HomeMy Public PortalAbout07-0177 Condon CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 04 -20 -2007 PERMIT #: 070177
WORK DESCRIPTION: CABINETS /SINK/WATER HEATER
WORK LOCATION: 1217 BAY ST 225A
OWNER NAME EVE CONDON
ADDRESS PO BOX 35
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME EVE CONDON
ADDRESS PO BOX 35
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 46.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $3,200.00
TOTAL BALANCE DUE: $ 46.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, tire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City, of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: _11;,y1,-e) /01;6
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
1 .
I . .
,.,
, ..: ,. .'."11'..6,,.
.. .,..2 '• • :-,::
..,.. ..,
Inspectiori Report
otv
o Tybee Island
4€4 i3a.iitier Ave,
P.cm. nor
Tee .Ksi-74ad, Grk 31326
PiAccie,: (912) P36-4573 ext. 114
F a. X: ('131.2) 7116-3539
1
Pert no, 07- 0 / ?? Date Requested
I /)
'-- Oltarter N a Ell e ( nx/driA/ Date Needed Acin . c-- 2- or.) r*
1 1.7-,:z_lp. Suhicc
, 1- "D f",:: 1- i fl
r-rt nt3C:t Yt IliTifi• 4W.:IT ft - r - k 1 1 0 ''' y \t/ ‘ nt ■ '-=', - ;2 (2 ) 4 , - -; / Li 6D - -5 ! - f 's/ /' % 5K.33
......
_.,.
ingpector ri-IP Date of Inspection el0?)
/ I
Typc of Inspection
, i
,,.. „.... LA t _
PaSS L e.... 1
,
bni)c7
r i... 1
Fail i X.
/
' to%
A1( 4v1
' 1
i NIL .., _
e:,
., a-- • 2
, _ ') " i t .::)' C :.— , \ .--
\ ' '''-i LiTg
, !,,,‘ .. i 4 4 • % ''.' !
'= - - 7 , 4 ::. •
Inspection Repot
4, gg Tybee Is mn4 C0 (1
403 Buller Alien LIP .(7'
P,..0. iacf.A 174-9
lybee Isizn;I, Gik 31.2
..,.., V
--- it
Phone: (81:2)1U6-4513 extension 1(14
Fax: - 91 - .1.1. 736-9535
„...,,,,,
Perm q bin, U ( -- 0 t 7
Chafne P ' 5 M a m e ‘,,.. 0 In c.A o 1,-,
( ) -, e .--
.00,N Nef...!ileird Ob - 2, 0 - - 7 m
... _
Gen_ coritractp. r SLabf:entracto r
K'e 11
1---- V '
co ritt hi litrkber
- 2_ ( 1 s"4-- -4- - Th
i -Th (---j
Locatinn , 0 c_1, _ . , „.•.-- .z...,..) _ /
_ U ----- /
/----- 7 —7
•
1 ri- pet to r C e
-.....s ,, nOtP cf I nsncti4Dn ......>
-
i
Type of Inspection
Pass
O.
,..s
I—I
Fa„ Li,
APR - 11 -2007 11:20 PNC MULTIFAMILY CAPITAL 678 762 9665 P.01/01
.;fly OF TYBEE ISLAND, GBORGI
APPLICATION FOR BUILDING PERMIT
Location: /ail 644 - 'P 4 .28 I-t' PIN #
NAME
/ ADDRESS TEL EPHONE
Owner 6- 4. 1 A � ,,+ ,A :t '.r f_ • W6-21
i liter 675-- clioZ -53 eat
/I) 11 or - w; e:er PM
Building vie b - A1+0 ``
Contractor fi t 1 /UMi ) r of7p0 / C / _ I o n_( r„
(Check all that apply)
III epair esidezttxal r] Footprint Changes
e ion A ' ❑ Single Family 121 Discovery
❑ Minor Ad Lion ❑ Duplex ❑ Demolition
E. Substantial Addition [] Multi - Family
E Other ❑ Commercial
Details of Project: I; ;x A / a- 510.,t . /MCP
-.
Estimated Cost of 'snstruction: S( 1'll d ' f '
Y
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
R.earks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF L and complete the
following information based on the construction drawings and site plan: fr
# Units # Bedrooms # .Bathrooms
Lot Area Living space (total sq. ft.)
# Off- street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft,) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances_
APR - 11 -2007 11:41 TOTAL P,01
678 762 9665 99% P^01
APR - 11 - 2007 11:0B NNl I`IUL 11 t - HI . 11 L T l Hr 1 i IL .
During construction:
On -site restroom facilities will be provided through id /4-, -
On -site waste and debris containers will be provided by �+ r, -
Construction debris will be disposed by c by means of ,1 "
I understand that I must comply with zoning. flood damage_cotiol_ building fire, shore
protections and wetlands ordinances. PEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must erasure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date; / ' //. ,tt '1 Signature of Applicant: '� , 4 r %MP'
Note: A permit normally takes 7 to 10 days to process_
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoningvariance7
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site c
Distance to water main tap site - e k
Distance to sewer stub site ,../, \� � _ .
Water meter size C1
Storm drainage
Approvals: Signature Date
PEE j
/ 5 . 1.O t7
Zoning Administrator /`?, Permit
0 °
Code Enforcement Officer v oz/-7/-0q Water Tap Inspections
Water/Sewer Sewer Stub /
Inspections Aid to Const. /
City Manager
TOTAL
APR -11 - 2007 11 :28 678 762 9665 99% P.02
APR -11 -2007 11 :08 PNC MULTIFPMiLY U-1 IHL
REQUIRED FOR: Building Permits
Relocation Permits
Sign Permits
Demolition Permits
Land Clearing, Disturbance or Excavation Pits
Tree Removal Permits
Relocation Permits
Special Review Permits
Site Plan Approval
Subdivision of Land
Sketch Plan Approval
Preliminary Plan Approval
Final Plat Approval
Minor Subdivision Plat Approval
Major Subdivision Nat Approval
In addition to specific requirements for the above permits and approvals, applicants must
demonstrate that they are in compliance with the City of Tybee Island Storm Water Maxiagement
requirements as outlined in Chapter 5-4, Code of Ordinances,
Section 5-4 -9 Prohibition provides, in part, as follows:
(4,) It is unlawful for any person to cause or permit any storm water to flow from their
property onto the property of another person, unless such storm water naturally
flowed thereon prior to any development activity.
(5.) It is unlawful for any person to interrupt the flow of any storm water runoff from
adjacent property onto their property by any development activity.
As part of the City's approval process applicants must illustrate how these storm water
management prohibitions will be met, including a showing of how storm water naturally flowed
on the affected property (prior to any development activity), and what changes in storm water
flow have occurred or are expected to occur, as attachments to this form. The City's approval or
permit does not guarantee that the applicant's plans will result in meeting requirements. The final
product must actually meet the City Ordinance requirements.
Applicant name:
Project I.D.:
Attachments approved by: Date:
TOTAL P.03
APR -11 - 2007 11:29 678 762 9665 97% P.03
APR -11 -2007 11:08 F'Nl riu� 1 rHi i i LT rir i i rye
FACSIMILE COVER S.1-1 " ! ` 61
71): Ms. Dianee Otto
Ty6ee IsCand Dept. of Building and Zoning
912`786
FROM: Eve Condon
Date: .April ii, 2007
Subject: Building Permit
,Ms. Otto,
yodowing _please find the completed building permit application for
the work that .F would like to do at my condo.
The work is mainly repair with replacement of outdated and
faulty appliances.
Please contact me at 678 - 462 to Cet me know how much the
permit wilt and how to proceed: I work in _Atlanta so it is
difficult for me to come into your office in person during the
normaf-work week.
appreciate your assistance with this matter.
APR -11 - 2007 11 :28 678 762 9665 98% P.01