Loading...
HomeMy Public PortalAbout07-0230 Savannah Beach & Racquet Club h '' 1 Rnjn'tW? / CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 05 -22 -2007 PERMIT #: 070230 WORK DESCRIPTION: SHALLOW WELL WORK LOCATION: 1217 BAY OWNER NAME SAVANAH BEACH & RAQUET CLUB ADDRESS 1218 BAY STREET CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME AQUA -WELL INC ADDRESS 101 EAST PINES ROAD CITY STATE ZIP SAVANNAH GA 31410 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $ 25.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $ 0.00 TOTAL BALANCE DUE: $ 25.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: v �!7 P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org Ma 81 Ur u•t :urn X"YI1EE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT a ' 0 '7 - 023 Location 5 t? 6)./),12,0 ; , Q� ��� t3r�E,�� , c PI # NAME ADDRESS TELEPHONE Owner: I I n,Ar^ s.. 1 TTY ; . � � /z/ 7 45 ,o-2 5 1 105 7-5 Architect or Engineer Building Contractor (Check all that apply) New Construction 0 Renovation 0 MmorAddition 0 Duplex ❑ Single Tainity ❑ Substantial Addition .,❑ Residential ❑ Commercial ❑ MMiIti is niiy �� Footprint Charge ❑ Repay ❑ Demolition [] Other Estimates cost of Construction: S • Construction Type (Eater Appropriate Number) - (1) Wood Frame (2) Wood & Masomy (3) $rxck'Veneer (4) Masonry (5) Steel & Masonry (6) Other (Please Specify) Proposed Use: Remarks: '574 / /C' if) // ATTACH A COPY OF TEE u.t.K.x IL u ELEVATION SURVEY OF LOTS and complete the following information based on the constnriction drawings and site plan T Units # Bedrooms # Bathrooms -- Lot Area Living Space (Total SgFt) Off strcct Parking Spaces Trees located & Listed on Site Plan Access: Driveway (FL) With Culvext? With Swale? Setbacks: Front Rear Sides (JL) ( R) Stories Freight 'Vertical dist:ance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive ofchinuucys, hcating exits, ventilation ducts, air conditioning waits, elevators 233d similar appurtanc es. During Construction. On-site =strum facilities will be provided tbrougb - On site waste & debris containers will be provided by MAY -21 - 2007 17:11 912 898 0799 95Y P.02 riay - e1 07 04 :57p Tommi Smoak 912 - 898 -0759 P•3 Construction debris will be disposed of by at by means of _ _ I understand that I must comply with zonine. flood damage control. buildine. firer shone protection & wetlands ordinances, �A regulations and all applicable codes and regulations: I understand that the lot roust be staked out and that the stakes will be inspected to ensure that the. setback requirements arc inet. X tiandcrstand also that a certified plot plan showing cicvati n must be attached to this application and that an as built elevation certification is due as 50011a.5 the Ilabi table floor level is established Drainage: X realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected" I accept responsibility for any corrective action that may be necessary to restore drainage ium zircd by this permitted construction. l 7 S " turc of Applicant: .! „ . (' - .-, Date: , ...?7Z//0 � Pp Note: A permit normally takes 7 to 10 days to Ivt- ocess. z 'c --5"_5 - -The following is to be completed by City Personnel_ Zoning Certification N'FIP Flood Zone Approved Rezoning/Variancc? - Street Address & Number: New - Existing - Is it in compliance with City Map? _ If not, has street name and/or Islin: bcz been reported to MPC? FEMA Certification Attached State Energy Code Affidavit Attach =d Utilities & public Works: Describe any unusual finding • • t - Access to Building Site 1— _ 1(.) - Distance to Water Main Tap Site ,/J i _) ) ► `,------- Distance to Sewer Stub Site - Ci /" '' �/ Water Meter Size --/ Store n Drainage v-- Approvals: Date Zoning Administrator l < Fees: ,, C o d e E n f o r c e m e n t 0 c. ,c C e --- ,� �^ /--61 Permit 5 Water /Sewer `� () Inspections Stor m/Drainage Total G/F Inspections Water Tap City Manager - ScwcrStub Aid to Const Total W/S MAY -21 -2007 17:11 912 898 0799 95% P.03 May c 1 u • • • REQ ABED FOR: Building Permits • - Relocation Permits - -. Sign Permits Demolition Pcnnits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Rcl•c-lioa Permits Special. Review Permits Site Plan Approval Subdivision of Land Sketch Pan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision. Plat Approval In addition to specific requirements for the above permits, and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storria :Water Management requirements as outlined in Chapter 5--4, Code ofOrdinanceso Section 5-4-9 Prohibition, provides in part, as follows: • (4) It is unlawful fo• any person to cause or permit any stoma water to flow from their property onto the pi opetty of another person„ unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for ray person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process, applicants must illustrate how these storm water management prohibitions will be tact, including a show of how storm water naturally flowed on the affected property (prior to y development activity), and what changes in storm water flow bavc occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requircancats. The final product must actually meet the City Ordinance requirements_ Applicant Name: Project X.D.: Attachments approved by: Date: 95� P.04 912 998 0799 ria El 07 1J457p IOMMY Smoak U1C r.1 F To: Chuck F Fax number: 786-9539 . . From: Tommy Smoak - Aqua-Welt Inc. Fax number: 898-0799 101 East Pines Road Savannah, Ga. 31410 Date: 5/21/2007 897-0770 WWW. AQUAWELLGA.COM Regarding: Permit Savannah Beach and Racquet Club Phone number for follow-up: • CELL - 210-3541 Comments: CHUCK, COULD YOU PROCESS THIS APPICATION AND LET ME KNOW WHEN IT ES READY_ I WILL COME DOWN PAY YOU . THANKS TOMMY SMOAK. MY COUNTY NUMBER IS 652-7648. MAY-21-2007 17:11 912 898 0799 95% P.01