approved by the Board of Directors. If staff conducts an administrative modification, notice will be provided to the Board of Directors either prior to or immediately following the modification. Amendments and administrative modifications are documented in the appendix of the TIP. More detail on the process for changes to the TIP can be found in the appendix of the current year TIP. Definitions of an amendment or administrative modification, according to 23 CFR §450.104, are as follows: Administrative modification means a minor revision to a long-range statewide or metropolitan transportation plan, Transportation Improvement Program (TIP), or Statewide Transportation Improvement Program (STIP) that includes minor changes to project/project phase costs, minor changes to funding sources of previously included projects, and minor changes to project/project phase initiation dates. An administrative modification is a revision that does not require public review and comment, a redemonstration of fiscal constraint, or a conformity determination (in nonattainment and maintenance areas). Amendment means a revision to a long-range statewide or metropolitan transportation plan, TIP, or STIP that involves a major change to a project included in a metropolitan transportation plan, TIP, or STIP, including the addition or deletion of a project or a major change in project cost, project/project phase initiation dates, or a major change in design concept or design scope (e.g., changing project termini or the number of through traffic lanes or changing the number of stations in the case of fixed guideway transit projects). Changes to projects that are included only for illustrative purposes do not require an amendment. An amendment is a revision that requires public review and comment and a redemonstration of fiscal constraint. If an amendment involves “non-exempt” projects in nonattainment and maintenance areas, a conformity determination is required. City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 46 PROGRAM OF PROJECTS (POP) The POP is a list of projects to be funded in a grant application submitted to the FTA by a designated recipient. The POP lists the subrecipients and indicates whether they are private non-profit agencies, governmental authorities, or private providers of transportation service, designates the areas served (including rural areas), and identifies any tribal entities. In addition, the POP includes a brief description of the projects, total project cost, and Federal share for each project. The POP is a component of the TIP and thus development and update processes follow the public participation procedures used for the TIP. City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 47 COORDINATED PUBLIC TRANSIT-HUMAN SERVICES TRANSPORTATION PLAN The Coordinated Public Transit-Human Services Transportation Plan (Coordinated Plan) identifies the transportation needs of individuals with disabilities, older adults, and people with low incomes, provides strategies for meeting these needs, and prioritizes transportation services for funding and implementation. In accordance with Fixing America’s Surface Transportation Act (FAST Act), the coordinated plan must be in place for agencies to apply for Federal Transit Administration (FTA) Section 5310 funding. Updates and amendments to the Coordinated Plan follow the procedures outlined in Tables 1 and 2 of the previous section. 3-YEAR UPDATE PROCESS The 3-year update of the MTP should include two phases of engagement. The first phase of engagement includes outreach to member jurisdictions, stakeholders, and the general public to gather information on changes to needs and demands in the region. The second phase of engagement includes reviewing data, goals, strategies, and modeling with these same member jurisdictions, stakeholders, and the general public. The second phase concludes with the draft document going through a multi-stage process of review by the Technical Committee, Board of Directors, and public before approval or adoption. The Coordinated Plan is presented to the Technical Committee for review and recommendation to the Board of Directors. The draft document is then presented to the Board of Directors for review and staff opens a 25- day public comment period. A final opportunity for public comment will be provided at the next scheduled Board of Directors meeting where the Board may choose to approve or adopt the plan. The Board of Directors will close the public comment period. During the public comment period, a notice will be placed on the CAMPO webpage and a legal notice will be placed in the newspaper as specified in Table 1. An example Notice is provided in this document. REVISION PROCESS Any changes to the Coordinated Plan will be presented to the Technical Committee and Board of Directors for their review and approval. The Board of Directors may open a public comment period to accommodate major revisions. City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 48 TITLE VI PROGRAM, PUBLIC PARTICIPATION PLAN, & LANGUAGE ASSISTANCE PLAN Title VI prohibits discrimination on the basis of race, color, or national origin in programs and activities receiving Federal financial assistance. Specifically, Title VI provides that: [n]o person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance. The Title VI Program is a federally required program and document that includes the Public Participation Plan (PPP) and Language Assistance Plan (LAP). The Title VI Program must be updated every three years. The update process includes a review of CAMPO procedures for notifying the public of their rights under Title VI and how to file a complaint. The document(s) demographic data is reviewed and updated. The update of the PPP includes a full review of current public engagement and comment procedures. A public survey is distributed to gather input on how engagement can be improved. The Title VI Program is presented to the Technical Committee for review and recommendation to the Board of Directors. The draft document is then presented to the Board of Directors for review and staff opens a 45-day public comment period. A final opportunity for public comment will be provided at the next scheduled Board of Directors meeting where the Board may choose to approve or adopt the plan. The Board of Directors will close the public comment period. During the public comment period, a notice will be placed on the CAMPO webpage and a legal notice will be placed in the newspaper as specified in Table 1. An example Notice is provided in this document. The PPP is the official public participation process for plans and programs of CAMPO, as well as the Program of Projects for JEFFTRAN, and OATS. REVISION PROCESS Any change to the Title VI Program, including the PPP or LAP will be presented to the Technical Committee and Board of Directors for their review and approval. The Board of Directors may open a public comment period to accommodate major revisions. City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 49 UNIFIED PLANNING WORK PROGRAM The Unified Planning Work Program (UPWP) defines tasks and anticipates funding requirements for the metropolitan planning activities performed by CAMPO with federal funds provided by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) under title 23 U.S.C . and title 49 U.S.C. Chapter 53. The UPWP defines activities for all public officials and agencies that contribute resources to the transportation planning process. The UPWP covers one fiscal year, November 1 to October 31, and outlines activities funded through the Consolidated Planning Grant and local funds and serves as the basis for funding agreements with the Missouri Department of Transportation (MoDOT). The UPWP also serves as a management tool for scheduling, budgeting, and monitoring the local planning activities. ANNUAL UPDATE PROCESS The UPWP is made available to the public during regularly scheduled Technical Committee and Board of Directors meetings. By regulation, the UPWP is not required to undergo the same level of public involvement as other MPO documents. The UPWP is presented to the Technical Committee for review and recommendation to the Board of Directors. The draft document is then presented to the Board of Directors for review and staff opens a 7-day public comment period. A final opportunity for public comment will be provided at the next scheduled Board of Directors meeting where the Board may choose to approve or adopt the plan. The Board of Directors will close the public comment period. During the public comment period, a notice will be placed on the CAMPO webpage specified in Table 1. An example Notice is provided in this document. The Board of Directors then requests approval of the UPWP by the Governor and ONE DOT (consisting of FHWA and FTA). AMENDMENT PROCESS The UPWP may be changed through an amendment or administrative modification. Amendments must be approved by the Board of Directors, FTA, and FHWA. Some modifications may also go through an official approval by the Board of Directors as deemed appropriate by staff. Amendments and administrative modifications are documented in the UPWP. More detail on the process for changes to the UPWP can be found in that document. RESPONSE TO PUBLIC COMMENTS Comments on planning documents will be documented and provided to the Technical Committee and the Board of Directors, and kept in MPO comment files. Comments may be included in plan appendices as summaries of public comments. General comments or questions regarding transportation policy, needs, and/or complaints will be acted upon by staff in accordance with the federal, state, and local regulations. Action on these comments may include addressing the comment directly, by correspondence to a comment or question; referring comments to the correct recipient, either to different city/state departments; or taking the matter up with the Technical Committee and/or Board of Directors. If the responses to public comments results in the Metropolitan Transportation Plan, Transportation Improvement Program and other plan or program documents or amendments being significantly different from the draft document which was sent out for public review, an additional public comment period shall be held. Determination of the need for an additional comment period will be made by the CAMPO Board of Directors. If significant oral and written comments and responses are received, an appendix containing the comments and recommendations will be made part of the final document. Interested parties may comment and make recommendations on any plan or program in person, by fax, email, or letter by contacting CAMPO staff at the following: City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 50 Department of Planning and Protective Services Attention: CAMPO 320 E. McCarty St Jefferson City, MO 65101 (573) 634-6410 (573) 634-6457 (Fax) campo@jeffersoncitymo.gov SPECIAL ACCOMMODATIONS Persons requiring special accommodations for attendance at meetings, activities and functions because of a disability or physical impairment should contact the City of Jefferson ADA Coordinator at (573) 634-6410 to request accommodations or alternative formats as required under the Americans with Disabilities Act. Please allow three business days to process the request. CAMPO maintains Language Assistance Plan and Title VI policies and performs periodic reviews of the both. LANGUAGE ACCOMMODATIONS As prescribed by the Language Assistance Plan, CAMPO will, when issuing statements or notices, note that interpreters or sign language professionals will be available upon advance notice of seven calendar days. CAMPO will also maintain a contact database of interpreters in anticipation of this need. NON-DISCRIMINATION POLICY CAMPO does not discriminate in the level and quality of transportation services and transit-related benefits based on race, color, national origin, sex, familial status, sexual orientation, religion, age, or disability and maintains information on and processes for complaints related to discrimination. Persons who feel that they have been subjected to discrimination should contact CAMPO or federal offices for information on local and federal procedures and forms for discrimination complaints. Person(s) alleging discrimination as it relates to the provision of transportation services and transit-related benefits may file a complaint with the Federal Transit Administration, and/or the U.S. Department of Transportation, Federal Transit Administration Office of Civil Rights 901 Locust Street, Room 404 Kansas City, MO 64106 Telephone 816-329-3920, or Federal Highway Administration 3220 West Edgewood, Suite H Jefferson City, MO 65109 Telephone: 573-638-2617 City of Jefferson Title VI Program 2023 – CAMPO Public Participation Plan 51 TITLE VI Any person who believes that they, individually, or as a member of any specific class of persons, has been subjected to discrimination may file a written complaint with the: Title VI Program Officer C/o City Administrator John G Christy Municipal Building/City Hall 320 East McCarty Street Jefferson City, MO 65101 Complainants have the right to complain directly to the appropriate federal agency. Every effort will be made to obtain early resolution of complaints. The option of informal meeting(s) between the affected parties and the Title VI Program Officer may be utilized for resolutions. The Title VI Program Officer will notify CAMPO of all Title VI related complaints as well as resolution. City of Jefferson Title VI Program 2023 – City of Jefferson/CAMPO Limited English Proficieny Plan 52 CITY OF JEFFERSON/CAMPO LIMITED ENGLISH PROFICIENY PLAN This limited English Proficiency (LEP) Plan has been prepared to address responsibilities of the City of Jefferson (including CAMPO and JEFFTRAN) as recipients of federal financial assistance as they relate to the needs of individuals with limited language skills. The plan has been prepared in accordance with Title VI of the Civil Rights Act of 1964; Federal Transit Administration Circular 4702.1B, dated October 1, 2012, which states that the level and quality of transportation service is provided without regard to race, color, or national origin. Executive order 13166, titled “Improving Access to Services for Persons with Limited English Proficiency,” indicates that differing treatment based upon a person's inability to speak, read, write or understand English is a type of national origin discrimination. It directs each federal agency to publish guidance for its respective recipients clarifying their obligation to ensure that such discriminations do not take place. This order applies to all state and local agencies which receive federal funds. SERVICE AREA DESCRIPTION The City of Jefferson is one of five incorporated communities within the CAMPO Planning Area as seen in Figure 17. In addition to the communities of Holts Summit, Jefferson City, St. Martins, Taos, and Wardsville, the CAMPO Planning Area also includes portions of Cole County and Callaway County. JEFFTRAN services are only provided within the City Limits of Jefferson City, see Figure 18. JEFFTRAN services include six fixed-routes, three tripper routes (serving schools during the Spring and Fall semesters), and a paratransit service via Handi-Wheels. FOUR FACTOR ANALYSIS The City of Jefferson has developed this LEP Plan to help identify reasonable steps for providing language assistance to persons with limited English proficiency who wish to access services provided by JEFFTRAN. As defined in Executive Order 13166, LEP persons are those who do not speak English as their primary language and have limited ability to read, speak, write or understand English. This plan outlines how to identify a person who may need language assistance, and the ways in which assistance may be provided. In order to prepare this plan, JEFFTRAN undertook the four-factor LEP analysis which considers the following factors: 1. The number or proportion of LEP persons served or encountered in the eligible service population ("served or encountered" includes those persons who would be served or encountered by the recipient if the persons received adequate education and outreach and the recipient provided sufficient language services). 2. The frequency with which LEP persons come into contact with the program. 3. The nature and importance of the program, activity, or service provided by the program. 4. The resources available and costs to the recipient. City of Jefferson Title VI Program 2023 – City of Jefferson/CAMPO Limited English Proficieny Plan 53 1. THE NUMBER AND PROPORTION OF LEP PERSONS ELIGIBLE TO BE SERVED OR LIKELY TO BE ENCOUNTERED IN THE CAMPO/JEFFTRAN SERVICE AREA: A significant majority of people in both the CAMPO and JEFFTRAN service area are proficient in the English language. Based on 2020 Decennial Census data, 2.5% of the Jefferson City population and 1.47% of the CAMPO population, five years of age and older speak English “less than very well” – a definition of limited English proficiency (LEP). Figure 17 and Figure 18 depict the number of LEP population in the City of Jefferson and the CAMPO Planning Area. FIGURE 17 - JEFFERSON CITY, MO LEP POPULATIONS LANGUAGE SPOKEN AT HOME Population % Population 5 year and over Population 5 years and over 40,033 100% English only 37,924 94.7% Language other than English 2,109 5.3% Speak English less than "very well" 997 2.5% Spanish 908 2.3% Speak English less than "very well" 285 0.7% Other Indo-European languages 600 1.5% Speak English less than "very well" 324 0.8% Asian and Pacific Islander languages 475 1.2% Speak English less than "very well" 348 0.9% Other languages 126 0.3% Speak English less than "very well" 40 0.1% FIGURE 18 – CAMPO PLANNING AREA LEP POPULATIONS POPULATION 5 YEARS AND OLDER BY LANGUAGE SPOKEN AT HOME Callaway County Cole County Holts Summit Jefferson City St. Martins Taos Wardsville Total Service Area Percentage of Population 5 years and older Population 5 years 42,575 72,087 4,197 40,033 1,128 1,319 1,612 162,951 100.00% English only 41,867 69,364 4,144 37,924 1,116 1,298 1,609 157,322 96.55% Language other than English 708 2,723 53 2,109 12 21 3 5,629 3.45% Speak English less than "very well"284 1,086 16 997 5 14 0 2,402 1.47% Spanish 281 1,283 4 908 3 5 0 2,484 1.52% Speak English less than "very well"135 308 1 285 0 5 0 734 0.45% Other Indo-European languages 149 824 22 600 5 16 3 1,619 0.99% Speak English less than "very well"47 390 15 324 5 9 0 790 0.48% Asian and Pacific Islander languages 244 479 27 475 4 0 0 1,229 0.75% Speak English less than "very well"95 348 0 348 0 0 0 791 0.49% Other languages 34 137 0 126 0 0 0 297 0.18% Speak English less than "very well"7 40 0 40 0 0 0 87 0.05% City of Jefferson Title VI Program 2023 – City of Jefferson/CAMPO Limited English Proficieny Plan 54 2. FREQUENCY OF CONTACT BY LEP PERSONS WITHIN CAMPO AND JEFFTRAN SERVICES: While City Hall staff at the City of Jefferson has occasionally received phone calls from non-english speaking persons, 3-4 times in the last 3 years, there has not been an official request for an interpreter. On these rare occasions this has only occurred with Spanish speakers. When such an occasion has occurred, a city staff member, fluent in Spanish was able to provide support. None of these calls were related to CAMPO or JEFFTRAN services. CAMPO staff reviewed the frequency with which office staff have, or could have, contact with LEP persons. To date, CAMPO has not received a request for an interpreter. None of the two current CAMPO staff members stated that they have ever had a request for an interpreter. CAMPO averages zero phone calls per month requesting an interpreter. CAMPO does include a the non-profit El Puente as a stakeholder agency during planning processes and uses the organization for translation services of some CAMPO products. JEFFTRAN staff reviewed, via a survey, the frequency with which office staff, dispatchers and drivers have, or could have, contact with LEP persons. To date, JEFFTRAN rarely has a request for an interpreter. Only two out of sixteen staff surveyed stated that they have ever had a request for an interpreter. JEFFTRAN averages zero phone calls per month requesting an interpreter. JEFFTRAN staff was given the following survey: 1. How often do you come into contact with riders who do not speak English or have trouble understanding you when you speak English to them? 2. Of these riders, what language is most often spoken? (Example: Spanish, Chinese, Russian, Vietnamese, French, Arabic, etc.) 1. Spanish was the only language identified. 3. If known, what other languages do you hear spoken by riders? (Example: Spanish, Chinese, Russian, Vietnamese, French, Arabic, Other European, African, or Asian Languages, etc.) 2. Spanish, African, Asian, and American Sign Language were identified. 4. What languages (other than English) do you understand or speak? 3. Spanish (2), some Spanish (3), French (1) 5. Have you ever requested translation or interpretation assistance? 4. Yes (2), No (14) 6. Do you have any suggestions regarding how we can serve LEP clients better? 5. Suggestions included employing a translator and use of cell phone for translation. 7. Have you ever received comments or feedback concerning the Spanish Route and Schedule Guides? 6. No (15), No response (1) Frequency of Contact with LEP Persons Frequency Language Spoken by LEP Persons 1 - Daily Spanish 4 - Weekly Spanish 3 - Monthly Spanish 8 - Less frequently than monthly Spanish City of Jefferson Title VI Program 2023 – City of Jefferson/CAMPO Limited English Proficieny Plan 55 3. THE IMPORTANCE OF PROGRAMS, ACTIVITIES OR SERVICES PROVIDED BY JEFFTRAN TO LEP PERSONS: Outreach activities, summarized in JEFFTRAN’s Title VI Public Engagement Plan, include events such as public meetings and/or open houses held at schools, churches, libraries and other non-profit locations, and include specific outreach to LEP persons to gain understanding of the needs of the LEP population, and the manner (if at all) needs are addressed. Outside Organization LEP Survey Organization: __________________ 1. What language assistance needs are encountered? 2. What languages are spoken by persons with language assistance needs? 3. What language assistance efforts are you undertaking to assist persons with language assistance needs? 4. When necessary, can we use these services? 4. THE RESOURCES AVAILABLE TO JEFFTRAN AND OVERALL COST TO PROVIDE LEP ASSISTANCE: Strategies for Engaging Individuals with Limited English Proficiency include: 1. Language line. Upon advance notice, translators can be provided. 2. Language identification flashcards. 3. Written translations of vital documents (identified via safe harbor provision). 4. One-on-one assistance through outreach efforts. 5. Website information. 6. To the extent feasible, assign bilingual staff for community events, public hearings, and Board of Directors meetings and on the customer service phone lines. As applicable: Based on our demographic analysis (Factor 1) the City of Jefferson has determined that no language group(s) within its service area meets Safe Harbor criteria requiring written translated “vital documents” by language group(s). City of Jefferson staff will provide assistance and direction to LEP persons who request assistance. Staff LEP Training The following training will be provided to JEFFTRAN staff: 1. Information on JEFFTRAN Title VI Procedures and LEP responsibilities. 2. Description of language assistance services offered to the public. 3. Use of Language Identification Flashcards. 4. Documentation of language assistance requests. City of Jefferson Title VI Program 2023 – City of Jefferson/CAMPO Limited English Proficieny Plan 56 Monitoring and Updating the LEP Plan The LEP Plan is a component of the City of Jefferson’s Title VI Plan requirement. JEFFTRAN and/or CAMPO staff will update the LEP plan as required. At minimum, the plan will be reviewed and updated when it is clear that higher concentrations of LEP individuals are present in the CAMPO or JEFFTRAN service areas. Updates include the following: 1. How the needs of LEP persons have been addressed. 2. Determine the current LEP population in the service area. 3. Determine as to whether the need for, and/or extent of, translation services has changed. 4. Determine whether local language assistance programs have been effective and sufficient to meet the needs. 5. Determine whether CAMPO or JEFFTRAN's financial resources are sufficient to fund language assistance resources as needed. 6. Determine whether CAMPO or JEFFTRAN has fully complied with the goals of this LEP Plan. 7. Determine whether complaints have been received concerning CAMPO and JEFFTAN’s failure to meet the needs of LEP individual. City of Jefferson Title VI Program 2023 – Subrecipient Assistance 57 SUBRECIPIENT ASSISTANCE JEFFTRAN (City of Jefferson) does not have any subrecipients. CAMPO does not have any subrecipients. SUBRECIPIENT MONITORING JEFFTRAN (City of Jefferson) does not have any subrecipients. CAMPO does not have any subrecipients. EQUITY ANALYSIS OF FACILITIES JEFFTRAN (City of Jefferson) has not constructed any storage facilities, maintenance facilities, or operations centers in the last three years. CAMPO has not constructed any storage facilities, maintenance facilities, or operations centers in the last three years. REQUIREMENT TO COLLECT AND REPORT DEMOGRAPHIC DATA* *Applies to providers that operate 50 or more fixed route transit vehicles in peak service; and 200,000+ population. Not applicable to the Jefferson City, JEFFTRAN, or CAMPO. REQUIREMENT TO MONITOR TRANSIT SERVICE* *Applies to providers that operate 50 or more fixed route transit vehicles in peak service; and 200,000+ population. Not applicable to the Jefferson City, JEFFTRAN, or CAMPO. SERVICE AND FARE EQUITY ANALYSIS* *Applies to providers that operate 50 or more fixed route transit vehicles in peak service; and 200,000+ population. Not applicable to the Jefferson City, JEFFTRAN, or CAMPO. Agenda Item 7A CAMPO Board of Directors Staff Report 2024-2028 Transportation Improvement Program Update April 19, 2023 Summary The Transportation Improvement Program (TIP) is a 5-year financial program of transportation projects to be implemented within the Metropolitan Planning Area (MPA). Projects in the program are funded by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), and are deemed ‘regionally significant.’ The TIP is updated annually by CAMPO in cooperation with local jurisdictions, the Missouri Department of Transportation (MoDOT), and local public transportation operators. The CAMPO TIP year runs from July 1, 2023 to June 30, 2028. The draft 2024-2028 TIP currently includes 49 projects that total over $96.9 million dollars. Fiscal constraint, the availability of local matching funds to federal funds, is demonstrated using updated financial data from local jurisdictions. Other important components of the TIP include: • Protocol for TIP Development: Public Participation, Project Selection, Amendments, and Modifications • CAMPO Federal Performance Measures: Performance Measures and targets uses system information to make investment and policy decisions to achieve national goals. The CAMPO Technical Committee and Board of Directors reviews and approves these performance measures and targets at regular intervals, per federal guidelines. • Financial Plan: Each year staff works with local jurisdictions to collect required financial data. This financial data, used to illustrate fiscal constraint, includes general tax revenue, local operating assistance, operations and maintenance estimates, and transportation grants. This data provides for creating current and forecasted totals of available and programmed funds. The 5-year 2024-2028 total of available funds is approximately $228.7 Million dollars, while the estimated programmed funds total approximately $96.9 Million. This includes funds from MoDOT, FHWA, FTA, and local jurisdiction budgets. These totals are subject to change during the month of April if new project costs estimates are received. • Fiscally Constrained Transportation Projects: The list of fiscally constrained projects includes all projects programmed for construction or scoping that utilize federal transportation funds. Most projects in the CAMPO TIP are MoDOT sponsored and are also listed in the Statewide Transportation Improvement Program (STIP). The 2024-2028 CAMPO TIP includes fourteen (14) Bridge Projects, eight (8) Road Projects, four (4) Other/Enforcement Projects, six (6) Scoping/Design Projects, seven (7) Pedestrian/Bicycle Projects, and ten (10) Public Transit Projects. • JEFFTRAN Program of Projects: The Program of Projects, federally required for public transportation agencies, is an illustrative list of projects and estimated costs. A draft 2024-2028 CAMPO TIP is attached. Technical Committee Recommendation The Technical Committee recommended the Draft FY2024 Unified Planning Work Program for review and approval to the Board of Directors at their April 6th meeting. Public Comment A 25-day public comment period will be opened April 19th and closed by the Board of Directors at a meeting on May 17th. DRAFT Transportation Improvement Program Program Years 20 24-2028 July 1, 2023 – June 30, 2028 Adopted May 17, 2023 The preparation of this report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, and Federal Transit Administration in cooperation with the Missouri Department of Transportation. The opinions, findings, and conclusions expressed in this report are not necessarily those of the Federal Highway Administration, Federal Transit Administration, or the Missouri Department of Transportation. Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as required under the Americans with Disabilities Act. Please allow three business days to process the request. DRAFT Table of Contents Introduction ............................................................................................................................................. 1 Public Participation ................................................................................................................................. 2 Project Selection ...................................................................................................................................... 2 TIP Development ..................................................................................................................................... 2 TIP Amendments and Administrative Modifications ............................................................................... 3 Previous Projects ................................................................................................................................. 3 Annual Listing of Obligated Projects ...................................................................................................... 3 Air Quality Designation .......................................................................................................................... 3 Environmental Justice ............................................................................................................................. 3 Federal Performance Measures ............................................................................................................... 4 Financial Plan ......................................................................................................................................... 6 Forecast Revenue Available for Transportation Funding .................................................................... 6 Operations and Maintenance .............................................................................................................. 8 Financial Constraint .............................................................................................................................. 10 Demonstration of Fiscal Constraint - Municipalities .......................................................................... 11 Demonstration of Fiscal Constraint – Public Transportation Providers .............................................. 12 Fiscally Constrained Transportation Projects – Bridges ..................................................................... 13 Fiscally Constrained Transportation Projects - Roadways ................................................................ 18 Fiscally Constrained Transportation Projects - Other ........................................................................ 21 Fiscally Constrained Transportation Projects – Scoping and Design Projects .................................... 23 Fiscally Constrained Transportation Projects - Pedestrian & Bicycle Projects .................................... 25 Fiscally Constrained Transportation Projects – Public Transportation Projects .................................. 28 Project Locations ............................................................................................................................... 32 Program of Projects ........................................................................................................................... 33 Multimodal Projects .............................................................................................................................. 34 Regionally Significant Projects ............................................................................................................. 34 Appendix 1 – Amendments and Administrative Modifications ............................................................ 35 Appendix 2 – Federal Funding Sources ................................................................................................ 36 Appendix 3 – Policies and Procedures ................................................................................................. 37 Appendix 4 – Definitions ...................................................................................................................... 40 CAMPO Title VI Nondiscrimination Policy The Capital Area Metropolitan Planning Organization is committed to the policy that no person shall be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity on the grounds of ra ce, color, or national origin, in accordance with Title VI of the Civil Rights Act of 1964, and the Civil Rights Restoration Act of 1987 (P.L. 100.259). Administration of the Capital Area MPO is provided by the City of Jefferson Department of Planning and Protective Services Room 120 John G. Christy Municipal Building 320 East McCarty St., Jefferson City, Missouri 65101 Phone: (573) 634-6410 Fax: (573) 634-6457 http://www.jeffersoncitymo.gov/campo DRAFT CAMPO 2024-2028 Transportation Improvement Program i LIST OF ABBREVIATIONS FTA 5303 Metropolitan & Statewide Planning and Non-Metropolitan Transportation Planning FTA 5307 Urbanized Area Formula Grants FTA 5310 Enhanced Mobility of Seniors and Individuals with Disabilities FTA 5339 Bus and Bus Facilities Adv. Con. Advanced Construction AM Asset Management (Replaces TCOS in 2022) CAMPO Capital Area Metropolitan Planning Organization CO Carbon Monoxide (vehicle emissions) EPA Environmental Protection Agency FAST Fixing America’s Surface Transportation Act FHWA Federal Highway Administration FTA Federal Transit Administration FY Fiscal Year HSIP Highway Safety Improvement Program MAP-21 Moving Ahead for Progress in the 21st Century MoDOT Missouri Department of Transportation MPO Metropolitan Planning Organization MTP Metropolitan Transportation Plan NHFP National Highway Freight Program NHPP National Highway Performance Program NO2 Nitrogen Dioxide ONE DOT Collaboration between FHWA and FTA PBPP Performance Based Planning and Programming PM-2.5 Small Particulate Matter Lead POP Program of Projects PY Program Year SO2 Sulfur Dioxide STIP State Transportation Improvement Program STBG Surface Transportation Block Grant Program TAP Transportation Alternatives TCOS Taking Care of the System TERM Transit Economic Requirements Model TDM Travel Demand Model TIP Transportation Improvement Program TPM Transportation Performance Management VMT Vehicle Miles of Travel DRAFT CAMPO 2024-2028 Transportation Improvement Program ii Resolution DRAFT CAMPO 2024-2028 Transportation Improvement Program iii MTP Process Certification DRAFT CAMPO 2024-2028 Transportation Improvement Program iv Lobbying Certificate DRAFT CAMPO 2024-2028 Transportation Improvement Program v Capital Area Metropolitan Planning Organization Board of Directors Chair – Ron Fitzwater, City Council Member, City of Jefferson Vice-Chair –Jeff Hoelscher, Eastern District Commissioner, Cole County City of Jefferson Jack Deeken, City Council Member Jon Hensley, City Council Member Mike Lester, City Council Member Clint Smith, AICP, Director, Planning & Protective Services Gerry Stegeman, Interim Transit Manager Matt Morasch, PE, Director, Public Works Cole County Eric Landwehr, PE, Director, Public Works Doug Reece, City Administrator, St. Martins Callaway County Roger Fischer, Western District Commissioner Holts Summit Brandon Ruediger, City Administrator, City of Holts Summit Missouri Department of Transportation (MoDOT) Machelle Watkins, PE, District Engineer Ex-Officio Members Luke Holtschnieder, Jefferson City Regional Economic Partnership Eva Steinman, Federal Transit Administration, Region VII Christy Evers, MoDOT Transit Administrator Vacant, Missouri Office of Administration Michael Henderson, AICP, MoDOT, Transportation Planning Dan Weitkamp, Federal Highway Administration, Missouri Div. Tamara Tateosian, Callaway County Economic Development Technical Committee Chair – David Bange, PE, City Engineer, Public Works, City of Jefferson Vice-Chair – Matt Prenger, PE, County Engineer, Public Works, Cole County City of Jefferson Clint Smith, AICP, Director, Planning & Protective Services Todd Spalding, Director, Parks, Recreation & Forestry Matt Morasch, PE, Director of Public Works Gerry Stegeman, Interim Transit Manager Eric Barron, AICP, Transportation Planner Britt Smith, PE, Operations & Maintenance Cole County Matt Prenger, PE, County Engineer Shannon Kliethermes, Senior Planner Callaway County Paul Winkelmann, PE, County Highway Administrator Small City Representative - Callaway Mark Tate, Streets Department, City of Holts Summit Small City Representative - Cole Rachel Busche, Wardsville Missouri Department of Transportation (MoDOT) Steve Engelbrecht, PE, District Planning Manager Michael Henderson, AICP, Transportation Planning Specialist Daniel Roeger, PE, Area Engineer Private Transportation Interest Joe Scheppers, N.H. Scheppers Distributing Company. Pedestrian or Biking Interest Kevin Schwartz, JC Parks Outdoor Recreation Program Manager Ex-Officio Members: Eva Steinman, Federal Transit Administration, Region VII Daniel Weitkamp, Federal Highway Administration, Missouri Div. Jason Branstetter, Heartland Port Authority Representative - February 2023 CAMPO Staff Clint Smith – Director, Planning & Protective Services Eric Barron, AICP - Planning Manager Katrina Williams, GISP, AICP – Senior Planner Vacant - Planner Lisa Dittmer – Administrative Assistant DRAFT CAMPO 2024-2028 Transportation Improvement Program 1 Introduction The Capital Area Metropolitan Planning Organization (CAMPO) is the designated metropolitan planning organization for the Jefferson City, Missouri Urban Area. CAMPO’s purpose is to carry out a continuing, cooperative, and comprehensive long-range transportation planning process. As part of this process CAMPO updates the Metropolitan Transportation Plan (MTP) with the latest program year TIP, to address the current and future transportation needs for the Metropolitan Planning Area (MPA). The MPA includes a southern portion of Callaway County, northeastern portion of Cole County, the communities of Holts Summit, Jefferson City, St. Martins, Taos, and Wardsville. Figure 1 – The CAMPO Planning Area The Transportation Improvement Program (TIP) is a 5-year financial program of transportation projects to be implemented within the MPA. The projects are funded by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), or are deemed “regionally significant.” Each project or project phase included in the TIP is consistent with investment strategies discussed in the MTP and is part of the process of applying for funds from the FHWA and FTA. Certain capital and non-capital transportation projects using funding under 23 U.S.C. and 49 U.S.C. Chapter 53 or regionally significant projects requiring action by the FHWA or the FTA are required to be included in the TIP. The TIP is updated annually by CAMPO in cooperation with the Missouri Department of Transportation and local public transportation operators. DRAFT CAMPO 2024-2028 Transportation Improvement Program 2 Public Participation CAMPO seeks active and meaningful involvement of the public and interested parties in the development and update of transportation plans and programs, including the TIP. All meetings of the CAMPO Technical Committee and Board of Directors are open to the public. All meeting agendas and minutes are available on the City of Jefferson website at www.jeffersoncitymo.gov or upon request. CAMPO provides all interested parties and the public with a reasonable opportunity to comment on the proposed TIP as required by federal law. Reasonable opportunity to comment and participate on the proposed TIP is made following the policies in the CAMPO Public Participation Plan located on the CAMPO website at https://www.jeffersoncitymo.gov/campo. The approved TIP is available for review at several locations throughout the CAMPO planning area as outlined in the Public Participation Plan. The FTA allows a grantee, e.g. JEFFTRAN and OATS, Inc., to rely on locally adopted public participation plans for the submittal of their projects in lieu of a separate “Program of Projects” (POP) if the grantee has coordinated with CAMPO and has ensured that the public is aware that the TIP and the Public Participation Plan are being used to satisfy the POP public participation requirements. JEFFTRAN is the public transit provider for the City of Jefferson and OATS, Inc. is a not-for-profit 501(c)3 corporation providing specialized transportation for senior citizens, people with disabilities and the rural general public in 87 Missouri counties. Federal Transit Administration recipients of certain categories of funds, JEFFTRAN and OATS, Inc. must follow a public participation plan. Both JEFFTRAN and OATS, Inc. meet this coordination and public awareness criteria. Project Selection Transportation projects, funded by direct allocation of Federal funds to a project sponsor, award of Federal funds via competitive grant, or wholly funded by the sponsor, are selected by the agency having jurisdiction over the project using their own criteria and submitted to the CAMPO Board of Directors for inclusion in the TIP. Transportation projects included within the TIP should be consistent with investment strategies discussed in the MTP. CAMPO does not receive any discretionary funding for infrastructure projects. If such funds again become available, the following prioritization process is in place. Transportation projects, funded by sub-allocated Federal funds directly to CAMPO or otherwise made available for programming at the discretion of CAMPO, are selected based on competitive process approved by the CAMPO Board of Directors. This process involves a call for projects, ranking based on CAMPO priorities by staff, and review by the CAMPO Technical Committee, prior to being forwarded to the CAMPO Board of Directors for a vote of approval. The ranking process has unique evaluation criteria for different categories of projects – roadway/intersection, bridge, non-motorized, transit, and ‘other.’ TIP Development The TIP document is updated every year and covers a 5-year period starting July 1 of each year. TIP development begins with a verification of status of projects in the current TIP, solicitation of new projects, and request for budget information from local jurisdictions. Local transit providers are also requested to provide information needed to develop their “Program of Projects” for inclusion in the TIP. CAMPO staff develops the financial plan, project listings, maintenance and operations, and other components of the TIP with support from the Technical Committee, member jurisdictions, MoDOT, FHWA, and FTA. Once the draft TIP is developed, it is presented to the Technical Committee for review and recommendation to the Board of Directors. A 25-day public comment period will open and be held prior to the Board of Directors approval of the TIP. The Board then requests approval of the TIP by the Governor and ONE DOT (consisting of FHWA and FTA). DRAFT CAMPO 2024-2028 Transportation Improvement Program 3 TIP Amendments and Administrative Modifications Between TIP updates, if projects need to be added, removed or changed, the TIP can be changed either by amendment or administrative modifications. Definitions of an amendment or an administrative modification, and information about public participation, notifications, and other procedures regarding amendments and administrative modifications, can be found in Appendix 3 – Policies and Procedures of this document. Appendix 1 contains a listing of amendments and administrative modifications that have occurred to this document. Previous Projects The TIP will include a listing of major projects from the previous TIP that were implemented and identify any significant delays in the planned implementation of major projects. Major projects are defined as transportation improvement projects receiving Federal financial assistance with an estimated total cost of $500 million or more or that have been identified by the FHWA as being a major project. No major projects were implemented, and no significant delays or projects from the previous TIP have been identified. No work on a federally funded project can begin until the scope of work has been authorized and the federal funds obligated in the FHWA Financial Management Information System (FMIS). Annual Listing of Obligated Projects The Fixing America’s Surface Transportation Act (FAST Act) requires that CAMPO publish an annual listing of federally obligated projects. The Annual Listing of Projects is an index of projects which used Federal funds that were obligated in the preceding TIP program year. Obligated projects are consistent with the funding categories identified in the TIP. An obligation is the Federal government’s legal commitment to pay the Federal share of a project’s cost. An obligated project is one that has been authorized and funds have been obligated by a Federal agency. Obligated projects are not necessarily initiated or completed in the program year, and the amount of the obligation will not necessarily equal the total cost of the project. For Federal Transit Administration projects, obligation occurs when the grant is awarded. For Federal Highway Administration projects, obligation occurs when a project agreement is executed and the State/grantee requests that the funds be obligated. CAMPO publishes the Annual Listing of Obligated Projects yearly within 90 days of the previous TIP’s program year. The Annual Listing of Obligated Projects is posted on the CAMPO website at: http://www.jeffersoncitymo.gov/campo Air Quality Designation The United States Environmental Protection Agency has designated the CAMPO Metropolitan Planning Area as being in attainment for Ozone, Carbon Monoxide (CO), Nitrogen Dioxide (NO2), Small Particulate Matter (PM- 2.5) Lead, and Sulfur Dioxide (SO2). If the air quality in a geographic area meets or is cleaner than the national standard, it is called an attainment area; areas that don't meet the national standard are called nonattainment areas. Environmental Justice Executive Order 12898 requires agencies receiving federal funding to meaningfully address low-income and minority populations in their plans, programs, policies, and activities. CAMPO strives to include all people, including protected classes, in planning activities. The CAMPO Title VI Program addresses this topic. Additionally, CAMPO staff expects project sponsors to identify and mitigate any disproportionately high and adverse effects of federal transportation programs. DRAFT CAMPO 2024-2028 Transportation Improvement Program 4 Federal Performance Measures In the passage of the Moving Ahead for Progress in the 21st Century Act (MAP-21). FHWA defines Transportation Performance Management (TPM) as a strategic approach that uses system information to make investment and policy decisions to achieve national performance goals. The FAST (Fixing America’s Surface Transportation) Act and Infrastructure Investment and Jobs Act both provided for continuation of these goals. Another requirement, Performance Based Planning and Programming (PBPP), refers to the application of performance management principles within the planning and programming processes of transportation agencies to achieve desired performance outcomes for the multimodal transportation system. To comply with these requirements, the CAMPO Board of Directors adopts targets for the five performance areas listed below. These measures and corresponding targets can be found in the System Performance Report located in Appendix C of the Metropolitan Transportation Plan (MTP). CAMPO usually adopts the state targets when they are updated. Transit Asset Management Measures MoDOT collected and evaluated existing buses and facilities to be included in the State Transit Asset Management Plan and used this information to set targets, which will be evaluated on an annual basis as inventory changes. JEFFTRAN participates in the State Transit Asset Management Plan. There is approximately $20,469,897 in project funding programmed into this TIP that may be utilized for bus replacement and other capital projects to help transit agencies move toward these targets. Safety Measures The Federal Highway Administration established five performance measures to assess performance and carry out the Highway Safety Improvement Program: (1) number of fatalities, (2) rate of fatalities per vehicle mile traveled (VMT), (3) number of serious injuries, (4) rate of serious injuries per VMT, and (5) number of combined non-motorized fatalities and non-motorized serious injuries. MoDOT established the statewide safety targets in 2021, which were adopted by CAMPO. These targets are updated annually. These targets can be found in the System Performance Report located in Appendix C of the Metropolitan Transportation Plan (MTP). There are a number of projects programmed for safety in the TIP, totaling $122,005,066, all sponsored by the Central District of MoDOT, to help the State move towards these targets. CAMPO staff also actively participates in the Central District Coalition of Roadway Safety, which works to implement Missouri’s Show-Me Zero ultimate goal of zero fatalities on Missouri roadways, and participates in the annual Highway Safety and Traffic Blueprint Conference. Pavement and Bridge Measures The Federal Highway Administration established 6 performance measures to assess pavement and bridge conditions: (1) percent of interstate pavements in Good condition, (2) percent of interstate pavements in Poor condition, (3) percent of non-interstate national highway system (NHS) pavements in Good condition, (4) percent of non-interstate NHS pavements in Poor condition, (5) percent of NHS bridges by deck area classified as Good condition, and (6) percent of NHS bridges by deck area classified as Poor condition. There are no interstate highways in the CAMPO region, so those targets are not addressed. MoDOT established statewide pavement and bridge targets in 2018, and revised in 2020, which shows the targets set by MoDOT and adopted by CAMPO. These targets may be updated every other year. These targets can be found in the System Performance Report located in Appendix C of the Metropolitan Transportation Plan (MTP). DRAFT CAMPO 2024-2028 Transportation Improvement Program 5 Many projects in the TIP address Asset Management, a major priority for MoDOT. There is currently $72,545,001 in project funding in the TIP that addresses road and/or bridge maintenance or scoping. Travel Time Reliability and Freight Reliability The Federal Highway Administration established 3 performance measures to assess travel time reliability and freight movement on the interstate system: (1) Percent of Reliable Person-Miles Traveled on the Interstate, (2) Percent of Reliable Person-Miles Traveled on the Non-Interstate NHS, and (3) Truck Travel Time Reliability Index. There are no interstate highways in the CAMPO region. MoDOT established the travel time reliability targets in 2018, which was adopted by CAMPO. This target may be updated every other year. These targets can be found in the System Performance Report located in Appendix C of the Metropolitan Transportation Plan (MTP). There are currently no projects programmed into the TIP with the sole purpose of improving travel time reliability. Several of the projects within the TIP address this target indirectly, which will help the state move toward this target. Transit Safety Measures The Federal Transit Administration requires that each Public Transportation Agency establish a Public Transportation Agency Safety Plan (PTASP). This plan utilizes existing agency safety practices and industry best practices to meet the new regulations set in 49 CFR Part 673 of the Federal regulations. The PTASP includes formal documentation to guide the agency in proactive safety management policy, safety risk management, safety assurance, and safety promotion. The goal is to provide management and labor with a comprehensive and collaborative approach to managing safety. The plan includes the process and schedule for an annual review of the plan to review the safety performance measures and update processes that may be needed to improve the organization’s safety practices. There is currently $352,719 in project funding in the TIP that addresses road and/or bridge maintenance or scoping. Other projects within the TIP address these targets indirectly, which will help transit agencies move toward these targets. DRAFT CAMPO 2024-2028 Transportation Improvement Program 6 Financial Plan The TIP includes a financial plan that demonstrates how the approved TIP can be implemented, and indicates resources from public and private sources that are reasonably expected to be made available to carry out the TIP. CAMPO, MoDOT, and public transportation operators cooperatively develop estimates of funds that are reasonably expected to be available to support TIP implementation. Only projects for which construction or operating funds can reasonably be expected to be available may be included. In developing the financial plan, CAMPO takes into account all projects and strategies funded under Title 23 U.S.C., Title 49 U.S.C. Chapter 53, and other federal funds, and regionally significant projects that are not federally funded. For purposes of transportation operations and maintenance, the financial plan shall contain system-level estimates of costs and revenue sources that are reasonably expected to be available to adequately operate and maintain Federal -aid highways (as defined by Title 23 U.S.C. 101(a)(5) and public transportation (as defined by Title 49 U.S.C. Chapter 53). Forecast Revenue Available for Transportation Funding Federal funding forecasts, provided by MoDOT based on published notices in the Federal Register, estimate fiscal year authorization levels by the FHWA and FTA under the current highway act. Appendix 2 briefly describes most of the Federal transportation programs which could fund projects in the CAMPO planning area. For Federally-funded projects, the TIP must identify the appropriate “matching funds” by source. The matching funds are usually provided by state and local governments. State revenue forecasts are also provided by MoDOT based on historical data of the State Fuel Tax, State Vehicle Sales and Use Tax and General Revenue. Local revenue forecast from the County Aid Road Trust (State Fuel Tax and State Vehicle Sales and Use Tax) for each jurisdiction are based on past distributions and are assumed to continue a trend of a two percent inflation rate. The City of Jefferson has a ½ cent sales tax to support its Capital Improvement Program and a ½ cent sales tax for Parks and Recreation, which supports greenways and other non-motorized transportation activities. The City of Jefferson has provided its own future revenue projections from these sources. St. Martins has a one-cent sales tax for parks and streets. Cole County has a ½ cent sales tax to support its Capital Improvement Program and a real property tax levy of $0.27 earmarked for Road & Bridges. All small cities get $100,000 every five years from Cole County, which comes from the aforementioned sales tax. Callaway County has a real property tax levy of $0.2466 earmarked for Road & Bridges. Figure 2 shows the total programmed project funds and available project funds by source. The project costs have inflation factored in by each project sponsor. The instructions on the form used to submit a project for inclusion in the TIP reminds the project sponsor to take inflation into account when estimating the project’s cost. Since the last iteration of the MTP, the inflation factor for the TIP has been set as two percent. DRAFT CAMPO 2024-2028 Transportation Improvement Program 7 Figure 2 – Programmed Funds and Available Project Funds by Source 2024 2025 2026 2027 2028 Total FHWA AC - STBG $237,600 $5,481,600 $1,098,400 $2,419,200 $0 $9,236,800 FHWA NHPP $28,897,600 $1,979,200 $164,800 $2,097,600 $700,800 $33,840,000 FHWA HSIP $0 $0 $0 $0 $0 $0 FHWA STBG $0 $0 $0 $0 $0 $0 FHWA TAP $1,782,136 $0 $0 $0 $0 $1,782,136 FHWA SAFETY $51,200 $51,200 $51,200 $0 $0 $153,600 FHWA BRO $83,336 $968,897 $0 $0 $0 $1,052,233 FHWA BFP $51,226 $102,863 $0 $0 $0 $154,089 FHWA RTP $128,850 $0 $0 $0 $0 $128,850 FTA 5307 $2,124,018 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,894,620 FTA 5310 $172,000 $172,000 $270,000 $182,000 $270,000 $1,066,000 FTA 5311 $0 $0 $0 $0 $0 $0 FTA 5329 $0 $0 $0 $0 $0 $0 FTA 5339 $954,953 $10,175 $0 $0 $0 $965,128 $34,482,919 $9,872,771 $2,746,578 $5,919,087 $2,252,101 $55,273,456 MoDOT STATE $11,859,414 $6,982,014 $4,780,014 $5,844,214 $4,626,614 $34,092,270 $11,859,414 $6,982,014 $4,780,014 $5,844,214 $4,626,614 $34,092,270 $0 $0 $0 $0 $0 $0 $5,438 $102,863 $0 $0 $0 $108,301 $62,500 $0 $0 $0 $0 $62,500 $1,609,806 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,380,408 $311,100 $30,544 $28,000 $28,000 $28,000 $425,644 $127,078 $0 $0 $0 $0 $127,078 $0 $0 $0 $0 $0 $0 $105,909 $0 $0 $0 $0 $105,909 $60,000 $60,000 $92,000 $70,000 $92,000 $374,000 $2,281,831 $1,300,243 $1,282,178 $1,318,287 $1,401,301 $7,583,840 $48,624,164 $18,155,028 $8,808,770 $13,081,588 $8,280,016 $96,949,566 2024 2025 2026 2027 2028 Total FHWA AC - STBG $237,600 $5,481,600 $1,098,400 $2,419,200 $0 $9,236,800 FHWA NHPP $28,897,600 $1,979,200 $164,800 $2,097,600 $700,800 $33,840,000 FHWA HSIP $0 $0 $0 $0 $0 $0 FHWA STBG $0 $0 $0 $0 $0 $0 FHWA TAP $1,782,136 $0 $0 $0 $0 $1,782,136 FHWA SAFETY $51,200 $51,200 $51,200 $0 $0 $153,600 FHWA BRO $83,336 $968,897 $0 $0 $0 $1,052,233 FHWA BFP $51,226 $102,863 $0 $0 $0 $154,089 FHWA RTP $128,850 $0 $0 $0 $0 $128,850 FTA 5307 $2,124,018 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,894,620 FTA 5310 $172,000 $172,000 $270,000 $182,000 $270,000 $1,066,000 FTA 5311 $0 $0 $0 $0 $0 $0 FTA 5329 $0 $0 $0 $0 $0 $0 FTA 5339 $954,953 $10,175 $0 $0 $0 $965,128 $34,482,919 $9,872,771 $2,746,578 $5,919,087 $2,252,101 $55,273,456 MoDOT STATE $11,859,414 $6,982,014 $4,780,014 $5,844,214 $4,626,614 $34,092,270 $11,859,414 $6,982,014 $4,780,014 $5,844,214 $4,626,614 $34,092,270 $6,147,498 $6,270,448 $6,395,857 $6,523,774 $6,654,250 $31,991,827 $6,115,901 $6,238,219 $6,362,983 $6,490,243 $6,620,048 $31,827,395 $1,797,162 $1,833,105 $1,869,767 $1,907,162 $1,945,305 $9,352,501 $7,565,284 $7,716,590 $7,870,922 $8,028,340 $8,188,907 $39,370,044 $4,957,247 $3,465,951 $3,553,208 $3,654,250 $3,759,055 $19,389,711 $420,412 $428,820 $437,397 $446,145 $455,068 $2,187,842 $504,619 $514,712 $525,006 $535,506 $546,216 $2,626,059 $345,704 $352,618 $359,670 $366,864 $374,201 $1,799,057 $120,000 $120,000 $228,000 $140,000 $228,000 $836,000 $27,973,827 $26,940,463 $27,602,811 $28,092,284 $28,771,050 $139,380,435 $74,316,160 $43,795,248 $35,129,403 $39,855,585 $35,649,765 $228,746,160Total Available Funds Yearly Totals Local Totals Total Programmed Total Available Funds Federal Toas State Local Callaway County Cole County Wardsville Oats Programmed Funds Federal Holts Summit State Federal Totals State Totals Local Federal Totals Oats Yearly Totals Local Totals JEFFTRAN St. Martins Taos Wardsville Callaway County Cole County Holts Summit City of Jefferson State Totals City of Jefferson JEFFTRAN St. Martins DRAFT CAMPO 2024-2028 Transportation Improvement Program 8 Operations and Maintenance MoDOT Maintenance costs for MoDOT includes salaries, materials and equipment needed to deliver the roadway and bridge maintenance programs. This category includes basic maintenance activities like minor surface treatments such as: sealing, small concrete repairs and pothole patching; mowing right of way; snow removal; replacing signs; striping; repairing guardrail; and repairing traffic signals. Performing these activities requires employees; vehicles and other machinery; and materials such as salt, asphalt and fuel. Maintenance operations expendi tures are provided annually by MoDOT. Maintenance operations expenditures are expected to increase 1.5% annually. MoDOT’s cost per lane mile is $5,323, ($5,323 per lane mile x 344.8 lane miles = $1,835,370 annual cost), and can be seen in Figure 4. Local Government Local revenue sources for operations and maintenance include state fuel tax, state vehicles sales/use tax, local sales taxes, franchise fees, license and permit fees, property taxes, and other revenue sources that provide significant resources for local general fund and specific funding of transportation. Not all taxes and fees go to transportation, so the local jurisdiction usually will identify a budget specifically for transportation purposes, such as capital improvements, Road and Bridge funds, transit operating subsidies, road and street budgets, or operations and maintenance budgets. Maintenance operations expenditures are expected to increase 1.5% annually. The operations and maintenance costs for local governments include salaries, fringe benefits, materials, and equipment needed to deliver the street and bridge maintenance programs. This category includes basic maintenance activities like minor surface treatments such as sealing, small concrete repairs, pothole patching, mowing, snow removal, replacing signs, striping, and repairing traffic signals. These activities may be performed in-house or outsourced. Local government operations and maintenance on federal aid roads calculated for the system wide average of operations & maintenance per centerline mile is determined below in Figure 4. As a further demonstration of fiscal constraint, another requirement is that municipalities report their operations and maintenance budget. Reported below are Cole and Callaway Counties, Holts Summit, Jefferson City, St. Martins, and MoDOT. The municipalities of Taos and Wardsville do not have any locally maintained roadways that are eligible for federal-aid and have not been included. There are 546.67 miles of Federal-Aid eligible roadway in the CAMPO region. MoDOT is responsible for the maintenance of all “State System” roadways (344.8 miles) while “Off System” roadways are the responsibility of the local governments (201.88 miles), shown in Figure 3. Figure 3 - Federal Aid Eligible Road Mileage by Jurisdiction. Jurisdiction MoDOT Lane Miles Local Lane Miles Total Lane Miles Callaway County 31.14 10.98 42.12 Holts Summit 17.04 14.37 31.4 Jefferson City 16.79 1.64 18.43 Cole County 117.58 28.46 146.04 Jefferson City 135.87 142.04 277.91 St. Martins 10.11 4.39 14.5 Taos 8.66 0 8.66 Wardsville 7.61 0 7.61 Total 344.8 201.88 546.67 DRAFT CAMPO 2024-2028 Transportation Improvement Program 9 Figure 4 – Locally Owned Federal-aid System Mileage and Operations and Maintenance Costs by Jurisdiction Transit In addition to the local government operations and maintenance previously discussed, JEFFTRAN expenses also cover fleet repair/maintenance, repairing/replacing bus shelters, bus washing, bus maintenance facilities, public restrooms, and fuel. Figures 5 and 6 show the estimated expenditures for transit operations and maintenance for JEFFTRAN and OATS, respectively. Operations and Maintenance revenue and expenditures are based on the most recently available budgets. Figure 5 - JEFFTRAN Estimated Expenditures for Operations & Maintenance. Figure 6 – OATS Estimated Expenditures for Operations & Maintenance. Cost/Lane Mile Local Lane Miles Local O&M Cost $6,458 10.98 $70,909 $4,778 14.37 $68,660 $7,209 1.64 $11,823 $6,935 28.46 $197,370 $7,209 142.04 $1,023,966 $7,146 4.39 $31,371 $5,291 0 $0 $5,291 0 $0 201.88 1,404,099$ Cost/Lane Mile State System Lane Miles MoDOT O&M Cost $5,323 344.8 $1,835,370 Jurisdiction St. Martins Taos Wardsville Total Callaway County Jefferson City Holts Summit Jefferson City Cole County State System MoDOT Locally owned federal-aid system lane miles for each jurisdiction were developed by MoDOT Source: MoDOT Personnel Services (1,800,000)$ (1,836,000)$ (1,872,720)$ (1,910,174)$ (1,948,378)$ Materials and Supplies (305,000)$ (311,100)$ (317,322)$ (323,668)$ (330,142)$ Contractual Services (320,000)$ (326,400)$ (332,928)$ (339,587)$ (346,378)$ Utilities (30,000)$ (30,600)$ (31,212)$ (31,836)$ (32,473)$ Repairs and Maintenance (550,000)$ (561,000)$ (572,220)$ (583,664)$ (595,338)$ Total (3,005,000)$ (3,065,100)$ (3,126,402)$ (3,188,930)$ (3,252,709)$ FY 2027 FY 2028FY 2026ExpenditureFY 2024 FY 2025 Personnel Services (111,500)$ (111,500)$ (129,000)$ (129,000)$ (129,000)$ Materials and Supplies (2,500)$ (2,500)$ (4,000)$ (4,000)$ (4,000)$ Repairs and Maintenance (6,000)$ (6,000)$ (7,000)$ (7,000)$ (7,000)$ Total (120,000)$ (120,000)$ (140,000)$ (140,000)$ (140,000)$ FY 2028FY 2025 FY 2026FY 2024Expenditure FY 2027 DRAFT CAMPO 2024-2028 Transportation Improvement Program 10 Financial Constraint To exhibit financial constraint, a financial plan should address three questions: 1) What will the needs for transportation in the CAMPO planning area cost? The needs are identified by project in the following section and costs are summarized by funding source in Figure 2. 2) What revenues are available that can be applied to the needs? Specific revenues available to meet the needs are identified in the Demonstration of Fiscal Constraint tables - Forecast Revenue for Transportation projects, Operations and Maintenance, by jurisdiction and source. 3) Are the revenues sufficient to cover the costs? As shown in Figure 2 – Programmed by Source, programmed fund amounts equal available fund amounts. For many jurisdictions as shown in Figure 2, available funds exceed the amounts of revenues required to fund programmed projects. DRAFT CAMPO 2024-2028 Transportation Improvement Program 11 Demonstration of Fiscal Constraint - Municipalities Source 2024 2025 2026 2027 2028 Total CART 1,897,498$ 1,935,448$ 1,974,157$ 2,013,640$ 2,053,913$ 9,874,657$ Taxes 4,250,000$ 4,335,000$ 4,421,700$ 4,510,134$ 4,600,337$ 22,117,171$ Total Available Revenue 6,147,498$ 6,270,448$ 6,395,857$ 6,523,774$ 6,654,250$ 31,991,827$ Operation & Maintenance Costs (70,909)$ (71,973)$ (73,052)$ (74,148)$ (75,260)$ (365,342)$ TIP Commitment Totals -$ -$ -$ -$ -$ -$ Total Costs (70,909)$ (71,973)$ (73,052)$ (74,148)$ (75,260)$ (365,342)$ Remaining Financial Capacity 6,076,589$ 6,198,475$ 6,322,805$ 6,449,626$ 6,578,989$ 31,626,485$ Callaway County Demonstration of Fiscal Constraint Revenue Costs Source 2024 2025 2026 2027 2028 Total CART 1,315,901$ 1,342,219$ 1,369,063$ 1,396,445$ 1,424,374$ 6,848,002$ Taxes 4,800,000$ 4,896,000$ 4,993,920$ 5,093,798$ 5,195,674$ 24,979,393$ Total Available Revenue 6,115,901$ 6,238,219$ 6,362,983$ 6,490,243$ 6,620,048$ 31,827,395$ Operation & Maintenance Costs (197,370)$ (200,331)$ (203,336)$ (206,386)$ (209,481)$ (1,016,903)$ TIP Commitment Totals -$ -$ -$ -$ -$ -$ Total Costs (197,370)$ (200,331)$ (203,336)$ (206,386)$ (209,481)$ (1,016,903)$ Remaining Financial Capacity 5,918,531$ 6,037,889$ 6,159,648$ 6,283,858$ 6,410,567$ 30,810,492$ Cole County Demonstration of Fiscal Constraint Revenue Costs Source 2024 2025 2026 2027 2028 Total CART 161,192$ 164,415$ 167,704$ 171,058$ 174,479$ 838,847$ General Revenue 1,635,970$ 1,668,689$ 1,702,063$ 1,736,104$ 1,770,827$ 8,513,654$ Total Available Revenue 1,797,162$ 1,833,105$ 1,869,767$ 1,907,162$ 1,945,305$ 9,352,501$ Operation & Maintenance Costs (68,660)$ (69,690)$ (70,735)$ (71,796)$ (72,873)$ (353,755)$ TIP Commitment Totals -$ -$ -$ -$ -$ -$ Total Costs (68,660)$ (69,690)$ (70,735)$ (71,796)$ (72,873)$ (353,755)$ Remaining Financial Capacity 1,728,502$ 1,763,415$ 1,799,032$ 1,835,366$ 1,872,432$ 8,998,746$ Holts Summit Demonstration of Fiscal Constraint Revenue Costs Source 2024 2025 2026 2027 2028 Total CART 1,965,284$ 2,004,590$ 2,044,682$ 2,085,576$ 2,127,287$ 10,227,419$ Taxes 5,600,000$ 5,712,000$ 5,826,240$ 5,942,765$ 6,061,620$ 29,142,625$ Total Available Revenue 7,565,284$ 7,716,590$ 7,870,922$ 8,028,340$ 8,188,907$ 39,370,044$ Operation & Maintenance Costs (1,035,789)$ (1,051,326)$ (1,067,096)$ (1,083,102)$ (1,099,349)$ (5,336,661)$ TIP Commitment Totals (1,110,630)$ (1,172,836)$ (1,228,178)$ (1,286,287)$ (1,347,301)$ (6,145,232)$ Total Costs (2,146,419)$ (2,224,162)$ (2,295,274)$ (2,369,389)$ (2,446,650)$ (11,481,893)$ Remaining Financial Capacity 5,418,865$ 5,492,428$ 5,575,648$ 5,658,951$ 5,742,257$ 27,888,150$ Costs City of Jefferson Demonstration of Fiscal Constraint Revenue Source 2024 2025 2026 2027 2028 Total CART 52,006$ 53,047$ 54,108$ 55,190$ 56,293$ 270,644$ General Revenue 368,406$ 375,774$ 383,289$ 390,955$ 398,774$ 1,917,198$ Total Available Revenue 420,412$ 428,820$ 437,397$ 446,145$ 455,068$ 2,187,842$ Operation & Maintenance Costs (31,371)$ (31,842)$ (32,319)$ (32,804)$ (33,296)$ (161,632)$ TIP Commitment Totals (82,967)$ -$ -$ -$ -$ (82,967)$ Total Costs (114,338)$ (31,842)$ (32,319)$ (32,804)$ (33,296)$ (244,599)$ Remaining Financial Capacity 306,074$ 396,979$ 405,078$ 413,341$ 421,772$ 1,943,243$ St. Martins Demonstration of Fiscal Constraint Revenue Costs DRAFT CAMPO 2024-2028 Transportation Improvement Program 12 Demonstration of Fiscal Constraint – Public Transportation Providers Source 2024 2025 2026 2027 2028 Total CART 40,054$ 40,855$ 41,673$ 42,506$ 43,356$ 208,444$ General Revenue 464,565$ 473,856$ 483,333$ 493,000$ 502,860$ 2,417,615$ Total Available Revenue 504,619$ 514,712$ 525,006$ 535,506$ 546,216$ 2,626,059$ Operation & Maintenance Costs -$ -$ -$ -$ -$ -$ TIP Commitment Totals -$ -$ -$ -$ -$ -$ Total Costs -$ -$ -$ -$ -$ -$ Remaining Financial Capacity 504,619$ 514,712$ 525,006$ 535,506$ 546,216$ 2,626,059$ Taos Demonstration of Fiscal Constraint Revenue Costs Source 2024 2025 2026 2027 2028 Total CART 68,704$ 70,078$ 71,479$ 72,909$ 74,367$ 357,538$ General Revenue 277,000$ 282,540$ 288,191$ 293,955$ 299,834$ 1,441,519$ Total Available Revenue 345,704$ 352,618$ 359,670$ 366,864$ 374,201$ 1,799,057$ Operation & Maintenance Costs -$ -$ -$ -$ -$ -$ TIP Commitment Totals -$ -$ -$ -$ -$ -$ Total Costs -$ -$ -$ -$ -$ -$ Remaining Financial Capacity 345,704$ 352,618$ 359,670$ 366,864$ 374,201$ 1,799,057$ Costs Wardsville Demonstration of Fiscal Constraint Revenue Source 2024 2025 2026 2027 2028 Total CARES Act Funds (Distributed as FTA 5307)207,170$ -$ -$ -$ -$ -$ FTA Section 5307 (reallocation from other agency)1,053,363$ -$ -$ -$ -$ -$ FTA Section 5307 (not including CARES)1,054,130$ -$ -$ -$ -$ -$ FTA Section 5307 Sub-Total 2,314,663$ 1,106,836$ 1,162,178$ 1,220,287$ 1,281,301$ 7,085,265$ FTA Section 5310 112,000$ 112,000$ 112,000$ 112,000$ 112,000$ 560,000$ FTA Section 5339 954,953$ 10,175$ -$ -$ -$ 965,128$ Sales Tax - 1/2% Capital Improvement 80,000$ 80,000$ 80,000$ 80,000$ 80,000$ 400,000$ City of Jefferson-Local Operating Assistance 1,035,000$ 1,705,000$ 1,739,100$ 1,773,882$ 1,809,360$ 8,062,342$ MoDOT State Operating Assistance 52,414$ 52,414$ 52,414$ 52,414$ 52,414$ 262,070$ Farebox and Reimbursements 391,692$ 399,526$ 407,516$ 415,667$ 423,980$ 2,038,381$ Total Available Revenue 4,940,722$ 3,465,951$ 3,553,208$ 3,654,250$ 3,759,055$ 19,373,186$ Personnel Services (1,800,000)$ (1,836,000)$ (1,872,720)$ (1,910,174)$ (1,948,378)$ (9,367,272)$ Materials and Supplies (305,000)$ (311,100)$ (317,322)$ (323,668)$ (330,142)$ (1,587,232)$ Contractual Services (320,000)$ (326,400)$ (332,928)$ (339,587)$ (346,378)$ (1,665,293)$ Utilities (30,000)$ (30,600)$ (31,212)$ (31,836)$ (32,473)$ (156,121)$ Repairs and Maintenance (550,000)$ (561,000)$ (572,220)$ (583,664)$ (595,338)$ (2,862,222)$ Operation & Maintenance Totals (3,005,000)$ (3,065,100)$ (3,126,402)$ (3,188,930)$ (3,252,709)$ (15,638,141)$ TIP Commitments TIP Commitment Totals (311,100)$ (30,544)$ (28,000)$ (28,000)$ (28,000)$ (425,644)$ Remaining Financial Capacity 1,624,622$ 370,307$ 398,806$ 437,320$ 478,346$ 3,309,401$ JEFFTRAN Demonstration of Fiscal Constraint Revenue Operation & Maintenance Source 2024 2025 2026 2027 2028 Total FTA Section 5310 60,000$ 60,000$ 158,000$ 70,000$ 158,000$ 506,000$ Farebox and Reimbursements 4,500$ 4,500$ 5,250$ 5,250$ 5,250$ 24,750$ Local Contracts 55,500$ 55,500$ 64,750$ 64,750$ 64,750$ 305,250$ Total Available Revenue 120,000$ 120,000$ 228,000$ 140,000$ 228,000$ 836,000$ Personnel Services (51,500)$ (51,500)$ (59,000)$ (59,000)$ (59,000)$ (280,000)$ Materials and Supplies (2,500)$ (2,500)$ (4,000)$ (4,000)$ (4,000)$ (17,000)$ Repairs and Maintenance (6,000)$ (6,000)$ (7,000)$ (7,000)$ (7,000)$ (33,000)$ Operation & Maintenance Totals (60,000)$ (60,000)$ (70,000)$ (70,000)$ (70,000)$ (330,000)$ TIP Commitments TIP Commitment Totals (60,000)$ (60,000)$ (92,000)$ (70,000)$ (92,000)$ (374,000)$ Remaining Financial Capacity -$ -$ 66,000$ -$ 66,000$ 132,000$ Operation & Maintenance OATS Demonstration of Fiscal Constraint Revenue DRAFT CAMPO 2024-2028 Transportation Improvement Program 13 Fiscally Constrained Transportation Projects – Bridges Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $298,400 $511,200 $809,600 MoDOT STATE $74,600 $127,800 $202,400 TIP #2022-03 Local $0 MoDOT#5S3458 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $3,033,600 $3,033,600 MoDOT STATE $758,400 $758,400 Local $0 Other $0 Total $373,000 $4,431,000 $0 $0 $0 $0 $0 $4,804,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $16,800 $42,400 $339,200 $398,400 MoDOT STATE $4,200 $10,600 $84,800 $99,600 TIP #2022-07 Local $0 MoDOT#5P3523 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $1,403,200 $1,403,200 MoDOT STATE $350,800 $350,800 Local $0 Other $0 Total $21,000 $53,000 $2,178,000 $0 $0 $0 $0 $2,252,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $1,600 $17,600 $19,200 MoDOT STATE $400 $4,400 $4,800 TIP #2022-08 Local $0 MoDOT#5P3451 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $160,800 $160,800 MoDOT STATE $40,200 $40,200 Local $0 Other $0 Total $2,000 $223,000 $0 $0 $0 $0 $0 $225,000 Project Name: Bridge Rehabilitation over Rte. 54 (Routes 94, H, and W). E N G Description & Location: Bridge rehabilitation over Rte. 54 includes Rte. 94, Rte. H and Rte. W. R O W MoDOT Funding Prior Funding State Program Year - July 1 to June 30 MoDOT Funding Prior Funding State Program Year - July 1 to June 30 Comments: Bridges A3508, A4635, and twin bridges A3539. Total Project Cost: $4,804,000 C O N S T Description & Location: Bridge improvement over Vetter Lane. Includes Bolivar Street over Rte. 50. R O W C O N S T Comments: Bridge A1420 and twin bridges A0722. Total Project Cost: $2,252,000 Project Name: Bridge Improvement on Rte. 50 over Vetter Lane & Bolivar. E N G MoDOT Funding Prior Funding State Program Year - July 1 to June 30 Project Name: Bridge washing On US 54 over Missouri River. E N G Description & Location: Bridge washing over Missouri River. R O W C O N S T Comments: Bridges A4497 and L0550. Total Project Cost: $225,000 DRAFT CAMPO 2024-2028 Transportation Improvement Program 14 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $132,000 $321,600 $453,600 MoDOT STATE $33,000 $80,400 $113,400 TIP #2022-09 Local $0 MoDOT#5P3467 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $1,551,200 $1,551,200 MoDOT STATE $387,800 $387,800 Local $0 Other $0 Total $165,000 $2,341,000 $0 $0 $0 $0 $0 $2,506,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $17,600 $89,600 $490,400 $597,600 MoDOT STATE $4,400 $22,400 $122,600 $149,400 TIP #2022-10 Local $0 MoDOT#5P3525 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $2,105,600 $2,105,600 MoDOT STATE $526,400 $526,400 Local $0 Other $0 Total $22,000 $112,000 $3,245,000 $0 $0 $0 $0 $3,379,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $80,800 $104,000 $428,000 $612,800 MoDOT STATE $20,200 $26,000 $107,000 $153,200 TIP #2022-11 Local $0 MoDOT#5P3560 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $1,780,800 $1,780,800 MoDOT STATE $445,200 $445,200 Local $0 Other $0 Total $101,000 $130,000 $2,761,000 $0 $0 $0 $0 $2,992,000 Total Project Cost: $3,379,000 MoDOT Funding Prior Funding State Program Year - July 1 to June 30 Project Name: Bridge Improvement On US 54 over Neighorn Branch E N G Description & Location: Bridge improvement over Neighorn Branch. Comments: Bridges A1415, A1309 and twin bridges A1305, A1307 and A1672. R O W C O N S T Comments: Bridge K0760. Total Project Cost: $2,992,000 State Program Year - July 1 to June 30 Project Name: Bridge Improvements On US 54 over Bus. 50 and others. E N G Description & Location: Bridge improvement over Bus. 50, Linden Drive, Moreau Overflow, and Stadium Boulevard. Includes Madison Street Ramp over Rte. 54. R O W C O N S T Total Project Cost: $2,506,000 MoDOT Funding Prior Funding Prior Funding State Program Year - July 1 to June 30 Project Name: MoDOT Funding Bridge rehabilitation on US 54 over McCarty Street and Rte. 50 E N G Description & Location: Bridge rehabilitation over McCarty Street and Rte. 50. R O W C O N S T Comments: Bridges A1416 and A1417. DRAFT CAMPO 2024-2028 Transportation Improvement Program 15 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $21,600 $48,800 $70,400 MoDOT STATE $5,400 $12,200 $17,600 TIP #2022-12 Local $0 MoDOT#5S3464 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $241,600 $241,600 MoDOT STATE $60,400 $60,400 Local $0 Other $0 Total $27,000 $363,000 $0 $0 $0 $0 $0 $390,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $50,400 $246,400 $296,800 MoDOT STATE $12,600 $61,600 $74,200 TIP #2022-13 Local $0 MoDOT#5S3526 Other $0 FHWA NHPP $4,000 $4,000 MoDOT STATE $1,000 $1,000 Local $0 Other $0 FHWA NHPP $940,000 $940,000 MoDOT STATE $235,000 $235,000 Local $0 Other $0 Total $68,000 $1,483,000 $0 $0 $0 $0 $0 $1,551,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $800 $800 $14,400 $21,600 $161,600 $199,200 MoDOT STATE $200 $200 $3,600 $5,400 $40,400 $49,800 TIP #2023-01 Local $0 MoDOT#CD0072 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $743,200 $743,200 MoDOT STATE $185,800 $185,800 Local $0 Other $0 Total $1,000 $1,000 $18,000 $27,000 $1,131,000 $0 $0 $1,178,000 MoDOT Funding Prior Funding State Program Year - July 1 to June 30 State Program Year - July 1 to June 30 Total Project Cost: $390,000 Project Name: Funding Prior Funding Project Name: Bridge rehabilitation On RT B over Moreau River E N G Description & Location: Bridge rehabilitation over Moreau River.R O W C O N S T Comments: Bridge A3618. MoDOT R O W C O N S T Total Project Cost: $1,178,000 State Program Year - July 1 to June 30 Project Name: Bridge Improvement On S. Summit Drive over Rte. 54 E N G MoDOT Funding Prior Funding Bridge Rehabilitation On Rt D over North Moreau Creek E N G Description & Location: Bridge rehabilitation over North Moreau Creek.R O W C O N S T Comments: Bridge A1470. Total Project Cost: $1,551,000 Description & Location: Bridge improvement over Rte. 54. Comments: Bridge A3521. DRAFT CAMPO 2024-2028 Transportation Improvement Program 16 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA AC-STBG $800 $800 $20,000 $21,600 MoDOT STATE $200 $200 $5,000 $5,400 TIP #2023-03 Local $0 MoDOT#CD0075 FHWA $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $152,800 $152,800 MoDOT STATE $38,200 $38,200 Local $0 MoDOT $0 Total $1,000 $1,000 $216,000 $0 $0 $0 $0 $218,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $800 $800 $800 $13,600 $161,600 $177,600 MoDOT STATE $200 $200 $200 $3,400 $40,400 $44,400 TIP #2024-01 Local $0 MoDOT#CD0140 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $539,200 $539,200 MoDOT STATE $134,800 $134,800 Local $0 Other $0 Total $0 $1,000 $1,000 $1,000 $17,000 $876,000 $0 $896,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $1,600 $14,400 $116,000 $921,600 $1,053,600 MoDOT STATE $400 $3,600 $29,000 $230,400 $263,400 TIP #2024-02 Local $0 MoDOT#CD0139 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $3,327,200 $3,327,200 MoDOT STATE $831,800 $831,800 Local $0 Other $0 Total $0 $2,000 $18,000 $145,000 $5,311,000 $0 $0 $5,476,000 State Program Year - July 1 to June 30 State Program Year - July 1 to June 30 Prior Funding Project Name: Bridge (Overpass) Removal on Tri- Level over US 50 Total Project Cost: $896,000 Project Name: Bridge improvements On US 50 over Osage River. E N G Description & Location: Bridge improvements over Osage River. Project involves bridges A5552 and A0506. R O W C O N S T MoDOT Description & Location: Bridge removal on tri- level over US 50.R O W C O N S T Comments: Bridge A1418. E N G MoDOT Funding Prior Funding MoDOT Funding Prior Funding Comments: Bridges A5552 and A0506 State Program Year - July 1 to June 30 Project Name: Bridge improvements On US 54/63 over Missouri River. E N G Description & Location: Bridge improvements over Missouri River. Project involves bridge A4497. R O W C O N S T Comments: Bridges A4497 Total Project Cost: $5,476,000 Total Project Cost: $218,000 Funding DRAFT CAMPO 2024-2028 Transportation Improvement Program 17 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $11,200 $143,200 $154,400 MoDOT STATE $2,800 $35,800 $38,600 TIP #2024-03 Local $0 MoDOT#CD0157 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $546,400 $546,400 MoDOT STATE $136,600 $136,600 Local $0 Other $0 Total $0 $14,000 $862,000 $0 $0 $0 $0 $876,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA BRO $83,336 $83,336 MoDOT BFP $51,226 $51,226 TIP #2024-04 Local Cole County $5,438 $5,438 MoDOT#BRO-R026(25)Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA BRO $1,576,241 $1,576,241 MoDOT BFP $968,897 $968,897 Local Cole County $102,863 $102,863 Other $0 Total $0 $140,000 $2,648,001 $0 $0 $0 $0 $2,788,001 Project Name: Bridge Improvement On US 54 over Neighorn Branch E N G Total Project Cost: $876,000 State Program Year - July 1 to June 30MoDOTFundingPrior Funding Description & Location: Bridge improvement over Neighorn Branch.R O W C O N S T Comments: Bridge G0302. Total Project Cost: $2,788,001 Cole County Funding Prior Funding State Program Year - July 1 to June 30 Project Name: Tanner Bridge Road bridge replacement over Moreau River E N G Description & Location: Replacement of bridge on Tanner Bridge Road over the Moreau River. Bridge #0780025 R O W C O N S T Comments: DRAFT CAMPO 2024-2028 Transportation Improvement Program 18 Fiscally Constrained Transportation Projects - Roadways Source Category 2024 2025 2026 2027 2028 Future Totals FHWA AC-STBG $12,800 $68,000 $80,000 $187,200 $348,000 MoDOT STATE $3,200 $17,000 $20,000 $46,800 $87,000 TIP #2020-12 MoDOT $0 MoDOT#5S3418 Other $0 FHWA AC-STBG $86,400 $86,400 MoDOT STATE $21,600 $21,600 Local $0 Other $0 FHWA AC-STBG $910,400 $910,400 MoDOT STATE $227,600 $227,600 Local $0 Other $0 Total $16,000 $85,000 $208,000 $1,372,000 $0 $0 $0 $1,681,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $220,000 $210,400 $430,400 MoDOT STATE $55,000 $52,600 $107,600 TIP #2022-01 Local $0 MoDOT#5P3497 MoDOT $0 FHWA NHPP $461,600 $461,600 MoDOT STATE $115,400 $115,400 Local $0 MoDOT $0 FHWA NHPP $2,326,400 $2,326,400 MoDOT STATE $581,600 $581,600 Local $0 MoDOT $0 Total $852,000 $3,171,000 $0 $0 $0 $0 $0 $4,023,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA AC-STBG $1,600 $800 $135,200 $137,600 MoDOT STATE $400 $200 $33,800 $34,400 TIP #2022-23 Local $0 MoDOT#5P3487 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $1,977,600 $1,977,600 MoDOT STATE $494,400 $494,400 Local $0 Other $0 Total $2,000 $1,000 $2,641,000 $0 $0 $0 $0 $2,644,000 State Program Year - July 1 to June 30 Funding R O W C O N S T Comments: Total Project Cost: $1,681,000 MoDOT Prior Funding C O N S T Comments: Total Project Cost: $4,023,000 Funding Total Project Cost: $2,644,000 Project Name: Guard Cable & Guardrail Repair in Northern Central District E N G Description & Location: Job Order Contracting for guard cable and guardrail repair on various routes in the northern portion of the Central District. R O W C O N S T Comments: Description & Location: Roadway improvements from West McCarty Street to Rte. 63 north of Missouri River Bridge in Jefferson City. R O W State Program Year - July 1 to June 30 Project Name: Roadway Improvements on US 54/ Missouri River Bridge. E N G Description & Location: Intersection improvements at South Ten Mile Drive (South Outer Road 50) in Jefferson City. Funding Prior Funding Project Name: Intersection Improvements at South Ten Mile Drive in Jefferson City. E N G MoDOT Prior Funding State Program Year - July 1 to June 30MoDOT DRAFT CAMPO 2024-2028 Transportation Improvement Program 19 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA AC-STBG $800 $800 $800 $800 $146,400 $149,600 MoDOT STATE $200 $200 $200 $200 $36,600 $37,400 TIP #2023-04 Local $0 MoDOT#CD0004 FHWA $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $2,272,800 $2,272,800 MoDOT STATE $568,200 $568,200 Local $0 FHWA $0 Total $1,000 $1,000 $1,000 $1,000 $3,024,000 $0 $0 $3,028,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $160,000 $1,529,600 $1,689,600 MoDOT STATE $40,000 $382,400 $422,400 TIP #2023-05 Local $0 MoDOT#CD0100 FHWA $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $17,708,000 $17,708,000 MoDOT STATE $4,427,000 $4,427,000 Local $0 FHWA $0 Total $200,000 $24,047,000 $0 $0 $0 $0 $0 $24,247,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $800 $800 $800 $26,400 $257,600 $286,400 MoDOT STATE $200 $200 $200 $6,600 $64,400 $71,600 TIP #2023-06 Local $0 MoDOT#CD0106 FHWA $0 FHWA $0 MoDOT $0 Local $0 FHWA $0 FHWA NHPP $3,277,600 $3,277,600 MoDOT STATE $819,400 $819,400 Local $0 FHWA $0 Total $1,000 $1,000 $1,000 $33,000 $4,419,000 $0 $0 $4,455,000 Prior Funding State Program Year - July 1 to June 30 MoDOT Funding Total Project Cost: $4,455,000 MoDOT Funding Description & Location: Pavement improvement from west of Shamrock Road to east of Stoney Gap Road. Includes westbound Rte. 50 from west of Maries River to east of Mari Osa Delta Lane and from west of Osage River to Moreau River. C O N S T Comments: State Program Year - July 1 to June 30 Prior Funding State Program Year - July 1 to June 30 Prior Funding MoDOT Funding R O W Project Name:Pavement Resurfacing on US 54 E N G Description & Location: Pavement resurfacing from County Road 147 north of Kingdom City to Missouri River bridge. Includes high friction surface treatment. R O W C O N S T Comments: Total Project Cost: $24,247,000 Project Name:Pavement Improvement on US 50 E N G Project Name: Guard Cable & Guardrail Repair in Northern Central District E N G Description & Location: Job Order Contracting for guard cable and guardrail repair on various routes in the northern portion of the Central District. R O W C O N S T Comments: Total Project Cost: $3,028,000 DRAFT CAMPO 2024-2028 Transportation Improvement Program 20 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA AC-STBG $800 $800 $12,000 $13,600 MoDOT STATE $200 $200 $3,000 $3,400 TIP #2023-08 Local $0 MoDOT#CD0040 FHWA $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $196,800 $196,800 MoDOT STATE $49,200 $49,200 Local $0 FHWA $0 Total $1,000 $1,000 $261,000 $0 $0 $0 $0 $263,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA AC-STBG $800 $5,600 $65,600 $72,000 MoDOT STATE $200 $1,400 $16,400 $18,000 TIP #2023-09 Local $0 MoDOT#CD0043 FHWA $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $1,109,600 $1,109,600 MoDOT STATE $277,400 $277,400 Local $0 Other $0 Total $1,000 $7,000 $1,469,000 $0 $0 $0 $0 $1,477,000 Funding Description & Location: Pavement improvement on RT H from RT E to end of state maintenance; RT BB from MO 17 to RT. H; and RT CC from RT C to US 54. Comments: This project includes three routes (H, BB, and CC). Total Project Cost: $1,477,000 MoDOT Total Project Cost: $263,000 MoDOT Funding Prior Funding State Program Year - July 1 to June 30 Project Name: Pavement Improvement on RT E from US 54 to RT B E N G Description & Location: Pavement improvement on RT E from US 54 to RT B.R O W C O N S T Comments: Prior Funding State Program Year - July 1 to June 30 Project Name: Pavement Improvement on Routes H, BB, and CC. E N G R O W C O N S T DRAFT CAMPO 2024-2028 Transportation Improvement Program 21 Fiscally Constrained Transportation Projects - Other Source Category 2024 2025 2026 2027 2028 Future Totals FHWA SAFETY $800 $800 MoDOT STATE $200 $200 TIP #2023-11 Local $0 MoDOT#5P3521 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA SAFETY $50,400 $50,400 MoDOT STATE $12,600 $12,600 Local $0 Other $0 Total $0 $64,000 $0 $0 $0 $0 $0 $64,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA SAFETY $800 $800 MoDOT STATE $200 $200 TIP #2023-12 Local $0 MoDOT#CD0006 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA SAFETY $50,400 $50,400 MoDOT STATE $12,600 $12,600 Local $0 Other $0 Total $0 $0 $64,000 $0 $0 $0 $0 $64,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA SAFETY $800 $800 MoDOT STATE $200 $200 TIP #2024-07 Local $0 MoDOT#CD0141 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA SAFETY $50,400 $50,400 MoDOT STATE $12,600 $12,600 Local $0 Other $0 Total $0 $0 $0 $64,000 $0 $0 $0 $64,000 Description & Location: On-call work zone enforcement at various locations in the Central District. R O W C O N S T Comments: Total Project Cost: $64,000 Prior Funding State Program Year - July 1 to June 30Funding Project Name:On-Call Work Zone Enforcement MoDOT E N G State Program Year - July 1 to June 30 Project Name:On-Call Work Zone Enforcement E N G Comments: Total Project Cost: $64,000 R O W C O N S T Description & Location: On-call work zone enforcement at various locations in the Central District. MoDOT Funding Prior Funding Total Project Cost: $64,000 MoDOT Funding Prior Funding State Program Year - July 1 to June 30 Project Name:On-Call Work Zone Enforcement E N G Description & Location: On-call work zone enforcement at various locations in the Central District. R O W C O N S T Comments: DRAFT CAMPO 2024-2028 Transportation Improvement Program 22 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA $0 MoDOT $0 TIP #2024-08 Local $0 MoDOT#5B0800T Other $0 FHWA $0 MoDOT STATE $107,000 $107,000 Local $0 Other $0 FHWA NHPP $0 MoDOT STATE $57,989,000 $4,399,000 $4,399,000 $4,399,000 $4,399,000 $4,399,000 $79,984,000 Local $0 Other $0 Total #########$4,399,000 $4,399,000 $4,399,000 $4,399,000 $4,399,000 $0 $80,091,000 MoDOT State Program Year - July 1 to June 30 Project Name: Payback for Safe and Sound bridges in the Central District. E N G Description & Location: Payback beginning in SFY 2008 for Safe and Sound bridges in the Central District. R O W C O N S T Comments: Total Project Cost: $80,091,000 Funding Prior Funding DRAFT CAMPO 2024-2028 Transportation Improvement Program 23 Fiscally Constrained Transportation Projects – Scoping and Design Projects Source Category 2024 2025 2026 2027 2028 Future Totals FHWA AC-STBG $44,000 $800 $2,400 $47,200 MoDOT STATE $11,000 $200 $600 $11,800 TIP #2013-16 Local $0 MoDOT#5S2234 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 Total $55,000 $1,000 $3,000 $0 $0 $0 $0 $59,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $227,200 $40,000 $267,200 MoDOT STATE $56,800 $10,000 $66,800 TIP #2022-27 Local $0 MoDOT#5P3588 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 Total $284,000 $50,000 $0 $0 $0 $0 $0 $334,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA NHPP $800 $1,600 $2,400 MoDOT STATE $200 $400 $600 TIP #2024-09 Local $0 MoDOT#CD0159 Other $0 FHWA NHPP $0 MoDOT STATE $0 Local $0 Other $0 FHWA NHPP $0 MoDOT STATE $0 Local $0 Other $0 Total $0 $1,000 $2,000 $0 $0 $0 $0 $3,000 MoDOT Funding Prior Funding State Program Year - July 1 to June 30 Project Name: Dix Road - Scoping for bridge improvements over US 50. E N G Description & Location: Scoping for bridge improvements over Rte. 50. R O W C O N S T Comments: Project involves bridge A1187 C O N S T Comments: Total Project Cost: $334,000 State Program Year - July 1 to June 30 Project Name: Scoping for Interchange Improvements at Truman Blvd and E N G Total Project Cost: $59,000 Prior Funding Description & Location: Scoping for intersection improvements at Routes M and Route W in Wardsville. R O W C O N S T Scoping Routes M, B, & W Comments: Description & Location: Scoping for Interchange Improvements at Truman Blvd and Country Club Drive. R O W MoDOT Funding MoDOT Funding E N G Total Project Cost: $3,000 Prior Funding State Program Year - July 1 to June 30 Project Name: DRAFT CAMPO 2024-2028 Transportation Improvement Program 24 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA AC-STBG $40,000 $800 $1,600 $42,400 MoDOT STATE $10,000 $200 $400 $10,600 TIP #2024-12 Local $0 MoDOT#CD0052 Other $0 FHWA AC-STBG $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $0 MoDOT STATE $0 Local $0 Other $0 Total $50,000 $1,000 $2,000 $0 $0 $0 $0 $53,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA AC-STBG $100,000 $40,000 $800 $140,800 MoDOT STATE $25,000 $10,000 $200 $35,200 TIP #2024-13 Local $0 MoDOT#CD0065 Other $0 FHWA AC-STBG $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $0 MoDOT STATE $0 Local $0 Other $0 Total $125,000 $50,000 $1,000 $0 $0 $0 $0 $176,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA AC-STBG $80,000 $320,000 $400,000 MoDOT STATE $20,000 $80,000 $100,000 TIP #2024-14 Local $0 MoDOT#CD0168 Other $0 FHWA AC-STBG $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $0 MoDOT STATE $0 Local $0 Other $0 Total $0 $100,000 $400,000 $0 $0 $0 $0 $500,000 MoDOT Funding Prior Funding State Program Year - July 1 to June 30 Scoping for bridge improvements at the Tri-level. Total Project Cost: $176,000 Total Project Cost: $53,000 MoDOT Funding Prior Funding State Program Year - July 1 to June 30 Project Name: VARIOUS - Traffic safety studies at vairous locations in Central E N G Description & Location: Traffic safety studies at vairous locations in Central District.R O W C O N S T Comments: MoDOT Funding Prior Funding State Program Year - July 1 to June 30 Project Name: VARIOUS - Scoping for curve chevron and object markers. E N G Description & Location: Scoping for curve chevron and object marker installation at vrious locations in the Central District. R O W C O N S T Comments: Comments: Bridges A1419, A4826, A4827 and A4828. Project Name: E N G Total Project Cost: $500,000 Description & Location: Scoping for bridge improvements at intersection of Rte. 50, Rte. 63, and Rte. 54 in Jefferson City. R O W C O N S T DRAFT CAMPO 2024-2028 Transportation Improvement Program 25 Fiscally Constrained Transportation Projects - Pedestrian & Bicycle Projects Source Category 2024 2025 2026 2027 2028 Future Totals FHWA AC-STBG $9,600 $800 $320,000 $330,400 MoDOT STATE $2,400 $200 $80,000 $82,600 TIP #2020-16 Local $0 MoDOT#CD0126 Other $0 FHWA AC-STBG $38,400 $38,400 MoDOT STATE $9,600 $9,600 Local $0 Other $0 FHWA AC-STBG $1,000,000 $1,000,000 MoDOT STATE $250,000 $250,000 Local $0 Other $0 Total $12,000 $49,000 $1,650,000 $0 $0 $0 $0 $1,711,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA RTP $17,350 $17,350 MoDOT $0 TIP #2023-14 Local St. Martins $27,650 $27,650 MoDOT#Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA RTP $128,850 $128,850 MoDOT $0 Local St. Martins $44,111 $44,111 Other Donation $574 $574 Total $45,000 $173,535 $0 $0 $0 $0 $0 $218,535 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA TAP $18,750 $18,750 $37,500 MoDOT $0 TIP #2023-18 Local St. Martins $6,250 $6,250 $12,500 MoDOT#Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA TAP $231,151 $231,151 $462,302 MoDOT $0 Local St. Martins $76,717 $76,717 $153,434 Other $0 Total $332,868 $332,868 $0 $0 $0 $0 $0 $665,736 Funding Prior Funding State Program Year - July 1 to June 30 Project Name:St. Martins Trail Comments: Updating Pedestrian Facilities C O N S T Description & Location: Transportation Alternatives Program Grant, bike-ped lanes along business 50. R O W C O N S T Comments: TAP Comments: Recreational Trail Program Grant awarded November 2022. Total Project Cost: $218,535 St. Martins Description & Location: Recreational Trails Grant, 7' ADA trail extension from Niekamp Park to Traci Dr. R O W C O N S T Total Project Cost: $1,711,000 MoDOT St. Martins Funding Prior Funding State Program Year - July 1 to June 30 Project Name: St. Martins Business 50 bike/ped path extension O P E R E N G Total Project Cost: $665,736 Funding Prior Funding State Program Year - July 1 to June 30 Project Name: E N G Description & Location: Upgrade pedestrian facilities to comply with the ADA Transition Plan in Jefferson City, Taos, Wardsville, and Frankenstein. R O W DRAFT CAMPO 2024-2028 Transportation Improvement Program 26 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA TAP $79,500 $79,500 MoDOT $0 TIP #2023-17 Local Holts Summit $62,500 $62,500 MoDOT#Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA TAP $420,500 $420,500 MoDOT $0 Local Holts Summit $62,500 $62,500 Other $0 Total $142,000 $483,000 $0 $0 $0 $0 $0 $625,000 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA TAP $0 MoDOT $0 TIP #2023-15 Local City of Jefferson $0 MoDOT#Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA TAP $222,744 $222,744 MoDOT $0 Local City of Jefferson $55,686 $55,686 Other $0 Total $0 $278,430 $0 $0 $0 $0 $0 $278,430 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA TAP $0 MoDOT $0 TIP #2023-16 Local City of Jefferson $0 MoDOT#Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA TAP $500,000 $500,000 MoDOT $0 Local City of Jefferson $483,465 $483,465 Other $0 Total $0 $983,465 $0 $0 $0 $0 $0 $983,465 Project Name: Wears Creek Greenway Extension Bypassing MO 179 O P E R Description & Location: Transportation Alternatives Program Grant, includes extension of the Wears Creek Greenway along Tree Valley Lane, bypassing MO 179. R O W C O N S T Comments: TAP State Program Year - July 1 to June 30 State Program Year - July 1 to June 30 Description & Location: Transportation Alternatives Program Grant, includes improvements to greenway crosswalks. R O W C O N S T Comments: TAP Total Project Cost: $983,465 Total Project Cost: $278,430 City of Jefferson C O N S T Comments: TAP Holts Summit Funding Prior Funding State Program Year - July 1 to June 30 Project Name: Holts Summit Sidewalk construction along S. Summit Drive O P E R Description & Location: Transportation Alternatives Program Grant, Sidewalk installation along S. Summit Drive from Holt Lane to Ellsworth Drive. R O W Funding Prior Funding Total Project Cost: $625,000 City of Jefferson Funding Prior Funding Project Name: Greenway crosswalks at Southwest Blvd and Lafayette St. O P E R DRAFT CAMPO 2024-2028 Transportation Improvement Program 27 Source Category 2024 2025 2026 2027 2028 Future Totals FHWA TAP $361,874 $361,874 MoDOT $0 TIP #2024-15 Local Wardsville $98,526 $98,526 MoDOT#Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA TAP $27,117 $27,117 MoDOT $0 Local Wardsville $7,383 $7,383 Other $0 Total $0 $494,900 $0 $0 $0 $0 $0 $494,900 Wardsville Funding Prior Funding State Program Year - July 1 to June 30 Project Name: Falcon Lane Pedestrian Improvements O P E R Description & Location: Construction of approximately 1400 feet of 8ft wide sidewalks along Falcon Lane to accommodate pedestrians and bicycle users. R O W C O N S T Comments: TAP Total Project Cost: $494,900 DRAFT CAMPO 2024-2028 Transportation Improvement Program 28 Fiscally Constrained Transportation Projects – Public Transportation Projects Source Category 2024 2025 2026 2027 2028 Future Totals Other Pass. Fares $521,590 $391,692 $468,886 $478,264 $487,829 $497,585 $2,845,846 MoDOT State Operating $11,500 $52,414 $52,414 $52,414 $52,414 $52,414 $273,570 TIP #2011-04 Local City of Jefferson $821,916 $1,070,655 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,663,173 MoDOT#FTA 5307 $821,916 $1,070,655 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,663,173 Total $2,176,922 $2,585,416 $2,734,972 $2,855,034 $2,980,817 $3,112,601 $0 $16,445,762 Source Category 2024 2025 2026 2027 2028 Future Totals Other $0 MoDOT $0 TIP #2022-21 Local General Fund $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $168,000 MoDOT#FTA 5310 $112,000 $112,000 $112,000 $112,000 $112,000 $112,000 $672,000 Total $140,000 $140,000 $140,000 $140,000 $140,000 $140,000 $0 $840,000 Source Category 2024 2025 2026 2027 2028 Future Totals Other Pass. Fares $0 MoDOT State Operating $0 TIP #2020-18 Local General Fund $35,500 $35,500 MoDOT#FTA 5339 $131,553 $131,553 Total $0 $167,053 $0 $0 $0 $0 $0 $167,053 Comments: Total Project Cost: $167,053 Update Bus Wash Facility O P E R State Program Year - July 1 to June 30 Project Name: Description & Location: This project would replace JEFFTRAN's antiquated bus wash facility. Jefferson City, MO. Prior Funding Funding Total Project Cost: $16,445,762 Total Project Cost: $840,000 City of Jefferson - JEFFTRAN Project Name: Description & Location: Operating Assistance for JEFFTRAN service within Jefferson City limits (A 3% annual inflation factor applied.) JEFFTRAN Operating Assistance O P E R Comments: City of Jefferson - JEFFTRAN Funding Prior Funding State Program Year - July 1 to June 30 Funding Prior Funding State Program Year - July 1 to June 30 Project Name:JEFFTRAN Operating Assistance O P E R Description & Location: Section 5310 Grant Program for acquiring new paratransit buses. Providing mobility needs for seniors and persons with disabilities. Comments: City of Jefferson - JEFFTRAN DRAFT CAMPO 2024-2028 Transportation Improvement Program 29 Source Category 2024 2025 2026 2027 2028 Future Totals Other Pass. Fares $0 MoDOT State Operating $0 TIP #2020-22 Local General Fund $8,000 $2,544 $10,544 MoDOT#FTA 5339 $32,000 $10,175 $42,175 Total $0 $40,000 $12,719 $0 $0 $0 $0 $52,719 Source Category 2024 2025 2026 2027 2028 Future Totals Other Pass. Fares $0 MoDOT State Operating $0 TIP #2022-24 Local General Fund $57,600 $57,600 MoDOT#FTA 5339 $230,400 $230,400 Total $0 $288,000 $0 $0 $0 $0 $0 $288,000 Source Category 2024 2025 2026 2027 2028 Future Totals Other Pass. Fares $0 MoDOT State Operating $0 TIP #2022-26 Local General Fund $7,000 $7,000 MoDOT#FTA 5339 $28,000 $28,000 Total $0 $35,000 $0 $0 $0 $0 $0 $35,000 Funding Prior Funding State Program Year - July 1 to June 30 Project Name:Repair Bus Barn Roof City of Jefferson - JEFFTRAN Funding Prior Funding State Program Year - July 1 to June 30 Total Project Cost: $35,000 City of Jefferson - JEFFTRAN Project Name: Replace Security Systems in Transit Facilities O P E R O P E R Description & Location: This project would repair the bus barn roof, which is leaking. Comments: Description & Location: This project would replace outdated security cameras and entry systems in transit facilities. Jefferson City, MO. And add solar lighting to select bus shelters. Comments: Total Project Cost: $52,719 City of Jefferson - JEFFTRAN Funding Prior Funding State Program Year - July 1 to June 30 Project Name: Replacement of Two Low-Floor Buses O P E R Description & Location: This project would purchase 2 replacement low-floor buses. Comments: Total Project Cost: $288,000 DRAFT CAMPO 2024-2028 Transportation Improvement Program 30 Source Category 2024 2025 2026 2027 2028 Future Totals FTA 5307 $1,053,363 $1,053,363 MoDOT $0 TIP #2022-30 Local General Fund $115,000 $115,000 MoDOT#FTA 5339 $293,000 $293,000 Total $0 $1,461,363 $0 $0 $0 $0 $0 $1,461,363 Source Category 2024 2025 2026 2027 2028 Future Totals FTA $0 MoDOT $0 TIP #2022-31 Local General Fund $60,000 $60,000 MoDOT#FTA 5339 $240,000 $240,000 Total $0 $300,000 $0 $0 $0 $0 $0 $300,000 Funding Prior Funding State Program Year - July 1 to June 30 Project Name:JEFFTRAN Hybrid Gillig Buses O P E R City of Jefferson - JEFFTRAN City of Jefferson - JEFFTRAN Funding Prior Funding State Program Year - July 1 to June 30 Project Name: AVL/AVA/APC/Infotainment Replacement Equipment and O P E R Description & Location: Replacement of AVL and related equipment and supporting services. Comments: Total Project Cost: $300,000 Description & Location: This project would allow the purchase of 2 hybrid gillig buses. Comments: This money stems from a reallocation of unspent funds from another agency. Total Project Cost: $1,461,363 DRAFT CAMPO 2024-2028 Transportation Improvement Program 31 Source Category 2024 2025 2026 2027 2028 Future Totals FTA 5310 $88,000 $88,000 $176,000 MoDOT $0 TIP #2018-10 Local $0 MoDOT#Other OATS $22,000 $22,000 $44,000 Total $0 $0 $0 $110,000 $0 $110,000 $0 $220,000 Source Category 2024 2025 2026 2027 2028 Future Totals FTA 5310 $60,000 $60,000 $70,000 $70,000 $70,000 $330,000 MoDOT $0 TIP #2018-11 Local $0 MoDOT#Other OATS $60,000 $60,000 $70,000 $70,000 $70,000 $330,000 Total $0 $120,000 $120,000 $140,000 $140,000 $140,000 $0 $660,000 OATS OATS Operating Assistance O P E R Description & Location: Within the Jefferson City MPO Region-Section 5310-Seniors and Individuals with Disabilities. Comments: Other Funding - OATS, Inc. Total Project Cost: $660,000 Funding Prior Funding Project Name: OATS Description & Location: Requesting replacement/expansion vehicles to provide service in Jefferson City and surrounding area.Comments: Other Funding - OATS, Inc. Total Project Cost: $220,000 State Program Year - July 1 to June 30 Funding Prior Funding State Program Year - July 1 to June 30 Project Name:OATS Operating Assistance O P E R DRAFT CAMPO 2024-2028 Transportation Improvement Program 32 Project Locations Figure 7 - Map of Fiscally Constrained Transportation Projects DRAFT CAMPO 2024-2028 Transportation Improvement Program 33 Program of Projects Figure 8 – JEFFTRAN Program of Projects No.Description Est. Total Funding by Others Local 1 Replace paratransit widebody cutaway buses 600,000$ $ 480,000 120,000$ 2 Replace low-floor minivan support vehicle 40,000$ 32,000$ 8,000$ 3 Upgrade/replace fare card system 150,000$ 120,000$ 30,000$ 4 Transit facility repairs & improvements 50,000$ 40,000$ 10,000$ 5 Security upgrades for transit facilities 30,000$ 24,000$ 6,000$ 6 Update/revise Transit facilities feasability study 50,000$ 40,000$ 10,000$ 7 Upgrade transit transfer facilities 150,000$ 120,000$ 30,000$ 8 Purchase and install bus shelters and amenities at various locations in Jefferson City 30,000$ 24,000$ 6,000$ 9 Update Bus Wash facility 175,000$ 140,000$ 35,000$ 10 Purchase back-up generator & switches for transit and CM facilities 200,000$ 160,000$ 40,000$ 11 Replace low-floor route buses 6,000,000$ 5,400,000$ 600,000$ 12 Construct replacement transit/central maintenace/bus barn/bus wash facilities 40,000,000$ 32,000,000$ 8,000,000$ 13 Transit admin facility rehab 50,000$ 40,000$ 10,000$ 14 Purchase and install additional transit traveler kiosks (each)15,000$ 12,000$ 3,000$ 15 Add bike racks/benches at passenger transfer facilities and selected bus stops 25,000$ 20,000$ 5,000$ 16 Charging systems/electrical upgrades for buses 600,000$ 480,000$ 120,000$ 17 Add crosswalks and supporting bike/ped amenities to transit bus shelters 60,000$ -$ 60,000$ 18 Rehabilitate/replace bus wash components 100,000$ 80,000$ 20,000$ 19 Add solar lighting/occupancy indicators for selected bus shelters 35,000$ 28,000$ 7,000$ 20 Replace floor scrubber for bus barn 18,000$ 14,400$ 3,600$ 21 Replace mobile column lifts for buses 100,000$ 80,000$ 20,000$ 22 Add vehicle electric charging stations and associated infrastructure 30,000$ 24,000$ 6,000$ 23 Time-tracking software for transit employees 15,000$ 12,000$ 3,000$ 24 Upgrade/replace AVL/AVA/APC systems on fixed routes 300,000$ 240,000$ 60,000$ 25 Passenger Engagement/Bus infotainment system, including digital displays 250,000$ 200,000$ 50,000$ 26 Pre-trip inspection software 30,000$ 24,000$ 6,000$ Total 49,103,000$ 39,834,400$ 9,268,600$ JEFFTRAN 2024 Program of Projects Illustrative Projects DRAFT CAMPO 2024-2028 Transportation Improvement Program 34 Multimodal Projects In 2015, CAMPO met with federal and state planning partners in a formal planning process review. Within two recommendations made, CAMPO was urged to include more multi-modal projects into the TIP. CAMPO staff sent out written requests and reminders at CAMPO meetings for projects, including those not using federal dollars. As of the writing of this document, no projects have been submitted. However, there are a number of factors why these projects are limited. These types of projects are usually incorporated into new road projects. Many of these types of projects are highly dependent on grants, which may or may not be annually awarded. Projects are usually decided each budget year. There are several bicycle or pedestrian projects in the MTP illustrative list, but projects are not constrained and funds are not obligated. Regionally Significant Projects A regionally significant project means a transportation project (other than projects that may be grouped in the TIP and/or STIP or exempt projects as defined in EPA’s transportation conformity regulation (40 CFR part 93) that is on a facility which serves regional transportation needs (such as access to and from the area outside the region; major activity centers in the region; major planned developments such as new retail malls, sports complexes, or employment centers; or transportation terminals) and would normally be included in the modeling of the metropolitan area’s transportation network. At a minimum, this includes all principal arterial highways and all fixed guideway transit facilities that offer a significant alternative to regional highway travel. US 54 & US 63 Improvements The TIP currently contains a project to improve traffic congestion and safety in northern Jefferson City (TIP #2022-01). The project scope is still being defined as of the development of the TIP and STIP documents in April 2023. The project would potentially include the construction of additional lanes and potential adjustments to ramp configurations and signage just north of the Missouri River Bridge. I-70 Rocheport Bridge In 2020, MoDOT secured funding for the replacement of the Rocheport Bridge over the Missouri River. The bridge is located on Interstate 70 and crosses the Missouri River between Boone and Howard Counties. For the duration of this project, travel inside the CAMPO region may see some minor impacts. This project may cause minor increases in volume on US Routes 40, 36, 63, and 50, but the anticipated effects are minimal. The project is nearing completion. DRAFT CAMPO 2024-2028 Transportation Improvement Program 35 Appendix 1 – Amendments and Administrative Modifications Amendments TIP No. Project Description Project Sponsor Project Cost Board Approval OneDOT Approval Administrative Modifications TIP No. Description of Modification Date DRAFT CAMPO 2024-2028 Transportation Improvement Program 36 Appendix 2 – Federal Funding Sources On November 15, 2021, President Biden signed the Infrastructure Investment and Jobs Act (IIJA), also known as the “Bipartisan Infrastructure Law”) into law. The Bipartisan Infrastructure Law (BIL) provides $550 billion over fiscal years 2022 through 2026 in new Federal investment in infrastructure, including in roads, bridges, and mass transit, water infrastructure, resilience, and broadband. As under the FAST Act, the BIL authorizes a single, combined amount for each fiscal year for all apportioned highway programs combined. That amount is first apportioned among the S tates, and then each State’s apportionment is divided among the individual apportioned programs. The BIL also appropriates funding from the General Fund for three other formula-based programs separate and apart from the apportioned amount described above (and the formula described below): (1) the Bridge Formula Program, (2) the National Electric Vehicle Infrastructure Formula Program, and (3) the Appalachian Development Highway System Program. Federal-aid Highway Apportioned Programs The BIL authorizes a total combined amount ($52.5 B for fiscal year (FY) 2022, $53.5 B for FY23, $54.6 B for FY24, $55.7 B for FY25, and $56.8 B for FY26) in Contract Authority from the Highway Account of the Highway Trust Fund to fund 8 highway apportioned programs (including certain set-asides): • National Highway Performance Program (NHPP) • Surface Transportation Block Grant Program (STBG) • Highway Safety Improvement Program (HSIP) • Congestion Mitigation and Air Quality Improvement Program (CMAQ) • National Highway Freight Program (NHFP) • Metropolitan Planning (PL) • Carbon Reduction Program (CRP) NEW • Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation (PROTECT) Formula Program NEW More information can be found at: https://www.fhwa.dot.gov/bipartisan-infrastructure-law/funding.cfm Federal Transit Administration Funding The Bipartisan Infrastructure Law authorizes up to $108 billion to support federal public transportation programs, including $91 billion in guaranteed funding. More information can be found at: https://www.transit.dot.gov/funding/grants/grant-programs FTA Programs Eligible Activities Section 5307 Urbanized Area Formula Grants This program provides grants to Urbanized Areas (UZA) for public transportation capital, planning, job access and reverse commute projects, as well as operating expenses in certain circumstances. Section 5310 Enhanced Mobility of Seniors and Individuals with Disabilities This program is intended to enhance mobility for seniors and persons with disabilities by providing funds for programs to serve the special needs of transit- dependent populations beyond traditional public transportation services and Americans with Disabilities Act (ADA) complementary paratransit services. Section 5311 Formula Grants for Rural Areas This program provides capital, planning, and operating assistance to states to support public transportation in rural areas with populations less than 50,000, where many residents often rely on public transit to reach their destinations. Section 5329 Transit Safety & Oversight This section requires FTA to implement and maintain a national public transportation safety program to improve the safety of all public transportation systems that receive federal funding. The safety program includes a national public transportation safety plan, a safety certification training program, a public transportation agency safety plan, and a state safety oversight program. Section 5339 Bus and Bus Facilities Provides capital funding to replace, rehabilitate and purchase buses and related equipment and to construct bus-related facilities. DRAFT CAMPO 2024-2028 Transportation Improvement Program 37 Appendix 3 – Policies and Procedures Amendments An amendment involves a major change to a project and requires approval by the Board of Directors and Governor. An amendment is a revision that requires public review, allowance of comment, possible re- demonstration of fiscal constraint, and includes at least one of the following: • Addition or deletion of a project using FHWA or FTA funds (except as allowed as an administrative modification), • Major changes affecting project cost from FHWA or FTA sources (changes exceeding 20% of FHWA or FTA sources of the existing project cost or changes over $2,000,000), • Major changes in a project phase initiation date (greater than 12 months), or • Major changes in design concept or design scope, such as changing project termini (more than 1/2 mile or 10% of the total length of the project, whichever is greater) or changing the number of through traffic lanes that also includes a substantial increase in Federal cost. Amendments will be initiated by the project sponsor. Amendments to delete a project can simply be made via written correspondence identifying the project and why it is to be removed from the TIP. Amendments to include a new project can be made on the TIP Project Form for the current TIP with a cover letter or remark in the comment section requesting inclusion in the TIP as an amendment. Amendments for existing projects can be made on the TIP Project Form for the current TIP with a cover letter or remark in the comment section highlighting the change in the project and providing the CAMPO TIP Number. After an Amendment has been requested the process as follows: • Staff will review the amendment for accuracy and to verify if an amendment is required or if the change qualifies as an administrative modification. Staff may consult with MoDOT and FHWA if necessary. • The amendment will be placed on the next Technical Committee (TC) meeting agenda for review. • The Technical Committee is an advisory board to the board of directors. Regardless of whether the Technical Committee recommends approval of a project, does not recommend approval of a project, or is unable to make a recommendation, the project shall still proceed to the Board of Directors to make a final decision. • If approval is recommended by the TC to the Board of Directors, staff will post the amendment notice on the website, initiating a minimum 7 calendar day public comment period, send notices to the appropriate parties, and place the amendment on the next Board of Directors meeting agenda. • At the Board of Directors Meeting, they will close the public comment period and a vote for approval will be held. If the project sponsor indicates an emergency situation upon submitting the amendment, staff will: • Initiate the public comment period • Post the amendment notice on the website, initiating the 7 calendar day public comment period • Send notices to the appropriate parties • Place the amendment on the next Board of Directors meeting agenda. The Board will close the public comment period at the next Board of Directors Meeting and hold a vote for approval. If this is not adequate to meet the emergency situation, a special Board of Directors meeting may be called and proceed as outlined in the Public Participation Plan. DRAFT CAMPO 2024-2028 Transportation Improvement Program 38 Administrative Modifications Revisions to the TIP and TIP projects that do not meet the criteria of an Amendment will be considered administrative modifications including: minor changes to project/project phase costs, minor changes to funding sources of previously-included projects, and minor changes to project/project phase initiation dates. An administrative modification is a revision that neither requires committee action, public review and comment, nor redemonstrates fiscal constraint. An administrative modification will be initiated by the project sponsor by written communication to CAMPO staff describing the change (phase cost, funding sources, or phase initiation date) warranting the modification. Staff will review the administrative modification for accuracy and to verify qualification as an administrative modification. Staff may consult with MoDOT and FHWA if necessary. Upon CAMPO staff confirmation of the administrative modification requirements being met, staff will modify the TIP appropriately, including noting the administrative modification in Appendix 1 of the TIP and making changes to the project listing in the body of the TIP; notify the Board of Directors, Technical Committee, MoDOT, FTA, and FHWA via email; draft a staff memo for the next Board of Directors and Technical Committee meeting; and post the modified TIP notice on the CAMPO website for a minimum of 7 calendar days. Combining or Splitting Projects Splitting a project into two or more projects or combining two or more projects can provide benefits to project scheduling, cost, and logistics. A split or combination can be made via an administrative modification to the TIP, if the project does not trigger a major change to the project as described in the amendment section and the overall scope of work does not change. When combining two or more projects, the financial and description information will be rolled up into the project which was in the TIP originally and use the previous MPO TIP number. When splitting a project into two or more projects, the financial and descriptive information will be separated appropriately into several (two or more) projects using the same MPO TIP number, but the additional projects will include alphabetic suffixes. The process for splitting or combining projects will follow the procedures of either an amendment or administrative modification. Compliance with Metropolitan Transportation Plan For a project to be eligible for the TIP, it first must be included in the adopted MTP. Large capital projects, roadway capacity, and/or general purpose roadway projects must be individually listed or clearly part of a larger project included in the fiscally‐constrained component of the plan. Certain projects seeking to improve safety, increase multi‐modal opportunities, or enhance the existing transportation system may be programmed in the TIP without individual identification in the regional plan, so long as they are consistent with the established goals and objectives of the plan. Project Delay Policy The goal of the Project Delay Policy for the Transportation Improvement Program is to maximize the federal funding obligated each fiscal year and to enable the MPO to redirect funds to different projects if any are inactive or otherwise limited from making progress. The Delay Policy applies to projects funded through the programs for which CAMPO has oversight of project selection. The intent of the Delay Policy is to provide an incentive for local agency sponsors to develop their projects according to a detailed schedule and, thereby, to obligate the federal funds assigned to each project within DRAFT CAMPO 2024-2028 Transportation Improvement Program 39 the timeframes initially shown in the TIP. The Delay Policy is primarily focused on projects that involve construction or provide transportation improvements that are handled through purchasing procedures. In the context of this Delay Policy, a “delay” occurs when a construction-related project phase does not get advertised within six months of the TIP program year in which its construction phase funding was originally programmed, or changed with an amendment, in the TIP. For non-construction projects and programs, a “delay” occurs when the “Notice to Proceed” is not issued within two months of the TIP program year in which its implementation was originally funded in the TIP. The consequence of a delay may be the withdrawal of its Federal funds from the TIP or other action by the Board. Project Funding Information When a new project is submitted for inclusion to the TIP, either during the initial development of the TIP or as an amendment, the project sponsor is required to provide information regarding the local funding sources in order to show fiscal constraint. The specific source of revenue, anticipated future, and any other financial information needed to show fiscal constraint will be required. Project Selection The CAMPO Board of Directors adopted (Resolution 2010-04) a project prioritization and selection process. This process involves a call for projects, ranking based on CAMPO priorities by staff and reviewed by the CAMPO Technical Committee, prior to being forwarded to the CAMPO Board of Directors for a vote of approval. The Board of Directors may modify the project selection if deemed necessary. Project Sponsor Commitment to Projects Project sponsors hold ultimate responsibility for ensuring that project information contained in the TIP is correct, that it accurately represents the scope of work being performed, and that the amount of funding being requested is correct. The sponsor is responsible for providing CAMPO with an honest accounting of project details including: costs, implementation schedules, and local matching fund sources, at the time of the application for federal funds and anytime such details change. The project sponsor is also responsible for reviewing the TIP after a project is included or modified to ensure correctness. Scriveners’ Error Errors made in the ministerial functions of creating and maintaining the TIP, such as cartography, typographical, spelling, minor word omissions, mathematical, and other error’s which do not alter the intent of the TIP and have little or no impact can be performed by staff and shall not be consider ed a revision to the TIP. DRAFT CAMPO 2024-2028 Transportation Improvement Program 40 Appendix 4 – Definitions Attainment area means any geographic area in which levels of a given criteria air pollutant (e.g., ozone, carbon monoxide, PM10, PM2.5, and nitrogen dioxide) meet the health-based National Ambient Air Quality Standards (NAAQS) for that pollutant. An area may be an attainment area for one pollutant and a nonattainment area for others. A maintenance area (see definition below) is not considered an attainment area for transportation planning purposes. Available funds means funds derived from an existing source dedicated to or historically used for transportation purposes. For Federal funds, authorized and/or appropriated funds and the extrapolation of formula and discretionary funds at historic rates of increase are considered available. A similar approach may be used for State and local funds that are dedicated to or historically used for transportation purposes. Conformity means a Clean Air Act (42 U.S.C. 7506(c)) requirement that ensures that Federal funding and approval are given to transportation plans, programs and projects that are consistent with the air quality goals established by a State Implementation Plan (SIP). Conformity, to the purpose of the SIP, means that transportation activities will not cause new air quality violations, worsen existing violations, or delay timely attainment of the NAAQS. The transportation conformity rule (40 CFR part 93) sets forth policy, criteria, and procedures for demonstrating and assuring conformity of transportation activities. Cooperation means that the parties involved in carrying out the transportation planning and programming processes work together to achieve a common goal or objective. Coordination means the cooperative development of plans, programs, and schedules among agencies and entities with legal standing and adjustment of such plans, programs, and schedules to achieve general consistency, as appropriate. Design concept means the type of facility identified for a transportation improvement project (e.g., freeway, expressway, arterial highway, grade separated highway, toll road, reserved right-of-way rail transit, mixed-traffic rail transit, or busway). Design scope means the aspects that will affect the proposed facility’s impact on the region, usually as they relate to vehicle or person carrying capacity and control (e.g., number of lanes or tracks to be constructed or added, length of project, signalization, safety features, access control including approximate number and location of interchanges, or preferential treatment for high occupancy vehicles). Financial Plan means documentation required to be included with a metropolitan transportation plan and TIP (and optional for the long-range statewide transportation plan and STIP) that demonstrates the consistency between reasonably available and projected sources of Federal, State, local, and private revenues and the costs of implementing proposed transportation system improvements. Financially Constrained or Fiscal Constraint means that the metropolitan transportation plan, TIP, and STIP includes sufficient financial information for demonstrating that projects in the metropolitan transportation plan, TIP, and STIP can be implemented using committed, available, or reasonably available revenue sources, with reasonable assurance that the federally supported transportation system is being adequately operated and maintained. For the TIP and the STIP, financial constraint/fiscal constraint applies to each program year. Additionally, projects in air quality nonattainment and maintenance areas can be included in the first two years of the TIP and STIP only if funds are available or committed. Illustrative Project means an additional transportation project that may (but is not required to) be included in a financial plan for a metropolitan transportation plan, TIP, or STIP if reasonable additional resources were to become available. Maintenance Area means any geographic region of the United States that the EPA previously designated as a nonattainment area for one or more pollutants pursuant to the Clean Air Act Amendments of 1990, and subsequently redesignated as an attainment area subject to the requirement to develop a maintenance plan under section 175A of the Clean Air Act, as amended. Major Projects - These transportation improvements are defined as projects receiving Federal financial assistance 1) with an estimated total cost of $500 million or more or 2) that have been identified by the FHWA as being a Major Project. The designated projects may include those: 1) that require a substantial amount of a State Transportation Agency's program resources, 2) that have a high level of public or congressional attention, or 3) that have extraordinary implications for the national transportation system. Metropolitan Planning Area (MPA) means the geographic area determined by agreement between the metropolitan planning organization (MPO) for the area and the Governor, in which the metropolitan transportation planning process is carried out. Metropolitan Transportation Plan (MTP) means the official multimodal transportation plan addressing no less than a 20-year planning horizon that is developed, adopted, and updated by CAMPO through the metropolitan transportation planning process. Nonattainment area means any geographic region of the United States that has been designated by the EPA as a nonattainment area under section 107 of the Clean Air Act for any pollutants for which an NAAQS exists. Obligated projects means strategies and projects funded under title 23 U.S.C. and title 49 U.S.C. Chapter 53 for which the supporting Federal funds were authorized and committed by the State or designated recipient in the preceding program year, and authorized by the FHWA or awarded as a grant by the FTA. Program of Projects (POP) is a list of projects to be funded in a grant application submitted to FTA by a designated recipient. The POP lists the subrecipients and indicates whether they are private non-profit agencies, governmental authorities, or private providers of transportation service, designates the areas served (including rural areas), and identifies any tribal entities. In addition, the POP includes a brief description of the projects, total project cost, and Federal share for each project. Project selection means the procedures followed by MPOs, States, and public transportation operators to advance projects from the first four years of an approved TIP and/or STIP to implementation, in accordance with agreed upon procedures. Project sponsor must be a city, county, state, or other transportation related government agency eligible to receive federal funding from the Federal Highway or Federal Transit Administrations. All other entities must partner with a city, county, or state agency to apply for and/or administer a transportation project. Public transportation operator means the public entity which participates in the continuing, cooperative, and comprehensive transportation planning process in accordance with 23 U.S.C. 134 and 135 and 49 U.S.C. 5303 and 5304, and is the designated recipient of Federal funds under title 49 U.S.C. Chapter 53 for transportation by a conveyance that provides regular and continuing general or special transportation to the public, but does not include school bus, charter, or intercity bus transportation or intercity passenger rail transportation provided by Amtrak. Regionally significant project means a transportation project (other than projects that may be grouped in the TIP and/or STIP or exempt projects as defined in EPA’s transportation conformity regulation (40 CFR part 93)) that is on a facility which serves regional transportation needs (such as access to and from the area outside the region; major activity centers in the region; major planned developments such as new retail malls, sports complexes, or employment centers; or transportation terminals) and would normally be included in the modeling of the metropolitan area’s transportation network. At a minimum, this includes all principal arterial highways and all fixed guideway transit facilities that offer a significant alternative to regional highway travel. Statewide transportation improvement program (STIP) means a statewide prioritized listing/program of transportation projects covering a period of four years that is consistent with the long-range statewide transportation plan, metropolitan transportation plans, and TIPs, and required for projects to be eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53. Transportation Improvement Program (TIP) is a document prepared by a metropolitan planning organization that lists projects to be funded with FHWA/FTA funds for the at least next one- to three-year period. Unified Planning Work Plan (UPWP) is the management plan for the (metropolitan) planning program. Its purpose is to coordinate the planning activities of all participants in the planning process. Agenda Item 7B Page 1 of 2 CAMPO Board of Directors Staff Report FY2024 Unified Planning Work Program (UPWP) April 19, 2023 Summary Staff has begun work on the FY2024 UPWP. This annual process starts very early due to the City of Jefferson’s budget process. The FY2024 UPWP is anticipated to be adopted by May 2023. The UPWP is CAMPO’s annual statement of work identifying the budget, planning priorities, and activities to be carried out for the year (November 1 to October 31). The UPWP contains many ongoing activities required to perform the essential functions of CAMPO, as well as, periodic and one-time activities. The UPWP serves as the basis for funding agreements with the Missouri Department of Transportation (MoDOT). Input from the Technical Committee, Board of Directors, stakeholders, and the general public are used throughout the process. UPWP activities are categorized into six work elements: • Work Element 521 - Program Support & Administration • Work Element 522 - General Development and Comprehensive Planning Coordination • Work Element 524 - Short Range Transportation Planning & Programming • Work Element 525 - Long Range Transportation Planning • Work Element 526 - Public Transportation Planning • Work Element 527 – Safe/Accessible Transportation Planning (New in FY 2023) Anticipated major activities in FY2024, developed thus far, include: • Development of the FY2025 UPWP (Annual) • Development of the 2025-2029 Transportation Improvement Program (Annual) • Technical assistance (i.e mapping, data development/management, grants) (Continuous) • Metropolitan Transportation Plan Update (every 5 years) • Urbanized Area/Planning Area review • Functional Classification review The estimated draft budget for FY2024 is approximately $241,955 with $195,119 (~80%) funded through the Consolidated Planning Grant (CPG). The CPG fund includes a combination of funds from the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA). A local match requirement (~20%) is provided by Jefferson City and Cole County. Of the 20% local match requirement, Jefferson City provides 75% and Cole County provides 25%. On some projects other stakeholders or jurisdictions may contribute to the matching funds. UPWP changes with the 2021 Bipartisan Infrastructure Law (BIL) In previous years the CPG fund existed as a 80% federal grant that required a 20% local match. This has changed slightly with the passing of the 2021 Bipartisan Infrastructure Law (BIL). The 2021 BIL requires each MPO to use at least 2.5% of FHWA Planning Funds (PL Funds), on specified planning activities related to Safe and Accessible Transportation Planning. This portion of the CPG fund is 100% federal and does not require a local match. PL funds constitute 80% of total CPG funds. The allocation estimate of 2.5% of the 80% PL funds is approximately $3,824 annually. The FY2024 allocation estimate will not be available until June 2023. If not expended in FY2023, it is estimated that CAMPO will have a little more than $7,000 available in this work element. More detail on the eligible projects for this work element are located in the attached draft document. Agenda Item 7B Page 2 of 2 Based on the anticipated FY2023 expenditure and estimated FY2024 draft budget, it is projected that CAMPO will have a balance of aproximately $479,410 in unprogrammed CPG funds at the end of FY2024. This amount may increase if funds are not expended. The following chart details the estimated trajectory of the CAMPO Consolidated Planning Grant balance. All of these totals are subject to change during the development of the UPWP. A draft FY 2024 UPWP is attached. Please refer questions or comments to Katrina Williams at 573-634-6536 or by email at kawilliams@jeffersoncitymo.gov. Technical Committee Recommendation The Technical Committee recommended the Draft FY2024 Unified Planning Work Program for review and approval to the Board of Directors at their April 6th meeting. Public Comment A 25-day public comment period will be opened April 19th and closed by the Board of Directors at a meeting on May 17th. CPG Balance for end of FY2022 $520,816 Verified 12/06/2022 FY 2023 CPG Allocation*$193,832 Estimate - Based on 2022 Allocation FY 2023 UPWP CPG Expenditure - Anticipated -($233,951)Board approved budget CPG Balance for end of FY2023 - Anticipated* Subtotal $480,697$0 FY 2024 CPG Allocation - Estimated per MoDOT's FY22 SPR Work Program $193,832 FY 2024 CPG Programmed Expenditure - Anticipated -($195,119)includes 3% cost of living increase Remaining Unprogrammed CPG Funds Anticipated at end of FY 2024 $479,410 Consolidated Planning Grant Balance DRAFT Unified Planning Work Program The preparation of this report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, and Federal Transit Administration in cooperation with the Missouri Department of Transportation. The opinions, findings, and conclusions expressed in this report are not necessarily those of the Federal Highway Administration, Federal Transit Administration, or the Missouri Department of Transportation. FY 2024 November 1, 2023 to October 31, 2024 Adopted - Pending Administration of the Capital Area MPO is provided by the City of Jefferson Department of Planning and Protective Services Room 120 John G. Christy Municipal Building 320 East McCarty St., Jefferson City, Missouri 65101 Phone: (573) 634-6410 http://www.jeffersoncitymo.gov/campo DRAFT Table of Contents Introduction......................................................................................................................................................... 1 Major Tasks Completed in FY 2023 .......................................................................................................................... 1 Tasks Carried Over from FY 2023 ............................................................................................................................ 1 Priorities for FY 2024 ...................................................................................................................................... 1 UPWP Development ......................................................................................................................................... 2 UPWP Modification and Amendment Process ............................................................................................. 2 Public Participation ........................................................................................................................................... 2 Air Quality Planning ......................................................................................................................................... 3 Safe and Accessible Transportation Planning ............................................................................................. 3 Financial Support for CAMPO ....................................................................................................................... 3 Transportation Planning Factors ..................................................................................................................... 4 Required Documents Timeline ......................................................................................................................... 4 Work Element 521 - Program Support & Administration ......................................................................... 6 Work Element 522 - General Development and Comprehensive Planning Coordination ................. 7 Work Element 524 - Short Range Transportation Planning & Programming ....................................... 8 Work Element 525 - Long Range Transportation Planning ...................................................................... 9 Work Element 526 - Public Transportation Planning ............................................................................... 10 Work Element 527 - Safe and Accessible Transportation Planning ..................................................... 11 Appendix A – Financial Summary ............................................................................................................... 12 Anticipated Expenditures & Revenue ...................................................................................................................... 12 Table 1: FY 2024 CAMPO Budget* ...................................................................................................................... 12 Table 2: FY 2024 Work Element Funding Summary - Consolidated Planning Grant and Local Funds ... 13 Table 3: FY 2024 Local Match by Jurisdiction .................................................................................................... 13 Table 4: Anticipated Available Federal Consolidated Planning Grant (CPG) Balance Revenue ............ 13 Appendix B – CAMPO Boundary Map ...................................................................................................... 14 Appendix C - Modifications and Amendments ......................................................................................... 15 DRAFT Insert Adoption Resolution DRAFT Insert Planning Process Certification DRAFT Insert Certification of Restrictions on Lobbying Capital Area Metropolitan Planning Organization Board of Directors Chair – Ron Fitzwater, City Council Member, City of Jefferson Vice-Chair –Jeff Hoelscher, Eastern District Commissioner, Cole County City of Jefferson Jack Deeken, City Council Member Jon Hensley, City Council Member Mike Lester, City Council Member Clint Smith, AICP, Director, Planning & Protective Services Gerry Stegeman, Interim Transit Manager Matt Morasch, PE, Director, Public Works Cole County Eric Landwehr, PE, Director, Public Works Doug Reece, City Administrator, St. Martins Callaway County Roger Fischer, Western District Commissioner Holts Summit Brandon Ruediger, City Administrator, City of Holts Summit Missouri Department of Transportation (MoDOT) Machelle Watkins, PE, District Engineer Ex-Officio Members Luke Holtschnieder, Jefferson City Regional Economic Partnership Eva Steinman, Federal Transit Administration, Region VII Christy Evers, MoDOT Transit Administrator Vacant, Missouri Office of Administration Michael Henderson, AICP, MoDOT, Transportation Planning Dan Weitkamp, Federal Highway Administration, Missouri Div. Tamara Tateosian, Callaway County Economic Development Technical Committee Chair – David Bange, PE, City Engineer, Public Works, City of Jefferson Vice-Chair – Matt Prenger, PE, County Engineer, Public Works, Cole County City of Jefferson Clint Smith, AICP, Director, Planning & Protective Services Todd Spalding, Director, Parks, Recreation & Forestry Matt Morasch, PE, Director of Public Works Gerry Stegeman, Interim Transit Manager Eric Barron, AICP, Transportation Planner Britt Smith, PE, Operations & Maintenance Cole County Matt Prenger, PE, County Engineer Shannon Kliethermes, Senior Planner Callaway County Paul Winkelmann, PE, County Highway Administrator Small City Representative - Callaway Mark Tate, Streets Department, City of Holts Summit Small City Representative - Cole Rachel Busche, Wardsville Missouri Department of Transportation (MoDOT) Steve Engelbrecht, PE, District Planning Manager Michael Henderson, AICP, Transportation Planning Specialist Daniel Roeger, PE, Area Engineer Private Transportation Interest Joe Scheppers, N.H. Scheppers Distributing Company. Pedestrian or Biking Interest Kevin Schwartz, JC Parks Outdoor Recreation Program Manager Ex-Officio Members: Eva Steinman, Federal Transit Administration, Region VII Daniel Weitkamp, Federal Highway Administration, Missouri Div. Jason Branstetter, Heartland Port Authority Representative - February 2023 CAMPO Staff and FTE (Full-Time Employee) apportionment Clint Smith, AICP– Director, Planning & Protective Services FTE – 0* Eric Barron, AICP - Planning Manager FTE - 0.3 Katrina Williams, GISP, AICP –Planner, Senior FTE – 1 Vacant – Planner I FTE – 1** Kortney Bliss – Planner I FTE – 0** Lisa Dittmer – Administrative Assistant FTE - .10 * The MPO Executive Director is also the Director of the Jefferson City Department of Planning and Protective Services. This full- time position is not funded by the MPO and does not appear in the CAMPO Budget. MPO activities are only a portion of the Director’s job duties. **The Planner I position may work on MPO and/or City of Jefferson planning activities depending on work flow. Both Planner I salaries are the same and CAMPO will not seek reimbursement for more than the equivalent of one full-time Planner I. DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 1 Introduction The Capital Area Metropolitan Planning Organization (CAMPO) is responsible for long-range transportation planning for the defined Metropolitan Planning Area (MPA), which includes the Jefferson City urbanized area. Planning activities are carried out in a continuing, cooperative, and comprehensive manner. The Fiscal Year 2024 Unified Planning Work Program (UPWP) defines tasks and anticipates funding requirements for the metropolitan planning activities performed by CAMPO with federal funds provided by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) under title 23 U.S.C . and title 49 U.S.C. Chapter 53. CAMPO staff, unless otherwise identified, performs all work. The UPWP defines activities for all public officials and agencies that contribute resources to the transportation planning process. The UPWP covers one fiscal year, November 1 to October 31. The UPWP outlines activities funded through the Consolidated Planning Grant and local funds and serves as the basis for funding agreements with the Missouri Department of Transportation (MoDOT). The UPWP also serves as a management tool for scheduling, budgeting, and monitoring the local planning activities. The MPA boundary was delineated by the CAMPO Board of Directors and approved by the Governor in 2013 (see Appendix B). The MPA includes the jurisdictions of Holts Summit, Jefferson City, St. Martins, Taos, Wardsville, and portions of unincorporated, non-urbanized areas within Cole and Callaway Counties. Note: In January 2023, new “Urban Area” boundaries using new criteria were released by the US Census Bureau. These new boundaries and criteria stem from the results of the 2020 Decennial Census. This new data may impact the implementation of the UPWP and may result in a modification or amendment. The CAMPO Board of Directors is composed of elected and appointed officials from local jurisdictions, selected state agencies, and Federal transportation representatives serving as ex-officio members. The CAMPO Technical Committee consists of representatives from member jurisdictions’ professional staff and acts in an advisory capacity to the Board of Directors. A memorandum of understanding between members identifies the City of Jefferson as the administrator of CAMPO, and as such, the City provides staffing. For FY2024, the City of Jefferson will provide staff consisting of a full-time Planner, full-time Senior Planner, and part time support from the Director of Planning and Protective Services, a Planning Manager, and an Administrative Assistant. Major Tasks Completed in FY 2023 • Annual update of the Unified Planning Work Program and the Transportation Improvement Program. • Staff assistance in planning the 2023 Active Transportation Summit. • Update of System Performance Report. • Update of Crash Analysis Report for the CAMPO area. • Completion of JEFFTRAN Transit Feasibility Study. • Update of Title VI Program, including the Public Participation Plan, and Language Assistance Plan. • Completion of Capital Area Active Transportation Plan (formerly Pedestrian and Bicycle Plan) • Update of regional databases, including; sidewalks, greenway, bike trails/lanes and local roads. Tasks Carried Over from FY 2023 • Review of US Census Bureau Urbanized Area data. • Update of the CAMPO 2045 & Beyond Metropolitan Transportation Plan • Continued work on any technical assistance projects as they arise. Priorities for FY 2024 • Implementation of the Metropolitan Transportation Plan. • Implementation of the Active Transportation Plan. • Provide technical assistance in mapping, data development, and land use planning to local jurisdictions. • Continue implementation of FAST Act performance measures and targets. • Review of Urbanized Area/Planning Area boundary. • Review of Federal Functional Classification of Urban Area roads. • Update of CAMPO 2045 & Beyond Metropolitan Transportation Plan. • Update of Coordinated Public Transit Human Services Transportation Plan (late FY 2024). DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 2 UPWP Development The UPWP is developed in accordance with 23 CFR 450.308 and 23 CFR part 420. CAMPO staff reviewed previous years’ time required for activities to determine time allocations for this UPWP. Because the MPO is administered by the City of Jefferson, CAMPO accommodates the city’s budgeting process/schedule and execution of the Consolidated Planning Grant agreement and must begin the development of the UPWP several months prior to the fiscal year for which the UPWP covers. CAMPO presents a draft UPWP to the Board of Directors in April, prior to the beginning of the fiscal year. This early start presents difficulties in assuming future tasks which may surface after adoption of the UPWP and in documenting activities occurring in the previous year. UPWP Modification and Amendment Process Modification: A change in language or content that does not result in a budget increase. This change may consist of a change to a Work Element’s objectives, activities, or products. Modifications are communicated by staff to the Technical Committee and Board of Directors at the next regularly scheduled meeting. Amendment: A change in language or content which results in a budget increase or major change in a work element. An amendment is necessary if a budget increase is needed which impacts the funding reimbursement agreed upon between the Missouri Highway and Transportation Commission and the City of Jefferson. Amendments must be approved by the Board of Directors, FTA, and FHWA. Some modifications may also go through an official approval by the Board of Directors as deemed appropriate by staff. Modifications and Amendments are documented in Appendix C. Public Participation Federal law requires CAMPO to develop a public involvement program to involve the community early and continuously in the transportation planning process. A proactive public program which provides information, timely public notice, and public access to key decisions is included in the CAMPO Public Participation Plan. During the development of the FY 2024 UPWP, the document is scheduled to be discussed at monthly Board of Directors and Technical Committee meetings from February to May, and concludes with a public comment period. Draft copies of the UPWP, as part of the meeting agendas and meeting minutes regarding UPWP development, are available to view on the CAMPO website. In accordance with the CAMPO Title VI Policy, any and all documents produced by CAMPO, may be requested in other formats by contacting CAMPO staff at City Hall or by calling (573)634-6410. DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 3 Air Quality Planning According to 23 CFR 420.111(e), State DOTs and MPOs are also encouraged to include cost estimates for transportation planning, research, development, and technology transfer related activities funded with other Federal or State and/or local funds; particularly for producing the FHWA-required data specified in paragraph (b) of §420.105, for planning for other transportation modes, and for air quality planning activities in areas designated as non-attainment for transportation-related pollutants in their work programs. The MPOs in TMAs must include such information in their work programs. Federal standards have been established through extensive scientific review, that set allowable concentrations and exposure limits for certain pollutants. Air quality standards have been established for six criteria pollutants: • ozone (or smog) • carbon monoxide • particulate matter • nitrogen dioxide • lead • sulfur dioxide The CAMPO Planning Area is in “attainment”. A geographic area with monitored levels that meet or do better than the primary standard for each of these pollutants is called an attainment area; areas that do not meet the primary standard for any one or more of these pollutants are called nonattainment areas. In Missouri, MoDOT is responsible for implementing the conformity regulation for transportation actions in attainment and nonattainment areas. Safe and Accessible Transportation Planning § 11201; 23 U.S.C. 134 - The Bipartisan Infrastructure Law (BIL) requires each MPO to use at least 2.5% of its PL funds (and each State to use 2.5% of its State Planning and Research funding under 23 U.S.C. 505) on specified planning activities to increase safe and accessible options for multiple travel modes for people of all ages and abilities. [§ 11206(b)] A State or MPO may opt out of the requirement, with the approval of the Secretary, if the State or MPO has Complete Streets standards and policies in place, and has developed an up-to-date Complete Streets prioritization plan that identifies a specific list of Complete Streets projects to improve the safety, mobility, or accessibility of a street. [§ 11206(c) and (e)] For the purpose of this requirement, the term “Complete Streets standards or policies” means standards or policies that ensure the safe and adequate accommodation of all users of the transportation system, including pedestrians, bicyclists, public transportation users, children, older individuals, individuals with disabilities, motorists, and freight vehicles. [§ 11206(a)] CAMPO, as detailed in this UPWP, is in the process of developing a new Pedestrian and Bicycle Plan that will incorporate Complete Streets standards and/or policies and result in a prioritized list of projects. CAMPO adopted the Capital Area Pedestrian & Bicycle Plan in 2016, which includes the CAMPO Livable Streets Policy. The term “Livable Streets” will be converted to “Complete Streets” in the next update cycle. Financial Support for CAMPO CAMPO receives 80% of funding from the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) 5303 funds through the Missouri Department of Transportation (MoDOT) via the Consolidated Planning Grant (CPG) and 20% via local funding. The 20% in local matching funds is provided by the City of Jefferson and Cole County. Of the 20% local funding, Jefferson City contributes 75% and Cole County contributes 25%. The total CAMPO budget for FY 2024 is $233,291. Appendix A provides more detailed breakdown of financial details. DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 4 Transportation Planning Factors The Fixing America’s Surface Transportation Act (FAST Act), passed into law in 2015, identifies ten planning factors required for consideration in any MPO planning activities, including in the development of the UPWP, MTP, and TIP. Figure 1 provides an overview of those planning factors and how they are addressed by each work element in the UPWP. A detailed overview of each work element is provided in the following pages. Figure 1: Planning Factors as addressed by work elements Planning Factor Work Program Element Work Element 521 - Program Support & Administration Work Element 522 - General Development and Comprehensive Planning Coordination Work Element 524 - Short Range Transportation Planning & Programming Work Element 525 - Long Range Transportation Planning Work Element 526 - Public Transportation Planning Work Element 527 – Safe & Accessible Transportation Planning A. Support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity, and efficiency. ◼ ◼ ◼ ◼ ◼ B. Increase the safety of the transportation system for motorized and nonmotorized users. ◼ ◼ ◼ ◼ ◼ ◼ C. Increase the security of the transportation system for motorized and nonmotorized users. ◼ ◼ ◼ ◼ ◼ ◼ D. Increase the accessibility and mobility of people and for freight. ◼ ◼ ◼ ◼ ◼ ◼ E. Protect and enhance the environment, promote energy conservation, improve the quality of life, and promote consistency between transportation improvements and State and local planned growth and economic development patterns. ◼ ◼ ◼ ◼ ◼ ◼ F. Enhance the integration and connectivity of the transportation system, across and between modes, for people and freight. ◼ ◼ ◼ ◼ ◼ ◼ G. Promote efficient system management and operation. ◼ ◼ ◼ ◼ ◼ ◼ H. Emphasize the preservation of the existing transportation system. ◼ ◼ ◼ ◼ ◼ I. Improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater impacts of surface transportation. ◼ ◼ ◼ ◼ ◼ ◼ J. Enhance travel and tourism. ◼ ◼ ◼ ◼ ◼ ◼ Required Documents Timeline Figure 2 outlines the general timeline for updating most of the federally required MPO plans and documents. The fiscal year runs from November 1 through October 31 and quarters are as follows: Quarter 1 – November 1 – January 31 Quarter 2 – February 1 – April 30 Quarter 3 – May 1 – July 31 DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 5 Quarter 4 – August 1-October 31 Figure 2: Timeline for updating required MPO plans and documents MTP - Metropolitan Transportation Plan Expires May 2024 TIP – Transportation Improvement Program Approved in May (Expires in June) UPWP – Unified Planning Work Program Approved in May (Expires in October) CPTHSTP – Coordinated Public Transit-Human Services Transportation Plan Update Required December 2024-2025 Title VI Program –Title VI of the Civil Rights Act of 1964. Update Required March 2026 LAP – Language Assistance Plan Update Required March 2026 PPP – Public Participation Plan Update Required March 2026 MPA / Functional Class Review Occurs every 10 years Year Qtr MTP TIP UPWP CPTHSTP Title VI LAP PPP MPA / Functional Class Review 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 2028 2023 2024 2025 2026 2027 DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 6 Work Element 521 - Program Support & Administration This task covers the activities necessary to carry out the daily activities of CAMPO in support of the transportation planning process. These include meeting preparation, UPWP development, public outreach activities, reporting, and professional development activities. Objectives / Activities • Manage CAMPO activities in order to comply with Federal and State administrative requirements and guidance. Support the operations of the Board of Directors and Technical Committee, communicate and coordinate with Federal and State agencies on MPO activities, and support day-to-day operations. • Develop the annual budget and Unified Planning Work Program along with the preparation and submittal of UPWP quarterly progress reports, billings, and invoices. Modify UPWP as needed with approval from the necessary authority. • Facilitate public participation such as public meetings, hearings and workshops, as needed and in accordance with the Public Participation Plan. Provide access to CAMPO activities through maintenance and updating of the CAMPO website. • Fulfill program update and reporting requirements related to Title VI, Public Participation Plan, Language Assistance Plan, Disadvantage Business Enterprise requirements, project obligation, and other topics as required. • Professional Development activities, including attendance at relevant training sessions, educational seminars, meetings, and conferences. FY 2023 Accomplishments • Facilitation of Board of Directors and Technical Committee monthly meetings as required. • FY 2024 UPWP updated. • Quarterly progress reports, billings, and invoices completed. • Disadvantaged Business Enterprise (DBE) Commitments Semi-Annual reports completed. • Staff participated in various professional development activities, including MoDOT sponsored events, webinars, and other training opportunities. • Completed update of Title VI Program, including Language Assistance Plan and Public Participation Plan as federally required for both JEFFTRAN and CAMPO FY 2024 Products • Board of Directors and Technical Committee meetings administration/facilitation support. • Meeting agendas, minutes, presentations, reports, and other support material. • FY 2025 UPWP. • End of year report, quarterly progress reports, billings, and invoices. • DBE Commitments Semi-Annual reports. • Participation in professional development activities and maintain pertinent professional certifications. Responsible Party: CAMPO staff Funding: This work element includes labor costs and direct costs. Work Element Cost Type Federal CPG Funds 80% Local Match 20% Total Percent of Work Program Budget 521 Labor $26,945 $6,736 $33,681 14% Direct $16,320 $4,080 $20,400 8% DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 7 Work Element 522 - General Development & Comprehensive Planning Coordination Not all of the CAMPO member organizations have planning staff or current comprehensive planning documents in place. In order to facilitate transportation planning by incorporating the vision and goals for the member organizations and the public, CAMPO will provide assistance in the crafting of the transportation component of local comprehensive planning documents, as practical. This task may include the development and maintenance of related spatial and non-spatial data collection and analysis; examples include land use, demographic data, housing, human services, environmental/natural resources, recreation/open space, and public facilities. Objectives / Activities • Provide technical planning assistance to CAMPO members in the development of the transportation component of comprehensive and other planning documents, including geospatial analytical support, local ordinances, and databases. • Assist jurisdictions in the acquisition and use of Geographic Information Systems (GIS) and other data for use in plans, transportation grant applications, measuring performance, and forecasting provided by the US Census, MoDOT and others. FY 2023 Accomplishments • Provided technical assistance in various grant application processes in the CAMPO area. • Provided assistance in the development of local comprehensive plans of member organizations. • Provided geospatial analysis/data (elevations, demographic, sidewalk, bicycle facilities, street right-of-way, etc.) to support development, and grant application activities. FY 2024 Products • Various inputs for comprehensive planning documents - ongoing for multiple years. • Various GIS databases. • Continue providing technical assistance for the transportation component of local planning documents. • Assist member jurisdictions with development of local ordinances that may facilitate corridor preservation and improve efficient network connectivity. Responsible Party: CAMPO staff and local jurisdictions. Local jurisdictions have ultimate responsibility for the development and publishing of their planning documents. Funding: This work element includes only labor costs. Work Element Cost Type Federal CPG Funds 80% Local Match 20% Total Percent of Work Program Budget 522 Labor $13,655 $3,414 $17,069 7% DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 8 Work Element 524 - Short Range Transportation Planning & Programming Identify and address immediate or short-term transportation needs which may include non-motorized planning activities, complete streets planning, freight planning, bicycle/pedestrian planning, safety planning, operations and management planning, transportation security planning, or wayfinding activities. Objectives / Activities • Provide support for short-range transportation planning by CAMPO and its members. • Participate in regional activities regarding freight, safety, security, bicycle/pedestrian, non-motorized, and other related planning activities. • Review and maintain the goals and strategies outlined in adopted CAMPO plans: o CAMPO 2045 & Beyond Metropolitan Transportation Plan and Major Thoroughfare Plan o Capital Area Active Transportation Plan o Coordinated Public Transit-Human Services Transportation Plan o Public Participation Plan o Regional Wayfinding Plan • Maintain the current TIP through the Amendment and Modifications process that meets statutory requirements, maintain fiscal constraint, and support changing priorities and project scope. • Continue analysis of safety data to be used in the implementation of recommended improvements and strategies as outlined in the MTP. • Be a resource for local jurisdictions seeking to develop an ADA Transition Plan or seeking to improve mobility and access. • Develop and adopt the FY2025-2029 TIP. • Develop and publish the Annual List of Obligated Projects (ALOP) for the prior year TIP. • Update the Capital Area Pedestrian and Bicycle Plan through use of a consultant. FY 2023 Accomplishments • Participated in activities, meetings and conferences including Missouri Coalition for Roadway Safety Conference, MoDOT Unfunded Needs List, and STIP project review/discussions. • Completed Program Year 2023 – 2027 TIP and any necessary amendments. • Developed 2024-2028 TIP. • Provided assistance to member jurisdictions in the completion of grant applications. • Updated Crash Analysis Report. • Continued update of Capital Area Pedestrian and Bicycle Plan. FY 202 4 Products • TIP amendments and administrative modifications as necessary • Development of the Program Year 2025-2029 TIP. • Update Crash Data Report. • Provide guidance and assistance to local jurisdictions in the transportation component of their ADA Transition Plan development work efforts. • Annual List of Obligated Projects from the previous program year. • Assist with planning and possibly hosting of Active Transportation Summit in cooperation with Missouri Bicycle and Pedestrian Federation. • Implement Capital Area Active Transportation Plan Responsible Party: CAMPO staff Funding: This work element includes only labor costs Work Element Cost Type Federal CPG Funds 80% Local Match 20% Total Percent of Work Program Budget 524 Labor $16,968 $4,242 $21,210 9% DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 9 Work Element 525 - Long Range Transportation Planning Provide for long-range transportation planning activities, studies, and plans supporting the transportation planning process out to a minimum of 20 years, for the CAMPO metropolitan planning area, and may include both system level planning activities and project level activities. Objectives / Activities • Keep the MTP current by maintaining and amending components of the plan such as major land use changes, major road changes, process improvements, funding, or new regulations and legislation; and any projects to be included into the TIP that are not already listed in the MTP. • Involve key stakeholders, business community and advocacy groups, environmental organizations, and the public in long range transportation planning activities to achieve the long-term transportation goals and vision of the MTP. • Report MPO performance targets in relation to performance measures for the MTP and TIP. • Implement the recommendations and strategies as identified in the MTP. • Update the CAMPO 2045 & Beyond MTP. This activity may include the use of consultant services in the review of project specific components of the Illustrative List and/or Travel Demand Model (TDM) FY 2023 Accomplishments • Staff, working with MoDOT, continued setting federal performance measures for the TIP and MTP. Performance measures and targets are included in the System Performance Report. • Worked with the Technical Committee and Board of Directors to implement the MTP strategies. • Began update of the CAMPO 2045 & Beyond Metropolitan Transportation Plan • Update of the Crash Analysis Report. • Staff continues development of GIS data and resources to assist jurisdictions with plan development and implementation. FY 2024 Products • Implementation of the MTP strategies and improvements • Assist member jurisdictions in implementing recommended improvements outlined in the MTP. • Maintain the Thoroughfare Plan. • Amendments to the MTP as necessary. • Report MTP and TIP performance measures and targets. • Annual Review of Illustrative List of Projects • Review of Urbanized Area/Planning Area Boundary and Federal Functional Classification • Complete review and update of Metropolitan Transportation Plan as federally required. Responsible Party: CAMPO staff and consultant. Funding: This work element includes direct costs and labor costs. Work Element Cost Type Federal CPG Funds 80% Local Match 20% Total Percent of Work Program Budget 525 Labor $56,061 $14,015 $70,077 29% Direct $24,000 $6,000 $30,000 12% DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 10 Work Element 526 - Public Transportation Planning Assist public transportation and transit providers in fulfilling State, Local, and Federal requirements for coordination and cooperative transportation planning through assistance with plan development, technical assistance, mapping, data, and GIS functions. Objectives / Activities • Continue to assist JEFFTRAN with the maintenance of Route and Schedule Guide, individual route maps and other tools to serve JEFFTRAN patrons. • Provide JEFFTRAN mapping, demographic, GIS, planning and other technical assistance in support of reporting requirements and evaluating possible changes in types of transit services offered. • Participate in transit and mobility management planning activities that support the goals and objectives laid out in the Coordinated Public Transit-Human Services Transportation Plan. • Continue collaboration with other regional transit providers to improve efficiency and access in Mid-Missouri. • Update and maintain the Coordinated Public Transit-Human Services Transportation Plan. FY 2023 Accomplishments • Provided assistance to JEFFTRAN in the update of route guides. • Completed review and update of JEFFTRAN Title VI Program. JEFFTRAN and CAMPO documents were combined into one product. FY 2024 Products • Update route and schedule guide as needed. • Maps, demographics, GIS analytics. • Improved service to patrons of JEFFTRAN. • Collaboration with regional transit providers and human service agencies to meet shared goals. Responsible Party: CAMPO staff. Funding: This work element includes only labor costs. Work Element Cost Type Federal CPG Funds 80% Local Match 20% Total Percent of Work Program Budget 526 Labor $33,396 $8,349 $41,745 17% DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 11 Work Element 527 - Safe and Accessible Transportation Planning Engage in specified planning activities to increase safe and accessible options for multiple travel modes for people of all ages and abilities, including pedestrians, bicyclists, public transportation users, children, older individuals, individuals with disabilities, motorists, and freight vehicles. Objectives / Activities • Implement CAMPO Complete Streets standards and policies as defined in the adopted Livable Streets (Complete Streets) Policy. • Developed and maintain a Complete Streets prioritization plan that identifies projects to improve the safety, mobility, or accessibility of a street. • Participation in the Missouri Complete Streets (MOCS) Advisory Committee • Educate jurisdictions and stakeholder about Complete Streets standards and policies. FY 2023 Accomplishments • Participated in activities, meetings and conferences including Missouri Coalition for Roadway Safety. • Began development of a prioritized list of projects as part of the update of the Capital Area Pedestrian and Bicycle Plan. • Facilitated stakeholder meetings to develop a bicycle education program within Jefferson City Public Schools. • Provided assistance to Missouri Pedestrian and Bicycle Federation in planning and/or hosting the 2023 Active Transportation Summit. FY 2024 Products • Host a Complete Streets Training or other similar safety/accessibility training that meets the requirements outlined in 23 U.S.C. 134 §11201 and §11206. • Implement the safety related goals and strategies as developed as part of the Capital Area Active Transportation Plan. • Provide assistance to Missouri Pedestrian and Bicycle Federation in planning and/or hosting the 2024 Active Transportation Summit. • Provide assistance to jurisdiction in the pursuit of funding for safety initiatives, infrastructure, and/or programing Responsible Party: CAMPO staff. Funding: This work element includes only labor costs. Work Element Cost Type Federal PL Funds 100% Local Match 20% Total Percent of Work Program Budget 527 Labor $7,774 $0 $7,774* 3% * The 2021 Bipartisan Infrastructure Law (BIL) requires each MPO to use at least 2.5% of its PL funds on specified planning activities related to Safe and Accessible Transportation Planning (Work Element 527). PL funds constitute ~80% of CPG funds and the FY 2023 2.5% estimate is $3,824. The FY 2024 estimate will not be available until June 2023. DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 12 Appendix A – Financial Summary Anticipated Expenditures & Revenue CAMPO receives funding from the FHWA (PL) and FTA (5303) through the Consolidated Planning Grant (CPG) administered by MoDOT. Funding consists of 80% federal and 20% local matching funds; Jefferson City contributes 75% and Cole County contributes 25% except where noted differently. Table 1: FY 2024 CAMPO Budget* *Rounded to the nearest whole number. ** The City of Jefferson covers all the Utility and Capital Purchases expenses, except for some specific software licenses used for publishing or mapping. Cost Category Federal - CPG (80%)Local (20%)Total (100%) Advertising $2,080 $520 $2,600 Postage $240 $60 $300 Printing $160 $40 $200 Copies $160 $40 $200 Office Supplies $800 $200 $1,000 Food $240 $60 $300 Operational Supplies $800 $200 $1,000 Subtotal $4,480 $1,120 $5,600 Dues & Publications $1,200 $300 $1,500 Training and Education $3,600 $900 $4,500 Tuition Reimbursement $2,400 $600 $3,000 Professional Services - MTP Update $24,000 $6,000 $30,000 Subtotal $31,200 $7,800 $39,000 Equipment Maintenance $0 $0 $0 Vehicle Wash $0 $0 $0 Maintenance Agreement $1,920 $480 $2,400 Subtotal $1,920 $480 $2,400 Equipment/software $2,720 $680 $3,400 Subtotal $2,720 $680 $3,400 Total Direct Costs $40,320 $10,080 $50,400 Labor Costs - CPG (80%)Federal - CPG (80%)Local (20%)Total (100%) Salaries plus benefits (CPG Funds)$147,025 $36,756 $183,781 Labor Costs - PL (100%)Federal - PL (100%)No Match Total (100%) Salaries plus benefits (PL Funds - Safety)$7,774 $0 $7,774 Total Labor Costs $154,799 $36,756 $191,555 Federal Funds Local Match Total (100%) $195,119 $46,836 $241,955 Direct Costs Materials & Supplies Other Contracted Services Equipment Repair and Maintenance Capital Purchases and Utilities** Total MPO Budget DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 13 Table 2: FY 2024 Work Element Funding Summary - Consolidated Planning Grant and Local Funds *Numbers are rounded to the nearest whole number. Staff salaries are based on an hourly rate (base + fringe). Staff time allocations are subject to change as planning activities fluctuate. The MPO Executive Director position is full-time, but is not funded by the MPO and does not appear in the table above. The MPO Director is the Director of the Jefferson City Department of Planning and Protec tive Services, MPO activities are only a portion of the Director’s job duties. Note: The 2021 Bipartisan Infrastructure Law (BIL) requires each MPO to use at least 2.5% of its PL funds (the FHWA portion of the CPG) on specified planning activities related to Safe and Accessible Transportation Planning (Work Element 527). **The annual allocation approximately $3,824. The FY 2024 estimate will not be available until June 2023. Table 3: FY 2024 Local Match by Jurisdiction Table 4: Anticipated Available Federal Consolidated Planning Grant (CPG) Balance Revenue *The final amount of the FY 2023 CPG Allocation will not be released by MoDOT until May of 2023. This UPWP will have been adopted before this information is made available. Additionally, the MoDOT FY2023 SPR Work Program is also not available until after adoption of this document. CAMPO staff may make modifications to totals in Table 4 after these allocation amounts are made available. CAMPO may over-program or under-program annual CPG or PL allocations in order to maintain a CPG balance to provide flexibility in accommodating large scale planning efforts that may require added staff or consultant services. Some years may require more funding than others in order to meet MPO planning goals and federal requirements. Work Element Planning Manager (.30 FTE)Planner, Senior (1 FTE)Planner (1 FTE)Admin. Asst. (.10 FTE)Sub-Total Total Federal CPG Funds 80% Total Local Match 20%Total Percent of Work Program BudgetLabor Costs* 521-Program Support & Administration $27,274 $6,407 $33,681 $26,945 $6,736 $33,681 14% 522-General Develop. and Comp. Planning $8,593 $8,476 $17,069 $13,655 $3,414 $17,069 7% 524-Short Range Transportation Planning $4,910 $16,300 $21,210 $16,968 $4,242 $21,210 9% 525-Long Range Transportation Planning $4,959 $39,690 $25,428 $70,077 $56,061 $14,015 $70,077 29% 526-Public Transportation Planning $24,141 $17,604 $41,745 $33,396 $8,349 $41,745 17% Subtotal $32,233 $77,334 $67,807 $6,407 $183,781 $147,025 $36,756 $183,781 Labor Costs Utilizing 100% PL Funds** 527-Safe/Accessible Transportation Planning $7,774 $7,774 $7,774 $0 $7,774 3% Labor Costs (Base + Fringe) Subtotal $32,233 $85,109 $67,807 $6,407 $191,555 $154,799 $36,756 $191,555 79% $20,400 $16,320 $4,080 $20,400 8% $30,000 $24,000 $6,000 $30,000 12% $50,400 $40,320 $10,080 $50,400 21% $195,119 $46,836 $241,955 100% Direct Costs Subtotal Total* 521-Direct Costs - Program Support and Administration 525-Direct Costs - Metropolitan Transportation Plan Update Direct Costs* Category Jefferson City 75%Cole County 25%Total Labor Costs (excludes work element 527 - Safety)$27,567 $9,189 $36,756 521-Direct Costs - Program Support and Administration $3,060 $1,020 $4,080 525-Direct Costs - MTP Update $4,500 $1,500 $6,000 Total $35,127 $11,709 $46,836 CPG Local Match CPG Balance for end of FY2022 $520,816 FY 2023 CPG Allocation*$193,832 FY 2023 UPWP CPG Expenditure - Anticipated -($233,951) CPG Balance for end of FY2023 - Anticipated* Subtotal $480,697 $0 FY 2024 CPG Allocation - Estimated per MoDOT's FY22 SPR Work Program $193,832 FY 2024 CPG Programmed Expenditure - Anticipated -($195,119) Remaining Unprogrammed CPG Funds Anticipated at end of FY 2024 $479,410 DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 14 Appendix B – CAMPO Boundary Map The CAMPO Metropolitan Planning Area (MPA) Boundary was approved by the CAMPO Board of Directors January 16, 2013 and was approved by the Governor of Missouri March 12, 2013. The MPA includes the jurisdictions of Holts Summit, Jefferson City, St. Martins, Taos, Wardsville, and portions of unincorporated, non-urbanized areas within Cole and Callaway Counties. DRAFT Capital Area Metropolitan Planning Organization FY 2024 UPWP 15 Appendix C - Modifications and Amendments No modifications or amendments have been made at this time. Agenda Item 7C - Page 1 of 8 CAMPO Board of Directors Staff Report Unfunded Needs Review April 19, 2023 Summary CAMPO Staff are requesting a review of the unfunded needs lists and guidance from the Technical Committee and Board of Directors on the 2023 process. Timeline MoDOT has moved the annual Unfunded Needs list review to a spring/summer timeline (previously a fall/winter timeline) in order to better align the yearly Unfunded Needs review with the annual development of the STIP. CAMPO unfunded needs submittals are due to Central District MoDOT (in April). MoDOT High Priority Unfunded Needs The purpose of the unfunded needs exercise is to identify and prioritize known transportation needs as a preliminary part of a larger process of “scoping” projects and incorporating them into the Statewide Transportation Improvement Program (STIP). Tiers The road and bridge unfunded needs are divided into “tiers” based on a combination of priority and ability to deliver the project within a general timeframe. Tier 1 – Urgent Needs, projects must be deliverable within the timeline of the current STIP Tier 2 – Remaining needs, projects should be deliverable within 10 years. Tier 3 – Remaining needs, deliverable in future years. Multimodal needs are grouped together within a single category, and include rail, air, river, transit, and bicycle/pedestrian categories of projects. Placement of projects within the tiered list is ultimately a function of MoDOT. Project lists are submitted to Central District by the MPO’s and RPC’s, where the list is finalized in consultation with planning partners (MPO’s and RPC staff). The District list is then sent to MoDOT Central Office, and ultimately presented to and adopted by the Missouri Highway and Transportation Commission. Guidance For the Unfunded Needs planning exercise, MoDOT has issued a list of capacity targets for each district divided between the Tier 1, 2, 3 Road and Bridge categories and the Multimodal category. See Attachment A. Central District targets are: Tier 1 – $56 Million Tier 2 – $225 Million Tier 3 – $225 Million Multimodal – $113 Million Existing Unfunded Needs List CAMPO unfunded needs discussion and development of list/submittals to MoDOT occurred in Summer/Fall of 2022, with the list being finalized at the statewide level by MoDOT in January of 2023. The current statewide unfunded needs document is available online at: https://www.modot.org/unfundedneeds An excerpt of the document showing projects within each Tier for the Central District is provided in Attachment B. An overview list of projects from the CAMPO area is attached as Attachment C. Agenda Item 7C - Page 2 of 8 Staff Proposed Unfunded Needs Submittal to MoDOT Staff propose to use the prioritized project lists approved by the Board of Directors in last years cycle for this round of the Unfunded Needs consideration, with the removal of any projects that have been funded. Technical Committee Review and Recommendation The Technical Committee reviewed the staff proposed list at their April 6 meeting and voted to edit the list as follows: - Combination of the Rex Whitton Expressway and Tri-level Interchange priorities into a single priority, and represent the priority as a need for a study to determine what improvements would be necessary. - Movement of the Highway 50/63 and Clark Avenue Interchange from #7 to #3 on the list (just below the combined Whitton Expressway/Tri-level priority. The recommended edits by the Technical Committee are shown in bold below. Road and Bridge Projects: 1. Highway 50 and Truman Blvd/Country Club Drive Interchange 2. Rex Whitton Expressway Improvements and Tri-level Interchange – need for study 3. Hwy 50/63 and Clark Avenue Interchange (moved from #7) 4. Highway 54 and Southwest/Ellis Blvd Interchange 5. Missouri Boulevard Corridor Study 6. Highway 50 and Dix Road Interchange 7. Route B Corridor-Ashbury Way/Friendship Rd. 8. Highway 54 and South Summit Drive Interchange 9. Highway 179 and Industrial Drive/Truman Blvd, with turn lanes on MO 179 10. Highway 54 and Center Street Interchange 11. Route B and Tanner Bridge Road, with widening of Route B (center turn lane) 12. Route M and Y shoulders near Taos Multimodal Projects: 1. Airport - Air Traffic Control Tower 2. JEFFTRAN – Transit Facilities 3. Port Facility 4. Airport – Runway 12/30 5. Airport – ARFF/SRE Facility (firefighting/snow removal) 6. Airport – Runway 9/27 7. Sidewalk – Missouri Boulevard Sidewalks 8. Sidewalk – South Summit Drive Sidewalks 9. Greenway – Jefferson City Greenway Extensions 10. Transload Facility at Algoa Industrial Park (previously considered fully funded, but has a funding gap) - Amtrak Station (considered fully funded) Staff Recommendation Staff is bringing this project list through the Technical Committee and on to the Board of Directors for review, discussion, and approval. After approval, staff will submit the top priorities (likely the top 5 or 6 road/bridge projects and top 10 multimodal projects) to Central District MoDOT. Recommended Form of Motion: Motion for approval of the proposed unfunded needs project submittal list, as edited by the Technical Committee, and instruct staff to submit to MoDOT Central District. Agenda Item 7C - Page 3 of 8 Attachment A 2023 Unfunded Needs Prioritization Guidelines With the expansion of the unfunded needs list to include the addition of a third tier and a multimodal listing, districts will need to work with planning partners from April through May to remove any delivered needs from the list, validate the remaining existing needs and to prioritize any new needs that must be considered for inclusion. Each district will be provided an estimate of available capacity between the current list with delivered needs removed and an overall target for each tier (1, 2, 3 and MO). The goal of the unfunded needs list is to be able to react quickly with deliverable projects to any identified or secured funding and to provide a list of needs which represent where additional funding could be used. Road and Bridge: The $4.5 billion of needs for road and bridges will be categorized as follows: 1. Tier 1 ‐ $500 million urgent needs a. Projects to address the need must be deliverable (awarded) within the timeline of the current STIP if funds become available. 2. Tier 2 ‐ $2 billion of remaining needs a. Projects to address the need should be deliverable in any of the next 10 years, (2024‐2033) if funds would come available. 3. Tier 3 ‐ $2 billion of remaining needs a. Remaining needs deliverable in future years if funds become available. Multimodal: The $1 billion future funding for Multimodal will be categorized as follows: 1. Needs may include all modes of Multimodal transportation. 2. The identified needs can address infrastructure improvements, operation assistance and capital maintenance. List Capacity (millions) Region Road and Bridge Multimodal District Distribution1 $500 Million Tier 1 $2 Billion Tier 2 $2 Billion Tier 3 Total $1 Billion NW 4.648% $23 $93 $93 $209 $46 NE 4.694% $23 $94 $94 $211 $47 KCR 3.168% $16 $63 $63 $143 $32 KCU 17.984% $90 $360 $360 $809 $180 CD 11.265% $56 $225 $225 $507 $113 SL 34.510% $173 $690 $690 $1,553 $345 SWR 9.044% $45 $181 $181 $407 $90 SWU 5.896% $29 $118 $118 $265 $59 SE 8.791% $44 $176 $176 $396 $88 Total Dist. 100% $500 $2,000 $2,000 $4,500 $1,000 1 Capacity apportioned based upon the MHTC’s FY24 system improvements funding formula. Agenda Item 7C - Page 4 of 8 Attachment B Agenda Item 7C - Page 5 of 8 Attachment B Agenda Item 7C - Page 6 of 8 Tier 1 – Central District Project Locations Tier 2 – Central District Project Locations Tier 3 – Central District Project Locations Attachment B Agenda Item 7C - Page 7 of 8 Attachment C April 2023 - Missouri Unfunded Needs List Update Summary MoDOT has finalized the January 2023 High-Priority Unfunded Needs document, which the CAMPO Board, Technical Committee, and staff were heavily involved in. The finalized document is available on the MoDOT website at: https://www.modot.org/unfundedneeds Current STIP System Expansion Projects Interchange Improvements at Simon Boulevard and Route OO Budgeted at $3,410,000 Planned Award in 2023 Intersection Improvements at South Ten Mile Drive and Missouri Boulevard Budgeted at $1,643,000 Planned Construction in 2025 Improvements to Missouri River Bridge approaches. Budgeted at $4,104,000 Planned Construction in 2024 Unfunded Needs List (Road and Bridge Needs) Tier 1 Hwy 50/Truman Boulevard/Country Club Drive Interchange (Phase 1 – NW Quadrant of Interchange) Estimated Funding Needed: $8 million Current Status: Scoping Project by MoDOT consultant complete Tier 2 Rex Whitten Expressway Improvements Estimated Funding Needed: $53 million Current Status: EIS document completed in 2009 Tri-level Interchange Improvements Estimated Funding Needed: $40 million Hwy 54/Ellis Boulevard/Southwest Boulevard Interchange Estimated Funding Needed: $18.7 million Current Status: Scoping Project underway by MoDOT consultant Missouri Boulevard Traffic Study (Corridor Study) Estimated Funding Needed: $280,000 Dix Road/Hwy 50 Intersection Improvements Estimated Funding Needed: $8.8 million Tier 3 No projects from CAMPO in Tier 3 Agenda Item 7C - Page 8 of 8 Unfunded Needs List (Multimodal Needs) Airport Construct New Air Traffic Control Tower Estimated Funding Needed: $5.3 million Runway and Taxiway Improvements for Runway 12/30 Estimated Funding Needed: $18.4 million Aircraft Rescue and Firefighting Building Estimated Funding Needed: $2 million Transit Bus Facility Replacement Estimated Funding Needed: $12.5 million (partial funding entry for $29 million project) Rail None. Amtrack Station and Transload Facility considered fully funded. Port Property Acquisition for North and South Port Sites Estimated Funding Needed: $73,000 Extend Utility Services into South Side Port Estimated Funding Needed: $99,000 Bridge and Road Infrastructure into South Side Port Estimated Funding Needed: $9.8 million Pedestrian Sidewalks on Missouri Boulevard Estimated Funding Needed: $3.3 million Sidewalks on South Summit Drive in Holts Summit Estimated Funding Needed: $0.6 million Agenda Item 8A CAMPO Board of Directors Staff Report Capital Area Active Transportation Plan April 19, 2023 Summary Staff, along with consultants Crafton Tull and LaneShift, are continuing development of the Capital Area Active Transportation Plan. The planning process will integrate the Capital Area Pedestrian & Bicycle Plan (2016), Jefferson City’s Sidewalk Plan (2010) and Greenway Master Plan (2007), and the Holts Summit Pedestrian, Bicycle, and Transit Plan (2014). The Capital Area Active Transportation Plan covers all CAMPO communities and is expected to be completed by early Fall 2023. The plan will generally include the following: • comprehensive set of strategies to ensure better options for biking, walking, and transit • recommendations for prioritizing infrastructure improvements • outline recommendations for new policies, processes, and infrastructure • base recommendations on a robust public and stakeholder involvement campaign Funding for this project totals $125,000 and is provided via the CAMPO Consolidated Planning Grant ($100,000), with the required 20% match provided by JC Parks ($25,000). Phase 1 – Public Survey and Engagement A public survey was disseminated in August and more than 800 responses were received. The survey was made available in English and Spanish. Three public meetings were held in September inviting the public to comment on the current bike/ped network and what barriers and opportunities they see in the region. Staff also gave multiple presentations to various community groups, committees, and commissions requesting comment. During the first round of public engagement, staff and consultants engaged with the steering committee and several stakeholder groups, including the following; Public Safety, Healthcare, Education, Small Communities, Advocates/Transit Providers, and Business Owners. Phase 2 – Public Survey/Engagement, Draft Network Development, Prioritization Survey A second round of engagement occurred on December 1st and 2nd, including a steering committee meeting, a public meeting, three walk-audits, and an outreach booth at Downtown #JCMO Living Windows. Invitations to participate were disseminated to all member communities and stakeholders. During this phase a prioritization survey was released asking the public and stakeholders how the draft network should be prioritized. More than 115 survey responses were received. A summary of the survey responses will be provided at the Technical Committee meeting. Draft Network Plan A draft network plan has been developed and is available for comment here: https://storymaps.arcgis.com/stories/dfab3f90e1284f93b88d6ba048897142 Within this project website there are descriptions of the project, proposed facility types, survey results, interactive maps, and additional survey questions requesting input on how to prioritize the projects. There are two interactive web maps depicting a sidewalk plan and bike/ped plan. Phase 3 – Public Engagement, Probable Cost Estimates, Phasing, Code Reform Recommendations During the months of February and March consultants and staff reviewed prioritization survey results and finalized network changes and prioritization criteria. A steering committee meeting and public meeting is being scheduled for May 2nd. A more finalized schedule will be sent out in early April. Phase 3 will include discussion of costs, phasing, and potential municipal code and policy changes. Staff will also be available at two public engagement events; April 22nd at Memorial Park during Earth Day form 12pm to 4pm and May 2nd at the Animal Shelter in the evening for a walking and biking safety event. More information about the project is available on the CAMPO Active Transportation webpage at: https://www.jeffersoncitymo.gov/campo. Agenda Item 8B CAMPO Board of Directors Staff Report Status of Current Work Tasks April 19, 2023 Summary The following list includes work tasks that are currently in progress or have been completed since the previous meeting: • Title VI Program Update. See staff report. • 2024-2028 Transportation Improvement Program (TIP) Development. See staff report. • FY 2024 Unified Planning Work Program Development. See staff report. • Capital Area Active Transportation Plan. See staff report. • MoDOT Unfunded Needs. See staff report. • 2022 Supplemental TAP Project Review and Ranking. Staff responded to a request by Central District MoDOT for participation in the review and ranking of supplemental TAP grant submittals in the Central District. The following projects were awarded: o Columbia - Awarded $446,028 o Wardsville - Awarded $389,091 o Rolla - Awarded $235,860 o Versailles - Awarded $430,861 • JEFFTRAN Transit Facility Feasibility Study. A final document has been completed and is under review by Federal Transit Administration and Jefferson City Public Works Staff. An updated presentation will be given to the Technical Committee at a future meeting. • GIS/Technical Assistance. Staff continues providing technical assistance regarding GIS data and mapping to member jurisdictions for various projects, including: o JEFFTRAN Transit Route Guides - Updates o Zoning Map – Wardsville o Zoning Map – St. Martins o Zoning Map – Taos o Zoning and Address Map – Holts Summit (in progress) o Crash data o Active Transportation Plan data (sidewalks, trails, and other analysis layers as requested by consultants • US Census Bureau Urban Area Designation and Boundary review. Staff is in the process of reviewing the recently released urban area boundary changes stemming from the 2020 Decennial Census. A staff report and presentation on the data release will be given at a future Technical Committee meeting. • FY 2023 Unified Planning Work Program (UPWP) Administrative Modification. The CAMPO FY2023 (current year) UPWP has been modified to reflect the award of FTA Section 5304 Public Transportation Planning funds. Changes were made to Appendix A, Table 4 (pages 14 and 15), showing the addition of $25,000 in grant funding. This new funding does not increase the overall CAMPO budget, nor does it add any activities to existing work elements. The grant funding will be used on an existing project. The updated document can be found on our CAMPO webpage at: https://www.jeffersoncitymo.gov/CAMPO/FY2023%20UPWP%20Modified%2004.04.2023.pdf