Loading...
HomeMy Public PortalAboutLetter- Water Syst ImprovBROWN'S INDUSTRIES, INC. 101 S. Capitol Blvd., Suite 1203 Boise, Idaho 83702 November 10, 1992 City of McCall Arthur J. Schmidt City Administrator Box 1065 McCall, Idaho 83638 Dear Bud: Telephone: (208) 342-7883 In accordance with the Subdivision Agreement between Brown's Industries, Inc. and the City of McCall, the water system improvements under Section 4.04 A have been completed except for the crossing of Highway 55. Brown's Industries, Inc. will pay for the cost of installing the water system to the center of Highway 55 when the City of McCall installs the water line from the Airport to center of Highway 55. Attached is a letter from J-U-B Engineers, Inc. stating the water system has been installed in accordance with the approved plans and specifications. Brown's Industies, Inc. will provide the City of McCall the as built drawings as soon as they are completed and will grant the City of McCall an easement for the water line if needed. Brown's Industries, Inc. dedicates the water line to the City of McCall's water system for the perpetual ownership and maintenance of the water system by the City of McCall. If you have any questions, please call me at 342-7883. Sincerely, ..t_____, DeBoer, President Ale,""(0.; ‘e-ee41 J-U-B ENGINEERS, Inc. ENGINEERS • SURVEYORS • PLANNERS 250 S. Beechwood Avenue, Suite 201 Boise, ID 83709-0944 208/376-7330 FAX: 208/323-9336 November 10, 1992 Mr. Judd W. DeBoer, President Brown's Industries, Inc. 101 S. Capitol Blvd., Suite 1818 Boise, ID 83702 Re: PAYETTE LAKES COMMERCIAL CENTER Commercial/Industrial Subdivision —McCall, Idaho Dear Mr. DeBoer: Per our Engineering Services Agreement, J-U-B ENGINEERS, Inc., has performed the necessary Construction Observation Services for the installation of the domestic water main, gravity sewer main and pressure sewer main for the above -referenced project. At this time, we can inform you that the domestic waterline installation is complete, in accordance with the approved plans and specifications. The waterline has been installed, backfilled, flushed, disinfected, pressure tested and water samples taken in accordance with said specifications. We have verbal confirmation from Alchem Laboratory in Boise, Idaho, that the water sample taken from the new water main meets current water quality standards. A copy of these results will be forwarded to you as soon as they are received. The sanitary sewer has not been completed as of this date. Therefore, a separate letter will be delivered to you upon its completion. In addition, we will incorporate the necessary record drawing information as will be supplied by your surveyor, Kerr Surveying. If you require additional information or if you have any questions, please call. Sincerely, J-U-B ENGINEERS, Inc. Gary A. Lee, GAL:ls cc: Arthur J. "Bud" Schmidt, City of McCall Project No. 18391