HomeMy Public PortalAbout07-0068 Mahany (N10O 4
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 02 -20 -2007 PERMIT #: 070068
WORK DESCRIPTION: RAISE KITCHEN FLOOR
WORK LOCATION: 1115 SECOND AVE
OWNER NAME HUGH MAIIANY
ADDRESS 12502 APACHE AVE
CITY, ST, ZIP SAVANNAH GA 31419
PHONE NUMBER
CONTRACTOR NAME HUGH MAHANY
ADDRESS 12502 APACHE AVE
CITY STATE ZIP SAVANNAH GA 31419
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 95.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $10,000.00
TOTAL BALANCE DUE: $ 95.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will he voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: / il nn
1 �—'
P. O, Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
e • ',•-,', ,
' t ` 7 ' . •. . :•,..:-.',• :
' Y •.‘.
‘ • •
, r
.I
nspection Report -- ..4
- ) k v
citv o Tee Edand
41)3 Butler Avenue.
P::n„ Rox 2149
Tybee. isfxind, GA, 31328
Ph emez (91)1 76-4573 ext.AS 114.
Fax (912) 786-9534
,----Th n 2 - i-.1
Permft fic). ( .--/ - 0 CDC-. R Date Rep, &Par) ted ________,L ...___IJ,.-7- ( ') - 1
fTh - 2 ---
Date Needed , -r -) (..)?5' 0 7Z,
0
C.411. contractor ,. Subcontractor
Contact Number 0 at-) 7
----0 ----
,
el.cation _0.15 . • C 0, _
-\ cA v e..J .
/ 1 ...---
, -.....
7 i 5, ' C. I
Dati-_ of 1:rhspc-. ,2,./ u / L-- • T ime - 1 rt* p a C te r `-- ' C
fTh /
Type of 1 nspe rth) n •- rro cyN . r) (?,
n
il grNss'
i i f , 1 i / ----
i ,- .., /74
f i / 17,
I ..: ` _.
. ,
__------- ----
;-----
,--
--...— - -- — -- -- -- ---. -- — ---
- CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
41$
d
Location: 1/13 2 . PIN #
NAME ADDRESS TELEPHONE
Owner
..V. i .,-F-,4., 'mil // /. 'S' ' 27 ilG� 7,q/-,- 7 7
Architect
or Engineer
Building
Contractor U,,,,,,, e r-4? {Z,
(Check all that apply)
El Repair Residential ❑ Footprint Changes
1 Renovation ❑ Single Family ❑
Ell Minor Addition n Duplex [V emolition
❑ Substantial Addition Ell Multi - Family
❑ Other ❑ Commercial
Details of Project: --- . 1-z, < i —cj_i .N.,i z, "
Estimated Cost of Construction: $ ,,, �, "
Construction Type / (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED EL !' • ► ' VEY OF LOT and complete the
following information based on the construe 'o drawing an• site plan:
# Units # Be. ooms 1 `� # Bathrooms
Lot Area Lilt' .. spac; Vaal • • . )
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culv . With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories 7 Height Z , Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by ��� �,�, v
Construction debris will be disposed by S � y , by means of
I understand that I must comply with zoning. flood damage control. building. fire. shore
protections and wetlands ordinances. FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 2 , -7 Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification _ NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site t ..
Distance to water main tap site , ., , < - _ � x.J
Distance to sewer stub site �% "` "
Water meter size .✓'��
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator /" „ Permit 600
Code Enforcement Officer • d a61r 4 Inspections
Water /Sewer — O Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
r TOTAL 9,�ji