Loading...
HomeMy Public PortalAboutAgreement 2.23.1993CITY OF McCALL/PAYETTE LAKES WATER & SEWER DISTRICT INTERAGENCY AGREEMENT THIS AGREEMENT is made and entered into this.2.3-Qday of , 1993 by and between the City of McCall (City) and the Payette Lakes Water and Sewer District (District), a political subdivision of the State of Idaho, provisions of Section 67-2332, Idaho Code. WHEREAS the parties to this agreement have a mutual interest and overlapping responsibilities and authority in the operation and maintenance of sewer collection facilities within their respective jurisdictions, and WHEREAS they presently share such concerns with respect to lands in the vicinity of McCall, Idaho, generally, and in the vicinity of Jacob Street in particular, and WHEREAS the City is desirous of obtaining on an interim basis the services of District to assume responsibility for the operation and maintenance of a privately owned sewer lift station being constructed approximately 600 to 700 feet south of Jacob Street and easterly of the Payette Lakes Water and Sewer District office building (and lying within the boundaries of the City) which services a collector running southerly from Deinhard Lane across Jacob Street and easterly of Highway 55, and INTERAGENCY AGREEMENT - Page 1 pursuant to the WHEREAS the District is agreeable to assuming such responsibility on certain terms and conditions, NOW THEREFORE in consideration of the foregoing and terms and conditions which follow, the parties agree to perform each for the other as follows: the 1) The City shall be responsible for billing and collecting from the owner of the lift station all fees and charges associated with the hookup, construction, operation, and maintenance of the lift station and related interceptor. 2 The District, following inspection and acceptance, shall assume operating and responsibility for the lift station to standards and the same manner as those stations owned by the District. 3) The District shall provide to the City, or as directed, the appropriate design standards and specifications necessary to integrate the lift station into its operation and maintenance programs. This agreement is conditioned on such standards being met and the District shall provide inspection services as necessary and appropriate in their judgment to ensure such standards have been met. technical maintenance the same lift 4) Costs and expenses associated with the District's services, including initial inspection services, engineering reviews, and legal services associated with negotiating and memorializing the present agreement or associated documents, shall be billed to and payable by the City as set forth in the following schedule of charges: a. Initial: District staff services for design and inspection activities, engineering review and legal services: Est. $1,000.00, subject to adjustment for actual. b. Operating/Maintenance: (1) Routine Operations: $366.22/month INTERAGENCY AGREEMENT - Page 2 (2) Repairs/Corrective Action: $25.34/hr. + Materials - actual (excludes utility charges/telephone or power - pass through billing if incurred by District) 5) The District agrees to take such steps as are necessary to bring the operating and maintenance services contemplated within the scope of their present ICRIMP coverage. 6) The District agrees to consult and coordinate with the representatives of City, and the private Developer's agents involved in the construction of the lift station during the construction phase, in order to address their particular concerns, including, but not limited to, the City's long term intention of integrating the system into a future gravity system contemplated for the immediate service area. 7) Both parties agree to execute and deliver such other and further documents, permits, and instruments as may be necessary to fully effectuate the objectives set forth above. City of McCall by Larry A. Smith Attest: Payette Lakes Water & Sewer District or Har r ergst , Chair INTERAGENCY AGREEMENT - Page 3 Attest: