Loading...
HomeMy Public PortalAbout07-0137 Rocker Development q CITY OF TYBEE ISLAND BUILDING PERMIT ABANDONED PROJECTS DATE ISSUED: 03 -26 -2007 PERMIT #: 070137 WORK DESCRIPTION: * *ABANDONED (7 BLDG /14 UNIT) ** WORK LOCATION: VILLAGE PL OWNER NAME ROCKER DEVELOPMENT, LLC ADDRESS P 0 BOX 2962 CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER 706- 816 -9078 CONTRACTOR NAME ROCKER DEVELOPMENT, LLC ADDRESS P 0 BOX 2962 CITY STATE ZIP TYBEE ISLAND GA 31328 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $1,750.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $ 1.00 ABANDONED PROJECT $250 X 7 = $1750 TOTAL BALANCE DUE: $1,750.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: eth P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org »7 1 t CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT ( oFfVBEg � .. 1 ,�� ry o, at'eL WED ��U1 0 � 0 -1 G EORG%I 1 • . ►1ay -P( Location: 9, B 1 - , Tvbee Island PIN # 4- 0003 -12 -007 NAME ADDRESS TELEPHONE Owner Rocker P.O. Box 2962 706 - 816 -9078 Developments Tybee Island, 31328 Architect Ciphers Design Co. 22 East Liberty Street 912- 233 -9968 or Engineer Savannah, GA 31401 - - - - - - -- - Building Rocker Building P.O. Box 2962 706 -816 -9078 Contractor Industries (Check all that apply) X New Construction ❑ Renovation [] Minor Addition X Duplex ❑ Single Family ❑ Substantial Addition X Residential ❑ Commercial ❑ Multi - Family El] Footprint Changes ❑ Repairs n Demolition ❑ Other Estimated cost of Construction: $ 307.530 . Construction Type 2 (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Residential Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units 2 # Bedrooms 3 per unit # Bathrooms 3 per unit . Lot Area 5438 s.£ Living space (total sq. ft.) 1669 + 1748 = 3417 s.£ # Off - street parking spaces 2 per unit . Trees located & listed on site plan 0 . Access: 14' -0" Driveway 14' -0" (ft.) With culvert? NO With swale? YES Setbacks: Front 20' Rear 10' Sides (L) 10' (R) 10' # Stories 2 Height 35' Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through . Tom's Jons . On -site waste and debris containers will be provided by Atlantic Waste , Construction debris will be disposed by Atlantic Waste at Savannah Land fill by means of Roll off dumpster I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances. FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: ' OLo Signature of Applica �/ 9C G � 61 2 �1 S Note: A permit normally takes 7 to 10 days to process. /7 J The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES Zoning Administrator t / o - . -o c. Permit / 30 Code Enforcement Officer Q $ 2 ..-p g Inspections 77 / Water /Sewer Q/a s/D Water Tap ✓�.SZ *x.2- Storm/Drainage '� �� (o -z! o c Sewer Stub ,55� Inspections Aid to Const. SV /7 City Manager /) e Z000 P rrp.: - •t3 • Sf' 7 "11 • w1 S 3 � TOTAL 417 acs- Y ° ` 11 gry. REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: Project I.D.: Attachments approved by: Date: CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT e p TYBEE GEORGI ✓) n v:1Ja5. el. Location: 1106t 10. Bates Tvbee Island PIN # 4- 0003 -12 -007 NAME ADDRESS TELEPHONE Owner Rocker P.O. Box 2962 706 -816 -9078 Developments Tybee Island, 31328 Architect Ciphers Design Co. 22 East Liberty Street 912- 233 -9968 or Engineer Savannah, GA 31401 Building Rocker Building P.O. Box 2962 706 -816 -9078 1 Contractor Industries (Check all that apply) X New Construction ❑ Renovation ❑ Minor Addition X Duplex ❑ Single Family ❑ Substantial Addition X Residential ❑ Commercial U Multi- Family ❑ Footprint Changes 0 Repairs ❑ Demolition C Other Estimated cost of Construction: $ 307,530 . Construction Type 2 (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Residential Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units 2 # Bedrooms 3 per unit # Bathrooms 3 per unit . Lot Area 5438 s.f. Living space (total sq. ft.) 1669 + 1748 = 3417 s.f. # Off -street parking spaces 2 Der unit . Trees located & listed on site plan 0 . Access: 14' -0" Driveway 14' -0" (ft.) With culvert? NO With swale? YES Setbacks: Front 20' Rear 10' Sides (L) 10' (R) 10' # Stories 2 Height 35' Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through . Tom's Jons . On -site waste and debris containers will be provided by Atlantic Waste . Construction debris will be disposed by Atlantic Waste at Savannah Land fill by means of Roll off dumpster I understand that I must comply with zoning, flood damage control. building., fire, shore protections and wetlands ordinances. FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: g3- & -OCR Signature of Applicant: ,d I 4g, (gr. l Pk1iE's Note: A permit normally takes 7 to 10 days to process. ✓ The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: S'_ e Date FEES Zoning Administrator �,�,., C, l D -z _06 Permit / 300. Code Enforcement Officer r �� I Inspections h `l f' Water /Sewer p Water Tap 5S0 , a. /�� 6 Storm/Drainage -2- 0 v Sewer Stub _ 5' Inspections Aid to Const. 3 //7. City Manager e R c2c oo. �.. pelf wAA" 1300 • Nse 7t 1 • — — w h A°`' TOTAL a e A. 44000. / REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: Project I.D.: Attachments approved by: Date: CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT 4;"r.::% Q-- ,,e' v ......- ----_ ) . (-6\ as... 00 ItQ l e, ?1. Location: l dt 11, Butler--Avenue, Tvbee Island PIN # 4- 0003 -12 -007 NAME ADDRESS TELEPHONE Owner Rocker P.O. Box 2962 706 - 816 -9078 Developments Tybee Island, 31328 Architect Ciphers Design Co. 22 East Liberty Street 912- 233 -9968 or Engineer Savannah, GA 31401 Building Rocker Building P.O. Box 2962 706- 816 -9078 Contractor Industries (Check all that apply) X New Construction ❑ Renovation ❑ Minor Addition X Duplex ❑ Single Family ❑ Substantial Addition X Residential ❑ Commercial ❑ Multi - Family ❑ Footprint Changes ❑ Repairs ❑ Demolition ❑ Other Estimated cost of Construction: $ 307.530 . Construction Type 2 (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Residential Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units 2 # Bedrooms 3 per unit # Bathrooms 3 per unit . Lot Area 5803 s.f. Living space (total sq. ft.) 1669 + 1748 = 3417 s.f. # Off-street parking spaces 2 per unit . Trees located & listed on site plan 0 . Access: 14' -0" Driveway 14' -0" (ft.) With culvert? NO With swale? YES Setbacks: Front 20' Rear 10' Sides (L) 10' (R) 10' # Stories 2 Height 35' Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Nat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: Project I.D.; Attachments approved by: Date: CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT 1 /A' .,' C c ( e ) * t (�1 OFORG \P Location: Li t 12, Bler--Avellue, Tybee Island PIN # 4- 0003 -12 -007 n. NAME ADDRESS TELEPHONE Owner Rocker P.O. Box 2962 706 - 816 -9078 Developments Tybee Island, 31328 Architect Ciphers Design Co. 22 East Liberty Street 912 -233 -9968 or Engineer ( Savannah, GA 31401 Building Rocker Building P.O. Box 2962 706 -816 -9078 Contractor Industries (Check all that apply) X New Construction ❑ Renovation ❑ Minor Addition X Duplex ❑ Single Family 0 Substantial Addition X Residential ❑ Commercial ❑ Multi - Family ❑ Footprint Changes ❑ Repairs ❑ Demolition ❑ Other Estimated cost of Construction: $ 307.530 . Construction Type 2 (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Residential Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units 2 it Bedrooms 3 per unit # Bathrooms 3 per unit . Lot Area 5866 s.£ Living space (total sq. ft.) 1669 + 1748 = 3417 s.£ # Off-street parking spaces 2 per unit . Trees located & listed on site plan 0 . Access: 14' -0" Driveway 14' -0" (ft.) With culvert? NO With swale? YES Setbacks: Front 20' Rear 10' Sides (L) 10' (R) 10' # Stories 2 Height 35' Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through . Tom's Jons . On -site waste and debris containers will be provided by Atlantic Waste Construction debris will be disposed by Atlantic Waste at Savannah Land fill by means of Roll off dumpster I understand that I must comply with zoning, flood damage control, building, fire. shore Protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. D � Date: 6 Signature of Applicant i Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES o0 Zoning Administrator r _ o c Permit /(. Code Enforcement Officer Os. z z - O (, Inspections Ill. Water /Sewer �G /� _ ( 6 Water Tap 55o. jr Storm/Drainage ; o . z Co Sewer Stub C Inspections . Aid to Const. 34.17. City Manager // `' ?C Z. 2000. �.. Pore"; A- % 300 00 TN5p 7 r1 I °° w/S moo• TOTAL _ A C C R. 44000' l 1) g� REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5-4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: - Project I.D.: , Attachments approved by: Date: • CITY OF TYBEE ISLAND, GEORGIA 4 APPLICATION FOR BUILDING PERMIT l q„ ( . 1 :o GEOROIP h k Location: 4 502, u ''- - rme, Tvbee Island PIN # 4- 0003 -12 -007 NAME ADDRESS TELEPHONE Owner Rocker P.O. Box 2962 706 - 816 -9078 Developments Tybee Island, 31328 Architect Ciphers Design Co. 22 East Liberty Street 912 - 233 -9968 or Engineer Savannah, GA 31401 Building Rocker Building P.O. Box 2962 706 - 816 -9078 Contractor Industries (Check all that apply) X New Construction ❑ Renovation ❑ Minor Addition X Duplex ❑ Single Family ❑ Substantial Addition X Residential ❑ Commercial ❑ Multi - Family ❑ Footprint Changes ❑ Repairs ❑ Demolition ❑ Other Estimated cost of Construction: $ 332,730 . Construction Type 2 (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Residential Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units 2 # Bedrooms 3 per unit # Bathrooms 3 Der unit . Lot Area 6915 s.f. Living space (total sq. ft.) 1823 + 1874 = 3697 s.f. # Off - street parking spaces 2 Der unit . Trees located & listed on site plan 0 . Access: 14' -0" Driveway 14' -0" (ft.) With culvert? NO With swale? YES Setbacks: Front 20' Rear 10' Sides (L) 10' (R) 10' # Stories 2 Height 35' Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: Project I.D.: Attachments approved by: Date: CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Z of TYBEF fi OZORG&P Location: 504. But.ler--A*eme; Tybee Island PIN # 4- 0003 -12 -007 NAME ADDRESS TELEPHONE Owner Rocker P.O. Box 2962 706 - 816 -9078 Developments Tybee Island, 31328 Architect Ciphers Design Co. 22 East Liberty Street 912 -233 -9968 or Engineer Savannah, GA 31401 Building Rocker Building P.O. Box 2962 706 -816 -9078 Contractor Industries (Check all that apply) X New Construction ❑ Renovation ❑ Minor Addition X Duplex ❑ Single Family El Substantial Addition X Residential ❑ Commercial ❑ Multi- Family ❑ Footprint Changes ❑ Repairs ❑ Demolition ❑ Other Estimated cost of Construction: $ 379.620 . Construction Type 2 (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Residential Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units 2 # Bedrooms 3 Der unit # Bathrooms 3 per unit Lot Area 6924 s.f. Living space (total sq. ft.) 2196 + 2022 = 4218 s.f. # Off - street parking spaces 2 per unit Trees located & listed on site plan 0 . Access: 14' -0" Driveway 14' -0" (ft.) With culvert? NO With swale? YES Setbacks: Front 20' Rear 10' Sides (L) 10' (R) 10' # Stories 2 Height 35' Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT \i/ G # oN \J K .,..RoP ``// I 1-: csk Sk . Location: LISt 506. Butler Avenue. Tybee Island PIN # 4 -0003- 12 -007 NAME ADDRESS TELEPHONE Owner Rocker P.O. Box 2962 706- 816 -9078 Developments Tybee Island, 31328 Architect Ciphers Design Co. 22 East Liberty Street 912- 233 -9968 "'- ' or Engineer Savannah, GA 31401 Building Rocker Building P.O. Box 2962 706 -816 -9078 Contractor Industries (Check all that apply) X New Construction ❑ Renovation 0 Minor Addition X Duplex ❑ Single Family ❑ Substantial Addition X Residential ❑ Commercial 0 Multi - Family ❑ Footprint Changes ❑ Repairs ❑ Demolition ❑ Other Estimated cost of Construction: $ 350,640 . Construction Type 2 (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Residential Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units 2 # Bedrooms 3 per unit # Bathrooms 3 per unit . Lot Area 6932 s.£ Living space (total sq. ft.) 1874 + 2022 = 3896 s.£ # Off - street parking spaces 2 per unit . Trees located & listed on site plan 0 . Access: 14' -0" Driveway 14' -0" (ft.) With culvert? NO With Swale? YES Setbacks: Front 20' Rear 10' Sides (L) 10' (R) 10' # Stories 2 Height 35' Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through . Tom's Jons . On -site waste and debris containers will be provided by Atlantic Waste . Construction debris will be disposed by Atlantic Waste at Savannah Land fill by means of Roll off dumnster I understand that I must comply with zoning, flood damage control, building, fire, shore Protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 0 - 8 G(_.v Signature of Applicant:_zh j .�Cl �11�2S Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signat ze Date FEES Zoning Administrator . _ t iZ I.& ( A , 2 .7 C Permit d Code Enforcement Officer 46r,_ gr Z Z 7 -04 Inspections Water /Sewer x //� j "° ,/s /(f 6- Water Tap 6 D Storm/Drainage � !© •� -�a Sewer Stub Inspections � Aid to Const. 3396 City Manager /) U 0612-- o DO. Pveit CV 4 EC) • =1‘sP e3 rl `1 • s asj , TOTAL 1 4 5 a,.c ' �''