Loading...
HomeMy Public PortalAboutMS FLOORING SPEC. FINAL INVITATION TO BID REPLACE LAMINATE CLASSROOM FLOORS WATERTOWN MIDDLE SCHOOL WATERTOWN,MA The Town of Watertown, MA is requesting bids from qualified contractors for a project to replace the laminate classroom floors in the Watertown Middle school. Bids must be provided in a sealed envelope and marked "WMS Classroom Floors" no later than Thursday,June 6, 2019 at 11:00 a.m. Bids must be received at the Office of Purchasing Agent, 149 Main Street,Watertown, MA, 02472, on or before Thursday,June 6, 2019, at which time they will be opened and read aloud. A 5% Bid deposit must accompany the bid submittal. No responsibility shall be attached to any person for the premature opening of bids not properly marked. No bid will be accepted at any other location after time and date specified. Specifications and bid forms may be obtained at the Office of the Purchasing Agent during regular business hours, Monday—Friday 8:30 AM until 5:00 PM, or through email at purchasing@ watertown-ma.gov beginning,Wednesday,May 22, 2019. Specifications are free of charge by request. Each general bid must be accompanied with a copy of a Certificate of Eligibility issued by DCAMM showing capacity and classification as being certified in Floor Covering Contracting for up to $200,000. Each bid must be accompanied by a DCAMM Contractor Qualification Statement Update. Any bid submitted without the appropriate Certificate of Eligibility and Contractor Qualification Statement Update shall be invalid. The successful bidder must furnish a certificate of insurance as detailed in bid documents. No bidder may withdraw his/her bid for a period of forty-five days, excluding Saturdays, Sundays and Holidays, after the actual date of the bid opening. An award will be made 45 days of prevailing time. Funding for this project is pending appropriations. The Town of Watertown has the authority to reject any and all bids if in the best interest of the Town to do so. Attention is directed to the minimum wage rates to be paid as determined by the Commissioner of Labor and Workforce Development and the weekly payroll record submittal requirements under the provisions of Massachusetts General Laws, Chapter 149, Section 26 through 27D inclusive. The Town Manager is the Awarding Authority. Raeleen Bandini Purchasing Agent WATERTOWN PUBLIC SCHOOLS SPECIFICATIONS FOR Replace Laminate Classroom Floors L General Purpose 1. The Town of Watertown, through its Department of Public Buildings ("DPB"), is issuing this Invitation for Bids (IFB) from qualified Contractors to replace the laminate classroom floors on the 2nd floor(top floor) of the old section, Side `B" of the Watertown Middle School. 2. The services in this project are subject to M.G.L. Chapter 149, as well as other applicable statutes. The Town reserves the right to solicit other proposals for work that is not a part of this proposal. II. Scope of Work Provide all labor, materials, equipment, tools, and supervision necessary to replace the laminate floor in the classrooms of the second floor(top floor) of the Watertown Middle School, side `B" as directed by the Director of Public Buildings, Watertown School Department, in accordance with the existing conditions and requirements. 1. General Requirements A. Contractor shall furnish all labor, materials, equipment, staging, and trucking as required for work in the Watertown Middle School in accordance with all specifications B. Contractor shall obtain all permits, inspections, licenses, and certificates required for work under this section. All work shall be performed in strict conformity and full compliance with all Federal, State and Local Laws and Regulations including OSHA requirements and Prevailing Wages Laws. C. All technicians shall have a copy of all required certifications and licenses on file. All persons operating a motor vehicle on town or school property must have a copy of the required motor vehicle license on file. D. All work or change orders shall be authorized by the Director of Public Buildings or her designee. Work will not be accomplished until authorized by the Director of Public Buildings. E. All parts installed and/or materials used are to be exact duplicate, or an approved substitute of the original used and/or specified by the manufacturer of the equipment, and in every case, guaranteed as per manufacturer's specification(s). All materials and equipment supplied by the contractor must be free of any lien, claim, or encumbrance. F. Hourly rates shall include all travel and mileage costs. No separate travel, truck, or equipment charges will be accepted. No other method or items of compensation shall be paid other than the basis specified herein. G. Invoices must indicate separate charges for labor and materials and material charges must be itemized. The Watertown School Department reserves the right to audit vouchers for material to determine proper pricing. H. Purchases made by the Watertown School Department are exempt from state sales tax and federal excise taxes and material prices must exclude such taxes. Tax exemption certificates will be furnished upon request. L All workmanship by the successful bidder shall be guaranteed against failure or defects during normal use for a period of one (1) year from the date of completion of the work. All materials and parts supplied by the successful bidder will have the standard manufacturers' warranties. Any defective materials or parts supplied by the contractor shall be replaced at no cost to the Watertown School Department or the Town of Watertown. J. The contractor shall, without expense to the Town, maintain during the term of the agreement the following insurance coverage's with the specified limits: 1) Bodily injury liability insurance, including accidental death, with limits of not less than $500,000 for each occurrence and $1,000,000 aggregate. 2) Property damage liability insurance with a limit of not less than $500,000 per occurrence and $1,000,000 aggregate. 3) If automotive equipment is used in the operation, automotive bodily injury and property damage combined insurance of not less than $500,000 for each occurrence. 4) Workers Compensation and Employer's Liability Insurance as required by Massachusetts General Laws. Ch 152 and 25C, including both statutory lines and Coverage B. The Town of Watertown shall be named as an additional insured on the entire policy with respect to liability. The Insurance Certificate must be written in the name of the Town of Watertown as an additional insured. The certificate must have the endorsement of the insurance agency. The policy must contain a notation that the insurer will give 10 days' notice to the Town of Watertown prior to cancellation, change, or non-renewal of the policy. Notice of occurrence is to be given to the Purchasing Department. All carriers must have an A.M. Best rating of A or better. The Town reserves the right, at its sole discretion, to amend the insurance requirements as set forth above. K. The contractor will sign in at the front office of the Middle School and notify the building custodian each day prior to accomplishing work during work hours. After hours the contractor will be given directions from the Director of Public Buildings on building procedures. L. Contractors shall keep all exterior doors locked when the buildings are unoccupied. M. The prevailing wage rates, as determined by the Massachusetts Department of Labor and Workforce Development and any amendments are applicable to any work performed by the successful bidder. N. AHERA Policy: All work should comply with the Asbestos Hazard Emergency Remediation Act (AHERA) in schools. This federal program regulates disturbance to Asbestos Containing Materials (ACM) in school buildings. The Town has provided Asbestos Management Plans to every school building within the district. These are located in the main office. The Contractor must ensure not to disturb ACM in schools without the proper procedures in place. Contractors will be asked to initial in sign in log acknowledging they are aware of the AHERA policies and potential ACM in the buildings. O. Subcontracting Policy: Prior approval of Town is required for any subcontracted service. In the event the Town authorizes the use of subcontractors, the Contractor is responsible for the satisfactory performance and adequate oversight of its sub-tier contractors. A Contractor company shall possess all mandatory licenses via named company employees for a specific trade in order to be eligible in that trade. The Town reserves the right to disapprove any requested subcontractor for any reason. All provisions of this agreement will bind all subcontractors approved under this agreement. Subcontractors must abide by policies, including security policies, directed in this contract for the prime contractor. P. It shall be the responsibility of the Contractor to establish a sequence of his work to ascertain that all the labor, materials and equipment progress smoothly and on schedule. This may involve coordinating with occupant schedules, school calendar, other work in the building, etc. Q. The contractor shall give personal supervision to the work and shall employ a competent staff during the progress of the work. The contractor shall employ an efficient number of competent workmen who are experienced thoroughly in this type of work. R. The Contractor shall be responsible for all damage resulting from improperly installed equipment, stored materials or equipment, improper sampling techniques, etc. Contractor is responsible for reporting any damage caused by themselves, their agents, employee, or sub-contractors, to the Public Buildings Director or her designee within forty-eight(48)hours upon finding. Contractor will be responsible for all damage to property or injury to the person arising out of the acts or omissions or strict liability of the Contractor, its agents, employees, or subcontractors, at no cost to the Town. . The contractor shall prohibit his employees from smoking, and they will be held responsible for any damage caused by smoking by any of his employees. S. In the event the Town becomes dissatisfied with the performance of any Contractor or personnel assigned to perform the services under this agreement, the Contractor agrees,upon written request of the Town, to assign substitute personnel with the above-listed qualifications. T. The Contractor shall be responsible for the security of all materials, tools, and equipment delivered to the site. All materials and equipment must be secured during and at the end of each workday so that building occupants, employees and the public may not injure themselves. The Town does not provide security or storage areas. U. All tools and equipment and waste must be removed from the job site at the end of each workday unless the Department approves otherwise. Contractor shall not leave any work areas unprotected and shall take all necessary measures to keep these areas in a safe manner. V. Department of Public Buildings, Watertown, CORI Policy: All Vendor(and sub- contractors of Vendor)management and employees are required to have an approved CORI check prior to entering any school. Awarded contract must submit CORI form for all workers that will be upon submission of Finalized Contract. Each contract employee will need to physically verify person and ID with the Town prior to work beginning. 2. Detailed Specifications A. Replace the second floor(top floor) classrooms floors in the old part(Side B) of the building. This includes 12 classrooms, I bathroom, 1 electrical closet and 1 custodial closet. (Replace all floors that currently have wooden looking laminate). See Attachment 1. B. Contractor is to demolish and dispose of the existing laminate flooring, the vinyl tile floor underneath, the underlayment/sub-floor and the vinyl/cove base. Dumpsters will be allowed on site at contractor's expense. C. Contractor will construct new underlayment/sub-floor. Subfloor will be 5-ply, 1/4 inch birch underlayment D. One to two skim coats of Ardex Feather Finish will be added to fix imperfections of the underlayment/sub-floor. E. Mannington Luxury Vinyl Tile Structural Alumina PE139 will be used to match the hallway. Area is approximately 10,300 square feet. F. Gray vinyl/cove base will be included; approximately 1,700 Linear Feet G. Vinyl transitions will be included were required H. Classroom univents/radiators/vents need to be covered during work to prevent dust from entering. I. Contractor will clean classrooms and hallway of dust and debris upon work completion. Classrooms should be clean enough for students to enter rooms upon work completion. J. Furniture will be removed from classrooms by the Town. K. All work is to be accomplished during the hours of 6:30a.m. and 10:30p.m., Monday through Friday). The Director of Public Buildings or his/her designee may authorize work outside normal working hours or days. Students will occupy the building during work hours but will not be allowed on the floor during the construction period. L. Contractors will provide a recommended schedule and procedures of preventative maintenance for all flooring installed upon work completion. M. The contractor must supply all applicable MSDS forms. Pursuant to MGL Chapter I I IF, Sections 8-10, any vendor who receives a contract resulting from this invitation agrees to submit a Material Safety Data Sheet for each toxic or hazardous substance or mixture containing such substance when deliveries are made. The contractor agrees to comply with all requirements set forth in the pertinent laws. III. Award and Contract Term 1. The Town expects to award a contract to the responsible and responsive Contractor that offers the best price. The best price is the lowest price for the total amount of the services rendered. The Contractor must complete and submit their pricing on the Bid Pricing Form, attached as Exhibit A. Please do not alter the forms. Award of a contract will be dependent upon funding for this work. 2. All bidders must sign and submit the attached certificates as to corporate bidder, non- collusion, and tax compliance. Bidders are also required to complete and submit the Qualification and Reference Forms provided in this bid package. By submitting a bid, Contractor is accepting they will be bound to the terms and conditions. 3. Contractor will be regularly and wholly engaged in the installation of the floor. Contractor will provide copies of all licenses/certifications of the company and all employee names that will be working on the project, as well as their license numbers or photocopies of any licenses that may apply. These must be included in the Vendor's response to this IFB. 4. In order to be responsive to this IFB, each bidder's company must have: a. Five (5) or more years in the industry and must hold a required licenses from the Commonwealth of Massachusetts b. Three (3)municipal references indicating the bidder's service quality, response time,personnel qualifications,business and billing office competence, equipment and part locating and pricing ability. c. Any certifications and/or licenses of personnel to be utilized during the term of this contract must be attached to each bid. d. All Bidders must be DCAMM certified in Floor Covering to be considered for Contract award. Bidders will submit DCAMM Certificate of Eligibility with bid submission. 5. Prevailing time and day will be on Thursday, June 6, 2019, at 11:00 am at the Town Hall Lower Hearing Room, 149 Main Street, Watertown, MA, 02472, the Purchasing Department will open and publicly read aloud, every bid received within the time set for receiving bids, irrespective of any irregularities therein. Bidders and other persons properly interested may be present, in person or by representative. No bid received after the closing time and date established in this IFB for the receipt of bids will be considered regardless of the cause for delay. 6. In case of any ambiguity, inconsistency, error or omission in any of the bid documents, or a conflict between the provisions in a bid regulation, the bidder is required to draw such matters to the attention of the Purchasing Department. They will, in turn, clarify the situation as to the true interpretation thereof, and notify each and every person who has received the bid documents through the issuance of an Addendum. The Department will not be held responsible for any oral instructions. If the bidder fails to draw such matters to the attention of the Department, as outlined herein, then his bid conclusively will be presumed to have been based upon the interpretation which may be given subsequently by the Department or, if such conflict is with a law or regulation, the bid conclusively is presumed to be predicated upon full compliance therewith. 7. Failure to comply with the above requirements or any attached specifications will be justification to reject any bids as incomplete. IV. Bonds 8. A Bid Bond, Certified or Cashier's Check in the amount of 5% of bid price made payable to the Town of Watertown must accompany each bid. Unsuccessful bidders' bonds will be returned immediately following the award to the successful bidder. 9. The bid proposal must be filled out on the form prescribed and enclosed in a sealed envelope which shall be endorsed on the outside, "BIDS" and shall indicate the title of the proposal "WMS Classroom Floors" as well as the name and address of the bidder. V. Bid Submission Information 1. Site Visit: A site visit of the WMS classrooms prior to bid submission is scheduled for Thursday, May 30, 2019 at 3:30 p.m. Please meet at the Watertown Middle School front office, 68 Waverly Ave in order that each bidder may acquaint themselves with the circumstances and conditions of this project as it exist. Please call the Department of Public Buildings, 617- 926-7791 for directions and information. By submitting a bid, the contractor agrees and is aware of conditions on the premises, and has reviewed the specifications. 2. Ouestions and Addenda A. Questions regarding the IFB should be in writing and delivered via email to purchasing@watetown-ma.gov or facsimile (617) 972-6403 to: Purchasing Department Attn: Raeleen Bandini 149 Main Street Watertown, MA 02472 purchasing@watertown-ma.gov B. All inquiries related to the requirements should prominently refer to "WMS Classroom Floors" and the bid opening date. In order to be considered, questions must be made in writing and received by the Office of Procurement no later than Thursday, May 30th at 5:00 P.M. Responses to inquiries will be in the form of a numbered addendum to the specifications issued by the Office of Procurement and sent to all parties listed in the bid file as Bidders(s) holding the bid documents. Bidders should base responses only on the specifications including any addenda. C. PLEASE NOTE that all addenda must be acknowledged. Failure to acknowledge any addendum may cause rejection of a bid response as required by Massachusetts General Laws. 3. Required Forms A. The Contractor understands that the following documents included in this bid must be included in the Contractor's response to this bid. If the Contractor fails to provide all documents requested below, the bid may be rejected by the Town. B. Required Documents are documents that must be completed and submitted in your bid response package and received at Procurement before the time set for a receipt. Review your bid response carefully to be sure all requirements are included. C. Unnecessary samples, attachments or other documents not specifically asked for should not be submitted. Please enter the firm price in the space provided on your Cost Sheet. Required Documents are documents that must be completed and submitted in your bid response package and received at Procurement at or before the time set for a receipt. D. The following documents require responses and must be included in the sealed bid response package: 1. Invitation for Bid Coversheet, Signed 2. Exhibit A, Bid Pricing Form 3. Exhibit B Sample Agreement(for Bidder review and comment) 4. Attachment 1 —School Footprint Diagram 5. Exhibit C Wage Rates 6. OSHA Form 7. DCAMM Update Statement 8. DCAMM Certificate of Eligibility(to be provided by the Bidder) 9. CORI Form (to be completed at time of contract award) 10. 5%Bid Bond(5% of the total Bid Price) 11. All other forms to be completed signed and notarized where applicable 12. Contractor key personnel and employee information 4. Submission Format A. Submission of Bids. Bidders are required to submit one (1) original Bid Response. Any Bids must be submitted in sealed envelopes each of which shall be clearly identified on the outside as; package"WMS Classroom Floors". The Bid envelope shall be placed inside a single container(box, envelope, etc.) clearly identified on the outside as Contractor's name; "WMS Classroom Floors" with bid number and opening date. The proposal shall be delivered to the address below: Office of Procurement Town of Watertown Attn: Raeleen Bandini 149 Main Street Watertown, MA 02472 B. Bidder forms shall be completed in ink, computer or by typewriter. Bids by corporations shall be executed in the corporate name by the president or other corporate officer accompanied by evidence of authority to sign and attested by the secretary or an assistant secretary, the corporate address and state of incorporation shall appear below the signature. Bids by partnerships shall be executed in the partnerships name and signed by a partner, whose title shall appear under the signature. The official address of the partnership shall be shown below the signature. Bids by joint ventures shall be similarly executed by all joint venture partners. All names shall be typed or printed below the signatures. C. Each bid submitted shall contain an acknowledgment of receipt of all addenda(the numbers of which shall be filled in on the form). The address to which communications regarding the proposal are to be directed shall be shown. D. A Bidder may correct, modify or withdraw its proposal by written notice received by the Town and the address specified above prior to the time and date specified for receipt of bids. After such time, a Bidder may not change its proposal in a manner prejudicial to Town or fair competition. All submitted Bid pricing will be held firm by the Town for a period of not less than Ninety(90) days. E. The Town shall notify the selected Proposer within the time for acceptance specified above. The selected Bidder will be required to sign a contract with the Town, consistent with this bid proposal, within ninety(90) days of receipt of notice of award. Inclusion of any conditions in a proposal response to this bid proposal, which deviate from this bid proposal, shall be cause for rejection of the proposer's response to this bid proposal. F. Bid responses must be received by 11:00 am EST on Thursday,June 6, 2019. Bid responses received after the bid opening time will not be accepted. Bids delivered to any other office or location will be rejected as non-responsive. If at the time of the scheduled IFB opening, Town Hall or the Office of Procurement is closed due to uncontrolled events such as fire or building evacuation, the IFB opening will be postponed until 11:00 am on the next normal business day. IFB's will be accepted until that date and time. G. The contractor shall indemnify and hold harmless the Town of Watertown and the Watertown School Department, and all of its officers, agents and employees against all suits, claims, and liabilities of every name and nature for any injuries to persons or damage to property arising out of or relating to any acts of, or failure to act by, the Contractor, his/her employees, agents, or subcontractors, in the performance of the work of this contract or failure to comply with the terms and conditions of the contract. H. The Town may cancel this contract at any time without cause upon thirty days prior notice. The Town may cancel this contract at any time for just cause upon 24-hours written notice. Upon termination, the Contractor is only entitled to be paid for work performed and completed and not for lost profits and/or any indirect overhead costs. V1. Schedule of Bid Events EVENT DATE SOLICITATION: RELEASE DATE May 22, 2019 PRE-BID MEETING(NON-MANDATORY) May 30, 2019 3:30 pm DEADLINE FOR SUBMISSION OF WRITTEN QUESTIONS May 30, 2019 11:00 am TO TOWN OF WATERTOWN—OFFICE OF PROCUREMENT OFFICIAL ANSWERS PUBLISHED (ESTIMATED) June 3, 2019 11:00 am SOLICITATION CLOSE DATE/ SUBMISSION DEADLINE June 6, 2019 11:00 am ANNOUNCEMENT OF AWARDED BIDDER(S) No later than July 15, (ESTIMATED) 2019 CONTRACT(S): ESTIMATED CONTRACT START DATE No later than July 15, 2019 EXHIBIT A TOWN OF WATERTOWN PAINTING 2nd FLOOR AT WATERTOWN MIDDLE SCHOOL GENERAL BID FORM TO THE AWARDING AUTHORITY: A. The undersigned proposes to furnish all labor and materials required for Painting Classroom Spaces at Watertown Middle School in Watertown,Massachusetts in accordance with the accompanying plans and specifications prepared by the Town of Watertown for the contract price specified below, subject to additions and deductions according to the terms of the specifications. B. This bid includes addenda number(s) C. The proposed contract price is: (Total of all Items I through 3 on the Itemized Bid Form) DOLLARS($ 1 For Alternate No. N/A Add$ N/A ; Subtract$ N/A The undersigned has completed and submits herewith the following documents: O A five percent(5%)bid depositibid guarantee O Signed Bid Form o Certificate of Non-Collusion, 1 page O Debarment Letter, 1 page o Non Collution, State Tax Status,Corporate Vote, 1 page o Certificate of Eligibility for Floor Covering(DCAM Form CQ7), Supplied by Bidder O Update Statement(DCAM Form CQ3), Supplied by Bidder O Itemized Bid Sheet, 1 page E. The sub-division of the proposed contract price is as follows: Item 1.The work of the General Contractor,being all work other than that covered by Item 2 Total of Item 1: $ N/A Item 2. Sub-bids as follows: Bond Required? Sub-Trade Name of Sub-bidder Amount (Yes or No) N/A N/A $ N/A N/A Total of Item 2: $ N/A The undersigned agrees that each of the above named sub-bidders will be used for the work indicated at the amount stated,unless a substitution is made. The undersigned further agrees to pay the premiums for the performance and payment bonds furnished by sub-bidders as requested herein and that all of the cost of all such premiums is included in the amount set forth in Item 1 of this bid. The undersigned agrees that if s/he is selected as general contractor,s/he will promptly confer with the awarding authority on the question of sub-bidders;and that the awarding authority may substitute for any sub-bid listed above a sub-bid filed with the awarding authority by another sub-bidder for the sub-trade against whose standing and ability the undersigned makes no objection; and that the undersigned will use all such finally selected sub-bidders at the amounts named in their respective sub-bids and be in every way as responsible for them and their work as if they had been originally named in this general bid,the total contract price being adjusted to conform thereto. F. The undersigned agrees that,if s/he is selected as general contractor,s/he will within five days, Saturdays, Sundays and legal holidays excluded,after presentation thereof by the awarding authority, execute a contract in accordance with the terms of this bid and furnish a labor and materials or payment bond,each of a surety company qualified to do business under the laws of the commonwealth and satisfactory to the awarding authority and each in the sum of the contract price, the premiums for which are to be paid by the general contractor and are included in the contract price. The undersigned hereby certifies that s/he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work and that s/he will comply fully with all laws and regulations applicable to awards made subject to section forty-four A of M.G.L. Chapter 30,s 39M. The undersigned certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work;(2)that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration("OSHA")that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and (3)that all employees to be employed in the work subject to this bid have successfully completed a course in construction safety and health approved by the United States OSHA that is at least 10 hours in duration. The undersigned understands that any employee found on a worksite subject to this section without documentation of successful completion of a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration shall be subject to immediate removal. The undersigned further certifies under the penalties of perjury that this bid is in all respects bona fide,fair and made without collusion or fraud with any other person.As used in this subsection the word"person" shall mean any natural person,joint venture,partnership,corporation or other business or legal entity. The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the Commonwealth under the provisions of section twenty-nine F of chapter twenty-nine,or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder. Date (Name of General Bidder) BY: (Signature) (Printed Name and Title of Signatory) (Business Address) (City, State Zip) (Telephone) (Fax) (E-mail address) NOTE: If the bidder is a corporation,indicate state of incorporation under signature,and affix corporate seal;if a partnership,give full names and residential addresses of all partners;and if an individual, give residential address if different from business address. END OF SECTION Exhibit B Sample Contract TOWN OF WATERTOWN, MASSACHUSETTS AGREEMENT FOR PAINTING SECTIONS OF WATERTOWN MIDDLE SCHOOL 2ND FLOOR THIS AGREEMENT made this day of July, 2019 by and between the Town of Watertown, a municipal corporation duly organized under the laws of Massachusetts and having a usual place of business at 149 Main Street Watertown, MA. 02472, acting by and through its Town Manager, hereinafter referred to as the"Town", and a Massachusetts Corporation having a usual place of business at , hereinafter referred to as the "Contractor". WITNESSETH: Whereas, the Town invited the submission of a proposal for Painting Sections of Watertown Middle School, 211 Floor"the Project"; and WHEREAS, the Contractor submitted a bid in response to said invitation, and the Town has awarded the contract therefor to the Contractor. NOW, THEREFORE, the Town and the Contractor agree as follows: 1. Contract Documents. The Contract Documents consist of this Agreement, the purchase description, the Invitation for Bids, Instructions to Bidders, Scope of Services or Specification, and bid submitted by the Contractor, including negotiated modifications to the Plan of Services, if any. The Contract Documents constitute the entire Agreement between the parties concerning the work, and all are as fully a part of this Agreement as if attached hereto. In the event of a conflict between any of the Contract Documents, the document most favorable to the Town, in its sole determination, shall prevail. 2. The Work. The Work consists of Painting Sections of Watertown Middle School, 2nd Floor, as more fully described in the Contract Documents as defined above. 3. Term of Contract. This Agreement shall be in effect from July, 2019 and shall expire on August, 2019,unless terminated earlier pursuant to the terms hereof. 3. Compensation. A. The Town shall pay, as full compensation for items and/or services furnished and delivered in carrying out this Agreement. B. The acceptance by the Contractor of final payment for items and/or services provided shall be deemed a release of the Town from any and all claims and liabilities under this Agreement. C. Neither the Town's review, approval or acceptance of, nor payment for any of the items and/or services provided shall be construed to operate as a waiver of any rights of the Town under the Agreement or any cause of action arising out of the performance of the Agreement. 5. Pavment of Compensation. The Town shall make payments as follows: Payments will be made within 30 days of invoice received. 6. Waae Rates Prevailing Wage Rates as determined by the Commissioner of the Department of Labor and Industries under the provisions of Massachusetts General Laws, Chapter 149, Section 26 to 27G, as amended, apply to this project. It is the responsibility of the Contractor to provide the Town with certified payrolls and to comply with all requirements of the above-cited statutes. The schedules of prevailing wage rates are included in the Contract Documents. 6. Liability of the Town. The Town's liability hereunder shall be to make all payments when they shall become due, and the Town shall be under no further obligation or liability. Nothing in this Agreement shall be construed to render the Town or any elected or appointed official or employee of the Town, or their successors in office, personally liable for any obligation under this Agreement. 7. Independent Contractor. The Contractor acknowledges and agrees that it is acting as an independent contractor for all work and services rendered pursuant to this Agreement, and neither the Contractor, nor its employees, agents, servants nor any person for whose conduct the Contractor is responsible shall be considered an employee or agent of the Town for any purpose. 8. Indemnification. The Contractor shall indemnify, defend, and hold the Town harmless from and against any and all claims, demands, liabilities, actions, causes of actions, costs and expenses, including attorney's fees, arising out of the Contractor's breach of this Agreement or the negligence or willful misconduct of the Contractor, or the Contractor's agents or employees. 9. Insurance. A. The Contractor shall obtain and maintain during the term of this Agreement the insurance coverage in companies licensed to do business in the Commonwealth of Massachusetts, and acceptable to the Town, as set out in the Invitation for Bids. B. All policies shall identify the Town as an additional insured(except Workers' Compensation) and shall provide that the Town shall receive written notification at least 30 days prior to the effective date of any amendment or cancellation. Certificates evidencing all such coverages shall be provided to the Town upon the execution of this Agreement, and at least ten(10) days prior to the renewal of any such coverage. Each such certificate shall specifically refer to this Agreement and shall state that such insurance is as required by this Agreement. Failure to provide or to continue in force such insurance shall be deemed a material breach of this Agreement and shall be grounds for immediate termination. 10. Assignment. The Contractor shall not assign, sublet or otherwise transfer this Agreement, in whole or in part, without the prior written consent of the Town, and shall not assign any of the moneys payable under this Agreement, except by and with the written consent of the Town. 11. Termination. A. Termination for Cause. If at any time during the term of this Agreement the Town determines that the Contractor has breached the terms of this Agreement by negligently or incompetently performing the work, or any part thereof, or by failing to perform the work in a timely fashion, or by failing to perform the work to the satisfaction of the Town, or by not complying with the direction of the Town or its agents, or by otherwise failing to perform this Agreement in accordance with all of its terms and provisions, the Town shall notify the Contractor in writing stating therein the nature of the alleged breach and directing the Contractor to cure such breach within ten (10) days. The Contractor specifically agrees that it shall indemnify and hold the Town harmless from any loss, damage, cost, charge, expense or claim arising out of our resulting from such breach regardless of its knowledge or authorization of the actions resulting in the breach. If the Contractor fails to cure said breach within ten (10) days, the Town may, at its election at any time after the expiration of said ten (10) days, terminate this Agreement by giving written notice thereof to the Contractor specifying the effective date of the termination. Upon receipt of said notice, the Contractor shall cease to incur additional expenses in connection with this Agreement. Upon the date specified in said notice, this Agreement shall terminate. Such termination shall not prejudice or waive any rights or action which the Town may have against the Contractor up to the date of such termination, and the Contractor shall be liable to the Town for any amount which it may be required to pay in excess of the compensation provided herein in order to complete the work specified herein in a timely manner. Upon such termination, the Contractor shall be entitled to compensation for all satisfactory work completed prior to the termination date, as determined by the Town. B. Termination for Convenience. The Town may terminate this Agreement at any time for convenience by providing the Contractor written notice specifying therein the termination date which shall not be sooner than ten days from the issuance of said notice. Upon receipt of said notice, the Contractor shall cease to incur additional expenses in connection with this Agreement. Upon such termination, the Contractor shall be entitled to compensation for all satisfactory work completed prior to the termination date, as determined by the Town, such payment not to exceed the fair value of the services provided hereunder. 12. Insnection and Reports. The Town shall have the right at any time to inspect the work of the Contractor, including the right to enter upon any property owned or occupied by Contractor, whether situated within or beyond the limits of the Town. Whenever requested, Contractor shall immediately furnish to the Town full and complete written reports of its operation under this Agreement in such detail and with such information as the Town may request. 13. Rovalties and Patents: The Contractor shall pay all applicable royalties and license fees. In addition, the Contractor hereby represents that it is duly authorized to use any process or other intellectual property rights held by third parties in the performance of this Agreement, it shall defend all suits or claims for infringement of any patent or other intellectual property rights and shall indemnify and hold the Town harmless from loss on account thereof. 14. Successor and Assigns. This Agreement is binding upon the parties hereto, their successors, assigns and legal representatives. Neither the Town nor the Contractor shall assign or transfer any interest in the Agreement without the written consent of the other. Notwithstanding the approval of any assignment by the Town pursuant to this paragraph, the Contractor shall remain liable for the full performance of the terms of this Contract. 15. Compliance with Laws. The Contractor shall comply with all Federal, State and local laws, rules, regulations and orders applicable to the work provided pursuant to this Agreement, such provisions being incorporated herein by reference, and shall be responsible for obtaining all necessary licenses, permits, and approvals required for the performance of such work. The Contractor shall indemnify and hold the Town harmless for and against any and all fines, penalties or monetary liabilities incurred by the Town as a result of the failure of the Contractor to comply with the previous sentence. 16. Notice. Any and all notices, or other communications required or permitted under this Agreement, shall be in writing and delivered by hand or mailed postage prepaid, return receipt requested, by registered or certified mail or by other reputable delivery service, to the parties at the addresses set forth on Page 1 or furnished from time to time in writing hereafter by one party to the other party. Any such notice or correspondence shall be deemed given when so delivered by hand, if so mailed, when deposited with the U.S. Postal Service or, if sent by private overnight or other delivery service, when deposited with such delivery service. 17. Severability. If any term or condition of this Agreement or any application thereof shall to any extent be held invalid, illegal or unenforceable by the court of competent jurisdiction, the validity, legality, and enforceability of the remaining terms and conditions of this Agreement shall not be deemed affected thereby unless one or both parties would be substantially or materially prejudiced. 18. Governing Law. This Agreement shall be governed by, construed and enforced in accordance with the laws of the Commonwealth of Massachusetts and the Contractor submits to the jurisdiction of any of its appropriate courts for the adjudication of disputes arising out of this Agreement. 19. Entire Agreement. This Agreement, including all documents incorporated herein by reference, constitutes the entire integrated agreement between the parties with respect to the matters described. This Agreement supersedes all prior agreements, negotiations and representations, either written or oral, and it shall not be modified or amended except by a written document executed by the parties hereto. 20. Contract Documents. The Contract Documents consist of the following, together with this Agreement: Invitation to Bid Instructions to Bidders Bid Form Non-Collusion Certificate Tax Compliance Certificate Clerk's Certificate of Corporate Vote Certificate of Insurance General Conditions Supplementary General Conditions General Requirements Specifications Schedule of Prevailing Wages IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and year first written above. I certify that an appropriation TOWN OF WATERTOWN is available in the amount of this Contract. By: Town Auditor Town Manager Approved as to Form: Town Attorney (Contractor) By: Name: (Type or Print) Non-Collusion Certificate The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word 'person"shall mean any natural person, business,partnership, corporation, union, committee, club, or other organization, entity, or group of individuals. Signature: Date: Print Name: Title: Name of Business: Non-Debarment Certificate The undersigned certifies under penalties of perjury that the said undersigned is not presently debarred from doing public construction work in the Commonwealth of Massachusetts under the provisions of Section 29F of Chapter 29, or any other applicable debarment provisions of any other Chapter of the General Laws or any rule or regulation promulgated thereafter. Signature: Date: Print Name: Title: Name of Business: Tax Compliance Certificate Pursuant to M.G.L. Chapter 62C, Chapter 49A, and Chapter 151A, Section 19A, I do hereby certify under the penalties of perjury that my company has filed all state tax returns and paid all taxes required by law and complied with all state laws pertaining to contributions to the unemployment compensation fund and to payments in lieu of contributions. Signature: Date: Print Name: Title: Name of Business: Certificate of Corporate Authority At a duly authorized meeting of the Board of Directors of (Name of Corporation) held on {Date)at which all Directors were present or waived notice, it was voted that {Name of Officer), by his/her position of {Title of Officer), is authorized to execute contracts and bonds in the name and behalf of the said company, and affix its corporate seals thereto, and such execution of any Contract or obligation in this company's name on its behalf by its (Title of Officer)shall be valid and binding upon this company. I hereby certify that I am the Clerk of {Name of the Corporation), that {Name of Officer) is the duly elected {Title of Officer) of said company, and that the above vote has not been amended or rescinded and remains in full force and effect as of the date below. A true copy, Attest: (Clerk) Place of Business: Affix Corporate Seal below: ATTACHMENT #I z > 0 5 En > en IS,s I- zz�w ED 0 0 r.L 0 ED !� (q 0 0 ED 0 r z :3 0 w 49 21 -�u�n- a: 0 r- 0 o o 0 N 0 co so Dr 0 0 E; E S' 0 , 0 o a o �21D Z Z wo. M- , 11 ED ED > < 0 Oa CIDO K, N. 0 SQ-J Ev-!j C) -4 n -4 0) > r, ED ED 5,6 :3 ED 0 rL :3 r- ED tj L zr r 0 0 ED 0 cl) CD co cu ED 0 L" 0) (n C),o ED m _0 (A cl) (D (D > > > c Ln gozv < ED ETO > 0 ED o CO cj) C) THE COMMONWEALTH OF MASSACHUSETTS EXHIBIT B ' EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates CHARLES D.BAKER As determined by the Director under the provisions of the ROSALIN ACOSTA Governor Secretary Massachusetts General Laws,Chapter 149,Sections 26 to 27H WILLIAM D McxINNEY KARYN E.POLITO Director Lt.Governor Awarding Authority: Town of Watertown Contract Number: City/Town: WATERTOWN Description of Work: Renovation of flooring at various locations at the Watertown Middle School Job Location: Waverly Avenue,Watertown Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number"on all pages of this schedule. • An Awarding Authority must request an updated wage schedule from the Department of Labor Standards("DLS")if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects(bid pursuant to G.L.c.149A),the earlier of. (a)the execution date of the GMP Amendment,or(b)the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L.c. 149, §27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L.c. 149§27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor,a filed sub-bidder,or any sub-contractor. • All apprentices working on the project are required to be registered with the Massachusetts Department of Labor Standards,Division of Apprentice Standards(DLS/DAS). Apprentice must keep his/her apprentice identification card on his/her person during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DLS/DAS regardless of whether or not they are registered with any other federal,state,local,or private agency must be paid the journeyworker's rate for the trade. • The wage rates will remain in effect for the duration of the project,except in the case of multi-year public construction projects. For construction projects lasting longer than one year,awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor.For multi-year CM AT RISK projects,awarding authority must request an annual update no later than two weeks before the anniversary date,determined as the earlier of. (a) the execution date of the GMP Amendment,or(b)the execution date of the first amendment to permit procurement of construction services.Contractors are required to obtain the wage schedules from awarding authorities,and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F"rental of equipment"contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee's name,address,occupational classification,hours worked,and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/Pw. • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at(617)626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at(617)727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE)DRIVER-EQUIPMENT 12/01/2018 $34.35 $11.91 $12.70 $0.00 $58.96 TEAMSTERS JOINT COUNCIL NO.10 ZONE A 06/01/2019 $35.35 $11.91 $12.70 $0.00 $59.96 08/01/2019 $35.35 $12.41 $12.70 $0.00 $60.46 12/01/2019 $35.35 $12.41 $13.72 $0.00 $61.48 06/01/2020 $36.25 $12.41 $13.72 $0.00 $62.38 08/01/2020 $36.25 $12.91 $13.72 $0.00 $62.88 12/01/2020 $36.25 $12.91 $14.82 $0.00 $63.98 06/01/2021 $37.05 $12.91 $14.82 $0.00 $64.78 08/01/2021 $37.05 $13.41 $14.82 $0.00 $65.28 12/01/2021 $37.05 $13.41 $16.01 $0.00 $66.47 (3 AXLE)DRIVER-EQUIPMENT 12/01/2018 $34.42 $11.91 $12.70 $0.00 $59.03 TEAMSTERS JOINT COUNCIL NO.10 ZONE A 06/01/2019 $35.42 $11.91 $12.70 $0.00 $60.03 08/01/2019 $35.42 $12.41 $12.70 $0.00 $60.53 12/01/2019 $35.42 $12.41 $13.72 $0.00 $61.55 06/01/2020 $36.32 $12.41 $13.72 $0.00 $62.45 08/01/2020 $36.32 $12.91 $13.72 $0.00 $62.95 12/01/2020 $36.32 $12.91 $14.82 $0.00 $64.05 06/01/2021 $37.12 $12.91 $14.82 $0.00 $64.85 08/01/2021 $37.12 $13.41 $14.82 $0.00 $65.35 12/01/2021 $37.12 $13.41 $16.01 $0.00 $66.54 (4&5 AXLE)DRIVER-EQUIPMENT 12/01/2018 $34.54 $11.91 $12.70 $0.00 $59.15 TEAMSTERS JOINT COUNCIL NO.10 ZONE A 06/01/2019 $35.54 $11.91 $12.70 $0.00 $60.15 08/01/2019 $35.54 $12.41 $12.70 $0.00 $60.65 12/01/2019 $35.54 $12.41 $13.72 $0.00 $61.67 06/01/2020 $36.44 $12.41 $13.72 $0.00 $62.57 08/01/2020 $36.44 $12.91 $13.72 $0.00 $63.07 12/01/2020 $36.44 $12.91 $14.82 $0.00 $64.17 06/01/2021 $37.24 $12.91 $14.82 $0.00 $64.97 08/01/2021 $37.24 $13.41 $14.82 $0.00 $65.47 12/01/2021 $37.24 $13.41 $16.01 $0.00 $66.66 ADS/SUBMERSIBLE PILOT 08/01/2018 $97.80 $9.90 $21.15 $0.00 $128.85 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2019 $102.78 $9.90 $21.15 $0.00 $133.83 For apprentice rates see"Apprentice-PILE DRIVER" AIR TRACK OPERATOR 12/01/2018 $39.40 $7.85 $15.35 $0.00 $62.60 LABORERS-ZONE 1 06/01/2019 $40.40 $7.85 $15.35 $0.00 $63.60 12/01/2019 $41.40 $7.85 $15.35 $0.00 $64.60 06/01/2020 $42.39 $7.85 $15.35 $0.00 $65.59 12/01/2020 $43.37 $7.85 $15.35 $0.00 $66.57 06/01/2021 $44.39 $7.85 $15.35 $0.00 $67.59 12/01/2021 $45.40 $7.85 $15.35 $0.00 $68.60 For apprentice rates see"Apprentice-LABORER" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 2 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment ASBESTOS REMOVER-PIPE/MECH.EQUIPT. 12/01/2018 $35.40 $12.50 $8.50 $0.00 $56.40 HEAT&FROST INSULATORS LOCAL 6(BOSTON) 06/01/2019 $36.40 $12.50 $8.50 $0.00 $57.40 12/01/2019 $37.40 $12.50 $8.50 $0.00 $58.40 06/01/2020 $38.40 $12.50 $8.50 $0.00 $59.40 12/01/2020 $39.40 $12.50 $8.50 $0.00 $60.40 ASPHALT RAKER 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE 1 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE 12/01/2018 $47.58 $11.50 $15.60 $0.00 $74.68 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.68 $11.50 $15.60 $0.00 $75.78 12/01/2019 $49.83 $11.50 $15.60 $0.00 $76.93 06/01/2020 $50.93 $11.50 $15.60 $0.00 $78.03 12/01/2020 $52.08 $11.50 $15.60 $0.00 $79.18 06/01/2021 $53.18 $11.50 $15.60 $0.00 $80.28 12/01/2021 $54.33 $11.50 $15.60 $0.00 $81.43 For apprentice rates see"Apprentice-OPERATING ENGINEERS" BACKHOE/FRONT-END LOADER 12/01/2018 $47.58 $11.50 $15.60 $0.00 $74.68 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.68 $11.50 $15.60 $0.00 $75.78 12/01/2019 $49.83 $11.50 $15.60 $0.00 $76.93 06/01/2020 $50.93 $11.50 $15.60 $0.00 $78.03 12/01/2020 $52.08 $11.50 $15.60 $0.00 $79.18 06/01/2021 $53.18 $11.50 $15.60 $0.00 $80.28 12/01/2021 $54.33 $11.50 $15.60 $0.00 $81.43 For apprentice rates see"Apprentice-OPERATING ENGINEERS" BARCO-TYPE JUMPING TAMPER 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE] 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" BLOCK PAVER,RAMMER/CURB SETTER 12/01/2018 $39.40 $7.85 $15.35 $0.00 $62.60 LABORERS-ZONE] 06/01/2019 $40.40 $7.85 $15.35 $0.00 $63.60 12/01/2019 $41.40 $7.85 $15.35 $0.00 $64.60 06/01/2020 $42.39 $7.85 $15.35 $0.00 $65.59 12/01/2020 $43.37 $7.85 $15.35 $0.00 $66.57 06/01/2021 $44.39 $7.85 $15.35 $0.00 $67.59 12/01/2021 $45.40 $7.85 $15.35 $0.00 $68.60 For apprentice rates see"Apprentice-LABORER" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 3 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment BOILERMAKER 01/01/2019 $44.71 $7.07 $17.72 $0.00 $69.50 BOILERMAKERS LOCAL 29 01/01/2020 $46.10 $7.07 $17.98 $0.00 $71.15 Apprentice- BOILERMAKER-Local 29 Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $29.06 $7.07 $11.52 $0.00 $47.65 2 65 $29.06 $7.07 $11.52 $0.00 $47.65 3 70 $31.30 $7.07 $12.40 $0.00 $50.77 4 75 $33.53 $7.07 $13.30 $0.00 $53.90 5 80 $35.77 $7.07 $14.18 $0.00 $57.02 6 85 $38.00 $7.07 $15.07 $0.00 $60.14 7 90 $40.24 $7.07 $15.95 $0.00 $63.26 8 95 $42.47 $7.07 $16.84 $0.00 $66.38 Effective Date- 01/01/2020 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $29.97 $7.07 $11.69 $0.00 $48.73 2 65 $29.97 $7.07 $11.69 $0.00 $48.73 3 70 $32.27 $7.07 $12.59 $0.00 $51.93 4 75 $34.58 $7.07 $13.49 $0.00 $55.14 5 80 $36.88 $7.07 $14.38 $0.00 $58.33 6 85 $39.19 $7.07 $15.29 $0.00 $61.55 7 90 $41.49 $7.07 $16.18 $0.00 $64.74 8 95 $43.80 $7.07 $17.09 $0.00 $67.96 rNotes:- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - J Apprentice to Journeyworker Ratio:1:4 BRICK/STONE/ARTIFICIAL MASONRY(INCL.MASONRY 02/01/2019 $53.55 $10.75 $20.66 $0.00 $84.96 WATERPROOFING) 08/01/2019 $54.90 $10.75 $20.80 $0.00 $86.45 BRICKLAYERS LOCAL 3(WALTHAM) 02/01/2020 $55.54 $10.75 $20.80 $0.00 $87.09 08/01/2020 $56.89 $10.75 $20.95 $0.00 $88.59 02/01/2021 $57.53 $10.75 $20.95 $0.00 $89.23 08/01/2021 $58.93 $10.75 $21.11 $0.00 $90.79 02/01/2022 $59.52 $10.75 $21.11 $0.00 $91.38 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 4 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- BRICK/PLASTERICEMENT MASON-Local 3 Waltham Effective Date- 02/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.78 $10.75 $20.66 $0.00 $58.19 2 60 $32.13 $10.75 $20.66 $0.00 $63.54 3 70 $37.49 $10.75 $20.66 $0.00 $68.90 4 80 $42.84 $10.75 $20.66 $0.00 $74.25 5 90 $48.20 $10.75 $20.66 $0.00 $79.61 Effective Date- 08/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $27.45 $10.75 $20.80 $0.00 $59.00 2 60 $32.94 $10.75 $20.80 $0.00 $64.49 3 70 $38.43 $10.75 $20.80 $0.00 $69.98 4 80 $43.92 $10.75 $20.80 $0.00 $75.47 5 90 $49.41 $10.75 $20.80 $0.00 $80.96 - - - - - - - - - - - - - - - - - - - - - - - - - rNotes: - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 BULLDOZER/GRADER/SCRAPER 12/01/2018 $47.10 $11.50 $15.60 $0.00 $74.20 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.19 $11.50 $15.60 $0.00 $75.29 12/01/2019 $49.33 $11.50 $15.60 $0.00 $76.43 06/01/2020 $50.41 $11.50 $15.60 $0.00 $77.51 12/01/2020 $51.55 $11.50 $15.60 $0.00 $78.65 06/01/2021 $52.64 $11.50 $15.60 $0.00 $79.74 12/01/2021 $53.78 $11.50 $15.60 $0.00 $80.88 For apprentice rates see"Apprentice-OPERATING ENGINEERS" CAISSON&UNDERPINNING BOTTOM MAN 12/01/2018 $39.75 $7.85 $15.55 $0.00 $63.15 LABORERS-FOUNDATIONAND MARINE 06/01/2019 $40.75 $7.85 $15.55 $0.00 $64.15 12/01/2019 $41.75 $7.85 $15.55 $0.00 $65.15 06/01/2020 $42.74 $7.85 $15.55 $0.00 $66.14 12/01/2020 $43.72 $7.85 $15.55 $0.00 $67.12 06/01/2021 $44.74 $7.85 $15.55 $0.00 $68.14 12/01/2021 $45.75 $7.85 $15.55 $0.00 $69.15 For apprentice rates see"Apprentice-LABORER" CAISSON&UNDERPINNING LABORER 12/01/2018 $38.60 $7.85 $15.55 $0.00 $62.00 LABORERS-FOUNDATIONAND MARINE 06/01/2019 $39.60 $7.85 $15.55 $0.00 $63.00 12/01/2019 $40.60 $7.85 $15.55 $0.00 $64.00 06/01/2020 $41.59 $7.85 $15.55 $0.00 $64.99 12/01/2020 $42.57 $7.85 $15.55 $0.00 $65.97 06/01/2021 $43.59 $7.85 $15.55 $0.00 $66.99 12/01/2021 $44.60 $7.85 $15.55 $0.00 $68.00 For apprentice rates see"Apprentice-LABORER" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 5 of 41 Supplemental Total Rate Classification Effective Date Base Wage Health Pension Unemployment CAISSON&UNDERPINNING TOP MAN 12/01/2019 $39.60 $7.85 $15.55 $0.00 $62.00 LABORERS-FOUNDATIONAND MARINE 06/01/2019 $39.60 $7.85 $15.55 $0.00 $63.00 12/01/2019 $40.60 $7.85 $15.55 $0.00 $64.00 06/01/2020 $41.59 $7.85 $15.55 $0.00 $64.99 12/01/2020 $42.57 $7.85 $15.55 $0.00 $65.97 06/01/2021 $43.59 $7.85 $15.55 $0.00 $66.99 12/01/2021 $44.60 $7.85 $15.55 $0.00 $68.00 For apprentice rates see"Apprentice-LABORER" CARBIDE CORE DRILL OPERATOR 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE] 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" CARPENTER 03/01/2019 $42.35 $9.90 $17.50 $0.00 $69.75 CARPENTERS-ZONE 2(Eastern Massachusetts) Apprentice- CARPENTER-Zone 2 Eastern MA Effective Date- 03/01/2019 supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $21.18 $9.90 $1.73 $0.00 $32.81 2 60 $25.41 $9.90 $1.73 $0.00 $37.04 3 70 $29.65 $9.90 $12.31 $0.00 $51.86 4 75 $31.76 $9.90 $12.31 $0.00 $53.97 5 80 $33.88 $9.90 $14.04 $0.00 $57.82 6 90 $33.99 $9.90 $14.04 $0.00 $57.82 7 90 $38.12 $9.90 $15.77 $0.00 $63.79 8 90 $38.12 $9.90 $15.77 $0.00 $63.79 rNotes: - - - - - - - - - - - - - - - - - - - - - - - - - - %Indentured After 10/l/17;45/45/55/55/70/70/90/90 Step 1&2$30.69/3&4$36.59/5&6$53.59/7&8$59.55 - - - - - - J _ - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 CARPENTER WOOD FRAME 04/01/2019 $27.52 $7.07 $7.96 $0.00 $42.45 CARPENTERS-ZONE 2(Wood Frame) 10/01/2019 $27.95 $7.07 $7.86 $0.00 $42.88 All Aspects of New Wood Frame Work Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 6 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- CARPENTER(Wood Frame)-Zone 2 Effective Date- 04/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $16.51 $7.07 $0.00 $0.00 $23.58 2 60 $16.51 $7.07 $0.00 $0.00 $23.58 3 65 $17.89 $7.07 $7.86 $0.00 $32.82 4 70 $19.26 $7.07 $7.86 $0.00 $34.19 5 75 $20.64 $7.07 $7.86 $0.00 $35.57 6 80 $22.02 $7.07 $7.86 $0.00 $36.95 7 85 $23.39 $7.07 $7.86 $0.00 $38.32 8 90 $24.77 $7.07 $7.86 $0.00 $39.70 Effective Date- 10/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $16.77 $7.07 $0.00 $0.00 $23.84 2 60 $16.77 $7.07 $0.00 $0.00 $23.84 3 65 $18.17 $7.07 $7.86 $0.00 $33.10 4 70 $19.57 $7.07 $7.86 $0.00 $34.50 5 75 $20.96 $7.07 $7.86 $0.00 $35.89 6 80 $22.36 $7.07 $7.86 $0.00 $37.29 7 85 $23.76 $7.07 $7.86 $0.00 $38.69 8 90 $25.16 $7.07 $7.86 $0.00 $40.09 - - - - - - - - - - - - - - - - - - - - - - - - rNotes: - - I %Indentured After 10/l/I7;45/45/55/55/70/70/80/80 - Step 1&2$19.45/3&4$26.96/5&6$34.19/7&8$36.95- - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 CEMENT MASONRY/PLASTERING 01/01/2019 $47.50 $12.50 $22.41 $0.30 $82.71 BRICKLAYERS LOCAL 3(WALTHAM) 07/01/2019 $48.24 $12.50 $22.41 $0.30 $83.45 01/01/2020 $49.64 $12.50 $22.41 $0.30 $84.85 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 7 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- CEMENT MASONRY/PLASTERING-Eastern Mass(Waltham) Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.75 $12.50 $15.41 $0.00 $51.66 2 60 $28.50 $12.50 $17.41 $0.30 $58.71 3 65 $30.88 $12.50 $18.41 $0.30 $62.09 4 70 $33.25 $12.50 $19.41 $0.30 $65.46 5 75 $35.63 $12.50 $20.41 $0.30 $68.84 6 80 $38.00 $12.50 $21.41 $0.30 $72.21 7 90 $42.75 $12.50 $22.41 $0.30 $77.96 Effective Date- 07/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.12 $12.50 $15.41 $0.00 $52.03 2 60 $28.94 $12.50 $17.41 $0.30 $59.15 3 65 $31.36 $12.50 $18.41 $0.30 $62.57 4 70 $33.77 $12.50 $19.41 $0.30 $65.98 5 75 $36.18 $12.50 $20.41 $0.30 $69.39 6 80 $38.59 $12.50 $21.41 $0.30 $72.80 7 90 $43.42 $12.50 $22.41 $0.30 $78.63 - - - - - - - - - - - - - - - - - - - - - - - - - - - rNotes: Steps 3,4 are 500 hrs.All other steps are 1,000 hrs. - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:3 CHAIN SAW OPERATOR 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE 1 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2018 $48.58 $11.50 $15.60 $0.00 $75.68 OPERATING ENGINEERS LOCAL 4 06/01/2019 $49.68 $11.50 $15.60 $0.00 $76.78 12/01/2019 $50.83 $11.50 $15.60 $0.00 $77.93 06/01/2020 $51.93 $11.50 $15.60 $0.00 $79.03 12/01/2020 $53.08 $11.50 $15.60 $0.00 $80.18 06/01/2021 $54.18 $11.50 $15.60 $0.00 $81.28 12/01/2021 $55.33 $11.50 $15.60 $0.00 $82.43 For apprentice rates see"Apprentice-OPERATING ENGINEERS" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 8 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment COMPRESSOR OPERATOR 12/01/2018 $32.03 $11.50 $15.60 $0.00 $59.13 OPERATING ENGINEERS LOCAL 4 06/01/2019 $32.78 $11.50 $15.60 $0.00 $59.88 12/01/2019 $33.57 $11.50 $15.60 $0.00 $60.67 06/01/2020 $34.32 $11.50 $15.60 $0.00 $61.42 12/01/2020 $35.10 $11.50 $15.60 $0.00 $62.20 06/01/2021 $35.85 $11.50 $15.60 $0.00 $62.95 12/01/2021 $36.64 $11.50 $15.60 $0.00 $63.74 For apprentice rates see"Apprentice-OPERATING ENGINEERS" DELEADER(BRIDGE) 01/01/2019 $50.36 $8.15 $20.85 $0.00 $79.36 PAINTERS LOCAL 35-ZONE 2 07/01/2019 $51.46 $8.15 $20.85 $0.00 $80.46 01/01/2020 $52.56 $8.15 $20.85 $0.00 $81.56 07/01/2020 $53.66 $8.15 $20.85 $0.00 $82.66 01/01/2021 $54.76 $8.15 $20.85 $0.00 $83.76 Apprentice- PAINTER Local 35 -BRIDGES/TANKS Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.18 $8.15 $0.00 $0.00 $33.33 2 55 $27.70 $8.15 $5.64 $0.00 $41.49 3 60 $30.22 $8.15 $6.15 $0.00 $44.52 4 65 $32.73 $8.15 $6.66 $0.00 $47.54 5 70 $35.25 $8.15 $17.78 $0.00 $61.18 6 75 $37.77 $8.15 $18.29 $0.00 $64.21 7 80 $40.29 $8.15 $18.80 $0.00 $67.24 8 90 $45.32 $8.15 $19.83 $0.00 $73.30 Effective Date- 07/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.73 $8.15 $0.00 $0.00 $33.88 2 55 $28.30 $8.15 $5.64 $0.00 $42.09 3 60 $30.88 $8.15 $6.15 $0.00 $45.18 4 65 $33.45 $8.15 $6.66 $0.00 $48.26 5 70 $36.02 $8.15 $17.78 $0.00 $61.95 6 75 $38.60 $8.15 $18.29 $0.00 $65.04 7 80 $41.17 $8.15 $18.80 $0.00 $68.12 8 90 $46.31 $8.15 $19.83 $0.00 $74.29 - - - - - - - - - - - - - - - - - - - - - - - - rNotes: Steps are 750 hrs. - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 DEMO:ADZEMAN 12/01/2018 $38.80 $7.85 $15.35 $0.00 $62.00 LABORERS-ZONE 1 06/01/2019 $39.80 $7.85 $15.35 $0.00 $63.00 12/01/2019 $40.80 $7.85 $15.35 $0.00 $64.00 For apprentice rates see"Apprentice-LABORER" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 9 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment DEMO:BACK-HOE/LOADER/HAMMER OPERATOR 12/01/2018 $39.80 $7.85 $15.35 $0.00 $63.00 LABORERS-ZONE 1 06/01/2019 $40.80 $7.85 $15.35 $0.00 $64.00 12/01/2019 $41.80 $7.85 $15.35 $0.00 $65.00 For apprentice rates see"Apprentice-LABORER" DEMO:BURNERS 12/01/2018 $39.55 $7.85 $15.35 $0.00 $62.75 LABORERS-ZONE 1 06/01/2019 $40.55 $7.85 $15.35 $0.00 $63.75 12/01/2019 $41.55 $7.85 $15.35 $0.00 $64.75 For apprentice rates see"Apprentice-LABORER" DEMO:CONCRETE CUTTER/SAWYER 12/01/2018 $39.80 $7.85 $15.35 $0.00 $63.00 LABORERS-ZONE 1 06/01/2019 $40.80 $7.85 $15.35 $0.00 $64.00 12/01/2019 $41.80 $7.85 $15.35 $0.00 $65.00 For apprentice rates see"Apprentice-LABORER" DEMO:JACKHAMMER OPERATOR 12/01/2018 $39.55 $7.85 $15.35 $0.00 $62.75 LABORERS-ZONE] 06/01/2019 $40.55 $7.85 $15.35 $0.00 $63.75 12/01/2019 $41.55 $7.85 $15.35 $0.00 $64.75 For apprentice rates see"Apprentice-LABORER" DEMO:WRECKING LABORER 12/01/2018 $38.80 $7.85 $15.35 $0.00 $62.00 LABORERS-ZONE 1 06/01/2019 $39.80 $7.85 $15.35 $0.00 $63.00 12/01/2019 $40.80 $7.85 $15.35 $0.00 $64.00 For apprentice rates see"Apprentice-LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2018 $47.10 $11.50 $15.60 $0.00 $74.20 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.19 $11.50 $15.60 $0.00 $75.29 12/01/2019 $49.33 $11.50 $15.60 $0.00 $76.43 06/01/2020 $50.41 $11.50 $15.60 $0.00 $77.51 12/01/2020 $51.55 $11.50 $15.60 $0.00 $78.65 06/01/2021 $52.64 $11.50 $15.60 $0.00 $79.74 12/01/2021 $53.78 $11.50 $15.60 $0.00 $80.88 For apprentice rates see"Apprentice-OPERATING ENGINEERS" DIVER 08/01/2018 $65.20 $9.90 $21.15 $0.00 $96.25 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2019 $68.52 $9.90 $21.15 $0.00 $99.57 For apprentice rates see"Apprentice-PILE DRIVER" DIVER TENDER 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62 PILEDRIVER LOCAL 56(ZONE 1) 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99 For apprentice rates see"Apprentice-PILE DRIVER" DIVER TENDER(EFFLUENT) 08/01/2018 $69.86 $9.90 $21.15 $0.00 $100.91 PILEDRIVER LOCAL 56(ZONE 1) 08/01/2019 $73.41 $9.90 $21.15 $0.00 $104.46 For apprentice rates see"Apprentice-PILE DRIVER" DIVER/SLURRY(EFFLUENT) 08/01/2018 $97.80 $9.90 $21.15 $0.00 $128.85 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2019 $102.78 $9.90 $21.15 $0.00 $133.83 For apprentice rates see"Apprentice-PILE DRIVER" DRAWBRIDGE OPERATOR(Construction) 03/01/2019 $51.10 $13.00 $18.88 $0.00 $82.98 ELECTRICIANS LOCAL 103 For apprentice rates see"Apprentice-ELECTRICIAN' ELECTRICIAN 03/01/2019 $51.10 $13.00 $18.88 $0.00 $82.98 ELECTRICIANS LOCAL 103 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 10 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- ELECTRICIAN-Local 103 Effective Date- 03/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $20.44 $13.00 $0.61 $0.00 $34.05 2 40 $20.44 $13.00 $0.61 $0.00 $34.05 3 45 $23.00 $13.00 $14.34 $0.00 $50.34 4 45 $23.00 $13.00 $14.34 $0.00 $50.34 5 50 $25.55 $13.00 $14.76 $0.00 $53.31 6 55 $28.11 $13.00 $15.17 $0.00 $56.28 7 60 $30.66 $13.00 $15.58 $0.00 $59.24 8 65 $33.22 $13.00 $16.00 $0.00 $62.22 9 70 $35.77 $13.00 $16.40 $0.00 $65.17 10 75 $38.33 $13.00 $16.82 $0.00 $68.15 Notes: : - - - - - - - - - - - - - - - - - - - - - - - - App Prior 1/l/03;30/35/40/45/50/55/65/70/75/80 - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:2:3*** ELEVATOR CONSTRUCTOR 01/01/2019 $59.47 $15.58 $17.51 $0.00 $92.56 ELEVATOR CONSTRUCTORS LOCAL 4 01/01/2020 $61.42 $15.73 $18.41 $0.00 $95.56 01/01/2021 $63.47 $15.88 $19.31 $0.00 $98.66 01/01/2022 $65.62 $16.03 $20.21 $0.00 $101.86 Apprentice- ELEVATOR CONSTRUCTOR-Local 4 Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $29.74 $15.58 $0.00 $0.00 $45.32 2 55 $32.71 $15.58 $17.51 $0.00 $65.80 3 65 $38.66 $15.58 $17.51 $0.00 $71.75 4 70 $41.63 $15.58 $17.51 $0.00 $74.72 5 80 $47.58 $15.58 $17.51 $0.00 $80.67 Effective Date- 01/01/2020 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $30.71 $15.73 $0.00 $0.00 $46.44 2 55 $33.78 $15.73 $18.41 $0.00 $67.92 3 65 $39.92 $15.73 $18.41 $0.00 $74.06 4 70 $42.99 $15.73 $18.41 $0.00 $77.13 5 80 $49.14 $15.73 $18.41 $0.00 $83.28 - - - - - - - - - - - - - - - - - - - - - - - - - Notes: - Steps 1-2 are 6 mos.;Steps 3-5 are 1 year - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 11 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment ELEVATOR CONSTRUCTOR HELPER 01/01/2019 $41.63 $15.58 $17.51 $0.00 $74.72 ELEVATOR CONSTRUCTORS LOCAL 4 01/01/2020 $42.99 $15.73 $18.41 $0.00 $77.13 01/01/2021 $44.43 $15.88 $19.31 $0.00 $79.62 01/01/2022 $45.93 $16.03 $20.21 $0.00 $82.17 For apprentice rates see"Apprentice-ELEVATOR CONSTRUCTOR" FENCE&GUARD RAIL ERECTOR 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE] 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2018 $43.19 $11.00 $15.50 $0.00 $69.69 OPERATING ENGINEERS LOCAL 4 05/01/2019 $44.33 $11.00 $15.50 $0.00 $70.83 11/01/2019 $45.33 $11.00 $15.50 $0.00 $71.83 05/01/2020 $46.48 $11.00 $15.50 $0.00 $72.98 11/01/2020 $47.48 $11.00 $15.50 $0.00 $73.98 05/01/2021 $48.68 $11.00 $15.50 $0.00 $75.18 11/01/2021 $49.63 $11.00 $15.50 $0.00 $76.13 05/01/2022 $50.78 $11.00 $15.50 $0.00 $77.28 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2018 $44.67 $11.00 $15.50 $0.00 $71.17 OPERATING ENGINEERS LOCAL 4 05/01/2019 $45.82 $11.00 $15.50 $0.00 $72.32 11/01/2019 $46.83 $11.00 $15.50 $0.00 $73.33 05/01/2020 $47.98 $11.00 $15.50 $0.00 $74.48 11/01/2020 $48.99 $11.00 $15.50 $0.00 $75.49 05/01/2021 $50.15 $11.00 $15.50 $0.00 $76.65 11/01/2021 $51.16 $11.00 $15.50 $0.00 $77.66 05/01/2022 $52.32 $11.00 $15.50 $0.00 $78.82 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2018 $22.45 $11.00 $15.50 $0.00 $48.95 OPERATING ENGINEERS LOCAL 4 05/01/2019 $23.13 $11.00 $15.50 $0.00 $49.63 11/01/2019 $23.72 $11.00 $15.50 $0.00 $50.22 05/01/2020 $24.39 $11.00 $15.50 $0.00 $50.89 11/01/2020 $24.98 $11.00 $15.50 $0.00 $51.48 05/01/2021 $25.66 $11.00 $15.50 $0.00 $52.16 11/01/2021 $26.26 $11.00 $15.50 $0.00 $52.76 05/01/2022 $26.93 $11.00 $15.50 $0.00 $53.43 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FIRE ALARM INSTALLER 03/01/2019 $51.10 $13.00 $18.88 $0.00 $82.98 ELECTRICIANS LOCAL 103 For apprentice rates see"Apprentice-ELECTRICIAN' FIRE ALARM REPAIR/MAINTENANCE 03/01/2019 $38.33 $13.00 $16.82 $0.00 $68.15 l COMMISSIONINGELECTRIcIANs LOCAL 103 For apprentice rates see"Apprentice-TELECOMMUNICATIONS TECHNICIAN' Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 12 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment FIREMAN(ASST.ENGINEER) 12/01/2018 $39.13 $11.50 $15.60 $0.00 $66.23 OPERATING ENGINEERS LOCAL 4 06/01/2019 $40.04 $11.50 $15.60 $0.00 $67.14 12/01/2019 $40.99 $11.50 $15.60 $0.00 $68.09 06/01/2020 $41.90 $11.50 $15.60 $0.00 $69.00 12/01/2020 $42.85 $11.50 $15.60 $0.00 $69.95 06/01/2021 $43.76 $11.50 $15.60 $0.00 $70.86 12/01/2021 $44.71 $11.50 $15.60 $0.00 $71.81 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FLAGGER&SIGNALER 12/01/2018 $22.50 $7.85 $15.35 $0.00 $45.70 LABORERS-ZONE] 06/01/2019 $22.50 $7.85 $15.35 $0.00 $45.70 12/01/2019 $23.50 $7.85 $15.35 $0.00 $46.70 06/01/2020 $23.50 $7.85 $15.35 $0.00 $46.70 12/01/2020 $24.50 $7.85 $15.35 $0.00 $47.70 06/01/2021 $24.50 $7.85 $15.35 $0.00 $47.70 12/01/2021 $24.50 $7.85 $15.35 $0.00 $47.70 For apprentice rates see"Apprentice-LABORER" FLOORCOVERER 03/01/2016 $42.13 $9.80 $17.62 $0.00 $69.55 FLOORCOVERERS LOCAL 2168 ZONE I Apprentice- FLOORCOVERER-Local 2168 Zone I Effective Date- 03/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.07 $9.80 $1.79 $0.00 $32.66 2 55 $23.17 $9.80 $1.79 $0.00 $34.76 3 60 $25.28 $9.80 $12.25 $0.00 $47.33 4 65 $27.38 $9.80 $12.25 $0.00 $49.43 5 70 $29.49 $9.80 $14.04 $0.00 $53.33 6 75 $31.60 $9.80 $14.04 $0.00 $55.44 7 80 $33.70 $9.80 $15.83 $0.00 $59.33 8 85 $35.81 $9.80 $15.83 $0.00 $61.44 - - - - - - - - - - - - - - - - - - - - - Notes:Steps are 750 hrs. %After 09/1/17;45/45/55/55/70/70/80/80(1500hr Steps) - Step 1&2$30.55/3&4$36.49/5&6$53.33/7&8$59.33- - - - - - - - - - - Apprentice to Journeyworker Ratio:l:l FORK LIFT/CHERRY PICKER 12/01/2018 $47.58 $11.50 $15.60 $0.00 $74.68 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.68 $11.50 $15.60 $0.00 $75.78 12/01/2019 $49.83 $11.50 $15.60 $0.00 $76.93 06/01/2020 $50.93 $11.50 $15.60 $0.00 $78.03 12/01/2020 $52.08 $11.50 $15.60 $0.00 $79.18 06/01/2021 $53.18 $11.50 $15.60 $0.00 $80.28 12/01/2021 $54.33 $11.50 $15.60 $0.00 $81.43 For apprentice rates see"Apprentice-OPERATING ENGINEERS" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 13 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment GENERATOR/LIGHTING PLANT/HEATERS 12/01/2018 $32.03 $11.50 $15.60 $0.00 $59.13 OPERATING ENGINEERS LOCAL 4 06/01/2019 $32.78 $11.50 $15.60 $0.00 $59.88 12/01/2019 $33.57 $11.50 $15.60 $0.00 $60.67 06/01/2020 $34.32 $11.50 $15.60 $0.00 $61.42 12/01/2020 $35.10 $11.50 $15.60 $0.00 $62.20 06/01/2021 $35.85 $11.50 $15.60 $0.00 $62.95 12/01/2021 $36.64 $11.50 $15.60 $0.00 $63.74 For apprentice rates see"Apprentice-OPERATING ENGINEERS" GLAZIER(GLASS PLANK/AIR BARRIER/INTERIOR 01/01/2019 $39.86 $8.15 $20.85 $0.00 $68.86 SYSTEMS)GLAZIERS LOCAL 35(ZONE 2) 07/01/2019 $40.96 $8.15 $20.85 $0.00 $69.96 01/01/2020 $42.06 $8.15 $20.85 $0.00 $71.06 07/01/2020 $43.16 $8.15 $20.85 $0.00 $72.16 01/01/2021 $44.26 $8.15 $20.85 $0.00 $73.26 Apprentice- GLAZIER-Local 35 Zone 2 Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.93 $8.15 $0.00 $0.00 $28.08 2 55 $21.92 $8.15 $5.64 $0.00 $35.71 3 60 $23.92 $8.15 $6.15 $0.00 $38.22 4 65 $25.91 $8.15 $6.66 $0.00 $40.72 5 70 $27.90 $8.15 $17.78 $0.00 $53.83 6 75 $29.90 $8.15 $18.29 $0.00 $56.34 7 80 $31.89 $8.15 $18.80 $0.00 $58.84 8 90 $35.87 $8.15 $19.83 $0.00 $63.85 Effective Date- 07/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.48 $8.15 $0.00 $0.00 $28.63 2 55 $22.53 $8.15 $5.64 $0.00 $36.32 3 60 $24.58 $8.15 $6.15 $0.00 $38.88 4 65 $26.62 $8.15 $6.66 $0.00 $41.43 5 70 $28.67 $8.15 $17.78 $0.00 $54.60 6 75 $30.72 $8.15 $18.29 $0.00 $57.16 7 80 $32.77 $8.15 $18.80 $0.00 $59.72 8 90 $36.86 $8.15 $19.83 $0.00 $64.84 - - - - - - - - - - - - - - - - - - - - - - - - rNotes: Steps are 750 hrs. - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 14 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment HOISTING ENGINEER/CRANES/GRADALLS 12/01/2018 $47.58 $11.50 $15.60 $0.00 $74.68 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.68 $11.50 $15.60 $0.00 $75.78 12/01/2019 $49.83 $11.50 $15.60 $0.00 $76.93 06/01/2020 $50.93 $11.50 $15.60 $0.00 $78.03 12/01/2020 $52.08 $11.50 $15.60 $0.00 $79.18 06/01/2021 $53.18 $11.50 $15.60 $0.00 $80.28 12/01/2021 $54.33 $11.50 $15.60 $0.00 $81.43 Apprentice- OPERATING ENGINEERS-Local 4 Effective Date- 12/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $26.17 $11.50 $0.00 $0.00 $37.67 2 60 $28.55 $11.50 $15.60 $0.00 $55.65 3 65 $30.93 $11.50 $15.60 $0.00 $58.03 4 70 $33.31 $11.50 $15.60 $0.00 $60.41 5 75 $35.69 $11.50 $15.60 $0.00 $62.79 6 80 $38.06 $11.50 $15.60 $0.00 $65.16 7 85 $40.44 $11.50 $15.60 $0.00 $67.54 8 90 $42.82 $11.50 $15.60 $0.00 $69.92 Effective Date- 06/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $26.77 $11.50 $0.00 $0.00 $38.27 2 60 $29.21 $11.50 $15.60 $0.00 $56.31 3 65 $31.64 $11.50 $15.60 $0.00 $58.74 4 70 $34.08 $11.50 $15.60 $0.00 $61.18 5 75 $36.51 $11.50 $15.60 $0.00 $63.61 6 80 $38.94 $11.50 $15.60 $0.00 $66.04 7 85 $41.38 $11.50 $15.60 $0.00 $68.48 8 90 $43.81 $11.50 $15.60 $0.00 $70.91 'Notes:- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:6 HVAC(DUCTWORK) 02/01/2019 $46.50 $13.20 $24.12 $2.52 $86.34 SHEETMETAL WORKERS LOCAL I7-A 08/01/2019 $48.10 $13.20 $24.12 $2.56 $87.98 02/01/2020 $49.75 $13.20 $24.12 $2.61 $89.68 08/01/2020 $51.35 $13.20 $24.12 $2.66 $91.33 02/01/2021 $53.00 $13.20 $24.12 $2.71 $93.03 08/01/2021 $54.75 $13.20 $24.12 $2.76 $94.83 02/01/2022 $56.50 $13.20 $24.12 $2.81 $96.63 For apprentice rates see"Apprentice-SHEET METAL WORKER" HVAC(ELECTRICAL CONTROLS) 03/01/2019 $51.10 $13.00 $18.88 $0.00 $82.98 ELECTRICIANS LOCAL 103 For apprentice rates see"Apprentice-ELECTRICIAN' Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 15 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment HVAC(TESTING AND BALANCING-AIR) 02/01/2019 $46.50 $13.20 $24.12 $2.52 $86.34 SHEETMETAL WORKERS LOCAL 17-A 08/01/2019 $48.10 $13.20 $24.12 $2.56 $87.98 02/01/2020 $49.75 $13.20 $24.12 $2.61 $89.68 08/01/2020 $51.35 $13.20 $24.12 $2.66 $91.33 02/01/2021 $53.00 $13.20 $24.12 $2.71 $93.03 08/01/2021 $54.75 $13.20 $24.12 $2.76 $94.83 02/01/2022 $56.50 $13.20 $24.12 $2.81 $96.63 For apprentice rates see"Apprentice-SHEET METAL WORKER" HVAC(TESTING AND BALANCING-WATER) 03/01/2019 $53.19 $10.95 $19.74 $0.00 $83.88 PIPEFITTERS LOCAL 537 09/01/2019 $54.69 $10.95 $19.74 $0.00 $85.38 03/01/2020 $56.19 $10.95 $19.74 $0.00 $86.88 09/01/2020 $57.69 $10.95 $19.74 $0.00 $88.38 03/01/2021 $59.19 $10.95 $19.74 $0.00 $89.88 For apprentice rates see"Apprentice-PIPEFITTER"or"PLUMBER/PIPEFITTER" HVAC MECHANIC 03/01/2019 $53.19 $10.95 $19.74 $0.00 $83.88 PIPEFITTERS LOCAL 537 09/01/2019 $54.69 $10.95 $19.74 $0.00 $85.38 03/01/2020 $56.19 $10.95 $19.74 $0.00 $86.88 09/01/2020 $57.69 $10.95 $19.74 $0.00 $88.38 03/01/2021 $59.19 $10.95 $19.74 $0.00 $89.88 For apprentice rates see"Apprentice-PIPEFITTER"or"PLUMBER/PIPEFITTER" HYDRAULIC DRILLS 12/01/2018 $39.40 $7.85 $15.35 $0.00 $62.60 LABORERS-ZONE] 06/01/2019 $40.40 $7.85 $15.35 $0.00 $63.60 12/01/2019 $41.40 $7.85 $15.35 $0.00 $64.60 06/01/2020 $42.39 $7.85 $15.35 $0.00 $65.59 12/01/2020 $43.37 $7.85 $15.35 $0.00 $66.57 06/01/2021 $44.39 $7.85 $15.35 $0.00 $67.59 12/01/2021 $45.40 $7.85 $15.35 $0.00 $68.60 For apprentice rates see"Apprentice-LABORER" INSULATOR(PIPES&TANKS) 09/01/2018 $47.09 $12.50 $15.60 $0.00 $75.19 HEAT&FROSTINSULATORS LOCAL 6(BOSTON) 09/01/2019 $49.59 $12.50 $15.60 $0.00 $77.69 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 16 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- ASBESTOS INSULATOR(Pipes&Tanks)-Local 6 Boston Effective Date- 09/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.55 $12.50 $11.40 $0.00 $47.45 2 60 $28.25 $12.50 $12.24 $0.00 $52.99 3 70 $32.96 $12.50 $13.08 $0.00 $58.54 4 80 $37.67 $12.50 $13.92 $0.00 $64.09 Effective Date- 09/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.80 $12.50 $11.40 $0.00 $48.70 2 60 $29.75 $12.50 $12.24 $0.00 $54.49 3 70 $34.71 $12.50 $13.08 $0.00 $60.29 4 80 $39.67 $12.50 $13.92 $0.00 $66.09 - - - - - - - - - - - - - - - - - - - - - - - - - - - rNotes: I Steps are 1 year - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:4 IRONWORKER/WELDER 09/16/2018 $46.07 $8.00 $22.85 $0.00 $76.92 IRONWORKERS LOCAL 7(BOSTONAREA) Apprentice- IRONWORKER-Local 7 Boston Effective Date- 09/16/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $27.64 $8.00 $22.85 $0.00 $58.49 2 70 $32.25 $8.00 $22.85 $0.00 $63.10 3 75 $34.55 $8.00 $22.85 $0.00 $65.40 4 80 $36.86 $8.00 $22.85 $0.00 $67.71 5 85 $39.16 $8.00 $22.85 $0.00 $70.01 6 90 $41.46 $8.00 $22.85 $0.00 $72.31 s:- - - - - - - - - - - - - - - - - - - - - - - - - - - rNote **Structural 1:6;Ornamental 1:4 - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:** JACKHAMMER&PAVING BREAKER OPERATOR 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE 1 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 17 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment LABORER 12/01/2018 $38.65 $7.85 $15.35 $0.00 $61.85 LABORERS-ZONE 1 06/01/2019 $39.65 $7.85 $15.35 $0.00 $62.85 12/01/2019 $40.65 $7.85 $15.35 $0.00 $63.85 06/01/2020 $41.64 $7.85 $15.35 $0.00 $64.84 12/01/2020 $42.62 $7.85 $15.35 $0.00 $65.82 06/01/2021 $43.64 $7.85 $15.35 $0.00 $66.84 12/01/2021 $44.65 $7.85 $15.35 $0.00 $67.85 Apprentice- LABORER-Zone 1 Effective Date- 12/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $23.19 $7.85 $15.35 $0.00 $46.39 2 70 $27.06 $7.85 $15.35 $0.00 $50.26 3 80 $30.92 $7.85 $15.35 $0.00 $54.12 4 90 $34.79 $7.85 $15.35 $0.00 $57.99 Effective Date- 06/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $23.79 $7.85 $15.35 $0.00 $46.99 2 70 $27.76 $7.85 $15.35 $0.00 $50.96 3 80 $31.72 $7.85 $15.35 $0.00 $54.92 4 90 $35.69 $7.85 $15.35 $0.00 $58.89 - - - - - - - - - - - - - - - - - - - - - - - - - - - rNotes: I - - - - - - - - - - - - - - - - - - - - - J Apprentice to Journeyworker Ratio:1:5 LABORER:CARPENTER TENDER 12/01/2018 $38.65 $7.85 $15.35 $0.00 $61.85 LABORERS-ZONE] 06/01/2019 $39.65 $7.85 $15.35 $0.00 $62.85 12/01/2019 $40.65 $7.85 $15.35 $0.00 $63.85 06/01/2020 $41.64 $7.85 $15.35 $0.00 $64.84 12/01/2020 $42.62 $7.85 $15.35 $0.00 $65.82 06/01/2021 $43.64 $7.85 $15.35 $0.00 $66.84 12/01/2021 $44.65 $7.85 $15.35 $0.00 $67.85 For apprentice rates see"Apprentice-LABORER" LABORER:CEMENT FINISHER TENDER 12/01/2018 $38.65 $7.85 $15.35 $0.00 $61.85 LABORERS-ZONE] 06/01/2019 $39.65 $7.85 $15.35 $0.00 $62.85 12/01/2019 $40.65 $7.85 $15.35 $0.00 $63.85 06/01/2020 $41.64 $7.85 $15.35 $0.00 $64.84 12/01/2020 $42.62 $7.85 $15.35 $0.00 $65.82 06/01/2021 $43.64 $7.85 $15.35 $0.00 $66.84 12/01/2021 $44.65 $7.85 $15.35 $0.00 $67.85 For apprentice rates see"Apprentice-LABORER" LABORER:HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2018 $38.80 $7.85 $15.35 $0.00 $62.00 LABORERS-ZONE] 06/01/2019 $39.80 $7.85 $15.35 $0.00 $63.00 12/01/2019 $40.80 $7.85 $15.35 $0.00 $64.00 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 18 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment For apprentice rates see"Apprentice-LABORER" LABORER:MASON TENDER 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE] 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" LABORER:MULTI-TRADE TENDER 12/01/2018 $38.65 $7.85 $15.35 $0.00 $61.85 LABORERS-ZONE 1 06/01/2019 $39.65 $7.85 $15.35 $0.00 $62.85 12/01/2019 $40.65 $7.85 $15.35 $0.00 $63.85 06/01/2020 $41.64 $7.85 $15.35 $0.00 $64.84 12/01/2020 $42.62 $7.85 $15.35 $0.00 $65.82 06/01/2021 $43.64 $7.85 $15.35 $0.00 $66.84 12/01/2021 $44.65 $7.85 $15.35 $0.00 $67.85 For apprentice rates see"Apprentice-LABORER" LABORER:TREE REMOVER 12/01/2018 $38.65 $7.85 $15.35 $0.00 $61.85 LABORERS-ZONE 1 06/01/2019 $39.65 $7.85 $15.35 $0.00 $62.85 12/01/2019 $40.65 $7.85 $15.35 $0.00 $63.85 06/01/2020 $41.64 $7.85 $15.35 $0.00 $64.84 12/01/2020 $42.62 $7.85 $15.35 $0.00 $65.82 06/01/2021 $43.64 $7.85 $15.35 $0.00 $66.84 12/01/2021 $44.65 $7.85 $15.35 $0.00 $67.85 This classification applies to all tree work associated with the removal of standing trees,and trimming and removal of branches and limbs when the work is not done for a utility company for the purpose of operation,maintenance or repair of utility company equipment.For apprentice rates see"Apprentice-LABORER" LASER BEAM OPERATOR 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE] 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" MARBLE&TILE FINISHERS 02/01/2019 $40.91 $10.75 $18.97 $0.00 $70.63 BRICKLAYERS LOCAL 3-MARBLE&TILE 08/01/2019 $41.99 $10.75 $19.11 $0.00 $71.85 02/01/2020 $42.50 $10.75 $19.11 $0.00 $72.36 08/01/2020 $43.58 $10.75 $19.26 $0.00 $73.59 02/01/2021 $44.09 $10.75 $19.26 $0.00 $74.10 08/01/2021 $45.21 $10.75 $19.42 $0.00 $75.38 02/01/2022 $45.68 $10.75 $19.42 $0.00 $75.85 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 19 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- MARBLE&TILE FINISHER-Local 3 Marble&Tile Effective Date- 02/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.46 $10.75 $18.97 $0.00 $50.18 2 60 $24.55 $10.75 $18.97 $0.00 $54.27 3 70 $28.64 $10.75 $18.97 $0.00 $58.36 4 80 $32.73 $10.75 $18.97 $0.00 $62.45 5 90 $36.82 $10.75 $18.97 $0.00 $66.54 Effective Date- 08/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.00 $10.75 $19.11 $0.00 $50.86 2 60 $25.19 $10.75 $19.11 $0.00 $55.05 3 70 $29.39 $10.75 $19.11 $0.00 $59.25 4 80 $33.59 $10.75 $19.11 $0.00 $63.45 5 90 $37.79 $10.75 $19.11 $0.00 $67.65 - - - - - - - - - - - - - - - - - - - - - - - - - - - rNotes: - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:3 MARBLE MASONS,TILELAYERS&TERRAZZO MECH 02/01/2019 $53.57 $10.75 $20.66 $0.00 $84.98 BRICKLAYERS LOCAL 3-MARBLE&TILE 08/01/2019 $54.92 $10.75 $20.80 $0.00 $86.47 02/01/2020 $55.55 $10.75 $20.80 $0.00 $87.10 08/01/2020 $56.90 $10.75 $20.95 $0.00 $88.60 02/01/2021 $57.54 $10.75 $20.95 $0.00 $89.24 08/01/2021 $58.94 $10.75 $21.11 $0.00 $90.80 02/01/2022 $59.51 $10.75 $21.11 $0.00 $91.37 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 20 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- MARBLE-TILE-TERRAZZO MECHANIC-Local 3 Marble&Tile Effective Date- 02/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.79 $10.75 $20.66 $0.00 $58.20 2 60 $32.14 $10.75 $20.66 $0.00 $63.55 3 70 $37.50 $10.75 $20.66 $0.00 $68.91 4 80 $42.86 $10.75 $20.66 $0.00 $74.27 5 90 $48.21 $10.75 $20.66 $0.00 $79.62 Effective Date- 08/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $27.46 $10.75 $20.80 $0.00 $59.01 2 60 $32.95 $10.75 $20.80 $0.00 $64.50 3 70 $38.44 $10.75 $20.80 $0.00 $69.99 4 80 $43.94 $10.75 $20.80 $0.00 $75.49 5 90 $49.43 $10.75 $20.80 $0.00 $80.98 - - - - - - - - - - - - - - - - - - - - - - - - - - - rNotes: - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 MECH.SWEEPER OPERATOR(ON CONST.SITES) 12/01/2018 $47.10 $11.50 $15.60 $0.00 $74.20 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.19 $11.50 $15.60 $0.00 $75.29 12/01/2019 $49.33 $11.50 $15.60 $0.00 $76.43 06/01/2020 $50.41 $11.50 $15.60 $0.00 $77.51 12/01/2020 $51.55 $11.50 $15.60 $0.00 $78.65 06/01/2021 $52.64 $11.50 $15.60 $0.00 $79.74 12/01/2021 $53.78 $11.50 $15.60 $0.00 $80.88 For apprentice rates see"Apprentice-OPERATING ENGINEERS" MECHANICS MAINTENANCE 12/01/2018 $47.10 $11.50 $15.60 $0.00 $74.20 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.19 $11.50 $15.60 $0.00 $75.29 12/01/2019 $49.33 $11.50 $15.60 $0.00 $76.43 06/01/2020 $50.41 $11.50 $15.60 $0.00 $77.51 12/01/2020 $51.55 $11.50 $15.60 $0.00 $78.65 06/01/2021 $52.64 $11.50 $15.60 $0.00 $79.74 12/01/2021 $53.78 $11.50 $15.60 $0.00 $80.88 For apprentice rates see"Apprentice-OPERATING ENGINEERS" MILLWRIGHT(Zone 1) 04/01/2019 $42.22 $9.90 $18.50 $0.00 $70.62 MILLWRIGHTS LOCAL 1121-Zone 1 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 21 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- MILLWRIGHT-Local 1121 Zone I Effective Date- 04/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $23.22 $9.90 $5.31 $0.00 $38.43 2 65 $27.44 $9.90 $15.13 $0.00 $52.47 3 75 $31.67 $9.90 $16.10 $0.00 $57.67 4 85 $35.89 $9.90 $17.06 $0.00 $62.85 rNotes:- - - - - - - - - - - - - - - - - - - - - - - - - - - - Steps are 2,000 hours- - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:5 MORTAR MIXER 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE 1 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" OILER(OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2018 $23.06 $11.50 $15.60 $0.00 $50.16 OPERATING ENGINEERS LOCAL 4 06/01/2019 $23.61 $11.50 $15.60 $0.00 $50.71 12/01/2019 $24.18 $11.50 $15.60 $0.00 $51.28 06/01/2020 $24.73 $11.50 $15.60 $0.00 $51.83 12/01/2020 $25.30 $11.50 $15.60 $0.00 $52.40 06/01/2021 $25.85 $11.50 $15.60 $0.00 $52.95 12/01/2021 $26.43 $11.50 $15.60 $0.00 $53.53 For apprentice rates see"Apprentice-OPERATING ENGINEERS" OILER(TRUCK CRANES,GRADALLS) 12/01/2018 $27.42 $11.50 $15.60 $0.00 $54.52 OPERATING ENGINEERS LOCAL 4 06/01/2019 $28.07 $11.50 $15.60 $0.00 $55.17 12/01/2019 $28.74 $11.50 $15.60 $0.00 $55.84 06/01/2020 $29.39 $11.50 $15.60 $0.00 $56.49 12/01/2020 $30.07 $11.50 $15.60 $0.00 $57.17 06/01/2021 $30.71 $11.50 $15.60 $0.00 $57.81 12/01/2021 $31.39 $11.50 $15.60 $0.00 $58.49 For apprentice rates see"Apprentice-OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT-CLASS II 12/01/2018 $47.10 $11.50 $15.60 $0.00 $74.20 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.19 $11.50 $15.60 $0.00 $75.29 12/01/2019 $49.33 $11.50 $15.60 $0.00 $76.43 06/01/2020 $50.41 $11.50 $15.60 $0.00 $77.51 12/01/2020 $51.55 $11.50 $15.60 $0.00 $78.65 06/01/2021 $52.64 $11.50 $15.60 $0.00 $79.74 12/01/2021 $53.78 $11.50 $15.60 $0.00 $80.88 For apprentice rates see"Apprentice-OPERATING ENGINEERS" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 22 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment PAINTER(BRIDGES/TANKS) 01/01/2019 $50.36 $8.15 $20.85 $0.00 $79.36 PAINTERS LOCAL 35-ZONE 2 07/01/2019 $51.46 $8.15 $20.85 $0.00 $80.46 01/01/2020 $52.56 $8.15 $20.85 $0.00 $81.56 07/01/2020 $53.66 $8.15 $20.85 $0.00 $82.66 01/01/2021 $54.76 $8.15 $20.85 $0.00 $83.76 Apprentice- PAINTER Local 35 -BRIDGES/TANKS Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.18 $8.15 $0.00 $0.00 $33.33 2 55 $27.70 $8.15 $5.64 $0.00 $41.49 3 60 $30.22 $8.15 $6.15 $0.00 $44.52 4 65 $32.73 $8.15 $6.66 $0.00 $47.54 5 70 $35.25 $8.15 $17.78 $0.00 $61.18 6 75 $37.77 $8.15 $18.29 $0.00 $64.21 7 80 $40.29 $8.15 $18.80 $0.00 $67.24 8 90 $45.32 $8.15 $19.83 $0.00 $73.30 Effective Date- 07/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.73 $8.15 $0.00 $0.00 $33.88 2 55 $28.30 $8.15 $5.64 $0.00 $42.09 3 60 $30.88 $8.15 $6.15 $0.00 $45.18 4 65 $33.45 $8.15 $6.66 $0.00 $48.26 5 70 $36.02 $8.15 $17.78 $0.00 $61.95 6 75 $38.60 $8.15 $18.29 $0.00 $65.04 7 80 $41.17 $8.15 $18.80 $0.00 $68.12 8 90 $46.31 $8.15 $19.83 $0.00 $74.29 rNotes:- - - - - - - - - - - - - - - - - - - - - - - - - - - Steps are 750 hrs. - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 PAINTER(SIGN,PICTORIAL&DISPLAY) 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 PAINTERS LOCAL 35-ZONE 2 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 23 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- PAINTER SIGN-Local 35 Zone 2 Effective Date- 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 rNotes:- - - - - - - - - - - - - - - - - - - - - - - - - - - Steps are 4 mos. - - - - - - - - - - - - - - - - - - - - - - J Apprentice to Journeyworker Ratio:1:1 PAINTER(SPRAY OR SANDBLAST,NEW)* 01/01/2019 $41.26 $8.15 $20.85 $0.00 $70.26 *If 30%or more of surfaces to be painted are new construction, 07/01/2019 $42.36 $8.15 $20.85 $0.00 $71.36 NEW paint rate shall be used.PAINTERS LOCAL 35-ZONE 2 01/01/2020 $43.46 $8.15 $20.85 $0.00 $72.46 07/01/2020 $44.56 $8.15 $20.85 $0.00 $73.56 01/01/2021 $45.66 $8.15 $20.85 $0.00 $74.66 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 24 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- PAINTER Local 35 Zone 2-Spray/Sandblast-New Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.63 $8.15 $0.00 $0.00 $28.78 2 55 $22.69 $8.15 $5.64 $0.00 $36.48 3 60 $24.76 $8.15 $6.15 $0.00 $39.06 4 65 $26.82 $8.15 $6.66 $0.00 $41.63 5 70 $28.88 $8.15 $17.78 $0.00 $54.81 6 75 $30.95 $8.15 $18.29 $0.00 $57.39 7 80 $33.01 $8.15 $18.80 $0.00 $59.96 8 90 $37.13 $8.15 $19.83 $0.00 $65.11 Effective Date- 07/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.18 $8.15 $0.00 $0.00 $29.33 2 55 $23.30 $8.15 $5.64 $0.00 $37.09 3 60 $25.42 $8.15 $6.15 $0.00 $39.72 4 65 $27.53 $8.15 $6.66 $0.00 $42.34 5 70 $29.65 $8.15 $17.78 $0.00 $55.58 6 75 $31.77 $8.15 $18.29 $0.00 $58.21 7 80 $33.89 $8.15 $18.80 $0.00 $60.84 8 90 $38.12 $8.15 $19.83 $0.00 $66.10 - - - - - - - - - - - - - - - - - - - - - - - - - - - rNotes: I Steps are 750 hrs. - - - - - - - - - - - - - - - - - - - - - - J Apprentice to Journeyworker Ratio:1:1 PAINTER(SPRAY OR SANDBLAST,REPAINT) 01/01/2019 $39.32 $8.15 $20.85 $0.00 $68.32 PAINTERS LOCAL 35-ZONE 2 07/01/2019 $40.42 $8.15 $20.85 $0.00 $69.42 01/01/2020 $41.52 $8.15 $20.85 $0.00 $70.52 07/01/2020 $42.62 $8.15 $20.85 $0.00 $71.62 01/01/2021 $43.72 $8.15 $20.85 $0.00 $72.72 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 25 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- PAINTER Local 35 Zone 2-Spray/Sandblast-Repaint Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.66 $8.15 $0.00 $0.00 $27.81 2 55 $21.63 $8.15 $5.64 $0.00 $35.42 3 60 $23.59 $8.15 $6.15 $0.00 $37.89 4 65 $25.56 $8.15 $6.66 $0.00 $40.37 5 70 $27.52 $8.15 $17.78 $0.00 $53.45 6 75 $29.49 $8.15 $18.29 $0.00 $55.93 7 80 $31.46 $8.15 $18.80 $0.00 $58.41 8 90 $35.39 $8.15 $19.83 $0.00 $63.37 Effective Date- 07/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.21 $8.15 $0.00 $0.00 $28.36 2 55 $22.23 $8.15 $5.64 $0.00 $36.02 3 60 $24.25 $8.15 $6.15 $0.00 $38.55 4 65 $26.27 $8.15 $6.66 $0.00 $41.08 5 70 $28.29 $8.15 $17.78 $0.00 $54.22 6 75 $30.32 $8.15 $18.29 $0.00 $56.76 7 80 $32.34 $8.15 $18.80 $0.00 $59.29 8 90 $36.38 $8.15 $19.83 $0.00 $64.36 - - - - - - - - - - - - - - - - - - - - - - - - - - - rNotes: I Steps are 750 hrs. - - - - - - - - - - - - - - - - - - - - - j Apprentice to Journeyworker Ratio:1:1 PAINTER(TRAFFIC MARKINGS) 12/01/2018 $38.65 $7.85 $15.35 $0.00 $61.85 LABORERS-ZONE1 06/01/2019 $39.65 $7.85 $15.35 $0.00 $62.85 12/01/2019 $40.65 $7.85 $15.35 $0.00 $63.85 06/01/2020 $41.64 $7.85 $15.35 $0.00 $64.84 12/01/2020 $42.62 $7.85 $15.35 $0.00 $65.82 06/01/2021 $43.64 $7.85 $15.35 $0.00 $66.84 12/01/2021 $44.65 $7.85 $15.35 $0.00 $67.85 For Apprentice rates see"Apprentice-LABORER" PAINTER/TAPER(BRUSH,NEW)* 01/01/2019 $39.86 $8.15 $20.85 $0.00 $68.86 *If 30%or more of surfaces to be painted are new construction, 07/01/2019 $40.96 $8.15 $20.85 $0.00 $69.96 NEW paint rate shall be used.PAINTERS LOCAL 35-ZONE 2 O1/01/2020 $42.06 $8.15 $20.85 $0.00 $71.06 07/01/2020 $43.16 $8.15 $20.85 $0.00 $72.16 O1/01/2021 $44.25 $8.15 $20.85 $0.00 $73.25 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 26 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- PAINTER-Local 35 Zone 2-BRUSHNEW Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.93 $8.15 $0.00 $0.00 $28.08 2 55 $21.92 $8.15 $5.64 $0.00 $35.71 3 60 $23.92 $8.15 $6.15 $0.00 $38.22 4 65 $25.91 $8.15 $6.66 $0.00 $40.72 5 70 $27.90 $8.15 $17.78 $0.00 $53.83 6 75 $29.90 $8.15 $18.29 $0.00 $56.34 7 80 $31.89 $8.15 $18.80 $0.00 $58.84 8 90 $35.87 $8.15 $19.83 $0.00 $63.85 Effective Date- 07/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.48 $8.15 $0.00 $0.00 $28.63 2 55 $22.53 $8.15 $5.64 $0.00 $36.32 3 60 $24.58 $8.15 $6.15 $0.00 $38.88 4 65 $26.62 $8.15 $6.66 $0.00 $41.43 5 70 $28.67 $8.15 $17.78 $0.00 $54.60 6 75 $30.72 $8.15 $18.29 $0.00 $57.16 7 80 $32.77 $8.15 $18.80 $0.00 $59.72 8 90 $36.86 $8.15 $19.83 $0.00 $64.84 - - - - - - - - - - - - - - - - - - - - - - - - rNotes: - - I Steps are 750 hrs. - - - - - - - - - - - - - - - - - - - - - - J Apprentice to Journeyworker Ratio:1:1 PAINTER/TAPER(BRUSH,REPAINT) 01/01/2019 $37.92 $8.15 $20.85 $0.00 $66.92 PAINTERS LOCAL 35-ZONE 2 07/01/2019 $39.02 $8.15 $20.85 $0.00 $68.02 O1/01/2020 $40.12 $8.15 $20.85 $0.00 $69.12 07/01/2020 $41.22 $8.15 $20.85 $0.00 $70.22 O1/O1/2021 $42.32 $8.15 $20.85 $0.00 $71.32 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 27 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- PAINTER Local 35 Zone 2-BRUSH REPAINT Effective Date- 01/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.96 $8.15 $0.00 $0.00 $27.11 2 55 $20.86 $8.15 $5.64 $0.00 $34.65 3 60 $22.75 $8.15 $6.15 $0.00 $37.05 4 65 $24.65 $8.15 $6.66 $0.00 $39.46 5 70 $26.54 $8.15 $17.78 $0.00 $52.47 6 75 $28.44 $8.15 $18.29 $0.00 $54.88 7 80 $30.34 $8.15 $18.80 $0.00 $57.29 8 90 $34.13 $8.15 $19.83 $0.00 $62.11 Effective Date- 07/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.51 $8.15 $0.00 $0.00 $27.66 2 55 $21.46 $8.15 $5.64 $0.00 $35.25 3 60 $23.41 $8.15 $6.15 $0.00 $37.71 4 65 $25.36 $8.15 $6.66 $0.00 $40.17 5 70 $27.31 $8.15 $17.78 $0.00 $53.24 6 75 $29.27 $8.15 $18.29 $0.00 $55.71 7 80 $31.22 $8.15 $18.80 $0.00 $58.17 8 90 $35.12 $8.15 $19.83 $0.00 $63.10 - - - - - - - - - - - - - - - - - - - - - - - - - - - rNotes: I Steps are 750 hrs. - - - - - - - - - - - - - - - - - - - - - J Apprentice to Journeyworker Ratio:1:1 PANEL&PICKUP TRUCKS DRIVER 12/01/2018 $34.18 $11.91 $12.70 $0.00 $58.79 TEAMSTERS JOINT COUNCIL NO.10 ZONE A 06/01/2019 $35.18 $11.91 $12.70 $0.00 $59.79 08/01/2019 $35.18 $12.41 $12.70 $0.00 $60.29 12/01/2019 $35.18 $12.41 $13.72 $0.00 $61.31 06/01/2020 $36.08 $12.41 $13.72 $0.00 $62.21 08/01/2020 $36.08 $12.91 $13.72 $0.00 $62.71 12/01/2020 $36.08 $12.91 $14.82 $0.00 $63.81 06/01/2021 $36.88 $12.91 $14.82 $0.00 $64.61 08/01/2021 $36.88 $13.41 $14.82 $0.00 $65.11 12/01/2021 $36.88 $13.41 $16.01 $0.00 $66.30 PIER AND DOCK CONSTRUCTOR(UNDERPINNING AND 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62 DECK) 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99 PILE DRIVER LOCAL 56(ZONE 1) For apprentice rates see"Apprentice-PILE DRIVER" PILE DRIVER 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62 PILEDRIVER LOCAL 56(ZONE 1) 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 28 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- PILEDRIVER-Local 56 Zone 1 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.29 $9.90 $21.15 $0.00 $54.34 2 60 $27.94 $9.90 $21.15 $0.00 $58.99 3 70 $32.60 $9.90 $21.15 $0.00 $63.65 4 75 $34.93 $9.90 $21.15 $0.00 $65.98 5 80 $37.26 $9.90 $21.15 $0.00 $68.31 6 80 $37.26 $9.90 $21.15 $0.00 $68.31 7 90 $41.91 $9.90 $21.15 $0.00 $72.96 8 90 $41.91 $9.90 $21.15 $0.00 $72.96 Effective Date- 08/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.47 $9.90 $21.15 $0.00 $55.52 2 60 $29.36 $9.90 $21.15 $0.00 $60.41 3 70 $34.26 $9.90 $21.15 $0.00 $65.31 4 75 $36.71 $9.90 $21.15 $0.00 $67.76 5 80 $39.15 $9.90 $21.15 $0.00 $70.20 6 80 $39.15 $9.90 $21.15 $0.00 $70.20 7 90 $44.05 $9.90 $21.15 $0.00 $75.10 8 90 $44.05 $9.90 $21.15 $0.00 $75.10 - - - - - - - - - - - - - - - - - - - - - - - - rNotes: - - I - - - - - - - - - - - - - - - - - - - - - J Apprentice to Journeyworker Ratio:1:5 PIPEFITTER&STEAMFITTER 03/01/2019 $53.19 $10.95 $19.74 $0.00 $83.88 PIPEFITTERS LOCAL 537 09/01/2019 $54.69 $10.95 $19.74 $0.00 $85.38 03/01/2020 $56.19 $10.95 $19.74 $0.00 $86.88 09/01/2020 $57.69 $10.95 $19.74 $0.00 $88.38 03/01/2021 $59.19 $10.95 $19.74 $0.00 $89.88 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 29 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- PIPEFITTER-Local 537 Effective Date- 03/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $21.28 $10.95 $8.00 $0.00 $40.23 2 45 $23.94 $10.95 $19.74 $0.00 $54.63 3 60 $31.91 $10.95 $19.74 $0.00 $62.60 4 70 $37.23 $10.95 $19.74 $0.00 $67.92 5 80 $42.55 $10.95 $19.74 $0.00 $73.24 Effective Date- 09/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $21.88 $10.95 $8.00 $0.00 $40.83 2 45 $24.61 $10.95 $19.74 $0.00 $55.30 3 60 $32.81 $10.95 $19.74 $0.00 $63.50 4 70 $38.28 $10.95 $19.74 $0.00 $68.97 5 80 $43.75 $10.95 $19.74 $0.00 $74.44 s:- - - - - - - - - - - - - - - - - - - - - - - - - - - rNote ** 1:3;3:15; 1:10 thereafter/Steps are 1 yr. - Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8=55:10;6:12;7:14;8:17;920;10:23(Max)- - - - - - - - J Apprentice to Journeyworker Ratio:** PIPELAYER 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE 1 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" PLUMBERS&GASFITTERS 03/01/2019 $56.69 $11.82 $16.51 $0.00 $85.02 PLUMBERS&GASFITTERS LOCAL 12 09/01/2019 $58.19 $11.82 $16.51 $0.00 $86.52 03/01/2020 $59.69 $11.82 $16.51 $0.00 $88.02 09/01/2020 $61.19 $11.82 $16.51 $0.00 $89.52 03/01/2021 $62.69 $11.82 $16.51 $0.00 $91.02 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 30 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- PLUMBERIGASFITTER-Local 12 Effective Date- 03/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $19.84 $11.82 $5.98 $0.00 $37.64 2 40 $22.68 $11.82 $6.79 $0.00 $41.29 3 55 $31.18 $11.82 $9.25 $0.00 $52.25 4 65 $36.85 $11.82 $10.85 $0.00 $59.52 5 75 $42.52 $11.82 $12.50 $0.00 $66.84 Effective Date- 09/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $20.37 $11.82 $5.98 $0.00 $38.17 2 40 $23.28 $11.82 $6.79 $0.00 $41.89 3 55 $32.00 $11.82 $9.25 $0.00 $53.07 4 65 $37.82 $11.82 $10.85 $0.00 $60.49 5 75 $43.64 $11.82 $12.50 $0.00 $67.96 s:- - - - - - - - - - - - - - - - - - - - - - - - - - - rNote ** 1:2;2:6;3:10;4:14;5:19/Steps are 1 yr Step4 with lic$63.17,Step5 with lic$70.47 - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:** PNEUMATIC CONTROLS(TEMP.) 03/01/2019 $53.19 $10.95 $19.74 $0.00 $83.88 PIPEFITTERS LOCAL 537 09/01/2019 $54.69 $10.95 $19.74 $0.00 $85.38 03/01/2020 $56.19 $10.95 $19.74 $0.00 $86.88 09/01/2020 $57.69 $10.95 $19.74 $0.00 $88.38 03/01/2021 $59.17 $10.95 $19.74 $0.00 $89.86 For apprentice rates see"Apprentice-PIPEFITTER"or"PLUMBER/PIPEFITTER" PNEUMATIC DRILL/TOOL OPERATOR 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE] 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" POWDERMAN&BLASTER 12/01/2018 $39.65 $7.85 $15.35 $0.00 $62.85 LABORERS-ZONE] 06/01/2019 $40.65 $7.85 $15.35 $0.00 $63.85 12/01/2019 $41.65 $7.85 $15.35 $0.00 $64.85 06/01/2020 $42.64 $7.85 $15.35 $0.00 $65.84 12/01/2020 $43.62 $7.85 $15.35 $0.00 $66.82 06/01/2021 $44.64 $7.85 $15.35 $0.00 $67.84 12/01/2021 $45.65 $7.85 $15.35 $0.00 $68.85 For apprentice rates see"Apprentice-LABORER" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 31 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2018 $47.58 $11.50 $15.60 $0.00 $74.68 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.68 $11.50 $15.60 $0.00 $75.78 12/01/2019 $49.83 $11.50 $15.60 $0.00 $76.93 06/01/2020 $50.93 $11.50 $15.60 $0.00 $78.03 12/01/2020 $52.08 $11.50 $15.60 $0.00 $79.18 06/01/2021 $53.18 $11.50 $15.60 $0.00 $80.28 12/01/2021 $54.33 $11.50 $15.60 $0.00 S81.43 For apprentice rates see"Apprentice-OPERATING ENGINEERS" PUMP OPERATOR(CONCRETE) 12/01/2018 $47.58 $11.50 $15.60 $0.00 $74.68 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.68 $11.50 $15.60 $0.00 $75.78 12/01/2019 $49.83 $11.50 $15.60 $0.00 $76.93 06/01/2020 $50.93 $11.50 $15.60 $0.00 $78.03 12/01/2020 $52.08 $11.50 $15.60 $0.00 $79.18 06/01/2021 $53.18 $11.50 $15.60 $0.00 $80.28 12/01/2021 $54.33 $11.50 $15.60 $0.00 $81.43 For apprentice rates see"Apprentice-OPERATING ENGINEERS" PUMP OPERATOR(DEWATERING,OTHER) 12/01/2018 $32.03 $11.50 $15.60 $0.00 $59.13 OPERATING ENGINEERS LOCAL 4 06/01/2019 $32.78 $11.50 $15.60 $0.00 $59.88 12/01/2019 $33.57 $11.50 $15.60 $0.00 $60.67 06/01/2020 $34.32 $11.50 $15.60 $0.00 $61.42 12/01/2020 $35.10 $11.50 $15.60 $0.00 $62.20 06/01/2021 $35.85 $11.50 $15.60 $0.00 $62.95 12/01/2021 $36.64 $11.50 $15.60 $0.00 $63.74 For apprentice rates see"Apprentice-OPERATING ENGINEERS" READY MIX CONCRETE DRIVERS after 4/30/10 07/01/2017 $28.18 $8.48 $9.72 $0.00 $46.38 (Drivers Hired After 4/30/2010)TEAMSTERSLOCAL 25b READY-MIX CONCRETE DRIVER 07/01/2017 $29.48 $8.48 $9.72 $0.00 $47.68 TEAMSTERS LOCAL 25b RECLAIMERS 12/01/2018 $47.10 $11.50 $15.60 $0.00 $74.20 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.19 $11.50 $15.60 $0.00 $75.29 12/01/2019 $49.33 $11.50 $15.60 $0.00 $76.43 06/01/2020 $50.41 $11.50 $15.60 $0.00 $77.51 12/01/2020 $51.55 $11.50 $15.60 $0.00 $78.65 06/01/2021 $52.64 $11.50 $15.60 $0.00 $79.74 12/01/2021 $53.78 $11.50 $15.60 $0.00 $80.88 For apprentice rates see"Apprentice-OPERATING ENGINEERS" RIDE-ON MOTORIZED BUGGY OPERATOR 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE] 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 32 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment ROLLER/SPREADER/MULCHING MACHINE 12/01/2018 $47.10 $11.50 $15.60 $0.00 $74.20 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.19 $11.50 $15.60 $0.00 $75.29 12/01/2019 $49.33 $11.50 $15.60 $0.00 $76.43 06/01/2020 $50.41 $11.50 $15.60 $0.00 $77.51 12/01/2020 $51.55 $11.50 $15.60 $0.00 $78.65 06/01/2021 $52.64 $11.50 $15.60 $0.00 $79.74 12/01/2021 $53.78 $11.50 $15.60 $0.00 $80.88 For apprentice rates see"Apprentice-OPERATING ENGINEERS" ROOFER(Inc.Roofer Waterproofng&Roofer Damproofg) 02/01/2019 $43.36 $11.50 $15.90 $0.00 $70.76 ROOFERS LOCAL 33 Apprentice- ROOFER-Local 33 Effective Date- 02/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.68 $11.50 $3.69 $0.00 $36.87 2 60 $26.02 $11.50 $15.90 $0.00 $53.42 3 65 $28.18 $11.50 $15.90 $0.00 $55.58 4 75 $32.52 $11.50 $15.90 $0.00 $59.92 5 85 $36.86 $11.50 $15.90 $0.00 $64.26 - - - - - - - - - - - - - - - Notes:** 1:5,2:6-10,the 1:10;Reroofing: 1:4,then 1:1 Step 1 is 2000 hrs.;Steps 2-5 are 1000 hrs. (Hot Pitch Mechanics'receive$1.00 hr.above ROOFER) - - - J - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:** ROOFER SLATE/TILE/PRECAST CONCRETE 02/01/2019 $43.61 $11.50 $15.90 $0.00 $71.01 ROOFERS LOCAL 33 For apprentice rates see"Apprentice-ROOFER" SHEETMETAL WORKER 02/01/2019 $46.50 $13.20 $24.12 $2.52 $86.34 SHEETMETAL WORKERS LOCAL 17-A 08/01/2019 $48.10 $13.20 $24.12 $2.56 $87.98 02/01/2020 $49.75 $13.20 $24.12 $2.61 $89.68 08/01/2020 $51.35 $13.20 $24.12 $2.66 $91.33 02/01/2021 $53.00 $13.20 $24.12 $2.71 $93.03 08/01/2021 $54.75 $13.20 $24.12 $2.76 $94.83 02/01/2022 $56.50 $13.20 $24.12 $2.81 $96.63 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 33 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- SHEET METAL WORKER-Local 17-A Effective Date- 02/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 42 $19.53 $13.20 $5.89 $0.00 $38.62 2 42 $19.53 $13.20 $5.89 $0.00 $38.62 3 47 $21.86 $13.20 $11.13 $1.39 $47.58 4 47 $21.86 $13.20 $11.13 $1.39 $47.58 5 52 $24.18 $13.20 $12.08 $1.48 $50.94 6 52 $24.18 $13.20 $12.33 $1.49 $51.20 7 60 $27.90 $13.20 $13.70 $1.64 $56.44 8 65 $30.23 $13.20 $14.65 $1.74 $59.82 9 75 $34.88 $13.20 $16.56 $1.94 $66.58 10 85 $39.53 $13.20 $17.96 $2.12 $72.81 Effective Date- 08/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 42 $20.20 $13.20 $5.89 $0.00 $39.29 2 42 $20.20 $13.20 $5.89 $0.00 $39.29 3 47 $22.61 $13.20 $11.13 $1.41 $48.35 4 47 $22.61 $13.20 $11.13 $1.41 $48.35 5 52 $25.01 $13.20 $12.08 $1.51 $51.80 6 52 $25.01 $13.20 $12.33 $1.52 $52.06 7 60 $28.86 $13.20 $13.70 $1.67 $57.43 8 65 $31.27 $13.20 $14.65 $1.77 $60.89 9 75 $36.08 $13.20 $16.56 $1.98 $67.82 10 85 $40.89 $13.20 $17.96 $2.16 $74.21 - - - - - - - - - - - - - - - - - - - - - - - - Notes: - - I Steps are 6 mos. - - - - - - - - - - - - - - - - - - - - - - J Apprentice to Journeyworker Ratio:1:4 SPECIALIZED EARTH MOVING EQUIP<35 TONS 12/01/2018 $34.64 $11.91 $12.70 $0.00 $59.25 TEAMSTERS JOINT COUNCIL NO.10 ZONE A 06/01/2019 $35.64 $11.91 $12.70 $0.00 $60.25 08/01/2019 $35.64 $12.41 $12.70 $0.00 $60.75 12/01/2019 $35.64 $12.41 $13.72 $0.00 $61.77 06/01/2020 $36.54 $12.41 $13.72 $0.00 $62.67 08/01/2020 $36.54 $12.91 $13.72 $0.00 $63.17 12/01/2020 $36.54 $12.91 $14.82 $0.00 $64.27 06/01/2021 $37.34 $12.91 $14.82 $0.00 $65.07 08/01/2021 $37.34 $13.41 $14.82 $0.00 $65.57 12/01/2021 $37.34 $13.41 $16.01 $0.00 $66.76 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 34 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment SPECIALIZED EARTH MOVING EQUIP>35 TONS 12/01/2018 $34.93 $11.91 $12.70 $0.00 $59.54 TEAMSTERS JOINT COUNCIL NO.10 ZONE A 06/01/2019 $35.93 $11.91 $12.70 $0.00 $60.54 08/01/2019 $35.93 $12.41 $12.70 $0.00 $61.04 12/01/2019 $35.93 $12.41 $13.72 $0.00 $62.06 06/01/2020 $36.83 $12.41 $13.72 $0.00 $62.96 08/01/2020 $36.83 $12.91 $13.72 $0.00 $63.46 12/01/2020 $36.83 $12.91 $14.82 $0.00 $64.56 06/01/2021 $37.63 $12.91 $14.82 $0.00 $65.36 08/01/2021 $37.63 $13.41 $14.82 $0.00 $65.86 12/01/2021 $37.63 $13.41 $16.01 $0.00 $67.05 SPRINKLER FITTER 03/01/2019 $58.98 $9.47 $19.60 $0.00 $88.05 SPRINKLER FITTERS LOCAL 550-(Section A)Zone 1 10/01/2019 $60.48 $9.47 $19.60 $0.00 $89.55 03/01/2020 $61.98 $9.47 $19.60 $0.00 $91.05 10/01/2020 $63.48 $9.47 $19.60 $0.00 $92.55 03/01/2021 $64.98 $9.47 $19.60 $0.00 $94.05 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 35 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- SPRINKLER FITTER-Local 550(Section A)Zone I Effective Date- 03/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $20.64 $9.47 $9.10 $0.00 $39.21 2 40 $23.59 $9.47 $9.10 $0.00 $42.16 3 45 $26.54 $9.47 $9.10 $0.00 $45.11 4 50 $29.49 $9.47 $9.10 $0.00 $48.06 5 55 $32.44 $9.47 $9.10 $0.00 $51.01 6 60 $35.39 $9.47 $10.60 $0.00 $55.46 7 65 $38.34 $9.47 $10.60 $0.00 $58.41 8 70 $41.29 $9.47 $10.60 $0.00 $61.36 9 75 $44.24 $9.47 $10.60 $0.00 $64.31 10 80 $47.18 $9.47 $10.60 $0.00 $67.25 Effective Date- 10/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $21.17 $9.47 $9.10 $0.00 $39.74 2 40 $24.19 $9.47 $9.10 $0.00 $42.76 3 45 $27.22 $9.47 $9.10 $0.00 $45.79 4 50 $30.24 $9.47 $9.10 $0.00 $48.81 5 55 $33.26 $9.47 $9.10 $0.00 $51.83 6 60 $36.29 $9.47 $10.60 $0.00 $56.36 7 65 $39.31 $9.47 $10.60 $0.00 $59.38 8 70 $42.34 $9.47 $10.60 $0.00 $62.41 9 75 $45.36 $9.47 $10.60 $0.00 $65.43 10 80 $48.38 $9.47 $10.60 $0.00 $68.45 - - - - - - - - - - - - - - - - - - - - - - - - - - - - Notes:Apprentice entered prior 9/30/10: 40/45/50/55/60/65/70/75/80/85 - -Steps are 850 hours J - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:3 STEAM BOILER OPERATOR 12/01/2018 $47.10 $11.50 $15.60 $0.00 $74.20 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.19 $11.50 $15.60 $0.00 $75.29 12/01/2019 $49.33 $11.50 $15.60 $0.00 $76.43 06/01/2020 $50.41 $11.50 $15.60 $0.00 $77.51 12/01/2020 $51.55 $11.50 $15.60 $0.00 $78.65 06/01/2021 $52.64 $11.50 $15.60 $0.00 $79.74 12/01/2021 $53.78 $11.50 $15.60 $0.00 $80.88 For apprentice rates see"Apprentice-OPERATING ENGINEERS" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 36 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment TAMPERS,SELF-PROPELLED OR TRACTOR DRAWN 12/01/2018 $47.10 $11.50 $15.60 $0.00 $74.20 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.19 $11.50 $15.60 $0.00 $75.29 12/01/2019 $49.33 $11.50 $15.60 $0.00 $76.43 06/01/2020 $50.41 $11.50 $15.60 $0.00 $77.51 12/01/2020 $51.55 $11.50 $15.60 $0.00 $78.65 06/01/2021 $52.64 $11.50 $15.60 $0.00 $79.74 12/01/2021 $53.78 $11.50 $15.60 $0.00 $80.88 For apprentice rates see"Apprentice-OPERATING ENGINEERS" TELECOMMUNICATION TECHNICIAN 03/01/2019 $38.33 $13.00 $16.82 $0.00 $68.15 ELECTRICIANS LOCAL 103 Apprentice- TELECOMMUNICATION TECHNICIAN-Local 103 Effective Date- 03/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $15.33 $13.00 $0.46 $0.00 $28.79 2 40 $15.33 $13.00 $0.46 $0.00 $28.79 3 45 $17.25 $13.00 $13.42 $0.00 $43.67 4 45 $17.25 $13.00 $13.42 $0.00 $43.67 5 50 $19.17 $13.00 $13.73 $0.00 $45.90 6 55 $21.08 $13.00 $14.03 $0.00 $48.11 7 60 $23.00 $13.00 $14.34 $0.00 $50.34 8 65 $24.91 $13.00 $14.66 $0.00 $52.57 9 70 $26.83 $13.00 $14.96 $0.00 $54.79 10 75 $28.75 $13.00 $15.27 $0.00 $57.02 rNotes:- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:1 TERRAZZO FINISHERS 02/01/2019 $52.49 $10.75 $20.66 $0.00 $83.90 BRICKLAYERS LOCAL 3-MARBLE&TILE 08/01/2019 $53.84 $10.75 $20.80 $0.00 $85.39 02/01/2020 $54.48 $10.75 $20.80 $0.00 $86.03 08/01/2020 $55.83 $10.75 $20.95 $0.00 $87.53 02/01/2021 $56.47 $10.75 $20.95 $0.00 $88.17 08/01/2021 $57.87 $10.75 $21.11 $0.00 $89.73 02/01/2022 $58.46 $10.75 $21.11 $0.00 $90.32 Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 37 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Apprentice- TERRAZZO FINISHER-Local 3 Marble&Tile Effective Date- 02/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.25 $10.75 $20.03 $0.00 $57.03 2 60 $31.49 $10.75 $20.03 $0.00 $62.27 3 70 $36.74 $10.75 $20.03 $0.00 $67.52 4 80 $41.99 $10.75 $20.03 $0.00 $72.77 5 90 $47.24 $10.75 $20.03 $0.00 $78.02 Effective Date- 08/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.92 $10.75 $20.80 $0.00 $58.47 2 60 $32.30 $10.75 $20.80 $0.00 $63.85 3 70 $37.69 $10.75 $20.80 $0.00 $69.24 4 80 $43.07 $10.75 $20.80 $0.00 $74.62 5 90 $48.46 $10.75 $20.80 $0.00 $80.01 - - - - - - - - - - - - - - - - - - - - - - - - - - - rNotes: - - - - - - - - - - - - - - - - - - - - - - Apprentice to Journeyworker Ratio:1:3 TEST BORING DRILLER 12/01/2018 $40.00 $7.85 $15.55 $0.00 $63.40 LABORERS-FOUNDATION AND MARINE 06/01/2019 $41.00 $7.85 $15.55 $0.00 $64.40 12/01/2019 $42.00 $7.85 $15.55 $0.00 $65.40 06/01/2020 $42.99 $7.85 $15.55 $0.00 $66.39 12/01/2020 $43.97 $7.85 $15.55 $0.00 $67.37 06/01/2021 $44.99 $7.85 $15.55 $0.00 $68.39 12/01/2021 $46.00 $7.85 $15.55 $0.00 $69.40 For apprentice rates see"Apprentice-LABORER" TEST BORING DRILLER HELPER 12/01/2018 $38.72 $7.85 $15.55 $0.00 $62.12 LABORERS-FOUNDATIONAND MARINE 06/01/2019 $39.72 $7.85 $15.55 $0.00 $63.12 12/01/2019 $40.72 $7.85 $15.55 $0.00 $64.12 06/01/2020 $41.71 $7.85 $15.55 $0.00 $65.11 12/01/2020 $42.69 $7.85 $15.55 $0.00 $66.09 06/01/2021 $43.71 $7.85 $15.55 $0.00 $67.11 12/01/2021 $44.72 $7.85 $15.55 $0.00 $68.12 For apprentice rates see"Apprentice-LABORER" TEST BORING LABORER 12/01/2018 $38.60 $7.85 $15.55 $0.00 $62.00 LABORERS-FOUNDATIONAND MARINE 06/01/2019 $39.60 $7.85 $15.55 $0.00 $63.00 12/01/2019 $40.60 $7.85 $15.55 $0.00 $64.00 06/01/2020 $41.59 $7.85 $15.55 $0.00 $64.99 12/01/2020 $42.57 $7.85 $15.55 $0.00 $65.97 06/01/2021 $43.59 $7.85 $15.55 $0.00 $66.99 12/01/2021 $44.60 $7.85 $15.55 $0.00 $68.00 For apprentice rates see"Apprentice-LABORER" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 38 of 41 Supplemental Total Rate Classification Effective Date Base Wage Health Pension Unemployment TRACTORS/PORTABLE STEAM GENERATORS 12/01/2019 $47.10 $11.50 $15.60 $0.00 $74.20 OPERA TING ENGINEERS LOCAL 4 06/01/2019 $48.19 $11.50 $15.60 $0.00 $75.29 12/01/2019 $49.33 $11.50 $15.60 $0.00 $76.43 06/01/2020 $50.41 $11.50 $15.60 $0.00 $77.51 12/01/2020 $51.55 $11.50 $15.60 $0.00 $78.65 06/01/2021 $52.64 $11.50 $15.60 $0.00 $79.74 12/01/2021 $53.78 $11.50 $15.60 $0.00 $80.88 For apprentice rates see"Apprentice-OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2018 $35.22 $11.91 $12.70 $0.00 $59.83 TEAMSTERS JOINT COUNCIL No.10 ZONE A 06/01/2019 $36.22 $11.91 $12.70 $0.00 $60.83 08/01/2019 $36.22 $12.41 $12.70 $0.00 $61.33 12/01/2019 $36.22 $12.41 $13.72 $0.00 $62.35 06/01/2020 $37.12 $12.41 $13.72 $0.00 $63.25 08/01/2020 $37.12 $12.91 $13.72 $0.00 $63.75 12/01/2020 $37.12 $12.91 $14.82 $0.00 $64.85 06/01/2021 $37.92 $12.91 $14.82 $0.00 $65.65 08/0t/2021 $37.92 $13.41 $14.82 $0.00 $66.15 12/01/2021 $37.92 $13.41 $16.01 $0.00 $67.34 TUNNEL WORK-COMPRESSED AIR 12/01/2018 $50.88 $7.85 $15.95 $0.00 $74.68 LABORERS(COMPRESSED AIR) 06/01/2019 $51.88 $7.85 $15.95 $0.00 $75.68 12/01/2019 $52.88 $7.85 $15.95 $0.00 $76.68 06/01/2020 $53.87 $7.85 $15.95 $0.00 $77.67 12/01/2020 $54.85 $7.85 $15.95 $0.00 $78.65 06/01/2021 $55.87 $7.85 $15.95 $0.00 $79.67 12/01/2021 $56.99 $7.85 $15.95 $0.00 $80.68 For apprentice rates see"Apprentice-LABORER" TUNNEL WORK-COMPRESSED AIR(HAZ.WASTE) 12/01/2018 $52.99 $7.85 $15.95 $0.00 $76.68 LABORERS(COMPRESSED AIR) 06/01/2019 $53.88 $7.85 $15.95 $0.00 $77.69 12/01/2019 $54.88 $7.85 $15.95 $0.00 $78.68 06/01/2020 $55.87 $7.85 $15.95 $0.00 $79.67 12/01/2020 $56.85 $7.85 $15.95 $0.00 $80.65 06/01/2021 $57.87 $7.85 $15.95 $0.00 $81.67 12/01/2021 $58.88 $7.85 $15.95 $0.00 $82.68 For apprentice rates see"Apprentice-LABORER" TUNNEL WORK-FREE AIR 12/01/2018 $42.95 $7.85 $15.95 $0.00 $66.75 LABORERS(FREE AIR TUNNEL) 06/01/2019 $43.95 $7.85 $15.95 $0.00 $67.75 12/01/2019 $44.95 $7.85 $15.95 $0.00 $68.75 06/01/2020 $45.94 $7.85 $15.95 $0.00 $69.74 12/01/2020 $46.92 $7.85 $15.95 $0.00 $70.72 06/01/2021 $47.94 $7.85 $15.95 $0.00 $71.74 12/01/2021 $48.95 $7.85 $15.95 $0.00 $72.75 For apprentice rates see"Apprentice-LABORER" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 39 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment TUNNEL WORK-FREE AIR(HAZ.WASTE) 12/01/2018 $44.95 $7.85 $15.95 $0.00 $68.75 LABORERS(FREE AIR TUNNEL) 06/01/2019 $45.95 $7.85 $15.95 $0.00 $69.75 12/01/2019 $46.95 $7.85 $15.95 $0.00 $70.75 06/01/2020 $47.94 $7.85 $15.95 $0.00 $71.74 12/01/2020 $48.92 $7.85 $15.95 $0.00 $72.72 06/01/2021 $49.94 $7.85 $15.95 $0.00 $73.74 12/01/2021 $50.95 $7.85 $15.95 $0.00 $74.75 For apprentice rates see"Apprentice-LABORER" VAC-HAUL 12/01/2018 $34.64 $11.91 $12.70 $0.00 $59.25 TEAMSTERSJOINT COUNCIL NO.10 ZONEA 06/01/2019 $35.64 $11.91 $12.70 $0.00 $60.25 08/01/2019 $35.64 $12.41 $12.70 $0.00 $60.75 12/01/2019 $35.64 $12.41 $13.72 $0.00 $61.77 06/01/2020 $36.54 $12.41 $13.72 $0.00 $62.67 08/01/2020 $36.54 $12.91 $13.72 $0.00 $63.17 12/01/2020 $36.54 $12.91 $14.82 $0.00 $64.27 06/01/2021 $37.34 $12.91 $14.82 $0.00 $65.07 08/01/2021 $37.34 $13.41 $14.82 $0.00 $65.57 12/01/2021 $37.34 $13.41 $16.01 $0.00 $66.76 WAGON DRILL OPERATOR 12/01/2018 $38.90 $7.85 $15.35 $0.00 $62.10 LABORERS-ZONE] 06/01/2019 $39.90 $7.85 $15.35 $0.00 $63.10 12/01/2019 $40.90 $7.85 $15.35 $0.00 $64.10 06/01/2020 $41.89 $7.85 $15.35 $0.00 $65.09 12/01/2020 $42.87 $7.85 $15.35 $0.00 $66.07 06/01/2021 $43.89 $7.85 $15.35 $0.00 $67.09 12/01/2021 $44.90 $7.85 $15.35 $0.00 $68.10 For apprentice rates see"Apprentice-LABORER" WASTE WATER PUMP OPERATOR 12/01/2018 $47.58 $11.50 $15.60 $0.00 $74.68 OPERATING ENGINEERS LOCAL 4 06/01/2019 $48.68 $11.50 $15.60 $0.00 $75.78 12/01/2019 $49.83 $11.50 $15.60 $0.00 $76.93 06/01/2020 $50.93 $11.50 $15.60 $0.00 $78.03 12/01/2020 $52.08 $11.50 $15.60 $0.00 $79.18 06/01/2021 $53.18 $11.50 $15.60 $0.00 $80.28 12/01/2021 $54.33 $11.50 $15.60 $0.00 $81.43 For apprentice rates see"Apprentice-OPERATING ENGINEERS" WATER METER INSTALLER 03/01/2019 $56.69 $11.82 $16.51 $0.00 $85.02 PLUMBERS&GASFITTERS LOCAL 12 09/01/2019 $58.19 $11.82 $16.51 $0.00 $86.52 03/01/2020 $59.69 $11.82 $16.51 $0.00 $88.02 09/01/2020 $61.19 $11.82 $16.51 $0.00 $89.52 03/01/2021 $62.69 $11.82 $16.51 $0.00 $91.02 For apprentice rates see"Apprentice-PLUMBER/PIPEFITTER"or"PLUMBER/GASFITTER" Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 40 of 41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemulovment Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre-determined hourly wage rate established by the Commissioner under the provisions of the M.G.L.c.149,ss.26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c.23,ss.I I&I IL. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L.c.23,ss.I IE-I IL. All steps are six months(1000 hours.) Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof,unless otherwise specified. ** Multiple ratios are listed in the comment field. *** APP to JM;1:1,2:2,2:3,3:4,4:4,4:5,4:6,5:7,6:7,6:8,6:9,7:10,8:10,8:11,8:12,9:13,10:13,10:14,etc. **** APP to JM;1:1,1:2,2:3,2:4,3:5,4:6,4:7,5:8,6:9,6:10,7:11,8:12,8:13,9:14,10:15,10:16,etc. Issue Date: 04/18/2019 Wage Request Number: 20190418-076 Page 41 of 41