HomeMy Public PortalAboutr 06:200
2R eøo!ní1on of t~e ~oro1tBq af ([I dent, (L 3J ~
No. JQ~__
l ", of Ador'¡''". July 6, 2006
-
AUTHORIZING A PROFESSIONAL SERVICES ONTRACT WITH
T&M ASSOCIATES - CONCRETE POND EDGiN REPLACEMENT /
CARTERET PARK POND RESTORJ nON
WHEREAS, the Borough of Carteret ("Borough") is n need of professional
engineering design services for the preparation of plans nd details for concrete
pond edging replacement with regard to the Carteret Park Pond Restoration
project; and
WHEREAS, T&M Associates, possesses the requisite skill and expertise to
provide said engineering services; and
WHEREAS, T &M Associates has submitted a pro osa1 to provide said
engineering services at a cost not to exceed $3,000.00; an
WHEREAS, the Chief Financial Officer has certified t at funds are or will be
available for said purpose.
NOW, THEREFORE, BE IT RESOLVED by the M yor and Council of the
Borough ofCarteret, County of Middlesex, State of New ersey, as follows:
1. The proposal of T &M Associates for rofessional engineering
design services for the preparation [plans and details for
concrete pond edging replacement wi regard to the Carteret
Park Pond Restoration project in a tot I amount not to exceed
$3,000.00, billable in accordance with &M's existing contract
with the Borough, is hereby approved.
2. The appropriate Borough officials a e hereby authorized to
enter into an agreement with T &M Þ sociates to provide the
above described services.
3. This action is approved as an award 0 a professional services
contract pursuant to NJ.SA 40A:11-5 I)(a).
Adopted this 6~' day 0 July, 2006
and certified as a true opy of the
original on July 7, 20 6.
KATHLEEN M. EM NEY, RMC/CMC
MuniÔpal Clerk
..---
-.-.--
RECORD OF COUNCIL VOTE
_ Dl~~ -X
_KRllI1_._ -X_.
n__
COUNCILM N YES NO
tjAPLES v
RIDS v
SIThR<: v
NY A,B.
--
_~_OUNCIL!'...IAN
BELLINO
YES NO NY A.B.
v
-
--
--
n
--
--
.. -'----- - .
---
x _ !Ildicalt YO¡c AB - Abstl1\ NY· Not Voting XQR - Inuic te.s VOlt (ü Ove.rrule. Veto
---- -_..--_.-- ----
__LJl-
Adopted ¡¡I a meeling of (he Municipal Council
/
}"\
7
./
July 9J2
-~ ~1,.r"
CLERK ~~
CJ
:/ft1I-d!ð
1':;~~ili
1966-2006
~ I ANNNERSARY
ELEVEN TINDALL ROAD. MIDDLETOWN Ncl 07748-27 2
(732) 671-6400 * fax (732) 67~¡:¿7'V'aSSOclate:;col-'
CART-01222
June 16, 2006
Mayor Daniel J. Reiman
Borough of Carteret
61 Cooke Avenue
Carteret, NJ 07008
~ø
Re: Concrete Pond Edging Replacement
Carteret Park Pond Restoration
Dear Mayor Reiman:
As a follow-up to our Friday, June 9, 2006 on-site meeting at Cartere Park Pond, it is understood that the
Borough is planning to remove the existing concrete and stone ripra edging around the entire perimeter
of the pond and replace the edging with a new concrete "apron" typ edging, similar to the existing boat
ramp which services the pond, at the recreation building. Furt er, as discussed, we estimate the
construction cost for the new concrete perimeter apron to be approxi ately $250,000.00. This estimate is
based on a 10-foot wide apron, 6-inch thick (reinforced with 6-inch y 6-inch welded wire mesh). This
estimate does not include costs for demolition of the existing rip ap edging as it is understood, the
Borough will undertake this work.
Per your direction, we have contacted V&K Contracting, the Boro gh's contractor for the project, and
will obtain pricing for construction of the new concrete perimeter edging. We will then present the
Borough with a cost proposal from V &K and prepare the necessary c ange order for the work.
In order to accomplish the construction, it will be necessary to provi e additional design services related
to the new edging. Although it is understood that new edging will re lace the existing riprap edging in its
current location, in order for the contractor to construct the edgin uniformly, a layout plan must be
prepared to provide the location and proposed elevations of the new dging. This will require our office
to provide a layout plan and grade control plan for improvements long with new construction details.
We do not anticipate additional field survey wili be necessary to ac omplish this work. Our efforts will
also include preparation of necessary change order and finalizing pri ing with the project contractor. We
estimate our fee for preparation of plans and details will not exceed 3,000.00, which will be invoiced in
accordance with our current contract billing rate schedule.
Please advise of your authorization to proceed with this additional ork. In the interim, if you have any
questions concerning the information provided herein, please call.
Very truly yours,
T&MA
z·
DONALD J. NORBUT, P.E , C.M.E.
CARTERET BOROUGH E GINEER
DJN:han
c: Kathleen Barney, Clerk
Patrick DeBlasio, Chief Financial Officer
H:\Cart\01222\Correspondence\Reimao_DJN_Concrete Pond Edging Replacement Proposa1.d c
ENGINEERS * PLANNERS * LANDSCAPE ARCHITECTS * EIWIRO MENTAL SCIE~ITI::,TS' SURVEYORS
CIVIL ~ ELECTRICAL * ENVIRONMENTAL * MECHAI'.ICAL ~ MUr--JICiPAL SITE SOLID W STt:: " STRUCTURp,'_ ' TF1f-\FFIC^ :-RÞ,NSPOF,T/,T'C,j':
REGIONAL OFFICES IN MOORESTOWN. TOMS RIVER AND CLlFTOfJ NJ !\!ORRISTOV/N. P.>;. Qoe: SA!\! .IUM" PUEf1TO Rlr:
'"""~
~
~DrDuB11 Df (]larfE d
MIODLES:::X COUNTY
~áD ;!IffßEU
ê "
TEL (734 541-3800
FAoX (734 541-8925
QPf[CE OF
K..\THLEEN M. BARNEY, RMCICMC
'fUNICl PAL CLERK
81 COOKE AVENUE
CARTERET, NEW JERSEY 07005
Date Jul 19, 2006
TO: Patrick J, DeBlasio, Treasurer
Borough of Carteret
REQUEST FOR CERTIFICA TION OF A V AILABLE FUNDS:
Services
ra +VS~
Name of Account:
Al'v1OUNT TO BE ENCUMBERED:
Resolution #06-200
cL-é
KAT EEN M BARNEY,
Munic pal Clerk
"
C/
Oc/J i--
//0>0
..Ý--- Þ¡ ?J
CERTIFICATION OF AVAILABILITY 0 FUNDS
I, Treasurer of the Borough of Carteret, do hereby cert1fy that there are ufficient fuods available in the current
budget to enabie the Municipal Council to authorize the entering into a co ract between the Borough of CaneIet
a.1d
The funds available for this contract are in the Budget, In the account of
.év&,',.-.u _ 0-£ G,ol-').?_/~;_2"f'1
in the amount of
'] ~-":>
By this certification, I have hereby encumbered the above named account r the amount of the contract
Date '/ //0 (:?/J
Kr'v=! cp
AFFIDAVIT OF PUBLIC TION
The following is a true copy of n Ordinance or
Resolution of the Borough of C rteret that has
appeared in the Home News Trib ne, a newspaper
which is printed in Freehold, New Je sey and published
in Neptune, in said County and Sta e and of general
circulation in said county. ONE (1) t mes, once in each
issue as follows:
AU¡:lIS t 4 r 2006
Kathie n Barney, RMC
Munici al Clerk
ary P. Jj c \~ ew Jersey
NÐV L .1KO
.-rfI.&IC Cf II\?W .¡!'¡¡sF.'!
I '.. .,..... 9113120013
Sworn and sUbscribeä:;::r
me this q jI. day of :2ð7)!;
(
6~ ~
?/ a1J
:;
BOROUGH OF CARTERE
20 COOKE AVENUE
CARTERET, NEW JERSEY 0 008
[:o' oc,~~
,p .<,
g illIG 2 1 2OJ¡
\ \.
\. C-Ä /2"
'<..(f::i,~;' )/
'~9.-./"
THIS AGREEMENT: made this 6th of July 2006
By and between: T&M Associates
11 Tindall Road
Middlestown, NJ 07748
And the Boroue:h of Carteret, a municipal corporation, havi g its Principal office at the
Borough Hall, 61 Cooke Avenue, Carteret, New Jersey.
As per Resolution Number 06-200.00
THE CONTRACTOR does hereby agree to perform the fol owing:
PROFESSIONAL SERVICE FOR DESIGN IN THE PREP RATION OF PLANS AND
DETIALS FOR CONCRETE POND EDGING REPLACEM NT.
NOT TO EXCEED $3,000.00
According to the terns set forth in the Resolultion.
THE BOROUGH does hereby agree to pay the Contractor he sum set forth in
Resolution.
IN WITNESS WHEREOF, the parties hereto have hereunde set their hands and seals or
caused these presents to be signed by their proper corporate fficers and their corporate
seals to be hereto affixed, the day and year written above.
BOROUGH OF CARTERET
<c
WITNESSETH BY:
~
~~~~~
Municipal Clerk