DATE ISSUED: 10 -23 -2008 PERMIT #: 080440
WORK DESCRIPTION REPAIR COMMERCIAL BLDG
WORK LOCATION 1509 BUTLER AVE
OWNER NAME AGNES YAO
ADDRESS PO BOX 2177
CITY, ST, ZIP TYBEE ISLAND GA 31328 -2177
PHONE NUMBER
CONTRACTOR NAME JIM BUTLER CONSTRUCTION
ADDRESS PO BOX 1363
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE U
TOTAL FEES CHARGED $ 0.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $ 300.00
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: Qj
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
n a�
Our CITY OF TYBEE ISLAND, GEORGIA
` ui APPLICATION FO `` R ��pp BUILDING PERMIT
ryO OC1D ,4
"Location: l SO c4.f r PIN #
Su.. vs. risc R„c",
NAME ADDRESS TELEPHONE
✓Owner A w� ( � /.1 1 s 1 ,A1 1 �' 0 �
Architect
or Engineer
J -Kuilding PC"V/ Contractor ! ^� ! � 4 '
-
(Check all that apply)
• Repair ❑ Residential ❑ Footprint Changes
❑ Renovation ❑ Single Family ❑ Discovery
❑ Minor Addition ❑ Duplex ❑ Demolition
❑ Substantial Addition ❑ Multi- Family
❑ Other ❑ Commercial
.4 of Project: 1 3 1
Estimated Cost of Construction: $ 3 0 0
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bed oo s # Bathrooms
Lot Area Liv`n a sp. ce (total sq. ft.)
# Off - street parki g sp e
Trees located & sted site p an
Access:
lir
Driveway \ (ft.) ' lvert? With swale?
Setbacks: Front \ R- Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through .
On -site waste and debris containers will be provided by .
Construction debris will be disposed by by means of .
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction. �, _
✓ate: / ° ^ Z-- Z- ° V 1- 51 - (nature of Applicant: igct/'" li
(/
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification /------------\ NFIP Flood Zone
Approved rezoning/vari. ce? \ \
Street address and num a er: ew / 1 I Existing
Is it in compliance wit C it m ?
If not, has street nam: an r mb -r . r ported to MPC?
li
FEMA Certification a ache
State Energy Code Affi attaa(ed
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site c- 1
Distance to water main tap site -h y ) q
Distance to sewer stub site ). ' '
Water meter size ' --�—
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator ,., ,, p Permit /
Code Enforcement Officer 10,(4 4>-)c` -- /o -C>'( Inspections (,-,7
Water /Sewer v Water Tap G/�
Storm /Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
Oen OF 7S
NATURAL
?t
x �
GEORGIA
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Proiects Involving Demolition. Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
,v1/4 - Z. c--)
Undersied Date
Printed Name
Office Use Only:
Project Address:
Permit Number: