Loading...
HomeMy Public PortalAbout12-0498 Johnson 4 skir •y CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 09-14-2012 PERMIT#: 120498 WORK DESCRIPTION CONSTRUCT 8X13 ROOM FOR CLOSET WORK LOCATION 1306 JONES OWNER NAME JEAN JOHNSON ADDRESS PO BOX 143 CITY,ST,ZIP TYBEE ISLAND GA 31328-0143 PHONE NUMBER CONTRACTOR NAME FIRST CITY ENTERPRISES ADDRESS PO BOX 1016 CITY STATE ZIP TYBEE ISLAND GA 31328 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 109.00 PROPERTY IDENTIFICATION# PROJECT VALUATION $8,000.00 TOTAL BALANCE DUE: $ 109.00 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. / - Signature of Building Inspector or Authorized Agent: • 4 P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 wnw•.cityofty bee.org /r gtis i24*, it-`..t., , City ur Tybee Island • Planning & Zoniny Dept. ■iKiy ,s;$ ' {1' Inspection Report s1�lk \\; % 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 """' • y INTERNATIONAL Phone 912.472.5032 • Fax 912.786.9539 INTER COMM MEMBER Permit No. / r_ 4/ �.� �� %c)„47,7,.., Date Requested Owner's Name 4-ii--e,=--ii Date Needed Gen. Contractor /ei-- -1 !•7-7 Subcontractor _ / Contact Information E/1 ''_?J7• `'. �q%( Project Address '% ,1? ,( Scope of Work - -.1- , �- , ::�J Inspector Date of Inspection Inspection [- ic„.. Pass D Fee j/:AA) A--%4-_€/25 `wee'-'.-2-,- (' f 9-- Inspection b„ )iT ! Pass . Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee r \ E3-"ZI City of Tybee Island • Planning & Zoning Dept. Itit*A. Inspection Report milliva4 n,..,....re 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 INTERZONAL Phone 912.472.5032 • Fax 912.786.9539 CODECOUNCE MEMBER Permit No. ':--- - OL--1f-2 Date Requested , ,,s,, Owner's Name -L-\t,..)_-_-;o,,) Date Needed t,D/ 23 /0- Gen. Contractor L,t-14-. , Subcontractor I --- Contact Information i , 1 \ 1 "--;?_.) Project Address i Scope of Work 0 1.---A-,) '2_,...i Inspector ')/ ) Date of Inspection Inspection I- , - , Pass El Fail 10 Fet_ '‘ -12re"( rF'-:- Inspection ,,, - Pass a'7a Fee odt Inspection 1-?1- - Pass 0 Fail El Fe- ii:__ Inspection Pass 0 Fail 0 Fee r CA-1 1 i-+Us-f- `�� s City of Tybee Island • Planning & Zoniny Dept. 111 j Inspection Report monk 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 INTEcNATIONAL .&,n.-,_,,'/ Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL MEMBER Permit No. )7_ - 0� t-, Date Requested ‘q/7--C2 f 17- p /I Owner's Name -. !r>)41-- -�%�r-) Date Needed C4ZT 1 r7.,. Gen. Contractor 1-1117- -A"' li Subcontractor Contact Information i L-pl/'t 4---1,----b`-7 - 8 L) Z-c, Project Address I --7_71) �C>r1`.S '!,W�� Scope of Work �-= .7t"1 ! C? • / / �/. Inspector p r �/'� Date of Ins ection ; :!� Z--- rAS Inspection ii\i - Pass .Fee //-4 , `"7k z1- i ,,11,-/9 //z2,---/ / V, /, ,) -, ii---0, /J/1.5H ' - / - J Inspection F YV1 - Pass "Fai Fee, �,.� —.7 Inspection I` I -' Pass I visfi Fee Inspection Pass ❑ Fail ❑ Fee 471i4c CitNiut Tybee Island • Planning & ZoningDept. way& 1.:::. ,1 Inspection Report ousallk nminnos 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 INTFRZONAL ,,„ Phone 912.472.5032 - Fax 912.786.9539 CODECOUNC1U / MEMBER , Permit No. r -}- / ----- Date Requested Owner's Name \, ,,"-- , ,, ,, ,,,' Date Needed i •?V/ 1. , Gen. Contractor -- _ - ,_ , - .„, / --1 Subcontractor / Contact Information Project Address / , , „, _ 7 Scope of Work Inspector Date of Inspection , /AD Inspection 7 ' / / ' '-'' ) Pass Pli re.' Fee , / , , _ / , • /--- / '0) 1 Asi/i( / )6-- ) .> 4=- =6- -/ i > /- ,--/ Inspection Pass 0 Fail El Fee Inspection Pass 0 Fail 0 Fee Inspection Pass 0 Fail 0 Fee j2 &4 'It of \ City of Tybee Island, Georgia ii s,\ 912-472-5033 or 912-472-5031 - Fax 912-786-9539 K.1, f i i a}, APPLICATION FOR BUILDING PERMIT Property Address: 130 5jpJg Ali ,TiVoLb cpi Name . Mailing Address Telephone [7A - t e, PQ 07( II-1 Home: %453F Owner I_..r=�. ' -*_� s y 6A :137 7 Cell: g5�,. 0379 Architect or ' -pi} So,J Engineer N �, Fi c i T y Glerfr&S g o d O .gam 1 0 1 f Home: n.-6-S240 Contractor 7 ! -. // u/)� # 132g Cell: ;67-7-02_6 (Check all that apply) '® Single Family ❑ Discovery/Tearout ❑ Demolition of Structure ❑ Duplex ❑ Footprint Changes— ❑ Other ❑ Multi-Family units new square feet ❑ Commercial units heated/cooled /� -�- �" Details of Project: C,fros i�Zi��.,�i (�I'.'n g.l(12 � � /<zU. (QrZ. €% I A"A "T61 a G k` l c,D` - IQ ;a�11,��Dvds .! I C o 1N I o i5 l 'ETC it//d 745 dí� cL ) I Est ted Cost of Construction: $ goo 0..00 (materials + labor+ profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: �Q5 Listed on National Historic Register or located within a National Historic District? Y / N *Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation,you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. *Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On-site reltroonifacilities will be provided through Q1' . Construction debris will be disposed by CO/MAO Of by means of c"Joq s fbk., . I understand that I must comply with zoning,flood damage control, building, fire, shore protection and wetlaid ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted constru ti.n. Date: 12. Signature of Applic.nt: )2/4,j / ', FEES Printed Name DO, A Af.1j MA PM Permit Inspections Note: A permit normally takes 7 to 10 days to process Cap Cost Rec Water Tap • Approvals: S.: ature Da - Sewer Stub Planning &Zoning Manager / Eng. Fees Building Official �� _ 21r,V Aid to Const. Water/Sewer Storm/Drainage City Manager TOTAL LEAD-BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead-safe work practices. Georgia Environmental Protection Division Lead-Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead-based painted or coated surfaces or components more than 6 ft2 per interior room or 20 fe of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * * * Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood osts, post spacing, Type G or A. pia l � Z� Signature for ceipt o Lead "aint, Asbestos, and BMP notices. Date Ihtsr4A . /11,-3h, "1' , Printed Name LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families. Child Care Providers. and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft per interior room or 20 ft of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Proiects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * ** BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood osts, post spacing, Type C, or A. g r, / VA Signature foraceipt of laint, Asbestos, and BMP notices. / / Date I g9-9 /RA Printed Name t