Loading...
HomeMy Public PortalAbout2024-03-07 packet Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as required under the Americans with Disabilities Act. Please allow three business days to process the request. Please call (573) 634-6410 with questions regarding agenda items. Technical Committee Thursday, March 7, 2024 at 10:00 a.m. Meeting Location: Boone-Bancroft Room, John G. Christy Municipal Building 320 E. McCarty, Jefferson City, MO 65101 - Enter through Main Lobby THIS MEETING IS AVAILABLE VIRTUALLY TO JOIN VIRTUALLY: https://jeffersoncity.webex.com/jeffersoncity/j.php?MTID=mc52dc698b112e3b0b4463be78a511dd4 CALL-IN AVAILABLE AT: 1-404-397-1516 MEETING NUMBER: 2485 825 8464 MEETING PASSWORD: 1234 TENTATIVE AGENDA 1. Call to order, roll call, and determination of a quorum 2. Public comment 3. Adoption of the agenda as printed or amended 4. Approval of the minutes from the meeting of January 11, 2024 5. Communications Received 6. Old Business A. CAMPO 2045 & Beyond Metropolitan Transportation Plan – Draft Action Requested: Review and discussion Staff Report: Staff have begun the update of the CAMPO 2045 & Beyond Metropolitan Transportation Plan (MTP). The MTP assesses regional transportation needs over a twenty-year planning horizon by outlining goals, strategies, and projects for the CAMPO region. The MTP is federally required to be updated every five years and was last updated in 2019. Products and materials pertaining to the update of the MTP are reviewed and vetted by the Technical Committee. See attached staff report and link to draft document and survey results. 7. New Business A. Traffic Study of US 54/63/50 Tri-Level Interchange – RFQ Selection Committee and Project Scope of Services Review Action Requested: Review, discussion and recommendation of selection committee to Board of Directors Staff Report: Staff are seeking review of Request for Qualifications/Scope of Services materials for the US 50/54/63 Tri-Level Interchange Study and formation of an RFQ selection committee to review and make recommendation on RFQ responses. See attached staff report. B. 2025-2029 Transportation Improvement Program (TIP) - Draft Action Requested: Review and discussion Staff Report: The TIP is a 5-year financial program of transportation projects to be implemented within the Metropolitan Planning Area (MPA), which are funded by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), or are deemed ‘regionally significant. The TIP is updated annually by CAMPO in cooperation with local jurisdictions, the Missouri Department of Transportation (MoDOT), and local public transportation operators. See attached staff report and draft document. C. FY 2025 Unified Planning Work Program (UPWP) - Draft Action Requested: Review and discussion Staff Report: The UPWP is CAMPO’s annual statement of work identifying the budget, planning priorities, and activities to be carried out for the year (November 1 to October 31). The UPWP contains many ongoing activities required to perform the essential functions of CAMPO, as well as, periodic and one-time activities. The UPWP serves as the basis for funding agreements with the Missouri Department of Transportation (MoDOT). See attached staff report and draft document. Capital Area Metropolitan Planning Organization Room 120 320 E. McCarty, Jefferson City, MO 65101 Phone 573.634.6410 Fax 573.634.6457 Agenda/Capital Area Metropolitan Planning Organization Page 2 Technical Committee 8. Other Business A. Status of Current Work Tasks B. Member Updates 9. Next Meeting Date Thursday, April 4, 2024 at 10:00 a.m. - Boone-Bancroft Room, City of Jefferson City Hall 10. Adjournment MINUTES TECHNICAL COMMITTEE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION January 11, 2023 VOTING MEMBERS PRESENT David Bange, Chair, City of Jefferson Eric Barron, City of Jefferson Steve Engelbrecht, MoDOT Shannon Kliethermes, Cole County Matt Prenger, Vice Chairman, Cole County Eric Bowers as designee for Britt Smith, City of Jefferson Clint Smith, City of Jefferson Aaron Grefrath, City of Jefferson Gerry Stegeman, City of Jefferson Howard David Thomas, Callaway County Rachel Busche, City of Wardsville Mike Henderson, MoDOT Daniel Roeger, MoDOT Kevin Schwartz, Bike/Ped Interest Matt Morasch, City of Jefferson VOTING MEMBERS ABSENT Mark Tate, Holts Summit EX-OFFICIO MEMBERS PRESENT Cecelie Cochran, FHWA STAFF PRESENT (Non-Voting) Katrina Williams, Senior Planner Kortney Bliss, Planner Tiphanie Pearson, Administrative Assistant GUESTS PRESENT Paul Samson Gary Plummer Stephi Smith Scott Spencer 1. Call to order, roll call, and determination of a quorum Mr. Bange called the meeting to order at 10:09 a.m. and asked Ms. Pearson to call roll. A quorum of 15 voting members were present. 2. Public comment No public comment. 3. Adoption of the agenda as printed or amended Mr. Britt Smith moved and Mr. Kliethermes seconded to adopt the agenda as printed. The motion passed unanimously. 4. Approval of the minutes from the meeting of December 7, 2023. Mr. Britt Smith moved and Mr. Prenger seconded to approve the minutes from the meeting of December 7, 2023 as written. The motion passed unanimously. 5. Communications Received No communications received. Minutes/Capital Area Metropolitan Planning Organization Technical Committee January 11, 2024 Page 2 6. Old Business A. CAMPO 2045 & Beyond Metropolitan Transportation Plan – 2023-2024 Update • Ms. Williams gave details on the plan and gave an update on what work needed to be done in the month of January. She stated that the public survey will close later this week and that staff has almost concluded presentations to jurisdictions. She stated that staff will begin writing, researching, analyzing, and integrating survey results. Mr. Bange asked what sort of timeframe this project will take and Ms. Williams stated it would take about a year to complete and she gave additional details about the extent of the project. Mr. Bange then asked when the deadline is for submittal and Ms. Williams stated that it was due by May 2024. There were no further questions. 7. New Business A. Metropolitan Planning Area Boundary Review • Mr. Barron gave details on the establishment of the new metropolitan planning area boundary. Mr. Barron stated that minimal changes were made to the existing boundary in order to accommodate inclusion of adjusted urban area. He also stated that minor adjustments were made to accommodate matching the new boundary with existing geographic boundaries such as municipal limits and census boundaries. Mr. Henderson stated that he had forwarded a digital version of the boundary to MoDOT GIS staff for a preliminary review and doesn’t expect any changes are necessary. o Mr. Morasch moved and Mr. Britt Smith seconded to forward the proposed 2024 CAMPO Metropolitan Planning Area Boundary to the Board of Directors for approval.  The motion passed unanimously. B. Federal Functional Classification Review • Mr. Barron provided an overview of the draft maps received from MoDOT that included to no changes to federal functional class. He explained that federal functional classification are the roads currently eligible for federal aid. Staff is to submit any proposed changes to MoDOT. Mr. Barron stated there were no proposed changes. No questions from the Committee. o Mr. Morasch motioned and Mr. Britt Smith seconded to forward the Functional Classification maps to the Board of Directors for approval.  The motion passed unanimously. C. FY 2024 UPWP Amendment – Proposed Tri-Level Study • Mr. Barron stated that a JC REP proposed use of CAMPO and local funds at the December Board of Directors meeting. He also stated that this project was number two on the unfunded needs list and was a high priority. He went on to state that an older study done in relation to this project was funded by Cole County. That study was to look into traffic volumes. Mr. Barron went over the estimated timeline for amending the UPWP to accommodate hiring a consultant to complete the study and highlighted important deadlines for the timeline. He stated that the project will be managed by the Jefferson City Public Works Department. There was then some discussion regarding scope of the project. Mr. Barron went on to explain the budget changes that would need to take place within CAMPO, City of Jefferson, and Cole County. Mr. Barron stated that an amendment to the FY 2024 UPWP would be necessary to accommodate starting the RFQ process in 2024 and that staff could develop this amendment for the January Board of Directors meeting. o Mr. Prenger motioned and Mr. Morasch seconded to forward to the Board of Directors for approval.  The motion passed unanimously. 8. Other Business A. 2025-2029 Transportation Improvement Program (TIP) – Annual update of the TIP is underway • Ms. Williams stated that staff is starting the annual process of developing the TIP and is gathering information from MoDOT and other local jurisdictions on federally funded projects, budgets, and Minutes/Capital Area Metropolitan Planning Organization Technical Committee January 11, 2024 Page 3 maintenance costs. She stated that the deadline to get information back is February 28th. Ms. Williams went on to state that the TIP will be adopted by the Technical Committee and Board of Directors in May and then the Governor gives final approval in June. She stated she will give more information in the February Technical Committee meeting. B. FY 2025 Unified Planning Work Program (UPWP) – Annual development of the UPWP is underway • Ms. Williams stated that this was an annual budget process that is required federally. She stated that the UPWP outlines work tasks staff will undertake in the the next fiscal year and went over the work elements. She stated that staff will be working on the Coordinated Public Transit – Human Services Transportation Plan and asked for information on any other potential new projects for FY 2025. More information will be provided at the next Technical Committee Meeting. There were no questions. C. Status of Current Work Tasks • Ms. Williams stated that staff is currently working on the following: o Metropolitan Transportation Plan (MTP) o CAMPO Metropolitan Planning Area (MPA) Boundary Review o Federal Functional Classification Review o Proposed US 54/63/50 Tri-Level Study o 2025-2029 Transportation Improvement Program (TIP) Development o FY 2025 Unified Planning Work Program Development (UPWP) o Capital Area Active Transportation Plan o GIS/Technical Assistance o JEFFTRAN Transit Facility Feasibility Study D. Member Updates • Mr. Stegeman stated that the two new hybrid buses were in • Mr. Britt Smith stated that plans are moving forward for the airport control tower • Mr. Henderson stated that the state-wide planning partner meeting is February 29th • Mr. Thomas introduced himself • Mr. Prenger stated that conversations on the TAP projects are ongoing; and he also stated that the contractor is slated to start on the bridge on Friendship Road by February 1st • Mr. Roeger stated that staffing continues to be an issue, however, the staff they have recently hired are being trained currently and it is going well • Ms. Williams mentioned the National Child Passenger Safety Course • Ms. Busche stated that there will be an open house at the new building coming up soon • Mr. Grefrath gave an update on the Boggs Creek project • Mr. Bange stated that the Greenway project is out to bid and is due back on January 23rd and he also stated that there is a new sewer main needed on the 179 bypass and it is out for construction by August 9. Next Meeting Date Thursday, February 1, 2023 at 10:00 a.m. in the Boone/Bancroft Room #200. 10. Adjournment The meeting adjourned at 11:19 a.m. Mr. Bange stated that we have come to the end of the meeting, so we stand adjourned. Respectfully submitted, Tiphanie Pearson, Administrative Assistant Agenda Item 6A CAMPO Technical Committee Staff Report CAMPO 2045 & Beyond Metropolitan Transportation Plan – 2023-2024 Update March 7, 2024 Summary The update of the CAMPO 2045 & Beyond Metropolitan Transportation Plan (MTP) began in mid-2023. The MTP, is a long-range plan that assesses regional transportation needs over a twenty-year planning horizon. The MTP sets goals and defines policies, programs, strategies, and projects to meet the transportation needs of the CAMPO region. The MTP is federally required to by updated every 5 years and utilize a minimum 20-year planning horizon. The MTP was last updated in 2019. The Technical Committee is requested to review the materials linked below and provide feedback to staff. Thank you. Progress Report February Staff focused on research, mapping, and writing the draft plan during the month of February. The draft document, provided in the link below, includes updates to several sections of the previous plan. The draft is very much a working draft document. Updates thus far include integration of survey results, text updates, and changes to several charts, maps and graphics. New requirement stemming for the Bipartisan Infrastructure Law (BIL) have been added to meet regulations. Staff will provide an update on these changes and recommendations for edits to the illustrative list and implementation strategies, stemming from public/stakeholder input and analysis of new GIS data. • Draft MTP Document: https://cms4files.revize.com/jeffersoncitymo/CAMPO2045_MTP_2024_Draft%2002.202024.pdf • Survey Results: https://cms4files.revize.com/jeffersoncitymo/MTP%20Survey%20Data_All_240111.pdf • Draft Illustrative List https://cms4files.revize.com/jeffersoncitymo/Illustrative%20Projects%20Section%20-%20DRAFT.pdf December/January Staff focused on public engagement, research, and writing the draft plan during the month of January. Staff closed the public survey January 12th. Survey results were reviewed and integrated into the plan. Staff and Technical Committee have produced a draft Illustrative Projects Section using input provided by the Technical Committee, Jurisdiction Staff, and stakeholders. October/November In October and November staff worked with the Technical Committee and local jurisdictions to review and update the Goals and Strategies, MTP Illustrative List, and Major Thoroughfare Plan. This process included discussion of new projects, completed projects, and the tier system used to categorize road and bridge projects. The Major Thoroughfare plan was updated and has been moved from the appendix to the Illustrative List section of the MTP. Public Engagement - In October a meeting for local jurisdictions was held with discussion focused on projects outside of Jefferson City. In November three general stakeholder meetings were held requesting in put on the Goals and Strategies, Illustrative List, and Major Thoroughfare Plan. Two public meeting were held in December; one in Jefferson City and one in Holts Summit. In November a public survey was released via email, social media, and during public presentations. As of December 14th, 190 responses have been received. Survey results will be presented at future CAMPO meetings and will inform that updates to the MTP goals and strategies. The survey will remain open through January 12th. Staff will continue presenting to all local jurisdictions in the CAMPO region throughout December and January. Additional presentations to other stakeholder groups will happen during this time. Agenda Item 6A Background The MTP is central to the MPO planning process and defines policies, programs, projects to meet regional needs for all transportation modes, including: • Surface Transportation (roads and bridges) • Pedestrian and Non-Motorized • Transit • Air • Waterways & Ports • Freight • Rail The planning process will consider and incorporate several local and regional topics including transportation system development, land use, employment, economic development, human and natural environment, and housing and community development. Per federal regulation, the MTP addresses the following ten planning factors: 1. Economic Vitality 2. Safety 3. Security 4. Accessibility and Mobility 5. Environmental Protection and Quality of Life 6. System Integration and Connectivity 7. System Management and Operation 8. System Preservation 9. Resiliency and Reliability 10. Travel and Tourism The current plan, adopted in 2019, utilized an in-depth Scenario Planning process that analyzed how transportation, land use, resources, demographics, and other factors may affect connectivity, mobility, and resiliency throughout the region. A preferred scenario was chosen and then used in the development of a Travel Demand Model (TDM). The TDM took the preferred land use scenario and analyzed the impacts of development on the transportation system, highlighting points of congestion, capacity, and increased demands on the road network. CAMPO staff then worked with the general public and stakeholders to develop a list of illustrative projects, combining public comments and the TDM outputs. The 2023-2024 planning process will use the preferred scenario and TDM from the 2019 planning process. This data, along with outreach to member jurisdictions, stakeholders, and the general public will be used in the update of the MTP. Staff anticipates that the planning process will be complete in Summer 2024. A general timeline of the project is provided in Figure 1. The current MTP document and information about the planning process can be found on the CAMPO website at: https://www.jeffersoncitymo.gov/government/long_range_transportation_plan/Metropolitan_Transportation_Plan.php Figure 1 – CAMPO 2045 & Beyond Metropolitan Transportation Plan 2023-2024 Update Timeline Summer 2023 •Data Review /Update •Coordination with Jurisdictions •Review Goals and Strategies Fall 2023 / Winter2024 •Assessment of Illlustrative List •Research and Mapping •Public Engagement Winter/Spring 2024 •Prioritization & Implementation Review •Draft Document Development •Public Engagment Summer 2023 •Draft Document •Public Review/Comment •MTP Adoption Agenda Item 7A CAMPO Technical Committee Staff Report US 54/63/50 Tri-Level Interchange Study – RFQ/Scope of Services Review and Selection Committee March 7, 2024 Summary Staff are seeking review of Request for Qualifications/Scope of Services materials for the US 50/54/63 Tri-Level Interchange Study and formation of an RFQ selection committee to review and make recommendation on RFQ responses. Request for Qualifications Review The CAMPO Board of Directors approved the UPWP Amendment to move forward with the Tri-level interchange study at a special Board of Directors meeting on January 24. JCREP and CAMPO/City Staff have prepared an RFQ notice (attached). Staff are seeking review of the draft RFQ and associated scope of services by the Technical Committee prior to moving forward with issuance of the RFQ. The RFQ contains the following elements: - Purpose, Background, and Goals - Study Area Description (and map) - List of Services o Traffic modeling and counts o Safety analysis o Review existing conditions and plans. o Future traffic projections o Develop reasonable alternatives o Traffic modeling and analysis of alternatives o Prepare exhibits of alternatives o Prepare cost estimates of alternatives o Identify potential phasing plans o Produce a Final Report - Follow environmental review processes. - Allowance for extension for additional services - Project timeline - Point rating criteria Staff would coordinate with the City Purchasing Agent to finalize the full RFQ package (containing all required documents including references to federal requirements) and coordinate with state and federal partners for any required review prior to posting the RFQ notice and distributing to known consulting firms. RFQ Selection Committee After receipt of RFQ responses, a selection committee will review and score responses and make recommendation to the Board of Directors. Staff is seeking formation of a recommended list of selection committee members to forward to the Board of Directors for approval. Recommended Form of Motion #1: Motion for approval of the draft RFQ materials. Recommended Form of Motion #2: Motion to forward recommend RFQ Selection Committee list to the Board of Directors. Jefferson City Tri-Level (US Route 50/54/63) Interchange and Rex Whitton Expressway Planning Study – Request for Qualifications Purpose. The purpose of this Request for Qualifications (RFQ) is to identify a consulting engineering firm to undertake a comprehensive planning study for the US 50/54/63 Interchange (also known as the Tri-Level Interchange) and US 50/63 between Jackson Street and the Tri-Level (also known as the Rex Whitton Expressway), in Jefferson City, Missouri. The Tri-level and Expressway have been identified as regionally significant needs within the CAMPO Metropolitan Transportation Plan. The Planning Study will analyze the existing conditions and develop reasonable alternatives to address traffic congestion, traffic safety issues, and vulnerable road user needs within the study area. The Planning Study will be utilized in a future NEPA environmental review process. Background. The existing “Tri-Level” interchange located in central Jefferson City is the confluence of US Routes 50, 54, and 63, all of which are major highway corridors in the Mid-Missouri region. The Tri-Level was originally constructed in the early 1960’s and currently services over 80,000 vehicles per day. While the Tri- Level has been has seen numerous additions over the years, the existing lane and ramp configurations are unconventional and are confusing for unfamiliar motorists. There are multiple stop and yield intersections as well as merging/weaving conflicts. Oversize loads have difficulty maneuvering some of the turns causing occasional roadway blockage. In general, the existing interchange is inadequate for existing traffic demand which causes congestion, significant delay and safety issues. US Route 50/63 east of the Tri-Level, known as the “Rex Whitton Expressway” was also constructed in the early 1960’s and currently operates above capacity for much of the day which causes frequent delays for the traveling public. The Expressway was the subject of an Environmental Impact Statement completed by MoDOT in 2008. The Preferred Alternative included additional thru-lanes on Route 50/63, a number of intersection improvements, grade separation structures at Madison Street and Jackson Street and a new diamond interchange at Lafayette Street. The construction of the Lafayette Street interchange and Jackson Street bridge have been completed. Project Goal. The goal of this project is to identify highway system needs within the study area, develop reasonable alternatives to address highway system needs, and develop cost estimates for reasonable alternatives which will be utilized to pursue future funding opportunities and provide a vision for the future of the study area. Approximate Study Area. The approximate study area includes US Route 50 from west of Jackson Street to Dix Road; US Route 54 from Linden Dr. overpass to the Missouri River; US Route 63 from west of Jackson Street to the Missouri River; Business Route 50 (Missouri Boulevard) from Ohio Street to West McCarty Street; as well as all major interchanges and intersections within the above routes. A map showing the approximate limit for the study area is attached. The consultant will collaborate with local planning partners to determine the final limits of the study area. Planning Study Services. It is anticipated that services included in the Planning Study may include: a. Perform traffic modeling and level of service analysis of existing conditions using MoDOT traffic counts, collected traffic counts, the CAMPO Traffic Demand Model and other available data to identify areas of concern within the study area. b. Conduct safety analysis to identify high accident locations. c. Perform other preliminary investigations such as as-builts plans, existing Right of Way, desktop environmental review, bridge assessments, utility investigations, and activities necessary to identify other areas of concern and/or project constraints. d. Develop projections for future traffic patterns, volumes, and movements. e. Develop reasonable alternative improvements that address identified areas of concern such as deficient levels of service, high accident locations, pedestrian needs, and aging infrastructure. The reasonable alternatives should include alternatives identified in the 2008 Rex Whitton EIS with updated traffic volume projections. f. Perform traffic modeling, level of service analysis and traffic safety analysis for reasonable alternatives with current and future traffic volumes. g. Prepare plan & profile exhibits of reasonable alternatives, including approximate construction limits and existing/proposed Right of Way needs on a conceptual level. h. Prepare rough order of magnitude cost estimates for construction of reasonable alternatives. i. Identify potential phasing for implementation. j. Produce a final Planning Study report. Because the Planning Study will be utilized in a future NEPA environmental review process, the following shall be included in the Planning Study: a. The Planning Study shall be developed through a planning process conducted pursuant to applicable Federal law. b. Consult with the appropriate Federal and State resource agencies. c. Develop a plan for the required consultation with Native American Tribes. All communication with tribal organizations must be conducted through MoDOT Historic Preservation Section. Tribal organizations shall not be contacted directly. d. Include broad multidisciplinary consideration of systems-level or corridor-wide transportation needs and potential effects, including effects on the human and natural environment. e. Include public notice that the resulting planning products may be adopted during a subsequent environmental review process in accordance with Section 168. f. Conduct public meetings to gather input on existing challenges and proposed reasonable alternatives. g. Conduct specific stakeholder meetings with project partners, constituents along the corridors, and review agencies. The City may elect to extend this contract via supplemental agreement with the consultant to authorize future additional services which may include: a. Identify future funding opportunities and assist with associated grant applications b. Surveying/Mapping/Property boundary surveys c. Environmental Review / NEPA Document Development d. Geotechnical Investigations e. Noise Studies f. Preliminary Plans g. Right of Way Plans h. Utility Coordination i. Final Plans, Specifications & Estimate j. Project support during construction Proposed Project Timeline. Issue RFQ: March 31, 2024 RFQ Responses Due: April 19, 2024 Consultant Selected: May 8, 2024 Scoping Phase Complete: May 31, 2024 Consultant Contract : June 17, 2024 Study Phase Complete: T.B.D. Consultant Selection. Consultant selection shall be conducted pursuant to the Brooks Act for Consultant Selection and other applicable Federal and State regulations. Rating Criteria w/ Weighted Values. The following criteria will be used to evaluate the submitted qualifications. Project Understanding & Approach 30 Points Max Experience and Technical Competence 30 Points Max Capacity & Capability 20 Points Max Past Record of Performance 20 Points Max 100 Points Max Total Agenda Item 7B CAMPO Technical Committee Staff Report 2025-2029 Transportation Improvement Program Update March 7, 2024 Summary The Transportation Improvement Program (TIP) is a 5-year financial program of transportation projects to be implemented within the Metropolitan Planning Area (MPA). Projects in the program are funded by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), and are deemed ‘regionally significant.’ The TIP is updated annually by CAMPO in cooperation with local jurisdictions, the Missouri Department of Transportation (MoDOT), and local public transportation operators. The CAMPO TIP year runs from July 1, 2024 to June 30, 2029. The draft 2025-2029 TIP currently includes 46 projects that total over $112 million dollars. Please note that all project information has not been received, new projects may be added and some removed in the coming weeks. Updated financial data for the jurisdictions within the CAMPO region are used to demonstrate fiscal constraint, which is the availability of local matching funds for federal transportation dollars. Other important components of the TIP include: • Protocol for TIP Development: Public Participation, Project Selection, Amendments, and Modifications • CAMPO Federal Performance Measures: Performance Measures and targets uses system information to make investment and policy decisions to achieve national goals. The CAMPO Technical Committee and Board of Directors reviews and approves these performance measures and targets at regular intervals, per federal guidelines. The TIP includes totals for programmed funds that address these performance measures. • Financial Plan: Each year staff works with local jurisdictions to collect required financial data. This financial data, used to illustrate fiscal constraint, includes general tax revenue, local operating assistance, operations and maintenance estimates, and transportation grants. This data provides for creating current and forecasted totals of available and programmed funds. The 5-year 2025-2029 total of available funds and programmed funds total include funds from MoDOT, FHWA, FTA, and local jurisdiction budgets. These totals are subject to change during the month of March after new project costs estimates are received from MoDOT. • Fiscally Constrained Transportation Projects: The list of fiscally constrained projects includes all projects programmed for construction or scoping that utilize federal transportation funds. Most projects in the CAMPO TIP are MoDOT sponsored and are also listed in the Statewide Transportation Improvement Program (STIP). The 2024-2028 CAMPO TIP includes nine (9) Bridge Projects, eight (8) Road Projects, four (4) Other/Enforcement projects, eight (8) Scoping Projects, nine (9) Pedestrian/Bicycle Projects, and eight (8) Transit Projects. • JEFFTRAN Program of Projects: The Program of Projects, federally required for public transportation agencies, is an illustrative list of projects and estimated costs. MoDOT Projects MoDOT will provide CAMPO staff with an updated project list and cost estimates after the March 7th CAMPO Technical Committee meeting. MoDOT staff has stated that it is unlikely that new projects will be added. An updated TIP document will be provided to Technical Committee members after incorporation of the MoDOT project updates. Staff requests that Technical Committee members please review the draft document and provide comments to Katrina Williams at 573-634-6536 or by email at kawilliams@jeffersoncitymo.gov. A draft 2025-2029 CAMPO TIP is attached. DRAFT Transportation Improvement Program Program Years 2025-2029 July 1, 2024 – June 30, 2029 Adopted May 15, 2024 Note: Items in RED are in draft form and have not been verified The preparation of this report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, and Federal Transit Administration in cooperation with the Missouri Department of Transportation. The opinions, findings, and conclusions expressed in this report are not necessarily those of the Federal Highway Administration, Federal Transit Administration, or the Missouri Department of Transportation. Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as required under the Americans with Disabilities Act. Please allow three business days to process the request. DRAFT Table of Contents Introduction ............................................................................................................................................. 1 Public Participation ................................................................................................................................. 2 Project Selection ...................................................................................................................................... 2 TIP Development ..................................................................................................................................... 2 TIP Amendments and Administrative Modifications ............................................................................... 3 Previous Projects ................................................................................................................................. 3 Annual Listing of Obligated Projects ...................................................................................................... 3 Air Quality Designation .......................................................................................................................... 3 Environmental Justice ............................................................................................................................. 3 Federal Performance Measures ............................................................................................................... 4 Financial Plan ......................................................................................................................................... 6 Forecast Revenue Available for Transportation Funding .................................................................... 6 Operations and Maintenance .............................................................................................................. 8 Financial Constraint .............................................................................................................................. 10 Demonstration of Fiscal Constraint – Municipalities ......................................................................... 11 Demonstration of Fiscal Constraint – Public Transportation Providers .............................................. 12 Fiscally Constrained Transportation Projects – Bridges ..................................................................... 13 Fiscally Constrained Transportation Projects - Roadways ................................................................ 16 Fiscally Constrained Transportation Projects - Other ........................................................................ 19 Fiscally Constrained Transportation Projects – Scoping and Design Projects .................................... 21 Fiscally Constrained Transportation Projects - Pedestrian & Bicycle Projects .................................... 24 Fiscally Constrained Transportation Projects – Public Transportation Projects .................................. 27 Project Locations - Figure 7 - Map of Fiscally Constrained Transportation Projects .......................... 30 Program of Projects ........................................................................................................................... 31 Multimodal Projects .............................................................................................................................. 32 Regionally Significant Projects ............................................................................................................. 32 Appendix 1 – Amendments and Administrative Modifications ............................................................ 33 Appendix 2 – Federal Funding Sources ................................................................................................ 34 Appendix 3 – Policies and Procedures ................................................................................................. 35 Appendix 4 – Definitions ...................................................................................................................... 38 CAMPO Title VI Nondiscrimination Policy The Capital Area Metropolitan Planning Organization is committed to the policy that no person shall be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity on the grounds of race, color, or national origin, in accordance with Title VI of the Civil Rights Act of 1964, and the Civil Rights Restoration Act of 1987 (P.L. 100.259). Administration of the Capital Area MPO is provided by the City of Jefferson Department of Planning and Protective Services Room 120 John G. Christy Municipal Building 320 East McCarty St., Jefferson City, Missouri 65101 Phone: (573) 634-6410 Fax: (573) 634-6457 http://www.jeffersoncitymo.gov/campo DRAFT CAMPO 2025-2029 Transportation Improvement Program i LIST OF ABBREVIATIONS FTA 5303 Metropolitan & Statewide Planning and Non-Metropolitan Transportation Planning FTA 5307 Urbanized Area Formula Grants FTA 5310 Enhanced Mobility of Seniors and Individuals with Disabilities FTA 5339 Bus and Bus Facilities Adv. Con. Advanced Construction AM Asset Management (Replaces TCOS in 2022) CAMPO Capital Area Metropolitan Planning Organization CO Carbon Monoxide (vehicle emissions) EPA Environmental Protection Agency FAST Fixing America’s Surface Transportation Act FHWA Federal Highway Administration FTA Federal Transit Administration FY Fiscal Year HSIP Highway Safety Improvement Program MAP-21 Moving Ahead for Progress in the 21st Century MoDOT Missouri Department of Transportation MPO Metropolitan Planning Organization MTP Metropolitan Transportation Plan NHFP National Highway Freight Program NHPP National Highway Performance Program NO2 Nitrogen Dioxide ONE DOT Collaboration between FHWA and FTA PBPP Performance Based Planning and Programming PM-2.5 Small Particulate Matter Lead POP Program of Projects PY Program Year SO2 Sulfur Dioxide STIP State Transportation Improvement Program STBG Surface Transportation Block Grant Program TAP Transportation Alternatives TCOS Taking Care of the System TERM Transit Economic Requirements Model TDM Travel Demand Model TIP Transportation Improvement Program TPM Transportation Performance Management VMT Vehicle Miles of Travel DRAFT CAMPO 2025-2029 Transportation Improvement Program ii Resolution DRAFT CAMPO 2025-2029 Transportation Improvement Program iii MTP Process Certification DRAFT CAMPO 2025-2029 Transportation Improvement Program iv Certification of Restrictions on Lobbying DRAFT CAMPO 2025-2029 Transportation Improvement Program v ONE DOT Approval Letter DRAFT CAMPO 2025-2029 Transportation Improvement Program vi Capital Area Metropolitan Planning Organization Board of Directors Chair – Jeff Hoelscher, Eastern District Commissioner, Cole County Vice-Chair – Scott Spencer, City Council Member, City of Jefferson City of Jefferson Jack Deeken, City Council Member Jon Hensley, City Council Member Jeff Ahlers, City Council Member Clint Smith, AICP, Director, Planning & Protective Services Gerry Stegeman, Interim Transit Manager Matt Morasch, PE, Director, Public Works Cole County Eric Landwehr, PE, Director, Public Works Doug Reece, City Administrator, St. Martins Callaway County Roger Fischer, Western District Commissioner Holts Summit Brandon Ruediger, City Administrator, City of Holts Summit Missouri Department of Transportation (MoDOT) Machelle Watkins, PE, District Engineer Ex-Officio Members Luke Holtschnieder, Jefferson City Regional Economic Partnership Daniel Nguyen, Federal Transit Administration, Region VII Christy Evers, MoDOT Transit Administrator Vacant, Missouri Office of Administration Michael Henderson, AICP, MoDOT, Transportation Planning Dan Weitkamp, Federal Highway Administration, Missouri Div. Tamara Tateosian, Callaway County Economic Development Technical Committee Chair – David Bange, PE, City Engineer, Public Works, City of Jefferson Vice-Chair – Matt Prenger, PE, County Engineer, Public Works, Cole County City of Jefferson Clint Smith, AICP, Director, Planning & Protective Services Aaron Grefrath, Director, Parks, Recreation & Forestry Matt Morasch, PE, Director of Public Works Gerry Stegeman, Interim Transit Manager Eric Barron, AICP, Transportation Planner Britt Smith, PE, Operations & Maintenance Cole County Matt Prenger, PE, County Engineer Shannon Kliethermes, Senior Planner Callaway County Howard Thomas, PE, County Highway Administrator Small City Representative - Callaway Mark Tate, Streets Department, City of Holts Summit Small City Representative - Cole Rachel Busche, Wardsville Missouri Department of Transportation (MoDOT) Steve Engelbrecht, PE, District Planning Manager Michael Henderson, AICP, Transportation Planning Specialist Daniel Roeger, PE, Area Engineer Private Transportation Interest Joe Scheppers, N.H. Scheppers Distributing Company. Pedestrian or Biking Interest Kevin Schwartz, JC Parks Outdoor Recreation Program Manager Ex-Officio Members: Daniel Nguyen, Federal Transit Administration, Region VII Daniel Weitkamp, Federal Highway Administration, Missouri Div. Jason Branstetter, Heartland Port Authority Representative - February 2024 CAMPO Staff Clint Smith – Director, Planning & Protective Services Eric Barron, AICP - Planning Manager Katrina Williams, GISP, AICP – Senior Planner Vacant - Planner Lisa Dittmer – Administrative Assistant DRAFT CAMPO 2025-2029 Transportation Improvement Program 1 Introduction The Capital Area Metropolitan Planning Organization (CAMPO) is the designated metropolitan planning organization for the Jefferson City, Missouri Urban Area. CAMPO’s purpose is to carry out a continuing, cooperative, and comprehensive long-range transportation planning process. As part of this process CAMPO updates the Metropolitan Transportation Plan (MTP) with the latest program year TIP, to address the current and future transportation needs for the Metropolitan Planning Area (MPA). The MPA includes a southern portion of Callaway County, northeastern portion of Cole County, the communities of Holts Summit, Jefferson City, St. Martins, Taos, and Wardsville. Figure 1 – The CAMPO Planning Area The Transportation Improvement Program (TIP) is a 5-year financial program of transportation projects to be implemented within the MPA. The projects are funded by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), or are deemed “regionally significant.” Each project or project phase included in the TIP is consistent with investment strategies discussed in the MTP and is part of the process of applying for funds from the FHWA and FTA. Certain capital and non-capital transportation projects using funding under 23 U.S.C. and 49 U.S.C. Chapter 53 or regionally significant projects requiring action by the FHWA or the FTA are required to be included in the TIP. The TIP is updated annually by CAMPO in cooperation with the Missouri Department of Transportation and local public transportation operators. DRAFT CAMPO 2025-2029 Transportation Improvement Program 2 Public Participation CAMPO seeks active and meaningful involvement of the public and interested parties in the development and update of transportation plans and programs, including the TIP. All meetings of the CAMPO Technical Committee and Board of Directors are open to the public. All meeting agendas and minutes are available on the City of Jefferson website at www.jeffersoncitymo.gov or upon request. CAMPO provides all interested parties and the public with a reasonable opportunity to comment on the proposed TIP as required by federal law. Reasonable opportunity to comment and participate on the proposed TIP is made following the policies in the CAMPO Public Participation Plan located on the CAMPO website at https://www.jeffersoncitymo.gov/campo. The approved TIP is available for review at several locations throughout the CAMPO planning area as outlined in the Public Participation Plan. The FTA allows a grantee, e.g. JEFFTRAN and OATS, Inc., to rely on locally adopted public participation plans for the submittal of their projects in lieu of a separate “Program of Projects” (POP) if the grantee has coordinated with CAMPO and has ensured that the public is aware that the TIP and the Public Participation Plan are being used to satisfy the POP public participation requirements. JEFFTRAN is the public transit provider for the City of Jefferson and OATS, Inc. is a not-for-profit 501(c)3 corporation providing specialized transportation for senior citizens, people with disabilities and the rural general public in 87 Missouri counties. Federal Transit Administration recipients of certain categories of funds, JEFFTRAN and OATS, Inc. must follow a public participation plan. Both JEFFTRAN and OATS, Inc. meet this coordination and public awareness criteria. Project Selection Transportation projects, funded by direct allocation of Federal funds to a project sponsor, award of Federal funds via competitive grant, or wholly funded by the sponsor, are selected by the agency having jurisdiction over the project using their own criteria and submitted to the CAMPO Board of Directors for inclusion in the TIP. Transportation projects included within the TIP should be consistent with investment strategies discussed in the MTP. CAMPO does not receive any discretionary funding for infrastructure projects. If such funds again become available, the following prioritization process is in place. Transportation projects, funded by sub-allocated Federal funds directly to CAMPO or otherwise made available for programming at the discretion of CAMPO, are selected based on competitive process approved by the CAMPO Board of Directors. This process involves a call for projects, ranking based on CAMPO priorities by staff, and review by the CAMPO Technical Committee, prior to being forwarded to the CAMPO Board of Directors for a vote of approval. The ranking process has unique evaluation criteria for different categories of projects – roadway/intersection, bridge, non-motorized, transit, and ‘other.’ TIP Development The TIP document is updated every year and covers a 5-year period starting July 1 of each year. TIP development begins with a verification of status of projects in the current TIP, solicitation of new projects, and request for budget information from local jurisdictions. Local transit providers are also requested to provide information needed to develop their “Program of Projects” for inclusion in the TIP. CAMPO staff develops the financial plan, project listings, maintenance and operations, and other components of the TIP with support from the Technical Committee, member jurisdictions, MoDOT, FHWA, and FTA. Once the draft TIP is developed, it is presented to the Technical Committee for review and recommendation to the Board of Directors. A 25-day public comment period will open and be held prior to the Board of Directors approval of the TIP. The Board then requests approval of the TIP by the Governor and ONE DOT (consisting of FHWA and FTA). DRAFT CAMPO 2025-2029 Transportation Improvement Program 3 TIP Amendments and Administrative Modifications Between TIP updates, if projects need to be added, removed or changed, the TIP can be changed either by amendment or administrative modifications. Definitions of an amendment or an administrative modification, and information about public participation, notifications, and other procedures regarding amendments and administrative modifications, can be found in Appendix 3 – Policies and Procedures of this document. Appendix 1 contains a listing of amendments and administrative modifications that have occurred to this document. Previous Projects The TIP will include a listing of major projects from the previous TIP that were implemented and identify any significant delays in the planned implementation of major projects. Major projects are defined as transportation improvement projects receiving Federal financial assistance with an estimated total cost of $500 million or more or that have been identified by the FHWA as being a major project. No major projects were implemented, and no significant delays or projects from the previous TIP have been identified. No work on a federally funded project can begin until the scope of work has been authorized and the federal funds obligated in the FHWA Financial Management Information System (FMIS). Annual Listing of Obligated Projects The Fixing America’s Surface Transportation Act (FAST Act) requires that CAMPO publish an annual listing of federally obligated projects. The Annual Listing of Projects is an index of projects which used Federal funds that were obligated in the preceding TIP program year. Obligated projects are consistent with the funding categories identified in the TIP. An obligation is the Federal government’s legal commitment to pay the Federal share of a project’s cost. An obligated project is one that has been authorized and funds have been obligated by a Federal agency. Obligated projects are not necessarily initiated or completed in the program year, and the amount of the obligation will not necessarily equal the total cost of the project. For Federal Transit Administration projects, obligation occurs when the grant is awarded. For Federal Highway Administration projects, obligation occurs when a project agreement is executed and the State/grantee requests that the funds be obligated. CAMPO publishes the Annual Listing of Obligated Projects yearly, within 90 days of the previous TIP’s program year. The Annual Listing of Obligated Projects is posted on the CAMPO website at: http://www.jeffersoncitymo.gov/campo Air Quality Designation The United States Environmental Protection Agency has designated the CAMPO Metropolitan Planning Area as being in attainment for Ozone, Carbon Monoxide (CO), Nitrogen Dioxide (NO2), Small Particulate Matter (PM- 2.5) Lead, and Sulfur Dioxide (SO2). If the air quality in a geographic area meets or is cleaner than the national standard, it is called an attainment area; areas that don't meet the national standard are called nonattainment areas. Environmental Justice Executive Order 12898 requires agencies receiving federal funding to meaningfully address low-income and minority populations in their plans, programs, policies, and activities. CAMPO strives to include all people, including protected classes, in planning activities. The CAMPO Title VI Program addresses this topic. Additionally, CAMPO staff expects project sponsors to identify and mitigate any disproportionately high and adverse effects of federal transportation programs. DRAFT CAMPO 2025-2029 Transportation Improvement Program 4 Federal Performance Measures In the passage of the Moving Ahead for Progress in the 21st Century Act (MAP-21). FHWA defines Transportation Performance Management (TPM) as a strategic approach that uses system information to make investment and policy decisions to achieve national performance goals. The FAST (Fixing America’s Surface Transportation) Act and Infrastructure Investment and Jobs Act both provided for continuation of these goals. Another requirement, Performance Based Planning and Programming (PBPP), refers to the application of performance management principles within the planning and programming processes of transportation agencies to achieve desired performance outcomes for the multimodal transportation system. To comply with these requirements, the CAMPO Board of Directors adopts targets for the five performance areas listed below. These measures and corresponding targets can be found in the System Performance Report located in Appendix C of the Metropolitan Transportation Plan (MTP). CAMPO usually adopts the state targets when they are updated. Transit Asset Management Measures MoDOT collected and evaluated existing buses and facilities to be included in the State Transit Asset Management Plan and used this information to set targets, which will be evaluated on an annual basis as inventory changes. JEFFTRAN participates in the State Transit Asset Management Plan. There is approximately $20,469,897 in project funding programmed into this TIP that may be utilized for bus replacement and other capital projects to help transit agencies move toward these targets. Safety Measures The Federal Highway Administration established five performance measures to assess performance and carry out the Highway Safety Improvement Program: (1) number of fatalities, (2) rate of fatalities per vehicle mile traveled (VMT), (3) number of serious injuries, (4) rate of serious injuries per VMT, and (5) number of combined non-motorized fatalities and non-motorized serious injuries. MoDOT established the statewide safety targets in 2021, which were adopted by CAMPO. These targets are updated annually. These targets can be found in the System Performance Report located in Appendix C of the Metropolitan Transportation Plan (MTP). There are a number of projects programmed for safety in the TIP, totaling $124,353,066, all sponsored by the Central District of MoDOT, to help the State move towards these targets. CAMPO staff also actively participates in the Central District Coalition of Roadway Safety, which works to implement Missouri’s Show-Me Zero ultimate goal of zero fatalities on Missouri roadways, and participates in the annual Highway Safety and Traffic Blueprint Conference. Pavement and Bridge Measures The Federal Highway Administration established 6 performance measures to assess pavement and bridge conditions: (1) percent of interstate pavements in Good condition, (2) percent of interstate pavements in Poor condition, (3) percent of non-interstate national highway system (NHS) pavements in Good condition, (4) percent of non-interstate NHS pavements in Poor condition, (5) percent of NHS bridges by deck area classified as Good condition, and (6) percent of NHS bridges by deck area classified as Poor condition. There are no interstate highways in the CAMPO region, so those targets are not addressed. MoDOT established statewide pavement and bridge targets in 2018, and revised in 2020, which shows the targets set by MoDOT and adopted by CAMPO. These targets may be updated every other year. These targets can be found in the System Performance Report located in Appendix C of the Metropolitan Transportation Plan (MTP). DRAFT CAMPO 2025-2029 Transportation Improvement Program 5 Many projects in the TIP address Asset Management, a major priority for MoDOT. There is currently $7,524,000 in project funding in the TIP that addresses road and/or bridge maintenance or scoping. Travel Time Reliability and Freight Reliability The Federal Highway Administration established 3 performance measures to assess travel time reliability and freight movement on the interstate system: (1) Percent of Reliable Person-Miles Traveled on the Interstate, (2) Percent of Reliable Person-Miles Traveled on the Non-Interstate NHS, and (3) Truck Travel Time Reliability Index. There are no interstate highways in the CAMPO region. MoDOT established the travel time reliability targets in 2018, which was adopted by CAMPO. This target may be updated every other year. These targets can be found in the System Performance Report located in Appendix C of the Metropolitan Transportation Plan (MTP). There are currently no projects programmed into the TIP with the sole purpose of improving travel time reliability. Several of the projects within the TIP address this target indirectly, which will help the state move toward this target. Transit Safety Measures The Federal Transit Administration requires that each Public Transportation Agency establish a Public Transportation Agency Safety Plan (PTASP). This plan utilizes existing agency safety practices and industry best practices to meet the new regulations set in 49 CFR Part 673 of the Federal regulations. The PTASP includes formal documentation to guide the agency in proactive safety management policy, safety risk management, safety assurance, and safety promotion. The goal is to provide management and labor with a comprehensive and collaborative approach to managing safety. The plan includes the process and schedule for an annual review of the plan to review the safety performance measures and update processes that may be needed to improve the organization’s safety practices. There is currently $352,719 in project funding in the TIP that addresses road and/or bridge maintenance or scoping. Other projects within the TIP address these targets indirectly, which will help transit agencies move toward these targets. DRAFT CAMPO 2025-2029 Transportation Improvement Program 6 Financial Plan The TIP includes a financial plan that demonstrates how the approved TIP can be implemented, and indicates resources from public and private sources that are reasonably expected to be made available to carry out the TIP. CAMPO, MoDOT, and public transportation operators cooperatively develop estimates of funds that are reasonably expected to be available to support TIP implementation. Only projects for which construction or operating funds can reasonably be expected to be available may be included. In developing the financial plan, CAMPO takes into account all projects and strategies funded under Title 23 U.S.C., Title 49 U.S.C. Chapter 53, and other federal funds, and regionally significant projects that are not federally funded. For purposes of transportation operations and maintenance, the financial plan shall contain system-level estimates of costs and revenue sources that are reasonably expected to be available to adequately operate and maintain Federal-aid highways (as defined by Title 23 U.S.C. 101(a)(5) and public transportation (as defined by Title 49 U.S.C. Chapter 53). Forecast Revenue Available for Transportation Funding Federal funding forecasts, provided by MoDOT based on published notices in the Federal Register, estimate fiscal year authorization levels by the FHWA and FTA under the current highway act. Appendix 2 briefly describes most of the Federal transportation programs which could fund projects in the CAMPO planning area. For Federally-funded projects, the TIP must identify the appropriate “matching funds” by source. The matching funds are usually provided by state and local governments. State revenue forecasts are also provided by MoDOT based on historical data of the State Fuel Tax, State Vehicle Sales and Use Tax and General Revenue. Local revenue forecast from the County Aid Road Trust (State Fuel Tax and State Vehicle Sales and Use Tax) for each jurisdiction are based on past distributions and are assumed to continue a trend of a two percent inflation rate. The City of Jefferson has a ½ cent sales tax to support its Capital Improvement Program and a ½ cent sales tax for Parks and Recreation, which supports greenways and other non-motorized transportation activities. The City of Jefferson has provided its own future revenue projections from these sources. St. Martins has a one-cent sales tax for parks and streets. Cole County has a ½ cent sales tax to support its Capital Improvement Program and a real property tax levy of $0.27 earmarked for Road & Bridges. All small cities get $100,000 every five years from Cole County, which comes from the aforementioned sales tax. Callaway County has a real property tax levy of $0.2466 earmarked for Road & Bridges. Figure 2 shows the total programmed project funds and available project funds by source. The project costs have inflation factored in by each project sponsor. The instructions on the form used to submit a project for inclusion in the TIP reminds the project sponsor to take inflation into account when estimating the project’s cost. Since the last iteration of the MTP, the inflation factor for the TIP has been set as two percent. DRAFT CAMPO 2025-2029 Transportation Improvement Program 7 Figure 2 – Programmed Funds and Available Project Funds by Source Please note this chart has not been updated at this time and reflects the totals for the previous years’ projects. 2024 2025 2026 2027 2028 Total FHWA AC - STBG $237,600 $5,481,600 $1,098,400 $2,419,200 $0 $9,236,800 FHWA NHPP $29,148,000 $1,984,000 $2,527,200 $2,097,600 $700,800 $36,457,600 FHWA HSIP $0 $0 $0 $0 $0 $0 FHWA STBG $0 $0 $0 $0 $0 $0 FHWA TAP $1,782,136 $0 $0 $0 $0 $1,782,136 FHWA SAFETY $51,200 $51,200 $51,200 $0 $0 $153,600 FHWA BRO $83,336 $968,897 $0 $0 $0 $1,052,233 FHWA BFP $51,226 $102,863 $0 $0 $0 $154,089 FHWA RTP $128,850 $0 $0 $0 $0 $128,850 FTA 5307 $2,124,018 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,894,620 FTA 5310 $172,000 $172,000 $270,000 $182,000 $270,000 $1,066,000 FTA 5311 $0 $0 $0 $0 $0 $0 FTA 5329 $0 $0 $0 $0 $0 $0 FTA 5339 $954,953 $10,175 $0 $0 $0 $965,128 $34,733,319 $9,877,571 $5,108,978 $5,919,087 $2,252,101 $57,891,056 MoDOT STATE $11,922,014 $6,983,214 $5,370,614 $5,844,214 $4,626,614 $34,746,670 $11,922,014 $6,983,214 $5,370,614 $5,844,214 $4,626,614 $34,746,670 $0 $0 $0 $0 $0 $0 $5,438 $102,863 $0 $0 $0 $108,301 $62,500 $0 $0 $0 $0 $62,500 $1,609,806 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,380,408 $311,100 $30,544 $28,000 $28,000 $28,000 $425,644 $127,078 $0 $0 $0 $0 $127,078 $0 $0 $0 $0 $0 $0 $105,909 $0 $0 $0 $0 $105,909 $60,000 $60,000 $92,000 $70,000 $92,000 $374,000 $2,281,831 $1,300,243 $1,282,178 $1,318,287 $1,401,301 $7,583,840 $48,937,164 $18,161,028 $11,761,770 $13,081,588 $8,280,016 $100,221,566 2024 2025 2026 2027 2028 Total FHWA AC - STBG $237,600 $5,481,600 $1,098,400 $2,419,200 $0 $9,236,800 FHWA NHPP $29,148,000 $1,984,000 $2,527,200 $2,097,600 $700,800 $36,457,600 FHWA HSIP $0 $0 $0 $0 $0 $0 FHWA STBG $0 $0 $0 $0 $0 $0 FHWA TAP $1,782,136 $0 $0 $0 $0 $1,782,136 FHWA SAFETY $51,200 $51,200 $51,200 $0 $0 $153,600 FHWA BRO $83,336 $968,897 $0 $0 $0 $1,052,233 FHWA BFP $51,226 $102,863 $0 $0 $0 $154,089 FHWA RTP $128,850 $0 $0 $0 $0 $128,850 FTA 5307 $2,124,018 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,894,620 FTA 5310 $172,000 $172,000 $270,000 $182,000 $270,000 $1,066,000 FTA 5311 $0 $0 $0 $0 $0 $0 FTA 5329 $0 $0 $0 $0 $0 $0 FTA 5339 $954,953 $10,175 $0 $0 $0 $965,128 $34,733,319 $9,877,571 $5,108,978 $5,919,087 $2,252,101 $57,891,056 MoDOT STATE $11,922,014 $6,983,214 $5,370,614 $5,844,214 $4,626,614 $34,746,670 $11,922,014 $6,983,214 $5,370,614 $5,844,214 $4,626,614 $34,746,670 $6,445,639 $6,574,552 $6,706,043 $6,840,164 $6,976,967 $33,543,364 $41,501,299 $42,331,325 $43,177,952 $44,041,511 $44,922,341 $215,974,429 $1,840,593 $1,877,404 $1,914,953 $1,953,252 $1,992,317 $9,578,518 $39,756,287 $40,551,413 $41,362,441 $42,189,690 $43,033,484 $206,893,314 $4,957,247 $3,465,951 $3,553,208 $3,654,250 $3,759,055 $19,389,711 $1,215,100 $1,239,402 $1,264,190 $1,289,473 $1,315,263 $6,323,427 $322,556 $329,007 $335,587 $342,299 $349,145 $1,678,593 $357,514 $364,665 $371,958 $379,397 $386,985 $1,860,520 $120,000 $228,000 $140,000 $228,000 $140,000 $856,000 $96,516,235 $96,961,718 $98,826,331 $100,918,035 $102,875,556 $496,097,875 $143,171,567 $113,822,503 $109,305,923 $112,681,336 $109,754,271 $588,735,601Total Available Funds Yearly Totals Local Totals Total Programmed Total Available Funds Federal Toas State Local Callaway County Cole County Wardsville Oats Programmed Funds Federal Holts Summit State Federal Totals State Totals Local Federal Totals Oats Yearly Totals Local Totals JEFFTRAN St. Martins Taos Wardsville Callaway County Cole County Holts Summit City of Jefferson State Totals City of Jefferson JEFFTRAN St. Martins DRAFT CAMPO 2025-2029 Transportation Improvement Program 8 Operations and Maintenance MoDOT Maintenance costs for MoDOT includes salaries, materials and equipment needed to deliver the roadway and bridge maintenance programs. This category includes basic maintenance activities like minor surface treatments such as: sealing, small concrete repairs and pothole patching; mowing right of way; snow removal; replacing signs; striping; repairing guardrail; and repairing traffic signals. Performing these activities requires employees; vehicles and other machinery; and materials such as salt, asphalt and fuel. Maintenance operations expenditures are provided annually by MoDOT. Maintenance operations expenditures are expected to increase 1.5% annually. MoDOT’s cost per lane mile is $5,323, ($5,323 per lane mile x 344.8 lane miles = $1,835,370 annual cost), and can be seen in Figure 4. Local Government Local revenue sources for operations and maintenance include state fuel tax, state vehicles sales/use tax, local sales taxes, franchise fees, license and permit fees, property taxes, and other revenue sources that provide significant resources for local general fund and specific funding of transportation. Not all taxes and fees go to transportation, so the local jurisdiction usually will identify a budget specifically for transportation purposes, such as capital improvements, Road and Bridge funds, transit operating subsidies, road and street budgets, or operations and maintenance budgets. Maintenance operations expenditures are expected to increase 1.5% annually. The operations and maintenance costs for local governments include salaries, fringe benefits, materials, and equipment needed to deliver the street and bridge maintenance programs. This category includes basic maintenance activities like minor surface treatments such as sealing, small concrete repairs, pothole patching, mowing, snow removal, replacing signs, striping, and repairing traffic signals. These activities may be performed in-house or outsourced. Local government operations and maintenance on federal aid roads calculated for the system wide average of operations & maintenance per centerline mile is determined below in Figure 4. As a further demonstration of fiscal constraint, another requirement is that municipalities report their operations and maintenance budget. Reported below are Cole and Callaway Counties, Holts Summit, Jefferson City, St. Martins, and MoDOT. The municipalities of Taos and Wardsville do not have any locally maintained roadways that are eligible for federal-aid.. There are 571 miles of Federal-Aid eligible roadway in the CAMPO region. MoDOT is responsible for the maintenance of all “State System” roadways (370 miles) while “Off System” roadways are the responsibility of the local governments (201 miles), shown in Figure 3. Figure 3 - Federal Aid Eligible Road Mileage by Jurisdiction. Jurisdiction State System Lane Miles Local Lane Miles Total Callaway Co.33 11 44 Cole Co.121 28 149 Holts Summit 18 14 32 Jefferson City 171 143 314 St. Martins 11 4 15 Taos 9 0 9 Wardsville 8 0 8 Total 370 201 571 DRAFT CAMPO 2025-2029 Transportation Improvement Program 9 Figure 4 – Locally Owned Federal-aid System Mileage and Operations and Maintenance Costs by Jurisdiction Transit In addition to the local government operations and maintenance previously discussed, JEFFTRAN expenses also cover fleet repair/maintenance, repairing/replacing bus shelters, bus washing, bus maintenance facilities, public restrooms, and fuel. Figures 5 and 6 show the estimated expenditures for transit operations and maintenance for JEFFTRAN and OATS, respectively. Operations and Maintenance revenue and expenditures are based on the most recently available budgets. Figure 5 - JEFFTRAN Estimated Expenditures for Operations & Maintenance. Source: FY 2024 Jefferson City Budget Figure 6 – OATS Estimated Expenditures for Operations & Maintenance. Cost/Lane Mile Local Lane Miles Local O&M Cost $6,458 11 $71,038 $6,935 28 $194,180 $4,778 14 $66,892 $7,209 143 $1,030,887 $7,146 4 $28,584 $5,291 0 $0 $5,291 0 $0 200 1,391,581$ Cost/Lane Mile State System Lane Miles MoDOT O&M Cost $5,323 370 $1,969,510 State System MoDOT Locally owned federal-aid system lane miles for each jurisdiction were developed by MoDOT Source: MoDOT Jurisdiction St. Martins Taos Wardsville Total Callaway County Jefferson City Holts Summit Cole County Personnel Services (1,820,479)$ (1,856,889)$ (1,894,026)$ (1,931,907)$ (1,970,545)$ Materials and Supplies (335,080)$ (341,782)$ (348,617)$ (355,590)$ (362,701)$ Contractual Services (350,176)$ (357,180)$ (364,323)$ (371,610)$ (379,042)$ Utilities (29,050)$ (29,631)$ (30,224)$ (30,828)$ (31,445)$ Repairs and Maintenance (457,050)$ (466,191)$ (475,515)$ (485,025)$ (494,726)$ Total (2,991,835)$ (3,051,672)$ (3,112,705)$ (3,174,959)$ (3,238,458)$ FY 2028 FY 2029FY 2027ExpenditureFY 2025 FY 2026 DRAFT CAMPO 2025-2029 Transportation Improvement Program 10 Financial Constraint To exhibit financial constraint, a financial plan should address three questions: 1) What will the needs for transportation in the CAMPO planning area cost? The needs are identified by project in the following section and costs are summarized by funding source in Figure 2. 2) What revenues are available that can be applied to the needs? Specific revenues available to meet the needs are identified in the Demonstration of Fiscal Constraint tables - Forecast Revenue for Transportation projects, Operations and Maintenance, by jurisdiction and source. 3) Are the revenues sufficient to cover the costs? As shown in Figure 2 – Programmed by Source, programmed fund amounts equal available fund amounts. For many jurisdictions as shown in Figure 2, available funds exceed the amounts of revenues required to fund programmed projects. DRAFT CAMPO 2025-2029 Transportation Improvement Program 11 Demonstration of Fiscal Constraint – Municipalities Source 2025 2026 2027 2028 2029 Total CART 2,195,639$ 2,239,552$ 2,284,343$ 2,330,030$ 2,376,630$ 11,426,193$ General Revenue (excluding CART)10,960,048$ 11,179,249$ 11,402,834$ 11,630,891$ 11,863,508$ 57,036,530$ Total Available Revenue 13,155,687$ 13,418,801$ 13,687,177$ 13,960,920$ 14,240,139$ 68,462,723$ Operation & Maintenance Costs (70,909)$ (71,973)$ (73,052)$ (74,148)$ (75,260)$ (365,342)$ TIP Commitment Totals -$ -$ -$ -$ -$ -$ Total Costs (70,909)$ (71,973)$ (73,052)$ (74,148)$ (75,260)$ (365,342)$ Remaining Financial Capacity 13,084,778$ 13,346,828$ 13,614,124$ 13,886,772$ 14,164,878$ 68,097,381$ Source 2025 2026 2027 2028 2029 TotalCART1,514,193$ 1,544,477$ 1,575,367$ 1,606,874$ 1,639,012$ 7,879,924$ General Revenue (excluding CART)39,987,106$ 40,786,848$ 41,602,585$ 42,434,637$ 43,283,330$ 208,094,506$ Total Available Revenue 41,501,299$ 42,331,325$ 43,177,952$ 44,041,511$ 44,922,341$ 215,974,429$ Operation & Maintenance Costs (197,370)$ (200,331)$ (203,336)$ (206,386)$ (209,481)$ (1,016,903)$ TIP Commitment Totals (5,438)$ (102,863)$ -$ -$ -$ (108,301)$ Total Costs (202,808)$ (303,194)$ (203,336)$ (206,386)$ (209,481)$ (1,125,204)$ Remaining Financial Capacity 41,298,491$ 42,028,132$ 42,974,616$ 43,835,125$ 44,712,860$ 214,849,225$ Source 2025 2026 2027 2028 2029 TotalCART204,623$ 208,715$ 212,889$ 217,147$ 221,490$ 1,064,864$ General Revenue (excluding CART)1,635,970$ 1,668,689$ 1,702,063$ 1,736,104$ 1,770,827$ 8,513,654$ Total Available Revenue 1,840,593$ 1,877,404$ 1,914,953$ 1,953,252$ 1,992,317$ 9,578,518$ Operation & Maintenance Costs (68,660)$ (69,690)$ (70,735)$ (71,796)$ (72,873)$ (353,755)$ TIP Commitment Totals (62,500)$ -$ -$ -$ -$ (62,500)$ Total Costs (131,160)$ (69,690)$ (70,735)$ (71,796)$ (72,873)$ (416,255)$ Remaining Financial Capacity 1,709,433$ 1,807,715$ 1,844,217$ 1,881,455$ 1,919,443$ 9,162,263$ Source 2025 2026 2027 2028 2029 TotalCART2,239,335$ 2,284,122$ 2,329,804$ 2,376,400$ 2,423,928$ 11,653,588$ General Revenue (excluding CART)37,516,952$ 38,267,291$ 39,032,637$ 39,813,290$ 40,609,556$ 195,239,726$ Total Available Revenue 39,756,287$ 40,551,413$ 41,362,441$ 42,189,690$ 43,033,484$ 206,893,314$ Operation & Maintenance Costs (1,035,789)$ (1,051,326)$ (1,067,096)$ (1,083,102)$ (1,099,349)$ (5,336,661)$ TIP Commitment Totals (1,554,120)$ (1,106,836)$ (1,162,178)$ (1,220,287)$ (1,281,301)$ (6,324,722)$ Total Costs (2,589,909)$ (2,158,162)$ (2,229,274)$ (2,303,389)$ (2,380,650)$ (11,661,383)$ Remaining Financial Capacity 37,166,378$ 38,393,251$ 39,133,167$ 39,886,301$ 40,652,834$ 195,231,931$ Costs Callaway County Demonstration of Fiscal Constraint Revenue Costs Cole County Demonstration of Fiscal Constraint Revenue Costs Holts Summit Demonstration of Fiscal Constraint Revenue Costs City of Jefferson Demonstration of Fiscal ConstraintRevenue Source 2025 2026 2027 2028 2029 TotalCART60,455$ 61,664$ 62,897$ 64,155$ 65,438$ 314,608$ General Revenue 1,154,645$ 1,177,738$ 1,201,293$ 1,225,319$ 1,249,825$ 6,008,819$ Total Available Revenue 1,215,100$ 1,239,402$ 1,264,190$ 1,289,473$ 1,315,263$ 6,323,427$ Operation & Maintenance Costs (31,371)$ (31,842)$ (32,319)$ (32,804)$ (33,296)$ (161,632)$ TIP Commitment Totals (127,078)$ -$ -$ -$ -$ (127,078)$ Total Costs (158,449)$ (31,842)$ (32,319)$ (32,804)$ (33,296)$ (288,710)$ Remaining Financial Capacity 1,056,651$ 1,207,560$ 1,231,870$ 1,256,669$ 1,281,967$ 6,034,717$ Source 2025 2026 2027 2028 2029 Total CART 52,471$ 53,520$ 54,591$ 55,682$ 56,796$ 273,060$ General Revenue (excluding CART)270,085$ 275,487$ 280,996$ 286,616$ 292,349$ 1,405,533$ Total Available Revenue 322,556$ 329,007$ 335,587$ 342,299$ 349,145$ 1,678,593$ Operation & Maintenance Costs -$ -$ -$ -$ -$ -$ TIP Commitment Totals -$ -$ -$ -$ -$ -$ Total Costs -$ -$ -$ -$ -$ -$ Remaining Financial Capacity 322,556$ 329,007$ 335,587$ 342,299$ 349,145$ 1,678,593$ St. Martins Demonstration of Fiscal ConstraintRevenue Costs Taos Demonstration of Fiscal ConstraintRevenue Costs DRAFT CAMPO 2025-2029 Transportation Improvement Program 12 Demonstration of Fiscal Constraint – Public Transportation Providers Source 2025 2026 2027 2028 2029 Total CART 80,514$ 82,125$ 83,767$ 85,443$ 87,151$ 419,001$ General Revenue 277,000$ 282,540$ 288,191$ 293,955$ 299,834$ 1,441,519$ Total Available Revenue 357,514$ 364,665$ 371,958$ 379,397$ 386,985$ 1,860,520$ Operation & Maintenance Costs -$ -$ -$ -$ -$ -$ TIP Commitment Totals (105,909)$ -$ -$ -$ -$ (105,909)$ Total Costs (105,909)$ -$ -$ -$ -$ (105,909)$ Remaining Financial Capacity 251,605$ 364,665$ 371,958$ 379,397$ 386,985$ 1,754,611$ Costs Wardsville Demonstration of Fiscal ConstraintRevenue Source 2025 2026 2027 2028 2029 Total CARES Act Funds (Distributed as FTA 5307)207,170$ -$ -$ -$ -$ -$ FTA Section 5307 (not including CARES)1,070,655$ -$ -$ -$ -$ -$ FTA Section 5307 Sub-Total 2,331,188$ 1,106,836$ 1,162,178$ 1,220,287$ 1,281,301$ 7,101,790$ FTA Section 5310 112,000$ 112,000$ 112,000$ 112,000$ 112,000$ 560,000$ FTA Section 5339 954,953$ 10,175$ -$ -$ -$ 965,128$ Sales Tax - 1/2% Capital Improvement 80,000$ 80,000$ 80,000$ 80,000$ 80,000$ 400,000$ City of Jefferson-Local Operating Assistance 1,035,000$ 1,705,000$ 1,739,100$ 1,773,882$ 1,809,360$ 8,062,342$ MoDOT State Operating Assistance 68,000$ 68,000$ 68,000$ 68,000$ 68,000$ 340,000$ Farebox and Reimbursements 391,692$ 399,526$ 407,516$ 415,667$ 423,980$ 2,038,381$ Total Available Revenue 4,972,833$ 3,481,537$ 3,568,794$ 3,669,836$ 3,774,641$ 19,467,641$ Personnel Services (1,820,479)$ (1,856,889)$ (1,894,026)$ (1,931,907)$ (1,970,545)$ (9,473,846)$ Materials and Supplies (335,080)$ (341,782)$ (348,617)$ (355,590)$ (362,701)$ (1,743,770)$ Contractual Services (350,176)$ (357,180)$ (364,323)$ (371,610)$ (379,042)$ (1,822,330)$ Utilities (29,050)$ (29,631)$ (30,224)$ (30,828)$ (31,445)$ (151,177)$ Repairs and Maintenance (457,050)$ (466,191)$ (475,515)$ (485,025)$ (494,726)$ (2,378,507)$ Operation & Maintenance Totals (2,991,835)$ (3,051,672)$ (3,112,705)$ (3,174,959)$ (3,238,458)$ (15,569,629)$ TIP CommitmentsTIP Commitment Totals (311,100)$ (30,544)$ (28,000)$ (28,000)$ (28,000)$ (425,644)$ Remaining Financial Capacity 1,669,898$ 399,321$ 428,089$ 466,876$ 508,182$ 3,472,367$ Operation & Maintenance JEFFTRAN Demonstration of Fiscal Constraint Revenue Source 2025 2026 2027 2028 2029 TotalFTA Section 5310 60,000$ 158,000$ 70,000$ 158,000$ 70,000$ 516,000$ Farebox and Reimbursements 4,500$ 5,250$ 5,250$ 5,250$ 5,250$ 25,500$ Local Contracts 55,500$ 64,750$ 64,750$ 64,750$ 64,750$ 314,500$ Total Available Revenue 120,000$ 228,000$ 140,000$ 228,000$ 140,000$ 856,000$ Personnel Services (51,500)$ (59,000)$ (59,000)$ (59,000)$ (59,000)$ (287,500)$ Materials and Supplies (2,500)$ (4,000)$ (4,000)$ (4,000)$ (4,000)$ (18,500)$ Repairs and Maintenance (6,000)$ (7,000)$ (7,000)$ (7,000)$ (7,000)$ (34,000)$ Operation & Maintenance Totals (60,000)$ (70,000)$ (70,000)$ (70,000)$ (70,000)$ (340,000)$ TIP CommitmentsTIP Commitment Totals (60,000)$ (92,000)$ (70,000)$ (92,000)$ (70,000)$ (384,000)$ Remaining Financial Capacity -$ 66,000$ -$ 66,000$ -$ 132,000$ OATS Demonstration of Fiscal Constraint Revenue Operation & Maintenance DRAFT CAMPO 2025-2029 Transportation Improvement Program 13 Fiscally Constrained Transportation Projects – Bridges MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA NHPP $42,400 $339,200 $381,600 MoDOT STATE $10,600 $84,800 $95,400 TIP #2022-07 Local $0 MoDOT#5P3523 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $1,403,200 $1,403,200 MoDOT STATE $350,800 $350,800 Local $0 Other $0 Total Project Cost: $2,231,000 Total $53,000 $2,178,000 $0 $0 $0 $0 $0 $2,231,000 Bridge Improvement on Rte. 50 over Vetter Lane & Bolivar. E N G Prior Funding Description & Location: Bridge improvement over Vetter Lane. Includes Bolivar Street over Rte. 50. R O W C O NS T Comments: Bridge A1420 and twin bridges A0722. MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA NHPP $89,600 $490,400 $580,000 MoDOT STATE $22,400 $122,600 $145,000 TIP #2022-10 Local $0 MoDOT#5P3525 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $2,105,600 $2,105,600 MoDOT STATE $526,400 $526,400 Local $0 Other $0 Total Project Cost: $3,357,000 Total $112,000 $3,245,000 $0 $0 $0 $0 $0 $3,357,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA NHPP $104,000 $428,000 $532,000 MoDOT STATE $26,000 $107,000 $133,000 TIP #2022-11 Local $0 MoDOT#5P3560 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $1,780,800 $1,780,800 MoDOT STATE $445,200 $445,200 Local $0 Other $0 Total Project Cost: $2,891,000 Total $130,000 $2,761,000 $0 $0 $0 $0 $0 $2,891,000 R OW C O N S T Comments: Bridge K0760. Description & Location: Bridge improvement over Bus. 50, Linden Drive, Moreau Overflow, and Stadium Boulevard. Includes Madison Street Ramp over Rte. 54. R O W CO NS T Comments: Bridges A1415, A1309 and twin bridges A1305, A1307 and A1672. Prior Funding Bridge Improvements On US 54 over Bus. 50 and others. E NG Prior Funding Bridge Improvement On US 54 over Neighorn Branch E N G Description & Location: Bridge improvement over Neighorn Branch. DRAFT CAMPO 2025-2029 Transportation Improvement Program 14 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA NHPP $800 $14,400 $21,600 $161,600 $198,400 MoDOT STATE $200 $3,600 $5,400 $40,400 $49,600 TIP #2023-01 Local $0 MoDOT#CD0072 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $743,200 $743,200 MoDOT STATE $185,800 $185,800 Local $0 Other $0 Total Project Cost: $1,177,000 Total $1,000 $18,000 $27,000 $1,131,000 $0 $0 $0 $1,177,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA AC-STBG $800 $20,000 $20,800 MoDOT STATE $200 $5,000 $5,200 TIP #2023-03 Local $0 MoDOT#CD0075 FHWA $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $152,800 $152,800 MoDOT STATE $38,200 $38,200 Local $0 MoDOT $0 Total Project Cost: $217,000 Total $1,000 $216,000 $0 $0 $0 $0 $0 $217,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA NHPP $800 $800 $800 $13,600 $161,600 $161,600 $339,200 MoDOT STATE $200 $200 $200 $3,400 $40,400 $40,400 $84,800 TIP #2024-01 Local $0 MoDOT#CD0140 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $539,200 $539,200 $1,078,400 MoDOT STATE $134,800 $134,800 $269,600 Local $0 Other $0 Total Project Cost: $1,772,000 Total $1,000 $1,000 $1,000 $17,000 $876,000 $876,000 $0 $1,772,000 Prior Funding Bridge improvements On US 50 over Osage River. EN G Description & Location: Bridge removal on tri- level over US 50.R O W C O N S T Comments: Bridge A1418. Description & Location: Bridge improvements over Osage River. Project involves bridges A5552 and A0506. R O W C O N S T Comments: Bridges A5552 and A0506 Prior Funding Bridge Improvement On S. Summit Drive over Rte. 54 E N G Prior Funding Bridge (Overpass) Removal on Tri- Level over US 50 EN G Description & Location: Bridge improvement over Rte. 54. R OW CO NS T Comments: Bridge A3521. DRAFT CAMPO 2025-2029 Transportation Improvement Program 15 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA NHPP $1,600 $14,400 $116,000 $921,600 $1,053,600 MoDOT STATE $400 $3,600 $29,000 $230,400 $263,400 TIP #2024-02 Local $0 MoDOT#CD0139 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $3,327,200 $3,327,200 MoDOT STATE $831,800 $831,800 Local $0 Other $0 Total Project Cost: $5,476,000 Total $2,000 $18,000 $145,000 $5,311,000 $0 $0 $0 $5,476,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA NHPP $11,200 $143,200 $154,400 MoDOT STATE $2,800 $35,800 $38,600 TIP #2024-03 Local $0 MoDOT#CD0157 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $546,400 $546,400 MoDOT STATE $136,600 $136,600 Local $0 Other $0 Total Project Cost: $876,000 Total $14,000 $862,000 $0 $0 $0 $0 $0 $876,000 Cole Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA BRO $83,336 $83,336 MoDOT BFP $51,226 $51,226 TIP #2024-04 Local Cole County $5,438 $5,438 MoDOT#BRO-R026(25)Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA BRO $1,576,241 $1,576,241 MoDOT BFP $968,897 $968,897 Local Cole County $102,863 $102,863 Other $0 Total Project Cost: $2,788,001 Total $140,000 $2,648,001 $0 $0 $0 $0 $0 $2,788,001 Description & Location: Replacement of bridge on Tanner Bridge Road over the Moreau River. Bridge #0780025 R O W C O N ST Comments: Prior Funding Bridge Improvement On US 54 over Neighorn Branch E N G Description & Location: Bridge improvements over Missouri River. Project involves bridge A4497. R OW CO NS T Comments: Bridges A4497 Prior Funding Tanner Bridge Road bridge replacement over Moreau River E N G Description & Location: Bridge improvement over Neighorn Branch.R O W C ON ST Comments: Bridge G0302. Prior Funding Bridge improvements On US 54/63 over Missouri River. E N G DRAFT CAMPO 2025-2029 Transportation Improvement Program 16 Fiscally Constrained Transportation Projects - Roadways MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA AC-STBG $68,000 $80,000 $187,200 $335,200 MoDOT STATE $17,000 $20,000 $46,800 $83,800 TIP #2020-12 MoDOT $0 MoDOT#5S3418 Other $0 FHWA AC-STBG $86,400 $86,400 MoDOT STATE $21,600 $21,600 Local $0 Other $0 FHWA AC-STBG $910,400 $910,400 MoDOT STATE $227,600 $227,600 Local $0 Other $0 Total Project Cost: $1,665,000 Total $85,000 $208,000 $1,372,000 $0 $0 $0 $0 $1,665,000 Prior Funding Intersection Improvements at South Ten Mile Drive in Jefferson City. E N G Description & Location: Intersection improvements at South Ten Mile Drive (South Outer Road 50) in Jefferson City. R OW C O N S T Comments: MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA AC-STBG $800 $135,200 $136,000 MoDOT STATE $200 $33,800 $34,000 TIP #2022-23 Local $0 MoDOT#5P3487 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $1,977,600 $1,977,600 MoDOT STATE $494,400 $494,400 Local $0 Other $0 Total Project Cost: $2,642,000 Total $1,000 $2,641,000 $0 $0 $0 $0 $0 $2,642,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA AC-STBG $800 $800 $800 $146,400 $148,800 MoDOT STATE $200 $200 $200 $36,600 $37,200 TIP #2023-04 Local $0 MoDOT#CD0004 FHWA $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $2,272,800 $2,272,800 MoDOT STATE $568,200 $568,200 Local $0 FHWA $0 Total Project Cost: $3,027,000 Total $1,000 $1,000 $1,000 $3,024,000 $0 $0 $0 $3,027,000 Description & Location: Job Order Contracting for guard cable and guardrail repair on various routes in the northern portion of the Central District. R O W C ON ST Comments: Prior Funding Guard Cable & Guardrail Repair in Northern Central District E N G Prior Funding Guard Cable & Guardrail Repair in Northern Central District E N G Description & Location: Job Order Contracting for guard cable and guardrail repair on various routes in the northern portion of the Central District. R O W C ON ST Comments: DRAFT CAMPO 2025-2029 Transportation Improvement Program 17 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA NHPP $1,529,600 $1,529,600 MoDOT STATE $382,400 $382,400 TIP #2023-05 Local $0 MoDOT#CD0100 FHWA $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA NHPP $17,708,000 $17,708,000 MoDOT STATE $4,427,000 $4,427,000 Local $0 FHWA $0 Total Project Cost: $24,047,000 Total #########$0 $0 $0 $0 $0 $0 $24,047,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA NHPP $800 $800 $26,400 $257,600 $285,600 MoDOT STATE $200 $200 $6,600 $64,400 $71,400 TIP #2023-06 Local $0 MoDOT#CD0106 FHWA $0 FHWA $0 MoDOT $0 Local $0 FHWA $0 FHWA NHPP $3,277,600 $3,277,600 MoDOT STATE $819,400 $819,400 Local $0 FHWA $0 Total Project Cost: $4,454,000 Total $1,000 $1,000 $33,000 $4,419,000 $0 $0 $0 $4,454,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA AC-STBG $800 $12,000 $12,800 MoDOT STATE $200 $3,000 $3,200 TIP #2023-08 Local $0 MoDOT#CD0040 FHWA $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $196,800 $196,800 MoDOT STATE $49,200 $49,200 Local $0 FHWA $0 Total Project Cost: $262,000 Total $1,000 $261,000 $0 $0 $0 $0 $0 $262,000 Prior Funding Pavement Improvement on RT E from US 54 to RT B E N G Description & Location: Pavement improvement from west of Shamrock Road to east of Stoney Gap Road. Includes westbound Rte. 50 from west of Maries River to east of Mari Osa Delta Lane and from west of Osage River to Moreau River. R OW C O N S T Comments: Description & Location: Pavement improvement on RT E from US 54 to RT B.RO W C O N S T Comments: Prior Funding Pavement Resurfacing on US 54 E N G Prior Funding Pavement Improvement on US 50 E N G Description & Location: Pavement resurfacing from County Road 147 north of Kingdom City to Missouri River bridge. Includes high friction surface treatment. R OW CO NS T Comments: DRAFT CAMPO 2025-2029 Transportation Improvement Program 18 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA AC-STBG $5,600 $65,600 $71,200 MoDOT STATE $1,400 $16,400 $17,800 TIP #2023-09 Local $0 MoDOT#CD0043 FHWA $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $1,109,600 $1,109,600 MoDOT STATE $277,400 $277,400 Local $0 Other $0 Total Project Cost: $1,476,000 Total $7,000 $1,469,000 $0 $0 $0 $0 $0 $1,476,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA NHPP $4,000 $4,000 $169,600 $177,600 MoDOT STATE $1,000 $1,000 $42,400 $44,400 TIP #2024-14 Local $0 MoDOT#CD0170 FHWA $0 FHWA NHPP $800 $800 MoDOT STATE $200 $200 Local $0 Other $0 FHWA NHPP $2,192,800 $2,192,800 MoDOT STATE $548,200 $548,200 Local $0 Other $0 Total Project Cost: $2,964,000 Total $5,000 $6,000 $2,953,000 $0 $0 $0 $0 $2,964,000 Prior Funding Callaway Rte 54 E NG Description & Location: Pavement improvement on RT H from RT E to end of state maintenance; RT BB from MO 17 to RT. H; and RT CC from RT C to US 54. R OW C O N S T Comments: This project includes three routes (H, BB, and CC). Description & Location: Add lanes north of the Missouri River Bridge in Jefferson City. Includes modifying interchange configuration at Rte. W and Rte. 54. R O W C O N S T Comments: This project was split from 5P3497. (TIP#2022-01) Prior Funding Pavement Improvement on Routes H, BB, and CC. E N G DRAFT CAMPO 2025-2029 Transportation Improvement Program 19 Fiscally Constrained Transportation Projects - Other MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA SAFETY $800 $800 MoDOT STATE $200 $200 TIP #2023-11 Local $0 MoDOT#5P3521 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA SAFETY $50,400 $50,400 MoDOT STATE $12,600 $12,600 Local $0 Other $0 Total Project Cost: $64,000 Total $0 $64,000 $0 $0 $0 $0 $0 $64,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA SAFETY $800 $800 MoDOT STATE $200 $200 TIP #2023-12 Local $0 MoDOT#CD0006 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA SAFETY $50,400 $50,400 MoDOT STATE $12,600 $12,600 Local $0 Other $0 Total Project Cost: $64,000 Total $0 $0 $64,000 $0 $0 $0 $0 $64,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA SAFETY $800 $800 MoDOT STATE $200 $200 TIP #2024-05 Local $0 MoDOT#CD0141 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA SAFETY $50,400 $50,400 MoDOT STATE $12,600 $12,600 Local $0 Other $0 Total Project Cost: $64,000 Total $0 $0 $0 $64,000 $0 $0 $0 $64,000 Description & Location: On-call work zone enforcement at various locations in the Central District. R O W C O N S T Comments: Prior Funding On-Call Work Zone Enforcement EN G Description & Location: On-call work zone enforcement at various locations in the Central District. R O W C O N S T Comments: Prior Funding On-Call Work Zone Enforcement EN G Description & Location: On-call work zone enforcement at various locations in the Central District. R O W C O N S T Comments: Prior Funding On-Call Work Zone Enforcement EN G DRAFT CAMPO 2025-2029 Transportation Improvement Program 20 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA $0 MoDOT $0 TIP #2024-06 Local $0 MoDOT#5B0800T Other $0 FHWA $0 MoDOT STATE $0 Local $0 Other $0 FHWA NHPP $0 MoDOT STATE $4,399,000 $4,399,000 $4,399,000 $4,399,000 $4,399,000 $4,399,000 $26,394,000 Local $0 Other $0 Total Project Cost: $26,394,000 Total $4,399,000 $4,399,000 $4,399,000 $4,399,000 $4,399,000 $4,399,000 $0 $26,394,000 Prior Funding Payback for Safe and Sound bridges in the Central District. E NG Description & Location: Payback beginning in SFY 2008 for Safe and Sound bridges in the Central District. R O W C ON ST Comments: DRAFT CAMPO 2025-2029 Transportation Improvement Program 21 Fiscally Constrained Transportation Projects – Scoping and Design Projects MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA AC-STBG $800 $2,400 $3,200 MoDOT STATE $200 $600 $800 TIP #2013-16 Local $0 MoDOT#5S2234 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 Total Project Cost: $4,000 Total $1,000 $3,000 $0 $0 $0 $0 $0 $4,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA NHPP $40,000 $40,000 MoDOT STATE $10,000 $10,000 TIP #2022-27 Local $0 MoDOT#5P3588 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 Total Project Cost: $50,000 Total $50,000 $0 $0 $0 $0 $0 $0 $50,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA NHPP $800 $1,600 $2,400 MoDOT STATE $200 $400 $600 TIP #2024-07 Local $0 MoDOT#CD0159 Other $0 FHWA NHPP $0 MoDOT STATE $0 Local $0 Other $0 FHWA NHPP $0 MoDOT STATE $0 Local $0 Other $0 Total Project Cost: $3,000 Total $1,000 $2,000 $0 $0 $0 $0 $0 $3,000 Description & Location: Scoping for bridge improvements over Rte. 50. RO W C O N S T Comments: Project involves bridge A1187 Prior Funding Scoping for Interchange Improvements at Truman Blvd and Country Club Drive E N G Description & Location: Scoping for intersection improvements at Routes M and Route W in Wardsville. R O W C O N S T Comments: Prior Funding Dix Road - Scoping for bridge improvements over US 50. E N G Description & Location: Scoping for Interchange Improvements at Truman Blvd and Country Club Drive. RO W C O N S T Comments: Prior Funding Scoping Routes M, B, & W EN G DRAFT CAMPO 2025-2029 Transportation Improvement Program 22 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA $0 MoDOT STATE $50,000 $100,000 $150,000 TIP #2024-08 Local $0 MoDOT#5S3592 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA $0 MoDOT STATE $0 Local $0 Other $0 Total Project Cost: $150,000 Total $50,000 $100,000 $0 $0 $0 $0 $0 $150,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA $0 MoDOT STATE $1,000 $2,000 $3,000 TIP #2024-09 Local $0 MoDOT#5P3402 Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA $0 MoDOT STATE $0 Local $0 Other $0 Total Project Cost: $3,000 Total $1,000 $2,000 $0 $0 $0 $0 $0 $3,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA AC-STBG $800 $1,600 $2,400 MoDOT STATE $200 $400 $600 TIP #2024-10 Local $0 MoDOT#CD0052 Other $0 FHWA AC-STBG $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $0 MoDOT STATE $0 Local $0 Other $0 Total Project Cost: $3,000 Total $1,000 $2,000 $0 $0 $0 $0 $0 $3,000 Prior Funding VARIOUS - Scoping for curve chevron and object markers. E N G Description & Location: Surveying to sell excess right-of-way parcels in the Central District. R O W CO NS T Comments: Description & Location: Scoping for curve chevron and object marker installation at vrious locations in the Central District. R O W CO NS T Comments: Prior Funding VARIOUS - Scoping for future projects in the Central District. E N G Prior Funding VARIOUS - Surveying to sell excess right-of-way. E N G Description & Location: Scoping for future projects on various routes in the Central District. R OW CO NS T Comments: DRAFT CAMPO 2025-2029 Transportation Improvement Program 23 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA AC-STBG $40,000 $800 $40,800 MoDOT STATE $10,000 $200 $10,200 TIP #2024-11 Local $0 MoDOT#CD0065 Other $0 FHWA AC-STBG $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $0 MoDOT STATE $0 Local $0 Other $0 Total Project Cost: $51,000 Total $50,000 $1,000 $0 $0 $0 $0 $0 $51,000 MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA AC-STBG $80,000 $320,000 $400,000 MoDOT STATE $20,000 $80,000 $100,000 TIP #2024-12 Local $0 MoDOT#CD0168 Other $0 FHWA AC-STBG $0 MoDOT $0 Local $0 Other $0 FHWA AC-STBG $0 MoDOT STATE $0 Local $0 Other $0 Total Project Cost: $500,000 Total $100,000 $400,000 $0 $0 $0 $0 $0 $500,000 Prior Funding Scoping for bridge improvements at the Tri-level. E NG Description & Location: Traffic safety studies at vairous locations in Central District.R OW C O N S T Comments: Description & Location: Scoping for bridge improvements at intersection of Rte. 50, Rte. 63, and Rte. 54 in Jefferson City. R O W C O N S T Comments: Bridges A1419, A4826, A4827 and A4828. Prior Funding VARIOUS - Traffic safety studies at vairous locations in Central E N G DRAFT CAMPO 2025-2029 Transportation Improvement Program 24 Fiscally Constrained Transportation Projects - Pedestrian & Bicycle Projects Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA AC-STBG $800 $320,000 $320,800 MoDOT STATE $200 $80,000 $80,200 TIP #2020-16 Local $0 MoDOT#CD0126 Other $0 FHWA AC-STBG $38,400 $38,400 MoDOT STATE $9,600 $9,600 Local $0 Other $0 FHWA AC-STBG $1,000,000 $1,000,000 MoDOT STATE $250,000 $250,000 Local $0 Other $0 Total Project Cost: $1,699,000 Total $49,000 $1,650,000 $0 $0 $0 $0 $0 $1,699,000 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA RTP $17,350 $17,350 MoDOT $0 TIP #2023-14 Local St. Martins $27,650 $27,650 MoDOT#Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA RTP $128,850 $128,850 MoDOT $0 Local St. Martins $44,111 $44,111 Other Donation $574 $574 Total Project Cost: $218,535 Total $218,535 $0 $0 $0 $0 $0 $0 $218,535 Prior Funding St. Martins Trail E N G Description & Location: Upgrade pedestrian facilities to comply with the ADA Transition Plan in Jefferson City, Taos, Wardsville, and Frankenstein. R O W C O NS T Comments: Description & Location: Recreational Trails Grant, 7' ADA trail extension from Niekamp Park to Traci Dr. R O W CO NS T Comments: Recreational Trail Program Grant awarded November 2022. St. Martins Prior Funding Updating Pedestrian Facilities EN G MoDOT Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA TAP $79,500 $79,500 MoDOT $0 TIP #2023-17 Local Holts Summit $62,500 $62,500 MoDOT#Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA TAP $420,500 $420,500 MoDOT $0 Local Holts Summit $62,500 $62,500 Other $0 Total Project Cost: $625,000 Total $625,000 $0 $0 $0 $0 $0 $0 $625,000 Prior Funding Holts Summit Sidewalk construction along S. Summit Drive E N G Description & Location: Transportation Alternatives Program Grant, Sidewalk installation along S. Summit Drive from Holt Lane to Ellsworth Drive. R OW C O N S T Comments: TAP Holts Summit DRAFT CAMPO 2025-2029 Transportation Improvement Program 25 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA TAP $0 MoDOT $0 TIP #2023-15 Local City of Jefferson $0 MoDOT#Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA TAP $222,744 $222,744 MoDOT $0 Local City of Jefferso $55,686 $55,686 Other $0 Total Project Cost: $278,430 Total $278,430 $0 $0 $0 $0 $0 $0 $278,430 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA TAP $0 MoDOT $0 TIP #2023-16 Local City of Jefferson $0 MoDOT#Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA TAP $500,000 $500,000 MoDOT $0 Local City of Jefferson $483,465 $483,465 Other $0 Total Project Cost: $983,465 Total $0 $983,465 $0 $0 $0 $0 $0 $983,465 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2028 Future Totals Project FHWA TAP $361,874 $361,874 MoDOT $0 TIP #2024-13 Local Wardsville $98,526 $98,526 MoDOT#Other $0 FHWA $0 MoDOT $0 Local $0 Other $0 FHWA TAP $27,117 $27,117 MoDOT $0 Local Wardsville $7,383 $7,383 Other $0 Total Project Cost: $494,900 Total $494,900 $0 $0 $0 $0 $0 $0 $494,900 City of Jefferson Wardsville Description & Location: Construction of approximately 1400 feet of 8ft wide sidewalks along Falcon Lane to accommodate pedestrians and bicycle users. R O W CO NS T Comments: TAP 2022 Supplemental Award Prior Funding Wears Creek Greenway Extension Bypassing MO 179 E N G Description & Location: Transportation Alternatives Program Grant, includes improvements to greenway crosswalks. R OW CO NS T Comments: TAP Prior Funding Falcon Lane Pedestrian Improvements E N G Description & Location: Transportation Alternatives Program Grant, includes extension of the Wears Creek Greenway along Tree Valley Lane, bypassing MO 179. R O W CO NS T Comments: TAP Prior Funding Greenway crosswalks at Southwest Blvd and Lafayette St. E N G City of Jefferson DRAFT CAMPO 2025-2029 Transportation Improvement Program 26 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA TAP $41,609 $41,609 MoDOT $0 TIP #2025-XX Local Cole County $18,391 $18,391 MoDOT#Other $0 FHWA TAP $0 MoDOT $0 Local Cole County $0 Other $0 FHWA TAP $458,391 $458,391 MoDOT $0 Local Cole County $202,609 $202,609 Other $0 Total Project Cost: $721,000 Total $0 $721,000 $0 $0 $0 $0 $0 $721,000 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA TAP $0 MoDOT $0 TIP #2025-XX Local City of Jefferson $0 MoDOT#Other $0 FHWA TAP $0 MoDOT $0 Local City of Jefferson $0 Other $0 FHWA TAP $500,000 $500,000 MoDOT $0 Local City of Jefferson $495,703 $495,703 Other $0 Total Project Cost: $995,703 Total $0 $0 $0 $995,703 $0 $0 $0 $995,703 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FHWA TAP $0 MoDOT $0 TIP #2025-XX Local City of Jefferson $0 MoDOT#Other $0 FHWA TAP $0 MoDOT $0 Local City of Jefferson $0 Other $0 FHWA TAP $169,762 $169,762 MoDOT $0 Local City of Jefferson $42,441 $42,441 Other $0 Total Project Cost: $212,203 Total $0 $212,203 $0 $0 $0 $0 $0 $212,203 Cole County City of Jefferson City of Jefferson Prior Funding South Country Club Sidewalk E NG Description & Location: Multi-Use trails construction from McCarty St.. to Riverside park in the Boggs Creek watershed. RO W C ON S T Comments: TAP 2023 Award Description & Location:Construction of Sidepath along S. Country Club Drive from 200 feet NE of Tanman Ct. to Farigrounds Rd. R O W C O N S T Comments: TAP 2023 Award Prior Funding Rainbow Dr. Sidewalk E N G Prior Funding Boggs Creek Multi-Use Trail E N G Description & Location: Sidewalk construction along Rainbow Dr. from Hunters Run to Terra Bella Dr. R OW CO NS T Comments: TAP 2023 Award DRAFT CAMPO 2025-2029 Transportation Improvement Program 27 Fiscally Constrained Transportation Projects – Public Transportation Projects Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project JEFFTRAN Operating Assistance Other Pass. Fares $521,590 $391,692 $468,886 $478,264 $487,829 $497,585 $2,845,846 MoDOT State Operatin $11,500 $52,414 $52,414 $52,414 $52,414 $52,414 $273,570 TIP #2011-04 Local City of Jefferso $821,916 $1,070,655 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,663,173 MoDOT#FTA 5307 $821,916 $1,070,655 $1,106,836 $1,162,178 $1,220,287 $1,281,301 $6,663,173 Total Project Cost: $16,445,762 Total $2,176,922 $2,585,416 $2,734,972 $2,855,034 $2,980,817 $3,112,601 $0 $16,445,762 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project JEFFTRAN Operating Assistance Other $0 MoDOT $0 TIP #2022-21 Local General Fund $28,000 $28,000 $28,000 $28,000 $28,000 $28,000 $168,000 MoDOT#FTA 5310 $112,000 $112,000 $112,000 $112,000 $112,000 $112,000 $672,000 Total Project Cost: $840,000 Total $140,000 $140,000 $140,000 $140,000 $140,000 $140,000 $0 $840,000 Description & Location: Operating Assistance for JEFFTRAN service within Jefferson City limits (A 3% annual inflation factor applied.) Comments: Prior Funding Description & Location: Section 5310 Grant Program for acquiring new paratransit buses. Providing mobility needs for seniors and persons with disabilities. Comments: Prior Funding O P E R O P E R City of Jefferson - JEFFTRAN City of Jefferson - JEFFTRAN Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project Other Pass. Fares $0 MoDOT State Operating $0 TIP #2020-22 Local General Fund $8,000 $2,544 $10,544 MoDOT#FTA 5339 $32,000 $10,175 $42,175 Total Project Cost: $52,719 Total $0 $40,000 $12,719 $0 $0 $0 $0 $52,719 Description & Location: This project would replace outdated security cameras and entry systems in transit facilities. Jefferson City, MO. And add solar lighting to select bus shelters. Comments: Prior Funding Replace Security Systems in Transit Facilities O PE R City of Jefferson - JEFFTRAN DRAFT CAMPO 2025-2029 Transportation Improvement Program 28 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project Other Pass. Fares $0 MoDOT State Operating $0 TIP #2022-24 Local General Fund $57,600 $57,600 MoDOT#FTA 5339 $230,400 $230,400 Total Project Cost: $288,000 Total $0 $288,000 $0 $0 $0 $0 $0 $288,000 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project Other Pass. Fares $0 MoDOT State Operating $0 TIP #2022-26 Local General Fund $7,000 $7,000 MoDOT#FTA 5339 $28,000 $28,000 Total Project Cost: $35,000 Total $0 $35,000 $0 $0 $0 $0 $0 $35,000 Description & Location: This project would purchase 2 replacement low-floor buses. Comments: Prior Funding Replacement of Two Low-Floor Buses O PE R Description & Location: This project would repair the bus barn roof, which is leaking. Comments: Prior Funding Repair Bus Barn Roof O PE R City of Jefferson - JEFFTRAN City of Jefferson - JEFFTRAN Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project FTA $0 MoDOT $0 TIP #2022-31 Local General Fund $60,000 $60,000 MoDOT#FTA 5339 $240,000 $240,000 Total Project Cost: $300,000 Total $0 $300,000 $0 $0 $0 $0 $0 $300,000 Description & Location: Replacement of AVL and related equipment and supporting services. Comments: Prior Funding AVL/AVA/APC/Infotainment Replacement Equipment and O P E R City of Jefferson - JEFFTRAN DRAFT CAMPO 2025-2029 Transportation Improvement Program 29 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project OATS Operating Assistance FTA 5310 $88,000 $88,000 $88,000 $264,000 MoDOT $0 TIP #2018-10 Local $0 MoDOT#Other OATS $22,000 $22,000 $22,000 $66,000 Total Project Cost: $330,000 Total $0 $0 $110,000 $0 $110,000 $0 $110,000 $330,000 Funding State Program Year - July 1 to June 30 Source Category 2025 2026 2027 2028 2029 Future Totals Project OATS Operating Assistance FTA 5310 $60,000 $70,000 $70,000 $70,000 $70,000 $340,000 MoDOT $0 TIP #2018-11 Local $0 MoDOT#Other OATS $60,000 $70,000 $70,000 $70,000 $70,000 $340,000 Total Project Cost: $680,000 Total $0 $120,000 $140,000 $140,000 $140,000 $140,000 $0 $680,000 Description & Location: Within the Jefferson City MPO Region-Section 5310-Seniors and Individuals w ith Disabilities. Comments: Other Funding - OATS, Inc. Prior Funding O P E R Description & Location: Requesting replacement/expansion vehicles to provide service in Jefferson City and surrounding Comments: Other Funding - OATS, Inc. Prior Funding O PE R OATS OATS DRAFT CAMPO 2025-2029 Transportation Improvement Program 30 Project Locations - Figure 7 - Map of Fiscally Constrained Transportation Projects CAMPO 2025-2029 Transportation Improvement Program July 1, 2024 – June 30, 2029 DRAFT CAMPO 2025-2029 Transportation Improvement Program 31 Program of Projects Figure 8 – JEFFTRAN Program of Projects No.Description Est. Total Funding by Others Local 1 Replace paratransit widebody cutaway buses 600,000$ $ 480,000 120,000$ 2 Upgrade/replace fare card system 150,000$ $ 120,000 30,000$ 3 Transit facility repairs & improvements 50,000$ 40,000$ 10,000$ 4 Security upgrades for transit facilities 30,000$ $ 24,000 6,000$ 5 Upgrade transit transfer facilities 150,000$ $ 120,000 30,000$ 6 Purchase and install bus shelters and amenities at various locations in Jefferson City 30,000$ 24,000$ 6,000$ 7 Purchase back-up generator & switches for transit and CM facilities 250,000$ 200,000$ 50,000$ 8 Replace low-floor route buses 8,000,000$ $ 6,400,000 1,600,000$ 9 Construct replacement transit/central maintenace/bus barn/bus wash facilities 40,000,000$ 32,000,000$ 8,000,000$ 10 Transit admin facility rehab 75,000$ $ 60,000 15,000$ 11 Purchase and install additional transit traveler kiosks (each)15,000$ 12,000$ 3,000$ 12 Add bike racks/benches at passenger transfer facilities and selected bus stops 25,000$ $ 20,000 5,000$ 13 Charging systems/electrical upgrades for buses 600,000$ 480,000$ 120,000$ 14 Add crosswalks and supporting bike/ped amenities to transit bus shelters 60,000$ $ 48,000 12,000$ 15 Add solar lighting/occupancy indicators for selected bus shelters 35,000$ 28,000$ 7,000$ 16 Replace mobile column lifts for buses 100,000$ $ 80,000 20,000$ 17 Add vehicle electric charging stations and associated infrastructure 50,000$ 40,000$ 10,000$ 18 Time-tracking software for transit employees 15,000$ $ 12,000 3,000$ 19 Passenger Engagement/Bus infotainment system, including digital displays 250,000$ 200,000$ 50,000$ 20 Pre-trip inspection software 30,000$ $ 24,000 6,000$ 21 Purchase and install heating system for bus wash building 35,000$ 28,000$ 7,000$ 22 Purchase and install vehicle operations monitoring system 332,000$ $ 265,600 66,400$ Total 50,882,000$ 40,705,600$ 10,176,400$ JEFFTRAN 2025 Program of Projects Illustrative Projects DRAFT CAMPO 2025-2029 Transportation Improvement Program 32 Multimodal Projects In 2015, CAMPO met with federal and state planning partners in a formal planning process review. Within two recommendations made, CAMPO was urged to include more multi-modal projects into the TIP. CAMPO staff sent out written requests and reminders at CAMPO meetings for projects, including those not using federal dollars. As of the writing of this document, no projects have been submitted. However, there are a number of factors why these projects are limited. These types of projects are usually incorporated into new road projects. Many of these types of projects are highly dependent on grants, which may or may not be annually awarded. Projects are usually decided each budget year. There are several bicycle or pedestrian projects in the MTP illustrative list, but projects are not constrained and funds are not obligated. Regionally Significant Projects A regionally significant project means a transportation project (other than projects that may be grouped in the TIP and/or STIP or exempt projects as defined in EPA’s transportation conformity regulation (40 CFR part 93) that is on a facility which serves regional transportation needs (such as access to and from the area outside the region; major activity centers in the region; major planned developments such as new retail malls, sports complexes, or employment centers; or transportation terminals) and would normally be included in the modeling of the metropolitan area’s transportation network. At a minimum, this includes all principal arterial highways and all fixed guideway transit facilities that offer a significant alternative to regional highway travel. The TIP does not currently contain a project that meets this criteria. DRAFT CAMPO 2025-2029 Transportation Improvement Program 33 Appendix 1 – Amendments and Administrative Modifications Amendments TIP No. Project Description Project Sponsor Project Cost Board Approval OneDOT Approval Administrative Modifications TIP No. Description of Modification Date DRAFT CAMPO 2025-2029 Transportation Improvement Program 34 Appendix 2 – Federal Funding Sources On November 15, 2021, President Biden signed the Infrastructure Investment and Jobs Act (IIJA), also known as the “Bipartisan Infrastructure Law”) into law. The Bipartisan Infrastructure Law (BIL) provides $550 billion over fiscal years 2022 through 2026 in new Federal investment in infrastructure, including in roads, bridges, and mass transit, water infrastructure, resilience, and broadband. As under the FAST Act, the BIL authorizes a single, combined amount for each fiscal year for all apportioned highway programs combined. That amount is first apportioned among the States, and then each State’s apportionment is divided among the individual apportioned programs. The BIL also appropriates funding from the General Fund for three other formula-based programs separate and apart from the apportioned amount described above (and the formula described below): (1) the Bridge Formula Program, (2) the National Electric Vehicle Infrastructure Formula Program, and (3) the Appalachian Development Highway System Program. Federal-aid Highway Apportioned Programs The BIL authorizes a total combined amount ($52.5 B for fiscal year (FY) 2022, $53.5 B for FY23, $54.6 B for FY24, $55.7 B for FY25, and $56.8 B for FY26) in Contract Authority from the Highway Account of the Highway Trust Fund to fund 8 highway apportioned programs (including certain set-asides): • National Highway Performance Program (NHPP) • Surface Transportation Block Grant Program (STBG) • Highway Safety Improvement Program (HSIP) • Congestion Mitigation and Air Quality Improvement Program (CMAQ) • National Highway Freight Program (NHFP) • Metropolitan Planning (PL) • Carbon Reduction Program (CRP) NEW • Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation (PROTECT) Formula Program NEW More information can be found at: https://www.fhwa.dot.gov/bipartisan-infrastructure-law/funding.cfm Federal Transit Administration Funding The Bipartisan Infrastructure Law authorizes up to $108 billion to support federal public transportation programs, including $91 billion in guaranteed funding. More information can be found at: https://www.transit.dot.gov/funding/grants/grant-programs FTA Programs Eligible Activities Section 5307 Urbanized Area Formula Grants This program provides grants to Urbanized Areas (UZA) for public transportation capital, planning, job access and reverse commute projects, as well as operating expenses in certain circumstances. Section 5310 Enhanced Mobility of Seniors and Individuals with Disabilities This program is intended to enhance mobility for seniors and persons with disabilities by providing funds for programs to serve the special needs of transit-dependent populations beyond traditional public transportation services and Americans with Disabilities Act (ADA) complementary paratransit services. Section 5311 Formula Grants for Rural Areas This program provides capital, planning, and operating assistance to states to support public transportation in rural areas with populations less than 50,000, where many residents often rely on public transit to reach their destinations. Section 5329 Transit Safety & Oversight This section requires FTA to implement and maintain a national public transportation safety program to improve the safety of all public transportation systems that receive federal funding. The safety program includes a national public transportation safety plan, a safety certification training program, a public transportation agency safety plan, and a state safety oversight program. Section 5339 Bus and Bus Facilities Provides capital funding to replace, rehabilitate and purchase buses and related equipment and to construct bus-related facilities. DRAFT CAMPO 2025-2029 Transportation Improvement Program 35 Appendix 3 – Policies and Procedures Amendments An amendment involves a major change to a project and requires approval by the Board of Directors and Governor. An amendment is a revision that requires public review, allowance of comment, possible re- demonstration of fiscal constraint, and includes at least one of the following: • Addition or deletion of a project using FHWA or FTA funds (except as allowed as an administrative modification), • Major changes affecting project cost from FHWA or FTA sources (changes exceeding 20% of FHWA or FTA sources of the existing project cost or changes over $2,000,000), • Major changes in a project phase initiation date (greater than 12 months), or • Major changes in design concept or design scope, such as changing project termini (more than 1/2 mile or 10% of the total length of the project, whichever is greater) or changing the number of through traffic lanes that also includes a substantial increase in Federal cost. Amendments will be initiated by the project sponsor. Amendments to delete a project can simply be made via written correspondence identifying the project and why it is to be removed from the TIP. Amendments to include a new project can be made on the TIP Project Form for the current TIP with a cover letter or remark in the comment section requesting inclusion in the TIP as an amendment. Amendments for existing projects can be made on the TIP Project Form for the current TIP with a cover letter or remark in the comment section highlighting the change in the project and providing the CAMPO TIP Number. After an Amendment has been requested the process as follows: • Staff will review the amendment for accuracy and to verify if an amendment is required or if the change qualifies as an administrative modification. Staff may consult with MoDOT and FHWA if necessary. • The amendment will be placed on the next Technical Committee (TC) meeting agenda for review. • The Technical Committee is an advisory board to the board of directors. Regardless of whether the Technical Committee recommends approval of a project, does not recommend approval of a project, or is unable to make a recommendation, the project shall still proceed to the Board of Directors to make a final decision. • If approval is recommended by the TC to the Board of Directors, staff will post the amendment notice on the website, initiating a minimum 7 calendar day public comment period, send notices to the appropriate parties, and place the amendment on the next Board of Directors meeting agenda. • At the Board of Directors Meeting, they will close the public comment period and a vote for approval will be held. If the project sponsor indicates an emergency situation upon submitting the amendment, staff will: • Initiate the public comment period • Post the amendment notice on the website, initiating the 7-calendar-day public comment period • Send notices to the appropriate parties • Place the amendment on the next Board of Directors meeting agenda. The Board will close the public comment period at the next Board of Directors Meeting and hold a vote for approval. If this is not adequate to meet the emergency situation, a special Board of Directors meeting may be called and proceed as outlined in the Public Participation Plan. DRAFT CAMPO 2025-2029 Transportation Improvement Program 36 Administrative Modifications Revisions to the TIP and TIP projects that do not meet the criteria of an Amendment will be considered administrative modifications including: minor changes to project/project phase costs, minor changes to funding sources of previously-included projects, and minor changes to project/project phase initiation dates. An administrative modification is a revision that neither requires committee action, public review and comment, nor redemonstrates fiscal constraint. An administrative modification will be initiated by the project sponsor by written communication to CAMPO staff describing the change (phase cost, funding sources, or phase initiation date) warranting the modification. Staff will review the administrative modification for accuracy and to verify qualification as an administrative modification. Staff may consult with MoDOT and FHWA if necessary. Upon CAMPO staff confirmation of the administrative modification requirements being met, staff will modify the TIP appropriately, including noting the administrative modification in Appendix 1 of the TIP and making changes to the project listing in the body of the TIP; notify the Board of Directors, Technical Committee, MoDOT, FTA, and FHWA via email; draft a staff memo for the next Board of Directors and Technical Committee meeting; and post the modified TIP notice on the CAMPO website for a minimum of 7 calendar days. Combining or Splitting Projects Splitting a project into two or more projects or combining two or more projects can provide benefits to project scheduling, cost, and logistics. A split or combination can be made via an administrative modification to the TIP, if the project does not trigger a major change to the project as described in the amendment section and the overall scope of work does not change. When combining two or more projects, the financial and description information will be rolled up into the project which was in the TIP originally and use the previous MPO TIP number. When splitting a project into two or more projects, the financial and descriptive information will be separated appropriately into several (two or more) projects using the same MPO TIP number, but the additional projects will include alphabetic suffixes. The process for splitting or combining projects will follow the procedures of either an amendment or administrative modification. Compliance with Metropolitan Transportation Plan For a project to be eligible for the TIP, it first must be included in the adopted MTP. Large capital projects, roadway capacity, and/or general purpose roadway projects must be individually listed or clearly part of a larger project included in the fiscally‐constrained component of the plan. Certain projects seeking to improve safety, increase multi‐modal opportunities, or enhance the existing transportation system may be programmed in the TIP without individual identification in the regional plan, so long as they are consistent with the established goals and objectives of the plan. Project Delay Policy The goal of the Project Delay Policy for the Transportation Improvement Program is to maximize the federal funding obligated each fiscal year and to enable the MPO to redirect funds to different projects if any are inactive or otherwise limited from making progress. The Delay Policy applies to projects funded through the programs for which CAMPO has oversight of project selection. The intent of the Delay Policy is to provide an incentive for local agency sponsors to develop their projects according to a detailed schedule and, thereby, to obligate the federal funds assigned to each project within DRAFT CAMPO 2025-2029 Transportation Improvement Program 37 the timeframes initially shown in the TIP. The Delay Policy is primarily focused on projects that involve construction or provide transportation improvements that are handled through purchasing procedures. In the context of this Delay Policy, a “delay” occurs when a construction-related project phase does not get advertised within six months of the TIP program year in which its construction phase funding was originally programmed, or changed with an amendment, in the TIP. For non-construction projects and programs, a “delay” occurs when the “Notice to Proceed” is not issued within two months of the TIP program year in which its implementation was originally funded in the TIP. The consequence of a delay may be the withdrawal of its Federal funds from the TIP or other action by the Board. Project Funding Information When a new project is submitted for inclusion to the TIP, either during the initial development of the TIP or as an amendment, the project sponsor is required to provide information regarding the local funding sources in order to show fiscal constraint. The specific source of revenue, anticipated future, and any other financial information needed to show fiscal constraint will be required. Project Selection The CAMPO Board of Directors adopted (Resolution 2010-04) a project prioritization and selection process. This process involves a call for projects, ranking based on CAMPO priorities by staff and reviewed by the CAMPO Technical Committee, prior to being forwarded to the CAMPO Board of Directors for a vote of approval. The Board of Directors may modify the project selection if deemed necessary. Project Sponsor Commitment to Projects Project sponsors hold ultimate responsibility for ensuring that project information contained in the TIP is correct, that it accurately represents the scope of work being performed, and that the amount of funding being requested is correct. The sponsor is responsible for providing CAMPO with an honest accounting of project details including: costs, implementation schedules, and local matching fund sources, at the time of the application for federal funds and anytime such details change. The project sponsor is also responsible for reviewing the TIP after a project is included or modified to ensure correctness. Scriveners’ Error Errors made in the ministerial functions of creating and maintaining the TIP, such as cartography, typographical, spelling, minor word omissions, mathematical, and other error’s which do not alter the intent of the TIP and have little or no impact can be performed by staff and shall not be considered a revision to the TIP. DRAFT CAMPO 2025-2029 Transportation Improvement Program 38 Appendix 4 – Definitions Attainment area means any geographic area in which levels of a given criteria air pollutant (e.g., ozone, carbon monoxide, PM10, PM2.5, and nitrogen dioxide) meet the health-based National Ambient Air Quality Standards (NAAQS) for that pollutant. An area may be an attainment area for one pollutant and a nonattainment area for others. A maintenance area (see definition below) is not considered an attainment area for transportation planning purposes. Available funds means funds derived from an existing source dedicated to or historically used for transportation purposes. For Federal funds, authorized and/or appropriated funds and the extrapolation of formula and discretionary funds at historic rates of increase are considered available. A similar approach may be used for State and local funds that are dedicated to or historically used for transportation purposes. Conformity means a Clean Air Act (42 U.S.C. 7506(c)) requirement that ensures that Federal funding and approval are given to transportation plans, programs and projects that are consistent with the air quality goals established by a State Implementation Plan (SIP). Conformity, to the purpose of the SIP, means that transportation activities will not cause new air quality violations, worsen existing violations, or delay timely attainment of the NAAQS. The transportation conformity rule (40 CFR part 93) sets forth policy, criteria, and procedures for demonstrating and assuring conformity of transportation activities. Cooperation means that the parties involved in carrying out the transportation planning and programming processes work together to achieve a common goal or objective. Coordination means the cooperative development of plans, programs, and schedules among agencies and entities with legal standing and adjustment of such plans, programs, and schedules to achieve general consistency, as appropriate. Design concept means the type of facility identified for a transportation improvement project (e.g., freeway, expressway, arterial highway, grade separated highway, toll road, reserved right-of-way rail transit, mixed-traffic rail transit, or busway). Design scope means the aspects that will affect the proposed facility’s impact on the region, usually as they relate to vehicle or person carrying capacity and control (e.g., number of lanes or tracks to be constructed or added, length of project, signalization, safety features, access control including approximate number and location of interchanges, or preferential treatment for high occupancy vehicles). Financial Plan means documentation required to be included with a metropolitan transportation plan and TIP (and optional for the long-range statewide transportation plan and STIP) that demonstrates the consistency between reasonably available and projected sources of Federal, State, local, and private revenues and the costs of implementing proposed transportation system improvements. Financially Constrained or Fiscal Constraint means that the metropolitan transportation plan, TIP, and STIP includes sufficient financial information for demonstrating that projects in the metropolitan transportation plan, TIP, and STIP can be implemented using committed, available, or reasonably available revenue sources, with reasonable assurance that the federally supported transportation system is being adequately operated and maintained. For the TIP and the STIP, financial constraint/fiscal constraint applies to each program year. Additionally, projects in air quality nonattainment and maintenance areas can be included in the first two years of the TIP and STIP only if funds are available or committed. Illustrative Project means an additional transportation project that may (but is not required to) be included in a financial plan for a metropolitan transportation plan, TIP, or STIP if reasonable additional resources were to become available. Maintenance Area means any geographic region of the United States that the EPA previously designated as a nonattainment area for one or more pollutants pursuant to the Clean Air Act Amendments of 1990, and subsequently redesignated as an attainment area subject to the requirement to develop a maintenance plan under section 175A of the Clean Air Act, as amended. Major Projects - These transportation improvements are defined as projects receiving Federal financial assistance 1) with an estimated total cost of $500 million or more or 2) that have been identified by the FHWA as being a Major Project. The designated projects may include those: 1) that require a substantial amount of a State Transportation Agency's program resources, 2) that have a high level of public or congressional attention, or 3) that have extraordinary implications for the national transportation system. Metropolitan Planning Area (MPA) means the geographic area determined by agreement between the metropolitan planning organization (MPO) for the area and the Governor, in which the metropolitan transportation planning process is carried out. Metropolitan Transportation Plan (MTP) means the official multimodal transportation plan addressing no less than a 20-year planning horizon that is developed, adopted, and updated by CAMPO through the metropolitan transportation planning process. Nonattainment area means any geographic region of the United States that has been designated by the EPA as a nonattainment area under section 107 of the Clean Air Act for any pollutants for which an NAAQS exists. Obligated projects means strategies and projects funded under title 23 U.S.C. and title 49 U.S.C. Chapter 53 for which the supporting Federal funds were authorized and committed by the State or designated recipient in the preceding program year, and authorized by the FHWA or awarded as a grant by the FTA. Program of Projects (POP) is a list of projects to be funded in a grant application submitted to FTA by a designated recipient. The POP lists the subrecipients and indicates whether they are private non-profit agencies, governmental authorities, or private providers of transportation service, designates the areas served (including rural areas), and identifies any tribal entities. In addition, the POP includes a brief description of the projects, total project cost, and Federal share for each project. Project selection means the procedures followed by MPOs, States, and public transportation operators to advance projects from the first four years of an approved TIP and/or STIP to implementation, in accordance with agreed upon procedures. Project sponsor must be a city, county, state, or other transportation related government agency eligible to receive federal funding from the Federal Highway or Federal Transit Administrations. All other entities must partner with a city, county, or state agency to apply for and/or administer a transportation project. Public transportation operator means the public entity which participates in the continuing, cooperative, and comprehensive transportation planning process in accordance with 23 U.S.C. 134 and 135 and 49 U.S.C. 5303 and 5304, and is the designated recipient of Federal funds under title 49 U.S.C. Chapter 53 for transportation by a conveyance that provides regular and continuing general or special transportation to the public, but does not include school bus, charter, or intercity bus transportation or intercity passenger rail transportation provided by Amtrak. Regionally significant project means a transportation project (other than projects that may be grouped in the TIP and/or STIP or exempt projects as defined in EPA’s transportation conformity regulation (40 CFR part 93)) that is on a facility which serves regional transportation needs (such as access to and from the area outside the region; major activity centers in the region; major planned developments such as new retail malls, sports complexes, or employment centers; or transportation terminals) and would normally be included in the modeling of the metropolitan area’s transportation network. At a minimum, this includes all principal arterial highways and all fixed guideway transit facilities that offer a significant alternative to regional highway travel. Statewide transportation improvement program (STIP) means a statewide prioritized listing/program of transportation projects covering a period of four years that is consistent with the long-range statewide transportation plan, metropolitan transportation plans, and TIPs, and required for projects to be eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53. Transportation Improvement Program (TIP) is a document prepared by a metropolitan planning organization that lists projects to be funded with FHWA/FTA funds for the at least next one- to three-year period. Unified Planning Work Plan (UPWP) is the management plan for the (metropolitan) planning program. Its purpose is to coordinate the planning activities of all participants in the planning process. Agenda Item 7C CAMPO Technical Committee Staff Report FY 2025 Unified Planning Work Program (UPWP) March 7, 2024 Summary Staff has begun work on the FY 2025 UPWP. This annual process starts very early due to the City of Jefferson’s budget process. The FY 2025 UPWP is anticipated to be adopted by May 2024. The UPWP is CAMPO’s annual statement of work identifying the budget, planning priorities, and activities to be carried out for the year (November 1 to October 31). The UPWP contains many ongoing activities required to perform the essential functions of CAMPO, as well as, periodic and/or one-time activities. The UPWP serves as the basis for funding agreements with the Missouri Department of Transportation (MoDOT) and stands as the divisional budget within the City of Jefferson’s annual budget. Staff is requesting the Technical Committee please review the objectives and activities outlined in the attached draft document and provide comments. Input from the Technical Committee, Board of Directors, stakeholders, and the general public will be used throughout the process. These activities are categorized into six work elements: • Work Element 521 - Program Support & Administration • Work Element 522 - General Development and Comprehensive Planning Coordination • Work Element 524 - Short Range Transportation Planning & Programming • Work Element 525 - Long Range Transportation Planning • Work Element 526 - Public Transportation Planning • Work Element 527 – Safe/Accessible Transportation Planning (No local match required. This causes overall local match requirements to fall slightly less than 20%.) Previous Year (FY 2024) - Major tasks (to be) completed: • Annual update of Unified Planning Work Program and the Transportation Improvement Program. • Review of Urbanized Area/Planning Area boundary. • Review of Federal Functional Classification of Urban Area roads. • Staff assistance in planning the 2024 Missouri Active Transportation Summit. • Completion of various reports: o System Performance, Disadvantaged Business (DBE), Title VI, Annual Listing Obligated Projects (ALOP). • Update of the CAMPO 2045 & Beyond Metropolitan Transportation Plan. • Completion of Capital Area Active Transportation Plan (formerly Pedestrian and Bicycle Plan). • Update of regional databases, including; sidewalks, greenway, bike trails/lanes and local roads. • Various ongoing technical assistance projects for member jurisdictions: o GIS, grants, research, etc. FY 2025 - Anticipated major activities in, developed thus far: • Development of the FY 2026 UPWP (Annual) • Development of the 2026-2030 Transportation Improvement Program (Annual) • Various Reports: System Performance, DBE, Title VI, ALOP. (Annual) • Update of Coordinated Public Transit – Humans Services Transportation Plan (4-5 years) • Technical assistance (i.e. mapping, data development/management, grants) (Continuous) • Safe Streets and Roads for All (SS4A) Grant Program -application for planning funds • Study of US 54/63/50 Tri-Level Interchange. The estimated draft budget for FY 2025 is approximately $482,933 with $386,993 (~80%) funded through the Consolidated Planning Grant (CPG) and $95,940 (~20%) funded through local match. The 20% local match is provided by Jefferson City (15%) and Cole County (5%). It is projected that CAMPO will have a balance of approximately $341,429 in unprogrammed CPG funds at the end of FY 2025, ased on the anticipated FY 2024 expenditure and estimated FY 2025 draft budget. Tri-level Study is excluded from the FY 2024 expenditure, and included in the FY 2025 expenditure. The project is anticipated to begin in FY 2024, but most of the expenditure will likely occur in FY 2025. It is anticipated to cost up to $500,000, Agenda Item 7C with $200,000 in Consolidated Planning Grant funds being utilized and local funds for the remainder. Local match is split between Jefferson City (50%) and Cole County (50%). The following chart details the estimated trajectory of the CAMPO CPG balance. All totals are subject to change during the development of the UPWP. A draft FY 2025 UPWP is attached. Please refer questions or comments to Katrina Williams at 573-634-6536 or at kawilliams@jeffersoncitymo.gov. CPG Balance for end of FY2023 $552,333 FY 2024 CPG Allocation*$172,841 FY 2024 UPWP CPG Expenditure - Anticipated (excludes Tri-Level Study)**-($169,636) CPG Balance for end of FY2024 - Anticipated* Subtotal $555,538$0FY 2025 CPG Allocation - Estimated per MoDOT's FY24 SPR Work Program $172,884 FY 2025 CPG Programmed Expenditure - Anticipated (Including 100% of Tri-Level Study)**-($386,993) FY 2025 END OF YEAR Remaining Unprogrammed CPG Funds Anticipated $341,429 Consolidated Planning Grant Balance Unified Planning Work Program The preparation of this report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, and Federal Transit Administration in cooperation with the Missouri Department of Transportation. The opinions, findings, and conclusions expressed in this report are not necessarily those of the Federal Highway Administration, Federal Transit Administration, or the Missouri Department of Transportation. FY 2025 November 1, 2024 to October 31, 2025 Pending Adoption - May 15, 2024 Administration of the Capital Area MPO is provided by the City of Jefferson Department of Planning and Protective Services Room 120 John G. Christy Municipal Building 320 East McCarty St., Jefferson City, Missouri 65101 Phone: (573) 634-6410 http://www.jeffersoncitymo.gov/campo DRAFT Table of Contents Introduction......................................................................................................................................................... 1 Major Tasks Completed in FY 2024 .......................................................................................................................... 1 Tasks Carried Over from FY 2024 ............................................................................................................................ 1 Priorities for FY 2025 ...................................................................................................................................... 1 UPWP Development ......................................................................................................................................... 2 UPWP Modification and Amendment Process ............................................................................................. 2 Public Participation ........................................................................................................................................... 2 Air Quality Planning ......................................................................................................................................... 3 Safe and Accessible Transportation Planning ............................................................................................. 3 Financial Support for CAMPO ....................................................................................................................... 3 Transportation Planning Factors ..................................................................................................................... 4 Required Documents Timeline ......................................................................................................................... 5 Work Element 521 - Program Support & Administration ......................................................................... 6 Work Element 522 - General Development & Comprehensive Planning Coordination ..................... 7 Work Element 524 - Short Range Transportation Planning & Programming ....................................... 8 Work Element 525 - Long Range Transportation Planning ...................................................................... 9 Work Element 526 - Public Transportation Planning ............................................................................... 10 Work Element 527 - Safe and Accessible Transportation Planning ..................................................... 11 Appendix A – Financial Summary ............................................................................................................... 12 Anticipated Expenditures & Revenue ...................................................................................................................... 12 Table 1: FY 2025 CAMPO Budget* ...................................................................................................................... 12 Table 2: FY 2025 Work Element Funding Summary - Consolidated Planning Grant and Local Funds ... 13 Table 4: Anticipated Available Federal Consolidated Planning Grant (CPG) Balance Revenue ............ 13 Appendix B – CAMPO Boundary Map ...................................................................................................... 14 Appendix C - Modifications and Amendments ......................................................................................... 15 DRAFT Resolution DRAFT Process Certification Page DRAFT Certification of Restrictions of Lobbying Page DRAFT FTA/FHWA Approval DRAFT Capital Area Metropolitan Planning Organization Board of Directors Chair – Jeff Hoelscher, Eastern District Commissioner, Cole County Vice-Chair – Scott Spencer, City Council Member, City of Jefferson City of Jefferson Jack Deeken, City Council Member Jon Hensley, City Council Member Jeff Ahlers, City Council Member Clint Smith, AICP, Director, Planning & Protective Services Gerry Stegeman, Transit Manager Matt Morasch, PE, Director, Public Works Cole County Eric Landwehr, PE, Director, Public Works Doug Reece, City Administrator, St. Martins Callaway County Roger Fischer, Western District Commissioner Holts Summit Brandon Ruediger, City Administrator, City of Holts Summit Missouri Department of Transportation (MoDOT) Machelle Watkins, PE, District Engineer Ex-Officio Members Luke Holtschnieder, Jefferson City Regional Economic Partnership Eva Steinman, Federal Transit Administration, Region VII Christy Evers, MoDOT Transit Administrator Vacant, Missouri Office of Administration Michael Henderson, AICP, MoDOT, Transportation Planning Dan Weitkamp, Federal Highway Administration, Missouri Div. Tamara Tateosian, Callaway County Economic Development Technical Committee Chair – David Bange, PE, City Engineer, Public Works, City of Jefferson Vice-Chair – Matt Prenger, PE, County Engineer, Public Works, Cole County City of Jefferson Clint Smith, AICP, Director, Planning & Protective Services Aaron Grefrath, Director, Parks, Recreation & Forestry Matt Morasch, PE, Director of Public Works Gerry Stegeman, Interim Transit Manager Eric Barron, AICP, Transportation Planner Britt Smith, PE, Operations & Maintenance Cole County Matt Prenger, PE, County Engineer Shannon Kliethermes, Senior Planner Callaway County Howard Thomas, PE, County Highway Administrator Small City Representative - Callaway Mark Tate, Streets Department, City of Holts Summit Small City Representative - Cole Rachel Busche, Wardsville Missouri Department of Transportation (MoDOT) Steve Engelbrecht, PE, District Planning Manager Michael Henderson, AICP, Transportation Planning Specialist Daniel Roeger, PE, Area Engineer Private Transportation Interest Vacant Pedestrian or Biking Interest Kevin Schwartz, JC Parks Outdoor Recreation Program Manager Ex-Officio Members: Daniel Nguyen, Federal Transit Administration, Region VII Daniel Weitkamp, Federal Highway Administration, Missouri Div. Jason Branstetter, Heartland Port Authority Representative - February 2024 CAMPO Staff and FTE (Full-Time Employee) apportionment Clint Smith, AICP– Director, Planning & Protective Services FTE – 0* Eric Barron, AICP - Planning Manager FTE - 0.3 Katrina Williams, GISP, AICP –Planner, Senior FTE – 1 Vacant – Planner I FTE – 1** Kortney Bliss – Planner I FTE – 0** Tiphanie Pearson – Administrative Assistant FTE - .10 * The MPO Executive Director is also the Director of the Jefferson City Department of Planning and Protective Services. This full- time position is not funded by the MPO and does not appear in the CAMPO Budget. MPO activities are only a portion of the Director’s job duties. **The Planner I position may work on MPO and/or City of Jefferson planning activities depending on work flow. Both Planner I salaries are the same and CAMPO will not seek reimbursement for more than the equivalent of one full-time Planner I. DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 1 Introduction The Capital Area Metropolitan Planning Organization (CAMPO) is responsible for long-range transportation planning for the defined Metropolitan Planning Area (MPA), which includes the Jefferson City urbanized area. Planning activities are carried out in a continuing, cooperative, and comprehensive manner. The Fiscal Year 2024 Unified Planning Work Program (UPWP) defines tasks and anticipates funding requirements for the metropolitan planning activities performed by CAMPO with federal funds provided by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) under title 23 U.S.C. and title 49 U.S.C. Chapter 53. CAMPO staff, unless otherwise identified, performs all work. The UPWP defines activities for all public officials and agencies that contribute resources to the transportation planning process. The UPWP covers one fiscal year, November 1 to October 31. The UPWP outlines activities funded through the Consolidated Planning Grant (CPG) and local funds, and serves as the basis for funding agreements with the Missouri Department of Transportation (MoDOT). The UPWP also serves as a management tool for scheduling, budgeting, and monitoring the local planning activities. The current MPA boundary was approved by the CAMPO Board of Directors January 17th, 2024 and approved by the Governor January 31, 2024 (see Appendix B). The MPA includes the jurisdictions of Holts Summit, Jefferson City, St. Martins, Taos, Wardsville, and portions of unincorporated, non-urbanized areas within Cole and Callaway Counties. The CAMPO Board of Directors is composed of elected and appointed officials from local jurisdictions, selected state agencies, and Federal transportation representatives serving as ex-officio members. The CAMPO Technical Committee consists of representatives from member jurisdictions’ professional staff and acts in an advisory capacity to the Board of Directors. A memorandum of understanding between members identifies the City of Jefferson as the administrator of CAMPO, and as such, the City provides staffing. For FY 2025, the City of Jefferson will provide staff consisting of a full-time Planner, full-time Senior Planner, and part time support from the Director of Planning and Protective Services, a Planning Manager, and an Administrative Assistant. Major Tasks Completed in FY 2024 • Annual update of the Unified Planning Work Program and the Transportation Improvement Program. • Review of Urbanized Area/Planning Area boundary. • Review of Federal Functional Classification of Urban Area roads. • Staff assistance in planning the 2024 Missouri Active Transportation Summit. • Completion of various reports: o System Performance, Disadvantaged Business, Title VI, Annual Listing Obligated Projects. • Update of the CAMPO 2045 & Beyond Metropolitan Transportation Plan. • Completion of Capital Area Active Transportation Plan (formerly Pedestrian and Bicycle Plan). • Update of regional databases, including; sidewalks, greenway, bike trails/lanes and local roads. • Various ongoing technical assistance projects for member jurisdictions: o GIS, grants, research, etc. Tasks Carried Over from FY 2024 • Update of the Coordinated Public Transit Human Services Transportation Plan. • Continued work on any technical assistance projects as they arise. • Traffic Study of US 54/63/50 Tri-Level Interchange. Priorities for FY 2025 • Completion of Coordinated Public Transit - Human Services Transportation Plan. • Implementation of the CAMPO 2045 & Beyond Metropolitan Transportation Plan. • Implementation of the Capital Area Active Transportation Plan. • Provide technical assistance in mapping, data development, and land use planning to local jurisdictions. • Continue implementation of FAST Act performance measures and targets. • Traffic Study of US 54/63/50 Tri-Level Interchange. • Application for Safe Streets and Roads for All (SS4A) Grant Program funds to complete a Safety Plan for the CAMPO region. • Update of Crash Analysis Report for the CAMPO area. • Begin update of the Title VI Program, including the Public Participation Plan, and Language Assistance Plan. Capital Area Metropolitan Planning Organization FY 2025 UPWP 2 UPWP Development The UPWP is developed in accordance with 23 CFR 450.308 and 23 CFR part 420. CAMPO staff reviewed previous years’ time required for activities to determine time allocations for this UPWP. Because the MPO is administered by the City of Jefferson, CAMPO accommodates the city’s budgeting process/schedule and execution of the Consolidated Planning Grant (CPG) agreement and must begin the development of the UPWP several months prior to the fiscal year for which the UPWP covers. CAMPO presents a draft UPWP to the Board of Directors in April, prior to the beginning of the fiscal year. This early start presents difficulties in assuming future tasks which may surface after adoption of the UPWP and in documenting activities occurring in the previous year. UPWP Modification and Amendment Process Modification: A change in language or content that does not result in a budget increase. This change may consist of a change to a work element’s objectives, activities, or products. Modifications are communicated by staff to the Technical Committee and Board of Directors at the next regularly scheduled meeting. Amendment: A change in language or content which results in a budget increase or major change in a work element. An amendment is necessary if a budget increase is needed which impacts the funding reimbursement agreed upon between the Missouri Highway and Transportation Commission and the City of Jefferson. Amendments must be approved by the Board of Directors, FTA, and FHWA. Some modifications may also go through an official approval by the Board of Directors as deemed appropriate by staff. Modifications and Amendments are documented in Appendix C. Public Participation Federal law requires CAMPO to develop a public involvement program to involve the community early and continuously in the transportation planning process. A proactive public program which provides information, timely public notice, and public access to key decisions is included in the CAMPO Public Participation Plan. During the development of the FY 2025 UPWP, the document is scheduled to be discussed at monthly Board of Directors and Technical Committee meetings from February to May, and concludes with a public comment period. Draft copies of the UPWP, as part of the meeting agendas and meeting minutes regarding UPWP development, are available to view on the CAMPO website. In accordance with the CAMPO Title VI Policy, any and all documents produced by CAMPO, may be requested in other formats by contacting CAMPO staff at City Hall or by calling (573)634-6410. DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 3 Air Quality Planning According to 23 CFR 420.111(e), State DOTs and MPOs are also encouraged to include cost estimates for transportation planning, research, development, and technology transfer related activities funded with other federal, state, and/or local funds; particularly for producing the FHWA-required data specified in paragraph (b) of §420.105, for planning for other transportation modes, and for air quality planning activities in areas designated as non-attainment for transportation-related pollutants in their work programs. The MPOs in TMAs must include such information in their work programs. Federal standards have been established through extensive scientific review that set allowable concentrations and exposure limits for certain pollutants. Air quality standards have been established for six criteria pollutants: • ozone (or smog) • carbon monoxide • particulate matter • nitrogen dioxide • lead • sulfur dioxide The CAMPO Planning Area is in “attainment”. A geographic area with monitored levels that meet or do better than the primary standard for each of these pollutants is called an attainment area; areas that do not meet the primary standard for any one or more of these pollutants are called nonattainment areas. In Missouri, MoDOT is responsible for implementing the conformity regulation for transportation actions in attainment and nonattainment areas. Safe and Accessible Transportation Planning § 11201; 23 U.S.C. 134 - The Bipartisan Infrastructure Law (BIL) requires each MPO to use at least 2.5% of its PL funds (and each State to use 2.5% of its State Planning and Research funding under 23 U.S.C. 505) on specified planning activities to increase safe and accessible options for multiple travel modes for people of all ages and abilities. [§ 11206(b)] A State or MPO may opt out of the requirement, with the approval of the Secretary, if the State or MPO has Complete Streets standards and policies in place, and has developed an up-to-date Complete Streets prioritization plan that identifies a specific list of Complete Streets projects to improve the safety, mobility, or accessibility of a street. [§ 11206(c) and (e)] For the purpose of this requirement, the term “Complete Streets standards or policies” means standards or policies that ensure the safe and adequate accommodation of all users of the transportation system, including pedestrians, bicyclists, public transportation users, children, older individuals, individuals with disabilities, motorists, and freight vehicles. [§ 11206(a)] CAMPO has an adopted Active Transportation Plan that incorporates Complete Streets standards and/or policies and includes a prioritized list of projects. CAMPO adopted a Livable Streets Policy with the 2016 adoption of the Capital Area Pedestrian & Bicycle Plan. The 2024 Adoption of the Capital Area Active Plan further emphasizes CAMPO’s continued commitment to complete streets standards and policies. The term “Livable Streets” and “Complete Streets” are used interchangeably in CAMPO products. Financial Support for CAMPO CAMPO receives 80% of funding from the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) 5303 funds through the Missouri Department of Transportation (MoDOT) via the Consolidated Planning Grant (CPG) and 20% via local funding. The 20% in local matching funds is provided by the City of Jefferson and Cole County. Of the 20% local funding, Jefferson City contributes 15% and Cole County contributes 5%. Note: The Traffic Study for the US 54/63/50 Tri-Level Interchange deviates from the local match statement above. The local match requirement is split between Jefferson City (10%) and Cole County (10%). The total CAMPO budget for FY 2025 is $482,933. Appendix A provides more detailed breakdown of financial details. DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 4 Transportation Planning Factors The Infrastructure Investment and Jobs Act (IIJA) (Public Law 117-58, also known as the “Bipartisan Infrastructure Law”) was signed into law in 2021. The BIL maintains the ten planning factors identified in the previous transportation bill, the Fixing America’s Surface Transportation Act (FAST Act). These ten planning factors are required for consideration in any MPO planning activities, including in the development of the UPWP, MTP, and TIP. Figure 1 provides an overview of those planning factors and how they are addressed by each work element in the UPWP. A detailed overview of each work element is provided in the following pages. Figure 1: Planning Factors as addressed by work elements Planning Factor Work Program Element Wo r k E l e m e n t 52 1 - Pr o g r a m Su p p o r t & A d m i n i s t r a t i o n Wo r k E l e m e n t 52 2 - Ge n e r a l De v e l o p m e n t a n d C o m p r e h e n s i v e Pl a n n i n g C o o r d i n a t i o n Wo r k E l e m e n t 52 4 - S h o r t R a n g e Tr a n s p o r t a t i o n P l a n n i n g & Pr o g r a m m i n g Wo r k E l e m e n t 52 5 - Lo n g Ra n g e Tr a n s p o r t a t i o n P l a n n i n g Wo r k E l e m e n t 5 26 - Pu b l i c Tr a n s p o r t a t i o n P l a n n i n g Wo r k E l e m e n t 5 27 – Sa f e & Ac c e s s i b l e Tr a n s p o r t a t i o n P l a n n i n g A. Support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity, and efficiency.      B. Increase the safety of the transportation system for motorized and nonmotorized users.       C. Increase the security of the transportation system for motorized and nonmotorized users.       D. Increase the accessibility and mobility of people and for freight.       E. Protect and enhance the environment, promote energy conservation, improve the quality of life, and promote consistency between transportation improvements and State and local planned growth and economic development patterns.       F. Enhance the integration and connectivity of the transportation system, across and between modes, for people and freight.       G. Promote efficient system management and operation.       H. Emphasize the preservation of the existing transportation system.      I. Improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater impacts of surface transportation.       J. Enhance travel and tourism.       DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 5 Required Documents Timeline Figure 2 outlines the general timeline for updating most of the federally required MPO plans and documents. The fiscal year runs from November 1 through October 31 and quarters are as follows: Quarter 1 – November 1 – January 31 Quarter 2 – February 1 – April 30 Quarter 3 – May 1 – July 31 Quarter 4 – August 1-October 31 Figure 2: Timeline for updating required MPO plans and documents Fiscal Year Qtr MTP TIP UPWP CPTHSTP Title VI LAP PPP 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 2029 2028 2024 2025 2026 2027 MTP - Metropolitan Transportation Plan Expires June 19, 2024 TIP – Transportation Improvement Program Approved in May (Expires in June) UPWP – Unified Planning Work Program Approved in May (Expires in October) CPTHSTP – Coordinated Public Transit-Human Services Transportation Plan Update Required December 2024-2025 Title VI Program –Title VI of the Civil Rights Act of 1964. Update Required March 2026 LAP – Language Assistance Plan Update Required March 2026 PPP – Public Participation Plan Update Required March 2026 MPA / Functional Class Review (Not shown above) Update required in 2033 (Occurs every 10 years) DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 6 Work Element 521 - Program Support & Administration This task covers the activities necessary to carry out the daily activities of CAMPO in support of the transportation planning process. These include meeting preparation, UPWP development, public outreach activities, reporting, and professional development activities. Objectives / Activities • Manage CAMPO activities in order to comply with Federal and State administrative requirements and guidance. Support the operations of the Board of Directors and Technical Committee, communicate and coordinate with Federal and State agencies on MPO activities, and support day-to-day operations. • Develop the annual budget and Unified Planning Work Program along with the preparation and submittal of UPWP quarterly progress reports, billings, and invoices. Modify UPWP as needed with approval from the necessary authority. • Facilitate public participation such as public meetings, hearings, and workshops, as needed, and in accordance with the Public Participation Plan. Provide access to CAMPO activities through maintenance and updating of the CAMPO website. • Fulfill program update and reporting requirements related to Title VI, Public Participation Plan, Language Assistance Plan, Disadvantage Business Enterprise requirements, project obligation, and other topics as required. • Professional Development activities, including attendance at relevant training sessions, educational seminars, meetings, and conferences. FY 2024 Accomplishments • Facilitation of Board of Directors and Technical Committee monthly meetings as required. • FY 2025 UPWP updated. • Quarterly progress reports, billings, and invoices completed. • Disadvantaged Business Enterprise (DBE) Commitments Semi-Annual reports completed. • Staff participated in various professional development activities, including MoDOT, FHWA, and FTA sponsored events, webinars, and other training opportunities. • Title VI Annual Report completed. FY 2025 Products • Board of Directors and Technical Committee meetings administration/facilitation support. • Meeting agendas, minutes, presentations, reports, and other support material. • Complete FY 2026 UPWP. • End of year report, quarterly progress reports, billings, and invoices. • DBE Commitments Semi-Annual reports. • Complete Title VI Annual Report. • Participation in professional development activities and maintain pertinent professional certifications. • Begin review and update of Title VI Program, including Language Assistance Plan and Public Participation Plan as federally required. Responsible Party: CAMPO staff Funding: This work element includes labor costs and direct costs. Work Element Cost Type Federal CPG Funds 80% Local Match 20% Total Percent of Work Program Budget 521 Labor $28,280 $7,070 $35,350 7% Direct $16,320 $4,080 $20,400 4% DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 7 Work Element 522 - General Development & Comprehensive Planning Coordination Not all of the CAMPO member organizations have planning staff or current comprehensive planning documents in place. In order to facilitate transportation planning by incorporating the vision and goals for the member organizations and the public, CAMPO will provide assistance in the crafting of the transportation component of local comprehensive planning documents, as practical. This task may include the development and maintenance of related spatial and non-spatial data collection and analysis; examples include land use, demographic data, housing, human services, environmental/natural resources, recreation/open space, and public facilities. Objectives / Activities • Provide technical planning assistance to CAMPO members in the development of the transportation component of comprehensive and other planning documents, including geospatial analytical support, local ordinances, and databases. • Assist jurisdictions in the acquisition and use of Geographic Information Systems (GIS) and other data for use in plans, transportation grant applications, measuring performance, and forecasting provided by the US Census, MoDOT, and others. FY 2024 Accomplishments • Provided technical assistance in various grant application processes in the CAMPO area. • Provided assistance in the development of local comprehensive plans of member organizations. • Provided geospatial analysis/data (elevations, demographic, sidewalk, bicycle facilities, street right-of-way, etc.) to support development, and grant application activities. FY 2025 Products • Assist with various inputs for comprehensive planning documents - ongoing for multiple years. • Assist with and maintain various GIS databases pertinent to transportation planning. • Continue providing technical assistance for the transportation component of local planning documents. • Assist member jurisdictions with development of local ordinances that may facilitate corridor preservation and improve efficient network connectivity. Responsible Party: CAMPO staff and local jurisdictions. Local jurisdictions have ultimate responsibility for the development and publishing of their planning documents. Funding: This work element includes only labor costs. Work Element Cost Type Federal CPG Funds 80% Local Match 20% Total Percent of Work Program Budget 522 Labor $15,352 $3,838 $19,190 4% DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 8 Work Element 524 - Short Range Transportation Planning & Programming Identify and address immediate or short-term transportation needs which may include non-motorized planning activities, complete streets planning, freight planning, bicycle/pedestrian planning, safety planning, operations and management planning, transportation security planning, or wayfinding activities. Objectives / Activities • Provide support for short-range transportation planning by CAMPO and its members. • Participate in regional activities regarding freight, safety, security, bicycle/pedestrian, non-motorized, and other related planning activities. • Review and maintain the goals and strategies outlined in adopted CAMPO plans: o CAMPO 2045 & Beyond Metropolitan Transportation Plan and Major Thoroughfare Plan o Capital Area Active Transportation Plan o Coordinated Public Transit-Human Services Transportation Plan o Public Participation Plan o Regional Wayfinding Plan • Maintain the current TIP through the Amendment and Modifications process that meets statutory requirements, maintain fiscal constraint, and support changing priorities and project scope. • Continue analysis of safety data to be used in the implementation of recommended improvements and strategies as outlined in the MTP. • Be a resource for local jurisdictions seeking to develop an ADA Transition Plan or seeking to improve mobility and access. • Develop and adopt the FY2025-2029 TIP. • Develop and publish the Annual List of Obligated Projects (ALOP) for the prior year TIP. • Pursue grant funding, as directed, to support short-term transportation needs, including: non-motorized planning activities, complete streets planning, freight planning, active transportation planning, safety planning, operations/management planning, transportation security planning, or wayfinding activities. FY 2024 Accomplishments • Participated in activities, meetings and conferences including Missouri Coalition for Roadway Safety Conference, MoDOT Unfunded Needs List, and STIP project review/discussions. • Completed Program Year 2024 – 2028 TIP and any necessary amendments. • Developed 2025-2029 TIP. • Provided assistance to member jurisdictions in the completion of grant applications. • Reviewed Crash Analysis Report. • Continued update of Capital Area Pedestrian and Bicycle Plan. • Assisted with planning for the 2024 Missouri Active Transportation Summit in cooperation with Missouri Bicycle and Pedestrian Federation. FY 2025 Products • TIP amendments and administrative modifications as necessary. • Development of the Program Year 2026-2030 TIP. • Review Crash Data Report. • Provide guidance and assistance to local jurisdictions in the transportation component of their ADA Transition Plan development efforts. • Annual List of Obligated Projects from the previous program year. • Assist with planning and possibly hosting of Missouri Active Transportation Summit in cooperation with Missouri Bicycle and Pedestrian Federation. • Implement Capital Area Active Transportation Plan. Responsible Party: CAMPO staff Funding: This work element includes only labor costs Work Element Cost Type Federal CPG Funds 80% Local Match 20% Total Percent of Work Program Budget 524 Labor $19,035 $4,759 $23,794 5% DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 9 Work Element 525 - Long Range Transportation Planning Provide for long-range transportation planning activities, studies, and plans supporting the transportation planning process out to a minimum of 20 years, for the CAMPO metropolitan planning area, and may include both system level planning activities and project level activities. Objectives / Activities • Keep the MTP current by maintaining and amending components of the plan such as major land use changes, major road changes, process improvements, funding, or new regulations and legislation; and review of any projects to be included into the TIP that are not already listed in the MTP. • Involve key stakeholders, business community and advocacy groups, environmental organizations, and the public in long range transportation planning activities to achieve the long-term transportation goals and vision of the MTP. • Report MPO performance targets in relation to performance measures for the MTP and TIP. • Implement the recommendations and strategies as identified in the MTP. FY 2024 Accomplishments • Staff, working with MoDOT, continued setting federal performance measures for the TIP and MTP. Performance measures and targets are included in the System Performance Report. • Worked with the Technical Committee and Board of Directors to implement the MTP strategies. • Completed update of the CAMPO 2045 & Beyond Metropolitan Transportation Plan as federally required. • Staff continues development of GIS data and resources to assist jurisdictions with plan development and implementation. • Completed review of Planning Area Boundary and Federal Functional Classification. FY 2025 Products • Implementation of the MTP strategies and improvements. • Assist member jurisdictions in implementing recommended improvements outlined in the MTP. • Amendments and review of the MTP as necessary. • Report MTP and TIP performance measures and targets. • Annual Review of Illustrative List of Projects. • Traffic Study of US 54/63/50 Tri-Level Interchange2. Responsible Party: CAMPO/City of Jefferson staff and consultant. Funding: This work element includes direct costs and labor costs. Work Element Cost Type Federal CPG Funds 80% Local Match 20% Total Percent of Work Program Budget 525 Labor $62,770 $15,692 $78,462 16% Direct2 $200,000 $50,000 $250,000 52% 2 The project is anticipated to cost up to $500,000, with only $200,000 in Consolidated Planning Grant funds being utilized and local funds for the remainder. Local match is split between Jefferson City(50%) and Cole County(50%). DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 10 Work Element 526 - Public Transportation Planning Assist public transportation and transit providers in fulfilling State, Local, and Federal requirements for coordination and cooperative transportation planning through assistance with plan development, technical assistance, mapping, data, and GIS functions. Objectives / Activities • Continue to assist JEFFTRAN with the maintenance of Route and Schedule Guide, individual route maps, and other tools to serve JEFFTRAN patrons. • Provide JEFFTRAN mapping, demographic, GIS, planning, and other technical assistance in support of reporting requirements and evaluating possible changes in types of transit services offered. • Participate in transit and mobility management planning activities that support the goals and objectives laid out in the Coordinated Public Transit-Human Services Transportation Plan. • Continue collaboration with other regional transit providers to improve efficiency and access in Mid-Missouri. • Update and maintain the Coordinated Public Transit-Human Services Transportation Plan. FY 2024 Accomplishments • Provided assistance to JEFFTRAN in the update of route guides. • Began update of the Coordinated Public Transit-Human Services Transportation Plan. FY 2025 Products • Update route and schedule guide as needed. • Maps, demographics, GIS analytics. • Provide assistance to JEFFTRAN staff to improve service to patrons of. • Collaborate with regional transit providers and human service agencies to meet shared goals. • Complete update of the Coordinated Public Transit-Human Services Transportation Plan. Responsible Party: CAMPO staff. Funding: This work element includes only labor costs. Work Element Cost Type Federal CPG Funds 80% Local Match 20% Total Percent of Work Program Budget 526 Labor $42,003 $10,501 $52,503 11% Note: A portion of funding for the update of the Coordinated Public Transit-Human Services Transportation Plan may be provided via a Missouri Highways and Transportation Commission Public Transportation Planning Grant (FTA 5304 Funds). This grant may provide up to $25,000 in federal grant funds and require a 20% local match. If applied for, these funds would not increase the overall CAMPO budget, but would decrease the amount of CPG funds used for this work element. This grant would potentially be applied for in FY 2024 and used in both FY 2024 and FY 2025. These funds are not programmed into the UPWP due to the uncertainty of timing and availability of funds. DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 11 Work Element 527 - Safe and Accessible Transportation Planning Engage in specified planning activities to increase safe and accessible options for multiple travel modes for people of all ages and abilities, including pedestrians, bicyclists, public transportation users, children, older individuals, individuals with disabilities, motorists, and freight vehicles. Objectives / Activities • Implement CAMPO Complete Streets standards and policies as defined in the adopted Livable Streets (Complete Streets) Policy. • Develop and maintain a Complete Streets prioritization plan that identifies projects to improve the safety, mobility, or accessibility of a street. • Participate in the Missouri Complete Streets (MOCS) Advisory Committee. • Participate in the Missouri Coalition for Roadway Safety. • Educate jurisdictions and stakeholder about Complete Streets standards and policies. FY 2024 Accomplishments • Participated in activities, meetings, and conferences including Missouri Coalition for Roadway Safety. • Completed development of a prioritized list of projects as part of the update of the Capital Area Active Transportation Plan. • Facilitated stakeholder and/or jurisdiction development of pedestrian and bicycle education programs. • Provided assistance to Missouri Pedestrian and Bicycle Federation in planning and/or hosting the 2024 Active Transportation Summit. FY 2025 Products • Host a Complete Streets Training or other similar safety/accessibility training that meets the requirements outlined in 23 U.S.C. 134 §11201 and §11206. • Implement the safety related goals and strategies as developed as part of the Capital Area Active Transportation Plan. • Provide assistance to Missouri Pedestrian and Bicycle Federation in planning and/or hosting the 2024 Active Transportation Summit. • Provide assistance to jurisdiction in the pursuit of funding for safety initiatives, infrastructure, and/or programing. Responsible Party: CAMPO staff. Funding: This work element includes only labor costs. Work Element Cost Type Federal PL Funds 100% Local Match 20% Total Percent of Work Program Budget 527 Labor $3,233 $0 $3,233* 0.7% * The 2021 Bipartisan Infrastructure Law (BIL) requires each MPO to use at least 2.5% of its PL funds on specified planning activities related to Safe and Accessible Transportation Planning (Work Element 527). PL funds constitute ~80% of CPG funds and the FY 2024 2.5% estimate is $3,451. The FY 2025 estimate will not be available until December 2024. DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 12 Appendix A – Financial Summary Anticipated Expenditures & Revenue CAMPO receives funding from the FHWA (PL) and FTA (5303) through the Consolidated Planning Grant (CPG) administered by MoDOT. Funding consists of 80% federal and 20% local matching funds; Jefferson City contributes 15% and Cole County contributes 5% except where noted differently. Note: The Traffic Study for the US 54/63/50 Tri-Level Interchange deviates from the local match statement above. The local match requirement is split between Jefferson City (50%) and Cole County (50%). CAMPO may over-program or under-program annual CPG or PL allocations in order to maintain a CPG balance to provide flexibility in accommodating large scale planning efforts that may require added staff or consultant services. Some years may require more funding than others in order to meet MPO planning goals and federal requirements. CAMPO may apply for and receive other grant funds that may offset the use of CPG funds outlined above. Depending on the nature of the funding and project utilizing said funding, CAMPO will follow the amendment and administrative modification processes, outlined in the UPWP. Table 1: FY 2025 CAMPO Budget* * Rounded to the nearest whole number. ** The City of Jefferson covers all the Utility and Capital Purchases expenses, except for some specific software licenses used for publishing or mapping. 1 The 2021 Bipartisan Infrastructure Law (BIL) requires each MPO to use at least 2.5% of its PL funds (the FHWA portion of the CPG) on specified planning activities related to Safe and Accessible Transportation Planning (Work Element 527). 2 The project is anticipated to cost up to $500,000, with only $200,000 in Consolidated Planning Grant funds being utilized and local funds for the remainder. Local match is split between Jefferson City (50%) and Cole County (50%). Cost Category Federal - CPG (80%) Local (20%) Total (100%) Advertising $2,080 $520 $2,600 Postage $240 $60 $300 Printing $160 $40 $200 Copies $160 $40 $200 Office Supplies $800 $200 $1,000 Food $240 $60 $300 Operational Supplies $800 $200 $1,000 Subtotal $4,480 $1,120 $5,600 Dues & Publications $1,200 $300 $1,500 Training & Education $3,600 $900 $4,500 Tuition Reimbursement $2,400 $600 $3,000 Prof. Services - US 54/63/50 Tri-Level Study2 $200,000 $50,000 $250,000 Subtotal $207,200 $51,800 $259,000 Equipment Maintenance $0 $0 $0 Vehicle Wash $0 $0 $0 Maintenance Agreement $1,920 $480 $2,400 Subtotal $1,920 $480 $2,400 Equipment/software $2,720 $680 $3,400 Subtotal $2,720 $680 $3,400 Total Direct Costs $216,320 $54,080 $270,400 Labor Costs - CPG (80%)Federal - CPG (80%) Local (20%) Total (100%) Salaries plus benefits (CPG Funds)$167,440 $41,860 $209,300 Labor Costs - PL (100%)Federal - PL (100%)No Match Total (100%) Salaries plus benefits (PL Funds - Safety)1 $3,233 $0 $3,233 Total Labor Costs $170,673 $41,860 $212,533 Federal Funds Local Match Total (100%) $386,993 $95,940 $482,933 Direct Costs Materials & Supplies Other Contracted Services Equipment Repair & Maintenance Capital Purchases & Utilities** Total MPO Budget DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 13 Table 2: FY 2025 Work Element Funding Summary - Consolidated Planning Grant and Local Funds Table 3: FY 2025 Local Match by Jurisdiction *Numbers are rounded to the nearest whole number. Staff salaries are based on an hourly rate (base + fringe). Staff time allocations are subject to change as planning activities fluctuate. The MPO Executive Director position is full-time, but is not funded by the MPO and does not appear in the tableabove. The MPO Director is the Director of the Jefferson City Department of Planning and Protective Services; MPO activities are only a portion of theDirector’s job duties. 1 The 2021 Bipartisan Infrastructure Law (BIL) requires each MPO to use at least 2.5% of its PL funds (the FHWA portion of the CPG) on specified planning activities related to Safe and Accessible Transportation Planning (Work Element 527). 2 The project is anticipated to cost up to $500,000, with only $200,000 in Consolidated Planning Grant funds being utilized and local funds for theremainder. Local match is split between Jefferson City (50%) and Cole County (50%). Table 4: Anticipated Available Federal Consolidated Planning Grant (CPG) Balance Revenue *The final amount of the FY 2024 CPG Allocation will not be released by MoDOT until May of 2024. This UPWP will have been adopted before this information is made available. Additionally, the MoDOT FY2024 SPR Work Program is also not available until after adoption of this document. CAMPOstaff may make modifications to totals in Table 4 after these allocation amounts are made available.**The Tri-level Study is excluded from the FY 2024 expenditure, and included in the FY 2025 expenditure. The project is anticipated to begin in FY 2024, but most of the expenditure may occur in FY 2025. It is anticipated to cost up to $500,000, with only $200,000 in Consolidated Planning Grant funds beingutilized and local funds for the remainder. Local match is split between Jefferson City (50%) and Cole County (50%). Table 5: Anticipated Available Federal 2.5% Safety Set-Aside Balance Revenue Work Element Planning Manager (.30 FTE) Planner, Senior (1 FTE) Planner (1 FTE) Admin. Asst. (.10 FTE)Sub-Total Total Federal CPG Funds 80% Total Local Match 20%Total* Percent of Work Program Budget Labor Costs 521-Program Support & Administration $28,546 $0 $0 $6,804 $35,350 $28,280 $7,070 $35,350 7% 522-General Dev. & Comp. Planning $0 $9,699 $9,491 $0 $19,190 $15,352 $3,838 $19,190 4% 524-Short Range Transportation Planning $0 $5,542 $18,252 $0 $23,794 $19,035 $4,759 $23,794 5% 525-Long Range Transportation Planning $5,190 $44,800 $28,472 $0 $78,462 $62,770 $15,692 $78,462 16% 526-Public Transportation Planning $0 $32,791 $19,712 $0 $52,503 $42,003 $10,501 $52,503 11% Subtotal $33,736 $92,832 $75,927 $6,804 $209,300 $167,440 $41,860 $209,300 Labor Costs Utilizing 100% PL Funds 527-Safe/Accessible Trans. Planning 1 $0 $3,233 $0 $0 $3,233 $3,233 $0 $3,233 0.7% Labor Costs (Base + Fringe) Subtotal $33,736 $96,065 $75,927 $6,804 $212,533 $170,673 $41,860 $212,533 44% $20,400 $16,320 $4,080 $20,400 4% $250,000 $200,000 $50,000 $250,000 52% $270,400 $216,320 $54,080 $270,400 56% $386,993 $95,940 $482,933 100% Direct Costs Subtotal Total* 521-Direct Costs - Program Support & Administration 525-Direct Costs - US 54/63/50 Tri-Level Study2 Direct Costs Category Jefferson City Cole County Total* Labor Costs (excludes work element 527 - Safety)1 $31,395 $10,465 $41,860 521-Direct Costs - Program Support & Administration $3,060 $1,020 $4,080 525-Direct Costs - US 54/63/50 Tri-Level Study2 $25,000 $25,000 $50,000 Total*$59,455 $36,485 $95,940 CPG Local Match CPG Balance for end of FY2023 $552,333 FY 2024 CPG Allocation*$172,841 FY 2024 UPWP CPG Expenditure - Anticipated (excludes Tri-Level Study)**-($169,636) CPG Balance for end of FY2024 - Anticipated*Subtotal $555,538$0FY 2025 CPG Allocation - Estimated per MoDOT's FY24 SPR Work Program $172,884 FY 2025 CPG Programmed Expenditure - Anticipated (Including 100% of Tri-Level Study)**-($386,993) FY 2025 END OF YEAR Remaining Unprogrammed CPG Funds Anticipated $341,429 Consolidated Planning Grant Balance 2.5% Safety Set-Aside Allocation Balance for end of FY2023 $3,286 FY 2024 2.5% Safety Set-Aside Allocation - Estimated $3,451 FY 2024 2.5% Safety Set-Aside Expenditure -($5,176) CPG Balance for end of FY2024 - Anticipated*Subtotal $1,561$0FY 2025 2.5% Safety Set-Aside Allocation - Estimated $3,451 FY 2025 2.5% Safety Set-Aside Expenditure -($3,233) FY 2025 END OF YEAR Remaining Unprogrammed 2.5% Safety Set-Aside Funds Anticipated $1,779 2.5% Safety Set-Aside Balance DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 14 Appendix B – CAMPO Boundary Map The CAMPO Metropolitan Planning Area (MPA) Boundary was approved by the CAMPO Board of Directors January 17, 2024 and was approved by the Governor of Missouri January 31, 2024. The MPA includes the jurisdictions of Holts Summit, Jefferson City, St. Martins, Taos, Wardsville, and portions of unincorporated, non-urbanized areas within Cole and Callaway Counties. DRAFT Capital Area Metropolitan Planning Organization FY 2025 UPWP 15 Appendix C - Modifications and Amendments Amendments No. Description Board Approval One DOT Approval Administrative Modifications No. Description of Modification Date DRAFT