As project manager and representative for the City of McCall I thank you for the
approval of our Nationwide Permit. I believe the plan will allow us to improve the natural
environment as well as to provide an enhanced golf course for the citizens and visitors of
McCall. Our policy will be to fully comply with the conditions listed in the letter dated
May 10, 2002. Below are the details for the project.
a. Mitigation shall be constructed concurrent with project construction. Most
mitigated areas will be developed with priority over fill areas. Mitigated areas
will have sod stripped and the topsoil removed and stockpiled for redistribution if
needed. Concurrently, excavation of approximately 6-12 inches of existing
wetland soil and vegetation will be completed and stockpiled for redistribution
over the mitigated areas.
b. Attached are drawings showing mitigated areas in red and fill areas in green.
Each mitigated area has a base elevation and each fill area has a top base
elevation. Pond expansion in figure 3, 3A will have a depth of 8 feet and will also
serve as additional water supply for the golf course. The ponds will be filled with
golf course wells and flows through surrounding wetlands during spring thaws.
c. All mitigated areas will have redistributed wetland soil and vegetation from fill
areas. Additional vegetation will be added if needed and will be selected from the
plant list provided by Secesh Engeneering in the permit application. Jim Fronk
from Secesh Engineering will help monitor and inspect the construction of the
mitigation and fill areas as conforming to specifications. Signage will be used to
warn golfers to not enter mitigated areas. All mitigated areas will have a
surrounding buffer zone used to prevent contamination of fertilizer and chemicals
and leaching into wetland areas. The city will keep the wetland areas charged with
flow from properly constructed grades allowing hydrology to work as described
in the permit drawings. Wetland areas will be filled with overflow from several
ponds throughout the golf course. The ponds are filled with golf course wells.
Weeds will be controlled by hand removal or careful spot spray treatments.
Additional irrigation from the golf course irrigation system will be used during
establishment if needed. Wildlife habitat will be encouraged in mitigated areas.
d. The city of McCall will provide a monitoring report for the entire growing season
and to be completed by December 31 of each year.
216 East Park Street • McCall, Idaho 83638 • (208) 634-7142 • FAX (208) 634-3038
CITY OF MCCALL
Attached are permitted plans, survey results and plans with base elevation only.
Jim Fronk, from Secesh Engineering has reviewed this plan and has met with me
to discuss pre construction items and to clarify any questions. I am looking
forward to successful completion of this project.
Singly,
Dan Pillard, CGCS, CA
Director of Golf and Parks Operations
Cc Jim Fronk, Secesh Engineering
Robert Strope, City Manager
216 East Park Street • McCall, Idaho 83638 • (208) 634-7142 • FAX (208) 634-3038
PERMITTED PLANS
NOT TO SCALE
FIGURE 1
McCALL MUNICIPAL GOLF COURSE
NTTnroMITV 1rAT�
SECESH ENGINEERING, INC.
335 DEINHARD LANE, SUITE 1
MoCALL, IDAHO 83638
208-634-6336
0
FIGURE 2
McCALL MUNICIPAL GOLF COURSE
INDEX SHEET
SCALE: 1" = 400'
■ WETLAND IMPACT
WETLAND MITIGATION
D(ISTING WETLANDS
SECESH ENGINEERING, INC.
335 DEINHARD LANE, SUITE 1
McCALL,.IDAHO 83638
208-634-6336
BASELINE PHOTO
POINT - WETLAND
DELINEATION CROSS
SECTION
SUPPLIMENTAL
HYDROLOGY
FAIRWAY
FIGURE 3
WETLAND MITIGATION
,/
WETLAND MITIGATIOR
0.19 AC. \SUPPLIMENTAL
„HYDROLOGY
EXPAND POND
ETLAND MITIG
.L
WETLAND MITIGATION
0.45 AC.
SUPPLIMENTAL
HYDROLOGY
PROPERTY LINE
WETLAND MITIGATION
EXISTING WETLANDS
EXISTING
WETLANDS
SCALE: 1 "=100'
SECESH ENGINEERING, INC.
335 DEINHARD LANE, SUITE 1
McCALL, IDAHO 83638
208-634=6336
BASELINE PHOTO
POINT -- WETLAND
DELINEATION CROSS
SECTION
SUPPLIMENTAL
HYDROLOGY
FAIRWAY
SCALE: 1 "= 50'
lS vrG
WETLAND
0.45 AC.
SUPPLIM
OLt
di • 4.75
1 A
cry et r• 1 50'
..."7".
WETLAND MITIGATION.
0.19 AC. `SU
•,HY
Fac,ee... 38
BASELINE PHOTO
POINT -- WETLAND
DELINEATION CROSS
SECTION
SUPPUMENTAL
HYDROLOGY
FAIRWAY
SCALE: 1 "= 50'
Fij•ure_ 3C
71,2 I345c.
WETLAND
0.45 AC.
SUPPLIM
HYDROU
7r Ba.rL
3 4 Sc. E te iw�l osi.S
_ _ _ _ EXISTING
- - - -WETLANDS -
--.K...._____
PROPERTY TINE
FIGURE 4
WETLAND IMPACTS
PROPERTY LINE
WETLAND IMPACT
WETLAND MITIGATION
EXISTING WETLANDS
0.06 AC
iirii
EXISTING POND
SECESH ENGINEERING, INC.
335 DEINHARD LANE, SUITE 1
McCALL, IDAHO 83638
208-634-6336
ND
w
tug _
G•6o
_IIWIWW,
Nr'
"�1+w� r ""rir iM/MMM1r� tiidrMMM yM wl
•IWIr
ELAND IMPACT
5 AC
y.fz
T'f7P 134°sue -
7, 2
•11
11Pr11g1
A 1111•11+
r
. ci•ai
To/0 eu)t -
0.06
��. . -
W E T L A N D M I T I G A T I O N
0 . 5
U P P L I M E N T A L H Y D R O L O G Y
I G U R E 5
V E T L A N D M I T I G A T I O N
t i w
W E T L A N D I M P A C T
W E T L A N D M I T I G A T I O N
S U P P L I M E N T A L H Y D R O L O G Y
F - 1 E X I S T I N G W E T L A N D S S C A L E : i � = 1 0 0 '