HomeMy Public PortalAbout07-0230 Savannah Beach & Racquet Club h '' 1 Rnjn'tW? /
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 05 -22 -2007 PERMIT #: 070230
WORK DESCRIPTION: SHALLOW WELL
WORK LOCATION: 1217 BAY
OWNER NAME SAVANAH BEACH & RAQUET CLUB
ADDRESS 1218 BAY STREET
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME AQUA -WELL INC
ADDRESS 101 EAST PINES ROAD
CITY STATE ZIP SAVANNAH GA 31410
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 25.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $ 0.00
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: v �!7
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
Ma 81 Ur u•t :urn
X"YI1EE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
a '
0 '7 - 023
Location 5 t? 6)./),12,0 ; , Q� ��� t3r�E,�� , c PI #
NAME ADDRESS TELEPHONE
Owner: I I n,Ar^ s.. 1 TTY ; . � � /z/ 7 45 ,o-2 5 1 105 7-5
Architect
or Engineer
Building
Contractor
(Check all that apply)
New Construction 0 Renovation 0 MmorAddition
0 Duplex ❑ Single Tainity ❑ Substantial Addition
.,❑ Residential ❑ Commercial ❑ MMiIti is niiy
�� Footprint Charge ❑ Repay ❑ Demolition
[] Other
Estimates cost of Construction: S •
Construction Type (Eater Appropriate Number) -
(1) Wood Frame (2) Wood & Masomy (3) $rxck'Veneer (4) Masonry
(5) Steel & Masonry (6) Other (Please Specify)
Proposed Use:
Remarks: '574 / /C' if) //
ATTACH A COPY OF TEE u.t.K.x IL u ELEVATION SURVEY OF LOTS and complete
the following information based on the constnriction drawings and site plan
T Units # Bedrooms # Bathrooms --
Lot Area Living Space (Total SgFt)
Off strcct Parking Spaces
Trees located & Listed on Site Plan
Access:
Driveway (FL) With Culvext? With Swale?
Setbacks: Front Rear Sides (JL) ( R)
Stories Freight 'Vertical dist:ance measured from the average adjacent grade of the
building to the extreme high point of the building, exclusive ofchinuucys, hcating exits,
ventilation ducts, air conditioning waits, elevators 233d similar appurtanc es.
During Construction.
On-site =strum facilities will be provided tbrougb -
On site waste & debris containers will be provided by
MAY -21 - 2007 17:11
912 898 0799 95Y P.02
riay - e1 07 04 :57p Tommi Smoak 912 - 898 -0759 P•3
Construction debris will be disposed of by at by means of _ _
I understand that I must comply with zonine. flood damage control. buildine. firer shone
protection & wetlands ordinances, �A regulations and all applicable codes and regulations: I
understand that the lot roust be staked out and that the stakes will be inspected to ensure that the.
setback requirements arc inet. X tiandcrstand also that a certified plot plan showing cicvati n must
be attached to this application and that an as built elevation certification is due as 50011a.5 the
Ilabi table floor level is established Drainage: X realize that 1 must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected" I accept
responsibility for any corrective action that may be necessary to restore drainage ium zircd by this
permitted construction. l
7 S " turc of Applicant: .! „ . (' - .-,
Date: , ...?7Z//0 � Pp
Note: A permit normally takes 7 to 10 days to Ivt- ocess. z 'c --5"_5
- -The following is to be completed by City Personnel_
Zoning Certification N'FIP Flood Zone
Approved Rezoning/Variancc? -
Street Address & Number: New - Existing -
Is it in compliance with City Map? _ If not, has street name and/or Islin: bcz
been reported to MPC?
FEMA Certification Attached
State Energy Code Affidavit Attach =d
Utilities & public Works:
Describe any unusual finding • •
t -
Access to Building Site 1— _ 1(.) -
Distance to Water Main Tap Site ,/J i _) ) ► `,-------
Distance to Sewer Stub Site - Ci /" '' �/
Water Meter Size --/
Store n Drainage v--
Approvals: Date
Zoning Administrator l < Fees: ,,
C o d e E n f o r c e m e n t 0 c. ,c C e --- ,� �^ /--61 Permit 5
Water /Sewer `� () Inspections
Stor m/Drainage Total G/F
Inspections Water Tap
City Manager - ScwcrStub
Aid to Const
Total W/S
MAY -21 -2007 17:11 912 898 0799 95% P.03
May c 1 u •
•
•
REQ ABED FOR: Building Permits •
- Relocation Permits -
-. Sign Permits
Demolition Pcnnits
Land Clearing, Disturbance or Excavation Permits
Tree Removal Permits
Rcl•c-lioa Permits
Special. Review Permits
Site Plan Approval
Subdivision of Land
Sketch Pan Approval
Preliminary Plan Approval
Final Plat Approval
Minor Subdivision Plat Approval
Major Subdivision. Plat Approval
In addition to specific requirements for the above permits, and approvals, applicants must
demonstrate that they are in compliance with the City of Tybee Island Storria :Water Management
requirements as outlined in Chapter 5--4, Code ofOrdinanceso
Section 5-4-9 Prohibition, provides in part, as follows:
•
(4) It is unlawful fo• any person to cause or permit any stoma water to flow from their
property onto the pi opetty of another person„ unless such storm water naturally
flowed thereon prior to any development activity.
(5.) It is unlawful for ray person to interrupt the flow of any storm water runoff from
adjacent property onto their property by any development activity.
As part of the City's approval process, applicants must illustrate how these storm water
management prohibitions will be tact, including a show of how storm water naturally flowed
on the affected property (prior to y development activity), and what changes in storm water
flow bavc occurred or are expected to occur, as attachments to this form. The City's approval or
permit does not guarantee that the applicant's plans will result in meeting requircancats. The
final product must actually meet the City Ordinance requirements_
Applicant Name:
Project X.D.:
Attachments approved by: Date:
95� P.04
912 998 0799
ria El 07 1J457p IOMMY Smoak U1C r.1
F To: Chuck
F Fax number: 786-9539
. .
From: Tommy Smoak -
Aqua-Welt Inc. Fax number: 898-0799
101 East Pines Road
Savannah, Ga. 31410 Date: 5/21/2007
897-0770
WWW. AQUAWELLGA.COM
Regarding:
Permit Savannah Beach and Racquet Club
Phone number for follow-up:
•
CELL - 210-3541
Comments:
CHUCK, COULD YOU PROCESS THIS APPICATION AND LET ME KNOW WHEN IT ES
READY_ I WILL COME DOWN PAY YOU . THANKS TOMMY SMOAK. MY COUNTY
NUMBER IS 652-7648.
MAY-21-2007 17:11 912 898 0799 95% P.01