Loading...
HomeMy Public PortalAbout07-0224 Buelterman VI rkroo,,,yo " CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 05 -14 -2007 PERMIT #: 070224 WORK DESCRIPTION: PATIO WORK LOCATION: 3 CEDARWOOD OWNER NAME JASON BUELTERMAN ADDRESS P 0 BOX 83 CITY, ST, ZIP TYBEEISLAND GA 313280083 PHONE NUMBER CONTRACTOR NAME JASON BUELTERMAN ADDRESS P 0 BOX 83 CITY STATE ZIP TYBEE ISLAND GA 313280083 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $ 25.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $1,200.00 TOTAL BALANCE DUE: $ 25.00 it is understood that if this permit is granted the builder will at all times comply with the zoning, subdis ision, flood control, building. lire, soil and sedimentation, wetlands. marshlands protection and shore protection ordinances and codes whether local. state or federal. including all env ironmental laws and regulations when applicable, subsequent owners should he informed that any alterations to the property must he appr ed by the issuance of another building permit. Permit holder agrees to hold the City of Ty bee Island harmless on am construction covered by this permit. I his permit 1101,1 ha lJ Ill a r onspii boils loeatlon in the troilt of building and piolecn-d from the ss(Attu i. 11 this p i unit is 1101 push( - fl w Oa IN ill he stopped. I In huildin ( oalca wilt replace curb pa)ino and gutser brokrn during constructiola. 1 hi > pet Mil will hr' filth rd under:, n0I I, has begun within si; months of lin date ofissuan<f. Si WOW of BItiidiri; liiapvdoi or Atithirrizec) Agt-nl: � r P. O. Box 2749 - 403 Buder Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: S s - <) Signature of Applicant ALA „� � Um cr- Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES Zoning Administrator Permit 2S'. Code Enforcement Officer Inspections Water /Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL 25. CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT iiit Location: 3 C.P_cicetr (Ji 0 0 4 PIN # NAME ADDRESS TELEPHONE Owner �a 0 ^ R.O. B oWg3 le ( r o.r t �1 6.gg_, J-S tQu, d , / . , - . • Architect or Engineer Building Contractor (Check all that apply) ❑ Repair [ ✓Residential n Footprint Changes n Renovation [•� mgle Family ❑ Discovery ❑ Minor Addition ❑ Duplex ❑ Demolition ❑ Substantial Addition ❑ Multi- Family ./Other p.i,. -; p ❑ Commercial Details of Project: Estimated Cost of Construction: $ I Z' o Construction Typenter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CE FIED ELEVATION SURVEY OF LOT and complete the following information base the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With Swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances.