HomeMy Public PortalAbout4d Resolution 2017-01-04 Approving partial reduction in surety Elk Creek 1TOWN OF FRASER RESOLUTION NO. 2017-01-04 A RESOLUTION APPROVING A PARTIAL REDUCTION IN THE SURETY PURSUANT TO THE SUBDIVISION IMPROVEMENT AGREEMENT (SIA) FOR ELK CREEK AT GRAND PARK FILING NO. 1. WHEREAS, Grand Park and the Town of Fraser entered into a SIA, Reception # 2016001809, to ensure completion of certain infrastructure and which SIA provides for reductions in surety requirements. and WHEREAS, Grand Park has requested a partial reduction in surety (irrevocable letter of credit SLCPPDX06831) because these improvements are substantially complete and the Town Staff and Engineer have reviewed the request and have determined it to be in conformance with the provisions of said agreement. NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FRASER, COLORADO THAT: 1. The Town Board of Fraser, Colorado hereby authorizes a reduction in the surety required under the terms of the SIA from $321,106.00 to $129,052.00, releasing $192,054.00 to Grand Park Development LLC. READ, PASSED AND ADOPTED BY THE BOARD OF TRUSTEES THIS 18th DAY OF JANUARY, 2017. BOARD TRUSTEES OF THE TOWN OF FRASER, COLORADO BY: Mayor ATTEST: S E A L) Town Clerk MEMORANDUM JRS ENGINEERING CONSULTANT, LLC TO: Catherine Trotter, Fraser Town Planner CC: Allen Nordin, Fraser Director of Public Works FROM: James R. "Jim"Swanson, P.E. DATE: January 4, 2017 SUBJECT: GP Elk Creek Filing 1 Surety Release Request#1 This memorandum summarizes my review of the Grand Park letter request for partial release of the irrevocable Letter of Credit, held by Fraser for the Grand Park Elk Creek Filing No. 1, dated December 29, 2016. Grand Park is requesting a partial release of the US Bank letter of credit surety related to the Elk Creek at Grand Park Filing No. 1 Improvements from the initial Performance Guarantee amount of 321,106.00 to an amount equal to $129,052.00. Review of this request is performed in accordance with the terms and conditions included in the Subdivision Improvements Agreement(SIA) between Fraser and Grand Park for the above referenced project; Reception#2016001809. Based on my review of Grand Park's request, no exception is taken to their requested reduction of the performance guarantee surety for this project. This recommendation is based on my understanding of the current project status, of the constructed improvements, from the periodic site observation reports received from Bowman Consulting. 6013 E. Briarwood Drive-Centennial,CO 80112 303) 726-5577 LcANLiPS 01,,, -042,„,r.k December 29,2016 Sent Via E-mail Town of Fraser Attn: Catherine Trotter P.O. Box 120 Fraser, CO 80442 Re: Elk Creek at Grand Park Filing No. 1 - Improvements Surety Release Request Number 1 Dear Catherine, Please accept this letter as a request to the Town of Fraser("Town") for a partial release of the US Bank letter of credit surety held relating to the Elk Creek at Grand Park Filing No. 1 (SIA Reception#2016001819 recorded 3/17/16) Improvements completed to date as noted on the attached Exhibit A less the 20%warranty surety for the completed items. The surety amount for this project currently held by Fraser is$321,106 including warranty and completion surety. This is the first surety release request for this project. Upon release,the Town will have a surety balance of$129,052 representing the uncompleted work with a 25%completion surety and the 20%warranty surety for the completed work all as shown on the attached Exhibit A. Thank you for your consideration of this request. Sincer- liti f ipscomb, _````.tr President Cc:Jeff Durbin M, IN Il1•1•Wl• 'ill 7;f 8411111 I.3,N tr71) 7 '4 )4,41;•1 H1:4 h, AlF• OP-ft 1- 'r7C 77(, $1701) 4 '14.1`41,11 lIIIN 4)1'1.11 I, 071, 7'ry ;1(1'4 I't),I 01•°'t '• 110X 411 WI 1•14 I'..Nlt COI tilt:VIII 1111.414:t EXHIBIT A Engineer's Cost Estimate for Public Improvements Project 15117-Elk Creek PHASE 1 Date-9/28/2015 CONSTRUCTION COSTS Quantities/Pricing Cost Roadways Ory Unit Price cost 1 Asphalt Pavement 2,857.00 SY $ 24.00 $ 68,568.00 complete 2 Mountable Curb and Gutter 2,712.45 IF $ 16.00 S 43,399.21 complete 3 Crosspan 934.60 SF $ 11.00 $ 10,280.60 4 Sidewalk 4,724.37 SF $ 4.00 $ 18,898.28 complete Signs(Stop Sign,Speed Limit,No Parking,Warning Sign) 5 9.00 EA $ 96.00 5 864.00 6Street Lights 3.00 EA $ 500.00 $ 1,500.00 Total 143,310.08 Storm Sewer Ary Unit Price Cost 1 18"RCP 77.00 IF $ 63.00 5 4,851 complete 2 24"RCP 24.00 IF S 67.00 $1,608 complete 3 30"RCP 710.00 LF $ 78.00 5 16,380 complete 4 18"FES 2.00 EA $ 2,000.00 $4,000 complete S 24"FES 1.00 EA $ 2.400.00 $2,400 complete 6 Pond Outlet Structures 2.00 EA $ 5,000.00 5 10,000 7 2'Type'M'Riprap 67.00 TN $ 88.12 $5,904 8 Concrete Aprons 909.00 SF $ 4.00 $3,636 9 Headwall(per COOT Std.M-601..10) 33.00 IF $ 80.00 $2,640 10 Wing Walls(per CDOT Std.M-601-20) 18.00 IF .$ 58.00 5 3,364 54,783 Sanitary Qty unit Price Cost 1 1 8'PVC 1,459.00 LF $ 31.20 $ 45,521 complete 2 Manholes 11.00 EA $ 3,000.00 $ 33,000 complete 3 4'PVC Service laps 10.00 EA 5 800.00 $8,000 complete 4 4"PVC Services 256.00 IF $ 25.00 $6,400 complete 5 Connect to Existing Manhole 1.00 EA $ 900.00 $ 900 complete Total 93,821 Water I Qty 1 Unit Price [ Con 1 1 8'Water(PVC) 314 IF $ 40.00 $ 12,560 complete 2 12'Water(PVC)877 IF $ 55.00 $ 48,235 complete 3 Fittings 15 EA $ 400.00 $6,000 complete 4 8'Gate Valves 2 EA $ 2,000.00 $4,000 complete 5 12'Gate Valve 4 EA $ 2,700.00 $ 10,800 complete 6 Fire Hydrant Assembly's 4 FA $ 4;800.00 $ 19,200 complete 7 3/4'Water Service Taps 4 EA $ 800.00 $3,200 complete 8 9t4"Water Services 338 Ir 5 71.00 $7,098 complete 9 Relocating F.H.Assembly w16'DIP A.6'Gate Valves I EA $ 1,300.00 $1,500 complete 10 Connect to Existing 1 FA $ 750.00 $ 750 complete Total 113,343 Erosion Control ow Unit Price l Cost I Erosion Control Log 3,489 IF $ 3.75 $ 13,084 complete 2 Vehicle Tracking Control Pad 1 EA $ 3,400.00 $3,400 complete 3 Sediment Basin(Pond u4) 1 EA $ 4,200.00 $4,200 complete 4 Rovegetaticn 44,676 SF $ 0.09 5 4.021 comelete Total 24,705 Roadway Grading I Qty 1 Unit 1 Price 1 1 Cost 1 1 Cot 200 CY $ 2.00 5 400 complete 2 Net(Fill) 7,104 CY $ 2.00 S 14,208 complete S Total 14,608 Total Uncompleted Work Cost Before Contingency 38,189 Town of Fraser 25%SIA Contingency 9,547 Surety Held for Work to be Completed 47,736 't Completed Work 5 406,581 20%Warranty Surety 81,316 •2 Total US Bank LOC Surety Provided 321,106 C:\Users\clipscomb\Desktop\Elk Creek Surety Release Cost Est.12-28-16 Page lof 1