HomeMy Public PortalAbout07-0008 Efird To
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 01-8-2007 PERMIT#: 070008
WORK DESCRIPTION: ARBOR
WORK LOCATION: 611 SECOND AVE
OWNER NAME SCOTT&CARRIE EFIRD
ADDRESS PO BOX 1989
CITY,ST,ZIP TYBEE ISLAND GA 313281989
CONTRACTOR NAME TYBEE GIRL HELPERS
ADDRESS 1303 JONES AVE
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 45.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $2,500.00
TOTAL BALANCE DUE: $ 45.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: 1(:)
Li':1A"-,...D
P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-5737
www.cityoftybee.org
;;---- ,,
:■::.";: '' - '::';:'-•
Inspection Report
City cpt Tybee Island
403 Btoder oieo0
P.:0.: Box '749
Tybe Isizndi GA 31322
Photte: (911) 186-8573 extension 114
Fax: (912) 786-9.539
Perm it Itjn, rt...." '-1 - (ID 0
Date Requested
- L2 - o *-7
1 1 • .0,. ..k. n
G r
eri. CJ=titractor A - -c-, i
Q-----_-_-___ ---, f;ubcontractor
Ca rit:itct Non'tbeP'
Ictcatiort •, ,
1 1 I i
( /i
,-----
7-) e-C,D,n A Li.e) ,
________...
Date f-1:: lins-pediert 1 jnite _ 7.:nspec t-or
n
Type: of Inspection --r n a , , c, , ( 0 r o c... i-z.., 4 ) .‹..sz_r--,
6 ,_
? C) r c 1:-.7 . ')
IN\1 /A . 1--) ''' 7-' Vi / •
t
1
O/?! - CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location: CO I ( �� — (fib -2 PIN#
N ADDRESS TELEPHONE
Owner �rc�e t 2--cuc
Architect
or Engineer
Building L 5 4-01 "2 1
Contractor , 5 13 q � „S
(Check all that apply)
❑ Repair ❑ Residential ❑ Footprint Changes
❑ Renovation ❑ Single Family ❑ Discovery
❑ Minor Addition ❑ Duplex ❑ Demolition
Substantial Addition ❑ Multi-Family
Other ❑ Commercial
Details of Project: --7'( 1 r) j v (( (k/b e'' --Z,,,�__P„ _,
-- • is CYL v o u ,
Estimated Cost of Construction: $ 7
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other(please specify)
(2) Wood&Masonry (5) Steel &Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
#Units # : 6'0 •om #Bathrooms
Lot Area ' ivin space (total sq. r`.)
#Off-street parking s p.ces
Trees located &list- on sit Jr, .
Access:
Driveway (ft.) Wi With swale?
Setbacks: Front Re, Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On-site restroom facilities will be provided through
On-site waste and debris containers will be provided by
Construction debris will be disposed by ‘0 - \ { by means of r c _.+-
- 44 e u
I understand that I must comply with zoning, flood damage control,building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: ( 0 Signature of Applicant.
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not,has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site y\i9
Water meter size _ t
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator �e Permit
Code Enforcement Offic.l �; ._ D/-- D5(j Inspections 4
Water/Sewer _ 41101. Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
�jr c C /Z/
REQUIRED FOR: Building Permits
Relocation Permits
Sign Permits
Demolition Permits
Land Clearing,Disturbance or Excavation Permits
Tree Removal Permits
Relocation Permits
Special Review Permits
Site Plan Approval
Subdivision of Land
Sketch Plan Approval
Preliminary Plan Approval
Final Plat Approval
Minor Subdivision Plat Approval
Major Subdivision Plat Approval
In addition to specific requirements for the above permits and approvals, applicants must
demonstrate that they are in compliance with the City of Tybee Island Storm Water Management
requirements as outlined in Chapter 5-4, Code of Ordinances.
Section 5-4-9 Prohibition provides, in part, as follows:
(4.) It is unlawful for any person to cause or permit any storm water to flow from their
property onto the property of another person,unless such storm water naturally
flowed thereon prior to any development activity.
(5.) It is unlawful for any person to interrupt the flow of any storm water runoff from
adjacent property onto their property by any development activity.
As part of the City's approval process applicants must illustrate how these storm water
management prohibitions will be met, including a showing of how storm water naturally flowed
on the affected property(prior to any development activity), and what changes in storm water
flow have occurred or are expected to occur, as attachments to this form. The City's approval or
permit does not guarantee that the applicant's plans will result in meeting requirements. The final
product must actually meet the City Ordinance requirements.
Applicant name: cP(MQ4 C t f} 11,'k c e L;P-�f 4--
Project I.D.: 1
Attachments approved by: Date: t/441 a`7
---tr-A`v
C----'
Q ) 0 N - . D4r2. _ L(0 ,-,-vi- - :} 79
----y-v .- }c ,„2„NI
y---,-14-9-) gt x 7
.1 %4.
c—v---)-0.- ---3- 7f, -2-el -)1....n9 1 : I , _±4 - j
1-7-9 ri ,,,,A >.■ (3)0-7-1 o-y---0--1Tc- ,
I ,
F IA f
1111-41,1110.111MM—F4 0,10;
/../- , , LA17!c-Y-\
/
/ - ,
vog
1
It__
{
/ Ciiwic, ,fc23)
, y \
2 • ---- -D----A,?,--j- -f-, A.,,r2 ki")0\ N\
1 •,, /z."' / . : /
----7(--?-- CI 1-4-aa
101
q1 k 1
C3
n
N
ZONING ADMINISTRATOR DATE
OWNER DATE
APPROVED BY THE TYBEE ISLAND MAYOR AND COUNCIL ',,,." 2" '
MAYOR DATE LOT 57-B
PT. LOT 58-B
CLERK OF COUNCIL DATE
N 10°02'11"E 55.11' N 10°57'38"E 69.31'
5/8" RBF „
•�■ s �,� CJl�I'' x x x.. x x x R"'.� t " x —K--.— x...
66.53' 1" IPF
2.78'
Co
ci
d 0 c
r,
X
. 1,3 9.8' 3
t�v is Mr 1 c, _ ' -
�
fi x
fi x
II
x
I W
SOUTH 55'
E-. PORCH x
a
B 10.0'
0 x
LOT 59-A LOT 58-A z 1
CO fi z LOT 57--A 1 I
0 2 STORY
p° x o LOT 56-A NI r) FRAME RESIDENCE fi
W ,p" 2 STORY I I'?
O co
: I I: FRAME RESIDENCE x
CO
�I I. I C^b
CO
CONC. DRIVE x 'e'
I
fi 4 10.0' 9 x
PORCH - I I
x
12.9' fi
.a 9.8' ae a PORCH x
Wfi
cn
A
E
W fi ' ;-e O II x
N 10°00'00"E
IOC*4A4° fi
2
I
.87 lo x
60.00' ox
5/8" RBF Y D CMF+ �.. .� ,66.57' 15/8" RBF 00.111•11■10111\ .11■01111, \rn.I
y / lu�uu vu°rr Y5.ua S 1I°05'25"W 69.44'
•■•■•■•1 ..,_... .......
fi j
SECOND AVENUE 60' R/W
ACCORDING TO THE F.I.R.M. DATED 6/17/86
THIS SITE IS WITHIN FLOOD ZONE A8, BFE 12.
EQUIPMENT:
RECOMBINATION
TOPCON AP-LIA
ERROR OF CLOSURE: LOTS 57—A & 58--A, WARD NO. 2, TYBEE
c,soRG.4 LINEAR: 1/- ISLAND, CHATHAM COUNTY, GEORGIA
cAsTER ANG: -"/ANGLE
* 4 L''I * :ALANCED BY: -
I, LAND REYNOLDS 2 49 t\ P 0. 1/67,000 10 FOR: THE COTTAGE COMPANY
LAND SURVEYOR
636 STEPHENSON AVENUE o� 0 1 I I (1i0 f 0 10 20 30
SUITE C •,.�z UR_. A 4 SCALE: 1" = 10' 1 1 1 11 1 1 1 11 1 1 fi•SAVANNAH GEORGIA 31405 \<°,1/77.,E11,.... DATE: JUNE 7, 2006 SURVEY
TELEPHONE: 912-352-0464 • Qct DATE: JUNE 21, 2006 PLAT GRAPHIC SCALE — FEET
FAX: 912-352-7787 FILE NO. 04-188FP