HomeMy Public PortalAbout20171025 - Agenda Packet - Board of Directors (BOD) - 17-26 SPECIAL AND REGULAR MEETING BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE DISTRICT Administrative Office 330 Distel Circle Los Altos, CA 94022 Wednesday, October 25, 2017 Special Meeting starts at 5:00 PM* Regular Meeting starts at 7:00 PM* A G E N D A 5:00 SPECIAL MEETING OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE DISTRICT – STUDY SESSION ROLL CALL 1. Board and Public Space Needs in the New Administrative Office (R-17-116) Staff Contact: Tina Hugg, Senior Planner, Planning Department General Manager’s Recommendation: Provide input to MKThink and staff on Board and public space needs in the new Administrative Office building. ADJOURNMENT 7:00 REGULAR MEETING OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE DISTRICT ORAL COMMUNICATIONS The Board President will invite public comment on items not on the agenda. Each speaker will ordinarily be limited to three minutes; however, the Brown Act (Open Meeting Law) does not allow action by the Board of Directors on items not on the agenda. If you wish to address the Board, please complete a speaker card and give it to the District Clerk. Individuals are limited to one appearance during this section. ADOPTION OF AGENDA CONSENT CALENDAR All items on the Consent Calendar may be approved without discussion by one motion. Board members, the General Manager, and members of the public may request that an item be removed from the Consent Calendar during consideration of the Consent Calendar. 1. Approve October 11, 2017 Minutes Meeting 17-26 2. Claims Report BOARD BUSINESS The President will invite public comment on agenda items at the time each item is considered by the Board of Directors. Each speaker will ordinarily be limited to three minutes. Alternately, you may comment to the Board by a written communication, which the Board appreciates. 3. Final Design Approval of the Alma College Parking Area and Trail Crossing (R-17-117) Staff Contact: Bryan Apple, Planner II General Manager’s Recommendation: 1. Approve the Alma College Parking Area and Trail Crossing Project Design 2. Delegate to the General Manager the authority to approve any necessary changes to the Project Design and Plans, and direct that the “As Built” designs come back to the Board for final approval INFORMATIONAL REPORTS – Reports on compensable meetings attended. Brief reports or announcements concerning activities of District Directors and staff; opportunity to refer public or Board questions to staff for information; request staff to report to the Board on a matter at a future meeting; or direct staff to place a matter on a future agenda. Items in this category are for discussion and direction to staff only. No final policy action will be taken by the Board. Committee Reports Staff Reports Director Reports ADJOURNMENT SPECIAL MEETING OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE DISTRICT – CLOSED SESSION ROLL CALL 1. CLOSED SESSION PUBLIC EMPLOYEE APPOINTMENT (GOVERNMENT CODE SECTION 54957) Title: Interim General Manager 2. CLOSED SESSION PUBLIC EMPLOYEE APPOINTMENT (GOVERNMENT CODE SECTION 54957) Title: General Counsel 3. PUBLIC EMPLOYEE PERFORMANCE EVALUATION. Government Code Section 54957(b)(1) Title of Employee: Controller General Counsel General Manager CONFERENCE WITH LABOR NEGOTIATORS. Government Code Section 54957.6 Agency designated representatives: Board of Directors Unrepresented Employees: Controller General Counsel General Manager ADJOURNMENT *Times are estimated and items may appear earlier or later than listed. Agenda is subject to change of order. In compliance with the Americans with Disabilities Act, if you need assistance to participate in this meeting, please contact the District Clerk at (650) 691-1200. Notification 48 hours prior to the meeting will enable the District to make reasonable arrangements to ensure accessibility to this meeting. Written materials relating to an item on this Agenda that are considered to be a public record and are distributed to Board members less than 72 hours prior to the meeting, will be available for public inspection at the District’s Administrative Office located at 330 Distel Circle, Los Altos, California 94022. CERTIFICATION OF POSTING OF AGENDA I, Jennifer Woodworth, District Clerk for the Midpeninsula Regional Open Space District (MROSD), declare that the foregoing agenda for the special and regular meetings of the MROSD Board of Directors was posted and available for review on October 20, 2017, at the Administrative Offices of MROSD, 330 Distel Circle, Los Altos California, 94022. The agenda and any additional written materials are also available on the District’s web site at http://www.openspace.org. Jennifer Woodworth, MMC District Clerk R-17-116 Meeting 17-26 October 25, 2017 STUDY SESSION AGENDA ITEM 1 AGENDA ITEM Board and Public Space Needs in the New Administrative Office GENERAL MANAGER’S RECOMMENDATION Provide input to MKThink and staff on Board and public space needs in the new Administrative Office building. SUMMARY On June 28, 2017, the Board of Directors (Board) approved a contract amendment for MKThink to conduct basic space programming for the new Administrative Office (R-17-54). This information will provide the exterior and interior space requirements to incorporate into a Request for Qualifications and Proposals and select with confidence a best-fit architecture firm to continue with more detailed programming, design, and construction documentation. Building upon their work during the futurist/architectural strategist phase of work, MKThink conducted interviews and gathered input from all departments related to storage and work space needs, staffing projections, and critical department adjacencies. MKThink will present these findings as context for the Board and will lead the Directors through an interactive workshop to solicit input on Board and public space needs for the new Administrative Office. In the body of this report, MKThink has provided the Board with a list of questions to consider in preparation for this Study Session. DISCUSSION On June 28, 2017, the Board approved a contract amendment with MKThink to assess the high- level space needs and goals of the Board and each department for the new Administrative Office. In September, MKThink conducted workshops with the District’s 14 departments to obtain input on workspace and storage needs, short- and long-term staffing projections, and collaborative relationships. The departments include: General Manager’s Office Finance Natural Resources General Counsel’s Office Human Resources Planning Administrative Services Information Systems and Public Affairs Budget Technology Real Property Engineering and Construction Land and Facilities Services Visitor Services MKThink is preparing a Workplace Needs Assessment Report that synthesizes the department input and feedback received to date. The report will contain a short narrative about each department, discuss work area and storage needs, and look at critical collaborative adjacencies R-17-116 Page 2 and future space needs projections. The report will include the type and quantity of department work spaces that would need to be accommodate in a new Administrative Office. A summary of staff feedback is included in Attachment 1as context for the Directors’ discussion on Board and public space needs at tonight’s Study Session. As further context for this interactive workshop, MKThink prepared Guiding Principles and Boundaries (Attachment 2). The Guiding Principles are aspirational and incorporate the November 18, 2015 Board-approved goals related to facilities (R-15-157), results from a staff survey MKThink conducted in 2016 during the futurist/architectural strategist phase of work, and evaluation criteria also developed in 2016. The Boundaries provide more tactical expectations for the new Administrative Office. In preparation for the Study Session workshop, the Board is asked to consider the following questions. 1. Do you have any specific parameters or goals with regard to the Board and public space needs? 2. What works and does not work with the Board’s current spaces? 3. What works and does not work regarding the current layout and allocations for public areas? 4. Do you anticipate any significant changes in how the Board works or how the organization works over the next 15 years? 5. Do you have any comments or refinements on the Guiding Principles and Boundaries? The Board’s input will be added to the final Workplace Needs Assessment Report. The report’s findings will then be incorporated into a future Request for Qualifications and Proposals for architectural services. FISCAL IMPACT The FY2017-18 budget includes $805,000 for the AO Project (Project #31202), and includes sufficient funding for this work. There is no direct fiscal impact of this report’s approval. BOARD COMMITTEE REVIEW The Facilities Ad Hoc Committee met on April 24, 2017 and during this meeting, expressed support for the basic programming phase for the AO. PUBLIC NOTICE Public notice was provided as required by the Brown Act. CEQA COMPLIANCE This item is not a project subject to the California Environmental Quality Act. R-17-116 Page 3 NEXT STEPS Following this Study Session, MKThink will incorporate the Board’s input into the draft Workplace Needs Assessment. The final report will be presented to the Board at a future meeting anticipated to be before the end of the year. The District has the ability to expedite construction projects using a design-build process. However, given the unique functions and workspace needs of the District, design-build approach is not well-suited where the District relinquishes design decision making over to a contractor. The design-build process is more suited towards typical projects like pond restoration and parking lots, where a high level of aesthetics and specificity is not as critical. The District’s interest is to complete the project as quickly as possible. Typically, large capital improvement projects take three years (one year each for design, permitting, and construction) to complete. The property owner of 5050 El Camino has until January 22, 2019 to close escrow, although this may occur sooner. As such, the District cannot proceed with construction until it has possession of the building, leases have expired, and tenants have vacated. Due to the complexity of the project and the unknown condition of the building that will influence the design, staff has added one year to account for unforeseen circumstances as they arise, e.g. structural issues discovered during testing, permitting challenges, existing tenant negotiations. The project’s tentative schedule below accommodates the complexity of this particular capital improvement project. Phase Tentative Time Period Pre-Development – Basic Programming and Space Needs Assessment June – Dec 2017 Architect/Engineer Firm Selection Early 2018 Programming / Preliminary Concept Design 2018 Maximum Time Period for Close of Escrow Jan 22, 2019 Schematic Design / Design Development / Environmental Review 2019 Permitting / Construction Document Development / Bidding 2019-2020 Construction 2021-2022 Attachments 1. Summary of Staff Input on Workplace Needs 2. Guiding Principles and Boundaries Responsible Department Head: Jane Mark, AICP, Planning Department Prepared by: Tina Hugg, Senior Planner, Planning Department Graphics prepared by: MKThink, Inc. 1 Midpeninsula Regional Open Space District — Space Programming and Adjacency Planning | Staff Engagement Summary In order to assess the workplace needs of Midpensinsula Regional Open Space District, in September 2017 MKThink ran affinity mapping exercises in meetings with five groups, roughly divided by service line. In these meetings, MKThink asked staff to share their thoughts about their workplace, including but not limited to individual workstations, collaboration space, storage, amenities, and public spaces. Participants wrote down their comments on one of four different colored Post It notes, corresponding to the following categories: »Retain »Enhance »Introduce »Discard MKThink also undertook an office walk-through and gathered written information from each department. The emerging themes from this assessment are presented on the facing page. CONTEXT CATEGORY*RETAIN ENHANCE INTRO.DISCARD TOTAL Individual workstations 28 12 15 9 64 Meeting rooms / Formal collaboration space 12 25 20 0 57 Environmental factors / Light / Air 15 10 13 7 45 Amenities 6 10 27 1 44 Adjacency 24 7 3 7 41 Storage 6 19 12 3 40 Kitchen / Breakrooms 13 11 5 1 30 Informal collaboration space 5 9 14 1 29 Technology 4 7 7 5 23 Parking / Transportation / Biking 5 6 6 0 17 HVAC 0 3 6 5 14 Board room 0 4 6 3 13 Outdoor access / Outdoors 3 5 2 0 10 Brand / Identity / Display 1 4 5 0 10 Acoustics 0 3 1 3 7 Telecommuting / Telework 1 5 1 0 7 Sustainability 0 0 0 4 4 TOTAL 123 140 143 49 455 Percent 27%31%31%11%100% *Table includes the top categories based on total number of Post Its. Other categories had fewer than 4 Post Its each so are not shown in this table. 2 Midpeninsula Regional Open Space District — Space Programming and Adjacency Planning | Staff Engagement Summary 5. MAINTAIN AND INCREASE STORAGE Storage was a top theme in two of the five groups. Concerns about storage related to providing additional general storage both at individual workstations and shared storage for departments as a whole. Specialized storage needs were also mentioned (and are detailed on each department specific page). 4. AMENITIES AND ENVIRONMENT ARE VALUED IN THE WORKPLACE Amenities (such as showers, fitness rooms, lactation rooms, and kitchen space) and environmental factors (such as natural light, outdoor space, and windows) were top themes in three out of the five groups. 1. PHYSICAL ADJACENCY OF DEPARTMENTS IS IMPORTANT Maintaining or improving adjacency to departments that work closely together came up as a top priority in three out of the five groups. Location to managers was also discussed for intra-department adjacency. 2. INDIVIDUAL WORKSTATIONS Concerns or comments about individual workstations also arose as a top priority in three out of the five groups. Ergonomics, aesthetics, and additional hoteling workstations were all mentioned repeatedly as important workstation themes. 3. MEETING/COLLABORATION SPACE FOR SMALL MEETINGS The need for both informal collaboration space and formal meeting rooms emerged as a top priority also in three of the five groups. In particular, small meeting rooms for three to four people or phone booths for quick private conversations came up many times. EMERGING THEMES 3 Midpeninsula Regional Open Space District — Space Programming and Adjacency Planning | Staff Engagement Summary TOP THEMES AND COMMENTS RETAIN ENHANCE INTRO.DISCARD INDIVIDUAL WORKSTATIONS »Sit/stand desks »Individual work space »More hoteling workstations »Phone booths »Cubicles without work layout space MEETING ROOMS/FORMAL COLLABORATION SPACE »Meeting rooms of various sizes but generally larger for inter- departmental meetings »Smaller meeting rooms »Board room »Technology enabled meeting rooms »Larger board room ENVIRONMENTAL FACTORS/LIGHT/ AIR »Solar protection and glare »Natural light - Views to outside »Outdoor eating area »Outdoor space »Operable windows for fresh air AMENITIES »Functionality of amenities in kitchen space »Outdoor meeting spaces »Kitchen areas for each floor of building »Shower facility »Lactation quiet room ADJACENCY »Proximity to dept managers (GMO) »All departments work in proximity to each other »Close proximity to my team »Eliminate separation of depts in different buildings »Walls/doors between departments STORAGE »Good storage »Equipment cleaning: ventilated, wet-room, oversize, near storage »Increase department file storage and equipment storage »Storage space for maps/drawings INFORMAL COLLABORATION SPACE »Collaborative space next to work space that doesn’t disturb other departments »Larger layout spaces that can also be used as collaboration spaces »Creative/collaborative work areas »Collaboration/lounge for group discussions/pin-ups/presentations TECHNOLOGY »Video-conference technology »Technology storage »EV charging »Smart building controls and environment PARKING/TRANSPORTATION/BIKING »Parking near office both personal and fleet »Emergency vehicle parking designated »Bike storage/lockers HVAC »New, improved HVAC »Building energy management system »Air ducts GUIDING PRINCIPLES AND BOUNDARIES 1MIDPENINSULA REGIONAL OPEN SPACE DISTRICT - SPACE PROGRAMMING APPROACH AND POLICIES • “Utilize forward looking and imaginative approaches for evaluating and designing each facility” • Establish policies and provide the technology to support work from satellite offices, “videoconferencing, and telecommuting” • “Pursue sustainable design and construction options that are cost-effective and are evaluated through a lifecycle analysis” • Retain “staff over a longer period of time” and “respond to the needs of diverse staff” GUIDING PRINCIPLES Items in quotations are from the Board Approved Goals dated 11/18/15 EXPERIENCE DESIGN • “Improve outward facing or public facilities so visitors have a more welcoming experience when visiting Midpen’s facilities” • Design physical space to reflect the culture, brand, and identity of the organization as a whole • Prioritize access to natural light, views, and outdoor space when possible • Deliver spaces that support health, wellness, and productivity PHYSICAL SPACE • Deliver an up-to-date, modern, and flexible work environment • Create spaces to facilitate collaboration among Midpen departments and across service lines • Account for the unique needs of each business line and department • Provide quiet places for focused work • “Ensure sufficient flexibility to allow Midpen to adjust and deal with uncertainty caused by outside factors influencing work force and work culture” EFFECTIVE SPACE • Increase the efficiency of space use through smart adjacencies • “Optimize staff deployment per FOSM recommendations and how departments and staff will work in the future” • Invest renovation funds strategically and creatively, focusing on high-impact areas while being mindful of the bottom line • “Facilitate Midpen’s ability to effectively provide services to the public and to execute projects to the highest capability of the organization” GUIDING PRINCIPLES AND BOUNDARIES 2MIDPENINSULA REGIONAL OPEN SPACE DISTRICT - SPACE PROGRAMMING • Locate the AO in one building • Fit all departments and functions in 5050 El Camino Road • Build flexible capacity for duration of facility’s expected lifetime (30 yrs) • Reserve 10,000 sq. ft. to lease for the next 15 years at 5050 El Camino • “Minimize relocation disruption to staff by thoughtful transition planning” BOUNDARIES Items in quotations are from the Board Approved Goals dated 11/18/15 October 11, 2017 Board Meeting 17-25 SPECIAL AND REGULAR MEETING BOARD OF DIRECTORS MIDPENINSULA REGIONAL OPEN SPACE DISTRICT Administrative Office 330 Distel Circle Los Altos, CA 94022 Wednesday, October 11, 2017 DRAFT MINUTES SPECIAL MEETING – STUDY SESSION President Hassett called the special meeting to order at 5:00 p.m. ROLL CALL Members Present: Jed Cyr, Larry Hassett, Curt Riffle, and Pete Siemens Members Absent: Nonette Hanko, Cecily Harris, Yoriko Kishimoto Staff Present: General Manager Steve Abbors, Assistant General Counsel Hilary Stevenson, Assistant General Manager Ana Ruiz, Chief Financial Officer/Administrative Services Director Stefan Jaskulak, District Clerk/Assistant to the General Manager Jennifer Woodworth, Public Affairs Manager Christine Butterfield, Visitor Services Manager Michael Newburn, Management Analyst II Gordon Baillie, Docent Program Manager Renee Fitzsimons, Volunteer Program Manager Paul McKowan, Docent Program Coordinator Jennifer Williams 1. Docent and Volunteer Programs Structure Study – Review of Draft Report (R-17-113) Assistant General Manager Ana Ruiz provided opening comments discussing the impetus of the Volunteer and Docent Programs Structure Study and its place in the previous and current fiscal years’ action plans. Any implementation of the study’s recommendations can be implemented as directed by the Board of Directors and in line with the District’s 2015 Financial and Operational Sustainability Model. Staff will return to the Board for acceptance of the report at the December 13, 2017 Board meeting and asks that Board members submit any written comments to staff on or before November 15, 2017. Director Harris arrived at 5:02 p.m. Visitor Services Manager Michael Newburn provided introductory comments and summarized the process used by District staff and the consultant, Conservation by Design, to develop the Meeting 17-25 Page 2 study and recommendations. Mr. Newburn introduced Ms. Rici Peterson of Conservation by Design to present the results of the Docent and Volunteer Programs Structure Study. Ms. Peterson described the method used for gathering input, including an online survey sent to current and previous volunteers and docents, interviews of current staff, meetings with members of the District’s Management Team, and conducting focus groups comprised of current docents and volunteers. The project team also interviewed members of the District’s peer agencies that have similar programs and met with the Board’s Diversity Ad Hoc Committee. Ms. Peterson described five challenges identified by the study: a need for a Districtwide communication plan for external messaging; undefined goals and success targets; unclear roles and responsibilities; undervaluing interpretive communications; and insufficient evaluation and quality control of “unpaid staff.” Ms. Peterson outlined various recommendations designed to address each of the five challenges previously identified, including a Districtwide Interpretive Master Plan for messaging that addresses content, consistency, and control; improving the visitor experience; augmenting staff levels; and a greater focus on staff and volunteer training and performance. Director Riffle inquired regarding any unique challenges the identified by the study. Ms. Peterson stated the widespread and complexity of the District’s preserves present challenges to the program, including geographic locations, populations served, natural resources found on the preserves, and the various histories of the preserves. Director Riffle requested additional information regarding the Interpretive Master Plan and preserve-specific interpretive plans. Ms. Peterson and Melanie Pierson of Conservation by Design described the overall message that could be developed for all of the District’s preserves, and preserve-specific plans would be unique to the visitors that visit each of the preserves and the unique opportunities and experiences provided by each of the preserves. Public comment opened at 5:51 p.m. Debbie Mytels, District docent, described her wonderful experiences as a docent and stated that many docents may want an opportunity to weigh in on the recommendations in the report. Additionally, Ms. Mytels expressed concern regarding the rigid nature of program as described in the recommendations. Kathryn Green, District docent, spoke in favor of the District’s mission and values and thanked the District for considering resources to the docent and volunteer programs. Ms. Green stated her support for the District and raising the bar for the docent program. Ms. Green described her ability to grow and share information as a District docent as her knowledge grows, which is possible because she is not required to follow a script at the District allowing for flexibility. Ms. Green spoke in favor of maintaining flexibility in the docent program. Ms. Peterson responded to Ms. Green’s comments including maintaining flexibility for docents. Any themes developed would be done in partnership with volunteers, docents, the Board, management staff, etc. Themes are not designed to be scripts but are general concepts to be shared. Meeting 17-25 Page 3 Marilyn Bauriedel, District outdoor activity docent, spoke regarding the familial nature of the docents and spoke in favor of maintaining flexibility in the docent program structure. Jayita Bhojwani, District docent, spoke in favor of the docent program and requested additional time for docents to review of the report and provide feedback. Ms. Bhojwani spoke in favor of additional training but stated she hoped the collegiate nature of the docents continue, where they can learn from each other and are treated equally. Jan Hintermeister, District docent, spoke in favor of the empowerment currently felt by docents once they have been training and expressed caution about making too many changes that could potentially damage the program. Vivian Neou, District docent, spoke highly of the District’s current docent program and stated her support for Docent Program Manager Renee Fitzsimons receiving additional support as recommended by the report. Ms. Neou expressed anger regarding Recommendation 32 and her belief that it points to racial profiling. Finally, Ms. Neou spoke regarding visitors that utilize the preserves for exercise and stated that for those visitors the interpretive elements may not be necessary for all docent-led hikes. Ms. Peterson provided additional information regarding the background behind Recommendation 32 explaining large groups present challenges, and the statements regarding people of color belonged in a different area of the report. The two sections were incorrectly compounded. Ms. Peterson apologized for the mistake and stated she would correct the report to accurately reflect the information provided by staff. Mary Bernstein, District docent, spoke highly of the District’s current docent program. Ms. Bernstein expressed concern that the information provided by docents would be changed into a marketing campaign. Ms. Peterson explained the use of themes is not meant to be propaganda but is designed to help visitors connect to the preserves. The content presented by the docents would not be changed, but the techniques utilized would be more consistent across the District. Public comment closed at 6:24 p.m. Director Harris spoke in favor of maintaining the fun of the program and inquired regarding the purpose of the project. Mr. Newburn spoke regarding the origin of the project, including seeking additional direction for the program and questioning if any improvements were needed for an already highly functioning program, such as ensuring everyone has received training, helping the program grow, etc. Director Harris inquired regarding the term “high priority preserve.” Docent Volunteer Program Manager Renee Fitzsimons referred to the 2009-2011 Interpretive Preserve Program and the process used at that time to identify priority preserves. Director Cyr spoke in favor of connecting with visitors in a natural way throughout the District’s preserves and their visitors. Meeting 17-25 Page 4 Director Siemens spoke in favor of having individual preserve plans that incorporate Districtwide themes, but these would be suggestions and not required content for docent hikes. Director Riffle suggested additional work is required before the report is finalized. The goal of the project is to connect more people to the District’s preserves, which can be done with a combination of District staff, volunteers, and docents. Director Riffle suggested the docent program could use refinement but not reinvention. General Manager Steve Abbors spoke in favor of helping align the District’s volunteer and docent programs with the mission and goals of the District, while maintaining the independence and creativity of the program and its docents. The District is also here to serve all of its preserve visitors and is constantly evolving to meet their needs. President Hassett adjourned the special meeting of the Board of Directors of the Midpeninsula Regional Open Space District at 7:00 p.m. REGULAR MEETING President Hassett called the regular meeting of the Midpeninsula Regional Open Space District to order at 7:09 p.m. ROLL CALL Members Present: Jed Cyr, Larry Hassett, Curt Riffle, and Pete Siemens Members Absent: Nonette Hanko, Cecily Harris, Yoriko Kishimoto Staff Present: General Manager Steve Abbors, Assistant General Counsel Hilary Stevenson, Assistant General Manager Ana Ruiz, Chief Financial Officer/Administrative Services Director Stefan Jaskulak, District Clerk/Assistant to the General Manager Jennifer Woodworth, Public Affairs Manager Christine Butterfield ORAL COMMUNICATIONS No speakers present. ADOPTION OF AGENDA Motion: Director Cyr moved, and Director Riffle seconded the motion to adopt the agenda. VOTE: 4-0-0 (Directors Hanko, Harris, and Kishimoto absent) Director Harris arrived at 7:10 p.m. SPECIAL ORDERS OF THE DAY • Proclamation to Honor the Retirement of Michael Newburn Meeting 17-25 Page 5 CONSENT CALENDAR Public comment opened at 7:17 p.m. No speakers present. Public comment closed at 7:17 p.m. Motion: Director Riffle moved, and Director Harris seconded the motion to approve the Consent Calendar. VOTE: 5-0-0 (Directors Hanko and Kishimoto absent) 1. Approve September 27, 2017 Minutes 2. Claims Report BOARD BUSINESS 3. Mount Umunhum Preview Events and Grand Opening Celebration Summary (R- 17-115) Public Affairs Specialist II Peggy Gibbons provided an informational report on the District’s efforts for the Mount Umunhum Preview Events and Grand Opening Celebration. Director Cyr shared positive comments he has heard from his friends commending staff on their work for the grand opening and the entire summit. Director Harris inquired whether other lessons were learned as part of the process. Public Affairs Manager Christine Butterfield commented on the importance of communication, the importance of identifying staff and resource needs early, and an understanding that standard services in other areas of the District may be affected as additional resources are committed to a preserve opening. Public comment opened at 7:38 p.m. No speakers present. Public comment closed at 7:38 p.m. No Board action required. INFORMATIONAL MEMORANDUM • Work Order and Asset Management System • Youth Engagement Strategy in Fiscal Year 2017-18 Meeting 17-25 Page 6 INFORMATIONAL REPORTS A. Committee Reports No Committee reports. B. Staff Reports Chief Financial Officer Stefan Jaskulak reported the District’s audit is almost complete and issuance of a new tranche of bonds is scheduled for Board approval on November 8, 2017. Assistant General Manager Ana Ruiz reported SB793 was signed by the Governor. The design- build process is very different from the District’s current contracting process, and staff will be attending training on the process and learning from other agencies that already use design-build. Ms. Ruiz also commented on staff’s attendance and presentations at a recent meeting of the Santa Cruz Mountain Stewardship Network. C. Director Reports The Board members submitted their compensatory reports. Director Harris commented on the current air quality in the area and spoke in favor of staff wearing masks and avoiding the poor quality air. President Hassett adjourned the regular meeting of the Board of Directors of the Midpeninsula Regional Open Space District into closed session at 7:56 p.m. CLOSED SESSION 1. CONFERENCE WITH LEGAL COUNSEL-ANTICIPATED LITIGATION Significant exposure to litigation pursuant to Government Code Section 54956.9(b) (one potential case) Public comment opened at 7:56 p.m. No speakers present. Public comment closed at 7:56 p.m. The Board went into closed session at 7:56 p.m. ADJOURNMENT President Hassett adjourned the meeting of the Board of Directors of the Midpeninsula Regional Open Space District at 9:02 p.m. ________________________________ Jennifer Woodworth, MMC District Clerk page 1 of 2 CLAIMS REPORT MEETING 17-26 DATE 10-25-2017 MIDPENINSULA REGIONAL OPEN SPACE DISTRICT Check Number Notes Vendor No. and Name Invoice Description Check Date Payment Amount 76343 11369 - BANK OF THE WEST COMMERCIAL CARD USA $402.99 Field Supplies - Auger, Nut/Thread Setting Kit 10/18/2017 156,845.63 $608.56 Field Supplies - Hardware for Horse Trough, Paint, IPC 10/18/2017 $4,801.52 Mt. Um Plaques, Board dinners, Proclamation Frame 10/18/2017 $60.68 Fuel for District Vehicle 10/18/2017 $144.06 Fuel for District Vehicles 10/18/2017 $350.00 Training for NR Staff 10/18/2017 $49.92 Fuel for District Vehicle 10/18/2017 $1,209.86 Field Supplies - Painting Supplies, Wood Filler, Lumber 10/18/2017 $65.97 Food for Rangers & Car Wash 10/18/2017 $1,101.75 Training/Staff Recognition Event 10/18/2017 $823.19 Vehicle Maintenance, Patches, Training, Office Supplies & District Shirt 10/18/2017 $708.89 Parts and Supplies - Label Maker, Brass Nozzle, Thermostat 10/18/2017 $791.45 Field Supplies - Batteries, Uniform Tape , Parts, Safety Locks 10/18/2017 $2,990.01 Web Hosting, Forms, Facebook Ads, Pop up Tent, Nametags 10/18/2017 $2,142.53 Document Recording Fee, Calendar, File Folders, Partners Day Lunch 10/18/2017 $462.38 CA Historical Resources Information Program 10/18/2017 $788.48 Field Supplies- PVC Pipe, Lumber, Steel Stake, Paint 10/18/2017 $1,626.75 Field Supplies - Tent, Hole Digger, Nail Puller, Trash 10/18/2017 $369.19 Concrete Mix, CPRS Training Conference and Lodging 10/18/2017 $69.62 Central Coast Rangeland Coalition Fee, Meeting Registration 10/18/2017 $214.43 Lodging for Training 10/18/2017 $1,798.93 Multi-Use Tool, Dues, Facilities Water System Maintenance 10/18/2017 $24.02 Cell Lightning Cable 10/18/2017 $2,787.22 Field Supplies - Tools, Paint Supplies, CPRS Conference 10/18/2017 $2,027.27 Volunteer Recognition Event 2017 Expenses 10/18/2017 $973.84 Volunteer Supplies for Volunteer Recognition Event 10/18/2017 $77,352.25 Mt. Umunhum Grand Opening Expenses/Shuttles/TShirts 10/18/2017 $3,463.67 Rock Ripper, Painting Supplies, CPRS Conference & Travel Fees 10/18/2017 $456.76 Field Supplies - Handle & Latch for Tailgate Mule, Equipment 10/18/2017 $290.47 Field Supplies - Concrete Mix, Tarp, Water 10/18/2017 $189.96 Field Supplies - Ice for Mt. Um Event, Concrete Mix 10/18/2017 $1,061.71 Book, Record Fee, Conference Fee, District Clothing & Postage 10/18/2017 $583.88 Autocad Software Maintenance, Form Plus Subscription 10/18/2017 $4,430.70 MISAC Conference Training, Dell Monitors (5), Internet Service 10/18/2017 $447.70 Preserve Use Survey Materials, Subscription, Parking Fee 10/18/2017 $415.00 IRWA Workshop Registration Fee for Sr. Real Property Agent 10/18/2017 $144.30 Conference Travel & Parking Reimbursement 10/18/2017 $4,874.84 Field supplies - First Aid Kits, Radar Tower Antigraffiti Paint 10/18/2017 $139.29 Office Supplies, Gate Locks 10/18/2017 $453.15 Drill Bit, Battery, Breakaway Brake Replacement Switch 10/18/2017 $1,330.55 Prepaid Commuter Checks, Interview Snacks 10/18/2017 $382.61 Volunteer Recognition Event Supplies & Car Wash for District Vehicle 10/18/2017 $899.31 Field Supplies - Gas Cap, Canopy, Water Jugs, Tool Kit 10/18/2017 $135.00 American Trails ,Central Coast Rangeland Membership 10/18/2017 $990.11 CalIPC Training and Uniform 10/18/2017 $2007.12 Transportation & Lodging for Budget Training Conference 10/18/2017 $10,112.69 Mt. Umunhum & Preserve Use Survey, Supplies, Printing 10/18/2017 $716.45 Snacks for Training, Volunteer Special Achievement Award 10/18/2017 $1,964.40 Field Supplies- Fence Repellent, Storage Tank, Coolers 10/18/2017 $170.47 Field Supplies - Socket Set, Cable Booster, Graphite,10/18/2017 $1,351.84 Shop Supplies and Measure AA Gate Supplies, Lumber 10/18/2017 page 2 of 2 CLAIMS REPORT MEETING 17-26 DATE 10-25-2017 MIDPENINSULA REGIONAL OPEN SPACE DISTRICT Check Number Notes Vendor No. and Name Invoice Description Check Date Payment Amount $346.51 Water, Batteries (SAO), Mouse Traps (SAO)10/18/2017 $155.44 Kitchen Sink and Gas Line Parts 10/18/2017 $5,482.31 Staff Recognition Event Items, Desks for HR 10/18/2017 $600.00 CSDA 2017 Annual Conference Registration - Schaffner 10/18/2017 $1,139.98 Lamp Recycling, Ceiling Tiles, Blind Repair, A0 Repairs 10/18/2017 $439.82 Honda Motorcycle Maintenance Service (FFO)10/18/2017 $1,431.67 FFO Internet, Scanner for Legal, Printer Toner 10/18/2017 $500.00 Field Supplies - Bear Creek Culvert Materials 10/18/2017 $1,534.40 Recruiting Expenses, Employee Recognition Raffle, Supplies 10/18/2017 $957.92 CAL IPC Conference & Travel Expenses 10/18/2017 $563.50 Cal IPC Training Conference & Uniforms 10/18/2017 $350.00 PARMA Conference Registration Feb 2017 10/18/2017 $372.82 Volunteer Recognition Event-Recognition Prize Baskets 10/18/2017 $32.68 Employee Business Dinner 10/18/2017 $1,093.20 Board Meeting Meals & Facility Rental 10/18/2017 $32.44 Lunch for Skills Assessment Testing 10/18/2017 R-17-117 Meeting 17-26 October 25, 2017 AGENDA ITEM 3 AGENDA ITEM Final Design Approval of the Alma College Parking Area and Trail Crossing GENERAL MANAGER’S RECOMMENDATIONS 1. Approve the Alma College Parking Area and Trail Crossing Project Design 2. Delegate to the General Manager the authority to approve any necessary changes to the Project Design and Plans, and direct that the “As Built” designs come back to the Board for final approval. SUMMARY The Alma College Parking Area and Trail Crossing at Bear Creek Redwoods Open Space Preserve (Preserve) will complete a critical milestone in the opening of the Preserve to the public. At their March 28, 2017 meeting, the Planning and Natural Resources Committee reviewed the schematic design and recommended that the design process continue. Due to concerns related to the at-grade trail crossing and the significance of the project to opening the west side of the Preserve, staff is bringing the final design of the Alma College Parking Area and Trail Crossing to the Board. Following Board confirmation, staff will finalize construction documents, which will be used to support permit application submittals and form the basis for a Request for Bids to solicit bid proposals for construction in Summer 2018. DISCUSSION The Alma College Parking Area and Trail Crossing will serve as a gateway to the Bear Creek Redwoods Open Space Preserve, and includes a 51 space parking lot, an at-grade trail crossing on Bear Creek Road (Phase I crossing), vault restrooms, an accessible path around Upper Lake, and native vegetation and cultural landscape restoration (see Attachment 1). Due to safety concerns related to the at-grade trail crossing on Bear Creek Road, staff hired an additional traffic consultant, TJKM Consultants, to provide a third party review of the crossing design. TJKM Consultants concurred with the location of the pedestrian crossing as designed, and provided minor engineering details. Santa Clara County Roads & Airports reviewed the crossing design as part of the encroachment permit process. Staff provided an FYI Memo at the September 27, 2017 Board Meeting detailing the review of the at-grade trail crossing design. As part of a future phase of construction, a combined culvert and trail undercrossing would replace the at-grade trail crossing. The combined culvert and trail undercrossing is currently under design, and would greatly increase the capacity of the existing undersized and degraded Webb Creek culvert, improve wildlife passage, and provide a safe trail undercrossing with relatively minimal grading and infrastructure. R-17-117 Page 2 A primary goal of the project involved integrating the new parking lot into the cultural landscape, and providing sensitive public access around the pond. The design of the project attempts to recall the former grandeur and spatial relationships of the historic pathways and plantings. To ensure the design complies with the intent of the Alma College Cultural Landscape Rehabilitation Plan, the project’s cultural landscape specialist reviewed the parking area and landscape design. PGA Design performed a consistency review to determine whether the design drawings are consistent with Guidelines for Rehabilitation of Cultural Landscapes at Alma College, and provided minor design revisions. At the time of the March 28th Planning and Natural Resources Committee Meeting, there was strong speculation that the Upper Lake and the adjacent grasslands provided important breeding habitat for Western Pond Turtle. Natural Resources hired a consultant to survey multiple ponds for the turtle. The surveys were completed in spring and fall 2017. The biologists found no evidence of recruitment or reproduction of the western pond turtle, and the low numbers are considered insufficient to support a viable population at this time. These findings allowed a little more flexibility in the design of the cultural landscape elements of the site as shown in the final design (Attachment 1). FISCAL IMPACT This project is part of Measure AA Expenditure Plan Portfolio #21, Bear Creek Redwoods Public Recreation and Interpretation Projects, which specifies, in part: Open for hiking, equestrian activities. Provide parking areas, trails, and is identified as MAA Project #21-5 Phase I Public Access Improvements. The Planning Department’s FY 2017-18 Budget for the Bear Creek Redwoods Public Access Phase I Implementation (MAA 21-005) includes $151,640 for design development, permitting, and draft construction documents. There is no direct fiscal impact of this final design approval. BOARD COMMITTEE REVIEW The Planning and Natural Resources Committee reviewed the schematic design during their March 28, 2017 meeting (R-17-39) and confirmed the recommended design of Alma College Parking Area and Trail Crossing. The Committee also reviewed the trail undercrossing conceptual design alternatives and confirmed a phased approach to the construction of the trail undercrossing. The Committee recommended proceeding with the design and engineering for a combined culvert-trail undercrossing. PUBLIC NOTICE Public notice was provided as required by the Brown Act. Additional noticing was sent to the residents along Bear Creek Road. CEQA COMPLIANCE Construction of the Alma College Parking Area and Trail Crossing was included in the Bear Creek Redwoods Preserve Plan EIR, which the Board certified on January 25, 2017 (R-17-15). R-17-117 Page 3 NEXT STEPS Remaining work will focus on the production of bid documents for contracting and initiating permitting. Construction is scheduled for Summer 2018, which will allow for the opening of the west side of Bear Creek Redwoods Preserve in late 2018. Design and regulatory permitting will continue with the design consultant for the future Bear Creek Road trail undercrossing. The timeline to meet the goal of providing public access to Bear Creek Redwoods by late 2018 appears in the table below. Alma College Parking Area and Trail Crossing Milestones Final Schematic Design for Committee Review March 28, 2017 (completed) Board Review of Final Design October 25, 2017 Construction Documents December 2017 Approve Phase I Construction Contract Spring 2018 Construction Phase I (parking area/trail crossing) Summer - Fall 2018 Public Access Opening Late 2018 Complete Design & Permitting for Phase II Trail Undercrossing Spring 2019 Attachment 1. Alma College Parking Area and Trail Crossing Final Design Responsible Department Head: Jane Mark, AICP, Planning Manager Prepared by: Bryan Apple, Planner II Contact person: Bryan Apple, Planner II B XING TRAIL XING TRAIL BB B B BB NO PARKING SHEET LX.1 BEAR CREEK R O A D B E A R C R E E K R O A D B E A R C R E E K R O A D SHEET LX.2 UPPER LAKE GATE BC04 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ALMA COLLEGE PARKING AREA AND TRAILHEAD BEAR CREEK REDWOODS OPEN SPACE PRESERVE SANTA CLARA COUNTY, CALIFORNIA MIDPENINSULA REGIONAL OPEN SPACE DISTRICT 330 DISTEL CIRCLE LOS ALTOS, CA 94022 (650) 691-1200 CONTACT: MATT BRUNNINGS, CAPITAL PROJECT MANAGER OWNER HARRIS DESIGN LANDSCAPE ARCHITECTURE 755 FOLGER AVENUE BERKELEY, CA 94710 (510) 647-3792 CONTACT: BILL HARRIS PRIME CONSULTANT GENERAL T1.0 COVER SHEET SURVEY - TOPOGRAPHIC SURVEY MAP LANDSCAPE L1.1 - L1.2 DEMOLITION PLAN CIVIL C0.0 CIVIL INFO C1.0 CONSTRUCTION ACCESS AND STAGING PLAN - POND LAYOUT C1.1 CONSTRUCTION ACCESS AND STAGING PLAN - PARKING LOT LAYOUT C2.0 HORIZONTAL CONTROL PLAN - POND LAYOUT C2.1 HORIZONTAL CONTROL PLAN - PARKING LOT LAYOUT C2.2 HORIZONTAL CONTROL PLAN - TABLES C3.0 SIGNAGE, STRIPING, AND PAVEMENT PLAN - PARKING LOT LAYOUT C4.0 GRADING AND DRAINAGE PLAN - POND LAYOUT C4.1 GRADING AND DRAINAGE PLAN - PARKING LOT LAYOUT C4.2 GRADING AND DRAINAGE PLAN - SECTIONS AND PROFILES C5.0 CIVIL DETAILS - PARKING LOT DETAILS C5.1 CIVIL DETAILS - GATE AND DRIVEWAY DETAILS C6.0 EROSION CONTROL PLAN - POND LAYOUT C6.1 EROSION CONTROL PLAN - PARKING LOT LAYOUT C6.2 EROSION CONTROL PLAN - DETAILS AND NOTES C7.0 STORMWATER CONTROL PLAN LANDSCAPE L2.1 - L2.2 SITE CONSTRUCTION PLAN L3.1 - L3.2 LANDSCAPE LAYOUT PLAN L4.1 - L4.2 PLANTING PLAN L5.1 - L5.4 CONSTRUCTION DETAILS TRAFFIC E-1 RRFB CROSSWALK SYSTEM INSTALLATION NOTES AND DETAILS E-2 RRFB CROSSWALK SYSTEM INSTALLATION SS-1 CROSSWALK INSTALLATION SIGNING AND STRIPING AGL ABOVE GROUND LEVEL CLR CLEARANCE CONC CONCRETE CONT CONTINUOUS CP CENTER POINT DIA DIAMETER DWG DRAWING (E)EXISTING EHS EXTRA HIGH STRENGTH EL ELEVATION EQ EQUAL EW EACH WAY FG FINISHED GRADE FL FLOW LINE FS FINISHED SURFACE FTG FOOTING GALV GALVANIZED GB GRADE BREAK HP HIGH POINT HT HEIGHT HORIZ HORIZONTAL L LENGTH LOW LIMIT OF WORK LP LOW POINT MFR MANUFACTURER (N)NEW NIC NOT IN CONTRACT NTS NOT TO SCALE OC ON CENTER PIP PROTECT IN PLACE POB POINT OF BEGINNING R RADIUS RRFB RECTANGULAR RAPID FLASHING BEACONS SIM SIMILAR SPECS SPECIFICATIONS SCD SEE CIVIL DRAWINGS SSD SEE STRUCTURAL DRAWINGS STD STANDARD TBD TO BE DETERMINED TBR TO BE REMOVED TR TO REMAIN TYP TYPICAL VERT VERTICAL VIF VERIFY IN FIELD ABBREVIATIONS LOCATION MAP NTS SHEET INDEX 1.DESIGN INTENT: THESE DRAWINGS REPRESENT THE GENERAL DESIGN INTENT TO BE IMPLEMENTED ON THE SITE. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ENGINEER FOR ANY ADDITIONAL CLARIFICATION OR DETAILS NECESSARY TO ACCOMMODATE SITE CONDITIONS. 2.CONTRACTORS' JOB SITE CONDITIONS: CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR SITE CONDITIONS DURING CONSTRUCTION, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE LANDSCAPE ARCHITECT HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE LANDSCAPE ARCHITECT. 3.COMPOSITE BASE SHEET: THE PROPOSED IMPROVEMENTS SHOWN ON THESE DRAWINGS ARE SUPERIMPOSED ON A BASE SHEET. THIS BASE SHEET IS COMPILED FROM THE TOPOGRAPHIC SURVEY, ENGINEERING DOCUMENTS, ARCHITECTURAL DOCUMENTS AND OTHER DATA AS MADE AVAILABLE TO THE LANDSCAPE ARCHITECT, WHO SHALL NOT BE HELD LIABLE FOR CHANGES, INACCURACIES, OMISSIONS OR OTHER ERRORS ON THE DOCUMENTS NOT PREPARED BY THE LANDSCAPE ARCHITECT OR SUB-CONSULTANTS. THE COMPOSITE BASE SHEET IS PROVIDED AS AN AID ONLY AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING THESE DOCUMENTS AND INCORPORATING/ INTEGRATING ALL CONSTRUCTION AS REQUIRED TO ACCOMMODATE SAME. THE BASE SHEET SOURCE FOR THIS PROJECT IS: EDMUNDSON & ASSOCIATES LAND SURVEYING 1512 SEABRIGHT AVENUE SANTA CRUZ, CA 95062 TEL: (831) 425-1796 SHEET NAME: TOPOGRAPHIC SURVEY MAP DATE: JULY 31, 2017 4.UTILITIES: A REASONABLE EFFORT HAS BEEN MADE TO LOCATE AND DELINEATE ALL KNOWN UNDERGROUND UTILITIES. THE CONTRACTOR IS CAUTIONED THAT ONLY EXCAVATION WILL REVEAL THE TYPES, EXTENT, SIZES, LOCATION AND DEPTHS OF SUCH UNDERGROUND UTILITIES. HOWEVER, THE LANDSCAPE ARCHITECT CAN ASSUME NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF ITS DELINEATION OF SUCH UNDERGROUND UTILITIES, NOR FOR THE EXISTENCE OF OTHER BURIED OBJECTS OR UTILITIES WHICH ARE NOT SHOWN ON THESE DRAWINGS. PRIOR TO CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE UTILITY COMPANIES INVOLVED AND REQUESTING A VISUAL VERIFICATION OF THE LOCATIONS OF THEIR UNDERGROUND FACILITIES. THE UTILITY COMPANIES ARE MEMBERS OF THE UNDERGROUND SERVICE ALERT (U.S.A.) ON-CALL PROGRAM. THE CONTRACTOR OR ANY SUBCONTRACTOR FOR THIS CONTRACT SHALL NOTIFY MEMBERS OF THE U.S.A., (800) 227-2600 AND THE DISTRICT AT LEAST 48 HOURS (2 WORKING DAYS) PRIOR TO BEGINNING ANY EXCAVATION IN THE VICINITY OF UNDERGROUND FACILITIES. EXCAVATION IS DEFINED AS BEING 18 OR MORE INCHES IN DEPTH BELOW THE EXISTING SURFACE. 5.UNAUTHORIZED CHANGES AND USES: ALL PROPOSED CHANGES TO THE PLANS MUST BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT IN WRITING AND MUST BE APPROVED BY THE LANDSCAPE ARCHITECT IN ADVANCE. LANDSCAPE ARCHITECT WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO, OR USE OF, THESE PLANS. ALL COMMUNICATION WITH LANDSCAPE ARCHITECT IS TO GO THROUGH DISTRICT'S REPRESENTATIVE. 6.TREE PROTECTION: PROVIDE TREE PROTECTION AS SPECIFIED FOR ALL EXISTING TREES TO REMAIN. 7.CONTRACTOR TO CONFIRM CONSTRUCTION STAGING LOCATION AND COORDINATE WITH DISTRICT. 8.CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL PRIVATE PROPERTY AS NECESSARY. ANY PRIVATE PROPERTY DAMAGED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO THE OWNER'S SATISFACTION AT CONTRACTOR'S OWN EXPENSE. GENERAL NOTES COVER SHEET PROJECT SITE P Bear Creek Redwoods Open Space Preserve Lexington Reservoir County Park L e x i n g t o n R e s e r v o i r Felton Station Open Space Preserve 17 Bear C r e e k R d Beard s l e y R d Al m a B r i d g e R d A l m a B r i d g e R d Black Rd Gist Rd NORTH 17 35 35 TO SAN JOSE TO SANTA CRUZ CIVIL ENGINEER FALL CREEK ENGINEERING, INC. 1525 SEABRIGHT AVENUE SANTA CRUZ, CA 95062 (831) 426-9054 CONTACT: ROBYN COOPER SUBCONSULTANTS GEOTECHNICAL ENGINEER BUTANO GEOTECHNICAL ENGINEERING, INC. 231 GREEN VALLEY ROAD, SUITE E FREEDOM, CA 95019 (831) 724-2612 CONTACT: GREG BLOOM LAND SURVEYOR EDMUNDSON & ASSOCIATES LAND SURVEYING 1512 SEABRIGHT AVENUE SANTA CRUZ, CA 95062 (831) 425-1796 CONTACT: OLIN S. EDMUNDSON TRAFFIC ENGINEER HEXAGON TRANSPORTATION CONSULTANTS, INC. 4 NORTH SECOND STREET, SUITE 400 SAN JOSE, CA 95113 (408) 971-6100 CONTACT: JEFF ELIA N.A. BH ZD T1.0 10/10/17 50% CD SUBMITTAL 6/16/17 90% CD 10/10/17 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com BH BH NORTH 0 20 40 80 120 SCALE: 1"=60'-0"SITE OVERVIEW PLAN (E) GATE, TR (E) EAST SIDE LEAF OF GATE BC 04, TR (E) SHRINE PROTECT IN PLACE (E) FENCE, TBR (E) FENCE, TBR UPPER LAKE B E A R C R E E K R O A D BEAR CRE E K R O A D (E) CONCRETE RISER, TR (E) GATE, TO BE SALVAGED & REINSTALLED AT SOUTH END OF PARKING LOT (E) GATE, TO BE SALVAGED AND REINSTALLED AT SOUTH END OF PARKING LOT (E) FENCE, TBR (E) FENCE, TBR LIMIT OF CLEARING & GRUBBING SHOWN DIAGRAMMATICALLY AND SHALL COINCIDE WITH LIMIT OF GRADING (E) PATH, TR (E) TRAIL, TR (E) FENCE, TR (E) FENCE, TR (E) FENCE, TBR (E) FENCE, TR 12 13 (E) SIGN AND POST, TO BE RETURNED TO DISTRICT (E) SIGN AND POST, TO BE RETURNED TO DISTRICT (E) BRICK WALLS , TBR SAWCUT (E) BENCH, TBR WATERLINE AT TIME OF TOPOGRAPHIC SURVEY (E)PAVEMENT, TR (E) BOULDERS GROUP OF THREE, TR (E) BOULDER TO BE RELOCATED AS SHOWN ON SITE CONSTRUCTION PLAN USING KEY NUMBER (E) FENCE, TBR (E) FENCE, TR (E) FENCE, TBR (E) FENCE, TR X X X X X X X X X X X X X X X X X XX XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX XX X X X X X X X XX X X X X X X X X X X X X X X X (E) WEST SIDE LEAF OF GATE BC 04, TBR 1" = 20'-0" MATCHLINE - SEE SHEET L1.2 BH ZD L1.1 NORTH 0 SCALE: 1"=20'-0" 10 20 40 60 DEMOLITION PLAN 10/10/17 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com SEE SHEET L1.2 FOR LEGEND & NOTES 50% CD SUBMITTAL 6/16/17 90% CD 10/10/17 BH BH (E) BOXWOOD HEDGE TR -PROTECT IN PLACE (E) POWER POLE, TR (E) HOSE BIB, TBR CAP WATER LINE (E) BOULDERS TO BE RELOCATED AS SHOWN ON SITE CONSTRUCTION PLAN USING KEY NUMBERS, DIRECTED IN THE FIELD BY OWNERS REPRESENTATIVE (E) BRICK & ROCK WALL & STEPS, PROTECT IN PLACE (E) FIRE HYDRANT, TR (E) WATER LINE, TR B E A R C R E E K R O A D 1 2 3 4 5 6 7 8 9 10 11 (E) ROCK COLUMN, PROTECT IN PLACE LIMIT OF CLEARING & GRUBBING SHOWN DIAGRAMMATICALLY AND SHALL COINCIDE WITH LIMIT OF GRADING (E) BENCH, TBR (E) CULVERT, TR (E) CULVERT OUTFALL & FLUME, TR (E) GUY WIRE, TR (E) FENCE, TBR (E) FENCE, TR (E) WOODEN SHED, TBR (E) SIGN AND POST, TO BE RETURNED TO DISTRICT WATERLINE AT TIME OF TOPOGRAPHIC SURVEY SAWCUT SAWCUT SAWCUT (E)CURB, TR (E) FENCE, TBR (E) FENCE, TR (E) PATH, TR (E) PATH, TR (E) FENCE, TBR X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X (E) CONCRETE RISER, TR (E) SHRUBS, TR -PROTECT IN PLACE 1" = 20'-0" MATCHLINE - SEE SHEET L1.1 NORTH 0 SCALE: 1"=20'-0" 10 20 40 60 BH ZD DEMOLITION PLAN L1.2 EXISTING WIRE FENCE, TRXX EXISTING TREE TO REMAIN EXISTING TREE TO BE REMOVED, NOT IN CONTRACT BEAR CREEK ROAD RIGHT OF WAY PLOTTED FROM RECORD INFORMATION. EXISTING WIRE FENCE TO BE REMOVEDXX AC PAVING & BASE, TO BE REMOVED OR RECYCLED ON SITE FOR CLASS 2 AGGREGATE BASE - ASSUME A MINIMUM OF 2 INCHES AC OVER 4 INCHES AB DEMOLITION LEGEND CLEARING & GRUBBING DEMOLITION NOTES 1.EXISTING CONDITIONS ARE SHOWN AS A HALF-TONE SCREEN,EXCEPT FOR THOSE ITEMS TO BE REMOVED. 2.IF UTILITIES ARE ENCOUNTERED IN THE FIELD THAT ARE NOT SHOWN ON THIS PLAN, CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY. THE CONTRACTOR IS CAUTIONED THAT ONLY EXCAVATION WILL REVEAL THE TYPES, EXTENT, SIZES, LOCATION, AND DEPTHS OF UNDERGROUND UTILITIES. THE LANDSCAPE ARCHITECT CAN ASSUME NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE DELINEATION OF SUCH UNDERGROUND UTILITIES, NOR FOR THE EXISTENCE OF OTHER BURIED OBJECTS OR UTILITIES WHICH ARE NOT SHOWN ON THESE DRAWINGS. 3.CONTRACTOR IS RESPONSIBLE TO LEGALLY DISPOSE OF ALL REMOVED MATERIAL AT CONTRACTOR'S OWN EXPENSE. 4.CONTRACTOR SHALL PROVIDE CONSTRUCTION FENCING AT CONTRACTOR'S OPTION. NO ADDITIONAL PAYMENT SHALL BE MADE FOR CONSTRUCTION FENCING, OBTAIN OWNERS REPRESENTATIVE'S APPROVAL PRIOR TO INSTALLATION. 5.ALL TREES TO REMAIN SHALL BE PROTECTED PER SPECS. 6.REMOVE ALL TREE STUMPS TO 3 FEET BELOW PROPOSED FINISH GRADES. 7.REMOVE ALL FOOTINGS IN THEIR ENTIRETY. 8.WALK THE SITE AND IDENTIFY TREES TO BE REMOVED WITH ENGINEER AND CONFIRM REMOVAL PRIOR TO DEMOLITION. 9.CONTRACTOR IS CAUTIONED THAT POISON OAK IS PRESENT. REMOVE POISON OAK FROM BOULDERS AND OTHER AREAS TO BE OPEN TO THE PUBLIC. REVIEW LIMITS WITH ENGINEER. 10.CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL WOOD, METAL, CONCRETE, DEBRIS, AND OTHER EXISTING SHED MATERIALS INCLUDING FOUNDATION. 11.CONTRACTOR SHALL CONTACT USA NORTH 811 PRIOR TO ANY EXCAVATION. BOULDER, TO BE RELOCATED SEE SITE CONSTRUCTION PLAN FOR NEW LOCATIONS ASSIGNED BY KEY NUMBER TBR TR TO BE REMOVED TO REMAIN TYP TYPICAL WATER LINE, TR STORM DRAIN LINE, TR OVERHEAD LINES, TR (E)EXISTING 1 10/10/17 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com EXISTING GRAVEL ROAD TO BE SCARIFIED AND COMPACTED 50% CD SUBMITTAL 6/16/17 90% CD 10/10/17 BH BH PIP PROTECT IN PLACE KEY NUMBER AC ADA AGG AI AWG B-# BCR BCROP BLDG BOC BVCE BVCS C# C&G ℄ CL DIA DG DI EL. EP DRAWING NOTATIONS EXISTING STORM DRAIN AREA INLET SIGN BOLLARD SINGLE GATE DOUBLE GATE SURFACE FLOW ARROW SET SPIKE FOR SURVEY ASPHALT CONCRETE AMERICAN DISABILITIES ACT AGGREGATE AREA INLET AMERICAN WIRE GAUGE STORMWATER BASIN # BEAR CREEK ROAD BEAR CREEK REDWOODS OPEN PRESERVE BUILDING BOTTOM OF CURB BEGINNING VERTICAL CURVE ELEVATION BEGINNING VERTICAL CURVE STATION CURVE # CURB & GUTTER CENTERLINE CENTERLINE DIAMETER DECOMPOSED GRANITE DROP INLET ELEVATION EDGE OF PAVEMENT EQUIDISTANT ENDING VERTICAL CURVE ELEVATION ENDING VERTICAL CURVE STATION EXISTING FINISHED GRADE HYDRANT INFILTRATION OAK LINE # LATERAL LENGTH LENGTH OF VERTICAL CURVE MAXIMUM MINIMUM NEW NOT TO SCALE ON CENTER OUTER DIAMETER OFFSET PEDESTRIAN POINT OF VERTICAL INTERSECTION PROPOSED SCHEDULE STORM DRAIN SYSTEM SQUARE FEET STATION STATION STORMWATER TREE TO BE REMOVED TOP OF CURB TOP OF WALL/TWISTED TREE PROTECTION ZONE TO REMAIN TOP OF STAIRS TYPICAL UNDERGROUND VERTICAL CURVE VEGETATED WASTEWATER INFRASTRUCTURE IDENTIFICATION EQ. EVCE EVCS (E) FG HYD INF K L# LAT LEN LVI MAX MIN (N) NTS O.C. O.D. OFF PED   PVI (P) SCH SD SF STA STN SW T   TBR TOC TOW TPZ TR TS TYP UG VC VEG WW XX-(#) PROPERTY LINE EXISTING CONTOURS PROPOSED CONTOURS LIMIT OF DISTURBANCE FLOWLINE STORMDRAIN PIPE EXISTING ELECTRICAL CONDUIT NEW ELECTRICAL CONDUIT EXISTING OVERHEAD POWER LINE TREE COVER OR DENSE VEG. RIVER, STREAM, GULCH, OR CREEK SAWCUT LINE PROJECT BOUNDARY SD E CIVIL LINE TYPES GRADING NOTES ASPHALT CONCRETE (AC) PAVEMENT (E) AC PAVING AND BASE TO BE REMOVED EROSION CONTROL - TURF REINFORCED MAT (TRM) (E) GRAVEL PATH TO BE REMOVED UNDISTURBED EARTH PERMEABLE CONCRETE PERMEABLE CONCRETE WITH MACROFIBER AGGREGATE BASE RESIN PAVING COMPACTED SUBGRADE TRUNCATED DOMES DEMO EXISTING FEATURE CLEAR AND GRUB AREA STAGING AREA STABILIZED ENTRANCE - METAL PLATES STABILIZED ENTRANCE - GRAVEL ACCESS RAMP ABBREVIATIONS APPROXIMATE GRADING VOLUMES SITE CUT (CY)FILL (CY)NET PROJECT IMPROVEMENTS 635.7 911.1 275.4 (F) TOTAL VOLUMES 635.7 911.1 275.4 (F) GENERAL NOTES GRADING NOTES: 1.A COMPACTION FACTOR OF 95% HAS BEEN APPLIED TO THE GRADING FILL VOLUMES. 2.GRADING VOLUMES DO NOT ACCOUNT FOR PAVEMENT SECTIONS. 3.ALL RECOVERY SLOPES SHALL NOT EXCEED 3:1 (H:V). 4.CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING EXISTING TOPOGRAPHY AND GRADING VOLUMES AS EXISTING SOIL IS SANDY AND SUBJECT TO CHANGING CONDITIONS. 5.ALL SITE GRADING SHALL COMPLY WITH THE RECOMMENDATIONS OF THE PROJECT'S GEOTECHNICAL ENGINEERING REPORT. MATERIALS LEGEND SSE FL SD E E OH X P EXISTING FENCE EASEMENT GUY POST AND WIRE FENCING GRADE BREAK NEW PERMANENT FENCE RESOURCE PROTECTION FENCING (TEMPORARY) STRAW BALES (TEMPORARY) 1.AREA OF DISTURBANCE: APPROXIMATELY 1.6 ACRES. 2.CONTRACTOR MUST COMPLY WITH REQUIREMENTS OF ALL APPLICABLE PERMITS. 3.IF THE PROJECT DISTURBS MORE THAN ONE ACRE, THE CONTRACTOR MUST DEVELOP A SWPPP, SUBMIT IT TO THE STATE FOR APPROVAL, AND FOLLOW THE REQUIREMENTS OF THE SWPPP. FALL CREEK TO PREPARE THE SWPPP. MROSD WILL SUBMIT TO THE STATE. SITE BALANCE NOTES: 1.CUT AND FILL VOLUMES ON THIS PROJECT ARE ESTIMATES AND SHALL BE VERIFIED. 2.CONTRACTOR SHALL DETERMINE THE QUANTITIES OF CUT AND FILL REQUIRED TO BALANCE THE SITE EARTHWORK, ALLOWING FOR SUCH FACTORS AS SHRINKAGE, SUBSIDENCE, ETC. 3.CONTRACTOR MUST HAUL ALL EXCESS SOIL OFFSITE AND IMPORT ANY REQUIRED BORROW FROM OFFSITE. X 1 C2.1 DETAIL NUMBER SHEET WHERE DETAIL IS SHOWN (E) GRADE FINISHED GRADE 10 12 14 16 18 20 22 EL E V A T I O N ( F T ) 0+00 0+10 0+20 0+30 14 . 0 14 . 0 14 . 8 16 . 6 16 . 3 17 . 0 16 . 6 13 . 0 FINISHED SURFACE EL. (FT) (E) SURFACE EL. (FT) PROFILE VIEW STATION CIVIL SHEET LIST TABLE TECHNICAL REFERENCES 1.GEOTECHNICAL INVESTIGATION DESIGN PHASE FOR ALMA COLLEGE PARKING AREA AND TRAILHEAD, SANTA CLARA COUNTY, CALIFORNIA, JULY 2017. 2.C.3 STORMWATER HANDBOOK, SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTON PROGRAM, JUNE 2016. 3.TOPOGRAPHIC SURVEY, CONDUCTED BY EDMUNSON & ASSOCIATES LAND SURVEYING, JULY 18, 2016 3.1.ELEVATIONS SHOWN ARE NAVD88 DATUM AS ESTABLISHED FROM NETWORK RTK GPS READINGS. NOT CONFIRMED WITH A LOCAL BENCHMARK 1 CIVIL INFO C0.0 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 Sheet Number Sheet Title C0.0 CIVIL INFO C1.0 CONSTRUCTION ACCESS AND STAGING PLAN- POND LAYOUT C1.1 CONSTRUCTION ACCESS AND STAGING- PARKING LOT LAYOUT C2.0 HORIZONTAL CONTROL PLAN - POND LAYOUT C2.1 HORIZONTAL CONTROL PLAN- PARKING LOT LAYOUT C2.2 HORIZONTAL CONTROL PLAN- TABLES C3.0 SIGNAGE, STRIPING, AND PAVEMENT PLAN-PARKING LOT LAYOUT C4.0 GRADING AND DRAINAGE PLAN - POND LAYOUT C4.1 GRADING AND DRAINAGE PLAN- PARKING LOT LAYOUT C4.2 GRADING AND DRAINAGE PLAN- SECTIONS AND PROFILES C5.0 CIVIL DETAILS- PARKING LOT DETAILS C5.1 CIVIL DETAILS- GATE AND DRIVEWAY DETAILS C6.0 EROSION CONTROL PLAN - POND LAYOUT C6.1 EROSION CONTROL PLAN- PARKING LOT LAYOUT C6.2 EROSION CONTROL PLAN - DETAILS AND NOTES C7.0 STORMWATER CONTROL PLAN X X X X X X X X X X X X X X X X X X X X X O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H OH OH OH OH OH OH O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H OH OH OH OH OH OH O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XING TRAIL (E) WALL- TO BE REMOVED SEE DEMOLITION PLAN (E) FENCE (E) BROKEN ASPHALT PATH TO BE REMOVED SEE DEMOLITION PLAN (E) SHRINE PROTECT IN PLACE SEE NOTE 1 X X X X X X X X X X X X X STAGING AREA SEE NOTE 2 CONSTRUCTION ACCESS ROUTE BEAR CREEK R O A D (E) GATE AND FENCE SECTION TO BE REMOVED- SEE DEMOLITION PLAN (E) GATE AND FENCE SECTION TO BE REMOVED- SEE DEMOLITION PLAN CONCRETE WASHOUT (E) GATE- PROTECT IN PLACE (E) CONCRETE RISER FENCE AND STRAW WATTLES SEE NOTE 3 (E) FENCE TR C6.2 3 C6.2 2 CONSTRUCTION ACCESS FROM ALMA COLLEGE ROAD SCALE: 1" = 20' @ 24"X36"1 CONSTRUCTION ACCESS AND STAGING PLAN- POND LAYOUT NO R T H 00 50'100' SCALE: 1" = 20' @ 24"X36" CONSTRUCTION ACCESS AND STAGING PLAN- POND LAYOUT C1.0 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 OVERHEAD LINE (E) MATCHLINE- SEE SHEET C1.1 NOTES: 1.CONTRACTOR MAY INSTALL TEMPORARY RESOURCE PROTECTION FENCING TO PROTECT SHRINE DURING CONSTRUCTION OR INSTALL PERMANENT WIRE FENCE (SEE LANDSCAPE PLANS). 2.CONTRACTOR MAY PROPOSE SPECIFIC CONFIGURATION, AREA SHOWN DIAGRAMMATICALLY. STAGING AREA SHALL BE ORIENTED SO AS TO ALLOW ACCESS FOR PATROL VEHICLES. 3.STAGING AREA SHALL BE FENCED WITH A TYPICAL TEMPORARY CHAIN LINK FENCE. OH O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H X X X X X X X X OH O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H X X X X X X X X X X X X X X X X (E) BOXWOOD HEDGE PROTECT IN PLACE STAGING AREA SEE NOTE 1 X X X X X X X X EXISTING BRICK WALL AND STEPS PROTECT IN PLACE CONCRETE WASHOUT FENCE AND STRAW WATTLES SEE NOTE 2 EXISTING BROKEN AC (E) CULVERT OUTFALL & FLUME WEBB CREEK (E) CULVERT (APPROX LOCATION) (E) CURB (E) ROCK COLUMN PROTECT IN PLACE COUNTY ROAD RIGHT-OF-WAY FAULT LINE (E) CONCRETE COLUMN C6.2 3 C6.2 2 (E) HISTORIC SHRUB PROTECT IN PLACE C6.2 2TREE PRO (TYP) CONSTRUCTION STAGING AREA CONSTRUCTION ACCESS VIA ALMA COLLEGE ROAD OFF SOUTHBOUD HIGHWAY 17 PROJECT SITE HIG H W A Y 1 7 LEXINGTON RESERVOIR LEGEND: CONCRETE WASHOUT STRAW WATTLE SCALE: 1" = 20' @ 24"X36"1 CONSTRUCTION ACCESS AND STAGING- PARKING LOT LAYOUT NO R T H 00 50'100' SCALE: 1" = 20' @ 24"X36" CONSTRUCTION ACCESS AND STAGING- PARKING LOT LAYOUT C1.1 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 MATCHLINE- SEE SHEET C1.1 NOTES: 1.CONTRACTOR MAY PROPOSE SPECIFIC CONFIGURATION, AREA SHOWN DIAGRAMMATICALLY. 2.STAGING AREA SHALL BE FENCED WITH A TYPICAL TEMPORARY CHAIN LINK FENCE. SCALE AS DIMENSIONED2CONSTRUCTION ACCESS ROUTE VIA ALMA COLLEGE ROAD CONSTRUCTION ACCESS ROUTE FROM HIGHWAY 17 VIA ALMA COLLEGE ROAD SEE DETAIL 2 THIS SHEET X X X X X X X X X X X X X X X X X X X XXXX XXX X X X X X X X XXXXX XXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X C 2 9 C3 0 C31 C32 L7 C33 L127 C141 C 1 4 2 L 1 2 8 L2 L 3 C 1 4 3 L 5 L 1 3 0 L 1 2 9 L 1 3 1 C 5 3 C 5 4 C6 C5 L9 L148 C 5 1 C26 C 2 5 C24 C 2 3 C 2 2 C2 1 C2 0 C1 9 C18 C17 C16 L6 C15 C14 C1 3 C11 C 1 2 C 1 0 C 9 C 8 BEAR CREEK R O A D SCALE: 1" = 30' @ 24"X36"1 HORIZONTAL CONTROL PLAN - POND LAYOUT NO R T H 00 50'100' SCALE: 1" = 30' @ 24"X36" HORIZONTAL CONTROL PLAN - POND LAYOUT C2.0 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 MATCHLINE- SEE SHEET C2.1 NOTES: 1.LINE AND CURVE TABLES ARE SHOWN ON SHEET C2.2 COORDINATE LISTING OF CONTROL POINTS CONTROL POINT EASTING NORTHING ELEVATION 1 1892990.761 6123514.207 976.097 2 1892844.489 6123633.644 976.434 3 1892948.993 6123633.644 979.250 4 1893025.880 6123529.521 975.893 5 1893030.115 6123192.635 992.844 6 1892857.617 6123247.042 992.811 7 1892589.633 6123342.434 991.301 8 1892536.983 6123315.845 987.294 9 1892922.535 6123515.253 978.450 10 1892673.635 6123521.459 975.110 11 1892898.202 6123533.005 978.665 12 1892854.080 6123283.008 980.399 13 1892944.186 6123291.339 980.392 14 1892751.264 6123324.164 982.858 15 1892714.264 6123339.091 984.339 16 1892633.092 6123429.798 983.604 17 1892550.042 6123465.803 982.679 18 1892606.959 6123575.598 980.061 19 1892588.255 6123679.591 981.531 20 1892684.220 6123713.615 978.390 21 1892527.220 6123757.520 983.410 22 1892436.035 6123626.634 974.498 23 1892527.515 6123672.547 980.549 24 1892366.571 6123721.636 967.333 25 1892302.326 6123802.273 961.962 26 1892214.581 6123914.473 958.408 B X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BB B B X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BS BS BB NO PARKING L39 L37 L 3 8 C64 L36 L 3 5 L 1 7 L19 C63 C 6 2 L 3 4 L33 L31 L32 C 6 1 C4 1 C38 L2 0 C37L16 L15 L18 L 1 3 L14 L12 L11 C36 L1 0 C 3 5 C 2 8 C7 0 C144 C69 C146 L61 C145L5 9 L58 L57 L5 6 L54 L55 L53 C55 L25 L24 C56 L26 L22 C150 C58 L2 8 C 5 9 L29 L30 C60 C57 L27 C44 C42 C43 L21 C40 C39 C27 C26 C7 C50 C49 C48 C45 C4 7 C46 C 1 4 9 L1 4 7 L146 C148 L145 L144 L 1 4 3 L142 L141 C147 L1 4 0 L1 3 9 L1 3 8 L137 L136 L135 L133 L134 L132 BE A R C R E E K R O A D SCALE: 1" = 20' @ 24"X36"1 HORIZONTAL CONTROL PLAN- PARKING LOT LAYOUT HORIZONTAL CONTROL PLAN- PARKING LOT LAYOUT C2.1 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 MATCHLINE- SEE SHEET C2.0 NOTES: 1.LINE AND CURVE TABLES ARE SHOWN ON SHEET C2.2 NO R T H 00 20'40' SCALE: 1" = 20' @ 24"X36" Parcel Table NUMBER C57 L27 C58 L28 C59 L29 L30 C60 L24 C56 C55 L25 L26 L9 C51 C150 C5 C6 L148 L22 C13 C11 C12 C10 C9 C8 C7 C50 C49 C48 C45 C47 C46 C44 C42 C43 L21 C40 C39 C27 RADIUS 167.29 113.31 99.97 3.00 105.56 73.43 97.57 172.79 339.43 106.24 50.00 50.00 333.96 236.33 3448.17 327.79 103.18 65.33 229.30 391.21 561.31 397.58 150.00 152.96 58.79 9.96 426.93 484.18 312.07 LENGTH 67.61 78.09 39.47 9.36 48.54 10.59 7.09 7.24 14.16 90.70 37.94 102.67 80.58 43.13 94.85 72.37 133.00 97.53 199.43 101.96 13.61 1.25 8.33 5.89 86.00 121.68 104.80 28.77 38.83 9.76 14.00 9.92 15.07 40.47 11.83 2.00 6.85 27.33 14.89 11.53 LINE/CHORD DIRECTION N88° 22' 09.46"E S12° 11' 13.73"E N67° 32' 35.47"W N59° 36' 25.55"W N44° 03' 04.41"W N27° 47' 44.02"W N32° 26' 38.97"W N31° 18' 55.76"E S48° 11' 30.36"W S75° 22' 40.18"W N61° 46' 37.57"E S50° 48' 54.65"E N12° 11' 13.73"W N25° 48' 50.78"W S09° 14' 02.50"E S26° 38' 31.39"W N14° 47' 02.57"W N21° 12' 22.56"E S36° 35' 21.96"E N50° 48' 54.65"W S59° 41' 52.96"E S51° 11' 00.06"E S45° 41' 26.83"E S38° 04' 08.24"E S25° 40' 23.51"E S13° 29' 07.03"E S26° 07' 27.46"W S65° 30' 34.99"W S82° 20' 40.99"W N02° 00' 05.81"E N88° 03' 02.14"W S02° 00' 02.80"W N83° 08' 46.91"W N72° 36' 47.65"W N66° 22' 42.71"W N24° 23' 35.70"E N65° 04' 35.14"W N62° 56' 00.64"W N60° 05' 09.05"W N58° 24' 00.71"W DELTA 23° 09' 27" 19° 57' 31" 27° 49' 10" 138° 05' 31" 49° 13' 42" 29° 36' 23" 55° 41' 54" 23° 59' 50" 22° 27' 02" 52° 35' 45" 15° 36' 01" 1° 25' 45" 1° 25' 45" 1° 25' 45" 1° 25' 45" 21° 16' 09" 58° 11' 33" 25° 13' 55" 9° 42' 10" 1° 25' 45" 1° 25' 45" 1° 25' 45" 5° 45' 17" 15° 09' 39" 11° 31' 42" 11° 31' 42" 3° 40' 03" 1° 45' 45" 2° 07' 03" Parcel Table NUMBER C26 C25 C24 C23 C22 C21 C20 C19 C18 C17 C16 L6 C15 C14 L2 L3 C143 L5 L130 L129 L131 C53 C54 C70 C144 C69 L61 C145 C146 L59 L57 L58 L56 L54 L55 L132 L133 L134 L53 L135 RADIUS 133.65 159.52 4.24 401.53 217.39 76.87 144.24 102.38 182.59 133.39 387.74 426.76 49.39 64.88 246.65 101.12 178.33 140.67 122.25 122.00 24.63 LENGTH 27.43 41.30 2.02 14.35 70.04 39.73 26.93 44.66 17.15 67.87 60.99 6.92 43.34 19.39 14.47 26.05 22.04 40.99 11.22 96.61 83.34 27.35 57.36 71.41 61.54 43.65 0.00 18.49 85.34 21.24 7.00 5.00 11.00 7.00 78.54 7.28 5.73 5.09 7.28 5.02 LINE/CHORD DIRECTION N53° 31' 36.02"W N38° 50' 12.36"W S56° 43' 29.55"W N32° 18' 19.88"W N22° 36' 38.46"W N00° 39' 06.74"W N15° 55' 50.08"E N34° 52' 59.20"E N49° 25' 15.07"E N65° 14' 19.10"E N81° 14' 39.81"E N85° 16' 28.99"E N89° 34' 38.87"E S78° 27' 33.03"E N70° 58' 44.41"E S12° 02' 50.63"E S30° 08' 22.08"E S34° 06' 38.99"E S37° 33' 37.84"E S36° 45' 38.09"E S36° 43' 21.92"E S33° 03' 39.27"E S16° 15' 35.07"E S14° 03' 00.93"W S35° 18' 53.77"W S56° 30' 14.21"W ??? N85° 55' 28.47"W S78° 14' 16.76"W S30° 14' 12.97"W N30° 14' 12.97"E S59° 45' 47.03"E S59° 45' 47.03"E S30° 14' 12.97"W S59° 45' 47.03"E N30° 14' 12.97"E N64° 56' 07.21"E N38° 57' 32.46"E N30° 14' 12.97"E N82° 04' 01.23"E DELTA 11° 45' 33" 14° 50' 06" 27° 16' 47" 2° 02' 50" 18° 27' 33" 29° 36' 39" 10° 41' 49" 24° 59' 37" 5° 22' 55" 29° 09' 10" 9° 00' 42" 5° 49' 07" 22° 29' 39" 19° 27' 49" 6° 21' 12" 32° 29' 58" 22° 56' 39" 25° 03' 50" 20° 27' 22" 8° 41' 00" 198° 29' 52" Parcel Table NUMBER L136 L137 L138 L139 L140 C147 L141 L142 L143 L144 L145 C148 L146 L147 C149 L36 L35 L17 L13 L14 L12 L11 C36 L10 C35 C28 C29 C30 C31 C32 L7 C33 L127 C142 L128 C141 L32 L31 C61 C62 RADIUS 13.50 0.25 171.55 5.32 8.00 133.20 276.25 114.26 127.89 171.02 409.35 80.34 4.96 57.71 57.45 LENGTH 5.24 5.16 6.41 67.80 39.51 5.88 9.78 8.50 8.65 10.51 19.57 0.61 17.82 209.73 108.25 26.44 22.32 5.85 13.97 5.00 8.00 10.77 3.83 15.32 11.98 27.40 94.54 97.20 80.39 75.48 42.96 57.13 10.19 10.53 17.34 8.80 4.65 16.64 34.26 16.25 LINE/CHORD DIRECTION S89° 45' 27.47"E S64° 20' 19.20"E S30° 14' 12.95"W S59° 45' 47.06"E S30° 20' 42.48"W S10° 39' 33.61"W S09° 25' 40.03"E S72° 22' 17.49"W N11° 42' 55.77"W S77° 20' 47.39"W N09° 55' 03.97"W N79° 50' 25.43"W S30° 14' 13.11"W N59° 45' 47.03"W N43° 44' 12.63"W S64° 15' 15.18"W N25° 36' 18.60"W N25° 33' 15.08"W N24° 46' 46.68"W N65° 24' 05.01"E N24° 35' 54.99"W N65° 24' 05.01"E N51° 08' 27.85"E N30° 01' 31.49"E N12° 51' 33.15"W N49° 51' 04.07"W N31° 14' 06.95"W N01° 15' 28.67"W N40° 24' 00.35"E N69° 19' 04.03"E N82° 32' 59.04"E N89° 00' 25.05"E S86° 17' 17.70"E N14° 23' 22.10"W N12° 31' 49.21"W N44° 07' 04.10"E N29° 57' 21.82"W N64° 08' 16.16"E N51° 33' 33.76"W S41° 06' 04.28"E DELTA 24° 58' 34" 139° 50' 43" 36° 09' 13" 41° 14' 12" 85° 46' 09" 11° 47' 07" 19° 36' 31" 48° 44' 33" 36° 00' 59" 25° 17' 18" 7° 59' 45" 7° 30' 24" 101° 36' 31" 34° 00' 58" 16° 12' 25" Parcel Table NUMBER L34 L33 L37 L38 L39 C64 C63 C41 C38 L20 L16 C37 L15 L19 L18 RADIUS 26.74 54.22 453.24 9.00 10.84 LENGTH 5.38 8.09 7.84 5.95 17.50 40.23 59.26 59.75 13.51 18.15 2.99 6.09 11.01 32.74 12.96 LINE/CHORD DIRECTION S29° 51' 58.03"E S26° 57' 03.86"E N24° 38' 50.24"W N29° 14' 00.41"W N64° 08' 16.16"E N79° 22' 36.36"W S81° 26' 52.62"E N63° 34' 11.28"W S77° 13' 17.19"W S30° 15' 43.12"W S65° 22' 36.15"W S51° 32' 30.09"W S24° 35' 54.99"E N64° 40' 16.04"E S65° 37' 01.85"W DELTA 86° 11' 50" 62° 37' 27" 7° 33' 14" 86° 01' 49" 32° 10' 55" NO SCALE1HORIZONTAL CONTROL PLAN- TABLES HORIZONTAL CONTROL PLAN- TABLES C2.2 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 OH OH OH OH OH O H OH OH OH OH OH OH OH OH OH OH O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H B X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BB B B X X X X X X X X X X X X X X X X BS BS BB NO PARKING B X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BB B B X X X X X X X X X X X X X X X X BS BS BB NO PARKING OH OH OH OH OH O H OH OH OH OH OH OH OH OH OH OH O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H UPPER LAKE ST O P C5.1 1 C5.0 3 C5.0 2 C5.0 1 C5.0 4 1.3 2.2 1.1 2.1 ACCESSIBLE PARKING PARKING STRIPE 2.3 PERMEABLE CONCRETE PARKING LOT RESINPAVING SEE LANDSCAPE DRAWINGS 1.2 AGGREGATE BASE PAVING SEE LANDSCAPE DRAWINGS AUTOMATIC GATE PER DISTRICT STANDARDS SEE TRAFFIC PLAN FOR SIGNAGE AND STRIPING ON BEAR CREEK ROAD WHEEL STOP (TYP) 2.4 C5.0 1PERMEABLE CONCRETE WITH MACROFIBER SCALE: 1" = 20' @ 24"X36"1 SIGNAGE, STRIPING, AND PAVEMENT PLAN-PARKING LOT LAYOUT NO R T H 00 20'40' SCALE: 1" = 20' @ 24"X36" SIGNAGE, STRIPING, AND PAVEMENT PLAN-PARKING LOT LAYOUT C3.0 NOTE: 1.DETAIL 1 ON SHEET C5.1 PROVIDES DETAILS ON SIGN MATERIALS AND INSTALLATION. VEHICULAR SIGN SCHEDULE SCHEDULE DESCRIPTION CA MUTCD DESIGNATION NO. SIGNS SIZE (W X H, INCHES) STOP R1-1 1 30 X 30 ADA ACCESSIBLE PARKING R99 2 8.5 X 8.5 VAN ACCESSIBLE R7-8b 1 4.25 X 8.5 PAVEMENT STRIPING SCHEDULE SCHEDULE DESCRIPTION NO.DETAIL # SHEET # STOP 1 5 C5.1 CENTERLINE DRIVEWAY 1 4 C5.1 PARKING STRIPE 47 4 C5.0 NO PARKING 1 6 C5.1 1.1 1.2 1.3 1.0 2.1 2.2 2.3 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 2.0 MATCHLINE- SEE SHEET C3.0 2.4 PROPOSED PATH SEE LANDSCAPE PLANS O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H OH OH OH OH OH OH O H O H O H OH O H O H O H OH O H O H O H O H O H OH O H O H O H OH O H O H OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH X X X X X X X X X X X X X X X X X X X XXXX XXX X X X X X X X XXXXX XXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 9 7 5 9 7 6 980 980 98 1 982 983 984 985 986 97 7 9 8 0 9 7 9 9 7 8 976 977 97 9 97 8 97 7 979 9 7 5 9 7 4 MATCH (E) GRADE ELEV: 975.91' TYP PATH SECTIONC4.2 35% M A X R U N N I N G S L O P E - S E E N O T E 1 1.8% MAX CROSS SLOPE SEE NOTE 1 BEAR CREE K R O A D B E A R C R E E K R O A D 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 SCALE: 1" = 20' @ 24"X36"1 GRADING AND DRAINAGE PLAN - POND LAYOUT NO R T H 00 20'40' SCALE: 1" = 20' @ 24"X36" GRADING AND DRAINAGE PLAN - POND LAYOUT C4.0 MATCHLINE- SEE SHEET C4.1 NOTE: 1.MAXIMUM RUNNING SLOPE SHALL BE 5% AROUND ENTIRE PATHWAY SHALL. MAXIMUM CROSS SLOPE SHALL BE 1.8% ACROSS ENTIRE SLOPE. OH OH OH OH OH OH O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H X X X X X X X X B X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BB B B X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BS BS BB NO PARKING 98 7 9 8 8 9 8 9 9 9 0 98 7 98 6 98 5 98 4 9 8 9 98 8 98 7 98 6 985 984 98 3 98 2 98 1 97 9 97 8 97 7 97 6 97 5 97 4 97 3 97 2 9 8 1 9 8 0 9 7 9 978 9 8 1 98 2 9 8 0 98 1 983 9 8 0 9 7 4 9 7 6 0 + 0 0 0+ 5 0 1+00 1+ 5 0 2+ 0 0 2+ 5 0 3+ 0 0 3+ 5 0 4+ 0 0 4+ 1 4 0+50 2 C4.2 2 C 4 . 2 3+ 7 5 2 C4 . 2 97 5 972 973 0+50 1 + 7 5 2+ 9 0 2 C4 . 2 3+ 7 5 PARKING LOT CENTER ALIGNMENT (E) CMP INV IN: 979' INV OUT: 953' BOC: 980.33' TOC: 980.83' ELEV: 983.66' ELEV: 987.60' ELEV: 987.60' ELEV: 990.40' ELEV: 990.40' ELEV: 980.89' BOC: 980.50' TOC: 981.00 BOC: 980.13' TOC:980.63' BOC: 979.66' TOC: 980.16' BOC: 975.00' TOC: 975.50' ELEV: 974.50' BOC: 974.00' TOC: 974.50' SLOPE AWAY FROM BLDG @ 2% MAX COUNTY ROAD RIGHT-OF-WAY POND OVERFLOW PIPE CONNECTION BOC: 971.50' TOC: 972.00' BOC: 973.00' TOC: 973.50' 30" HDPE PIPE TO (E) CULVERT C5.0 7 5% M A X R U N N I N G S L O P E 1.8% MAX CROSS SLOPE ELEV: 982.33' ELEV: 982.66' BE A R C R E E K R O A D BOC: 975.50' TOC: 976.00' ELEV: 981.40' 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 SCALE: 1" = 20' @ 24"X36"1 GRADING AND DRAINAGE PLAN- PARKING LOT LAYOUT NO R T H 00 20'40' SCALE: 1" = 20' @ 24"X36" GRADING AND DRAINAGE PLAN- PARKING LOT LAYOUT C4.1 MATCHLINE- SEE SHEET C4.0 NOTE: 1.MAXIMUM RUNNING SLOPE SHALL BE 5% AROUND ENTIRE PATHWAY SHALL. MAXIMUM CROSS SLOPE SHALL BE 1.8% ACROSS ENTIRE SLOPE. EL E V A T I O N ( F T ) STATION (FT) CENTERLINE PROFILE 960 965 970 975 980 985 990 995 1000 960 965 970 975 980 985 990 995 1000 0+10 98 7 . 0 99 0 . 0 0+20 98 5 . 2 98 9 . 7 0+30 98 5 . 0 98 9 . 3 0+40 98 5 . 5 98 8 . 5 0+50 98 5 . 2 98 7 . 6 0+60 98 4 . 6 98 6 . 9 0+70 98 4 . 0 98 6 . 0 0+80 98 3 . 4 98 5 . 0 0+90 98 3 . 0 98 4 . 0 1+00 98 3 . 0 98 3 . 2 1+10 98 3 . 0 98 3 . 1 1+20 98 2 . 8 98 2 . 8 1+30 98 2 . 9 98 2 . 6 1+40 98 3 . 0 98 2 . 2 1+50 98 2 . 8 98 1 . 9 1+60 98 2 . 4 98 1 . 5 1+70 98 1 . 8 98 1 . 1 1+80 98 1 . 1 98 0 . 9 1+90 98 0 . 7 98 0 . 7 2+00 98 0 . 4 98 0 . 6 2+10 98 0 . 2 98 0 . 4 2+20 97 9 . 9 98 0 . 2 2+30 97 9 . 5 98 0 . 0 2+40 97 9 . 1 98 0 . 0 2+50 97 8 . 9 97 9 . 9 2+60 97 8 . 6 97 9 . 5 2+70 97 8 . 2 97 9 . 1 2+80 97 7 . 4 97 8 . 9 2+90 97 6 . 4 97 8 . 3 3+00 97 6 . 0 97 7 . 9 3+10 97 5 . 4 97 7 . 8 3+20 97 5 . 0 97 7 . 0 3+30 97 4 . 8 97 6 . 7 3+40 97 4 . 5 97 6 . 1 3+50 97 4 . 2 97 6 . 0 3+60 97 4 . 0 97 5 . 7 3+70 97 3 . 8 97 4 . 8 3+80 97 3 . 6 97 4 . 4 3+90 97 3 . 5 97 3 . 9 4+00 97 3 . 3 97 3 . 3 4+10 97 3 . 2 97 3 . 2 TWO-LANE DRIVEWAY PARKING LOT- PERMEABLE CONCRETE WITH MACROFIBER PARKING LOT- PERMEABLE CONCRETE PATH ROAD VEGETATED AREA 0+50 970 980 990 1000 970 980 990 1000 0 100-10-20-30-40 PATH VEGETATED AREA PARKING LOT VEGETATED AREAPATH 1+75 960 970 980 990 1000 960 970 980 990 1000 0 10 20 30 400-10-20-30-40-50-60-70-80-90-100 PATH PARKING LOT 3+75 960 970 980 990 960 970 980 990 0 10 20 30 40 500-10-20-30-40-50 VEGETATED AREA PATH 0+25 960 970 980 990 1000 960 970 980 990 1000 MAX CROSS SLOPE 1.8% VEGETATED AREA 960 970 980 990 960 970 980 990 PARKING LOT PATH VEGETATED AREA 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 NO SCALE2PARKING LOT CROSS SECTIONS (TYP) GRADING AND DRAINAGE PLAN- SECTIONS AND PROFILES C4.2 NO SCALE1PARKING LOT AISLE CENTERLINE PROFILE NO SCALE3TRAIL CROSS SECTION (TYP) TYP DRIVEWAY ENTRANCE SECTION FOR STATIONS 0+00 TO 1+00 TYP PARKING SECTION FOR STATIONS 3+50 T0 4+00 TYP PARKING SECTION WITH 6" CURB FOR STATIONS 2+00 TO 3+50TYP PARKING SECTION FOR STATIONS 1+00 TO 2+00 NO PARKING RESIN PAVING SEE LANDSCAPE DRAWINGSACCESSIBLE PARKING SIGN C5.0 5 WHEEL STOP (TYP)C5.0 2 ACCESSIBLE PERMEABLE CONCRETE PARKING SPOT C5.0 1 18' 12' MIN VAN STALL 5' MIN ACCESS 8' MIN ADA STALL 12" HIGH LETTERS TYP 2' TYP EQ TYP EQ TYP CL TYP EDGER OR FLUSH CURB 6" CLASS II AGGREGATE BASE (95% COMPACTION) 6" MOISTURE CONDITIONED PREPARED SUBGRADE (95% COMPACTION) PERMEABLE CONCRETE PARKING LOT 6" PERMEABLE CONCRETE 6" PERMEABLE CONCRETE 6" AGGREGATE BASE (95% COMPACTION) 6" MOISTURE CONDITIONED PREPARED SUBGRADE (95% COMPACTION) 1.8% MAX CROSS SLOPE ACCESSIBLE PERMEABLE CONCRETE PARKING SPOT 9' 6" CLASS II AGGREGATE BASE (95% COMPACTION) 6" MOISTURE CONDITIONED PREPARED SUBGRADE (95% COMPACTION) PERMEABLE CONCRETE WITH MACROFIBER 6" PERMEABLE CONCRETE WITH MACROFIBER 6" CLASS II AGGREGATE BASE (95% COMPACTION) 6" MOISTURE CONDITIONED PREPARED SUBGRADE (95% COMPACTION) PERMEABLE CONCRETE PARKING LOT EDGE 6" PERMEABLE CONCRETE 6" X 12" PERMEABLE CONCRETE EDGER WITH #4 REBAR EVENLY SPACED 95% COMPACTION BELOW EDGER 2' - 0 " 24" EDGE OF ASPHALT CONCRETE WHEEL STOP (2) 1 2 X 24" REBAR ANCHORS (RECESS REBAR 1 2" BELOW TOP OF WHEEL STOP) 1' - 6 " (T Y P E A S I D E ) 6' - 0 " 5" (N) WHEELSTOP (TYP)5.2 3 ASPHALT CONCRETE PARKING SPACE 9'-0" 18' -0"4" STRIPE WITH WHITE THERMOPLASTIC 1'-0" 2'-0" 70 SQUARE INCH METAL SIGN W/ REFLECTIVE PAINT, BLUE BORDER, AND WHITE BACKGROUND. BLUE SYMBOL OF ACCESSIBILITY IN ACCORDANCE WITH CBC FIGURE 11A 2" HIGH BLUE LETTERS, HELVETICA MEDIUM, W/ REFLECTIVE PAINT, BLUE BORDER, AND WHITE BACKGROUND. VAN ACCESSIBLE $250 FINE 4'-5" 4'-5" SYMBOL OF ACCESSIBILITY PROPORTION IN ACCORDANCE WITH CBC FIGURE 11A WHITE BORDER WITH BLUE BACKGROUND ACCESSIBLE PARKING STRIPING ACCESSIBLE PARKING SIGN TYPICAL STEEL POSTC5.0 6 ℄ 212" O.D. GALV. PIPE OR BREAKAWAY PIPE AS DIRECTED BY DISTRICT CIP CONC. FOOTING (SLOPE TO DRAIN) UNDISTURBED SOIL, TYP. 7'-0" MIN. 6" 12"X18" TRAFFIC/ REGULATORY SIGN, E.G. SPEED LIMIT -CONFIRM TYPE OF SIGN AND WORDING WITH DISTRICT METAL PIPE W/ CONC. FOOTING SINGLE CLAMP U-BRACKET, HAWKINS (800-772-3995) M2G-C2BS OR EQUIVALENT SIGN ATTACHMENT 3'-6" 3'-0" 18" MIN ENGINEERED FILL MATERIAL PER GEOTECHNICAL SPECIFICATIONS (95% RELATIVE COMPACTION) ENGINEERED FILL OR COMPACTED NATIVE MATERIAL BACKFILL COMPACTED TO AT LEAST 90% RELATIVE COMPACTION WITH APPROVED ON-SITE MATERIAL CONFORM TO (E) PAVEMENT TRENCH UNDER PAVEMENT AREAS TRENCH OUTSIDE OF PAVED AREAS PIPE 6" TYP BOTH SIDES MIN 12" COVER WARNING TAPE 6" BEDDING 12" MIN (TYP) UNDISTURBED (E) NATIVE MATERIAL 4" MIN (N) 36" X 36" UTILITY BOX 30" Ø HDPE N-12 POND OVERFLOW PIPE (2% MAXIMUM SLOPE) (N) HDPE PIPE END CAP (N) HDPE 45° FITTING (N) INSERT-A-TEE FLANGE FITTING (E) 60"Ø CMP CULVERT C5.0 10 C5.0 9 CIVIL DETAILS- PARKING LOT DETAILS C5.0 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 SCALE: AS DIMENSIONED1PAVING AND PARKING SECTIONS SCALE: AS DIMENSIONED2WHEEL STOP SCALE: AS DIMENSIONED4PARKING SPOT DIMENSIONS SCALE: AS DIMENSIONED3ACCESSIBLE PARKING DIMENSIONS SCALE: AS DIMENSIONED6SIGN INSTALLATION SCALE: AS DIMENSIONED5ACCESSIBLE PARKING SIGN AND STRIPING SCALE: AS DIMENSIONED8TYPICAL TRENCH DETAIL SCALE: AS DIMENSIONED7POND OVERFLOW PIPE CONNECTION SCALE: AS DIMENSIONED9UTILITY BOX SCALE: AS DIMENSIONED10INSERT-A-TEE FLANGE FITTING SUPPORT POST ELEVATION GATE SECTION ELEVATION 23' - 10" CLR. MIN. 2" 11'-10" 4'-0" TYP. 4" 1'-3" 3'-10" 12" PLATE W/ 3 4" DIA. HOLE, 14" DEEP, CENTERED TO ACCEPT 3 4" BALL BEARING GATE TUBE STL.: 23 8"Ø, 14" TUBE STL., TYP. CAPPED HANGING POST SECTION: 412"Ø, 14" TUBE STL. FINISH GRADE 9" TYP. 3'-10" PLAN VIEW (X) HANGING POST DEPTH (SEE CHART) 1'-3" 4" CLR. (Y) HANGING POST FOOTING DEPTH (SEE CHART) GATE SLIPPED OVER SUPPORT POST 12"Ø ROUND BAR, TYP. CAPPED SUPPORT POST: 312" O.D., 14" TUBE STL. W/ 12"W, 316" BANDS, SPLIT AND WELDED AT 12" AND 43" FROM TOP FOR SHIMS 12" TOP PLATE, TYP. R=5" EQ.EQ. CAPPED GATE LOCKING POST: 312"Ø, 14" TUBE STL. HANGING POST DEPTH (X) 7'-0" 7'-6" 8'-0" HANGING POST FOOTING DIA. (Y) 2'-0" 1'-6" 1'-0" SEE CHART 4" CLR. CIP CONC. FOOTING, SLOPE TO DRAIN, TYP. CHAIN NUBS 12"Ø ROUND X 1 12"BAR E E E E E E E E E E E E E E EEEEEEEEEEEEE E E E E E E E E E E E E E E E E E E E E E E C5.1 1DOUBLE LEAF ACCESS GATE (N) ELECTRIC PANEL TO BE SUPPLIED BY CONTRACTOR (N) ELECTRICAL WIRING (FROM RRFB POWER SOURCE TO ACTUATED ARM) 4"X4" PT DOUGLASS FIR OR EQUIVALENT (TYPICAL POST INSTALLATION)C5.0 6 DISTANCE VARIES 4" W WHITE SOLID RIGHT EDGE LINE (TYP) 4" W YELLOW STRIPED CENTERLINE STOP 1'-0" STOP BAR MARKING 6' PAVEMENT MARKINGS AND WORDS SHALL BE WHITE 9'-9" STOP SIGN WHITE THERMOPLASTIC NO PARKING 2' 6' 3' WHITE THERMOPLASTIC 4" WIDE WHITE TERMOPLASTIC DRIPLINE TYPICAL TREE 4' TALL SAFETY FENCE INFORMATIONAL SIGNS WOOD OR STEEL POST CIVIL DETAILS- GATE AND DRIVEWAY DETAILS C5.1 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 SCALE: AS DIMENSIONED1AUTOMATIC DOUBLE LEAF ACCESS GATE SENTRY 300 SOLAR POWERED GATE OPENER OR EQUIVALENT3GATE CONTROLLER NOTES: 1.THE GATE CONTROLLER SHALL BE INSTALLED ON THE DOUBLE LEAF ACCESS GATE. THE LOCATION SHALL BE VERIFIED WITH MROSD BEFORE INSTALLATION. 2.ALL CONTROLLER COMPONENTS SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS 3.THE LEAVES IN THE DOUBLE LEAF ACCESS GATE SHALL LOCK IN THE OPEN POSITION AT EACH SIDE OF THE DRIVEWAY. SCALE: AS DIMENSIONED4CENTERLINE DRIVEWAY SCALE: AS DIMENSIONED5STOP SCALE: AS DIMENSIONED6NO PARKING SCALE: NTS2RESOURCE PROTECTION FENCING (TYP) O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H OH OH OH OH OH OH O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH X X X X X X X X X X X X X X X X X X X XXXX XXX X X X X X X X XXXXX XXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 9 7 5 9 7 6 980 980 98 1 982 983 984 985 986 97 7 9 8 0 9 7 9 9 7 8 976 977 97 9 97 8 97 7 979 9 7 5 9 7 4 C6.2 3 STRAW WATTLES AND TEMPORARY FENCE AROUND PERIMETER OF STAGING AREA C6.2 2 CONCRETE WASHOUT SEED AND MULCH SEE LANDSCAPE DRAWINGS SEED AND MULCH SEE LANDSCAPE DRAWINGS X X X X X X X X X X X X X SCALE: 1" = 20' @ 24"X36"1 EROSION CONTROL PLAN - POND LAYOUT NO R T H 00 20'40' SCALE: 1" = 20' @ 24"X36" EROSION CONTROL PLAN - POND LAYOUT C6.0 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 MATCHLINE- SEE SHEET C6.1 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X OH OH OH OH OH OH O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H O H X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X B X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BB B B X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BS BS BB NO PARKING 98 7 9 8 8 98 9 9 9 0 98 7 98 6 98 5 98 4 9 8 9 98 8 98 7 98 6 985 984 98 3 98 2 98 1 97 9 97 8 97 7 97 6 97 5 97 4 97 3 97 2 9 8 1 9 8 0 9 7 9 978 9 8 1 98 2 9 8 0 98 1 983 9 8 0 9 7 4 9 7 6 97 5 972 973 C6.2 3 STRAW WATTLES AROUND PERIMETER OF STAGING AREAC6.2 2 SEED AND MULCH SEE LANDSCAPE DRAWING EROSION CONTROL BLANKET C6.2 1 X X X X X X X X STABILIZED CONSTRUCTION ENTRANCEC6.2 4 CONCRETE WASHOUT SCALE: 1" = 20' @ 24"X36"1 EROSION CONTROL PLAN- PARKING LOT LAYOUT NO R T H 00 20'40' SCALE: 1" = 20' @ 24"X36" EROSION CONTROL PLAN- PARKING LOT LAYOUT C6.1 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 MATCHLINE- SEE SHEET C6.0 12" MIN. ISOMETRIC VIEW 3' BLANKETS SHALL BE INSTALLED VETICALLY DOWNSLOPE MIN. 4" OVERLAP EROSION CONTROL BLANKET ANCHOR (SEE DETAIL A) STAPLE, TYP. SEE EROSION CONTROL NOTES FOR STAPLE PATTERN INFORMATION 4' DETAIL A: EROSION CONTROL BLANKET ANCHOR DETAIL 1' STAPLES 1 " 12" 6" 112" 8"-10" Ø FIBER ROLL STRAW WATTLE 3"-5" 1" X 2" X 24" WOOD STAKE SEDIMENT, ORGANIC MATTER AND NATIVE SEEDS ARE CAPTURED BEHIND ROLLS VARIES WITH SLOPE (SEE TABLE) TRENCH AND KEY IN WATTLE FIBER ROLL/ STRAW WATTLE DIRECTION OF FLOW END TURNED UPHILL DIRECTION OF FLOW 25' PLASTIC LINER HAY BALES PLASTIC LINER SECTION A-A NOTES: 1.PLASTIC LINER SHALL BE WRAPPED AROUND AND TUCKED UNDER HAY BALES. 2.CONCRETE WASHOUT SHALL BE INSTALLED IN A LOCATION APPROVED BY THE PROJECT ENGINEER. A A REBAR ANCHORS 10 FT MIN. CORRUGATED STEEL PANELS PLAN VIEW CORRUGATED STEEL PANELS SECTION VIEW ORIGINAL GRADE (E) PATH OR ROAD SCALE: 1:2 @ 24"X36"1 EROSION CONTROL BLANKET EROSION CONTROL PLAN - DETAILS AND NOTES C6.2 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054SCALE: ### @ 24"X36"2 STRAW WATTLES STRAW WATTLE MAX SPACING SLOPE (H:V)SPACING (FT) >1:1 5 2:1 - 1:1 10 4:1 - 2:1 20 6:1 - 4:1 25 <6:1 50 SCALE: ### @ 24"X36"3 CONCRETE WASHOUT SCALE: ### @ 24"X36"4 STABILIZED CONSTRUCTION ENTRANCE EROSION CONTROL NOTES: 1. GENERAL. THE CONTRACTOR SHALL INSTALL, MAINTAIN AND INSPECT TEMPORARY EROSION CONTROL AND TEMPORARY STORMWATER CONTROL MEASURES TO CONTROL SEDIMENT AND RUNOFF IN ACCORDANCE WITH THESE PLANS AND THE COUNTY OF SANTA CLARA REQUIREMENTS. REFER TO LANDSCAPE PLANS FOR PERMANENT LANDSCAPING. 1.1.THE CONSTRUCTION OF THIS PROJECT IS NOT EXPECTED TO OCCUR DURING THE WINTER SEASON (OCTOBER 15TH THROUGH APRIL 15TH). 1.2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY EROSION AND SEDIMENT CONTROL BMP INSTALLATION AND MAINTENANCE. 1.3.EROSION CONTROL MEASURES SHALL BE IMPLEMENTED IN ALL AREAS WHERE SOIL IS DISTURBED. 1.4.EROSION IS TO BE CONTROLLED AT ALL TIMES ALTHOUGH SPECIFIC MEASURES SHOWN ARE TO BE IMPLEMENTED AT ANY TIME RAIN IS FORECASTED. 1.5.ALL EROSION CONTORL AND SOIL CONSERVATION ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS ESTABLISHED BY SANTA CLARA COUNTY AND THE CALIFORNIA BUILDING CODE. 1.6.DISTURBED AREAS SHALL BE STRAWED AND SEEDED AT THE COMPLETION OF THE PROJECT. 1.7.DURING THE CONSTRUCTION PERIOD IF RAIN IS FORECASTED, ALL DISTURBED AREAS SHALL BE COVERED ACCORDING TO THE FOLLOWING GUIDELINES: 1.7.1.OBTAIN STERILE, WEED-FREE WHEAT, BARLEY, OAT, OR RICE STRAW IN ORDER TO PREVENT THE SPREAD OF NOXIOUS WEEDS. AVOID MOLDY, COMPACTED STRAW BECAUSE IT TENDS TO CLUMP AND IS NOT EVENLY DISTRIBUTED. 1.7.2.THE STRAW SHALL BE EVENLY DISTRIBUTED BY HAND OR MACHINE TO THE DESIRED DEPTH AND SHOULD COVER THE EXPOSED AREA TO A UNIFORM DEPTH. 1.7.3.AN APPLICATION RATE OF 2,000 POUNDS PER ACRE SHOULD BE USED. 1.7.4.THERE SHOULD BE A MINIMUM OF 3 - 4" OF STRAW OVER THE SOIL AND NO BARE SOIL SHOULD BE VISIBLE. 1.7.5.ON STEEP OR HIGH WIND SITES, STRAW WILL BE USED FOR EROSION CONTROL AND WILL BE SPREAD AFTER CONSTRUCTION DISTURBANCE. 2. SEED AND MULCH. ALL AREAS ON- AND OFF-SITE EXPOSED DURING CONSTRUCTION ACTIVITIES, IF NOT PERMANENTLY LANDSCAPED PER PLAN, SHALL BE PROTECTED BY MULCHING AND/OR HAND BROADCASTING OF THE FOLLOWING SEED MIX AND INCORPORATED OVER ALL DISTURBED SLOPES: BROMUS CARINATUS 10#/ACRE LEYMUS TRITICOIDES 8#/AC. HORDEUM BRACHYANTHERUM 5#/AC. FESTUCA RUBRA 8#/AC. DESCHAMPSIA CESPITOSA 8#/AC. (IF THE AREA IS SUNNY, REPLACE THIS SPECIES WITH STIPA PULCHRA & ELYMUS GLAUCUS). IF HYDROSEEDING, ADD MULCH AND TACKIFIER TO ABOVE. ALL SEEDS SHALL BE SOURCED FROM THE SANTA CRUZ MOUNTAINS. 2.1 ALL EXCAVATED MATERIAL SHALL BE REMOVED TO AN APPROVED DISPOSAL SITE OR DISPOSED OF ON-SITE IN A MANNER THAT WILL NOT CAUSE EROSION. 2.2 ANY MATERIAL STOCKPILED ON-SITE SHALL BE COVERED WITH PLASTIC, ESPECIALLY DURING THE WINTER MONTHS OR DURING PERIODS OF RAIN. 2.3 SLOPES LESS THAN OR EQUAL TO 20% SHALL BE SEEDED AND COVERED WITH 2 INCHES OF STRAW MULCH. 2.4. EXPOSED SOIL ON SLOPES GREATER THAN 20% SHALL BE SEEDED, COVERED WITH 2 INCHES OF STRAW, AND AN EROSION CONTROL BLANKET. THE EROSION CONTROL BLANKET SHALL BE STAKED IN PLACE PER MANUFACTURERS RECOMMENDATIONS. 2.5 STRAW MULCH COVER SHALL BE SUFFICIENT SO THAT NO BARE SOIL IS VISIBLE. 2.6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SEE THAT ADDITIONAL MEASURES, NECESSARY TO CONTROL SITE EROSION AND PREVENT SEDIMENT TRANSPORT OFF-SITE ARE IMPLEMENTED. 3. STRAW WATTLE. STRAW WATTLES (OR FIBER ROLLS) SHALL BE INSTALLED ALONG THE CONTOUR OF THE SLOPE TO SLOW RUNOFF VELOCITY AND TRAP SEDIMENT. STRAW WATTLES SHALL BE INSTALLED WHEREVER THE DISTURBED SLOPE IS ADJACENT TO A STREAM OR DRAINAGE COURSE. TRENCH DEPTH SHALL BE 14 TO 13 OF THE THICKNESS OF THE WATTLE, AND THE WIDTH SHALL EQUAL THE WATTLE DIAMETER, IN ORDER TO PROVIDE AREA TO BACKFILL THE TRENCH. WOOD STAKES SHALL BE INSTALLED EVERY FOUR FEET THROUGH THE WATTLE AND THE END SHALL BE TURNED UP HILL TO PREVENT RUNOFF FORM GOING AROUND THE WATTLE. 4. CONCRETE WASHOUT. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOCATED A MINIMUM OF 50 FEET FROM STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES. THE CONCRETE WASHOUT FACILITY SHALL BE BELOW GRADE AND CONSTRUCTED WITH A MINIMUM LENGTH AND MINIMUM WIDTH OF 10 FEET. TEMPORARY CONCRETE FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS. THE WASHOUT SHALL HAVE A 10 MIL POLYETHYLENE PLASTIC LINER. WHEN CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR THE WORK, THE HARDENED CONCRETE AND MATERIALS FOR THE WASHOUT SHALL BE REMOVED AND DISPOSED OF. HOLES, DEPRESSIONS, OR OTHER GROUND DISTURBANCES CAUSED BY THE REMOVAL OF THE CONCRETE WASHOUT SHOULD BE BACKFILLED AND REPAIRED. 5. EROSION CONTROL BLANKET. THE EROSION CONTROL BLANKET SHALL BE CONSTRUCTED OF JUTE FIBERS, CURLED WOOD FIBERS, STRAW, COCONUT FIBER, OR A COMBINATION OF THESE MATERIALS. NO PLASTIC MATERIAL WILL BE ACCEPTED. 5.1. CONSTRUCTION GUIDELINES 5.1.1 GRADE AND SHAPE AREA OF INSTALLATION 5.1.2 REMOVE ALL ROCK, CLODS, AND VEGETATIVE OR OTHER OBSTRUCTIONS SO THAT THE INSTALLED BLANKET WILL HAVE DIRECT CONTACT WITH THE SOIL. 5.1.3 LOOSEN 2-3 INCHES OF TOPSOIL ABOVE FINAL GRADE 5.1.4 U-SHAPED WIRE STAPLES, METAL GEOTEXTILE STAKE PINS OR TRIANGULAR WOODEN STAKES CAN BE USED TO ANCHOR MATS TO THE GROUND SURFACE. WIRE STAPLES SHOULD BE A MINIMUM OF 11 GAUGE. METAL STAKE PINS SHOULD BE 3/16 INCH DIAMETER STEEL WITH A 1 ½ INCH STEEL WASHER AT THE HEAD OF THE PIN. WIRE STAPLES AND METAL STAKES SHOULD BE DRIVEN FLUSH TO THE SOIL SURFACE. ALL ANCHORS SHOULD BE 6-8 INCHES LONG AND HAVE SUFFICIENT GROUND PENETRATION TO RESIST PULLOUT. LONGER ANCHORS MAY BE REQUIRED FOR LOOSE SOILS. 5.1.5 EROSION CONTROL BLANKETS AND HYDROSEED SHALL BE INSTALLED ON ALL DISTURBED SLOPES WITH GREATER THAN 20% GRADES. 5.2. INSTALLATION ON SLOPE: 5.2.1 BEGIN AT THE TOP OF THE SLOPE AND ANCHOR THE BLANKET IN A 6 INCH DEEP BY 6 INCH WIDE TRENCH. BACKFILL TRENCH AND TAMP EARTH FIRMLY. 5.2.2 UNROLL BLANKET DOWNSLOPE IN THE DIRECTION OF WATER FLOW. BLANKET SHOULD BE UNROLLED SLOWLY IN A CONTROLLED MANNER TO ACHIEVE DIRECT CONTACT WITH THE SOIL. 5.2.3. THE EDGE OF ADJACENT PARALLEL ROLLS MUST BE OVERLAPPED 2-3 INCHES AND BE STAPLED EVERY 3 FEET. 5.2.4. WHEN BLANKETS MUST BE SPLICED, PLACE BLANKET END OVER END (SHINGLE STYLE) WITH 6 INCH OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12 INCHES APART. 5.2.5. LAY BLANKET LOOSELY AND MAINTAIN DIRECT CONTACT WITH THE SOIL, DO NOT STRETCH. 5.2.6. BLANKETS SHALL BE STAPLED SUFFICIENTLY TO ANCHOR BLANKET AND MAINTAIN CONTACT WITH THE SOIL. STAPLES SHALL BE PLACED DOWN THE CENTER AND STAGGERED WITH THE STAPLES PLACED ALONG THE EDGES. STEEP SLOPES, 1:1 TO 2:1 REQUIRE 2 STAPLES PER SQUARE YARD. MODERATE SLOPES, 2:1 TO 3:1, REQUIRE 1-2 STAPLES PER SQUARE YARD (1 STAPLE 3 O.C.). GENTLE SLOPES REQUIRE 1 STAPLE PER SQUARE YARD. 6. OTHER PROVISIONS 6.1. IF CONSTRUCTION OCCURS BETWEEN OCTOBER 15TH AND APRIL 15TH, EXPOSED SOIL NOT INVOLVED IN IMMEDIATE CONSTRUCTION ACTIVITY SHALL BE PROTECTED FROM EROSION AT ALL TIMES. AFTER APRIL 15TH, EROSION CONTROL MEASURES SHALL BE IN PLACE DURING INCLEMENT WEATHER. 6.2. EROSION CONTROL MEASURES SHALL BE KEPT IN PLACE BY THE CONTRACTOR UNTIL NATIVE VEGETATION HAS BEEN ESTABLISHED AND PROVIDES NECESSARY SLOPE COVER (MINIMUM 70% COVER). 6.3 STABILIZED CONSTRUCTION ENTRANCE SHALL BE LOCATED ON DIRT ROAD JUST PRIOR TO PAVED SURFACE. THE INTENT OF THE STABILIZED CONSTRUCTION ENTRANCE IS TO PREVENT SEDIMENT/SOIL FROM TRACKING ONTO PAVED ROADS. CONTRACTOR IS RESPONSIBLE FOR LOCATING STABILIZED CONSTRUCTION ENTRANCE APPROPRIATELY. B X X X X X X X X X X X BB B B X X X X X X X X X X XXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BS BS BB X X X X X X X X X X NO PARKING 9 7 5 9 7 6 980 980 98 1 982 983 984 985 986 98 7 9 8 8 98 9 9 9 0 98 7 98 6 98 5 98 4 9 8 9 98 8 98 7 98 6 985 984 98 3 98 2 98 1 97 9 97 8 97 7 97 6 97 5 97 4 97 3 97 2 9 8 1 9 8 0 9 7 9 978 97 7 9 8 0 9 7 9 97 8 976 977 97 9 97 8 97 7 9 8 1 98 2 9 8 0 98 1 98 3 9 8 0 9 7 4 9 7 6 979 9 7 5 9 7 4 97 5 972 973 DMA 1 DMA 2 SCALE: 1" = 50' @ 24"X36"1 STORMWATER CONTROL PLAN NO R T H 00 50'100' SCALE: 1" = 50' @ 24"X36" STORMWATER CONTROL PLAN C7.0 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 1525 SEABRIGHT AVE SANTA CRUZ, CA 95062 (831) 426-9054 STORMWATER DATA TABLE DRAINAGE AREA TREATMENT TYPE TOTAL AREA IMPERVIOUS AREA PERVIOUS AREA PERCENT IMPERVIOUS SIZING METHOD RUNOFF COEFFICIENT, C TREATMENT REQUIRED (CF) TREATMENT PROVIDED (CF) SQ. FT ACRES SQ. FT ACRES SQ. FT ACRES DMA-1 PERMEABLE CONCRETE 20,380 0.47 900 0.02 19,480 0.45 77 VOLUME BASED 0.30 1,873 9,740 DMA-2 SELF-TREATING AREA 72,360 1.66 9,760 0.22 39,400 0.90 20 N/A 0.10 N/A N/A LEGEND: DMA BOUNDARY XING TRAIL X X X X X X X X X X X X X X X XX XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X (E) EAST SIDE LEAF OF GATE BC 04, TR UPPER LAKE B E A R C R E E K R O A D BEAR CRE E K R O A D EXISTING SHRINE PROTECT IN PLACE 2 L5.2 MULTI-USE TRAIL (E) GATE, TR (E) TRAIL, TR (E) FENCE, TR 4 L5.1 DRY STACK RETAINING WALL 1 L5.2 RESIN PAVING 1 L5.2 AGGREGATE BASE PAVING (E) FENCE, TR (E) FENCE, TR 4 L5.3 WIRE BARRIER FENCE WATERLINE AT TIME OF TOPOGRAPHIC SURVEY 1 L5.2 RESIN PAVING 4 L5.3 WIRE BARRIER FENCE 4 L5.3 WIRE BARRIER FENCE (E) FENCE, TR 4 L5.3 WIRE BARRIER FENCE (E) FENCE, TR (E) FENCE, TR (E) CONCRETE RISER, TR (E) PATH, TR (E)PAVEMENT, TR (E) BOULDERS, TR BOULDER LOCATIONS REVIEW WITH LANDSCAPE ARCHITECT PRIOR TO PLACEMENT 3 L5.1BENCH - 8 FEET LONG (E) FENCE, TR 1 L5.2 AGGREGATE BASE PAVING 1 2 345 6 7 1" = 20'-0" MATCHLINE - SEE SHEET L2.2 BH ZD SITE CONSTRUCTION PLAN L2.1 NORTH 0 SCALE: 1"=20'-0" 10 20 40 60 SEE SHEET L2.2 FOR LEGEND & NOTES 10/10/17 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 50% CD SUBMITTAL 6/16/17 90% CD 10/10/17 BH BH B XING TRAIL X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BB B B X X X X X X X X X X X X X X X X X X X X X BB NO PARKING (E) POWER POLE & GUY WIRE, TR 2 L5.3 FENCE - DOUBLE SPLIT RAIL FENCE B E A R C R E E K R O A D 1 L5.2 RESIN PAVING 1 L5.2 AGGREGATE BASE PAVING TRUNCATED DOMES, TYP TRAFFIC SIGN, STD PARKING LOT, SCD ADA PARKING SIGN, SCD, TYP. (E) CULVERT APPROXIMATE LOCATION, VIF WHEEL STOP, SCD, TYP.20FT X 30FT CLEAR SPACE HAMMERHEAD TURNAROUND PER SANTA CLARA COUNTY FIRE MARSHALL'S OFFICE STANDARD DETAIL SD16, TURNAROUND B 3 L5.1 BENCH - 6 FEET LONG DRIVEWAY ENTRANCE, SCD 2 L5.2 MULTI-USE TRAIL 1 L5.3 HORSE HITCHING POST 4 L5.1 DRY STACK RETAINING WALL 2 L5.3 FENCE - DOUBLE SPLIT RAIL FENCE VEHICLE GATE DISTRICT STANDARD, SCD PREFABRICATED RESTROOM, SUPPLIED BY OWNER - INSTALLED BY CONTRACTOR 4 L5.3 WIRE BARRIER FENCE 4 L5.3 WIRE BARRIER FENCE 5 L5.3 TRAILHEAD / PRESERVE ENTRANCE TYPE 3 6 L5.3 LOG BARRIER STILE (E) FENCE, TR 3 L5.1 BENCH - 8 FEET LONG WATERLINE AT TIME OF TOPOGRAPHIC SURVEY 2 L5.3 FENCE - DOUBLE SPLIT RAIL FENCE 1 L5.2RESIN PAVING 2 L5.3 FENCE - DOUBLE SPLIT RAIL FENCE 4 L5.3 WIRE BARRIER FENCE (E) SERVICE ROAD (E)WALL & STAIRS - PIP CROSS TO BE INSTALLED BY DISTRICT 3 L5.1 BENCH - 8 FEET LONG (E) SERVICE ROAD (E)CONCRETE COLUMN - PIP WHEEL STOP, SCD, TYP. INSTALL SALVAGED GATE 1 L5.2 RESIN PAVING 1 L5.2 RESIN PAVING PA PA PA 8 10 11 13 12 9 4 L5.3 WIRE BARRIER FENCE PA GATE OPERATOR (E) CONCRETE RISER, TR NEW RECTANGULAR BOULDER 2X2X4 FEET. INSTALL ON TOP OF NEW AGGREGATE BASE - SEE SPECIFICATIONS INSTALL SALVAGED GATE BOOT BRUSH PER SPECIFICATION PRESERVE ENTRANCE SIGN - ALT- H-BRACKET 9 FEET WIDTH, OWNER SUPPLIED - CONTRACTOR INSTALLED 6 L5.3 LOG BARRIER STILE 5 L5.3 TRAILHEAD / PRESERVE ENTRANCE TYPE 3 INFORMATION SIGN, 2 EACH PROVIDED BY DISTRICT INSTALLED BY CONTRACTOR 10 FEET LONG LOGS FROM ON SITE TREES AGGREGATE BASE 4 INCH LAYER 6 L5.1STRIPING BOLLARD 1" = 20'-0" MATCHLINE - SEE SHEET L2.1 NORTH 0 SCALE: 1"=20'-0" 10 20 40 60 BH ZD SITE CONSTRUCTION PLAN L2.2 RESIN PAVING AGGREGATE BASE PAVING BICYCLE BOLLARD PER SPECIFICATIONSBB CONSTRUCTION NOTES 1.REFER TO SPECIFICATIONS FOR SITE FURNISHINGS. 2.SEE COVER SHEET FOR ADDITIONAL ABBREVIATIONS AND LEGEND. EXISTING WIRE FENCEXX BENCH, PER SPECIFICATIONS 8 FEET OR 6 FEET LONG AS SHOWN TO REMAINTR 2 L5.1 1 L5.2 1 L5.2 VERIFY IN FIELDVIF SEE CIVIL DRAWINGSSCD BEAR CREEK ROAD RIGHT OF WAY PLOTTED FROM RECORD INFORMATION. PROPOSED WIRE FENCEXXXX 4 L5.3 EXISTING(E) 10/10/17 1 B FOLDING BOLLARD 5 L5.1 NEW LOCATION FOR EXISTING BOULDER TO BE RELOCATED. SEE DEMOLITION PLAN FOR EXISTING LOCATIONS. SEE TRAFFIC DRAWINGSSTD 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 50% CD SUBMITTAL 6/16/17 90% CD 10/10/17 BH BH EXISTING TREE TO REMAIN PLANTING AREAPA PROTECT IN PLACEPIP TRUNCATED DOMES DETECTABLE WARNING SURFACE PER SPECIFICATIONS SITE CONSTRUCTION LEGEND (E) GATE BC 04, TR UPPER LAKE B E A R C R E E K R O A D BEAR CRE E K R O A D XING TRAIL X X X X X X X X X X X X X X X XX XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 1 2 345 6 7 (E) GATE, TR (E) FENCE, TR, TYP (E) TRAIL, TR (E) PATH, TR 14 3 11 15 13 1 4 9 5 6 12 2 WATERLINE AT TIME OF TOPOGRAPHIC SURVEY BOULDER GROUPING TO BE LAID OUT IN FIELD BY LANDSCAPE ARCHITECT AFTER COMPLETION OF ROUGH GRADING LOCATE BENCH IN FIELD PER LANDSCAPE ARCHITECT DIRECTION ± 25'-0" 8'- 0 " 14'-0" 6'-0" 8'-0" 4'-0" 1" = 20'-0" MATCHLINE - SEE SHEET L3.2 BH ZD L3.1 NORTH 0 SCALE: 1"=20'-0" 10 20 40 60 SEE SHEET L3.2 FOR LEGEND & NOTES LANDSCAPE LAYOUT PLAN 10/10/17 50% CD SUBMITTAL 6/16/17 90% CD 10/10/17 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com B E A R C R E E K R O A D B XING TRAIL X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BB B B X X X X X X X X X X X X X X X X X X X X X BB NO PARKING 8 10 11 13 12 9 24'-0" 6 ' - 0 " CL EQ EQ 10'-2" 8 ' - 1 0 " 1 1 ' - 1 0 " 9 ' - 0 " 10'-2" 4'-0" 4'-0" 10 17 22 20 19 23 18 8 7 16 WATERLINE AT TIME OF TOPOGRAPHIC SURVEY 4 ' - 4 " 5'-0 " 8'- 0 " 6'-0"6'-0" 4'- 0 " 3'- 0 " 3' - 0 " 7' - 0 " 3'-0"3'-0"8'-0" 9 ' - 0 " 1 3 ' - 3 " 13'-0" END FENCE ADJACENT TO GATE POST LAY OUT LOGS FOR LANDSCAPE ARCHITECT'S REVIEW 3'- 0 " T Y P 6 ' - 0 " 6'-0" 8'-0 " 8'-0 " 4'-0 " 1" = 20'-0" MATCHLINE - SEE SHEET L3.1 NORTH 0 SCALE: 1"=20'-0" 10 20 40 60 BH ZD LANDSCAPE LAYOUT PLAN L3.2 LAYOUT LEGEND LAYOUT NOTES 1.WRITTEN DIMENSIONS SUPERCEDE SCALED DIMENSIONS. 2.ALL CURVES SHALL BE SMOOTH AND CONTINUOUS WITH CAREFULLY MATCHED TANGENTS. 3.LAY OUT BENCH LOCATIONS IN FIELD PER LANDSCAPE ARCHITECTS DIRECTION. 4.LAY OUT NUMBERED BOULDERS IN FIELD FOR LANDSCAPE ARCHITECT'S REVIEW PRIOR TO INSTALLATION. TYP TYPICAL EQ EQUAL 10/10/17 9 3 SURVEY MONUMENT (FOUND REBAR) SEE TOPOGRAPHIC SURVEY MAP SURVEY MONUMENT (SET SPIKE) SEE TOPOGRAPHIC SURVEY MAP ALIGN BEAR CREEK ROAD RIGHT OF WAY PLOTTED FROM RECORD INFORMATION. 50% CD SUBMITTAL 6/16/17 90% CD 10/10/17 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com PA PLANTING AREA XING TRAIL X X X X X X X X X X X X X X X XX XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 1 2 345 6 7 UPPER LAKE B E A R C R E E K R O A D BEAR CRE E K R O A D WATERLINE AT TIME OF TOPOGRAPHIC SURVEY TOP OF BANK TREE CANOPY REMOVE 14 SAPLINGS 7 SEQ SOQ 5 QUE AGR 16 RHA CAL 18 RHA CAL 25 RHA CAL 27 RHA CAL ROOT BARRIER ROOT BARRIER 10 ' - 6 " CL CL 1 0 ' - 6 " CL CL 10 ' TY P . 1 0 ' T Y P . 1" = 20'-0" MATCHLINE - SEE SHEET L4.2 BH ZD PLANTING PLAN L4.1 NORTH 0 SCALE: 1"=20'-0" 10 20 40 60 SEE SHEET L4.2 FOR LEGEND & NOTES 10/10/17 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 50% CD SUBMITTAL 6/16/17 90% CD 10/10/17 BH BH B XING TRAIL X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BB B B X X X X X X X X X X X X X X X X X X X X X BB NO PARKING 8 10 11 13 12 9 B E A R C R E E K R O A D WATERLINE AT TIME OF TOPOGRAPHIC SURVEY TOP OF BANK TREE CANOPY EXISTING SHRUB, TR 3 SEQ SOQ 25 RHA CAL 27 RHA CAL 29 RHA CAL 23 RHA CAL 22 RHA CAL 12 MYR COM 29 RHA CAL 10 BUX SEM ROOT BARRIER 10 ' - 6 " CL CL 12'- 6 " C L C L 10'-6" CLCL 3 CED ATL ROOT BARRIER 10 ' TY P . 10' TY P . 1 CER OCC 8 POL MUN 1 RIB SAN 6 MAH AQU 6 POL MUN 11 VAC OVA 1" = 20'-0" MATCHLINE - SEE SHEET L4.1 NORTH 0 SCALE: 1"=20'-0" 10 20 40 60 BH ZD PLANTING PLAN L4.2 10/10/17 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 50% CD SUBMITTAL 6/16/17 90% CD 10/10/17 BH BH PLANTING NOTES 1.SPECIFICATIONS: SEE PLANTING SPECIFICATIONS FOR ADDITIONAL INFORMATION. 2.TOPSOIL: ALL PLANTING AREAS SHALL RECEIVE A SIX INCH LAYER OF NATIVE TOPSOIL AMENDED PER SPECIFICATION, INCLUDING ALL AREAS TO BE SEEDED. 3.TREES: ALL TREES SHALL HAVE STRAIGHT TRUNKS OF UNIFORM TAPER, LARGER AT THE BOTTOM. TRUNKS SHALL BE FREE OF DAMAGED BARK, WITH ALL MINOR ABRASIONS AND CUTS SHOWING HEALING TISSUE. SUCKER BASAL GROWTH AND SUCKER LATERAL GROWTH SHALL BE REMOVED AND TREATED TO ELIMINATE RESPROUTING. NORMAL LOWER SIDE BRANCHING SHALL REMAIN. TREES UNABLE TO SUPPORT THEMSELVES WITHOUT STAKING SHALL BE REJECTED. 4.PROTECTION OF PLANTS: CONTRACTOR SHALL MAINTAIN ALL PLANT MATERIAL IN A HEALTHY GROWING CONDITION PRIOR TO AND DURING PLANTING OPERATIONS. 5.ROOT BARRIER: INSTALL TO DIMENSIONS SHOWN. WHERE NO DIMENSION IS SHOWN, PROVIDE 10' MIN. LENGTH CENTERED ON TREE. 6.BASINS: CONSTRUCT BASINS AS NECESSARY TO WATER PLANTS. BASINS FOR PLANTS TO BE HAND WATERED SHALL REMAIN IN PLACE. BASIN BOTTOMS SHALL DRAIN TO BERM AWAY FROM PLANT STEM. 7.MULCH: INSTALL A 3 INCH DEEP LAYER OF MULCH PER SPECIFICATIONS BENEATH ALL SHRUBS; TAPER TO ADJACENT GRADE AT EDGES. 8.QUALITY: MINIMUM QUALITY OF ALL PLANT MATERIAL SHALL CONFORM TO PREVAILING PUBLISHED SPECIFICATIONS OF THE CALIFORNIA ASSOCIATION OF NURSERYMEN AND THE AMERICAN ASSOCIATION OF NURSERYMEN UNLESS OTHERWISE INDICATED. ADDITIONAL SPECIFICATIONS SHALL BE AS INDICATED ON THE DRAWINGS. ALL CONTAINER-GROWN STOCK SHALL BE GROWN IN ITS CONTAINER FOR AT LEAST SIX MONTHS PRIOR TO ITS PLANTING. CONTRACTOR SHALL ALLOW 1% OF THE QUANTITY OF PLANTS FOR REMOVAL AND INSPECTION. FOLIAGE, ROOTS, AND STEMS OF ALL PLANTS SHALL BE OF VIGOROUS HEALTH AND NORMAL HABIT OF GROWTH FOR ITS SPECIES. ALL PLANTS SHALL BE FREE OF DISEASES, INSECT STAGES, BURNS OR DISFIGURING CHARACTERISTICS. 9.SOD: SOD SHALL HAVE A WELL-DEVELOPED ROOT STRUCTURE SUFFICIENTLY MATURE SO THAT IT WILL HOLD TOGETHER WHEN HELD BY ONE END OF THE ROLL. YELLOWING, BROWN, DISEASED, DRIED, OR PEST INFESTED SOD SHALL NOT BE INSTALLED. ALL SOD SHALL BE INSTALLED IN ACCORDANCE WITH THE GROWER'S RECOMMENDATIONS. 10.QUANTITIES: THE QUANTITIES SHOWN ON THE PLANT LIST AND IN LABELS ARE FOR THE LANDSCAPE ARCHITECT'S USE AND ARE NOT TO BE CONSTRUED AS THE COMPLETE AND ACCURATE LIMITS OF THE CONTRACT. CONTRACTOR SHALL FURNISH AND INSTALL ALL PLANTS SHOWN SCHEMATICALLY ON THE DRAWINGS. 11.SOILS TESTING: SEE SPECIFICATIONS FOR REQUIRED TESTING OF TOPSOIL AND AMENDMENTS. 12.DO NOT APPLY SEEDING TO AREAS BENEATH SHRUBS. PLANTING PLAN LEGEND ROOT BARRIER 3 L5.2 SEEDED GRASSLAND TYPE A SEE SCHEDULE SEEDED GRASSLAND TYPE B - NATIVE BENTGRASS FROM SOD BY DELTA BLUEGRASS COMPANY EXISTING TREE TO REMAIN COAST REDWOOD TREE PLANT SCHEDULE SHRUBS 4 L5.2 BOTANICAL NAME COMMON NAME APPLICATION RATE BROADCAST SEED PLS SEED (LBS/ACRE) BROMUS CARINATUS CALIFORNIA BROME 8 ELYMUS GLAUCUS BLUE WILD RYE 6 HORDEUM BRACHYANTHERUM MEADOW BARLEY 8 FESTUCA RUBRA, MOLATE MOLATE RED FESCUE 6 KOELERIA MACRANTHA JUNEGRASS 1 MELICA CALIFORNICA CALIFORNIA MELIC GRASS 3 NASSELLA PULCHRA PURPLE NEEDLEGRASS 4 NASSELLA CERNUA NODDING NEEDLEGRASS 4 TOTAL LBS PER ACRE 40 SEE SPECIFICATIONS QUANTITY ABBREVIATION BOTANICAL NAME COMMON NAME SIZE SPACING WATER USE HT / SPD REMARKS TREES 3 CED ATL CEDRUS ATLANTICA 'GLAUCA PENDULA' WEEPING BLUE ATLAS CEDAR MINIMUM 8 YEARS OF GROWTH PER PLAN MODERATE 10'-12' HT 3'-4' SPD SERPENTINE VARIETY NOT ACCEPTABLE 1 CER OCC CERCIS OCCIDENTALIS WESTERN REDBUD 15 GAL AS SHOWN VERY LOW 7'-8' HT 2'-3' SPD STANDARD 5 QUE AGR QUERCUS AGRIFOLIA COAST LIVE OAK ACORN PER PLAN VERY LOW - 10 SEQ SOQ SEQUOIA SEMPERVIRENS 'SOQUEL' COAST REDWOOD 15 GAL PER PLAN LOW / MODERATE 6'-7' HT 2'-3' SPD 10 BUX SEM BUXUS SEMPERVIRENS 'SUFFRUTICOSA' TRUE DWARF BOXWOOD 5 GAL 3'-0" OC MODERATE 6 MAH AQU MAHONIA AQUIFOLIUM 'COMPACTA' OREGON GRAPE 1 GAL 2'-0" OC MODERATE 12 MYR COM MYRTUS COMMUNIS TRUE MYRTLE 15 GAL 6'-0" OC MODERATE 14 POL MUN POLYSTICHUM MUNITUM WESTERN SWORD FERN 1 GAL 2'-0" OC MODERATE 189 RHA CAL RHAMNUS CALIFORNICA 'EVE CASE' COFFEE BERRY 5 GAL 3'-6" OC LOW 1 RIB SAN RIBES SANGUINEUM WINTER FLOWERING CURRANT 5 GAL AS SHOWN LOW 11 VAC OVA VACCINIUM OVATUM EVERGREEN HUCKLEBERRY 1 GAL 2'-0" OC MODERATE QUANTITY ABBREVIATION BOTANICAL NAME COMMON NAME SIZE SPACING WATER USE SHRUBS WEEPING BLUE ATLAS CEDAR TREE COAST LIVE OAK TREE GRASSLAND SEED MIX - TYPE A TYPICALTYP 5 L5.2 WESTERN REDBUD TREE 3' - 6 " 2" 3' - 0 " 1'-0" SQUARE SECURING HARDWARE, 1/2" DIAMETER THREADED ROD W/NUTS AND 1/2" WASHERS. CUT RODS 1/4" BEYOND NUTS AND NOTCH OR FILE TO PREVENT REMOVAL RESIN PAVING CONCRETE FOOTING DRAINROCK, 4" LAYER LOOP, WALL MOUNT, COLUMBIA CASCADE, CYCLOOPS MODEL 2174-C GALVANIZED, OR APPROVED EQUAL 6" 2" BOLLARD: COLUMBIA CASCADE, TIMBERFORM MODEL # 2560 OR APPROVED EQUAL45° 1" 1 L5.2 SUBGRADE, COMPACTED TO 95% OR UNDISTURBED SUBGRADE HOLD CONCRETE FOOTING BELOW CONCRETE PAVING FINISH SURFACE 2'-0" SQUARE NOTE: BOLLARD SHALL FOLD AWAY FROM THE STREET, PERPENDICULAR TO CURB 3' - 6 " 1'-6" FOLDING BOLLARD PER SPECIFICATIONS RESIN PAVING1 L5.2 HOLD CONCRETE FOOTING BELOW CONCRETE PAVING 18" ANCHOR BOLTS, 4 EACH FOUR VERTICAL #4 REBAR, 37" LONG PER MANU. SPECIFICATIONS FOUR #3 REBAR HOOP TIES WITH 12" MIN LAP PER MANUFACTURERS SPECIFICATIONS AGGREGATE BASE, CLASS 2, COMPACT TO 95% UNDISTURBED SUBGRADE OR COMPACTED TO 95% 6" BENCH POST 1'-0"Ø AGGREGATE BASE PAVING OR FINISH GRADE WHERE EXISTS 1 L5.2 7/16" Ø HOLE WITH 6-INCH LENGTH OF 3/8" REBAR PROVIDED AND INSTALLED BY CONTRACTOR 3" 2' - 9 " 6" CONCRETE FOOTING AGGREGATE BASE, CLASS 2, COMPACTED TO 95% UNDISTURBED SUBGRADE HOLD TOP OF CONCRETE FOOTING 3" BELOW FINISH SURFACE OR GRADE 1' - 6 " ( ± 1 " ) SEAT: SET LEVEL BENCH PER SPECIFICATIONS FINISH SURFACE, RESIN PAVING FIELD STONE, DRY SET, SEE SPECS HE I G H T V A R I E S , 2 ' - 0 " M A X , SE E G R A D I N G P L A N FINISH GRADE CAP STONE - MORTAR IN PLACE PEA GRAVEL OR 3/4" DRAIN ROCK FILTER FABRIC WRAP 1'-0" 1' - 0 " CLASS 2 AGGREGATE BASE, COMPACT TO 95% SUBGRADE, COMPACT UPPER 8" TO 95% OR UNDISTURBED SUBGRADE1'-0" 6" M I N . 1'-0" 4" PERFORATED DRAIN LINE PER SPECIFICATIONS, DAYLIGHT EACH END OF WALL BA T T E R RESIN PAVING1 L5.2 NOTE: DRY-STACK STONES PER SPECIFICATIONS, MIN. 9"X9", FILL INNER VOIDS WITH MORTAR. 3/4" DRAIN ROCK, 6" DEEP 2/ 3 D I A . 1/ 3 D I A . BOULDER; INSTALL WITH WEATHERED FACE EXPOSED. DIA. VARIES, SEE PLANS SUBGRADE, COMPACTED TO 92% MIN. SECTION FINISH GRADE 1' - 0 " 1'-0"5'-0"5'-0"1'-0" 4" WIDE YELLOW LINE, TYP. 2 L5.1 FOLDING BOLLARD OF BOLLARDCL CL PLAN L5.1SCALE: 1"=1'-0" DRY STACK RETAINING WALL4 LANDSCAPE CONSTRUCTION DETAILS AS SHOWN SCALE: 3/4"=1'-0" BICYCLE PARKING BOLLARD1 SCALE: 3/4"=1'-0" FOLDING BOLLARD2 SCALE: 1"=1'-0" BENCH 3 50% CD SUBMITTAL 6/16/17 90% CD 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com SCALE: 1"=1'-0" BOULDER PLACEMENT5 10/10/17 10/10/17 SCALE: 1/2"=1'-0" STRIPING BOLLARD6 NOTES 1.SEE CIVIL DRAWINGS FOR PARKING LOT AND DRIVE WAY PAVING 2.DEPTH OF AGGREGATE BASE PAVING SHALL BE 81 2 " WHERE ADJACENT TO RESIN PAVING ON THE MULTI-USE TRAIL 3.DEPTH OF AGGREGATE BASE PAVING SHALL BE 6" AT ALL OTHER LOCATIONS 4.PROVIDE GEOTEXTILE FABRIC BENEATH ALL AGGREGATE BASE PAVING 5.EXCAVATE FULL PAVEMENT SECTION INCLUDING SHOULDERS INTO SUBGRADE AFTER 95% COMPACTION HAS BEEN APPROVED. 6.ALL RESIN PAVING AND AGGREGATE BASE PAVING SHALL HAVE NEAT, STRAIGHT EDGES WHERE IT MEETS ADJACENT GRADE. 7.RESIN PAVEMENT ABUTTING STONE WALLS, BOULDERS AND OTHER SITE IMPROVEMENTS ALONG EDGES OF PATH SHALL BE HAND COMPACTED TO ACHIEVE SPECIFIED COMPACTION AND CONSISTENT SURFACE, TYP. FINISH GRADE AGGREGATE BASE PAVING (WHERE OCCURS) 2 1 / 2 " FLUSH FLUSH BACKING LAYER, UPPER 21 2" SHALL BE CLASS 2 AGGREGATE BASE, COMPACT TO 92% 6" RESIN PAVING, WITH ROLLED EDGE PER MANUFACTURER'S RECOMMENDATIONS AGGREGATE BASE, CLASS 2, COMPACT TO 95% SUBGRADE, COMPACT TO 95% GEOTEXTILE FABRIC, PER SPECIFICATIONS SECTION 8" 2" AGGREGATE BASE, CLASS 2, COMPACT TO 95% 2'-0" LEVEL SHOULDER4'-0" CROSS SLOPE PER PLAN RESIN PAVINGL5.2 1 8'-0" OR AS NOTED ON PLAN FLUSH FLUSHFLUSH FINISH GRADE 2'-0" LEVEL SHOULDER FINISH GRADE SECTION AGGREGATE BASE PAVING WHERE OCCURS L5.2 1 OR AS NOTED GEOTEXTILE FABRIC SEE SPECIFICATIONS SUBGRADE COMPACTED TO 95% SHOULDER EDGE RESTRAINT, CLASS 2 AGGREGATE BASE, TAPER AS SHOWN TO EXTENT OF BASE COURSE. FILL OVER TOP OF EDGE RESTRAINT WITH NATIVE SOIL AND COMPACT TO 85%. EXTEND BASE COURSE UNDERNEATH SHOULDER NOTE: 1. SEE DETAIL 1 SHEET L5.2 FOR NOTES. FINISH SURFACE OF ADJACENT PAVING 2" FINISH GRADE OF PLANTING AREA PLASTIC ROOT BARRIER PER SPECS SECTION SET CROWN OF ROOTBALL 2" ABOVE FINISH GRADE 2" MULCH LAYER, WITHIN WATERING BERM - KEEP MULCH 3" AWAY FROM TRUNK - SEE PLANTING PLANS FOR DG MULCH LOCATIONS 6" PLANT TABLETS, PER SPECS - PLACE IN CONTACT WITH ROOT BALL UNAMENDED BACKFILL PER SPECS WATERING BERM, 4" HIGH, MIN. 3'-0" DIAMETER BACKFILL PER SPECS WITH ORGANIC AMENDMENT AND FERTILIZER (UPPER 12" OF PLANT PIT ONLY) 1' - 0 " M I N . I N T O UN D I S T U R B E D SUBGRADE, COMPACT PER GEOTECH REPORT PLANT PIT SCARIFY SIDES & BOTTOM SO I L SECTION TAB AND ANTI-ROTATION PIN, INSTALL 2-4" BELOW GRADE UNAMENDED SOIL, BELOW ROOTBALL SCARIFY AND RECOMPACT TO 90% PLAN NOTES: 1.VERIFY POSITIONING OF STAKES WITH ENGINEER PRIOR TO INSTALLATION. TREE TIES, TYP - 24" CORDED, BLACK RUBBER IN FIGURE-EIGHT LOOP AROUND TRUNK, ATTACH TO STAKES WITH SHEET METAL SCREWS, 2 PER TIE BRACE: 1x6 REDWOOD, CONSTRUCTION GRADE, FASTEN TO STAKES WITH TWO WOOD SCREWS PER STAKE TREE STAKE - 3" DIA. LODGEPOLE PINE STAKE, SET STAKES PLUMB AND AT SAME HEIGHT BELOW BOTTOM BRANCH TO ALLOW TREE TIES TO BE INSTALLED JUST BELOW BOTTOM BRANCH BARK MULCH WATERING BERM PLANTING OR TURF TREE BRACE TIE STAKE MIN. 2X CONTAINER WIDTH 2x CONTAINER WIDTH NOTE: 1.PLACE NO MULCH ON TOP OF ROOTBALL. SET ROOT CROWN 2" HIGHER THAN FINISH GRADE 3" HIGH BERM OUTSIDE OF ROOTBALL FERTILIZER TABLETS, PER SPECS BACKFILL PER SPECS WITH AMENDMENT AND FERTILIZER (UPPER 12 INCHES OF PLANT PIT ONLY) UNAMENDED BACKFILL UNAMENDED SOIL BENEATH ROOTBALL SCARIFY AND RECOMPACT TO 90% SCARIFY SIDES AND BOTTOM 6" EQ EQ EQ CONTAINER PLANTS WITH ON-CENTER SPACING AS INDICATED ON PLANS EDGE OF PLANTING AREA, BACK OF CURB, EDGE OF PAVING OR EDGE OF WALL TRIANGULAR SPACING DIAGRAM L5.2 SCALE: 1/2" = 1'-0" MULTI-USE TRAIL2 LANDSCAPE CONSTRUCTION DETAILS SCALE: 1'=1'-0" RESIN PAVING / AGGREGATE BASE PAVING1 AS SHOWN 50% CD SUBMITTAL 6/16/17 90% CD 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 10/10/17 10/10/17 SCALE: 1" = 1'-0" ROOT BARRIER3 SCALE: N.T.S. TREE PLANTING4 SCALE: N.T.S. SHRUB PLANTING5 SCALE: N.T.S. SHRUB & GROUNDCOVER SPACING6 L5.3 SCALE: 1/2" = 1'-0" FENCE - DOUBLE SPLIT RAIL FENCE2 LANDSCAPE CONSTRUCTION DETAILS SCALE: 1/2"=1'-0" HORSE HITCHING POST1 AS SHOWN SCALE: 1/2"=1'-0" WIRE BARRIER FENCE4 SCALE: 1/2"=1'-0" WIRE BARRIER FENCE BRACING, END, AND CORNER3 10/10/17 50% CD SUBMITTAL 6/16/17 90% CD 16.04 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA HARRIS DESIGN Landscape Architecture Park & Recreation Planning Urban Design 755 Folger Avenue Berkeley, CA 94710 t: 510.647.3792 f: 501.647.3712 www.hd-la.com 10/10/17 SCALE: 1/2"=1'-0" LOG BARRIER STILE6SCALE: 1/4"=1'-0" TRAILHEAD/PRESERVE ENTRANCE TYPE 35 REVIEW SUBMITTAL OCTOBER 2017 NOT FOR CONSTRUCTION 15GB14 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA OF 3 1" = 20' 10/20/17 J. ELIA T. CHANG R E Y A E LI AJEFF LIICVS T TA E OF C A L I F O R NIA REGISTER E D P R O F ESSIONAL E N G I N E ER HEXAGON TRANSPORTATION CONSULTANTS, INC. 4 North Second Street, Suite 400 San Jose, California 95113 Ph: (408) 971-6100 www.hextrans.com Notes and Details E-1 FRONT VIEW (FACING ONCOMING TRAFFIC) FRONT VIEW (FACING ONCOMING TRAFFIC) AHEAD RRFB Crosswalk System Installation 1 FRONT VIEW (FACING ONCOMING TRAFFIC) TRAILX-ING TRAILX-ING AHEAD BEAR CREEK ROAD TRAILX-ING TRAILX-ING TRAILX-ING TRAILX-ING REVIEW SUBMITTAL OCTOBER 2017 NOT FOR CONSTRUCTION 15GB14 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA OF 3 1" = 20' 10/20/17 J. ELIA T. CHANG R E Y A E LI AJEFF LIICVS T TA E OF C A L I F O R NIA REGISTER E D P R O F ESSIONAL E N G I N E ER HEXAGON TRANSPORTATION CONSULTANTS, INC. 4 North Second Street, Suite 400 San Jose, California 95113 Ph: (408) 971-6100 www.hextrans.com E-2 RRFB Crosswalk System Installation 2 NO PARKING ANY TIME NO PARKING ANY TIME AHEAD HERE TO YIELD HERE TO YIELD BEAR CREEK ROAD YIELD TURNING VEHICLES TO REVIEW SUBMITTAL OCTOBER 2017 NOT FOR CONSTRUCTION 15GB14 Midpeninsula Regional Open Space District Alma College Parking Area and Trailhead Bear Creek Redwoods Open Space Preserve Santa Clara County, CA OF 3 1" = 20' 10/20/17 J. ELIA T. CHANG R E Y A E LI AJEFF LIICVS T TA E OF C A L I F O R NIA REGISTER E D P R O F ESSIONAL E N G I N E ER HEXAGON TRANSPORTATION CONSULTANTS, INC. 4 North Second Street, Suite 400 San Jose, California 95113 Ph: (408) 971-6100 www.hextrans.com SS-1 Crosswalk Installation Signing and Striping 3