HomeMy Public PortalAbout2017-27 Awarding and approving a contract for Emergency Disaster Debris Removal and Response Services to AshBritt and Bergeron ERESOLUTION NO. 2017-27
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA, AWARDING AND
APPROVING A CONTRACT FOR EMERGENCY DISASTER
DEBRIS REMOVAL AND RESPONSE SERVICES;
PROVIDING FOR AUTHORIZATION; PROVIDING FOR
IMPLEMENTATION; AND PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, on May 12, 2017, the Village of Key Biscayne ("Village") issued a Request
for Proposals ("RFP No. 2017 -05 -12 -DR") for Emergency Disaster Debris Removal and Emergency
Response Services to select the primary contractor as AshBritt and the secondary contractor
Bergeron Emergency Services for the removal and disposal of storm -generated debris within the
Village ("Project"); and
WHEREAS, in response to the Request for Proposals, the Village received proposals; and
WHEREAS, after careful review and consideration of the proposals, the Village Manager
recommends the awarding of the contract for the Project to AshBritt Environmental and Bergeron
Emergency Services ("Contractors") as the responsible, responsive bidder, based on unit prices for
basic services provided in Exhibits"A" and "B"; and
WHEREAS, the Village Council finds that the adoption of this Resolution is in the best
interest and welfare of the residents of the Village.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA AS FOLLOWS:
Section 1. Recitals. That each of the above -stated recitals are hereby adopted,
confirmed, and incorporated herein.
Section 2. Award of Contract for Emergency Disaster Debris Removal and
Emergency Response Services.
That the award of the contract for the Project to Contractors
pursuant to the Request for Proposals is approved.
Section 3. Authorization. The Village Council hereby authorizes the Village Manager
to execute a contract consistent with the Contractor's Proposal attached hereto as Exhibits "A" and
"B" and execute any related or necessary documentation on behalf of the Village, subject to approval
by the Village Attorney as to form, content, and legal sufficiency.
Section 4. Implementation. The Village Council hereby authorizes the Village Manager
to take any and all action which is reasonably necessary to implement the purpose of this Resolution.
Section 5. Effective Date. This Resolution shall be effective immediately upon
adoption.
PASSED and ADOPTED this 13th day of June, 2017.
14,/(eq,
CONCHITA H. ALVAREZ, MMC, VILLAGE CLERK
APPROVED AS TO FORM AND
LEGAL SUFFICIENCY
17-
-VILLAGE ATTORNEY
2
i /lc
AYRrA RA PENA LINP A
EXHIBIT "A"
(Price Proposal)
AStIBRITT I''C. RESPONSE TO THE VILLAGE OF KEY BISCAVNE, FL
RFP #2017-05-12 FOR ENIERGENCV DISASTER DEBRIS REMOVAL SERVICES
TAB 10. Pricing
** Please see the following pages for AshBritt's Pricing **
Ash
136 Pricing
PART IV PRICE PROPOSAL
PRICE PROPOSAL: The Proposer shall provide the hourly rates, unit prices, and equipment
rates requested below and on Attachments A and B, respectively. These prices and rates
shall be all inclusive of labor, equipment, maintenance, fuel, delivery costs, travel time, per
diem and any other travel or miscellaneous expenses.
DEBRIS REMOVAL HOURLY RATES:
Project Director
Operations Managers
Crew Foreman
Skilled Sawman
Tree Climber
Administrative Staff
$ 95.00 per hour
$ 75.00 per hour
$ 50.00 per hour
$ 65.00 per hour
$ 85.00 per hour
$ 35.00 per hour
EMERGENCY RESPONSE SERVICES HOURLY RATES:
Program Manager
Public Assistance Specialist
Grant Specialist
Planning Specialist
Administrative Support Specialist
$ 85.00
$ 105.00
/hr.
/hr.
$ 85.00 /hr.
$ 65.00 /hr.
$ 45.00 /hr.
The undersigned attests to his/her authority to submit this proposal and to bind the firm
herein named to perform as per contract, if the firm is awarded the agreement by the Village.
The undersigned further certifies that he/she has read the Request for Proposal and Super
Circular Laws and Appendices (Attachment C) relating to this request and this proposal is
submitted with full knowledge and understanding of the requirements and time constraints
noted herein.
By signing this form, the proposer hereby declares that this proposal is made without
collusion with any other person or entity submitting a proposal pursuant to this RFP.
AshBritt, Inc.
Firm Name
Randal Perkins Chairman
Name of I
Signature of Individual Binding Firm
Firm Mailing Address and Phone Number:
565 E Hillsboro Blvd
Deerfield Beach, FL 33441
Village of Key Biscayne, Florida
RFP for Emergency Disaster Debris Removal, No. 2017-05-12 Page 17
ATTACHMENT A
Task and Unit Fee Schedule Revised
Item / Description Unit Unit Price
1. Loading and Hauling Debris from Public Property
and Rights -of -Way to a Temporary Debris Staging
and Reduction Site Cubic Yard $ 8.95
2. Loading and Hauling Debris from Public Property
and Rights -of -Way to a Final Disposal Site Cubic Yard $ 24.50
3. Management and Operation of a Temporary
Debris Staging and Reduction Site
4. Debris Reduction by Chipping/Grinding
5. Freon Management and Recycling
a. White goods removal from Right-of-way to DMS
Cubic Yard $ 2.95
Cubic Yard $ 1.50
Per Unit $ 45.00
Per Unit $ 45.00
6. Animal Carcass Collection, Hauling, and
Final Disposal Pound $ 3.95
7. Loading and Hauling Debris Reduction
By -Products to a Final Disposal Site Cubic Yard $ 15.95
8. Loading and Hauling Household Hazardous
Waste to a Final Disposal Site
9. Hazardous Stump Removal, Loading and
Hauling to a Temporary Debris Staging and Reduction
Site
Pound $ 30.00
A. 24 inch to 35.99 inch diameter Each $ 85.00
B. 36 inch to 47.99 inch diameter Each $ 115.00
C. 48 inch and larger diameter Each $ 195.00
10. Clean, Fill Dirt Cubic Yard $ 15.00
11. Set up Mobile Command Center/Temporary office
Each $ 0.00
12. Commissary Services- Breakfast
Tier One: 100 people or less Each $ 21.58
Tier Two: 200 people Each $ 20.74
Tier Three: 300 people Each $ 20.28
13. Commissary Services- Lunch
Tier One: 100 people or less Each $ 20.02
Tier Two: 200 people Each $ 19.44
Tier Three: 300 people Each $ 18.72
14. Commissary Services- Dinner
Tier One: 100 people or less Each $ 32.50
Tier Two: 200 people Each $ 31.85
Tier Three: 300 people Each $ 31.20
Additional Items
15. Removal of hazardous stump from ROW or public property and
transportation to DMS. 24" to 36" diameter.
24" to 36" diameter
Greater than 36" to 48" diameter
Greater than 48" diameter
16. Backfill - supply and placement of clean fill dirt into holes
created by stump removal in the ROW.
17. Removal of hazardous trees (LEANERS OR DAMAGED) from
ROW or public property. Debris shall be place on ROW for
collection under the terms and conditions of Scope, trunk
measured at 4.5' Diameter breast height (DBH).
6" to 12" trunk DBH
Greater than 12" to 24" trunk DBH
Greater than 24" to 36" trunk DBH
Greater than 36" to 48" trunk DBH
Greater than 48" trunk DBH
18. Removal of hazardous hanging limbs (Hangers) from limbs
hanging over ROW or public property. 2" or greater at break
EACH $ 100.00
EACH $ 125.00
EACH $ 195.00
CUBIC YARD $ 20.00
EACH $ 10.00
EACH $ 95.00
EACH $ 150.00
EACH $ 225.00
EACH $ 250.00
$
PER TREE 95.00
ATTACHMENT B
Equipment Rates Revised
Item / Description - or equivalent
JD 544 Wheel Loader with debris grapple
JD 644 Wheel Loader with debris grapple
Extendaboom Forklift with debris grapple
753 Bobcat Skid Steer Loader with debris grapple
753 Bobcat Skid Steer Loader with bucket
30-50 HP Farm Tractor with box blade or rake
2 - 21/2 cu. yd. Articulated Loader with bucket
3 - 4 cu. yd. Articulated Loader with bucket
JD 648E Log Skidder, or equivalent
CAT D4 Dozer
CAT D5 Dozer
CAT D6 Dozer
CAT D7 Dozer
CAT D8 Dozer
CAT 125 - 140 HP Motor Grader
JD 690 Trackhoe with debris grapple
JD 690 Trackhoe with bucket & thumb
Hand -Fed Debris Chipper
300 - 400 HP Horizontal Grinder
800 - 1,000 HP Horizontal Grinder
30 Ton Crane
50 Ton Crane
100 Ton Crane (8 hour minimum)
40 - 60' Bucket Truck
Greater Than 60' Bucket Truck
Fuel / Service Truck
Water Truck
Hourly Price
$155.00
$155.00
$ 60.00
$105.00
$105.00
$35.00
$120.94
$138.68
$75.00
$86.10
$118.70
$131.61
$160.00
$180.00
$110.00
$120.00
$120.00
$25.00
$380.00
$425.00
$195.00
$275.00
$380.00
$132.81
$165.00
$90.00
$75.00
Item / Description - or equivalent (cone)
Portable Light Plant
Lowboy Trailer with Tractor
Flatbed Truck
Pick-up Truck (unmanned)
Self -Loading Dump Truck with debris grapple Single
Axle Dump Truck, 5 - 12 cu. yd.
Tandem Axle Dump Truck, 16 - 20 cu. yd.
Tandem Axle Dump Truck, 21 - 30 cu. yd.
Tandem Axle Dump Truck, 31 - 50 cu. yd.
Tandem Axle Dump Truck, 51 - 80 cu. yd.
Optional Services
Item / Description - or equivalent (cont.)
Temporary Office Trailer
Portable Toilets/Handwash stations
Temporary Shower Facilities
Temporary Dining Facilities
(Including lighting, tables and chairs for up to 300)
Emergency power generation
Hourly Price
$14.00
$65.00
$25.00
$14.00
$195.00
$50.00
$95.00
$97.50
$65.00
$65.00
per week $ See Attached Optional Services Schedule
per week $ See Attached Optional Services Schedule
per week $ See Attached Optional Services Schedule
per unit $ See Attached Optional Services Schedule
per day/per week $ See Attached Optional
Services Schedule
Notes:
Optional Services: See Additional Support Services for additional items and size/quantity discounts
Additional Support Services
Beach Restoration, Canal Work, Waterways & Sunken Vessel Removal
Beach/Lake Restoration
No.
M001
M002
M003
Description Unit
Collection of debris -laden sand from ROW, hauling to the processing screen and sand pile
maintenance. Up to 15 mile haul to screen. Debris from screen to be hauled by cubic yard Per Cubic Yard $18.50
debris rate in contract.
Berm/Beach Construction shall include transportation of screened sand to beach from
screening site, including shaping of material on emergency berm. To include stockpile Per Cubic Yard $25.50
maintenance. Up to 15 miles haul from screen.
Scrape and screen shall include the collection of debris laden sand from beach, processing
it through screen, returning sand to beach and spreading sand on beach. Work to be Per Cubic Yard $18.50
performed on beach.
Bank/Canal Work
No.
M004
M005a
M005a
M005a
M005b
Description
Bank/Canal Shoreline Restoration
Unit Price
Note: To include any necessary excavation, compaction, fill and backliill of embankment
soils and seeding, materials to restore banks to preexisting conditions insofar as possible.
Canal; Marine Debris Removal (Land Based)_/a [0-5 miles, one-way hauling]
[5.1-10 miles, one-way hauling]
[ 10.1 miles and greater, one-way hauling]
Canal/Marine Debris Removal (Marine Based)_/a [0-5 miles, one-way hauling]
[5.1-10 miles, one-way hauling]
[10.1 miles and greater, one-way hauling]
Per Linear Foot $32.50
Per Cubic Yard
Per Cubic Yard
Per Cubic Yard
Per Cubic Yard
Per Cubic Yard
Per Cubic Yard
Note: Removal of storm generated debris from marine environments including streams, canals, and waterfronts by
applicable land -based or marine -based processes.
a. Price negotiated for special circumstances for canal and marine debris removal (incident specific).
Culvert/Storm Sewer/Drainage Ditch Work
$42.50
$55.00
$75.00
$325.00
$425.00
$495.00
No.
Description Unit Price
M006
Round Culvert
M006a
Clean 21" & 24" Storm Sewer
Linear Foot
$31.18
M006b
Clean 27" & 30" Storm Sewer
Linear Foot
537.51
M006c
Clean 36" Storm Sewer
Linear Foot
$49.55
M006d
Clean 42" Storm Sewer
Linear Foot
$56.25
M006e
Clean 48" Storm Sewer
Linear Foot
$68.66
M006f
Clean 54" Storm Sewer
Linear Foot
$86.76
M006g
Clean 60" Storm Sewer
Linear Foot
$99.54
M006h
Clean 72" Storm Sewer
Linear Foot
5144.25
M007
Box Culverts
M007a
Clean 0 - 4 (Square Foot)
Linear Foot
$26.04
M007b
Clean 4.01 - 9 (Square Foot)
Linear Foot
$33.79
M007c
Clean 9.01 - 15 (Square Foot)
Linear Foot
$41.66
M007d
Clean 15.01 - 20 (Square Foot)
Linear Foot
$49.54
M007e
Clean 20.01 - 30 (Square Foot)
Linear Foot
$57.41
M007f
Clean 31.01 - 40 (Square Foot)
Linear Foot
$70.01
M007g
Clean 40.01 - 50 (Square Foot)
Linear Foot
$77.89
M007h
Clean 50.01 - 60 (Square Foot)
Linear Foot
$85.76
M0071
Clean 60.01 - 70 (Square Foot)
Linear Foot
$90.49
M007i
Clean greater than 70 (Square Foot)
Linear Foot
$96.79
M008
Clean and Clear Catch Basins and Inlets
M008a
4' x 4'
Each
$650.00
M008b
8' x 8'
Each
$L150.00
M008c
10' x 10'
Each
$L500.00
M008d
20' x 20'
Each
$3,750.00
M009
Clean Drainage Manholes
Each
$125.00
Derelict/Sunken Vessel Removal
No.
Description
Unit
Price
MO 10
Marine Salvage Operations
Per Linear Foot
M010a
Less than 20 feet
$215.00
M010b
20 to 25 feet
$250.00
M010c
25 to 30 feet
$375.00
MO I0d
Greater than 30 feet
By Case
MO 11
Land Based Salvage Operations
Per Linear Foot
MOl la
Less than 20 feet
$155.00
MO 11 b
20 to 25 feet
$225.00
M011c
25 to 30 feet
$325.00
MO l 1 d
Greater than 30 feet
By Case
Note: Large vessels, houseboats or vessels within environmentally sensitive areas may require unexpected additional
effort. Work may be negotiated on a case -by -case basis under such conditions.
•;Dote: Fuel surc Note: Fuel surcharges may apply (negotiable at time ofNTP).
Emergency Drinking Water, Ice Supply & Supplemental Foods Price Schedules
No.
Description
Unit
Price
1
Liter bottled water in cases (12 per case)
Per/Liter + freight
5 0.38
2
Liter bottled water in cases (12 per case)
Per/Case + freight
$ 4.58
3
Gallon bottled water in cases (4 per case)
Per/Gallon + freight
5 2.62
4
Galion bottled water in cases (4 per case)
Per/Case + freittht
$ 10.48
5
** Emergency Ice
Per/Pound + freight
$ 0.23
6
** Emergency Ice
Per/Bag + freight
$ 1.64
Addendum:
PRICES BASED ON A MINIMUM OF I TRUCKLOAD FOR BOTH BOTTLED WATER AND PACKAGED ICE. Freight is not included. Freight
will be determined at time of order based on distance from supplier to customer directed site of delivery.
*WATER PRICING EXCEPTIONS:
a) Contractor reserves the right to utilize a variety of PET water bottle sizes, based on availability and delivery times, in order to meet the contractual
requirement for the 1 Liter size requirement. Sizes and case count can vary between .5L and I.5L and will be based on availability of product in the
b) Price does not include freight. Freight pricing will be determined at time of purchase by distance from supplier to the initial destination identified in
the purchase order. Additional cost for onward mileage will be $6.00 per mile.
c) Client is responsible for unloading at staging areas for all trucks & trailers. Upon arrival at the initial destination as identified in the purchase order,
the truck will allow 2 "free" hours for unloading.
d) After the initial 2 hours, the truck will be compensated at 5164.82 per hour until it is fully unloaded and released.
e) The 2 free hours is only at the initial stop indicated in the purchase order. A fee of $164.82 per stop will be charged at each additional location.
0 Client will not be charged onward mileage and standby time concurrently. If the truck is moving, the onward mileage charge will apply; if the truck
is held at a site identified by the County, standby time will apply.
**ICE PRICING EXCEPTIONS:
a) Contractor reserves the right to utilize a variety of ice bag sizes in order to meet the contractual requirement for the 7# bag size requirement. Sizes
and count will vary from 8 pounds to 20 pounds based on availability and delivery times available at the time of order at the disaster area.
b) Price does not include freight. Freight pricing will be determined at time of purchase by distance from supplier to the initial destination identified in
the purchase order. Additional cost for onward mileage will be $6.00 per mile.
c) Client is responsible for unloading at staging areas for all trucks & trailers. Upon arrival at the initial destination as identified in the purchase order,
the truck will allow 2 "free" hours for unloading.
d) After the initial 2 hours, the truck will be compensated at $164.82 per hour until it is fully unloaded and released.
e) The 2 free hours is only at the initial stop indicated in the purchase order. A fee of $164.82 per stop will be charged at each additional location.
f) Client will not be charged onward mileage and standby time concurrently. If the truck is moving, the onward mileage charge will apply; if the truck
is held at a site identified by the County, standby time will apply.
g) Client will be responsible for the fuel for the packaged ice (refrigerated trailer fuel only while staged on stand by time).
Disaster Response Man Camps/Comfort Services Price Schedule
Total Personnel Base Camp All -Inclusive Occupied Pricing
NIMS
Camp
Capacity
Mobilization
Freight*
Mobilization
Labor
Weekly
Operations
PP/PD
Demobilization
Freight*
Demobilization
Labor
Tvpe
T
2000+
83 Truckloads
$1.046.976.00
$ 2.03 1,960.00
5145.14
83 Truckloads
$ 1,046,976.00
11
2000
83 Truckloads
$1,046.976.00
8 2,03 I ,960.00
$145.14
83 Truckloads
$ 1,046.976.00
III
15(10
64 Truckloads
$ 779.328 00
5 1,549,800.00
$147.60
64 Truckloads
$ 779,328 00
IV
1000
45 Truckloads
5 531360.00
$ 1,050.420.00
$150.06
45 Truckloads
$ 53L360.00
V
750
37 Truckloads
$ 409.344.00
$ 820.102.50
$156.21
37 Truckloads
5 409.344.00
VI
500
30 Truckloads
8 283.392,00
$ 568.260.00
8162.36
30 Truckloads
$ 283.392.00
VII
250
18 Truckloads
$ 177.120.00
5 350.857.50
$200.49
I8 Truckloads
$ 177,120.00
VIII
100
15 Truckloads
$ 70,848.00
8 195,447.00
$279.21
15 Truckloads
$ 70.848.00
*$6.00lmile/L.oad
Component Pricing
Kitchen/DFAC
*$4.00/mile/Load
NIMS
Camp
Capacity
Mobilization
Freight*
Mobilization
Labor
Weekly
Operations
PP/PD
Demobilization
Freight
Demobilization
Labor
Seating
Tvpe
I
2000+
12 Truckloads
$ 113:900.46
5 89,544.00
5 6.40
12 Truckloads
$ 113,900.46
1200
11
2000
12 Truckloads
5 113,900.46
$ 89,544.00
$ 6.40
12 Truckloads
$ 113,900.46
1200
Ill
1500
10 Truckloads
$ 105,182.22
$ 70,725.00
$ 6.74
10 Truckloads
$ 105,182.22
900
TV
1000
8 Truckloads
$ 71.156.73
8 61.992.00
$ 8.86
8 Truckloads
$ 71.156.73
600
V
750
7 Truckloads
$ 60,764.46
$ 53.597 25
$ 10.21
7 Truckloads
$ 60.764.46
450
VI
500
6 Truckloads
$ 52.779.30
5 37.884.00
$ 10.82
6 Truckloads
$ 52.779.30
300
VII
250
5 Truckloads
$ 45,192.66
$ 27,767.25
8 15.87
5 Truckloads
$ 45,192.66
150
VIII
100
4 Truckloads
$ 21,149.05
5 23,031.75
.$ 32.90
4 Truckloads
$ 21,199.05
60
Meal Service
Population
100-499
500 -20004 -
Meal
Meal Price
Nleal Price
Breakfast
$ 21.58
5
20.28
Lunch
$ 20.02
5
18.72
Dinner
5 32.50
5
31.20
Total PP/PD
$ 74.10
$
70.20
Tents, flooring, cots/beds, linens, Power/HVAC, fuel, staffin
NIMS
Camp
Capacity
Mobilization
Freight*
Mobilization
Labor
Weekly
Operations
PP/PD
" Demobilization
Freight
Demobilization
Labor
Tvpe
I
2000+
33 Truckloads
$ 824.100.00
$ 557.190.00
5 39.80
33 Truckloads
$ 824100.00
11
2000
33 Truckloads
$ 824,100 00
$ 557,190.00
.$ 39.80
33 Truckloads
$ 824,100.00
111
1500
26 Tnuckloads
$ 618,075.00
$ 426,502.50
$ 40.61
26 Truckloads
$ 618,075.00
TV
1000
20 Truckloads
$ 412,050,00
$ 2295,815.00
$ 42.26
20 Truckloads
$ 412,050,00
V
750
16 Truckloads
$ 309,037.50
$ 213.251.25
$ 40.61
16 Truckloads
$ 309.037.50
VI
500
10 Truckloads
5 206.025.00
8 147.907.50
$ 42.26
10 Truckloads
$ 206,025.00
VII
250
6 Truckloads
$ 103.012.50
5 101.013.75
8 57.72
6 Truckloads
$ 103,012.50
VTTT
100
4 Truckloads
$ 41.205.00
$ 58.117.50
5 83.03
4 Truckloads
$ 41,205.00
Mobile Showers
NIMS
Camp
Capacity
Mobilization
Freight
Mobilization
Labor
Weekly
Operations
PP/PD
Demobilization
Freight
Demobilization
Labor
Showerheads
Tvpe
I
2000+
20'1'uckloads
$ 89.421.00
8 247.968.00
$ 17.71
20 Truckloads
5 89,421.00
200
II
2000
20 Truckloads
$ 89.421.00
$ 247,968.00
5 17,71
20 Truckloads
$ 89,421.00
200
ITT
1500
15 Truckloads
5 66,635.25
$ 184,684.50
$ I7 59
1.5 Truckloads
5 66,635.25
150
IV
1000
10 Truckloads
$ 47,662.50
$ 124,845.00
$ 17.84
I0 Truckloads
8 47,662.50
100
V
750
8 Truckloads
$ 38.822.49
$ 93.633.75
$ 17.84
8 Truckloads
$ 38,822.49
75
VI
500
6 Truckloads
$ 28.905.00
$ 64.575.00
$ 18.45
6 Truckloads
$ 28.905.00
50
VII
250
3 Truckloads
$ 24,292.50
$ 32.287.50
$ 18.45
3 Truckloads
5 24,292.50
25
VIII
100
1 Truckloads
$ 16,830.09
$ 13,99115
$ 19.99
I Truckloads
5 16,830.09
10
Mobile Laundry Facilities
NIMS
Camp
Capacity
Mobilization
Freight
Mobilization
Labor
Weekly
Operations
PP/PD
Demobilization
Freight
Demobilization
Labor
Laundry
Units
Tyne
I
2000+
4 Truckloads
8 18,388.50
$ 81.795.00
5 5.84
4 Truckloads
$ 18,388.50
40
I1
2000
4 Truckloads
5 18,388.50
5 81,795.00
$ 5.84
4 Truckloads
$ 18,388.50
40
III
1500
4 Truckloads
$ 13,591.50
$ 61,992,00
$ 5.90
4 Truckloads
$ 13,591.50
30
1V
1000
3 Truckloads
5 9.102,00
$ 43.050.00
$ 6.15
3 Truckloads
$ 9,102.00
20
V
750
3 Truckloads
5 6.765.00
5 32,287.50
$ 6.15
3 Truckloads
5 6.765.00
15
VI
500
3 Truckloads
5 4,628.49
$ 22.60 1.25
8 6.46
3 Truckloads
' $ 4,628.49
10
VII
250
2 Truckloads
5 2.760. l2
5 12.377.49
5 7.07
2 Truckloads
5 2.760.12
5
VIII
100
1 Truckloads
$ 2,306.25
$ 5,596.50
$ 8.00
1 Truckloads
$ 2,306.25
2
Chemical Toilets
NIMS
Camp
Capacity
:Mobilization
Freight
Mobilization
Labor
Weekly
Operations
PP/PD
Demobilization
Freight
Demobilization
Labor
Chemical
Toilets
Type
[
2000+
8 Truckloads
$ 8.241.00
S 46.149.60
$ 3.30
8 Truckloads
$ 824100
133
11
2000
8 Truckloads
$ 8.241.00
$ 46.149.60
$ 3.30
8 Truckloads
$ 8.241 00
[33
[II
1500
6 Truckloads
$ 6,150 00
$ 34.440.00
S 3.28
6 Truckloads
`5 6;150.00
100
IV
1000
4 Truckloads
$ 4;120.50
$ 23,074.80
$ 3.30
4 Truckloads
$ 4,120.50
67
V
750
3 Truckloads
$ 3,075.00
$ 17,220.00
$ 3.28
3 Tnickl_oads
$ 3,075.00
50
VI
500
1 Truckloads
$ 2.091.00_
$ 11,709.60
$ 3.35
1 Truckloads
$ 2,091.00
33
VII
250
1 Truckloads
$ 1.045.50
$ 5.854.80
$ 3.35
1 Truckloads
$ 1,045.50
17
VIII
100
1 Truckloads
$ 430.50
$ 2.410.80
$ 3.44
1 Truckloads
$ 430.50
7
Restroom Trailers/Handwash Stations
NIMS
Camp
Capacity
Mobilization
Freight
Mobilization
Labor
Weekly
Operations
PP/PD
Demobilization
Freight
Demobilization
Labor
Restroom
Units
Type
I
2000+
8 Truckloads
$ 8.241.00
$ 246.000.00
$ 17.58
8 Truckloads
$ 8,241.00
22
II
2000
8 Truckloads
$ 8.241.00
$ 246.000.00
$ 17.58
8 Truckloads
$ 8.241.00
22
III
1500
6 Truckloads
$ 6.150.00
$ 184.500.00
$ 17.58
6 Truckloads
$ 6.150.00
17
[V
1000
4 Truckloads
$ 4.120.50
$ 123.000.00
$ 17.58
4 Truckloads
$ 4,120.50
11
V
750
3 Truckloads
$ 3,075.00
$ 92,250.00
$ 17.58
3 Truckloads
$ 3,075.00
8
VT
500
1 Tnickloads
$ 2,091 00
5 61,500.00
5 17.58
1 Truckloads
$ 2,091.00
6
VII
250
1 Truckloads
$ 1,045.50
$ 34,166.94
$ 19.52
1 Truckloads_
$ 1045.50
3
V[IT
100
1 Truckloads
$ 430.50
$ 16.399.59
$ 23.43
1 Truckloads
$ 430.50
1
Seat
NIMS
Camp
Capacity
Mobilization
Freight
Mobilization
Labor
Weekly
Operations
PP/PD
Demobilization
Freight
Demobilization
Labor
No. of
Guards
Type
I
2000+
$0
$ -
$ 33,062.40
$ 2.36
SO
$ -
12
L1
2000
$0
5 -
$ 33,062.40
$ 2.36
$0
$ -
12
11.1
1500
$0
$ -
$ 27,552.00
$ 2.62
50
$ -
10
IV
1000
50
$ -
$ 22.041.60
$ 3.15
SO
$ -
8
V
750
50
$ -
$ 16.531.20
$ 3.15
S0
$ -
6
VI
500
50
$ -
$ 16.531.20
$ 4.72
SO
$ -
6
VII
250
$0
$ -
$ 11,020.80
$ 6.30
SO
5 -
4
VTTI
100
50
$ -
$ 11,020 80
$ 15.74
50
$ -
4
Fencin
NIMS
Camp
Capacity
Mobilization
Freight
Mobilization
Labor
Weekly
Operations
PP/PD
Demobilization
Freight
Demobilization
Labor
Linear Feet
of Fencing
Type
I
2000+
8 Truckloads
$ -
$ 21.525.00
$ I.54
8 Truckloads
$ -
8000
II
2000
8 Truckloads
$ -
$ 21,525.00
$ 1.54
8Truckloads
$ -
8000
111
1500
7 Truckloads
$ -
$ 19,372.50
$ 1.85
7 Truckloads
$ -
7000
1V
1000
6 Truckloads
$ -
$ 17.220.00
$ 2.46
6 Truckloads
$ -
6000
V
750
6 Truckloads
$ -
$ 14.206.50
$ 2.71
6 Truckloads
$ -
5000
VI
500
4 Truckloads
$ -
$ 10,762.50
$ 3.08
4 Truckloads
$ -
4000
VII
250
3 Truckloads
$ -
$ 8,610.00
$ 4.92
3 Truckloads
$ -
3000
VIII
100
2 Truckloads
$ -
$ 5,166.00
$ 7 3R
2 Truckloads
$ -
2000
Small Expedition Cam
NIMS
Camp
Capacity
Mobilization
Freight
Mobilization
Labor
Weekly
Operations
PP/PD
Demobilization
Freight
Demobilization
Labor
Type
VIII
60-70
2 Truckloads
$ 59.655.00
$ 150.675 00
$307 50
2 Truckloads
$ 39,606.011
NOTES:
1. All services and equipment are offered on an availability basis.
2. Per person/Per day pricing does not include Fuel, Potable & Gray Water, Freight Mobilization & Demobilization
3. Mobilization and demobilization are determined based on asset closest storage location at time of service request.
4. Trucking mileage rates may be adjusted due to availability/location of trucks.
Disaster Response Man Camps/Comfort Services ?rice Schedule
TYPED SUPPORT PACKAGES
OPERATIONAL RESONSE TIME UPON
NOTIFICATION
ITEM
QTY
NIMS TYPING
DESCRIPTION
RENTAL
RATE
PRICE"
WITHIN
6 HRS
WITHIN
12 FIRS
WITHIN
24 HRS
WITHIN
364HRS
WITHIN
7 DAYS
I
NEMA TYPE I
POD SUPPORT PACKAGE (COMMODITY DISTRIBUTION.NONMEDICAL)
WOK
S 27552.00
2 each, all terrain extended reach rorklifts, 4 each manual pallet jacks, 4 Lath 4000 wait light lowers • self
contained, 6 each 10'X i 0' pap -up tents, 60 Lerch folding chairs, 20 each folding 106100, 4 each 24" warehouse
fans, 70 each 100' 1213 etension cords, 20 each 3 -way splitters, 20 each 55 gallon plastic trash cans with lids
DAILY REFUELING SERVICES FOR EQUIPMENT ALL SYSTEMS DELIVERED. INSTALLED AND
No
No
No
Yes
Yes
1.
1
NEMA TYPE II
.R.EMQIILIZED
POD SUPPORT PACKAGE (COMMODITY DISTRIBUTION, NON-MEDICAL) PER
WEEK
S 18,019.50
WITHIN
6 HRS
WITHIN
12 HRS
WITHIN
24 HRS
WITHIN
36 HAS
WITHIN
7 DAYS
1 each, all terrain expended reads forklifts, 4 each manual pallet I0cks. 3 each 4000 watt light towers - self
contained. 4 each 10'3(I(/' pop-up tents. 40 each folding chairs. 12 Lerch folding tables, 0 each 24" warehouse
fem, 10.6 100' 12/3 extension cords. 10 each q -way splicers, 20 each 55 gallon plastic trash Lanz with lids
DAILY REFUELING SERVICES FOR EQUIPMENT ALL SYSTEMS DELIVERED. INSTALLED AND
5RMOR(IJ7F,D
No
No
No
Yes
Y.
3
1
NEMA TYPE 111
POD SUPPORT PACKAGE (COMMODITY DISTRIBUT , NON -MEDICAL)
ION
PER
WEEK 6
0 13,087.20
WITHIN
D
W[THIN
12HRS
WITHIN
14 HRS
WITHIN
36 FIRS
WITHIN
7DAYS
I each, all terrain extended reach forkfr04, 2 each manual palletlacks. 2_ =114000 wait light towers - self
contained, 2 cash I0'X10' pop-ap tents, 20 each folding chairs, 8 each folding tables, 2 each 24" warehouse
fans, 8 each 100' 12/3 extension cords, 0 eaee 3 -way splitters. (0 each 55 gallon plastic trash ems wain lids
DAILY REFUELING SERVICES FOR EQUIPMENT ALL SYSTEMS DELIVERED, INSTALLED AND
pEMOBRIZED
No
No
No
Yes
Yes
4
1
FL TYPE I
COOLING/ COMFORT STATION
PER
WEEK
S 65,90749
WITHIN
6 HRS
WITHIN
12 HES
WITHIN
24 NHS
WITHIN
16 NM
WITHIN '
7 RAYS
I each all terrain extended reach WEIR. I each manual pdRlack, 2 each 4000 watt light LOW= - sell -
contained. 1 each 80 kW diesel generator, 2 oast 40'X40' pole tents with side curtains and Iluors, 2 each 20
Ton Ponoblc 14VAC ler Tents, 8 strings tern lighting, 150 sch folding chairs, 40 salt folding tattles, 4 each
24' warehouse fans, 20 each 1017 12/3 extension cores, 20 each 3 -way spli ham 20 each 55 gallon plastic trash
cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT ALL SYSTEMS DELIVERED;
flLccrst 3 Pn a5 0 n0Ul7R11 (7En
Nn
No
No
Yes
Y.
5
I
FL TYPE II
COOLING / COMFORT STATION
PER
WEEK
F 26,697,15
WITHIN
6HR8
WITHIN
12 HRS
WITHIN
24111R8
WITHIN
36 HRS
WITHIN
7DAYS
1 each all terrain extended reach forklift, 1 each manual pallet jock, 2 each 4000 well light Rowers - self
contained, 1 each 80 kW dicsol generator, 2 each 20'X20' pole tents with side curtains and floors, l each 20
Ten ?<usable HVAC for Tenn, 4 strings tent lighting, 100 ehadh (biding chairs, 30 each fielding tables. 4 each
24" warehouse fans, 70 each 100' 12/3 extension uxds. 20 each I -way splitters, 20 ca. 53 gallon plastic bash
cons with lids. DAILY REFUELING SERVICES FOR EQUIPMENT ALL SYSTEMS DELIVERED.
INSTALLED AND DEMODIL:LED.
,No
No
No
Yes
Yes
6
1
FL TYPE I
SHELTER SUPPORT PACKAGE (GENERAL PUBLIC)
PER
WEEK
Y 7.44130
WITHIN
6'IRS
WITHIN
12 HRS
WITHIN
24 NHS
WITHIN
36 IIRS
WITHIN
7 DAYS
I each manual pane%jack, 2 each 40(10 welt light towere - serf aattoim:d 4 ouch 42" warehouse fans. 20 each
100' 12/3 4tcna10n cords, 20 each 3 -way sputters, 20 =It 35 gallon plastic rash eons with lids DAILY
REFUELING SERVICES FOR EQUIPMENT ALL SYSTEMS DELIVERED. INSTALLED AND
DEMORII.IZEO
No
No
No
Yes
Yee
7
1
FL TYPE I -A
SHELTER SUPPORT PACKAGE (SPECIAL MEDICAL NEEDS)
PER
wEV(
0 6348030
WITHIN
6NHS
WITHIN
(2HRS
WITHIN
24 DRS
WITHIN
36 HR.
WITHIN
7DAYS
I each manual pallet jack 2 each 4000 wall light toweea • sefwnlamed, 2=0 220 Ton Portable HVAC with
ducting for building, 8 each 52'. warehouse fans. 40 each (00' 1213 extension cords, 20 each 3 -way splinters. 20
each 55 gallon plastic hash cans wish lids NOTE GENE/LAME MAY ALSO BE 1{BQW:II,ED'OLT
No
No
No
V.
Des
WOULD NEED TO E SIZED TO TH FACILITY DAILY REFUELING SERVICES FOR EQUIPMENT
,ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED
8
1
FL TYPE(
MOBILE/ FIXED KITCHEN SUPPORT PACKAGE(WlrENT PACKAGE)
PER
WEEK
0 71.31909
WITHIN
6NHS
WITHIN
1v_ -MR;
WITHIN
24 MR'S, 36HS
WIT uIN
WITHIN
7 DAYS
I each all terrain extended retch 1'orkh0s, 1 each manual pallet lack, 4 each 4000 wad light towers - self
oa0tatoc , t each 80 SW diesel generator, 2 each 40'3(40' pole tents watt solo uvulas and floors. 2 each 20
Too Portabk HV AC fix r4010, x strings Lem lighting, 150 each ,I4ding chain, 60 ,n. eh folding tables, 4 each
52" waacnous0 fans. 40 each 100' 32/3 extension corn. 40 each 3 -way splin0m. 20 ea0h 55 gallon plastic trash
amts with lids DAILY REFLELINC SERVICES FOR EQUIPMENT ALL SYSTEMS DELIVERED,
INSTALLED AND DEMOBILIZED
No
No
No
Yes
Yes
9
1
PL TYPE 11
MOBILE,'FIXED KITCHEN SUPPORT PACKAGE (NO TENTS)
�R
WEEK
31 13,624.71
WITHIN
6 HRS
WITHIN
12 HES
WITHIN
24 HRS
WITHIN
36 FIRS
WITHIN
' DAYS
1 each Al (main exlerded mach forklifts. '. sech manual pallet jack, 2,ych 4000 weir light :owns - self
contained, I each 90 kW diesel generator. 4 each 52" warehouse fans. DAILY REFUELNG SERVICES FOR
EQUIPMENT ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED
No
No
No
Yes
Yes
!0
I
FL TYPE I
SANPAC (SANITATION PACKAGE) 3600 PERSONS PER DAY
PER
WEEK
S 460030
WCTF3TN
6 HRS
WITHIN
12 RBS
W17FIIN
24 HRs
WITHIN
36 HAS
WITHIN
7 DAYS
20 each porta potties, 4 each ADA potties. 8 cash hand wash 130110,4, 2 each 30 Cu Yd. mli-off dumps0x. All
with TWICE DAILY supplies and stares ALL SYSTEMS DELIVERED, INSTALLED AND
PEW/IV-12M
No
No
No
Yes
Yes
1 t
1
FL TYPE II
SANPAC (SANITATION PACKAGE) 1800 PERSONS PER DAY
PER
WEEK 6
g 2,300.10
WITHIN
HAS
WITHIN
12 HRS
WITHIN
24 IRS
WITHIN
36 HAS
WITHIN
7 DAYS
liteoch porta potties, 2 mach ADA potties, 4 each hand wash stations, 1 each 30 Cu Yd awl-oirdwepster All
with DAILY supplies and servos. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED
No
No
No
Yes
Vey
12
1
FL TYPE III
SAIOPAC(SANITATION PACKACE11000 PERSONS PER DAY
PER
WEEK
S L70600
WITHIN
6 HRS
WITHIN
12 FIRS
WITHIN
24 HAS
WITHIN
36 HRS
WITHIN
7 DAYS
6 each porta pollas, , cac, ADA pours, 3.-ach hand wash slalorq, 2 each 3 Cu Yd. dumpier. All with
DAILY sappla s and service. ALL SYSTEMS DELIVERED. INSTALLED AND DEMOBILIZED
No
Na
No
Yes
Yes
13
1
PL TYPE IV
SANPAC ISANITATION PACKAGE) 500.750 PERSONS PER DAY
PER
WEEK
5 153730
WITHIN
6HRS
WITHIN
12 HRS
WITHIN
24 HRS
WITHIN
MIMS
WITHIN
7DAYS
4 each pore putties, • each ADA potties. 2 each hand wash station % 1 each 3 Cu Yd dumpater. Ali with
DAILY supplies and service ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED
No
No
No
Yea
Yes
14
1
NIMS TYPE 1
MOBILE KITCHEN
PER
WEEK
5 39,040.00
WITHIN
6FIRS
WITHIN
12 FIRS
WITHIN
24.HRS
WITHIN
36HRS
WRHIN
7DAYS
L p to 13011 inters
Per day
containers
I driver. 2 workers, Unit Leader Food Safety Candied, Unit has function to prepare or deliver pre -prepared I0 u
oobilo or temporary Eyed sole 440acdy; Prepare 4 mm,mutn ol'two 121 means a day (hmch/dinser), can operate
far l day to the field without resupply. 1 14• l6 Nu cargo trader, Po0We Water - Aaxssibdily 10 (1,16(34 water
annuce at staging area; Iea (bagged. potable, in coolm) - mihdmwn IR pa0n daily at staging area: Gas or
Diesel • available at service station or staging isme. Propane • available a1 service steno.] or staging area. Waste
Water Removal Igray/black) - at a stationer 1tagmg arca, Jumpster - at staging area. 30 ,nsunled food
(Canb,ol, 3,300 quantity daily cups, 2,000 Qly daily Picea; Packs, 2,11011 Qty daily 3-Companm,at
Clamshells; Foal service capabilities arc based upon swing sires of 8 -oz entree 6 -oz vegetables. and 6 or
Dun
No
No
No
Yes
Y.
Note: Meal costs are it 7rbreakfast. 320/lunch and 322/dinner per person per day. This configuration is
1 seas t J C4nr4trnrrired enif4
Li
1
NUNS TYPE II
MOBILE KITCHEN S
WEEK
S 29520.00
WITHIN
6 HRS
WITHIN
I: HRS.
WITHIN
24 HRS
WITHIN
36 HRS
WITHIN
7 DAYS
up to 1,000 meda
per day
t dnrer, I worker: Unit Loader Faotd Safety C.ntif 1, Unl has function to prepare or uelivcr pre -prepared in a
mobile or temporary f veil silo capacity; Prepare a .minimum of two (2) meals a day (lunch/dinner), can operate
for I day in tlso field without resupply, 1 t4 -foot cargo trader, Potable Water - Accessibility to public water
sours at staging arca::ce (bagged, potable, iu coolers) • minimum '!2 pallet daily at staging area: Gas -
nvailablc 31 5304400 41411011 or staging area, Propane - available at scrvsce station or staging veer; W11313 Wutr
Removal lgrsy/black) - at a slatton or staging area; Dumpsler 31 staging area: 20 insulated food comment
(Carnbro); 2.0011 quantity daily cups, 1,500 Qty Jody Picnic Packs. 1.500 Qty daily 3-CJmpartmcnt
Clamshells, Food sorvice capabilities am based upon serving sizes of gez anima. 6 -oz vegetables. and 603
Gant
Na
No
No
Yes
Yes
Note; Meal coats are S17/breakfast, 420/lunch and 422/dinner per person per day. This eonfgural.on is
t set :4 contaiitersed unite.
16
NIMS TYPE 111
MOBILE KITCHEN
PER
WFF.K
S 295'0011
WITHIN
6MKS
WITHIN
12145$
WITHIN
24 FIRS
WITHIN
ad FIRS
WITHIN
7(3AY5
lip to 750 meals
Dar day
1 driver. I worker. Una Leader Food Safety Certified: Unit has function to prepma ordelivor pre -prepared 31 a
mobile 301cmporary fixed site caparaty; Prepare a minimum of two 12) ioccals a Jay (lunch/dinner), cm operate
for I day in the field without resupply: 1 12 -foot cargo trailer; Potable Water -.Accessibility to public water
source at slaging area: lee (bagged, potable, in coolers) • minimum 1 i4 pallet daily a1 sieg0g area; Gas •
available at service station or staging area: Propane - available at service stationor staging area: Want, Waltz
Removal (gray/like:I - at a noon m staging area; Chummier - at staging area. 13 insuiotad Mod containers
(Cambrs), 1.500 quantity daily cups, 1,000 Qty doily Picric Podrs, 1,000 Qty daily 3-Companment
Clamshells; Food service capabilities are based upon serving secs of g -oz entree, 6 -oz, vegetablrs, and 6 0,
rnpl
Nn
No
No
Yes
Yes
Note: Meal 00048 hre 317/breakfast, S20/lunch and 522/dinner per person per day. 1 set a 4
containarved m its.
I7
1
NIMS TYPE IV
MOBILE KITCHEN
PER
WEEK
S 19,52000
WITHIN
6 FIRS
WITHIN
12 HRS
WITHIN
24 HRS
WITHIN
36 HIES
WITHIN
. DAYS
Up to 500 meals
per day
1 driver, I worker, Unit Lender Food Safety Cenificd; Unit has f'unclton to prepare or deliver pre-prcparod in a
mobile or temporary fixed site capacity. Prtpare a minimum of two (2) meals a day (lunch/dinner). can operate
for I day in the field without resupply: 1 12 -four cargo trailer; Potable Water - Accessibility to public rater
sauce at staple arm; lac (bagged. potable., in coolers) - minimum lie pallet daily at statiin5 area; Gas -
available at service station or staging area; Propane- available at servt543Wtim or staging area; Waste Wafer
Removal (gray/black) - at a station or stagang area, Dempster -'at staging area; 10 insulated food containers
(Cambro); 1,000 quantity daily cups. 750 Qty doily Picnic Packs. 750 Qty doily 3 -Compartment Clamshells:
Food service capabilities am based upon serving sins of R -oz. 00u00. 6or_ vegetables, and 6 az fruit
No
No
No
t
Yes
Yes
Note: Meal Loma are SI7/breakfast, =Munch and 522/dimser per person per day. This configuration is
I set 5 4 containerized units.
I4
I
NI MS TYPE Itt
FIXED KITCHEN
PER
WEEK
S i18,090.00WITHIN
6 FIRS
WITHIN
!2 HRS
WITHIN
24 ORS
WITHIN
36 HRS
WITHIN
7 DAYS
Up to 10,000 meaty
perday
1 manager. 20 workers; Unit Linder Food Safety Certified; 2 4S -foot Dry Bits Trailers, I 2S -foot Refrigenned
Traders, ? Outdoor Faridi(ts; Electrical Power • lard !ioeor generated; Potable Water Access • Public safer
source or onmsuo n 5,000 gallon corker with appropriate fittings and pump; Bagged lee -Minimum 4 pallets
daily, Pm) - Gas or Chasiddelivery availability to fill on-site/drop tank, Propene - Delivery, ability to fill on-
sitddrop 250 -gallon tank; Waste Water • catch and removal (gmy/bleck); Dumpsarr - 1 40 -cu yard; 400
insulated fwd contemns (Camino); 10.000 quantity daily cups. 10.000 Qty daily Picnic Packs, t 0,001 Qty
dally 3 -Compartment Clamsfralls; Unit prepares food for demi s4rvim delivery or can serve as hub and spoke
distribution with food service delivery units. Food scrvicr capabilities arc hosed upon serving sizes of 3 -or
entree, 6-30 vegetabks, and 6.. fruit; Prepare minimum of two (2) :heals per day (Iund0dinnmr).
No
Na
No
Yes
Yes
Notr. Meal eons are S17/bresk(nt, S20/hmeh and 472/dinner per person per day. Pricing valid for
1000• parting with soft 50511 nrospltea,
19
1
Nl.!s TYPE IV
FIXED KITCHEN
PER
WEEK
i w156o tin
WITHIN
6 HRS
WITHIN
12 HAS
WITHIN
Tel HRS
WITHIN
36 HAS
WITHIN
7 RAYS
up to 5,000 ...op
Ve__
1 manager, 15 workers; Um Leader Food Safety Conn -art 1 40 -foot Dry Box Trailer. 1 20-11101 Rcl'ngaratet
Trailer. 1 Outdoor Forl li0. Elruxn0al Power - lard !doe or generated, Potable Water Access - Public water
source at minimum 5,000 gallon tanker twill appropriate 1 illirrg0 and pump. Bagged Ice - Minimum 4 pellets
daily Fuel - Gas or Diesel delivery availability to fill on-sac/drop tank; Propane - Delivery. ability to fill on-
stterdrop 250 -gallon lank; W soar Water- catch and renovnl (gray/black) Dempster - 140- a yard; 200
insulated food containers (Cambml; 5,000 quantity daily cups, 5,000 Qty daily Picnic Packs, 5,000 Qty daily 3 -
Compartment Clamshells, (:nit prepares toad for direct service delivery Of cm 0:000 04 hub and spoke
distribution with food erviced:livery units, Food service capabilams arc based upon serving sixes of S•oz
entree, 6.00 vegeables, and ,1 or Ouht, ?rep= minimum of two (2) steals pit day (;unchidinn r)
No
No
No
Yes
Yes
NMr Meal costs are 517/breakfast. S2W1uneh and SID/dinner per person per day. Pricing valid kw 1
1000• run -ern ails sort well atrocious -
"Does riot iatlude 56,5Wrrdk transportation casts.
Emergency Power Generation Rental Price Schedule
ITEM
DESCRIPTION
WEEKLY RENTAL RATE
MONTHLY RENTAL RATE
1
10 KW Generator
$
654.36
$
1.963.08
2
15 KW Generator
$
654.36
$
1.963.08
3
25 KW Generator
$
936.77
$
2,810.55
4
50 KW Generator
$
1,446.48
$
4,339.44
5
75 KW Generator
$
1,790.88
$
5,372.64
6
100 KW Generator
$
2,135.28
$
6,405.84
7
175 KW Generator
$
3,099.60
$
9,298.80
8
250 KW Generator
$
3,857.28
$
11,571.84
9
300 KW Generator
$
4,408.32
$
13,224.96
10
350 KW Generator
$
5,372.64
$
16.117.92
11
500 KW Generator
$
6,888.00
$
20,664.00
12
750 KW Generator
$
8265.60
$
24.796.80
13
800 KW Generator
$
8,816.64
$
26,449.92
14
1000 KW Generator
$
11.020.80
$
33,062.40
15
1250 KW Generator
$
13,776.00
$
41,328.00
16
1500 KW Generator
$
16,531.20
$
49,593.60
17
1750 KW Generator
$
17,908.80
$
53,726.40
l8
2000 KW Generator
$
20,664.00
$
61,992.00
19
Cables (400 amp) 50 ft.
$
51.66
$
154.98
Notes:
1. Generators will be delivered with a full tank of diesel. The generator must have a full tank of diesel at time of pick-up or
there will be a per gallon rate charged for the required fuel.
2. The customer is responsible for the generator until the generator is picked up by AshBritt and AshBritt releases them from
liability once the generator is inspected.
3. Fueling will be accomplished on an as -needed basis. The per gallon rate will be determined at time of event, to include the
delivery fee. Smaller generators may require more than one visit per day if running 24 -hours a day.
4. If the personnel/equipment package is not used, and fueling is required for the rental generators; Fuel trucks will be
available for a daily rate (24 -hour operations) at $8,265.60 per day. This rate includes the truck and two (2) drivers, lodging,
per diem, and has a three (3) day minimum lease period. An additional option would be a fuel truck with a single driver for 12 -
hour operations, at a 12 -hour rate of $5,787.15. This rate includes the truck, an one (1) driver, lodging, per diem, and has a
three (3) day minimum lease period. The number of fuel trucks will be based on mission requirements.
5. Generators are rented at the weekly rate, triple shift, with a 1 -week minimum rental period, or at a monthly rate.
6. Transportation/Freight fees for rental generators is not included in above pricing and will be based on distance from the
closest provider to the delivery site. Transportation and freight fees will be quoted for mobilization and demobilization at time
of event.
Heating & Air Conditioning Equipment For Community Shelters & Other Facilities
DELIVERY RESPONSE
TIME
Item 0
NIMS TYPE
DESCRIPTION
DAILY RENTAL
RATE^**
WEEKLY RENTAL
RATE^**
WITHIN 24 HRS
1
Tvpc V
5 -Tun Air Conditioner Unit
$
612.00
5
1,224.00
X
2
7 -Ion Air Conditioner Unit
5
688.50
$
1,377.00
X
3
1.0 -Ton Air Conditioner Unit
5
765.00
$
1,530.00
X
4
15 -Ton Air Conditioner Unit
5
1,071.00
$
2,142.00
X
5
20 -Ton Air Conditioner Unit
5
1,224.00
5
2,448.00
X
6
25 -Ton Air Conditioner Unit
5
1,377.00
5
2,754.00
X
8
35 -Ton Air Conditioner Unit
$
1.530.00
5
3,060.00
X
9
40 -Ton Air Conditioner Unit
$
1.683.00
$
3,366.00
X
10
50 -Ton Air Conditioner Unit
5
1.836.00
5
3.672.00
X
I 1
Type [II
60 -Ton Air Conditioner Unit
5
1,989.00
5
3,978.00
X
12
70 -Ton Air Conditioner Unit
$
2,448.00
$
4.896.00
X
13
75 -Ton Air Conditioner Unit
$
2.601.00
$
5,202.00
X
14
80 -Ton Air Conditioner Unit
$
2,677.50
$
5,355.00
X
15
Type IV
40 -Ton Air Cooled Chiller Unit
$
4,284.00
$
8,568.00
X
16
50 -Ton Air Cooled Chiller Unit
5
4,896.00
$
9,792.00
X
17
60 -Ton Air Cooled Chiller Unit
$
5,049.00
$
10,098.00
X
18
75 -Ton Air Cooled Chiller Unit
$
5,202.00
$
10,404.00
X
^Does not include $6.50/mile transport cost.
**Generators must be returned with same amount of fuel as when they were rented. Fuel cost not included.
DELIVERY RESPONSE
TIME
Item 4
NIMS TYPE
DESCRIPTION
DAILY RENTAL
RATE^**
WEEKLY RENTAL
RATE^**
WITHIN 24 HRS
19
100 -Ton Air Cooled Chiller Unit
$
5,355.00
$
10,710.00
X
20
125 -Ton Air Cooled Chiller Unit
5
6.120.00
$
12,240.00
X
21
Type V
150 -Ton Air Cooled Chiller Unit
5
6,885.00
5
13.770.00
X
22
170 -Ton Air Cooled Chiller Unit
5
7.650,00
$
15.300.00
X
23
200 -Ton Air Cooled Chiller Unit
$
9.180.00
$
18.360.00
X
24
Type V
50 -Ton Air Handler
$
918.00
$
1.836.00
X
25
100 -Ton Air handler
$
1,147.50
$
2.295.00
X
26
120 -Ton Air Handler
$
1,224.00
$
2.448.00
X
27
Type [II
20 KW Heater Unit
$
306.00
$
612.00
X
28
40 KW Heater Unit
$
382.50
5
765.00
X
29
Type IV
100 KW Heater Unit
$
1,147.50
$
2.295.00
X
30
Type III
150 KW Heater Unit
$
1,377.00
$
2,754.00
X
31
150 KW High Temperature Heater Unit
$
1.377.00
$
2.754.00
X
32
1125 CFM Desiccant Dehumidifier
$
765.00
$
1.530.00
X
33
2250 CFM Desiccant Dehumidifier
$
1.530,00
5
3,060.00
X
34
4500 CFM Desiccant Dehumidifier
5
2.295.00
$
4,590.00
X
^Does not include $6.50/mile transport cost.
** Generators must be returned with same amount of fuel as when they were rented. Fuel cost not included.
Item 4
Job Description
Daily Rate
Overtime Rate PER
ADDITIONAL HOUR
1
Installation Technician -Monday -Friday
$1,224
5230
2
Installation Technician -Weekends
$1,836
5230
3
Installation Technician -Holidays
52,448
5306
4
Generator Meehan -tic -Monday -Friday
$1,224
5230
5
Generator Mechanic -Weekends
$1,836
$230
6
Generator Mechanic -Holidays
$2,448
5306
Emergency Fuel Delivery/Management Price Schedule
No.
FOOI
F002
F003
F004
F005
F006
F007
F008
F009
FO10
FOI 1
kern/Equipment
550 gallon dual wall tank
1.000 gallon single wall tank
L000 gallon dual wall tank
6,000 gallon or greater tank
12 Volt Fill -Rite Pump
Portable Tank Delivery/Pickup
Portable Tank Cleanout Fee
Truck with Man
Mobile Fuel Station
Frac Tank
Labor
Description
Portable Storage Tank (Secondary Containmcnt)
Portable Storage Tank
Portable Storage Tank (Secondary Containment)
Portable Storage Tank
Fuel Pump 13 GPM, includes nozzle
Delivery/Pickup Charge
Cleanout of portable tank (if required)
Transport Truck w/trailer or Bobtail Truck
12,000 Gal capacity on trailer
20,000 gallon frac tank
Man to operate fuel station or fuel vehicles
Note: Additional Storage Tanks ranging from 250 to 20,000 gallons are available upon request
* Requires 24 hour minimum notice
Rental/Labor Rate
S172.20
$172.20
S241.08
$482.16
$61.99
$206.64
5688.80
5241.08
$241.08
5757.68
5103.32
Unit
Per day
Per day
Per day
Per day
Per day
Per hour
Per service
Per hour'"
Per hour*
Per day
Per hour
No.
F100
Item
Fuel
Description
Gasoline/Diesel/Aviation Fuel
Purchase Price /b [nit
Locked -in Market rate
at the time of the Per gallon
event
Notes:
a. Rental/Labor Rate begins when equipment or labor leaves the facility and ends upon its return to the same facility. Reasonable lodging expense may apply.
b. Fuel rate based on daily published average gasoline and diesel rack prices from Oil Price Information Service Net (OPNSNetcom) for Houston, Texas (OPIS rack
city), plus applicable federal, state and local taxes, delivery, administration and overhead costs. Aviation fuel based on OPISNet Jet Fuel Report for Gulf Coast Market
(5 Day Average), plus applicable fees, federal. state and local taxes.
Description of service:
A self contained generator powered system designed to meet the emergency fuel response needs of government and commercial entities. This unit combines high
volume fuel dispensing capabilities along with maximum portability features.
Features:
•Total fuel storage capacity -12,000 gallons (One 1OK tank and two IK tanks)
•Tanks are dual walled (secondary containment) & are Flame shield NFPA 30 rated.
•Mounted on a 53' drop deck trailer
•Six high volume fueling points with hoses on reels
•Fueling points have meter registers
•Grounding cable for vehicle re -fueling
• 20KW diesel generator
•Lights for night fueling
•No special transportation permits required
• Equipped with spill response kits.
- Air compressor
-Lubricants storage tank with dispenser
Note: Equipment/Units subject to availability
Temporary Office Trailers, Mobile Command Center Price Schedule
Office Trailers
Single Unit
Dimensions: Width = 8', Unit Length = 20'
No. Category
OTOIa Setup Fee: $ 1,930.80 One time
OTOIb Single Unit $ 670.93 Per month
Rate Unit
Single Unit
Dimensions: Width = 8', Unit Length = 28'
No. Category
OT02a Setup Fee: $ 2,149.06 One time
OT02b Single Unit $ 819.44 Per month
Rate Unit
Single Unit
Dimensions: Width = 10', Unit Length = 24'
No. Category
OT03a Setup Fee: $ 2,862.61 One time
OT03b Single Unit $ 1,037.84 Per month
Rate Unit
Emergency Pumping Units Price Schedule
No.
Rental Per flour/Dory (Basic Package)
Description (Pump Size)
4" Trash Pump Package $ 1,415.77 $ 153.77
6" Trash Pump Package $ 2,151.31 $ 215.13
6" Hydraulic Pump with Power Pack $ 2,340.00 $ 234.00
8" Hydraulic Pump with Power Pack $ 2,730.00 S 27100
10" Hydraulic Pump with Power Pack $ 2,800.00 $ 280.00
12" Hydraulic Pump with Power Pack /b S 3,200.00 $ 320.00
12" Centrifugal Pump (up to 115 ft. total head) jb $ 1,870.00 $ 187.00
18" Centrifugal Pump (up to 200 ft. total head)_ib $ 2,810.00 $ 281.00
24" Axial Flow (up to 120 ft. total head)_/b $ 3,145.00 $ 262.08
Rate (Per Day)
Rate (Per Hour) /a
E P001
EP002
EP003
EP004
EP005
EP006
EP007
EP008
EP009
Notes:
1. Transportation, mobilization/demobilization charges not included (to be charged cost plus).
2. Includes suction and discharge hoses.
3. Includes installation, service and routine maintenance.
4. Pump watch services, as applicable, $910.00 per day per pump.
5. A minimum pump usage charge of 12 hours (day rate) will be effective upon official client Notice to Proceed,
Task Order, Purchase/Deployment Order or work area relocation request or other reasonably unnecessary
interference (once deployed) whether pumps are operational or not (with the exception of routine maintenance
and/or pump or operator failure). Pump down time attributed to client relocation requests or cease orders to
accommodate some other activity will be a considered a billable hour.
6. Surplus pumps officially authorized for deployment by the client and not utilized will be subject to a
minimum usage charge_
7. Items subject to availability_
a. Rate per day is effective rate per 12 hour period.
b. Ten (10) day minimum applies to pump services.
Note: Fuel surcharges may apply cost plus (negotiable at time of NTP/work Order, as applicable).
Hazardous Materials General Labor Price Schedule
No. Title
Level
Abbr. Rate Unit
HZLO 1 Project Manager Upper Level ULM
HZL02 Mid Level Manager Middle Level MLM
HZL03 Professional Upper Level ULP
Middle Level MLP
Lower Level LLP
HZL04 Technical Upper Level ULT
Middle Level MLT
Lower Level LLT
HZL05 Secretarial/Clerical
HZL06 Equipment Operator
HZLO7 Laborer
HZL90 Per diem
$281.91 Per hour
$161.30 Per hour
$196.94 Per hour
$150.99 Per hour
$120.02 Per hour
$126.90 Per hour
$95.76 Per hour
$68.65 Per hour
$71.68 Per hour
$59.90 Per hour
$43.90 Per hour
$135.58 Per day
Hazardous Materials Equipment/Materials Price Schedule
No.
Description
Personal Protective Equip., Level A (DuPont RS562T)
Personal Protective Equip., Level B (DuPont R3123T)
Personal Protective Equip., Level C (DuPont C_ 2127T)
Cascade Air Filtration Panel
Air Filtration Panel
Airline Respirator
High Hazard Personnel Decontamination
Low Hazard Personnel Decontamination
Personnel Retrieval System
Personnel Retrieval Harness
Combustible Gas Indicator
Toxic Gas Detector
Photo ionization Detector
Hazmat Kit
Unit
Price
HZMI
HZM2
HZM3
HZM4
HZMS
HZM6
HZM7
HZM8
HZM9
HZM 10
HZM 11
HZMI2
HZM l3
HZMI4
HZM 15
HZMI6
HZMI7
HZM18
HZM 19
HZM20
HZM21
HZM22
HZM23
HZM24
HZM25
HZM26
HZM27
HZM28
HZM29
HZM30
HZM31
HZM32 _
HZM33
HZM34
HZM35
HZM36
HZM37
HZM38
HZM39
HZM40_
HZM41
HZM42
HZM43
HZM44
HZM45
HZIv146
HZM4?
HZM48
HZM49
HZM50
HZM51
HZM52
Hand Ammer, Stainless Steel -
Hand Operated Transfer Pump
1" Diaphragm Pump (1") ..
2" Diaphragm Pump (2")
2" Diaphragm Pump S.S. (2" S.S.)
3" Diaphragm Pump (3")
6" Diaphragm Pump (6") - --
1" Suction or Discharge Hose (I")
2" Suction or Discharge Hose (2")
3" Suction or Discharge Hose (3") _ 6" Suction or Discharge Hose (6")
2" Chemical Suction or Discharge Hose (2")
3" Chemical Suction or Discharge Hose (3")
6" Chemical Suction or Discharge Hose (6")
Electrical Cord Station 50'
Spike Bar
Airless Spray (With operator)
Pressure Washer (With operator)
Water hose Section (Garden)
Cutting Torch (With operator)
_Wire Welder (With operator)
Air Blower (With operator)
HEPA Vac (With operator)
Barrel Cart
Wheelbarrow
Oil Dry Spreader
Traffic Control Vest, Cones, Flags, Barrels, etc.
Drill w/ Bits
Grounding Cable and Rod
Circular Saw
Hand Tool per employee *(shovels, brooms etc. )
Tool Kit (Hammers, Pliers, Screwdrivers)
Wrench Kit (Bung wrench, speed, etc.)
Step Ladder
Extension Ladder
Photographic Equipment
Level A Suit (Kappler Responder)
Level 13 Suit (Kappler Responder)
Per Unit $1,163.00
Per Unit $514.00
Per Unit $254.00
$140.00
Day $182.00
Day __.. $273.00
Per Kit $52.00
Per Kit $20.00
Day $182.00
D `.._...__.._. $35.00.
Day-- . $95.00 __.
Day - $175.00
Day $110.00
Day__ $425.00
Day _ $20_.00_
Day $85.00
Day $163.00
Day ___ $208.00 _
_Day__ $358.00
- Day $425.00
Day $1,280.00
Day $46.00
Dad- _ _ $70.00
Day $90.00
Day $145.00 _-
Day $140.00 -
Day $180.00
Day $650.00
Day $55.00
Each $65.00
Day _ $275.00
Day $255.00
Each $35.00
Day -_ $175.00
Day $225.00
Day _ $175.00
Day _ $480.00
Day $15.00
Day $35.00
Day _ - $18.00
Day $55.00
Day
Day $45.00
Day $45.00
Day $40:00
Dom.... $75.00
Dad $55.00
Day $12.00
Day $20.00
Day $125.00
Each $1,040.00
Each $455.00
Hazardous Materials Equipment/Materials Price Schedule
No.
Description
Unit
Price
HZM53
Level C Suit (Kappler Responder)
Each
$225.00
HZM54
Proshield (DuPont NG127s)
Each
$15.00
HZM55
_
Saranex (DuPont SL 127T)
Each
$30.00
HZM56
Acid Suit
Each
$125.00
HZM57
Rain Suit
Each
545.00
HZM58
Neoprene Gloves, Pair
Pair
$15.00
HZM59
Nitrile Gloves, Pair
Pair
$8.00
HZM60
Silvershied Gloves
Pair
$15.00
HZM61
PVC Gloves
Pair
510.00
HZM62
Cotton or Latex Gloves
Pair
$5.00
HZM63
Leather Work Gloves
Pair
520.00
HZM64
PVC Boots (Haz Mat)
Pair
542.00
HZM65
Boot Covers
Pair
512.00
HZM66
Hearing Protection
Pair
$1.00
HZM67
Detector Tubes
Each
$18.00
HZM68
Ph Paper
Pack
$35.00
HZM69
_ _ _
Spill Classifier
Each
$15.00
HZM70
Respirator Airline 50' Section
Each
$225.00
HZM71
Respirator Cartridges
-
Pair
$35.00
HZM72
Handheld Radios
Each
$75.00
HZM73
5'x10' Absorbent Boom -Petroleum (CEP-WB510)
Bale of 4
$140.00
HZM74
8"x10' Absorbent Boom -Petroleum (CEP-WBS 10)
Bale of 4
$202.00
HZM75
3"x 12' Absorbent Boom -Universal (CEP-HAZSOCIO)
Bale of 4
$91.00
HZM76
Absorbent Pads Bundle -Petroleum (CEP -WP l OOH or equal)
Bundle
$114.00
HZM77
Absorbent Pads Bundle -Universal (CEP-OPP 15 or equal)
Bundle
$135.00_
HZM78
Oil Dry (CEP-FLAB50 or equal)
Bag (401b)
_
$19.50
HZM79
Peat Moss (CEPEXSORB or equal)
Bag
$45.50
HZMSO
_
Vermiculite (CEP-VERM4 or equal)
_
Bag
$39.00
HZM81
-
Soda Ash Bag (CEP-SODASH or equal)
- 9 )
Bag
_ __
$39.00
HZM82
- - --- - - - -- - -- - - --
4 mil 20x100 polyethylene (4 mil)
Roll
$91.00
HZM83
6 mi120x100 polyethylene (6 mil)
Roll
$115.00
HZM84
6 mil bas (6 mil)
_
Case
$92.00
HZM85
Duct Tape (N/A)
Roll
$7.00
HZM86
55 Gallon Drum Oversoak (CEP-1230YE or equal)
Each
$110.00
HZM87
55 Gallon Drum Liners (10 mil)
Each
$11.25
HZM88
Fiber Drums (55 gallon)
Each
$55.00
HZM89
30 Gallon Overpak (CEP-1230YE or equal)
Each
$115.00
HZM90
95 Gallon Overpak (CEP-1237YE or equal)
Each
$275.00
HZM91
DOT Hazardous Waste Labels (DOT)
_
Box
$46.00
HZM92
Fire Extinguisher
Each
575.00
HZM93
Caution/Hazard Tape
Roll
$12.00
HZM94
Respirator Wipes
Box
520.00
HZM95
ChemTape , 10' roll (Kappler)
Roll
$19.50
Note:
1. Transport (0-100 miles one way) and disposal of petroleum contaminated soil.
2. Includes pump, 100' of header pipe w/ well point 5' o.c., jet installation not to exceed 12' deep.
Set up, take down, mob and demob is 1 charge at the weekly rate.
Note: Items subject to availability. Fuel surcharges may apply (negotiable at time of NTP).
Commercial Barges, Divers & Diver Related Equipment
No.
Description
Unit
Price
Notes
CDOI Section Bar s-10ft x 40ft Each $4,612.50 Monthly rental only
CDO2 Sectional Barges Spud Pockets _ _ Each $799.50 Monthly rental only
CD03 20ft Spud Poles for Barges Each $600.00 _ Monthly rental one -
CD04 Barge Deck Cleats Each $75.00 Mon _rental only
CD05 Wood Barge Mats (5" x-4' x 20') for Cranes Each $307.50 Monthly rental only
CD06 Hydraulic Push Unit for Sectional Barges Each $9,225.00 Monthly rental only
CDO7 Commercial Dive Supervisor -Reg Hour S156.83
CD08 Commercial Dive Su rvisor-OT How $215.87 _
CD09 Commercial Diver -Reg Hour $143.91
CD10 Commercial Diver -OT Hour $215,87
CD l 1 Commercial Dive Tender -Reg Hour $104.24
CDl2 Commercial Dive Tender -OT Hour $156.36
CD13 Portable Shallow Air DivePackage-Equipment Only Day - $1,045.50
CD l4 Portable Shallow Air Dive Package -Truck Mounted _ Day $1,414.50
CD 15 Underwater Video System-300ft minimum Day $461.25
CD l6 Contamination Dive equipment -one set Day - _ $584.25
CD 17 Work Skiff-1411-w/motor w/2 man crew Day_ $2,100.00
EXHIBIT "B"
(Price Proposal)
E•••••••••••••••••••••••••••:
••••••••••••• • • • •,,!L,• • • • • • • • •E
.••••••••••• o 4 411••••••••�<
`••41•••••0.0•• • 0••••••••`
!•••••• •_ 0•• 0000••0 •••'.
••••••• W� °i°it�► i •s 0000*e• s
v. 4•••••000000•••••••••0100 ., _
�"..,: ••••••••••••••••••••
•••••••••••••••
ERGERJN
EMERGENCY SERVICES tUr
Emergency Disaster Debris Removal
RFP #: 2017-05-12 111
Tab 5: Price Proposal
5.0 Price Propsal
PART IV PRICE PROPOSAL
PRICE PROPOSAL: The Proposer shall provide the hourly rates, unit prices, and equipment
rates requested below and on Attachments A and B, respectively. These prices and rates
shall he all inclusive of labor, equipment, maintenance, fuel, delivery costs, travel time, per
diem and any other travel or miscellaneous expenses.
DEBRIS REMOVAL HOURLY RATES:
Project Director $ 110.00 per hour
Operations Managers $ `0.00 per hour
Crew Foreman $ 75.00 per hour
Skilled Sawman $ 3`1.0x) per hour
Tree Climber $ 90-00 per hour
Administrative Staff $ 45.0() per hour
EMERGENCY RESPONSE SERVICES HOURLY RATES:
Program Manager
Public Assistance Specialist
Grant Specialist
Planning Specialist
Administrative Support Specialist
$ N/A /hr.
$ N/A /hr.
$ N/A /hr.
$ NIA /hr.
$ N/A /hr.
Responsibility of the Monitor Finn
The undersigned attests to his/her authority to submit this proposal and to bind the firm
herein named to perform as per contract, if the firm is awarded the agreement by the Village.
The undersigned further certifies that he/she has read the Request for Proposal and Super
Circular Laws and Appendices (Attachment C) relating to this request and this proposal is
submitted with full knowledge and understanding of the requirements and time constraints
noted herein.
By signing this forrn, the proposer hereby declares that this proposal is made without
collusion with any other person or entity submitting a proposal pursuant to this RFP.
Bergeron Emergency Services. Inc.
Firm Name
Brian L. Thomason
Binding Firm
Signature of individual Binding Firm
Firm Mailing Address and Phone Number:
I9(I2 SW (91h Place
For Lauderdale. FL 33332
(954) h8t)-6100 Ext. 223
Village of Key Biscayne, Florida
RFP for Emergency Disaster Debris Removal, No. 2017-05-12 Page 17
nJ
111
EMERGENCY fEWYICE.S
Use or disclosure of data contained on this sheet is subject to the restriction Page 1 27
on the title page of this proposal.
10
Emergency Disaster Debris Removal
RFP #: 2017-05-12
Tab 5: Price Proposal
ATTACHMENT A
Task and Unit Fee Schedule Revised
Item / Description Unit Unit Price
1. Loading and Hauling Dehris from Public Property
and Rights -of -Way to a Temporary Debris Staging
and Reduction Site Cubic Yard $ 8.5O
2. Loading and Hauling Debris from Public Property
and Rights -of -Way to a Final Disposal Site Cubic Yard $ 15.50
3. Management and Operation of a Temporary
Dehris Staging and Reduction Site Cubic Yard $ 1.25
4. Dehris Reduction by Chipping/Grinding Cubic Yard $ 2.25
5. Freon Management and Recycling Per Unit $ 60.00
a. White goods removal from Right-of-way to DMS Per Unit $ 60.00
6. Animal Carcass Collection, Hauling, and
Final Disposal
Pound $ 5.00
7. Loading and Hauling Debris Reduction
By -Products to a Final Disposal Site Cubic Yard $ 6.50
8. Loading and Hauling Household Hazardous
Waste to a Final Disposal Site
Pound $350.00
9. Hazardous Stump Removal, Loading and
Hauling to a Temporary Dehris Staging and Reduction
Site
A. 24 inch to 35.99 inch diameter Each $ 295.00
B. 36 inch to 47.99 inch diameter Each $ 425.(10
C. 48 inch and larger diameter Each $ 575.00
10. Clean, Fill Dirt Cubic Yard $ 10.00
11. Set up Mobile Command Center/Temporary office
Each $ 5,000.00
12. Commissary Services- Breakfast
Tier One: 100 people or Tess Each $22.00
Tier Two: 200 people Each $20.00
Tier Three: 300 people Each $18.00
Use or disclosure of data contained on this sheet is subject to the restriction Page 128
on the title page of this proposal.
f Me f,UL 4CV 5t wt.:C S ,
®Emergency Disaster Debris Removal
RFP #: 2017-05-12
Tab 5: Price Proposal
13. Commissary Services- Lunch
Tier One:100 people or less Each $ 27.00
Tier Two: 200 people Each $ 25.00
Tier Three: 300 people Each $ 23.0(1
14. Commissary Services- Dinner
Tier One: 100 people or less Each $ 32.00
Tier Two: 200 people Each $ 30.00
Tier Three: 300 people Each $28.00
Additional Items
15. Removal of hazardous stump from ROW or public property and
transportation to DMS. 24" to 36" diameter.
24" to 36" diameter
Greater than 36" to 48" diameter
Greater than 48" diameter
16. I3ackfill - supply and placement of clean fill dirt into holes
created by stump removal in the ROW.
17. Removal of hazardous trees (1.FANF.RS OR DAMAGED) from
ROW or public property. Debris shall be place on ROW for
collection under the terms and conditions of Scope. trunk
measured at 4.5' Diameter breast height (DBH).
6" to 12" trunk DIM
Greater than 12" to 24" trunk DBH
Greater than 24" to 36" trunk DBI1
Greater than 36" to 48" trunk DBH
Greater than 48" trunk DBH
18. Removal of hazardous hanging limbs (Hangers) from limbs
hanging over ROW or public property. 2" or greater at break
EACH S 295.00
EACH 5425.00
EACH $ 575.00
CUBIC YARD $ 10.00
EACH 5100.00
EACH 5 250.00
EACH 5375.00
EACH 5450.00
EACH 5595.00
5120.00
I'ER TREE
Use or disclosure of data contained on this sheet is subject to the restriction
J on the title page of this proposal.
111 t [ NOrncr 5 WV10E a
Page X29
10Emergency
Disaster Debris Removal
RFP #: 2017-05-12
Tab 5: Price Proposal
ATTACHMENT B
Equipment Rates Revised
1 tem / Description - or equivalent
JD 544 Wheel Loader with debris grapple
JD 644 Wheel Loader with debris grapple
Extendaboom Forklift with debris grapple
753 Bobcat Skid Steer Loader with debris grapple
753 Bobcat Skid Steer Loader with bucket
30-50 HP Farm Tractor with box blade or rake
2 - 21/2 cu. yd. Articulated Loader with bucket
3 - 4 cu. yd. Articulated Leader with bucket
JD 648E Log Skidder, or equivalent
CAT D4 Dozer
CAT DS Dozer
CAT D6 Dozer
CAT D7 Dozer
CAT D8 Dozer
CAT 125 - 140 HP Motor Grader
JD 690 Trackhoc with debris grapple
JD 690 Trackhoe with bucket & thumb
Hand -Fed Debris Chipper
300 - 400 HP Horizontal Grinder
800 - 1,000 HP Horizontal Grinder
30 Ton Crane
50 Ton Crane
100 Ton Crane (8 hour minimum)
40 - 60' Bucket Truck
Greater Than 60' Bucket Truck
Fuel / Service Truck
Water Truck
EMf.NOENCY SIFVICL S
Hourly Price
$125.00
5155.00
$115.00
595.00
595.00
585.00
5115.00
S135.00
5165.00
5125.00
5140.00
5155.00
516,500
5185.(x1
5135.00
5155.00
5145.00
590.00
5475.00
5650.00
5135.00
5175.00
5275.00
5175.00
$225.00
5110.00
590.00
Use or disclosure of data contained on this sheet is subject to the restriction P a g 1 30
on the title page of this proposal.
I 0Emergency Disaster Debris Removal
RFP #: 2017-05-12
Tab 5: Price Proposal
Item / Description - or equivalent (conk) Hourly Price
Portable Light Plant 5.45.00
Lowboy Trailer with Tractor $100.00
Flatbed Truck $75.00
Pick-up Truck (unmanned) $35.01)
Self -Loading Dump Truck with debris grapple Single $225.00
Axle Duiup Truck, 5 - 12 cu. yd. $55.00
Tandem Axle Dump Truck, 16 - 20 cu. yd. $65.00
Tandem Axle Dump Truck, 21- 30 cu. yd. $75.00
Tandem Axle Dump Truck, 31- 50 cu. yd. $95.00
Tandem Axle Dump Truck, 51- 80 cu. yd. $110.00
Optional Services
Jtem / Description - or equivalent (cont.)
Temporary Office Trailer per week $ 1.800.00
Portable Toilets/Handwash stations per week $ 550.00
Temporary Shower Facilities per week $ 1.000.00
Temporary Dining Facilities per unit $ 10.000.00
(Including lighting, tables and chairs for up to 300)
Emergency power generation per day/per week $800.(x1 5.600.00
Use or disclosure of data contained on this sheet is subject to the restriction
on the title page of this proposal.
Page 131
C Alen( N(:v s.Av,f.,s