Loading...
HomeMy Public PortalAbout07-0005 Shira CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 01 -5 -2007 PERMIT #: 070005 WORK DESCRIPTION: REPLACE WINDOWS WORK LOCATION: 8A TWELFTH ST OWNER NAME ANNE & WILLIAM SHIRA ADDRESS 5507 WATERS DR CITY, ST, ZIP SAVANNAH GA 314062038 CONTRACTOR NAME WINDOW WORLD OF SAVANNAH ADDRESS 2708 LEGION DRIVE CITY STATE ZIP THUNDERBOLT GA 31404 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $ 95.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $10,000.00 TOTAL BALANCE DUE: $ 95.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org „ -,•;,,ig.• - - . 4.; c .i : • 1 ... . 3 YJ V,.‘n A • • . 4 , I *7 ... • S': -./ zz - ; , :.. ,, .. -- Inspection RepOrt. City of Tybee Island 403 Butler Averude P.O. Box 2749 Tybee Isidell, GP, 3131 toe: (912) 7B6-4573 extc.asitto 114 Fax; (91)) 7R6- D --) , 0 Date R?questPd 01 - D. L I - 0 -- Date N eeded 0 --/ ,,.. •en., clztti-71,f-tor W ” c= vi \1J 0 r 6,-- Subcontractor Contaci N LIME:4-1.e , ..--->-- A 1 /Pc oi iosp,: f: Rion Tirne inspector Trpk- of Tnspection I 1) t ,--, ------, - M __ _ _ ------ 1 1 CITY OF TYBEE ISLAND, GEORGIA `\ F APPLICATION FOR BUILDING PERMIT k} R\ C7 -o 0 ocation: 8 A I 2A cit e e T PIN # /� NAME ADDRESS TELEPHONE ✓ Owner Paw c44-71214 BA 2; mile) Ti2.-- Arch} ect 1 orgineer , �, R c uilding c�� CC;- ontractor W t L) O W b Z7 de C e6t o I1 bet &Je. t'1 Z - z-CI (Check all that apply) Repair ❑ Residential ❑ Footprint Changes • Renovation ❑ Single Family ❑ Discovery ❑ Minor Addition ❑ Duplex ❑ Demolition ❑ Substantial Addition ❑ Multi- Family ❑ Other ❑ Commercial Details of Project: 2C_� �J - t dp . ,� 1 \I ERA houS e , Project: 'Rep y � c , ( 1 " vEstimated Cost of Construction: $ 0 bb( , b D - Construction Type (i) (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following inform. ' , • : - - . on the construction drawings and site plan: # Units ed . oms # Bathrooms Lot • ea , i • g s i ace (total sq. ft.) # 0 street p. . . aces Tree• located : 1 .:d on s' .e c Acces • Drivewa (ft.) Wi culvert,,.? With With swale? Setbacks: t ar ,��� Sides (L) (R) # Stories Height / V: al is r ' ce m:. ured from the average adjacent grade of the building to the extreme • :. p nt o. �► b • ding, exclusive of chimneys, heating units, ventilation ducts, air conditio • : units, - . ors, and similar appurtances. During construction: On -site restroom facilities will be provided through 7A/ A , On -site waste and debris containers will be provided by (b /tic -& C. � Construction debris will be disposed by 40 �,►,Id c..by means of — new %— I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. ti a flq/o ignature of Applicant: ale e E - c Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification ' Flood Zone Approved rezoning/variance? Street address and number: New , E -' ting Is it in compliance with City map? not, has street name and/or n u m b e r be n r' . 'i ed tf ' . FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site 1 _ Distance to water main tap site Distance to sewer stub site )X 1 S T 1 VA `\' Water meter size `� 1 Storm drainage Approvals: ignatur Date FEES 6s.'7 Zoning Administrator // , Permit Code Enforcement Office L ff a/ -- 0/— �j�/ -O7 Inspections �p. Water /Sewer U Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL