~l\e£5aluttün üf tIp' ~ürült.gIT of QIlXd ref, ~. ].
O_~Z6-º--
-
Date 01 Adoption---ª-..eptember _21, 2006
AUTHOIUZING A PROFESSIONAL SERVICES CONTR~ CT WITI!
CME ASSOCIATES FOR DI'W SITE PROJECT
vVHEREAS, the Borough of Carteret is in need of specialized Cl gineering and
cnvironJl1ental engineering services In connection with comp etion of the
environmcntal remediation work, preparation of revisions to tl1 construction
plans and for construction administration services for the site i01 'ovements for
the DPW Site Project; and
\VHERF,AS, CME Associates, 1460 Route 9 South, Howell, New ersey, 07731,
possesses the requisite experience and expertise to provide said serv ces; and
\VIlEREAS, CME Associates has submitted a proposal to provid said services
at a total cost not to exceed $85,200; and
'VI-IEREAS, the ìvfayOl and Council of the Borough of Carteret ave revÎc\ved
said proposal; and
'VHEREAS, the Chief Financial Officer has cCI1ified that funds re or wil! be
available for said pUl1Jose.
NO'V, THEREFORE, DE IT RESOLVED by the Mayor and ouncit of the
Borough ofCarteret, County of Middlesex, State of New Jersey, as allows':
1. The proposal from CME Associates for spcciahzed e meenng and
environmental engineering services related to the com Jetion of the
environmental remediation work, preparatlOn of re slons to the
construction plans and for construction administration s rvices' for the
site improvements for the DP\V Site Project, at a tot 1 cost: not to
exceed $85,200 is hereby approved;
II
II
II
2. This action is approved as an award of a professional SCI ices contract
pursu3.nt to NJ.S.A 40A:l1-S(I)(a).
3. A copy of this Resolution he forwarded to the Borough's Purch~sillg
Department and CME Associates.
Adopted this 21 It day of Septe! 1ber, 2006
and certified as a true copy of he original 011
September 22nd, 2006.
KATHLEEN M. BARNEY, F MCICMê---
Municipal Clerk
1-
A
-
-----
----
.--
ES
NO
NV
A.B.
-
RECORD OF COUNCIL VOTE
NO NV A.B. COUNCIUvlÂN
X_ c--- NAI'LES
_+ RIOS
± __ SITARZ
.-
X
X
L- __~~~ic~le Yore AS - Absent NV Not Voting XOR ·nLlicaln Vot~ to ( verruk Veto
-
--
COUNCIrJ\fAN
YES
_~ELLI!I-º-
DIAZ
--,,--.
KRUM
---,--
X
X
--
--
C----__ ___
Adopted at a meeting of the Muni":lpal Council
/
Septem er 21, 2006
'AAAc2 /:;z:;¡;:..
\
--
tlERK
-
"'}
o
-
~.~
JOHN H. ALLGAIR, P.E-, P.P. (19S3-2001)
DAVID J. SAMUEL, P.E., P.P
JOHN J. STEFANI, PE., L.S., PoP
JAY B. CORNELL, P.E., P.P.
MICHAEL J. McCLELLAND. P.E., P.P.
GREGORY A. VALESI, P.E., PoP
TIMOTHY W. GILLEN, P.E., P.P.
BRUCE M. KOCH, P.E.. PP.
ERNEST J. PETERS. JR, P.E., P,P
September 11 2006
Mayor Daniel Reiman
Borough of Carteret
Municipal Building
61 Cooke Avenue
Carteret, NJ 07008
Re: Proposal for Professional Engineering
and Environmental Engineering Services
for the Carleret DPW Project
Our File No. HCA00500-01
Proposal No.: 2006-161
Dear Mayor Reiman:
We are pleased to have the opportunity to present 0 r pr\:>posal for professional
engineering and environmental engineering services for the abol.ie·referenced project.
It is our understanding that the Borough requires additio al s~rvices to complete the
environmental remediation work, prepare revisions to he cþnstruction plans, and
provide construction administration services for the site imp ove~ents.
With this in mind we offer the following scope of services:
Construction Plan Revisions
As per our recent discussions with the Borough, our offic will I revise the construction
plans as follows:
1. Review the effect of the contaminated soil plume a
Investigation Report
2. Revise the water and sanitary sewer alignments
3. Relocate the truck wash location to the area in front
PROPICA 500-01 9-8-06.doc
delineated in the Remedial
/
f the pump statio~filding
/
CONSUlllNGHID MJIIICPAl ~
1460 AOUTE 9 SOUTH, HOWEll. NEW JERSEY 07731 - (732) 462-7400 FAX: (732) 409-0756
@
Mayor Daniel Reiman
Re: Proposal for Professional Engineering and
Environmental Engineering Services for
The Carteret DPW Project
Utilitv Coordination
September 11, 2006
Proposal No. 2006·161
HCA00500-01
Page 2
As requested by the Borough, our office will coordinat the! utility services for the
following:
1. Telephone - Verizon
2. Electric - PSE & G
3. Cable Television - Cablevision
4. Gas - PSE & G
5. Water - Middlesex Water Company
The work will include contacting the utilities for services, pr paration and coordination of
service applications, attending field meetings as req ired Iwith the utilities, and
coordination during construction.
Fuelinq Station Relocation Coordination
As requested by the Borough, our office will coordinate e rdlocation of the existing
fueling station at the existing DPW yard to the new site. T is will include contacting the
tank and system manufacturer, planning temporary servic an~ telemetry as required,
coordinating final service and telemetry within the propos d building, and coordinating
the relocation of the above ground tank to the new DPW ya d. '
Bui/dinq Stakeout
Work under this phase is complete at this time and include sta~ing out the building for
the Contractor as requested by the Borough. The work als incl~ded preparation of cut
sheets for the Contractor.
Pre are Contract Documents for Remedial Action Work Plan RAWP Contract
It is our understanding that the Borough desires to publicly bid the work included in the
Remedial Action Work Plan prepared by our office. Wo k in this phase will include
preparation of contract documents, including specification and construction plans, to
publicly bid the proposed work consisting of the removal of he ekisting soil, observation
of the groundwater monitoring wells, and all other relate wor~. Also, our office will
provide the Borough with a final construction cost estimate f r thel remediation work.
PROPICA 500-01 9-8-QS.doc
@
Mayor Daniel Reiman
Re: Proposal for Professional Engineering and
Environmental Engineering Services for
The Carteret DPW Project
September 11, 2006
Proposal No. 2006-161
HCA00500-01
Page 3
Obtain Interim Tidelands License
The NJDEP has requested that the Borough obtain an int rim ti~elands license from the
Bureau of Tidelands in the event that the Tidelands G ant~ not obtained prior to
commencing the site work. As the Department has not y t iss ed the Tidelands Grant,
the work under this phase will include preparation of th ne ssary applications and
paper work to obtain the interim license. '
¡
Geotechnical Services I
I
Work under this phase is complete at this time and incl~ded providing on site
engineering services during the over excavation of the e istin~ subgrade soils located
within the building footprint to ensure that the subgrade as *ceptable for backfilling
prior to construction of the building footing. I
¡
I
¡
Bid Phase Services
I
It is our understanding that the Borough desires to publici bid the work included in the
Remedial Action Work Plan prepared by our office. I
Work in this phase will provide the following services to pu licly ~id the work proposed in
the Remedial Action Work Plan: I
¡
I
1. Provide Bid Documents to Prospective Bidders as n ede~
2. Answer Prospective Bidder's Request for Informatio I
3. Provide Addenda for Clarification of Project Specific tion~
4. Attend Bid Opening I
5. Analyze Responsible Bids and Recommend Contra t Aw~rd
6. Coordinate with the Borough as needed
PROP\CA 500-01 9-B-06.doc
@
Mayor Daniel Reiman
Re: Proposal for Professional Engineering and
Environmental Engineering Services for
The Carteret DPW Project
Contract Administration Services - RAWP
September 11, 2006
Proposal No. 2006-161
HCA00500-01
Page 4
Background
Our office has prepared a Remedial Action Workplan ( wlI» for areas of concern
AOC-1 and AOC-3/AOC-5 at the site (September 20 6). "I The RAWP proposes
excavation of contaminated soil in both areas of concern, nd b ckfilling with clean soil.
Excess excavation water will be pumped to a holding t nk a d later disposed at an
appropriate offsite facility. The contaminated soil will be temp rarily stockpiled onsite
pending disposal at an appropriate offsite facility. Post-e cava ion soil samples will be
collected to confirm that the remaining soil is in complianc with he NJDEP soil cleanup
criteria. The RAW also proposes to abandon one existing well~hat will be disrupted by
the excavation, and to install three additional shallow (15 feet) monitoring wells. Two
post-remedial rounds of groundwater monitoring will be pe orm d, including sampling of
eight onsite wells. I
It is our understanding that the Borough plans to com men e thj project prior to NJDEP
approval of the RAWP. The Borough will thus proceed wit the isk that modifications to
the RAWP may be required pursuant to the NJDEP review.
!
A contractor will be retained to perform the remediation. Th wo k in this phase includes
oversight of the field activities, preparation of a remedial ac ion r port, and post-remedial
groundwater monitoring.
Scope of Work
Task 1: Field Oversiqht
Site remediation work will be performed by the remediati n c ntractor in accordance
with contract documents prepared by our office. CME will cordi ate with the contractor
to ensure the work is performed in accordance with the P. A licensed Subsurface
Evaluator will be provided to direct the soil excavation activi es, rform dust monitoring,
screen soils, and collect post-excavation soil samples. It is assu ed that the field work
will be completed in a maximum of 4 work days. Post-ex avati n soil samples will be
analyzed for potential contaminants in a New Jersey certifi d lab ratory. Samples from
AOC-1 will be analyzed for Total Petroleum Hydrocarbo s ( PH) and semi-volatile
organic compounds (PAH). Samples from AOC-3/AOC-5 ill b analyzed for lead and
volatile organic compounds (VO+10). Note that soil and aste classification sampling
are not included in this scope of work, but will be pe orm d by the remediation
contractor.
PROPICA 500-01 9-8-06.doc
@
-
Mayor Daniel Reiman
Re: Proposal for Professional Engineering and
Environmental Engineering Services for
The Carteret DPW Project
September 11, 2006
Proposal No. 2006·161
HCA00500-01
Page 5
Our office will also provide oversight of post-remedial m nito~ng well installation. In
addition, the wells will be survey located and Form A an Fo B will be completed.
Note that the actual well installations are not included in t is s pe of work, but will be
specified in the contract documents for the site remediatio wor to be performed by the
remediation contractor. I
Task 2: Remedial Action Report
We will prepare a Remedial Action Report in acco dan with the Technical
Requirements for Site Remediation (NJAC 7:26E-6.7). Th report will include a
summary of contamination in each area of concern, a escri tion of the completed
remedial activities, the results of post-excavation sampli an a comparison to the
remedial goals, and a description of site restoration. A prop iate documentation for
offsite transport of waste material as well as a clean fill certi catio will be included in the
report. The report will include drawings delineating the e ent of soil excavation and
backfill.
Task 3: Groundwater Monitorinq
Two (2) rounds of post-remedial groundwater samples will e col ected at approximately
one-month and two-months following completion of the s il re edial action. In each
round, our office will sample eight (8) onsite wells. Two 2) fi Id days per round are
anticipated to collect the well samples in accordance with the JDEP Field Sampling
Procedures Manual (August 2005). All samples will be eliv red to a New Jersey
certified laboratory for analysis of potential contaminants. amp es from AOC-1 will be
analyzed for volatile (VO+10) and semi-volatile (BN+15) or anic ompounds. Samples
from AOC-3/AOC-5 will be analyzed for lead and VO+10 incl din MTBE and TBA. This
task also includes offsite disposal of drummed waste w ter enerated during well
purging during the two monitoring rounds. Previously gen ated waste water currently
stored in drums on site will be disposed by the remediation c ntra~or in accordance with
the contract documents. At the end of the second monitori g ro nd, we will prepare a
single posHemedial groundwater investigation report for s bmilt I to the NJDEP case
manager.
PROP\CA 500-01 9-8-0e.doc
@
-
Mayor Daniel Reiman
Re: Proposal for Professional Engineering and
Environmental Engineering Services for
The Carteret DPW Project
September 11, 2006
Proposal No. 2006-161
HCA00500-01
Page 6
Contract Administration Services - Site Work
Contract Administration Services for the site work curr ntly ~ommenced by Atlantic
Realty shall include the following services:
1. Shop drawing review
2. Daily site observation
3. Field meetings
4. Preparation of punch lists
5. Project Close-out
Fee Estimate
1. Construction Plan Revisions (Not to exceed) ................. .......;................... $4,000.00
2. Utility Coordination (Not to exceed) ................................ .......J................... $9,600.00
3. Fueling Station Relocation Coordination (Not to Exceed .......:................... $2,900.00
4. Building Stakeout (Complete - Not to Exceed)............... .......~................... $2,700.00
5. Prepare Contract Documents for RAWP Contract (Not t Exc$ed)............. $4,300.00
6. Obtain Interim Tideland License (Not to Exceed) ........... ........¡.................. $4,500.00
7. Geotechnical Services (Complete - Not to Exceed) ....... ........i...................... $900.00
8. Bid Phase Services (Not to exceed) ............................... ........1................... $3,400.
9. Contract Administration Services - RAWP (Budget) ....... ........1..................$3 .00
10. Contract Administration Services - Site Work (Budget).. ......).............. 0,000.00
Total Fee Esti ate.f........~
¡ ~ <?5: :;$>. ro
Proiect Schedule
CME would expect to start work immediately upon your acc Ptan~e of this proposal.
PRO PICA 500-01 9-B-06.doc
@
Mayor Daniel Reiman
Re: Proposal for Professional Engineering and
Environmental Engineering Services for
The Carteret DPW Project
September 11, 2006
Proposal No. 2006-161
HCA00500-01
Page 7
Excentions
·
This scope of work does not include tasks or costs for soil cPr water waste sampling
and classification, soil disposal, disposal of excavation atet. or well installation and
abandonment.
·
This scope of work and budget does not include se
additional requirements that might be imposed by the
of the Remedial Action Report.
Printing costs will be invoiced in accordance with the all che~ rate schedule.
Any environmental permitting beyond the scope oullin d a~ove will be considered
extra. Said fees will be based on the hourly rate or a fi ed fe!e mutually agreed upon
writing.
ices lor costs related to any
JDE1p in their official review
,
·
·
The above-quoted fees will be in effect for a period of twel~ (12) months from the
date of this proposal; however, the fees on the hourly rate !;chedule are subject to
change by January 1 of each year.
Should you accept our fee estimate, kindly provide a pu chas~ order or professional
services resolution authorizing same.
·
We would like to thank you for allowing us to present this ropqsal and look forward to
continue working with you in providing the professional servl es yfou require.
GRVm
PROP\CA 500-01 9-8-06.doc
@
09/20/2006 14:31 FAX 732 541 8925
BORO OF CARTERET C RK
~001
***~$*********2$****$
$.$ TX REI'ORT $$.
*****~***************
TRANSMISSION OK
TX/RX :'10
CONNECTION TEL
CONNECTION TD
ST. TIllE
USAGE T
PGS. SENT
RESULT
4511
732541 884
09/20 14: 30
00'56
2
OK
~,..
,~ ,~
. '.
~
lß.nrnugl¡ .af C1I r±ære±
MrDDlESEJI; COu
~.b 'JIm."".
.
QF":PCCJ; OF'
!C.I.1'HLEEN iII. ¡;¡-'RNEY. RMC/CMC
il'lUNJ:CIPAl.. CLEJU;:
D t.~
9-20-06
TO: Pat,i~k DeBlasio.
TI'ee.su'(er
Borough of Carterat
REQUEST FOR CERTIFICATION OF AVAILAB
Far: A PROFESSIONAL SERVICES CON
FOR DPW SIn: PROJECT.
E FUNDS:
Act WITH CME ASSOCIATES
AMO~T TO BE ENCUMBERED ~
nt
85 200.00
Name of Ao~ount:
KA HLE N M. BARNEY.
M.u iciþal Clerk
-~---~-------------~~--------------
~-------------~-------
CERTIFICATION OF. AVAIL
ILIT! OF FUNDS
t. do hereby certify that
n the' current budget ta
ize the entering 1nto e
ct' and:
I, Treasurer of the Borough of Cnrter
there are suffici"-nt funds avail.able
enable che Municipal Council to nutho
Contract bet~een the 8orough of Cart"-
The fUnds available ,far this contract are in the Budge.t, in the
account ~f: