HomeMy Public PortalAbout07-0103 Coral Investment Group }
(
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 03 -9 -2007 PERMIT #: 070103
WORK DESCRIPTION: CLOSE IN RELOCATED COMM BLDG
WORK LOCATION: 1213 HWY 80
OWNER NAME CORAL INVESTMENT GROUP
ADDRESS PO BOX 1418
CITY, ST, ZIP TYBEE ISLAND GA 313281418
PHONE NUMBER
CONTRACTOR NAME VIPER CONTRACTING LLC
ADDRESS PO BOX 1968
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE U
TOTAL FEE'S CHARGED $ 25.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $2,200.00
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must he posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will he voided
unless work has begun within six months of the date of issuance.
v
Signature of Building Inspector or Authorized Agent: .../LO,Y1 01
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
('c e_ r
::\OE. • - • .er".
DX Lilcr./13 - •
c\:) T',/ • • •
. -
-0C r ry-N ':.) \.)
.4% • • AI /
c 0_ \
inspection Report
City of Tybee Island
403 Butler Avenue
P.O. Box 2749
Tybee Island, GA 31328
PhOfte7 (912) 1ft-4513 extension 114
Fel.N7 (912) 186-9539
Permit 74 ri 0 - 3 Date Reg n 1 - -
„
Owrkee* artiea f a -- Date Needed 0 "7
Gen, T. \( es s hcontractor
Contact': ti limber aso t 1- i12-o193
Location
\ 3
.„
-a -7)0
( - 1
Inspector Date of Inspection •
Tyrte'"of inspection ("N 61 8 Q_ .
•,, Pass Ez
Fail
,
,
In sPeCti011 Report
431- TybePl.lizilfil
40flier Avenue
P.O. :lox 2749
Tybee island, GA - 3E32 is
Phgne' (912) 18(7-..-4513 ey.tf-resiltitgi 114
Fan: (912) 786-9539
---. r ----, (---„„ , i ■
Perm ii Mo. (,--) I - L.-) 0 3 nate Recii,7G L- :1 — I 1 - Di
Ownees Mame. L a k .- ,n V
,
Gefi, 1.2antr;3,r_tkr \l' , 0 (j Subcoiltractor
____________
I,) S P - -7)?,4■*, 1
lIrv.,4 c \rm
CrP r4t73 Ct iti : g rr ber
L 0 catjon (---,
1 3 . , ,I. „,, i,,, 0 te:
, ,
3 /)11-7,(vi —1,-----/
pat,- of inspectfr - 1 „,0 L f Time Inspector , I
Type c3i :Cm5p-f-A l C? ■ 1
i
i \
1 1 \ .1 1
I
-------
1 -,-- ,-----
1 ,
,/
CITY OF TYBEE ISLAND, GEORGIA o ,s
APPLICATION FOR BUILDING PERMIT
�• is-
�� - 01 0 3
OGN� 5+
Location: 1 L ,,L, r 2D U,S 1 #
NAME ADDRESS TELEPHONE
Owner eA4,2,,Q141 i4 t 7
Architect
or
Building Engineer r�,
Contractor
Wait- Pte" Csa'^� RA/ 1 y tt. sS�c _ .
(Chec 1 that apply)
epair ❑ Residential ❑ Footprint Changes V \ . r
❑ Renovation ❑ Single Family ❑ Discovery
❑ Minor Addition El Duplex ❑ Demolition \ J •
❑ Substantial Addition ❑ Multi - Family
❑ Other ❑ Commercial
Details of Project: CLbSE Fiot -1 t! L! NC FIL-Q4A
Estimated Cost of Construction: $ 2 ' - o o .
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction: � `� On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by Q kii1 'ate by means of 1 Z. Cam)
I understand that I must comply with zoning, flood damage control. building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necess ore-drainage impaired by this
permitted construction. n
Date: 3 -st- Signature of Applicant.
Note: A Hermit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES Sri,
Zoning Administrator �� Permit r —
Code Enforcement Officer ( 7 03 ^ d 7- -0 Inspections
Water /Sewer 0 Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL