HomeMy Public PortalAboutCosts" City of McCall OFFICE OF THE CLERK BOX 1065 MCCALL, IDAHO 83638 December 20, 1993 Judd DeBoer Brown's Industries 101 S. Capitol Blvd. Suite 1203 Boise, ID 83702 Dear Judd, This letter is to advise you that the water line extension from Jacob St. through the GTE yard and connecting and looping that line with the airport water line has been completed. In addition, the city elected to install a line along Highway 55 to Jacob St., which further improves the network in that area. This installation was completed pursuant to the Development agreement addressing Payette Lakes Commercial Center, reference Section 4.04. While not explicit in the terms of that agreement, our subsequent agreement was that the city would undertake the highway crossing and that your effort stopped short of the highway. Our project extended this line across the entire Highway 55 right-of-way. I believe we agreed that it was easier for the city to secure the highway crossing permit from the state. My understanding was that you agreed to reimburse the city the costs of the line to the highway centerline as the agreement anticipates. We received excellent bids on the project and the extended fall allowed for the line completion before snowfall. Only some surface restoration remains to be completed next spring. We believe that this fully satisfies the City of McCall's obligations pursuant to this agreement. Toothman-Orton has prepared the attached cost summary for your share of the work. If you have questions about the calculations, please call. If this cost appears reasonable, please remit to the City the amount shown. Best wishes for pleasant holidays! Sincerely, Arthur J. Schmidt, City Administrator cc City Treasurer Mayor and City Council TOOTHMAN-ORTON ENGINEERING COMPANY CONSULTING ENGINEERS, SURVEYORS AND PLANNERS McCALL AIR TAXI BUILDING P.O. BOX 4240 McCALL, IDAHO 83638-4240 208-634-4863 • FAX 208-634-4951 December 17, 1993 Mr. Bud Schmidt City Administrator City of McCall P.O. Box 1065 McCall, Idaho 83638 RF: Breakdown of Highway 55 Waterline Costs Dear Bud, Attached is the cost breakdown you requested for the highway crossing and connection to the existing main for the Highway 55 - Jacob St. to Deinhard water system improvements. The costs consist of half of the cost of the highway crossing, including material, construction and engineering costs. The other items are the cost of the preparation of the Highway Crossing Permit and the material, construction and engineering cost for the connection to the existing main at Jacob St. Please let me know if you have any questions. Sincerly, TOOTHMAN-ORTON ENGINEERING COMPANY --L e:A--6 e Kimberly Allen, P.E. cc: Barry Semple - T-O Rich Kinder - T-O BOISE • McCALL, IDAHO HIGHWAY 55 WATERLINE - DEINHARD TO JACOB ST. COST BREAKDOWN 1. Half of the crossing of Highway 55 a. Half of the bore crossing 25 1.f. @ $130/1.f. b. Half of the engineering design for the highway crossing 2 hrs @ $53/hr c. Half of the construction inspection and construction management of the highway crossing 2 hrs @ $53/hr d. Half of computer time for design of highway crossing 4 hrs @ $10/hr $3250 $106 $106 $40 TOTAL $3502 2. Preparation of Highway Crossing Permit Technician: 3 hrs @ $45/hr Engineer: 2 hrs @ $53/hr $135 $106 TOTAL $241 3. Connection to existing main at Jacob St. a. Connect to existing main $1500 b. 10 1.f. 8" waterline @ $23.50/1.f. $235 c. 2 - 8" Gate Valves @ $400/ea $800 d. 2 - 8" Bends @ $100/ea $200 e. 1 - 8" Tee @ $200/ea $200 f. Engineering design and construction inspection 4 hrs @ $53/hr $212 TOTAL TOTAL ALL ITEMS $2935 $6890