Loading...
HomeMy Public PortalAboutTOL PR 2018-03-01 Main pool reopening Town of Leesburg News Release For Immediate Release March 1, 2018 Media Contact: Betsy Arnett, Public Information Officer barnett@leesburgva.gov  703-771-2734 Ida Lee Main Indoor Pool Will Reopen on Sunday, March 4, 2018 Leesburg, VA (March 1, 2018) – Repairs to the drain vaults in the deep end of the main indoor pool at Ida Lee Park Recreation Center have been completed and the pool will reopen on Sunday, March 4, 2018, at 8:00 a.m. On Wednesday, February 7, staff discovered that the fiberglass lining of one of the pool’s three drain vaults was cracked and leaking. Engineering analysis determined that the leak did not cause significant erosion under the pool shell or any structural damage to the pool. As a precaution against similar problems with the other two drain vaults, all three vault s were reinforced with rebar, encased in new concrete, and covered with a new plaster coating. # # #