Loading...
HomeMy Public PortalAbout07-0204 Mulling O 44 CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 05 -2 -2007 PERMIT #: 070204 WORK DESCRIPTION: CARPET, TILE, CABINETS, FIXTURES WORK LOCATION: 1608 JONES AVE 12 OWNER NAME JEFF MULLING ADDRESS PO BOX 2683 CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER 429 -9988 CONTRACTOR NAME GRIMES CONSTRUCTION ADDRESS CITY STATE ZIP SAVANNAH GA FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $ 175.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $20,000.00 TOTAL BALANCE DUE: $ 175.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to bold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected front the weather. If this permit is not posted work will he stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: 1:24 „ev-,4,43 P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org e Inspection Report City of Tyb€e 403 RFiltier Avenue P„0„ ;lox :2149 Tytwe Istan GA 313 Pitirtue-.! t91)) 18f:k-4513 Plitensiou 114 fa:4: (912) 786•9539 -- 204 Permt _ Date Requested 0 CnitErter's Marne _I Date Needed 0 1 - o Ger?, C nt N 7 Subcontractor Q Co intar t Nulnbei= Q ri g (E)- c") ce3 . Loc-atio I Of; Pec 170 Date of Inspection T ipe of 11-sperthil Pass E ?,S8 tx et CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT 0'7-0204 Location: / 60 ,S l c��r 4Pei..4k / PIN # NAME ADDRESS TELEPHONE Owner ,,y� r� /i/ 6 Pc g.aX 2 6.Y3 t y, C 5l 2 29- 9‘clii? Architect or Engineer Building Contractor G,e _, ,PS G»N.s Tie yc 7r0r0 (Check all that apply) ❑ Repair ❑ Residential El Footprint Changes Renovation U Single Family ❑ Discovery ❑ Minor Addition ❑ Duplex El Demolition ❑ Substantial Addition ❑ Multi- Family ❑ Other ❑ Commercial Details of Project: ebt,,e) re'• Coq fc'7 r r ( � �2 , iv C OfiA:Ti rCS Estimated Cost of Construction: $ ..Q 00Q Construction Type 2 (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: / c <; ,u Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units / # Bedrooms / # Bathrooms / Lot Area Living space (total sq. ft.) 6 0 # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories .2_ Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by n n4- rc .� 1-cr by means of .1- .j I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequa drainage of this property so that surrounding property is in no way adversely affect-d. I accept responsibility for any corrective action that may be necessary to restore d • nag- i afire. by this permitted construction. Date: 312/0 Signature of Ap t,/ i Note: A Hermit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site . , n Distance to sewer stub site ,t)( 1 3 J 1 r\./ )' Water meter size Storm drainage Approvals: � Si� rem Date FEES Zoning Administrator Permit (1 S Code Enforcement Office" ��` -- D5 0.? - 7 Inspections (o D Water /Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL PC. S