HomeMy Public PortalAbout07-0114 McCarthy R
tr
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 03 -15 -2007 PERMIT #: 070114
WORK DESCRIPTION: DISCOVERY
WORK LOCATION: 1117A VENETIAN EXT
OWNER NAME KEVIN °A° ALIOTTA MCCARTHY
ADDRESS PO BOX 1566
CITY, ST, ZIP TYBEE ISLAND GA 313281566
PHONE NUMBER
CONTRACTOR NAME KEVIN % ALIOTTA MCCARTHY
ADDRESS PO BOX 1566
CITY STATE ZIP TYBEE ISLAND GA 313281566
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 50.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $10,000.00
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
, Y 0
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
MAYOR ; »r� CITY MANAG]
Jason Buelterman
A Diane Schleicher
CITY COUNCIL CITY CLERK
Wanda Doyle, Mayor Pro Tem Vivian Woods
Charlie R. Brewer
Barry Brown CITY ATTORN
Eddie Crone Edward M. Hugh
Dick Smith .
Paul Wolff
CITY OF TYBEE ISLAND
John Kevin McCarthy `-J 11�
P.O. Box 1566
Tybee Island, Georgia 31328
Date: February 28, 2008 Telephone Number: 912 - 786 -4582
Reference: Address Change
It has come to our attention that there is a House Numbering problem in the block
in which you reside. This causes a Public Safety problem of a critical nature:
therefore it is necessary to change the address of your house.
Please be advised that effective immediately the address of your house will be
changed:
FROM: 1117 -A Venetian Drive TO: 1111 Venetian Drive
Please change your records to reflect this address change and place the correct
number on the outside of your house so it can be clearly seen from the street.
A copy of this letter will be sent to the Police and Fire Departments, Electric
Company, Telephone Company and Water Department to update their records to
reflect the address change of the property. Please notify any other agencies you
deem necessary.
We apologize for any inconvenience this may cause.
Thank You for your cooperation.
Jimmy Brown 912- 786 -4573 X 112 O (14
0"1- D 4 -
P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749
(866) 786 -4573 — FAX (866) 786 -5737
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
D7- Q/(4t
✓Location: �/� �C^�i4 G�� /� PIN #
NAME ADDRESS TELEPHONE
Owner //c 3 /:y5?' /1' &/ i &<' c >�/9 Z 6" *5 6'
Architect
or Engineer ,�'rr� :�a of '�� z-9-/9/1
Building
Contractor
(Check all that apply)
❑ Repair ❑ Residential n Footprint Changes
❑ Renovation ❑ Single Family ;`a Discovery
❑ Minor Addition ❑ Duplex Demolition
❑ Substantial Addition El Multi - Family
❑ Other ❑ Commercial
Details of Project: T . y Q Li1/4 fi (Z. VolltiRMie t-ko v zf 0
... _. .._ .. `O0 ��
Construction Type Enter appropriate number)
(1) Wood Frame ' (4 I, sonry (6) Other (please specify)
(2) Wood & Masonry ` Y 5 S eel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the c• • ' wings and site plan:
# Units Bedrooms # Bathrooms
Lot Area L ing ..pac - t • t • sq. ft.)
# Off - street parking space
Trees located & listed on s to p •
Access:
Driveway (ft.) With cul . With swale?
Setbacks: Front • ear Sides (L) (R)
# Stories Height V - 'c. di i c easured from the average adjacent
grade of the building to the extreme "gh , • t ! ' i ilding, exclusive of chimneys, heating
units, ventilation ducts, air conditio g s, 1: a , ,rs, and similar appurtances.
D 'ng construction:
n -site restroom facilities will be provided through 72k y S ,72;
On -site waste and debris containers will be provided by SZK4) ,v1z --- T�s
Construction debris will be disposed by G by means of
understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
te: 1/„ /SYCr ignature of Applicant: & , ;?
U
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES C �
Zoning Administrator Permit 7
Code Enforcement Officer Inspections
Water /Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL ,�{�