Loading...
HomeMy Public PortalAboutSewer SystemRICHARD BLAND BOULDER LAKE ROAD McCALL, IDAHO 83638-9510 (208) 634-5253 City of McCall City Administrater City Council The construction of the -gOter, completed and approprifk.,_, approvals of the work aria" who are the project en. a copy of operation magi' the Payette Lakes operationa and maintendWe As agent for the aboli ato and maintenance _s_e• m, tW. services. Very Truly, Richard Bland SOW6ri July 26, 1993 Payette Lakes Commercial Center .:the above project has been 03ocn performed and obtained from JUB engineers these test results and voiliment are being provided as - your contractor for -1g*8 equipment. , Kew. equesting that operation ',ovided for sewer cc Ted Whiteman, Payette Lakes Water and Sewer igtrict Encl: JUB test results letter July 23, 1993 Pacific Equipment test results letter July 22, 1993 JUB letter July 23, 1993 regarding work items 0 r� uJ July 23, 1993 Mr. Judd W. DeBoer, President Brown's Industries, Inc. 101 S. Capitol Blvd., Suite 1818 Boise, ID 83702 Dear Mr. DeBoer: J-U-B ENGINEERS, Inc. ENGINEERS • SURVEYORS • PLANNERS 250 S. Beachwood Avenue, Suite 201 Bone, ID 83709-0944 208/376-7330 FAX: 208/323-9336 Re: PAYETTE LAKES COPMiIERCIAL CENTER Commercial/Industrial Subdivision, McCall, Idaho and JACOB MANOR MOBILE HOME PARK Per your request, please accept this letter as the ENGINEER'S CERTIFICATION that the following required testing for the gravity sewer main, pressure sewer main, and domestic water main has been completed by the contractor, observed by the Engineer, and successfully passed: 1. Air pressure test for exfiltration in accordance with Idaho Standards for Public Works Construction (ISPWC) Section 506.08 has been successfully completed for the 8" gravity sewer main and 4" sewer service laterals. 2. Deflection tests for PVC pipe in accordance with ISPWC Section 506.10 (using a solid pointed mandrel) has been successfully completed for the 8" gravity sewer main. 3. The hydrostatic pressure test in accordance with ISPWC Section 404.03 has been successfully completed for the 4" pressure sewer main. 4. The hydrostatic pressure test in accordance with ISPWC Section 404.03 has been successfully completed for the 8" domestic water main and services. 5. The water system leakage test in accordance with ISPWC Section 404.04 has been successfully completed for the 8" domestic water main and services. If you require additional information or if you have any questions, please call Sincerely, J-U-B ENGINEERS, Inc. 4:1 �— ary A. Lee, P.E./L.S. Project Manager GAL:ls cc: Richard Bland Ronald L. Marier Project No. 18391 1 BaCIFIC BQUIPEORT, INC 112C 'Nth Ave O. iB.O. Dos ASS 'Nampa, ID 834.53 i allepresenting Equipment fer' the meter & Sewer Industries* DATIVE: JULY 22, 1993 A 008, 464,-2823 Fax (208) 444-4931 : RICHARD BLAND COMPAt+ Y; HROWN, S INDUSTRIES FROM: JEFF PRYOR PAYETTE LAKES SAL °INTER MR. BLAND, TEIS wEmo SERVES AS OUR CONFIRMATION THAT THE ABOVE REFERENCE© .NQIII.MKT RAS BEEN STARTED ,'PROPERLY AND ALL SYSTEMS OPERATED PROPERLY RITH TAR SON TEAT A. TRANCEI©ER CARD HAS REED ORDERED FOR TED WHITEM N WHICH KS W/LL SEND DIRECTLY TO RIM. IF THERE IS ANY ADDI't1oNAL INFORMATION NEEDED PLEASL FEEL FREE TO GIVE ME A CALL. jEPP PRYOR J-U-B ENGINEERS, Inc. ENGINEERS • SURVEYORS • R.ANNERS 250 S. Beachwood Avenue, Suite 201 Boise, ID 83709-0944 20E076-7330 FAX: 2081323-9338 July 23, 1993 Mr. Judd W. DeBoer, President Brown's Industries, Inc. 101 S. Capitol Blvd., Suite 1818 Boise, ID 83702 Dear Mr. DeBoer: Re: PAYETTE LAKES COMMERCIAL CENTER Commercial/Industrial Subdivision, McCall, Idaho and JA.COB MANOR MOBILE HOME PARK Enclosed please find our testing Certification Letter dated July 23, 1993, for the above project. However,there are still some details that should be addressed before final acceptance for this project can be completed. The following is a list of items that should be addressed and completed by your contractor: 1. Pursuant to :the Electrical Engineer's inspection of the sewage pumping station on July 19, 1993, the contractor should address the following: a. Clean debris out of control panel b. Change out "LB" cover in wet well c. Station is operational on temporary service; permanent service needs to be installed d. Permanent electrical and telephone services have yet to be installed e. Submit record drawings, oaM Manuals and manufacturer guarantees 2. Certification of soils compaction testing from the contractors soils engineer should be submitted stating that compaction for all trenches, road base, pavement, etc-., meets the requirements of Idaho Standards for Public Works Construction (ISPWC) 3. A certification from the pump manufacturer should be submitted stating the pumping equipment has been successfully tested in accordance with the specifications Section 16000, Item 4.01.33.12. Testing. 4. The domestic water system should be disinfected and flushed in accordance with ISPWC Section 405. In addition, bacteriologic samples are to be taken and tested for effectiveness of disinfection procedure. 5 A hydrostatic exfiltration test in accordance with ISPWC Section 505.06 should be conducted on a random selection of sewer manholes. In addition, enclosed please find three copies of an Operation and Maintenance Manual for the Payette Lakes Commercial Subdivision Pump rJru- A Engineers Surveyors Planners Mr. Judd W. DeBoer July 23, 1993 Page 2 Station as supplied by Consolidated Electric Company and Pacific Equipment, Inc., for the control panel and pumps. Please see that Ted Whiteman gets two copies and retain one copy for yourself. Please have your contractor take care of the above, so that a final acceptance can be given. If you require additional information or if you have any questions, please call. Sincerely, J-U-B ENGINEERS, Inc. --<7" Ga A. Lee, P.E.A.S. Project Manager GAL:ls Enclosure cc: Richard Bland Ronald L. Marier Project No. 18391