Loading...
HomeMy Public PortalAbout2017 Budget2017 PARKVILLE CITY BUDGET Fiscal Year: January 1, 2017 - December 31, 2017 2017 Operating Budget 2017-2022 Capital Improvement Program 1 Elected Officials Mayor Nanette K. Johnston Aldermen Diane Driver Ward 1 Tina Welch Ward 1 Dave Rittman Ward 2 Jim Werner Ward 2 Bob Lock Ward 3 Doug Wylie Ward 3 Marc Sportsman Ward 4 Greg Plumb Ward 4 City Staff City Administrator Lauren Palmer – January to October Kirk Davis –November to December Senior Management Team Alysen Abel Public Works Director Steve Berg Treasurer Timothy Blakeslee Assistant to the City Administrator Matthew Chapman Finance / Human Resource Director Kevin Chrisman Police Chief Stephen Lackey Community Development Director Melissa McChesney City Clerk 2 3 Table of Contents Elected Officials ............................................................................................................................................................. 2 City Staff ........................................................................................................................................................................ 2 Introduction and Overview ............................................................................................................................................ 6 Budget Message ........................................................................................................................................................ 7 Form of Government ............................................................................................................................................... 18 City Demographics .................................................................................................................................................. 18 About our Citizens: ............................................................................................................................................. 18 About our Community: ....................................................................................................................................... 19 Budget Strategies .................................................................................................................................................... 20 Budget Process ........................................................................................................................................................ 21 Budget Development .............................................................................................................................................. 23 Budgeting Basics ...................................................................................................................................................... 25 Consolidated Financials ............................................................................................................................................... 26 General Fund ........................................................................................................................................................... 27 Debt Service Funds .................................................................................................................................................. 28 Sewer Fund .............................................................................................................................................................. 29 Transportation Fund................................................................................................................................................ 30 Fewson Fund ........................................................................................................................................................... 31 Economic Development Fund ................................................................................................................................. 32 Emergency Reserve Fund ........................................................................................................................................ 33 Nature Sanctuary Donation Fund ............................................................................................................................ 33 Park Donations Fund ............................................................................................................................................... 34 Projects Fund ........................................................................................................................................................... 35 Other Information and Policies ................................................................................................................................... 36 Organizational Chart ............................................................................................................................................... 37 Position Summary Schedule (1 of 2) ....................................................................................................................... 38 Position Summary Schedule (2 of 2) ....................................................................................................................... 39 Summary of Intergovernmental Fund Transfers ..................................................................................................... 40 Financial Policies ..................................................................................................................................................... 40 Credit Card Handling Policy................................................................................................................................. 41 Reserve Policy ..................................................................................................................................................... 41 Debt Management Policy ................................................................................................................................... 41 Economic Development Incentives Policy ........................................................................................................... 42 Economic development incentives to promote appropriate development in the Brush Creek Drainage and Brink Meyer Road Neighborhood Improvement Districts .................................................................................. 42 Employee Salary Schedule .................................................................................................................................. 42 4 Fewson Fund Policy ............................................................................................................................................. 43 Parkville Police Community Assistance Fund ...................................................................................................... 43 Purchasing Policy ................................................................................................................................................ 44 Miscellaneous Expense Authorization and Reimbursement Policy ................................................................... 44 Rate Increase for the Parkville Sewer Utility / Sewer Utility Billing Policies & Procedures ................................ 44 Records Retention Policy .................................................................................................................................... 44 LAGERS Increase ................................................................................................................................................. 45 Detailed Financials ....................................................................................................................................................... 46 General Fund ........................................................................................................................................................... 47 Revenues ............................................................................................................................................................. 48 Administration Department ................................................................................................................................ 53 Police Department .............................................................................................................................................. 58 Municipal Court .................................................................................................................................................. 62 Public Works Department ................................................................................................................................... 65 Community Development Department .............................................................................................................. 68 Operations Division: Streets ............................................................................................................................... 72 Operations Division: Parks .................................................................................................................................. 76 Nature Sanctuary ................................................................................................................................................ 80 Public Information Division ................................................................................................................................. 83 Information Technology Division ........................................................................................................................ 86 Capital Outlay...................................................................................................................................................... 89 Debt Service Funds .................................................................................................................................................. 92 Sewer Fund ............................................................................................................................................................ ..98 Transportation Fund.............................................................................................................................................. 106 Fewson Fund ......................................................................................................................................................... 110 Economic Development Fund ............................................................................................................................... 113 Emergency Reserve Fund ...................................................................................................................................... 115 Nature Sanctuary Donation Fund .......................................................................................................................... 117 Parks Donation Fund ............................................................................................................................................. 119 Equipment Reserve Fund ...................................................................................................................................... 121 Projects Fund ......................................................................................................................................................... 121 Capital Improvement Program (CIP) Summary ......................................................................................................... 124 Performance Statistics ............................................................................................................................................... 143 Glossary ..................................................................................................................................................................... 148 5 Introduction and Overview In this section: Budget Message: Brief summary of this budget document. Form of Government: Description of the Mayor-Board of Aldermen-City Administrator form of government. City Demographics: Summary of City population statistics and City amenities. Budget Strategies: Motivations behind this budget document. Budget Process: Timeline of budget development and implementation. Budget Development: Summary of budget work sessions. Picture 1: Photo by Angela K The Missouri River along English Landing Park 6 Budget Message February 1, 2017 The Honorable Mayor and Members of the Board of Aldermen 8880 Clark Avenue Parkville, MO 64152 RE: The 2017 City Budget Dear Mayor and Board: In accordance with Section 112.070.D. of the Parkville Municipal Code, I hereby present the 2017 Annual Operating Budget and 2017 – 2022 Capital Improvement Program (CIP). The budget will be adopted by the Board of Aldermen on December 20, 2016. 2017 Budget Overview The operating budget includes projected revenues and expenditures for 15 governmental funds: General Fund, Emergency Reserve Fund, Debt Service Funds (5), Economic Development Fund, Equipment Reserve Fund, Fewson Fund, Nature Sanctuary Donations Fund, Park Donations Fund, Projects Fund, Sewer Enterprise Fund, and Transportation Fund. The total operating budget is approximately $15.3 million as demonstrated in the table below: Revenues (includes carryover fund balance except in debt service funds) Expenses Balance General Fund $5,512,561 $4,617,840 $895,084 Emergency Reserve Fund $1,775,775 $348,224 $1,427,551 Debt Service Funds $1,566,491 $1,566,491 $0 Special Revenue Funds $4,919,361 $3,257,294 $1,662,067 Sewer Enterprise Fund $1,491,563 $1,304,641 $186,922 TOTAL $15,265,751 $11,094,490 $4,171,624 In addition to the operating budget, the City has a 6-year Capital Improvement Program (CIP). The 2017 – 2022 CIP is a planning document that prioritizes capital projects and establishes a financing strategy for completing each project. The 2017 CIP includes $4.52 million of capital improvements with an operating budget impact of $3.32 million. The City’s portion of the 2017 CIP (budget impact) is budgeted to be funded as follows: Sewer Fund (13.3%), Transportation Fund (74.2%), General Fund (11.3%), and other funds (1.2%). The five-year plan (2018-2022) reflects the priorities of the governing body for the immediate future, but it will be evaluated on an annual basis and adjusted to reflect changing needs and conditions. 7 Budget Purpose The budget is the most significant document that the City prepares each year. The budget is organized to convey to the reader the services being delivered by the municipal government to the community in 2017. The budget serves four primary goals: Policy Document – The budget is an expression of Board of Aldermen policy. Policy is implemented by the appropriations made, projects funded, and staffing authorized for the upcoming year. Financial Plan – The budget sets out how expenditures are to be made and specifies anticipated revenues and other resources to fund those expenditures. The document is a reflection of related financial policies such as the Purchasing Policy, Reserve Policy, Debt Management Policy, the Fewson Fund Policy, and the Neighborhood Improvement District (NID) Financing Strategy. The Capital Improvement Program (CIP) is a long-term capital purchase planning document that attempts to balance future needs with future revenue. Operations Guide – The budget outlines the broad range of city services provided to citizens according to each department and division of the government. Communications Device – The budget communicates to the general public the annual priorities of the City of Parkville and the services purchased with taxes and other fees. The budget contains charts and graphs that are designed to assist readers with understanding the complex financial data included herein. Budget Priorities for 2017 In each of the past three years, the Mayor and Board of Aldermen participated in a strategic session workshop to review community priorities and set organizational goals. A key outcome of the process in July 2016 was the confirmation of the City of Parkville Vision Statement: Vision Statement Parkville offers an exceptional quality of life for residents and visitors by embracing opportunities to enhance commerce and economic activity, while preserving the community’s historic charm, attractive character and unique natural environments. The Vision Statement is an expression of the inspirational long-term impact resulting from the work of the City of Parkville. In addition, the Mayor and Board identified five critical success factors – the things that must go well – to achieve the City’s vision. 8 Critical Success Factors Examples of 2017 Budget Impact Basic Services – Parkville will be a role model for delivery of City services and will meet citizens on their level with customer service that consistently exceeds expectations. Approved 2% employee wage increase and a LAGERS tier benefit adjustments to aid with personnel recruitment and retention; increased new police officer starting salary to aid with personnel recruitment and retention; continued implementation of duty reassignment to increase staff support for customer service (sewer billing, code enforcement, line locates, etc.); implemented more cost effective and customer service friendly credit card payment system at City Hall. Infrastructure– Maintain existing infrastructure and construct new facilities that support safety, standards, and aesthetics, using cost efficient and best management practices while thinking strategically. Approved $2.36 million dollar debt financing strategy for street improvements (phase 1 and 2a of Route 9 corridor and $1.13 million dollar enhanced street maintenance program); completion of sanitary sewer phase 2 improvements; approved sanitary sewer phase 3 improvements. Economic Development* – Parkville employs an economic development strategy that supports community and market needs, provides diverse quality development opportunities, makes strategic use of incentives, and encompasses all areas of the community. Asterisks denote categories that were identified in 2014. Progress was made on these items with additions to the budget in 2014 - 2016, and those efforts will be continued in 2017. Continued Parkville Economic Development Council investment at $30,000; maintained operating budget to include the additional seasonal staff for parks maintenance and additional legal services for economic development and related needs; approved phase 2 of the English Landing Park restroom rehabilitation, accepted a donation for a new shelter house by Grigsby Field. Parks* – Our parks are regionally recognized for diverse use and quality facilities that provide residents and visitors an outdoor destination. All neighborhoods will be connected by trail to each other, the City, and regional park systems. Finances – Stable finances give us a road map for future priorities while guiding staff's allocation of time and resources. Although a finite resource, it emphasizes the need for quality economic development, serves as a positioning tool for strategic partnerships, and allows us to make decisions based on long‐ term cost efficiencies versus short‐term responses. Reviewed five-year forecasts for all major funds to determine long-term impact of annual budget decisions; adjusted Emergency Reserve Fund transfer to $317,500 in accordance with NID financing strategy. 9 Status on Progress of 2016 - 2017 Priorities Implement a viable strategy to develop Highway 45/435 Corridor •The City assisted Parkville EDC with release, review, and recommendation of the request for proposals (RFP) for development of properties within the 45/I-435 NIDs. •The City submitted application to the Urban Land Institute (ULI) Kansas City Technical Assistance Program for support with the 45/I-435 NIDs. •The City hosted two Board of Aldermen work sessions regarding development of the 45/I-435 NIDs. The first work session provided an update to the development efforts by the Parkville EDC to market this area. During that work session, the EDC proposed an option that the City could invest in the grading and installation of public improvements to make the pad sites more appealing to developers. The second work session provided further analysis to develop the properties to “shovel-ready” condition. •Funding was set aside from the 2017 health insurance cost savings to support recommendations that arise to spur development regarding the I-435/45 Corridor ($40,852). Complete/Develop Platte Landing Park and Sports Fields •The City is moving forward with the construction of a practice ballfield through a donation from the Friends of Parkville Parks (FOPP) and a City match. In January, R.L. Buford surveyed the intended area in Platte Landing Park. The City contracted with Shafer, Kline & Warren for the design of the ballfield. The design is currently underway. Improve streets and sewers •The City has released a request for proposals (RFP) for financing to fast-track street maintenance in 2017. The bid package for the street maintenance program will be released in early February, which will include approximately $1.2 million dollars worth of street, curb, and sidewalk improvements. •The City has released a request for proposals (RFP) to finance a $1,279,112 project for Phase 1 and 2a of Route 9 (Route 45 to Clark Ave.) in 2017 with interest and fees paid in subsequent years. This project will be funded by future Route 9 Community Improvement District (CID) revenue and grants from the Surface Transportation Block Grant Program and the Congestion Mitigation and Air Quality Program. •The City adopted a 10% sewer rate increase for 2017 in response to emergency issues with the sanitary sewer system. By increasing the rate to 10%, the projected revenue supply needed funding for critical system improvements planned in the 2017 Capital Improvement Program (CIP) can be completed and restore the Sewer Fund working capital back to the level set by City policy. •The City worked with Park University on a sidewalk maintenance research project. The Board of Aldermen directed staff to budget for an inventory of the city sidewalks in Parkville as a future out-year Capital Improvement Program (CIP) item. 10 Complete/develop trails and connections • The City has been working with Platte County and Riverside to develop the trail connection east of English Landing Park. The County has signed a contract with Blue Moon Hauling for the construction of the Parkville-Riverside Connector. The County and BNSF are still finalizing the proper paperwork to allow the County to secure the easement needed for the section of trail that is in the railroad right of way. • With a 2016 Outreach Grant, the City installed a perimeter trail around the fence of the large dog park in Platte Landing Park, both inside and outside of the fence. Staff submitted a grant application in January 2017 for a trail around the perimeter of the small dog park. • With a 2016 Outreach Grant, the City removed the asphalt trail adjacent to the Grigsby Field. The trail was replaced with a wider section of gravel, to be consistent with the rest of the trail in the park. Regularly conduct a comprehensive capital needs assessment • The City cleans and televises a portion of its sanitary sewer system through the CCTV program each year. From this evaluation, the City can prioritize the repair of the sewer collection system. Staff is currently developing a proposal for the Board of Aldermen to create a strategy to perform the repairs in less time than originally programmed. • Since 2014, the City staff has evaluated the condition of the City’s streets using a standard rating system. The information collected from this street rating is used to prioritize the street maintenance. Staff is currently seeking bids to finance an aggressive street maintenance program that exceeds $1.2 million. • Staff included a project in the Capital Improvement Program (CIP) for the evaluation of the storm sewer lines. This is similar to the CCTV program for the sewer collection system after three sinkhole areas developed over a 1 year period related to storm sewer lines. Review and ensure proper package of basic services, assessing value and cost • Staff began the For Your Information Newsletter (FYIN) which is a weekly digest of internal City highlights that is intended for review by the Board of Aldermen. The newsletter may contain information such as a follow up to a question raised at Board meeting, recognition of staff for accomplishments, a calendar of events, and internal news. • The Public Works staff continues to provide superior service to the residents with regard to street repairs, tree trimming, snow operations, sewer repairs, and parks maintenance. The Public Works staff drives the streets each day to look for issues before residents contact the City. • The City adopted a records retention policy to help staff start organizing the City’s records and disposing of documents no longer required to be kept. Once the files are organized it will help fill open records requests much quicker. • The City released a Request for Proposals for city attorney services in October and hired a new attorney in December to become effective January 1, 2017. 11 • Staff created an “Opening a New Business in Parkville” flyer for new businesses to provide detailed information of required items for prospected businesses. • The City began implementing TextCaster to distribute information by text message and e-mail about events, road closures and severe weather. • The Police Department maintain a high clearance rate for crimes against persons and property, which helps to maintain our low crime rate. • Chief Chrisman and Captain Jordan are on the MEMC (Mid-America Emergency Managers Committee) and Captain Jordan helped complete the Hazardous Mitigation Plan with MARC. • The Police Department expanded the Parkville Police Community Assistance Fund which now includes Shop with a Cop, Backpack School Supplies program, Halloween bags filled with candy, and the Senior Luncheon at Park Village Apartments. • The Police Department maintains community policing model in which Officers are encouraged to be approachable while in public. Parkville officers seek positive citizen contacts by stopping and getting out of their patrol cars in shopping and residential areas, routinely attend new business ribbon cuttings, block parties, and special events. • The City improved starting salary for police officers and LAGERS for all employees for better recruitment and retention. • Implemented the City’s new credit card payment system provides a simplified convenience fee model for administration transactions, removes burden of Payment Card Industry Data Security Standard (PCI-DSS) security reporting on City Staff, and provides an easy to manage online payment gateway for sewer payments. • Staff updated City website to make it more user-friendly and organized the filing system to get rid of outdated/unused files. • The City began a social media campaign/public relations campaign with Buddy using the hashtag #BuddyParkerPKV to share information about city services, projects and events. Expanded outreach through additional social media platforms including NextDoor, the Riss Lake eNeighbors group and Facebook groups for Ward 3 and Riss Lake. Raise low water crossing at English Landing Park • The City applied for FEMA Hazard Mitigation Grant Program funding for a 75% match to raise the Low Water Crossing. In anticipation of that funding, staff is moving forward with the preliminary design concept. In February, staff will release a Request for Proposal for the engineering design of the low water crossing. In the meantime, Staff will work on getting a commitment from FEMA about the funding and the requirements associated with the grant funding. It is anticipated that the construction will start in late November 2017, following Turkey Trot. Restrooms at English Landing Park • The first phase of the restroom was completed in late November 2016. The improvements included epoxy walls, Tnemec flooring, new plumbing fixtures, upgraded electrical/lighting, ADA stalls, and a new water fountain. The City received $40,000 from 12 Platte County through an Outreach Grant for the restroom improvements. •The second phase of the restroom improvements will include exterior upgrades, new roof and heating. The City submitted an Outreach Grant application for assistance with the project. It is anticipated that the work associated with this project will occur in late summer/early fall 2017 and will conclude prior to the work on the low water crossing. Status on Progress of Long-Term Priorities Automate City functions •Community Development Staff began utilizing new smartphones when conducting building and code inspections, using internet-based Missouri One-Call system (paperless), and purchased new line locating equipment. •Staff developed an online reporting code complaint system (http://parkvillemo.gov/residents/code-complaint-system/) to allow residents to report code violations to the City online. •The City began accepting shelter reservations by e-mail and payment by credit card over the phone. •Staff updated the website to include a one-stop-shop for all types of fillable permits and forms. Develop maintenance standards for city property •Staff completed the 2016 Building Reserve Study to plan for future capital improvements and maintenance projects for city buildings. •Released an RFP for new janitorial services in January 2017. •Planned increased in building maintenance spending to complete tile cleaning, concrete sealing, phase 1 of carpet replacement, window cleaning, among other projects. Create an economic development strategy in partnership with the EDC •Staff submitted applications to MARC and MoDOT for funding for transportation improvements along MO-Hwy 9. •Staff assisted EDC members in establishment of 9 Highway Corridor Community Improvement District (CID). The City approved the petition to create the 9 Highway Corridor Community Improvement District to fund improvements on Highway 9 from Highway 45 to Clark Avenue. The CID will hold an election in June to approve the creation of a sales tax in the District. •Staff convened meetings with the Parkville EDC and prospective developers regarding Project Keystone and Project Nitro. Streamline process for codes, permits, licenses •The City adopted new Title IV – Development Code via Zoning Code & Subdivision Regulations Update project 13 • Staff rewrote and the City adopted new Parkville Property Maintenance Code. • Staff scanned all building permits from 1988-1996 for easy digital review. • Staff budgeted funding in 2018 CIP for building permit software that will automate an number of paper processes. • Staff updated the business license code to ensure compliance and enhance penalties for non-compliance. • Staff implemented checklist system for renewals of business license renewals instead of having the applicant resubmit a new application. Businesses now have a clearer picture of what requirements are needed for renewal. Create a stand-alone parks department • The City adopted the 2016 Parks Master Plan which had the recommendation to consider a 10-year 1/2 cent sales tax dedicated to park operations and development of new facilities. Increase staff resources to maintain all new park areas • The City approved a use/volunteer agreement with Prodigy Baseball Academy which provides free use of the baseball fields to Prodigy in turn for the group to provide field maintenance and improvements in order to allow parks staff to spend time on other projects. Assess fee-for-structure services • The City approved an ordinance to revise Development Fee Structure associated with the construction of Public Improvements. • Staff developed revisions to the event fee structure that will come to the Board of Aldermen in late February for approval. Be proactive about opportunities to expand broadband/high-speed internet • Staff met with representatives of Time Warner Cable to discuss faster high speed internet in Parkville. General Fund Overview The General Fund is the largest governmental fund and accounts for the primary governmental operations including administration, municipal court, police, public works, parks, and community development. General Fund revenues are healthy, and the projected year-end revenues for 2016 are expected to be within $17,000 (<0.5%) of budget. Revenues for 2017 were budgeted 2% above 2016 projections to account for growth-related increases in sales taxes, property taxes, and building permits. Year-end expense projections are approximately $400,000 below budget. This is due primarily to personnel savings, legal services savings, and capital improvement projects that postponed 14 in 2016 but will be completed in 2017. The savings will be carried over to 2017 to support one- time General Fund expenses including capital outlay ($384,895) and transfer to emergency reserves ($313,134). Most divisions within the General Fund remain relatively flat compared to the 2016 budget with the exception of an expanded program for city hall building maintenance in 2017. The budgeted ending fund balance is approximately 19% of 2017 budgeted expenditures, which exceeds the Board’s goal to maintain a 15% balance. The larger balance is warranted based on the five-year fund projection that includes ongoing transfers to emergency reserves. Emergency Reserve Fund A $317,500 transfer from the General Fund to the Emergency Reserve Fund is planned in 2017 to maintain the balance of the Emergency Reserve Fund at $1.46 million, which is approximately 31% of 2017 General Fund budgeted expenditures (including CIP). This balance exceeds the Board’s goal to maintain at least 25% of annual General Fund expenditures in reserve. The Board has been strategically growing reserves beyond the minimum target in order to prepare for the need to backstop special assessment delinquencies for the Brush Creek and Brink Meyer Neighborhood Improvement Districts (NIDs). The City requires healthy reserves to support the NID financing strategy to maximize contributions to the Emergency Reserve Fund and 5-year CIP. Beginning in 2017 the Emergency Reserve Fund will see the first balance reduction (≈$31,000) as intended by the NID financing strategy. Debt Service Funds The City issued permanent financing for the Brush Creek and Brink Meyer NIDs in 2014. The Brush Creek NID debt financed the extension of sewer infrastructure, and the Brink Meyer NID debt supported improvements to Brink Myers Road, including the retaining wall. The City had interest-only payments for these bonds in 2015 and 2016, and the Board established a long- term financing strategy to make future payments if assessments are delayed due to delinquencies. The City continues to pursue its legal and economic development options to encourage property owners to develop in this area and stay current on all assessments. The 2006 Certificates of Participation (COPs) financed City Hall and voter-approved projects from a 2004 ballot measure. The debt has historically been supported by the temporary property tax levy (2004 portion) and General Fund revenues. The principal balance was reduced by approximately $1.5 million by a refunding in December 2015. Due to the refunding savings, there was not a General Fund transfer for this debt in 2016, but these dollars were be redirected to the Emergency Reserve Fund in 2016 and beyond as part of the NID financing strategy. Sewer Enterprise Fund The Board of Aldermen’s policy related to the Sewer fund is to maintain working capital equal to at least 90 days of operating expenses and the annual debt payment. The 2017 budget reflects the large number of unexpected repairs and equipment failures in 2016. As a result of the unexpected expenses, the 2017 Sewer Fund estimated ending fund balance is $181,508 15 which is below the working capital of target of $358,002. The five year plan reflects a strategy to return to working capital target by 2022 with modest rate increases and dispersal of CIP projects over a number of years. In addition to routine operating expenses, the 2017 budget included capital outlay (CIP) of $453,000. This includes carryover from several projects that were initiated in 2016 but will be completed in 2017. The largest portion of funding is recommended to complete the improvements to the 45 Hwy Pump Station, South National Pump Station Equipment Replacement, and to begin Phase 3 Manhole and Line Repairs for older downtown sewers. These are priority improvements that were identified in the 2008 Sanitary Sewer Evaluation Study (SSES) and subsequent closed-circuit television (CCTV) inspections. The five-year CIP includes funding to continue an annual CCTV and cleaning program on a cycle of reviewing the entire sanitary sewer system every 8 years in accordance with industry best management practices. Funding is recommended to do a major line repair project every two to three years to keep up with maintenance needs. Transportation Fund In 2013, the Transportation Fund was operating in a structural deficit and relied on one-time fund reserves to balance the budget. The City corrected this trend in 2014 and 2015 by reducing the annual transfer to the General Fund to help support the personnel costs for the Streets Division of the Public Works Department. Over time this transfer will be slowly eliminated to preserve more funding for capital improvements and maintenance. The recommended transfer for 2017 is $225,000, which is $15,000 lower than 2016. Infrastructure has been a Board of Alderman priority for the past three years. In 2017, Street improvement projects total $2,536,112 compared to $505,278 in 2016. The significant increase in funding is a result of the debt financing strategy approved Board of Aldermen to complete Route 9 phase 1 and 2a and significantly increase street maintenance repairs to improve streets that are deteriorating at faster rate than basic maintenance funding can fix. The Transportation Fund 5-year forecast includes planned expenditures for the 5-year CIP and shows that the Fund will sustain modest surpluses in the foreseeable future. The current maintenance investment is considerably higher than in recent years prior to 2015, and the City is slowly working through a backlog of maintenance projects. Although this is an improvement, the City needs to continue to look for ways to grow and stretch transportation dollars. Future Outlook The 2017 budget maintains essential services at current levels and directs limited additional resources toward the five critical success factors. The City is fortunately experiencing steady growth in its retail, residential, and commercial base that bodes well for future financial security. The Board continues to exercise caution when implementing new projects and expanding services due to the debt burden associated with the Brush Creek and Brink Meyer NIDs. Success can come from taking advantage of grant opportunities and strategic financing. 16 For example, the English Landing Park restroom project, a long-deferred community priority, was successfully accomplished through a combination of sources – county grant and city funding. Acknowledgments City staff, volunteer board members, and consulting partners worked hard to prepare this annual budget that will guide city operations for the upcoming year. I appreciate the effort of the staff each year to analyze budget recommendations and respond to questions while handling their routine duties. Special thanks to the Mayor and Board of Aldermen for devoting extra time to budget work sessions and the strategic priorities workshop. Because of your attention and thoughtful input, I am confident this budget reflects the key community priorities for the upcoming year. Respectfully submitted, Kirk Davis, Interim City Administrator 17 2,402 4059 5554 5928 6098 6296 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Po p u l a t i o n Year Population Over Time 1990 2000 2010 2013 2014 2015 $54,726 $107,917 $57,568 $113,652 $60,917 $117,955 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 Per capita median income Median household income Income Per Person and Per Household 2009-2013 2010-2014 2011-2015 Form of Government Parkville operates under a Mayor-City Administrator-Aldermen form of government. The mayor is elected at-large for a three-year term (beginning in 2016) and two board members are elected for two- year terms from each of the City’s four wards. The Mayor and Board of Aldermen provide leadership in setting and achieving community policy, establishing the budget, and hiring the administrator/department heads. The Mayor and Board are committed to the provision of efficient and quality services essential to the quality of life citizens enjoy in Parkville. The day-to-day operations of the city government are handled by a professional staff headed by the City Administrator. The City Administrator recommends the annual budget, implements policy adopted by the governing body, hires subordinate staff, and supervises department head level positions. City Demographics About our Citizens: The City of Parkville, Missouri, is a fourth-class city organized and existing under the laws of the State of Missouri. The City is located approximately 10 miles northwest of downtown Kansas City, Missouri, in Platte County, Missouri. Platte County, Missouri is in the northwest portion of the State of Missouri. In 1990 the City had 2,402 residents, in 2000 the City had 4,059 residents, and in 2010 the City had 5,554 residents. The 2015 estimated population for the City is 6,296 residents. The 2015 owner- occupied housing unit was approximately sixty-eight percent. The average per capita median income from 2011-2015 was $60,917. The median household income from 2011-2015 was $117,955. Median value of owner-occupied housing units from 2011-2015 was $346,900. 18 About our Community: Municipal Services and Utilities The City provides many municipal services including police, public works, parks, community development, and municipal court. The City provides public waste water services for the majority of the City. Transportation and Facilities The City is located near the following four major highways: Interstate 435, Interstate 29, Interstate 635 and Missouri Route 152. Missouri state highways 45 and 9 also bisect the City. Because of its location, the City’s residents have a short commute into downtown Kansas City. The Kansas City International Airport and Kansas City’s Downtown Airport provide both commercial and charter flights. Educational Facilities The City is served by the Park Hill School District (the “School District”), which currently holds an “accredited with distinction” rating from the State of Missouri Department of Elementary and Secondary Education, which is the highest attainable rating. The School District is comprised of nine elementary schools, three middle schools, two high schools and one alternative school. The City’s metropolitan location provides residents with easy access to several colleges and universities for undergraduate, graduate and continuing education opportunities. The City is home to Park University, a private, four-year liberal arts institution founded in 1875, with a full and part time enrollment of more than 11,000 students at 40 campus locations across the United States. Recreational Facilities The City is well known for its restaurants and “Main Street” appeal. The City maintains five public parks and two nature sanctuaries. The City assumed maintenance duties of Platte Landing Park in summer 2014. The City is also home to The National Golf Club, a private golf course designed by Tom Watson. Medical and Health Facilities The City is served by the following hospitals: Providence Medical Center approximately 8 miles from the City in Kansas City, Kansas; the University of Kansas Hospital, located approximately 9 miles from the City in Kansas City, Kansas; North Kansas City Hospital, located approximately 9 miles from the City in North Kansas City, Missouri; and St. Luke’s Northland Hospital, located approximately 7 miles from the City in Kansas City, Missouri. American Medical Response (AMR) provides ambulance services within the City under contract with the Southern Platte County Ambulance District. Additionally, there are numerous physicians and dentists which serve the residents of the City. 4th of July Festivities 19 Budget Strategies Maintaining the Financial Health of the City While attempting to provide the citizens with high quality services for the lowest responsible cost, the Mayor and the Board of Aldermen have the challenge of ensuring that the City maintains a sound financial condition. The City of Parkville’s financial position is monitored and reviewed by the City Administrator, staff, and the Board of Aldermen. The Board has closely scrutinized past expenses with the help of enhanced financial reporting. Using information from past years, the Board has attempted to minimize projected expenses in selected areas in order to direct funding to the areas of greatest importance to the citizens. Providing Quality Services at a Reasonable Cost The Mayor, Board of Aldermen, and staff place a high priority on listening to, and addressing the concerns of the citizens in the community. As a result, the Board recognizes that there are significant planning and infrastructure needs to be addressed over the next several years. These concerns are documented in the CIP. Simultaneously, the Board is aware of the fact that everyday maintenance and repair of infrastructure and amenities are of great importance and mindfully budgets for these expenses. Future Goal Setting The Board of Aldermen developed five critical success factors at the Board’s annual strategic planning workshop. This budget document drew direction primarily from these priorities and other issues raised by the Mayor, Board of Aldermen, and staff throughout the budget process. The City recognizes that it is important to have short and long-term goals to drive future budget documents and community development in a coherent direction. Short-Term Factors This budget document also incorporated many short term factors into its development. Improved code enforcement, an employee health insurance renewal, park restroom upgrades, and the desire to maintain emergency reserves all played significant roles in the budget decision making and creation process. With these factors in mind, this budget document is intended to be an accurate projection of the overall revenues and expenses. Moreover, this budget represents a good faith effort to provide the citizens of Parkville a high quality of service at the lowest responsible cost. Board of Aldermen Planning Retreat 20 Budget Process July 2016 11th Review 2017 budget calendar with Finance Committee 18th Board of Aldermen priority setting workshop 25th Budget worksheets issued to staff for capital and operating budgets (all funds). August 2016 10th Preliminary review of parks and nature sanctuary budget request by Community Land and Recreation Board (CLARB). 16th Public hearing on the revised property tax levy for the 2016 tax year. September 2016 2nd Deadline for departments to have 2017 Budget requests in to the city administrator 5th – 9th Review and creation of initial operating budget for major funds and Capital Improvement Program (CIP) 14th Final review of Parks and Nature Sanctuary budget request by Community Land and Recreation Board (CLARB) 12th - 30th City administrator and department head budget meetings • General Fund and CIP o Revenues o Administration  Information Technology  Public Information o Community Development o Police o Municipal Court o Public Works  Administration  Parks  Streets o Nature Sanctuary • Transportation Fund • Sewer Utility • Other Funds December S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 October S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 August S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 September S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 November S M T W T F S 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Denotes Board of Aldermen review/action 21 October 2016 3rd - 10th Review and creation of second iteration of operating budget for major funds and CIP 11th Planning and Zoning Commission review of proposed projects for 2017-2022 CIP 18th First budget work session with the Board of Aldermen on proposed 2017 budget (3rd Tuesday - 5:30 p.m.) Topics – Revenue forecast, General Fund operating budget, Emergency Reserve Fund, minor funds 25th Second budget work session with the Board of Aldermen on proposed 2017 budget and 2017-2022 CIP. (4th Tuesday – 5:30 p.m.) Topics – CIP – Part 1 (focus on General Fund); debt service funds; General Fund operating follow-up November 2016 8th Third budget work session with the Board of Aldermen on proposed 2017 Budget and 2017-2022 CIP. (2nd Tuesday – 7:00 p.m.) Topics – CIP – Part 2 (focus on outside sources and minor funds); Transportation Fund, miscellaneous follow-up 15th Fourth and final budget work session with the Board of Aldermen on proposed 2017 Budget and 2017-2022 CIP. (3rd Tuesday – 5:30 p.m.) Topics - Sewer Enterprise Fund and sewer CIP; summary review December 2016 6th First reading of ordinance adopting the 2017 budget, 2017-2022 CIP, and amended 2016 City Budget for select funds if necessary (1st Tuesday – 7:00 p.m.) 20th Second and final reading of ordinance adopting the 2017 budget and 2017-2022 CIP (3rd Tuesday – 7:00 p.m.) 2017 January 1st 2016 Fiscal Year begins February 8th Publication of adopted 2016 Budget document 2016 Parkville Microbrew Festival 22 Budget Development The City operates on a January 1 – December 31 fiscal year and therefore must adopt a 2016 budget before the end of the calendar year. The process involves four budget work sessions followed by final review and adoption of the budget at a regular legislative meeting. The budget uses a line item level of budgetary control. At the first budget work session, staff presented preliminary budget sheets for the General Fund, Economic Development Fund, Emergency Reserve Fund, Fewson Fund, Nature Sanctuary Donations Fund, Park Donations Fund, and Projects Fund. The proposed 2017 General Fund budget is a 3.73% operating expense increase over 2016 totaling $140,830 (net of transfers and capital outlay), which is approximately $128,116 below anticipated revenues for 2017 (net of fund balance). This includes the Board of Aldermen’s recommendation to increase employee compensation by 2% in 2017. The current projected General Fund ending balance for 2017 is approximately $893,084. This represents a General Fund reserve of 19%, which exceeds the City’s reserve policy to “endeavor to grow a general fund balance of 15% of general fund appropriations for the succeeding fiscal year” (Resolution No. 12-01-13). Staff recommends keeping approximately this level of fund balance in 2017 based on the five-year fund forecast which shows declining reserve balances. The overall 5-year budgetary trend is only sustainable if the City continues to outperform budget. The City requires healthy reserves to support the NID financing strategy to maximize contributions to the Emergency Reserve Fund and 5-year CIP. The result of a tight year would require scaling back capital outlay (CIP) expenses. The second budget work session focused on the Debt Service Funds and the 2017 – 2022 Capital Improvement Program (CIP). The proposed CIP includes $4,518,007 of projects for the 2017 budget year. This includes the total cost of multi-year or grant funded projects, so the budget impact for 2017 is $3,316,007. The proposed 2017 General Fund CIP is $384,895, the proposed 2017 Transportation Fund CIP is $2,536,112, the proposed 2017 Sewer Fund CIP is $453,000, and the proposed 2017 CIP for all other funds totals $42,000. Finally, the CIP includes approximately $10 million of projects that are outside the five-year program and listed for “future years” due to limited funding. The third budget work session focused on the Transportation Fund. This included a discussion of debt financing for (1) street maintenance and (2) Route 9 Improvements. Staff presented two options. The first option was a pay as you go approach of funding for basic street maintenance at a rate of $380,000 per year. The second option was a debt financing strategy totaling $2,365,000 plus interest which includes: • $1,279,112 for Phase 1 and 2a of Route 9 (Route 45 to Clark Ave.) in 2017 with interest and fees paid in subsequent years. This project will be funded by future Route 9 Community Improvement District (CID) revenue and grants from the Surface Transportation Block Grant Program and the Congestion Mitigation and Air Quality Program. • $1,000,000 for an increased street maintenance program in 2017 with interest and fees paid in subsequent years along with a more limited level of funding for additional street maintenance over the following 5-year period. The funding from the debt financing will assist with improving the streets that are deteriorating at faster rate than basic maintenance funding can fix. The City’s financial advisor Springsted, Inc. provided the net present value of the pay as you go strategy vs. the debt financing strategy to the 23 Board of Aldermen. The analysis concluded that over six years, the debt financing strategy will be able to complete 6,660 more linear feet (≈$180,000 - $192,000) of roadway than the pay as you go approach with a similar present value. Following discussion at both the third and fourth budget work sessions, the Board of Aldermen directed staff to move forward with the debt financing strategy. In addition, similar to 2016, prior to implementation of the annual mill and asphalt overlay program in 2017, staff will monitor spending for the first quarter of the fiscal year. Any personnel savings generated between January and March will be redirected to the Transportation Fund to increase the bid package for the mill and asphalt overlay program. Mechanically, this change will be accomplished by short-paying budgeted monthly transfers from the Transportation Fund to the General Fund in the second half of the fiscal year. This direction from the Board is documented in the ordinance proposed for adoption of the 2017 budget. The fourth budget work session was focused on the Sewer Fund. The Sewer Fund is a self-sustaining enterprise fund that operates on its own revenues distinct from the City’s General Fund. In addition to routine operating expenses, City administration recommends capital outlay (CIP) expenses in the amount of $453,000 in 2017. The five-year CIP projection includes funding to complete an annual closed-circuit television (CCTV) inspection and sewer cleaning program on a cycle of reviewing the entire sanitary sewer system every 8 years in accordance with industry best management practices. Funding is recommended to do a major repair project every two years to keep up with the maintenance needs. After the sewer repair projects in the 2017-2022 CIP are completed, the intent is to continue with a major line repair project every few years, although these projects will become smaller as the City catches up with past deterioration. The table below summarizes the recommended expenditures for 2017 by fund: Expenditures 2016 Budget 2016 Unaudited 2017 Budget General Fund (operations) $3,774,615 $3,287,420 $3,915,445 Transfers (includes emergency reserve transfer) $317,500 $333,410 $317,500 Capital Outlay $351,035 $300,328 $384,895 Emergency Reserve Fund $146,758 $144,431 $348,224 Debt Service $1,240,416 $1,253,580 $1,566,491 Sewer Enterprise Fund $1,665,821 $1,412,892 $1,304,641 Special Revenue Funds Transportation Fund $1,114,000 $1,008,517 $3,144,112 Projects Fund $380,651 $275,510 $41,000 Park Donations Fund $5,000 $6,383 $50,000 Eco Devo/Guest Tax Fund $1,000 $1,000 $2,582 Equipment Fund $0 $0 $0 Nature Sanctuary Fund $6,200 $4,900 $12,000 Fewson Fund $6,478 $2,493 $7,600 Although minor adjustments were made to correct errors or update account descriptions, there were no major substantive changes to the budget following the fourth work session. On December 20, 2016, the budget was adopted by the Board of Alderman with a unanimous vote. City staff is expected to keep expenses at or below each prescribed line item within each department/division. Major department/division level changes to the budget must be approved by the Board of Aldermen with a majority vote. Minor adjustments to line items at the department/division level may be approved the City Administrator so long as the department/division budget remains the neutral. 24 Budgeting Basics Basis of Budgeting Parkville uses the cash-basis method of accounting for budgeting and operating purposes. This means that all expenditures that are included in the budget for any year are expected to be paid from revenues or funds that will be received and available during that same year. This helps to assure cash on hand will be sufficient at any time for expenditures, and avoids unnecessary complexity to both the budgeting and financial operating processes. Year-end accrual adjustments enable the City to report its annual audited financial statements according to the modified accrual basis. Balanced Budget Definition For the purpose of budgeting, the City defines a balanced budget as meaning that all expenditures included in the budget are balanced by funds that are anticipated to be available during the budget year, either from revenues described in the budget, or from existing fund balances that will be carried over from the prior year. Estimating Revenues for the Budget Year Revenues from most sources are fairly consistent from year to year. This enables reasonably accurate revenue predictions to be made based on current year revenue and underlying trends over the previous several years. Property tax revenues for the coming year are determined by assessed valuation and the tax levy rate, both of which are known well in advance of the budgeting process. Certain revenues, including electric, gas and water utility gross receipts taxes vary with severity of seasons which cannot predicted in advance. These revenues are budgeted conservatively to allow for variations that reduce tax revenue below typical averages. Other types of revenue, notably building permit fees, vary considerably with associated business cycles, and are estimated from underlying current and expected activities related to that revenue source. Differences between the City budget accounting and modified accrual year-end financial statements The adjustments needed at year end to prepare for modified accrual accounting for the annual audit and financial statements are entirely operational, and consist of identifying and recording at year end all outstanding expenditures that were appropriated from the ending year’s budget, and recording all revenues that were “earned” prior to the end of the year. Earned revenues include various sales taxes and sewer charges for periods up to December 31 which may not be received until January or February of the following year. Because these amounts are largely offset by similar accruals for the previous year, no adjustments to the budget are required. 25 Consolidated Financials In this section: General Fund (10) Debt Service Funds (21-24, 30) Sewer Fund (30) Transportation Fund (40) Fewson Fund (45) Economic Development Fund (46) Emergency Reserve Fund (50) Nature Sanctuary Donation Fund (60) Park Donations Fund (63) Projects Fund (95) Park University 26 General Fund The General Fund includes most City activities including Administration, Police, Municipal Court, Community Development, Public Works, Streets, Parks, the Parkville Nature Sanctuary, Public Information, and Information Technology. 2014 2015 2016 2016 2017 Actual Actual Budget Unaudited Budget Beginning Fund Balance 738,327 1,137,653 1,347,819 1,514,319 1,469,363 Revenues Taxes 2,066,998 2,132,142 2,159,187 2,220,054 2,213,500 Licenses 47,824 59,563 56,160 60,506 57,800 Permits 331,390 256,201 263,415 264,313 221,670 Franchise Fees 901,327 828,215 874,000 865,176 874,000 Other Revenue 32,657 35,096 35,261 45,781 40,761 Court Revenue 269,935 225,128 250,000 191,726 220,000 Interest Income 6,626 7,623 8,000 8,047 8,000 Miscellaneous Revenue 39,848 60,460 25,183 110,658 22,080 Grant Revenue 3,837 8,827 1,500 10,756 10,750 Transfers 582,680 348,251 343,530 293,530 375,000 Total - General Fund Revenues: 4,283,121 3,961,506 4,016,236 4,070,548 4,043,561 Total Sources: 5,021,449 5,099,160 5,364,055 5,584,867 5,512,924 Expenditures Administration 896,855 789,401 1,011,983 918,746 1,098,192 Police 1,096,979 1,036,581 1,223,870 1,039,766 1,242,136 Municipal Court 138,999 132,141 153,471 137,562 155,900 Public Works 145,444 172,372 215,770 172,785 226,756 Community Development 249,809 267,231 316,393 253,046 293,038 Street Department 340,633 356,757 399,656 373,379 422,576 Parks Department 281,741 319,765 356,007 302,440 373,479 Nature Sanctuary 27,156 29,834 39,681 33,031 40,201 Information Technology 34,167 34,185 43,974 44,907 49,907 Public Information 15,450 15,357 13,810 11,759 13,260 Capital Outlay (CIP) 118,562 149,139 351,035 300,328 384,895 Transfers 538,000 282,077 317,500 333,410 317,500 Total - General Fund Expenditures: 3,883,795 3,584,841 4,443,150 3,921,158 4,617,840 Estimated Ending Balance (deficit): 1,137,653 1,514,319 920,905 1,663,709 895,084 27 Debt Service Funds The Debt Service Funds summarize the City’s debt obligations. Although the City maintains separate governmental funds for each debt issue, these separate funds are shown together in order to summarize all city debt. 2014 2015 2016 2016 2017 Revenues Actual Actual Budget Unaudited Budget COPs (22) 564,464 568,707 330,636 338,534 370,682 Transfer from Sewer Fund (30) 191,504 357,870 185,495 184,768 180,965 River Park NID (21) 323,969 319,925 321,300 320,650 321,194 Brush Creek NID (23) 2,083 255,658 252,997 258,177 405,667 Brink Meyer NID (24) 1,522 184,837 149,988 151,451 287,983 Total Debt Service Revenues: 1,083,542 1,686,997 1,240,416 1,253,580 1,566,491 Expenditures Debt Retirement and Reserves COPs (22) 559,975 568,707 330,636 338,534 370,682 Sewer Service Debt (30) 191,504 357,870 185,495 184,768 180,965 River Park NID (21) 323,969 319,925 321,300 320,650 321,194 Brush Creek NID (23) 255,658 252,997 258,177 405,666 Brink Meyer NID (24) 1,522 184,837 149,988 151,451 287,983 Total Debt Service Expenditures: 1,076,970 1,686,997 1,240,416 1,253,580 1,566,490 Apex Development Site 28 Sewer Fund The Sewer Fund is an enterprise fund used to operate and maintain the City’s sewer service system. It is funded by the revenue collected from charges on customers using the service. The sewer department's day-to-day operations are handled by contract with Alliance Water Resources. 2014 2015 2016 2016 2017 Actual Actual Budget* Unaudited Budget Beginning Fund Balance 516,873 1,101,730 797,784 795,105 314,043 Revenues *Amended Approved Rate Increase 3.00% 3.00% 2.50% 2.50% 10.00% Sewer Charges 1,006,362 1,020,684 1,014,750 981,723 1,103,300 Sewer Tap Fees 43,500 39,000 36,000 33,000 30,000 Sewer Impact Fees 42,000 36,400 33,600 32,300 34,000 MOAW Bill Collection Payment 562 643 650 431 550 Grinder Pump Administrative Fee 4,620 4,620 4,620 4,620 4,620 Interest Income 4,361 4,956 4,800 4,499 5,000 Transfer from Sewer CIP (33) 294,984 - - - - Miscellaneous 1,000 74 200 10 50 Sewer Fund Revenues: 1,397,390 1,106,376 1,094,620 1,056,583 1,177,520 Total Sources: 1,914,263 2,210,785 1,892,404 1,851,688 1,491,563 Expenditures Operating Expenses 461,041 494,543 538,596 560,187 519,940 Capital Expenses 59,988 459,088 838,200 563,680 453,000 Debt Service 191,504 357,870 185,495 185,495 181,701 Transfer to General Fund - Admin Fee 100,000 101,500 103,530 103,530 150,000 Sewer Fund Expenditures: 812,533 1,413,001 1,665,821 1,412,892 1,304,641 Estimated Working Capital (deficit): 1,101,730 795,105 226,583 438,796 186,922 New Waste Water Treatment Storage Facility 29 Transportation Fund The Transportation Fund is a special revenue fund that accounts for sales and motor fuel taxes that are dedicated to transportation expenses. Non-personnel operating costs and capital expenses associated with the City’s annual street maintenance program are budgeted in this fund. 2014 2015 2016 2016 2017 Actual Actual Budget Unaudited Budget Beginning Fund Balance 162,682 327,997 217,699 231,767 235,670 Revenues Parkville Special Road District 124,328 128,588 132,000 134,675 134,000 City Transportation Sales Tax 438,160 456,397 456,000 472,771 472,000 Motor Fuel Tax 143,352 146,671 144,000 147,908 145,000 County Transportation Sales Tax 178,948 194,587 190,000 239,661 240,000 Curb/Sidewalk Cost Share 18,125 2,300 5,325 11,525 5,304 Sale of Equipment 8,275 11,075 7,500 - 25,500 MPR Safety Funds 4,300 - - - - Bond Proceeds - - - - 2,279,112 Transportation Fund Revenues: 915,488 939,617 934,825 1,006,540 3,300,916 Total Sources: 1,078,170 1,267,614 1,152,524 1,238,307 3,536,586 Expenditures Streets - Capital 81,966 455,696 488,000 508,302 2,536,112 Streets - Operating 313,207 335,150 386,000 310,215 383,000 Transfers (including debt service) 355,000 245,000 240,000 190,000 239,207 Transportation Fund Expenditures: 750,173 1,035,846 1,114,000 1,008,517 3,158,319 Estimated Ending Balance (deficit): 327,997 231,767 38,524 229,790 378,268 Street Maintenance Program 30 Fewson Fund The Fewson Fund is a special revenue fund that was created when a Parkville resident, George Fewson, donated a portion of his estate to the City. One-half of the annual earnings go to the City to fund capital projects, and the remaining earnings are returned to the Fund. The City may also borrow from the Fund for eligible capital improvements. 2014 2015 2016 2016 2017 Actual Actual Budget Unaudited Budget Beginning Fund Balance 557,014 557,891 570,887 569,204 572,404 Revenues Interest Income 5,937 4,510 5,450 5470 4,429 Miscellaneous - - - - - Return on Investments - - - - - Earned on Investments - 8,475 - 695 - Total Fewson Fund Revenues: 6,924 12,985 5,450 6,165 4,429 Total Sources: 563,938 570,876 576,337 575,369 576,833 Expenditures Loss on Investment 3,042 1,575 1,000 835 1,000 Trust/Bank Fees 73 97 100 92 150 Distribution to City (50% of Proceeds) 2,932 - 2,675 - 5,950 Distribution to City (Prior Years) - - 2,703 - - Project Loans - - - - - Fewson Fund Expenses: 6,047 1,672 6,478 927 7,600 Estimated Ending Balance (deficit): 557,891 569,204 569,859 574,442 569,233 Cash and Investments Long Term Investments N/A 397,000 316,000 316,000 316,001 Cash and Money Market Accounts N/A 172,204 98,859 258,442 253,232 Loan to City N/A - 155,000 Total Cash and Investments N/A 569,204 569,859 574,442 569,233 Fewson Fund Project: Downtown Entryway Beautification 31 Economic Development Fund The Economic Development Fund is a special revenue fund comprised of revenues from a hotel tax imposed on transient guest rooms. These dollars are allocated at the Board’s discretion for economic development or marketing initiatives to promote tourism and business development in Parkville. 2014 2015 2016 2016 2017 Actual Actual Budget* Unaudited Budget Beginning Fund Balance 2,312 404 882 882 1,082 Revenues *Amended Guest Room Tax 1,592 1,843 1,515 1,397 1,500 Partner Contributions 1,500 1,411 - - - Eco Dev Fund Revenues: 3,092 3,254 1,515 1,397 1,500 Total Sources: 5,404 3,658 2,397 2,279 2,582 Expenditures Economic Development 5,000 2,776 1,000 1,000 2,582 Eco Dev Fund Expenditures: 5,000 2,776 1,000 1,000 2,582 Estimated Ending Balance (deficit): 404 882 1,397 1,279 0 New Missouri American Water Plant Construction 32 Emergency Reserve Fund The Emergency Reserve Fund is intended to protect the City against emergency costs related to natural disasters, declared states of emergency, or other major unforeseen financial obligations. 2014 2015 2016 2016 2017 Actual Actual Budget Unaudited Budget Beginning Fund Balance 1,070,966 1,387,966 1,269,842 1,269,842 1,458,275 Revenues Temporary Operating Levy - - 15,364 15,364 - Transfer from General Fund 317,000 60,000 317,500 317,500 317,500 Emergency Reserve Revenues: 317,000 60,000 332,864 332,864 332,864 Total Sources: 1,387,966 1,447,966 1,602,706 1,602,706 1,602,706 Expenditures Brush Creek Sewer NID - - - - 69,658 Brink Meyer Road NID - 178,124 146,758 144,431 278,566 Emergency Reserve Expenditures: - 178,124 146,758 144,431 348,224 Estimated Ending Balance (deficit): 1,387,966 1,269,842 1,455,948 1,458,275 1,427,551 Nature Sanctuary Donation Fund The Nature Sanctuary Donation Fund (60) is a special revenue fund that contains donations made specifically for the Nature Sanctuary, partly from private citizens, special events, and grants. 2014 2015 2016 2016 2017 Actual Actual Budget Unaudited Budget Beginning Fund Balance 40,821 42,781 42,581 34,708 41,933 Revenues Donations 6,539 4,877 1,500 4,877 1,750 Programs - 1,500 1,500 1,500 1,500 - - - 7,425 7,500 Nature Sanctuary Fund Revenues: 6,539 6,377 3,000 13,685 3,000 Total Sources: 47,360 49,157 45,581 48,393 45,581 Expenditures Expenditures 4,579 14,450 6,200 4,900 12,000 Transfers - - - - - Nature Sanctuary Fund Expenditures: 4,579 14,450 6,200 4,900 12,000 Estimated Ending Balance (deficit): 42,781 34,708 39,381 43,493 40,683 33 Park Donations Fund The Park Donations Fund (63) is a special revenue fund that contains donations made specifically for the Park system from private citizens, organizations, and businesses. The Fund is used to help finance parks capital improvements that would not otherwise be achievable with general revenues. 2014 2015 2016 2016 2017 Actual Actual Budget* Unaudited Budget Beginning Fund Balance 45,462 45,794 25,203 25,203 24,995 Revenues *Amended Transfer from Park Reservations & Fees - - - - - Transfer from Parkland Dedication Fund - - - - - Donations 332 7,761 8,500 31,142 25,000 Park Donations Fund Revenues: 332 7,761 8,500 31,142 25,000 Total Sources: 45,794 53,555 33,703 56,345 49,995 Expenditures Parks - 28,352 6,500 6,383 25,000 Transfers - - - - 25,000 Park Donations Expenditures: - 28,352 6,500 6,383 50,000 Estimated Ending Balance (deficit): 45,794 25,203 27,203 49,962 (5) Girl Scout Troop Dog Park Project and Donation 34 Projects Fund The Projects Fund (95) was previously used for larger capital improvement projects. Since there is not a dedicated revenue stream for the Project Fund, capital improvements are now funded as capital outlay expenses from source funds as indicated in the CIP. The Projects Fund is still used to account for one- time revenues, such as significant grant revenues or transfers, associated with major capital projects in order to avoid irregular fluctuations in the General Fund. 2014 2015 2016 2016 2017 2017 Actual Actual Budget Unaudited Budget Projected Beginning Fund Balance 69,604 16,922 41,967 $56,744 0 5,758 Revenues Transfer from Park Donation Fund - - - - - 40,000 Transfer from General Fund - 4,577 - 15,910 - - Transfer from Sewer Fund - - - - - - Transfer of Fewson Fund Distribution 17,221 - 155,000 1,566 - - Grants/Donations - 12,500 134,000 146,299 25,000 - Grant for Livable Communities 416 - - - - - MARC Planning Sustainable Places Grants 17,682 - - - - - Platte County Outreach Grants 5,000 - 40,000 50,749 19,000 19,000 Partner Contributions 1,500 96,040 10,000 10,000 707,000 707,000 Projects Fund Revenues: 41,819 113,117 339,000 224,524 751,000 766,000 Total Sources: 111,423 130,039 380,967 281,268 751,000 771,758 Expenditures Public Works 15,000 62,797 170,995 200,291 - - Community Development 250 - - Streets - 1,040 - - Parks 73,906 1,172 205,000 75,219 41,000 71,000 Fewson Fund Projects 5,344 8,286 4,656 - - - Transfers - - - - Projects Fund Expenditures: 94,501 73,295 380,651 275,510 41,000 71,000 Estimated Ending Balance (deficit): 16,922 56,744 316 5,758 710,000 700,758 2016 Parks Master Plan Update 35 Other Information and Policies In this section: Organizational Chart: Chart visualizing the City’s organizational hierarchy. Position Summary Schedule: Number of positions and salaries organized at the departmental level. Summary of Intergovernmental Fund Transfers: Chart of fund to fund transfers. Financial Polices: Summary of financial polices enacted by the City. • Credit Card Handling Policy • Reserve Policy • Debt Management Policy • Economic Development Incentives Policy • Economic development incentives to promote appropriate development in the Brush Creek Drainage and Brink Meyer Road Neighborhood Improvement Districts • Employee Salary Schedule • Fewson Fund Policy • Parkville Police Community Assistance Fund • Purchasing Policy • Miscellaneous Expense Authorization and Reimbursement Policy • Rate Increase for the Parkville Sewer Utility/Sewer Utility Billing Policies & Procedures • Records Retention Policy • LAGERS Increase Parkville City Hall 36 Organizational Chart 37 Position Summary Schedule (1 of 2) MAYOR AND BOARD MUNICIPAL COURT Number of Positions Personnel Budget Number of Positions Personnel Budget 2015 9 $57,600 2015 2 $68,483 2016 9 $57,600 2016 2 $69,100 2017 9 $57,600 2017 2 $73,326 Change - - Change - $4,226 % Change - - % Change - 6.12% Incumbent 2016 Positions Status Incumbent 2016 Positions Status Johnston Mayor Elected Part-Time Humiston Judge Elected Part-Time Driver Ward 1 Alderman Elected Part-Time Rizzuti Administrative Court Clerk Full-Time Welch Ward 1 Alderman Elected Part-Time Eckerle Court Clerk Part-Time Werner Ward 2 Alderman Elected Part-Time Rittman Ward 2 Alderman Elected Part-Time PUBLIC WORKS - ADMINISTRATION Wylie Ward 3 Alderman Elected Part-Time Number of Positions Personnel Budget Lock Ward 3 Alderman Elected Part-Time 2015 2 $121,245 Plumb Ward 4 Alderman Elected Part-Time 2016 2.5 $138,500 Sportsman Ward 4 Alderman Elected Part-Time 2017 3 $145,463 Change .5 $6,963 ADMINISTRATION % Change 20% 5.02% Number of Positions Personnel Budget Incumbent 2016 Positions Status 2015 5.5 $297,608 Abel Director Full-Time 2016 6.5 $326,252 Davis Department Assistant Part-Time 2017 7 $352,511 Blair Construction Inspector Part-Time Change .5 $26,259 Vacant Summer Intern Seasonal Full-Time % Change 7.7% 8.05% Incumbent 2017 Positions Status COMMUNITY DEVELOPMENT Vacant City Administrator Full-Time Number of Positions Personnel Budget McChesney City Clerk Full-Time 2015 3.5 $198,900 Hefley Treasurer Full-Time 2016 4.5 $228,900 Chapman Finance/HR Director Full-Time 2017 4.5 $214,483 Blakeslee Asst to the CA Full-Time Change - ($14,417) Crook Billing Clerk Full-Time** % Change - -6.3% Hauth Receptionist Part-Time Incumbent 2017 Positions Status Vacant Receptionist Part-Time Lachky Community Dev. Director Full-Time Giarratana Building Official Full-Time 1.0 = Full Time Position (Including Elected Officials) Gault Building Inspector Full-Time 0.5 = Part-Time or Seasonal Full/Part-Time Hare Code Enforcement Part-Time **Shared full-time between Sewer and Administration Department Knight Department Assistant Part-Time Vacant Planning Intern Seasonal Part- Time 38 Position Summary Schedule (2 of 2) POLICE PUBLIC WORKS – OPERATIONS (STREETS) Number of Positions Personnel Budget Number of Positions Personnel Budget 2015 18 $825,658 2015 6 $245,762 2016 18 $798,200 2016 6 $252,130 2017 18 $829,000 2017 6 $263,081 Change - $30,800 Change - $10,951 % Change - 3.86% % Change - 4.34% Incumbent 2017 Positions Status Incumbent 2017 Positions Status Chrisman Chief Full-Time Schank Operations Director Full-Time Jordan Captain Full-Time Johnson Skilled Laborer Full-Time Hubbell Sergeant Detective Full-Time White Skilled Laborer Full-Time Shadid Sergeant Full-Time Lovell Laborer Full-Time Stone Sergeant Full-Time Whitby Laborer Full-Time Tomlin Officer Full-Time Sager Laborer Full-Time Gee Officer Full-Time Parker Officer Full-Time PUBLIC WORKS – OPERATIONS (PARKS) Pence Officer Full-Time Number of Positions Personnel Budget Sollars Officer Full-Time 2015 4.5 $162,800 Bowman Officer Full-Time 2016 5 $166,380 Haynes Officer Full-Time 2017 5 $166,126 Fetters Officer Full-Time Change - ($254) Rich Officer Full-Time % Change - -0.15% Heckadon Officer Full-Time Incumbent 2017 Positions Status Hill Officer Full-Time Barnard Superintendent Full-Time Vacant Officer Full-Time Phelan Laborer Full-Time Liberty Receptionist Full-Time Schaffner Laborer Full-Time Vacant Seasonal Laborer Seasonal Full-Time SEWER UTILITY Vacant Seasonal Laborer Vacant Number of Positions Personnel Budget Vacant Seasonal Laborer Seasonal Full-Time 2015 0.5 $13,662 Vacant Seasonal Laborer Seasonal Full-Time 2016 0.5 $13,824 2017 0.5 $14,102 Change - $278 NATURE SANCTUARY % Change - 2% Number of Positions Personnel Budget Incumbent 2017 Positions Status 2015 1 $18,000 Crook Sewer Billing Clerk Full-Time** 2016 1 $25,064 Note: Personnel budget includes salaries and overtime only. 2017 1 $25,314 Change - $250 % Change - 1% Incumbent 2016 Positions Status Ryan Director Part-Time Frazier Assistant Director Part-Time 39 Summary of Intergovernmental Fund Transfers City of Parkville Intergovernmental Fund Transfers for 2017 General Fund Sewer Fund Transportation Fund Emergency Reserve Fund Debt Service Funds Purpose General Fund: Transfers In 150,000 -150,000 - - - Administrative costs attributed to sewer operations. 225,000 - -225,000 - - Transportation revenue transferred to cover Street Division expenses. General Fund: Transfers Out -317,500 - - 317,500 - Transfer to the Emergency Reserve Fund. Sewer Fund: Transfers Out - -181,701 - - 181,701 Transfer for Sewer Debt Service payments. 40 Financial Policies Credit Card Handling Policy The City of Parkville Municipal Code, Title VII, Chapter 800, Section 800.020 anticipates the acceptance of credit and debit cards for various municipal sales transactions and enacts convenience fee charges regarding the same. Per Section 112.080 (B) of the Parkville Municipal Code, the City created an administrative Credit and Debit Card Handling Policy 1 to establish the procedures for proper handling of credit and debit card transactions. The City of Parkville must take appropriate measures to protect credit and debit card numbers. Credit card and debit payments must be processed in compliance with Payment Card Industry Data Security Standard (PCI DSS) requirements which are intended to limit exposure and/or theft of personal cardholder information. The City of Parkville must adhere to these standards in order to retain the ability to accept credit and debit card payments. The policy, which is signed by city employees, is intended to ensure that credit and debit card information is handled and disposed of in a manner that satisfies the City’s obligation to protect such information to the level that is required by the PCI DSS. The City anticipates minor changes to this policy in 2017 as a result of recent switch to a new credit card vendor. Reserve Policy The establishment and maintenance of adequate cash balances and reserves allow the City financial flexibility and security and is recognized as an important factor considered by bond rating agencies and the underwriting community when reviewing City debt issuance. Along with maintaining the City’s credit worthiness, such cash balances and reserves provide the means to handle economic uncertainties, local disasters and other unanticipated financial hardships, as well as, to meet cash flow requirements. It is the objective of the policy that fund balance levels will be sufficient to meet funding requirements for projects approved in prior years that are carried forward into the new year including debt service reserve requirements, reserves for encumbrances and other reserves or designations required by contractual obligations or generally accepted accounting principles. The full policy can be viewed by following this link2 Debt Management Policy In 2014, the City adopted a debt management policy. The policy establishes criteria by which the city will evaluate debt issuance in order to appropriately limit the City’s financial exposure. It also sets protocols for the administration and financing of all debt issues and post-issuance compliance. It is the objective of the policy that (1) the City obtain financing only when necessary, (2) the process for identifying the timing and amount of debt or other financing be as efficient as possible, (3) the most favorable interest rate and other related costs be obtained, and (4) when appropriate, future financial flexibility be maintained. The policy includes sections regarding general debt management, debt evaluation criteria, administration and financing, debt limitations, refunding of debt, conduit financings, and post issue management. A copy of the debt management policy can be obtained by contacting Parkville City Hall. The full policy can be viewed by following this link3 1 Link location: http://parkvillemo.gov/wp-content/uploads/2014/09/Credit-and-Debit-Card-Handling-Policy-10-1- 14.pdf 2 Link location: http://parkvillemo.gov/wp-content/uploads/2015/09/Parkville-Police-Community-Assistance-Fund- Administrative-policy.pdf 41 Economic Development Incentives Policy In 2010, the City adopted the Parkville Plan for Progress pursuant to Resolution 09-01-10 setting forth a strategic plan for economic development for the City. The Plan for Progress called for the formation of the Parkville Economic Development Council ("EDC") to encourage and facilitate responsible economic development within the City and outlined several goals and implementation recommendations to achieve those goals. The EDC completed one of the implementation items by the adoption of an Economic Development Incentive Policy. The City recognizes the importance of the efficient and effective use of limited public and private resources and incentive programs to facilitate responsible economic development. The City further recognizes that the City's adoption of an economic development incentive policy is essential to its responsible use of these limited resources. In furtherance of the Plan for Progress, the City adopts the Economic Development Incentive Policy ("EDI Policy") to guide the City and City staff in the responsible use of incentive programs within the City in 2011. The full policy can be viewed by following this link4 Economic development incentives to promote appropriate development in the Brush Creek Drainage and Brink Meyer Road Neighborhood Improvement Districts In 2015, the Board of Aldermen adopted Resolution No. 09-04-15. The resolution affirms the City’s willingness to use public incentives to offset the impact of the NIDs assessments on development. The resolution is a policy statement that is intended to supplement the master Economic Development Incentive Policy. The resolution states that owners who are delinquent on NID assessments will not be considered for incentives, and Tract 9 (45 Park Place) will be given the highest priority for public incentives since it carries the greatest debt burden. The policy is a marketing tool to generate more developer interest in the properties. The full policy can be viewed by following this link5 Employee Salary Schedule In 2014, City staff completed a comprehensive review of the City’s compensation policy through a salary survey of comparable positions for local peer communities. As a result of this process, a new pay range structure was established for full-time, part-time, and temporary positions with the City of Parkville. Peer cities submitted salary information through the Mid-America Regional Council (MARC) Compensation Survey System. Salary figures for comparable peer city positions were compared with City of Parkville compensation, and a positional salary range was established. The salary scheduled was enacted by Ordinance 2787. The ordinance can be viewed by following this link 6 For 2017, the Board of Aldermen adopted updated employee classifications and pay ranges (Ordinance No. 2874). Adjustments are recommended due to a variety of factors, including the following: • The revised salary ordinance addresses promotions, new positions, eliminated positions, and salary adjustments that were discussed during the budget process to better align staff with organizational priorities. 3 Link location: http://parkvillemo.gov/wp-content/uploads/2015/09/Parkville-Police-Community-Assistance-Fund- Administrative-policy.pdf 4 Link location: http://parkvillemo.gov/wp-content/uploads/2015/09/Parkville-Police-Community-Assistance-Fund- Administrative-policy.pdf 5 Link location: http://parkvillemo.gov/wp-content/uploads/2015/09/Parkville-Police-Community-Assistance-Fund- Administrative-policy.pdf 6 Link location: http://parkvillemo.gov/download/board-agendas/BoAPacket122016.pdf 42 • Pay ranges were revised based on a review of salary information submitted by peer cities through the Mid-America Regional Council (MARC) Compensation Survey System. • Ranges for exempt positions were adjusted for compliance with expected changes in federal laws regarding minimum compensation. • Ranges were evaluated for wage compression between subordinate and supervisory positions. • An increase to the minimum starting salary of police officers to $38,000 • Effective January 1, 2017, all positions are eligible for a 2.0% merit raise (within established ranges), per Section 2.G. of the Personnel Manual, pending receipt of a satisfactory performance review. The ordinance can be viewed by following this link7 and navigating to page 193. Fewson Fund Policy In 1998, Parkville resident George W. Fewson left a portion of his estate in trust to the City of Parkville for the purpose of establishing a project fund. The will stipulated that earnings from the fund were to be distributed so that one-half of the earnings would be given to the City for “general projects of the City,” which the City has interpreted to mean projects of a capital improvements nature. The remaining one- half was to be returned to the project fund principal. In 2010, in order to reduce administrative fees and eliminate income taxes on the fund’s earnings, the trust was dissolved and the City assumed responsibility for the Fewson Fund as a governmental special revenue fund (Ord. No. 2534). The Fewson Fund funds or finances capital projects of the City of Parkville. The full policy can be viewed by following this link8 Parkville Police Community Assistance Fund In 2010 a fund was created by members of the Parkville Police Department and one donor to assist children and families in need during the Christmas season. The children and families were identified by the Park Hill School District and through contacts with members of the police department. The initiative has continued with great success and continues to grow with citizen participation and increased donations yearly. While the main benefactor of the fund is the “Shop with a Cop” program, the fund is intended for other assistance programs similar in nature at the discretion of the Chief of Police. In 2015 the policies behind this program were formalized into the following: • Promote good community relations between members of the Parkville Police Department and citizens in the Parkville area. • Provide assistance to citizens at a time of need. Assistance may include, but not be limited to, the provision of goods and services but will not include cash. • The primary objective is to fund the “Shop with a Cop” program that provides gifts to children and families in need during the Christmas season. • Other assistance programs similar in nature to “Shop with a Cop” may be implemented at the discretion of the Chief of Police. • Allow department members and other citizen volunteers an opportunity to give back to the community. The full policy can be viewed by following this link9 7 Link location: http://parkvillemo.gov/download/board-agendas/BoAPacket120115.pdf 8 Link location: http://parkvillemo.gov/wp-content/uploads/2015/09/Parkville-Police-Community-Assistance-Fund- Administrative-policy.pdf 43 Purchasing Policy The purpose of the policy is to broadly define procurement procedures to follow based on the type of good or service being acquired. The policy includes general purchasing rules and requirements, revised levels of purchasing authority, a section regarding the disposal of city assets, and references to standard contract and bidding documents for a variety of projects and purchases. In 2017, the Board of Aldermen approved Resolution No. 16-012 to adopt revisions to the Purchasing Policy to allow greater flexibility related to smaller equipment, construction, and professional services purchases. The full policy can be viewed by following this link10 Miscellaneous Expense Authorization and Reimbursement Policy In 2015 the Miscellaneous Expense Authorization and Reimbursement Policy was adopted to ensure accountability and outline proper record-keeping and approval levels for reimbursement of miscellaneous expenses, including non-intrinsic memento-type gifts, other gifts of a minor nature, flowers, and City business related meals involving non-City employees. The full policy can be viewed by following this link11 Rate Increase for the Parkville Sewer Utility / Sewer Utility Billing Policies & Procedures To support the operating budget and six-year CIP, a 10% sewer rate increase was adopted for 2017. A 2.5% rate increase was implemented in 2016. The impact to the average residential household of a 10% rate increase in 2016 is approximately $3.80 per month. This rate increase will allow the City to implement the proposed capital projects and to preserve working capital equal to the target established in the reserve policy of 90 days of operating reserves plus one year of debt service payments. The report detailing the increase can be viewed by following this link 12 and navigating to page 121 The City of Parkville identifies sewer customers based on water service customer records. For all but a few customers, this information comes from Missouri American Water Company (MOAM). Home and business owners may either call or come to the office to set up a sewer service account for a new customer or to update existing customer information. The City will bill for service based on the information received from MOAM, or other water authority, and any changes will take effect for the following monthly billing cycle. The full policies and procedures can be viewed by following this link13 Records Retention Policy In 2016, the Records Retention Policy was adopted to guide the City in the organization of records, the disposal of records that have exceeded their required retention period, the protection and security of records and the conservation of records to ensure longevity of the physical integrity of permanent or archival records. 9 Link location: http://parkvillemo.gov/wp-content/uploads/2015/09/Parkville-Police-Community-Assistance-Fund- Administrative-policy.pdf 10 Link location: http://parkvillemo.gov/wp-content/uploads/2015/09/Parkville-Police-Community-Assistance- Fund-Administrative-policy.pdf 11 Link location: http://parkvillemo.gov/wp-content/uploads/2015/09/Parkville-Police-Community-Assistance- Fund-Administrative-policy.pdf 12 Link location: https://parkvillemo.gov/download/board-agendas/BoAPacket011717_Part-1.pdf 13 Link location: http://parkvillemo.gov/wp-content/uploads/2015/09/Parkville-Police-Community-Assistance- Fund-Administrative-policy.pdf 44 This policy provides a quick reference to all employees with information necessary to carry out their specific duties related to public records and provides that all officials and employees are responsible for properly managing records they come across in the course of their duties, regardless of format (paper, electronic, e-mail, etc.). This policy includes details regarding retention of Financial Documents. The policy can be viewed by following this link 14 and navigating to page 57. LAGERS Increase The City adopted the Missouri Local Government Employees Retirement System (LAGERS) in 2009. The City joined at the lowest benefit level and remained at this level until 2014. LAGERS offers seven levels of benefit ranging from 1% (L-1) to 2.5% (L-11). In July 2016, staff requested an actuarial valuation to determine the feasibility of moving to a higher benefit tier in 2017. In 2016 the Board of Aldermen approved first reading of an ordinance moving to the next highest level (L-7) with a benefit factor of 1.5%. All eligible employees contribute 4% of each paycheck toward their LAGERS retirement benefits and if this change is approved the City of Parkville will contribute 8.2% for general employees and 10.3% for police employees. Final action is scheduled for February 7, 2017. LAGERS retirement benefits are calculated using the formula below: Benefit Factor X Member’s Final Average Monthly Salary X Member’s Years of Service Credit = Member’s Monthly Benefit The report detailing the increase can be viewed by following this link 15 and navigating to page 249 14 Link location: http://parkvillemo.gov/download/board-agendas/BoAPacket081616.pdf 15 Link location: http://parkvillemo.gov/download/board-agendas/BoAPacket120616.pdf Main Street Parkville 45 Detailed Financials In this section: This section presents the 2017 budget by department and line item. Audited 2014 and 2015 financials and unaudited 2016 financials are included for comparison. Helpful graphs are provided as a visual aid prior to the spreadsheets to illustrate where staff time and taxpayer resources were spent in 2016 and also where they are being directed in 2017. General Fund (10) Revenues Expenses Administration (501) Police Department (505) Municipal Court (510) Public Works (515) Community Development (518) Streets Division (520) Parks Division (525) Nature Sanctuary Division (535) Public Information (540) Information Technology (555) Capital Improvement Program (CIP) (560) Debit Service Funds (21-24, 30) Sewer Fund (30) Transportation Fund (40) Fewson Fund (45) Economic Development (46) Emergency Reserve Fund (50) Nature Sanctuary Donation Fund (60) Park Donations Fund (63) Projects Fund (95) PLEASE NOTE: REVENUE PROJECTIONS AND REVENUE BAR CHARTS INCLUDE BEGINNING FUND BALANCES AS REVENUE. REVENUE PIE CHARTS DO NOT INCLUDE BEGINNING FUND BALANCES AS REVENUE. 46 General Fund The general fund is the primary operating fund of the City of Parkville. The General Fund is used to account for resources traditionally associated with government which are not required by law or by sound financial management practice to be accounted for in another fund. The General Fund accounts for resources devoted to financing the general services that the City performs for the citizens of Parkville. The primary sources of revenue for the General Fund include taxes (property and sales tax are the largest contributors), licenses, permits, franchise fees, court revenue, interest income, and other miscellaneous revenues. The General Fund is split into various departments and divisions. These include Administration, Police, Municipal Court, Community Development, Public Works, Streets, Parks, the Parkville Nature Sanctuary, Public Information, Information Technology (IT), and Capital Outlay. Please note that in 2015, capital outlay items were consolidated into their own division for better year to year analysis of capital spending. The result is that the detailed expenses from budget documents prior to 2015 will not correlate precisely with the current document. REVENUES – The budget reflects the belief that income will remain stable during the fiscal year. Revenues are budgeted conservatively using past actual data and current economic conditions as a working guide. EXPENSES – Expenses are projected as accurately as possible. Department heads are expected to maintain control of all expenses within their respective departments. Furthermore, the Board follows its constitutional responsibility to monitor and approve all expenses. Parkville Spirit Fountian Rededication 47 Revenues Property tax is one of the two largest revenue sources in Parkville’s General Fund. Owners of real and personal property in the City of Parkville pay an annual property tax which is calculated by multiplying the assessed valuation of the property by the overall mill levy. The other major source of revenue in the General Fund is sales tax. The City levies a 1% general sales tax on purchases made within City limits and paid by customers at Parkville businesses. Other taxes, licenses, permits, franchise fees, court revenue, interest income, and miscellaneous revenues also contribute to the General fund revenue. Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Revenues 5,021,449 5,099,159 5,364,055 5,584,867 5,512,924 5,021,449 5,099,159 5,364,055 5,584,867 5,512,924 4,700,000 4,800,000 4,900,000 5,000,000 5,100,000 5,200,000 5,300,000 5,400,000 5,500,000 5,600,000 5,700,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year Total General Fund Revenues 48 Category Taxes Franchise Fees Transfers Permits Court Revenue Other Revenue Licenses Budget Revenues 2,213,500 874,000 375,000 221,670 220,000 81,591 57,800 Taxes 55% Franchise Fees 22% Transfers 9% Permits 6% Court Revenue 5% Other Revenue 2% Licenses 1% 2017 Budget Revenues by Catagory Taxes Franchise Fees Transfers Permits Court Revenue Other Revenue Licenses 49 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Projected carryover from prior year. 738,327 1,137,653 1,347,819 1,514,319 1,469,363 Real & Personal Property Taxes Real and personal property taxes collected on property within city limits.41001-00 904,003 921,072 941,387 962,311 970,000 Penalties Penalties charged on outstanding property taxes.41002-00 4,351 3,096 4,500 3,892 4,000 Corporate Merchants & Manufacturing Disbursement of county tax collected to replace lost revenues from the merchants and manufacturing personal property tax exemption. 41003-00 137,763 146,270 147,000 148,946 150,000 Financial Institution Tax Disbursement of state tax on financial institutions located within the city.41004-00 1,261 2,065 2,000 2,955 2,500 Vehicle Tax A fee charged for every vehicle registered within city limits.41005-00 24,493 25,192 24,800 25,986 26,000 Sales Tax The City levies a 1% sales tax on purchases made within City limits.41401-00 929,047 963,853 970,000 1,004,192 990,000 Motor Vehicle Sales Tax Sales taxes levied on the purchase of motor vehicles by citizens of Parkville.41402-00 42,619 46,053 46,000 47,540 47,000 Motor Vehicle Fees Fees paid for motor vehicles.41403-00 23,462 24,539 23,500 24,232 24,000 2,066,998 2,132,142 2,159,187 2,220,054 2,213,500 Dog Licenses (Tags) License fee charged for each dog owned by a resident. The fee is $10/year for each spayed/neutered dog and $15/year for each non-spayed/neutered dog. 41101-00 994 1,983 1,950 2,015 1,950 Occupational Licenses The license fee charged to maintain, operate, or conduct a business within City limits. 41102-00 32,699 35,833 33,835 38,632 37,000 Late fees on Occ. Licenses Late fee assessed on occupational licenses. Included in Occupational Licenses above until actuals are known.41102-02 250 500 18 Peddlers License License fee charged for peddlers and solicitors.700 650 1,110 850 Liquor Licenses The license fee charged to any business that manufactures, brews, sells or distributes alcoholic beverages. 41104-00 13,526 18,878 18,225 17,057 18,000 Credit Card Processing Fees Surcharge applied to credit/debit card transactions to cover processing costs. No longer used, the city switched to a vendor that covers credit card processing fees for administrative sales. 41111-00 355 1,670 1,500 1,675 47,824 59,563 56,160 60,506 57,800 Building Permits Permit fees charged for construction on any property in the City.41201-00 261,972 212,814 220,000 207,582 182,500 Occupancy Permit Fee for occupancy inspections not otherwise associated with a building permit.41201-01 800 850 1,500 550 500 Sign Permits Permit required for any sign erected in the City.41202-00 540 890 1,830 1,000 Electrical Permits Permit required for any electrical work. Included in Building Permits above until actuals are known.41203-00 170 Alarm Permit Permit required for alarm installation. Included in Building Permits above until actuals are known.41203-01 739 Plumbing Permits Permit required for plumbing work. Included in Building Permits above until actuals are known.41204-00 57 Development Permits Permit fee to (re)develop any property.41205-00 2,033 1,650 1,515 1,895 1,670 Public Improvement Fees Fee charged on public improvement projects to cover staff time and materials.41205-01 51,553 33,604 30,300 29,239 35,000 Rezoning Permits Fee charged for rezoning permits. Included in Building Permits above until actuals are known.41206-00 1,200 900 300 Subdivision Permit Fees Fee charged for subdivision permits. Included in Building Permits above until actuals are known.41207-00 1,505 4,468 22,059 Board of Zoning Adjustment Application Fees Fee charged for applications to the Board of Zoning adjustment for variances, exemptions, and appeals. 41208-00 300 Conditional Use Permits Permits issued subject to certain conditions stipulated by the Board of Aldermen. Included in Building Permits above until actuals are known. 41209-00 1,940 600 662 Grading/Public Works Use Permits Permits issued to alter the grade of land or work in the City's right-of-way. Included in Building Permits above until actuals are known. 41210-00 115 75 195 1,000 Plan Reviews Fee for commercial and residential plan reviews. 41211-00 5,090 10,100 Special Event Permit No longer used. Permit required to host an event in the city. Now included in Special Event Event Reservations 41209-01 3,675 50 331,390 256,201 263,415 264,313 221,670 General Fund (10) Revenues Lic e n s e s Total Licenses Pe r m i t s Total Permits Tax e s Total Taxes Beginning Fund Balance 50 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget General Fund (10) Revenues Telecom Franchise All telecom companies are charged a franchise fee equal to 5% of gross receipts.41301-00 215,381 196,969 210,000 190,658 205,000 Missouri Gas Energy The gas utility franchise license fee is 5% of gross receipts.41302-00 121,539 111,092 128,000 91,034 120,000 Missouri American Water The water utility franchise license fee is 5% of gross receipts.41303-00 119,865 119,679 125,000 127,425 128,000 KC Power & Light The electricity utility franchise license fee is 5% of gross receipts.41304-00 306,966 319,967 330,000 370,422 340,000 Martin Marietta Stone Royalties Stone royalties are $0.03 per ton of limestone physically removed from the mine.41305-00 15,230 14,775 15,000 16,009 13,000 Cable/Video Service Franchise The cable/video service franchise fee is 5% of gross receipts.41306-00 122,346 65,733 66,000 69,628 68,000 901,327 828,215 874,000 865,176 874,000 Farmers Market Fees paid for stall rentals at the farmers market.41501-00 1,000 1,030 1,061 1,061 1,061 Park Shelter Reservations Fees paid to reserve shelters at English Landing Park.41504-00 11,788 11,535 12,000 12,598 12,000 Sports Field Reservations Fees paid to reserve the athletic fields at English Landing Park. 41504-01 4,234 4,610 4,500 14,195 11,000 Special Event Reservations Fees paid to host events in City limits 41504-02 12,785 15,221 15,000 15,228 14,000 Nature Sanctuary Programs Fees paid for events and programming at Parkville Nature Sanctuary properties.41505-01 2,850 2,700 2,700 2,700 2,700 32,657 35,096 35,261 45,781 40,761 Fines Fines collected from City ordinance violations.41601-00 260,790 217,455 250,000 181,708 220,000 CVC Reports Collection fee for the Crime Victims Compensation reports. Included in Fines above until actuals are known. 41602-00 634 526 532 Appointed Attorney Reimbursement Money received to reimburse cost of attorney for qualified defendants. Included in Fines above until actuals are known. 41602-01 3,666 3,119 3,649 Boarding of Prisoners Reimbursement Money received to reimburse expense of boarding prisoners at the County prison. Included in Fines above until actuals are known. 41602-02 2,035 661 2,766 Police Reports Fee charged to produce police reports upon request. Included in Fines above until actuals are known.41603-00 2,810 3,368 3,071 269,935 225,128 250,000 191,726 220,000 Interest Income Interest earned from general fund investments.41701-00 6,626 7,623 8,000 8,047 8,000 6,626 7,623 8,000 8,047 8,000 Miscellaneous Money received from various sources that do not fall into any other category. 41801-00 9,386 14,243 10,000 10,448 10,000 Rebates Money received from product rebate claims.41801-03 778 461 Leased/Owned Properties Revenue from City-owned properties with lease arrangements made with outside organizations, such as the Chamber of Commerce, Parkville EDC, and the City Farm Ground. 2016 excess due to back-dated cell tower lease payments. 41802-00 9,915 6,315 5,880 64,665 5,880 FEMA Flood Reparations Disaster recovery funds received from FEMA.41803-99 15,803 19,204 Sale of Vehicles & Equipment Revenue generated from the sale of City-owned vehicles and equipment.41805-00 10,750 8,000 10,625 5,000 Insurance Claim Reimbursement Reimbursements for insurance claims, workers compensation, etc. 41807-01 14,216 8,648 5,716 P.O.S.T. Monies Any P.O.S.T. certified training reimbursement.41808-00 1,303 1,689 1,303 1,200 Newsletter Advertising No longer used. Money received from advertisers for space in the City newsletters. Contracted with the Platte County Citizen for newsletter services in fall 2015. 41801-05 4,250 2,550 39,849 60,460 25,183 110,658 22,080 Storm Water Grant Platte County Outreach Grants for stormwater projects.41804-05 10,000 Bulletproof Vest Grant Grant for bulletproof vests for police department.41804-07 690 345 1,500 756 1,500 Other Grants Grant money received from other miscellaneous sources. Funding in 2017 includes anticipated associated with the MDC TRIM Grant ($9,250). 41804-09 3,147 8,482 9,250 3,837 8,827 1,500 10,756 10,750 Total Interest Income Total Miscellaneous Mi s c e l l a n e o u s Gra n t s Total Grant Revenue Fra n c h i s e F e e s Total Franchise Fees Ot h e r Re v e n u e Total Other Revenue Co u r t R e v e n u e Total Court Revenue Int e r e s t Inc o m e 51 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget General Fund (10) Revenues Transfer from Transportation Fund Fund transfer to reimburse General Fund for transportation-related expenses.41901-00 355,000 245,000 240,000 190,000 225,000 Sewer Administrative Fee Fee from Sewer Fund for salaries and various administrative functions relating to the Sewer Fund and operations, includes sewer billing service. 41903-00 100,000 101,500 103,530 103,530 150,000 Transfer from Projects Fund No longer used. Transfer from Projects Fund from 2012 carryover. 41904-00 80,749 Transfer from Equipment Fund No longer used. Transfer of the remaining balance of the dormant Equipment Fund.41905-00 1,751 Transfer from Health Insurance Fund No longer used. Refund for prior employer contributions upon close out of the Health-Insurance Fund. 41908-00 46,870 Transfer from Sewer Special Assessments Fund No longer used. Transfer from Sewer Special Assessments Fund to close out fund.41909-00 61 582,680 348,251 343,530 293,530 375,000 5,021,449 5,099,159 5,364,055 5,584,867 5,512,924 Total General Fund (10) Revenues Tra n s f e r s Total Transfers 52 1,434,855 1,071,478 1,329,483 1,252,156 1,415,692 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 1,600,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year Total Administration Expenses Administration Department The Administration Department includes the Mayor and Board of Aldermen, City Administrator, City Clerk, Finance and Human Resources staff, and the Parkville Nature Sanctuary. The Administration Department manages the City of Parkville’s budget creation process, accounts payable, financial statements, payroll, accounts management, special assessments, business licensees, and other various licensing for the City. The budget increase from 2016 to 2017 is primarily the result of funding set aside from heath care savings to support recommendations that arise to spur development regarding the I- 435/45 Corridor ($40,852), the liability insurance premium increase, and approved benefit adjustments for administrative staff. The City Administrator is appointed by the Mayor with the consent of the Board of Aldermen. The City Administrator serves at the pleasure of the Board. The City Administrator is responsible for managing the day-to-day operations of the City and is responsible for the enforcement of all policies, laws, and ordinances set by the Board of Aldermen. The Administrator makes recommendations to the Mayor and Board of Aldermen as appropriate concerning the operation, affairs, and future needs of the City; participates in Board meetings without the right to vote; and keeps the Board advised on the operation, finances, and needs of the City. The Assistant to the City Administrator serves under the City Administrator and provides analytical management assistance by planning, coordinating, and directing programs, conducting surveys and studies, and special projects as required. The City Clerk is the custodian for all official records including official actions of the Board of Aldermen, administers oaths of office, processes various licenses, serves as the City's election official, and maintains records of appointments to City boards and committees. The Finance/Human Resources Director operates the City’s Finance department, which includes, but is not limited to accounting, revenue forecasting, budgeting, payroll, debt management, and accounts payable/receivable. The Director also oversees the City’s human resources and employee relations program. This includes recommendations to the City Administrator regarding the hiring process, personnel training, and providing recommendations on city policies and procedures that are necessary to comply with changing labor laws. Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Expenses 1,434,855 1,071,478 1,329,483 1,252,156 1,415,692 53 Category Personnel Transfers Professional Fees Insurance Utilities Maintenance Other Budget Expenses 492,461 317,500 298,222 150,589 73,720 44,500 38,700 Personnel 35% Transfers 22% Professional Fees 21% Insurance 11% Utilities 5% Maintenance 3% Other 3% 2017 Budget Administration Expenses by Category Personnel Transfers Professional Fees Insurance Utilities Maintenance Other 54 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Salaries The total salaries for Administration employees. A portion of staff salaries are covered by the Sewer Administrative Fee, as related to sewer work performed. 01-01-00 286,777 297,603 326,252 309,766 352,511 Overtime Any additional salary payment over the base rate of pay for department employees.01-03-00 1,500 49 Mayor and Aldermen Annual salary for Mayor ($14,400/year). Annual salary for Aldermen ($5,400/year per Alderman).01-11-00 57,703 57,014 57,600 53,883 57,600 FICA & Medicare This is the City's share of FICA & Medicare cost for its employees.01-21-00 25,840 25,561 26,826 26,768 30,490 Retirement The City's LAGERS contribution for 2017 is 8.2% of general employee salaries. Includes ICMA-RC Retirement contribution per City Administrator contract. 01-22-00 15,421 22,283 25,820 24,228 30,589 Board of Aldermen Allowance No longer used. Elected officials used to receive a monthly allowance of $45. This allowance was eliminated in 2015 to add miscellaneous funding for reimbursements for eligible city related business expenditures. 01-32-00 4,860 1,170 City Administrator Auto Allowance City Administrator auto allowance ($100/month).01-33-00 1,200 1,200 1,200 1,000 1,200 Membership Fees & Dues - Mayor and Board of Aldermen The fees associated with membership to organizations for the Mayor and Board. 01-40-00 411 1,090 1,000 1,331 1,000 Membership Fees & Dues - Administrative Staff The fees associated with membership to organizations for Administration employees. 01-41-00 1,742 1,582 2,900 2,186 2,700 Professional Development - Administrative Staff Cost of educational seminars and conferences attended by Administrative employees.01-41-02 10,770 10,394 11,000 9,268 12,370 Professional Development - Mayor and Board of Aldermen Cost of educational seminars and conferences attended by elected officials. 01-41-03 1,236 2,253 5,500 1,720 4,000 405,961 420,150 459,598 430,198 492,461 Liability Premium payment for the City's liability insurance.02-01-00 88,264 33,498 68,000 80,922 77,259 Insurance Deductible Any insurance claim has $5,000 or $10,000 deductible. This is a budget placeholder, claims will be recorded to the appropriate department. 02-01-01 2,168 20,000 8,832 20,000 Health, Life, & Dental The City offers health, dental, and life insurance to its employees and subsidizes a portion of the premium. Reflects premium increases for employees. 02-02-00 22,854 36,053 36,499 38,290 32,830 Workers Compensation The workers compensation premium that covers all Administration employees.02-03-00 1,246 313 1,500 1,077 1,500 Unemployment This covers the cost of any unemployment insurance claims for the Administration Department.02-04-00 2,500 2,000 Property Insurance Premium payment for the City's property insurance.02-05-00 18,533 3,111 18,000 16,198 17,000 133,065 72,975 146,499 145,319 150,589 Telephone & Voicemail Charges for local and long distance telephone service for City Hall.03-01-00 6,376 5,455 6,000 5,713 6,000 Electricity Electric utility charges for City Hall.03-02-00 56,392 51,759 58,500 53,047 59,000 Water Water utility charges for City Hall.03-04-00 5,940 4,925 6,250 5,771 6,200 Mobile Phones Cellular phone stipend for the staff person assigned public information duties ($10/month).03-05-00 110 120 130 120 Train Depot Utilities No longer used. All utility charges for the Train Depot. The Train Depot is currently under a lease agreement. Utilities are paid by the tenant. 03-07-00 7,727 105 Cable Internet charges for City Hall.03-08-00 1,925 2,133 2,100 1,922 2,100 Trash Hauling/Recycling Trash and recycling pickup fee for City Hall ($300/year).03-09-00 300 300 300 300 300 78,660 64,682 73,270 66,989 73,720 Lease Purchase - Office Equipment Lease of the postage machine.04-22-00 1,233 825 1,200 837 650 1,233 825 1,200 837 650 General Fund (10) Administration (501) Ins u r a n c e Total Insurance Ut i l i t i e s Total Utilities Pe r s o n n e l Total Personnel Total Capital ExpensesCa p i t a l E x p . 55 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget General Fund (10) Administration (501) Office Supplies, Computer Accessories & Consumable Items This includes items such as stationery, pens/pencils, folders, etc. as well as computer accessories, meeting supplies and general consumables. 05-01-00 4,978 4,632 5,000 10,993 4,500 Postage All postage and shipping costs, along with any incidental charges.05-02-00 1,381 1,544 1,350 1,746 1,600 Printing Expenses for printing work not performed by City personnel. This includes items such as business cards, forms, letterhead, and books. 05-04-00 616 908 700 717 700 Publications Purchase of books and periodicals that are pertinent to City services and/or employee performance, such as the MARC salary report. 05-05-00 236 395 250 472 250 7,211 7,479 7,300 13,928 7,050 Building Maintenance & Repair Maintenance and repair charges for City Hall.06-01-00 8,463 18,665 20,000 26,700 25,000 HVAC Maintenance & Repair Maintenance and repair costs associated with City Hall's HVAC unit.06-01-01 51 1,769 2,500 11,153 3,000 Janitorial Services/Supplies Janitorial services contracted for the cleaning of City Hall ($757.50/month) and the purchase of supplies such as paper towels, toilet paper, etc. 06-02-00 9,266 10,809 11,000 9,159 11,000 Train Depot Maintenance Costs associated with the upkeep of the Train Depot and its contents. 06-11-00 806 167 6,200 411 2,000 Office Equipment Maintenance Maintenance and printing costs for the Administration copier.06-34-00 3,012 2,325 2,500 4,454 3,500 21,598 33,736 42,200 51,877 44,500 Elections The City's share of the county's cost to hold elections. 07-01-00 2,469 2,055 2,500 2,397 3,500 Advertising/Public Notice Costs for any advertisements placed in local newspapers of and codification of city ordinances.07-02-00 5,513 2,146 6,120 1,813 6,300 Credit Card Processing Fees No longer used. Cost to process credit and debit card transactions. Switched providers in late 2016. Processing fees are no longer charged to administrative sales. 07-04-00 2,000 1,470 MARC HHW Program No longer used. The cost of participating in MARC's Hazardous Household Waste program, which allows residents to safely dispose of such waste at no charge. Moved to Transportation Fund. 07-47-00 5,776 5,776 5,776 5,776 Friends of Parkville Animal Shelter - Animal Control The City pays the Friends of Parkville Animal Shelter for providing animal control and kenneling services.07-99-00 6,000 6,500 6,000 5,500 6,000 19,758 16,477 22,396 16,956 15,800 Total Office Expenses Off i c e E x p e n s e s Total City Services Total Maintenance Ma i n t e n a n c e Cit y S e r v i c e s 56 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget General Fund (10) Administration (501) Attorney/Legal Fees Fees paid for services provided by the City's contracted law firm, includes monthly contracted amount ($5,400/month), the balance is for special services. 08-01-00 125,765 101,542 120,000 80,999 120,000 Litigation Legal fees arising from litigation.08-01-01 44,621 16,913 60,000 17,575 60,000 Auditor Fees Fees paid for services rendered to perform the annual financial audit of the City.08-02-00 11,040 11,520 18,120 18,120 18,570 Professional Services Contractual arrangements with outside professionals such as engineers, planning, executive search, etc. Includes memberships for regional and state organizations. 2017 includes city administrator recruitment services ($6,000) and funding set aside from heath care savings support recommendations that arise to spur development regarding the I-435/45 Corridor ($40,852). 08-02-02 34,253 32,485 48,000 59,757 99,652 215,679 162,459 246,120 176,451 298,222 Holiday Decorations The cost of hanging decorations on utility poles around the City during the holidays.09-04-00 1,052 1,318 900 804 900 Cemetery Maintenance Maintenance of the Old Parkville Cemetery.09-11-00 3,393 3,369 4,000 3,656 4,000 Meeting Food For food costs associated with various meetings including work sessions, Finance Committee, and executive sessions. 09-20-02 1,794 1,715 2,000 1,776 1,800 Meeting Supplies Miscellaneous supplies for meetings. 09-20-07 694 113 500 458 500 Miscellaneous Miscellaneous includes uncategorized expenses. Includes funding for elected official business meetings, speaker/volunteer acknowledgements, etc. 09-21-00 6,756 4,102 6,000 9,498 6,000 Employee Appreciation Funding for yearly employee appreciation events. 09-21-03 2,000 13,690 10,618 13,400 16,192 15,200 Transfer to Emergency Reserve Transfer to Emergency Reserve Fund to cover any emergency expenses.20-20-00 317,000 60,000 317,500 317,500 317,500 Transfer to Debt Service Transfer to Debt Service to cover the City's current, annual debt obligations. Change in 2016 is a result of the refunding of the 2006 COPs 20-21-00 221,000 217,500 Transfer to Projects Fund Transfer to Projects Fund to cover any Projects Fund related expenses.20-21-00 4,577 15,910 538,000 282,077 317,500 333,410 317,500 1,434,855 1,071,478 1,329,483 1,252,156 1,415,692 Total General Fund (10) Administration (501) Pro f e s s i o n a l F e e s Total Professional Fees Total Other Expenses Ot h e r E x p e n s e s Tra n s f e r s Total Transfers 57 Police Department Police officers act as official representatives of government and are required and trusted to work within the law. Fundamental duties of police officers include: serving the community, safeguarding lives and property, protecting the innocent, keeping the peace, ensuring the rights of all, and most importantly being readily available to answer all calls for service. The budget increase in 2017 is primarily the result of a base salary and benefit increase for Police Officers to assist with department recruitment and retention. The discrepancy between the 2016 and 2017 budgeted numbers and the 2014, 2015, 2016 actual/unaudited numbers is primarily the result of position vacancies. The Police Department is staffed 24/7 by 17 sworn and 1 civilian member: Chief of Police, Captain, Three Sergeant(s), One Detective Sergeant, 11 Patrol Officer(s), and 1 Civilian Administrative Assistant. Within the Police Department, 1 Sergeant and 3 Patrol Officer(s) are trained and equipped as a bicycle unit. In 2017, the Police Department will continue to monitor crime statistics and address any developing crime trends in a timely fashion. Personnel will continue highly visible patrols and community policing. 1,096,979 1,036,581 1,223,870 1,039,766 1,242,136 900,000 950,000 1,000,000 1,050,000 1,100,000 1,150,000 1,200,000 1,250,000 1,300,000 2014 Actual 2013 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year Total Police Department Expenses Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Expenses 1,096,979 1,036,581 1,223,870 1,039,766 1,242,136 58 Category Personnel Insurance Maintenance Office Expenses Other Budget Expenses 979,488 156,048 65,800 24,850 15,950 Personnel 79% Insurance 13% Maintenance 5% Office Expenses 2% Other 1% 2017 Budget Police Department Expenses by Category Personnel Insurance Maintenance Office Expenses Other 59 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Salaries The total salaries for Police Department employees.01-01-00 773,147 715,104 798,200 697,055 811,000 Overtime Any additional salary payment over the base rate of pay for department employees.01-03-00 12,828 15,103 15,000 17,214 18,000 FICA & Medicare This is the City's share of FICA & Medicare cost for its employees.01-21-00 57,131 53,582 61,457 53,947 63,419 Retirement The City's LAGERS contribution for 2017 is 10.3% of police salaries. The contribution for employees who are not police officers is 8.2%. 01-22-00 31,820 41,795 53,825 45,017 79,619 Membership Fees & Dues The fees associated with membership to organizations for Police employees.01-41-00 370 400 950 425 950 Professional Development Cost of educational seminars and conferences attended by Police employees.01-41-02 834 653 4,500 559 4,500 Tuition Reimbursement Reimbursement of educational advancement of employees.01-43-00 578 2,000 2,000 876,130 827,215 935,932 814,216 979,488 Health, Life, & Dental The City offers health, dental, and life insurance to its employees and subsidizes a portion of the premium.02-02-00 101,126 122,532 140,448 128,214 118,548 Workers Compensation The workers compensation premium that covers all Police employees.02-03-00 33,662 16,132 39,490 34,318 36,000 Unemployment This covers the cost of any unemployment insurance claims for the Police Department.02-04-00 6,400 2,203 1,500 1,500 141,188 140,866 181,438 162,532 156,048 Telephone & Voicemail Private line to assist with investigations or other confidential matters in the Department.03-01-00 1,238 1,149 900 563 900 Mobile Phones The cost of cellular phones and coverage for Police personnel.03-05-00 3,890 3,675 4,500 3,550 4,500 5,128 4,824 5,400 4,114 5,400 Office Supplies, Computer Accessories & Consumable Items Includes items such as stationery, pens/pencils, ink/toner, folders, etc. as well as computer accessories, meeting supplies and general consumables. 05-01-00 2,018 1,708 2,800 1,949 2,800 Postage All postage and shipping costs, along with any incidental charges.05-02-00 200 189 250 129 250 Printing Expenses for printing work not performed by City personnel. Includes items such as business cards, forms, notices, letterhead, signage and books. 05-04-00 92 157 500 402 500 Small Office Equipment Items such as printers, calculators, etc.05-20-00 112 395 1,000 500 1,000 Equipment and Hand Tools Any equipment or hand tools needed to carry out the work of the Police Department. Includes radars, in-car video, Kevlar vests, evidence and fingerprinting supplies, duty ammunition, Taser cartridges, radios, safety vests, batteries, keys, tools, etc. 05-21-00 3,692 7,694 9,000 4,762 9,000 Terminal - Rejis Service charges to access the REJIS database. Recurring monthly fee of $2.25 per user. 05-22-01 1,499 1,356 1,400 1,335 1,500 Terminal - Platte County Service charges to access the Platte County Sheriff's database.05-22-02 2,014 2,014 2,300 2,014 2,300 Uniforms Purchase of uniforms and uniform equipment for each officer.05-31-00 3,009 5,493 7,000 4,839 7,000 Other Purchases Training and use of AED devices within the Department.05-99-00 36 12 500 364 500 12,672 19,019 24,750 16,295 24,850 General Fund (10) Police (505) Ins u r a n c e Total Insurance Ut i l i t i e s Total Utilities Pe r s o n n e l Total Personnel Off i c e E x p e n s e s Total Office Expenses 60 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget General Fund (10) Police (505) Vehicle Repair & Maintenance Maintenance and repair of police vehicles.06-21-00 10,268 11,157 15,000 10,642 15,000 Equipment Repair & Maintenance Maintenance and repair of police equipment.06-21-01 499 1,096 1,800 731 2,300 Vehicle Gas & Oil Fuel for Police Department vehicles.06-22-00 44,652 25,160 45,000 21,938 45,000 Crimestar Maintenance Maintenance on the City's Crimestar service and TIPS Hotline Fee.06-32-02 1,500 1,500 1,500 1,500 1,500 Office Equipment Maintenance Service contract/maintenance for Police Department copier.06-34-00 966 1,248 2,000 1,529 2,000 57,885 40,161 65,300 36,340 65,800 Hiring Expenses Screening tests completed before hiring new police officers as well as advertising costs to recruit new police officers for vacant positions. 07-56-00 2,442 3,455 4,000 5,104 3,500 Crime Commission The City's annual contribution to the Crime Commission.07-57-00 500 500 500 500 500 Lab Work The cost of sending evidence out for laboratory analysis.07-81-00 95 2,000 2,000 Contractual Service Agreement Payments for investigative information services rendered, Leads on Line, Medical Advisor/AED, and Accurint Information Services. 07-90-00 360 360 2,000 360 2,000 Other City Services Any other services performed by the Police Department not already covered. This includes the boarding of animals not covered by FOPAS agreement, including euthanasia. 07-99-00 128 700 144 700 3,525 4,315 9,200 6,108 8,700 Miscellaneous Miscellaneous includes uncategorized expenses. 09-21-00 200 180 350 111 350 Harvesters-Deer Donation This line item is used for Harvester donations for deer management. 09-21-04 250 1,500 50 1,500 450 180 1,850 161 1,850 1,096,979 1,036,581 1,223,870 1,039,766 1,242,136 Total General Fund (10) Police Expenses Ma i n t e n a n c e Total Maintenance Cit y S e r v i c e s Total City Services Total Other ExpensesOth e r Ex p . 61 Municipal Court The Municipal Court of the City of Parkville is a division of the 6th Judicial Circuit of the State of Missouri. The court employs an elected part-time Judge, an Administrative Court Clerk, and a Part-Time Administrative Court Clerk. The Municipal Court’s primary duties include the hearing of ordinance violation cases, the supervision of fee collection, and the handling of warrants. The budget remains essentially flat from 2016 to 2017. The 2016 unaudited numbers are below the budgeted numbers as a result of the fluctuating cost of prisoner boarding which ended up being low in 2016. The cases heard in Municipal Court are those as set forth in the Revised Statutes of Missouri. As a division of the court system, the rules the court follows are those set forth by the Supreme Court of Missouri and by statute and ordinance. Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Expenses 138,999 132,141 153,471 137,562 155,900 138,999 132,141 153,471 137,562 155,900 120,000 125,000 130,000 135,000 140,000 145,000 150,000 155,000 160,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year Total Court Expenses 62 Category Personnel City Services Insurance Office Expenses Other Budget Expenses 110,605 18,800 12,425 9,250 4,820 Personnel 71% City Services 12% Insurance 8% Office Expenses 6% Other 3% 2017 Budget Court Expenses by Category Personnel City Services Insurance Office Expenses Other 63 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Salaries Salaries of the Court Clerk and Part-Time Court Clerk.01-01-00 48,521 51,173 50,800 50,858 55,076 Overtime Any additional salary payment over the base rate of pay for department employees.01-03-00 64 33 300 250 Judge Judge's annual salary.01-11-00 18,000 18,221 18,000 17,315 18,000 FICA & Medicare The City's share of FICA & Medicare cost for its employees.01-21-00 5,122 5,285 5,441 5,309 5,609 Retirement The City's LAGERS contribution for 2017 is 8.2% of general employee salaries.01-22-00 1,422 2,214 2,160 2,141 2,929 Judge Allowance Judge's allowance ($45/month).01-32-00 540 495 540 540 540 Membership Fees & Dues The fees associated with membership to organizations for the Judge, attorneys, and Court employees.01-41-00 100 500 500 270 500 Professional Development Cost of educational seminars and conferences attended by Court employees.01-41-02 3,768 3,523 5,000 3,942 5,500 Prosecutor Prosecutor's annual salary.01-51-00 22,200 17,150 15,000 16,250 15,000 Public Defender Public Defender's annual salary. 01-51-02 6,500 7,200 7,200 7,800 7,200 106,237 105,793 104,941 104,425 110,605 Health, Life, & Dental The City offers health, dental, and life insurance to its employees and subsidizes a portion of the premium.02-02-00 7,505 9,454 9,660 8,689 8,025 Workers Compensation The workers compensation premium that covers all Municipal Court employees.02-03-00 2,981 1,888 4,200 3,761 4,400 10,486 11,341 13,860 12,451 12,425 Mobile Phones Cellular phone stipend for Court Clerk ($10/month).03-05-00 140 120 120 130 120 140 120 120 130 120 Office Supplies, Computer Accessories & Consumable Items Includes items such as stationery, pens/pencils, folders, etc. as well as computer accessories, meeting supplies, and general consumables. 05-01-00 234 376 1,800 371 1,500 Postage All postage and shipping costs, along with any incidental charges.05-02-00 440 312 500 256 400 Printing Expenses for printing work not performed by City personnel. Includes business cards, forms, notices, letterhead, and books. 05-04-00 3,703 1,907 4,500 2,738 4,500 Publications Purchase of books and periodicals that are pertinent to City services and/or employee performance.05-05-00 230 250 350 318 350 Processing Fees Fees associated with processing credit cards. 05-06-00 1,979 1,169 2,200 1,987 2,500 6,585 4,014 9,350 5,669 9,250 REJIS System The fees incurred to check for warrants on defendants. 06-32-00 237 247 700 247 700 Software Support Agreement Maintenance agreement with Tyler Technologies for the Incode court module.06-33-00 2,169 2,278 2,400 2,392 2,800 Office Equipment Maintenance Maintenance costs for Municipal Court copier. 06-34-00 444 127 800 204 800 2,851 2,652 3,900 2,842 4,300 Boarding of Prisoners The cost to board prisoners at the Platte County prison facilities.07-80-00 4,401 2,286 14,000 8,372 12,000 Bailiff The cost to have a police officer stand as bailiff for court.07-82-00 6,072 4,939 6,000 2,995 6,000 Translator Translation services for non-English speaking defendants.07-82-01 1,243 627 800 361 800 11,716 7,852 20,800 11,729 18,800 Miscellaneous Miscellaneous includes uncategorized expenses.09-21-00 984 369 500 315 400 984 369 500 315 400 138,999 132,141 153,471 137,562 155,900 Off i c e E x p e n s e s Total Office Expenses General Fund (10) Court (510) Ins u r a n c e Total Insurance Uti l i t i e s Total Utilities Pe r s o n n e l Total Personnel Total Other ExpensesOth e r Ex p . Total General Fund (10) Court Expenses Ma i n t e n a n c e Total Maintenance Cit y Ser v i c e s Total City Services 64 Public Works Department The Public Works Department includes two divisions: Operations (Parks and Streets) and Sewer. The Administration side of the Public Works department consists of one Director, one part-time construction inspector, and one part-time department assistant. Public Works, with support from a contract City Engineer and contracted engineering firms, manages the City's major project design and implementation needs. The scope of work includes development plan review, capital project planning, project design, and construction administration. The Public Works department supervises various sewer plant improvements, street improvements, and park improvements. The budget increase in 2017 is primarily the result of approved benefit adjustments for staff. 145,444 172,372 215,687 172,785 226,756 0 50,000 100,000 150,000 200,000 250,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year Total Public Works Expenses Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Expenses 145,444 172,372 215,687 172,785 226,756 65 Category Personnel Professional Fees Insurance Maintenance Other Budget Expenses 172,866 30,000 17,860 3,500 2,530 Personnel 76% Insurance 8% Maintenance 2% Professional Fees 13% Other Expenses 1% 2017 Budget Public Works Expenses by Category Personnel Insurance Maintenance Professional Fees Other Expenses 66 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Salaries Includes salaries for Public Works employees. A portion is covered by the Sewer Administrative Fee, as related to sewer work performed. 01-01-00 68,482 113,140 138,500 126,168 145,463 FICA & Medicare This is the City's share of FICA & Medicare cost for its employees.01-21-00 5,597 8,594 9,902 9,801 11,128 Retirement The City's LAGERS contribution for 2017 is 8.2% of general employee salaries.01-22-00 2,029 2,087 4,467 4,430 7,825 Public Works Director Auto Allowance Public Works Director auto allowance ($250/month).01-33-00 2,250 3,000 3,000 3,000 3,000 Membership Fees & Dues The fees associated with membership to organizations for the Public Works Director.01-41-00 634 305 600 549 650 Professional Development Cost of educational seminars and conferences attended by Public Works employees.01-41-02 2,824 3,164 3,800 2,891 3,800 Tuition Reimbursement Reimbursement of educational advancement of employees.01-43-00 1,000 1,000 1,000 81,817 131,291 160,269 147,838 172,866 Health, Life, & Dental The City offers health, dental, and life insurance to its employees and subsidizes a portion of the premium.02-02-00 3,569 12,426 12,948 12,960 16,360 Workers Compensation The workers compensation premium that covers Public Works employees.02-03-00 437 129 500 448 500 Unemployment This covers the cost of any unemployment insurance claims for the Public Works Department.02-04-00 3,520 491 1,000 1,000 7,526 13,046 14,448 13,408 17,860 Mobile Phones Cellular stipend for the Public Works Director ($40/month) and cell phone expense for inspector. 03-05-00 400 687 720 707 730 400 687 720 707 730 Office Supplies, Computer Accessories & Consumable Items Includes items such as stationery, pens/pencils, folders, etc. as well as computer accessories, meeting supplies and general consumables. 05-01-00 518 799 750 643 750 Postage All postage and shipping costs, along with any incidental charges.05-02-00 131 98 150 126 150 Computer Equip/Access/Programs No longer used. Miscode of engineering services in 2014. Moved to Information Technology 05-03-00 525 Printing Expenses for printing work not performed by City personnel. This includes items such as business cards, forms, letterhead, and books. 05-04-00 242 564 250 37 150 Small Office Equipment No longer used. Items such as printers, etc.05-20-00 4 Uniforms Uniform allowance is provided for required apparel for the Public Works inspector.05-31-00 196 250 174 250 Other Purchases No longer used. Miscellaneous purchases necessary to perform jobs. Now included with Miscellaneous.05-32-00 38 1,459 1,656 1,400 979 1,300 Tornado Siren Contracted monthly maintenance on the City's tornado/public safety siren. Includes funding for the City's participation in the Missouri River flood gauge partnership. 06-36-00 2,424 3,084 3,350 2,808 3,500 2,424 3,084 3,350 2,808 3,500 Engineer & Planning Fees For on-call assistance to supplement staff for special projects and periods of high volume for plan reviews, materials testing, and inspections. Offset in part by development fees for public improvements. 08-03-00 51,640 21,729 35,000 6,776 30,000 51,640 21,729 35,000 6,776 30,000 Miscellaneous Miscellaneous includes uncategorized expenses.09-21-00 179 880 500 270 500 179 880 500 270 500 145,444 172,372 215,687 172,785 226,756 Off i c e E x p e n s e s Total Office Expenses General Fund (10) Public Works (515) Ins u r a n c e Total Insurance Uti l i t i e s Total Utilities Pe r s o n n e l Total Personnel Total General Fund (10) Public Works Expenses Ma i n t . Total Maintenance Pro f e s s i o n a l Fee s Total Professional Fees Oth e r Exp . Total Other Expenses 67 Community Development Department The Community Development Department provides current and long-range planning, zoning, building safety and inspection, code enforcement, 911 addressing, mapping and similar related development services. Community Development also provides utility locating services, floodplain administration, supports the City’s Planning and Zoning Commission, supports the Board of Zoning Adjustment, and supports the Board of Housing Appeals. The department includes three full-time staff that includes the department director, building official, building inspector and two part-time staff that include the code enforcement officer and the administrative assistant. The budget decrease from 2016 to 2017 is primarily the result of cost savings associated with making the code enforcement officer/administrative assistant two part-time positions. 249,809 267,231 316,393 253,046 293,038 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year Total Community Development Expenses Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Expenses 249,809 267,231 316,393 253,046 293,038 68 Category Personnel Insurance Professional Fees City Services Office Expenses Other Budget Expenses 251,087 22,551 6,300 5,500 3,950 3,650 Personnel 86% Insurance 8% Professional Fees 2% City Services 2% Office Expenses 1% Other 1% 2017 Budget Community Development Expenses by Category Personnel Insurance Professional Fees City Services Office Expenses Other 69 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Salaries The total salaries for Community Development employees. 01-01-00 193,480 195,335 228,900 193,535 214,483 FICA & Medicare This is the City's share of FICA & Medicare cost for its employees.01-21-00 13,558 14,752 17,893 14,944 16,408 Retirement The City's LAGERS contribution for 2017 is 8.2% of general employee salaries.01-22-00 6,629 10,673 12,054 7,161 12,746 Community Development Director Auto Allowance Community Development Director auto allowance ($200/month).01-31-00 2,400 2,300 2,400 2,200 2,400 Membership Fees and Dues The fees associated with membership to organizations for Community Development employees.01-41-00 1,132 1,373 1,675 1,355 850 Professional Development This includes the costs for educational seminars and conferences attended by employees, such as registration, travel, lodging, and per diem. 01-41-02 4,149 3,440 5,400 1,553 4,200 221,349 227,872 268,322 220,748 251,087 Health, Life, & Dental The City offers health, dental, and life insurance to its employees and subsidizes a portion of the premium. Reflects premium increases for employees. 02-02-00 19,872 24,180 25,701 22,286 20,551 Workers Compensation The workers compensation premium that covers all Community Development employees.02-03-00 666 184 1,000 520 1,000 Unemployment This covers the cost of any unemployment insurance claims for the Community Development Department.02-04-00 1,000 1,000 20,538 24,365 27,701 22,805 22,551 Mobile Phones & Pagers The cost of cellular phones and coverage for Community Development employees. 03-05-00 1,739 1,623 1,600 1,498 1,600 1,739 1,623 1,600 1,498 1,600 Office Supplies, Computer Accessories & Consumable Items Includes items such as stationery, pens/pencils & folders, meeting supplies, computer accessories, plotter ink and, general consumables. 05-01-00 937 1,090 1,000 571 1,000 Postage All postage and shipping costs, along with any incidental charges.05-02-00 920 1,718 1,500 1,316 2,000 Printing Expenses for printing work not performed on City equipment. Examples include items such as business cards, inspection forms, violation notice cards, etc. 05-04-00 125 260 500 340 500 Publications Purchase of books and periodicals that are pertinent to City services and/or employee performance, such as code books and other printed manuals. 05-05-00 870 Small Office Equipment Small equipment such as desktop printers, hole punches, calculators, etc.05-20-00 27 9 Equipment and Hand Tools Equipment necessary to carry out department duties including, electrical testers, flash lights, canned smoke, and other necessary tools. 05-21-00 154 300 155 250 Uniforms An allowance is provided for required apparel including uniforms, boots, gloves, etc. on an "as needed" basis.05-31-00 361 237 500 504 200 2,371 3,459 4,670 2,896 3,950 Off i c e E x p e n s e s Total Office Expenses General Fund (10) Community Development (518) Ins u r a n c e Total Insurance Uti l i t i e s Total Utilities Pe r s o n n e l Total Personnel 70 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget General Fund (10) Community Development (518) Vehicle Repair & Maintenance All maintenance and repair work for Community Development Department vehicles.06-21-00 368 1,261 750 74 500 Vehicle Gas & Oil Fuel for Community Development Department vehicles.06-22-00 1,932 1,313 1,500 1,016 1,200 2,300 2,575 2,250 1,090 1,700 Public Notices The cost to advertise and post public notices, including newspaper publications, signage, etc. and for recording. Certified mail included in Postage above. 07-02-01 1,409 2,350 2,000 1,021 1,500 Code Enforcement Costs associated with code enforcement services, including condemnation, demolition, mowing, trash removal, liens and other enforcement expenses. 07-04-00 2,251 5,000 1,153 4,000 1,409 4,602 7,000 2,175 5,500 Engineer & Planning Fees The fees for consultant engineering, planning, surveying, interns or similar specialty work or reviews performed for the Community Development Department. 08-03-00 1,992 3,000 25 3,000 NPDES II/Arcview The cost to purchase data, aerials, and maintain the City's GIS mapping system.08-03-02 250 1,500 1,245 3,300 - 2,242 4,500 1,270 6,300 Planning Commission meeting food/supplies Food and miscellaneous supplies associated with Planning Commission meetings.09-20-00 8 150 122 150 Miscellaneous Miscellaneous includes uncategorized expenses.09-21-00 104 485 200 443 200 104 493 350 565 350 249,809 267,231 316,393 253,046 293,038 Total General Fund (10) Community Development Expenses Ma i n t e n a n c e Total Maintenance Cit y S e r v i c e s Total City Services Pro f e s s i o n a l F e e s Total Professional Fees Oth e r Exp e n s e s Total Other Expenses 71 Operations Division: Streets The Operations Division (Streets and Parks) consists of one operations director, one superintendent, and seven laborers. The Operations Division is responsible for maintaining approximately 90 lane miles of pavement, right of ways, sidewalks, and storm drains. In the summer this includes patching potholes, sealing pavement cracks, repairing storm sewers, mowing of 18 miles of right of way/highway medians, and assisting with the annual street maintenance program. In the winter months the Operations Division works together to plow snow, apply salt, and spread sand to provide clear travel routes on the City's street network. Projects completed in 2016 include updates to the street ratings on all city streets, used new technology to line storm sewer pipes on Oakdale Place and Pineridge Circle, applied 15,000 pounds of crack sealing material on City streets, replaced over 3,072 feet of concrete curb and gutter, and installed 35,000 feet of Pavement Marking. The budget increase from 2016 to 2017 is primarily the result of the movement of the Household Hazardous Waste Collection Program from Administration to Streets and the result of approved benefit adjustments for staff. 340,633 356,757 399,656 373,379 422,576 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year Total Operations: Streets Expenses Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Expenses 340,633 356,757 399,656 373,379 422,576 72 Category Personnel Insurance Utilities City Services Other Budget Expenses 305,280 68,598 15,400 23,148 10,150 Personnel 72% Insurance 16% Utilities 4% City Services 6% Other 2% 2017 Budget Streets Expenses by Category Personnel Insurance Utilities City Services Other 73 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Salaries The total salaries for Streets Division employees.01-01-00 220,765 227,256 237,130 227,677 248,081 Overtime Any additional salary payment over the base rate of pay for department employees.01-03-00 11,050 8,266 15,000 6,205 15,000 FICA & Medicare This is the City's share of FICA & Medicare cost for its employees.01-21-00 17,128 16,983 18,285 17,418 20,126 Retirement The City's LAGERS contribution for 2017 is 8.2% of general employee salaries.01-22-00 7,774 12,423 14,102 13,161 21,573 Professional Development Cost for educational seminars and conferences attended by Streets employees.01-41-02 104 500 160 500 256,718 265,033 285,017 264,621 305,280 Health, Life, & Dental The City offers health, dental, and life insurance to its employees and subsidizes a portion of the premium.02-02-00 30,285 48,703 46,929 47,919 42,098 Workers Compensation The workers compensation premium that covers all Streets Divisions employees.02-03-00 21,323 10,148 25,000 20,333 25,000 Unemployment This covers the cost of any unemployment insurance claims for the Streets Division.02-04-00 138 1,500 1,500 51,607 58,989 73,429 68,252 68,598 Telephone & Voicemail The charges for local and long distance telephone service and internet for the Street Barn.03-01-00 1,455 1,387 1,400 1,460 1,400 Electricity Electric utility charges for the Street Barn.03-02-00 2,950 2,916 3,800 2,847 3,800 Gas Gas utility charges for the Street Barn.03-02-01 1,524 1,426 2,200 1,156 2,200 Water Water loads and drinking water for the Street Barn.03-04-00 3,364 3,863 4,200 3,479 4,200 Mobile Phones The cost of cellular phones and coverage for street division employees.03-05-00 1,645 2,405 2,800 2,127 2,800 Trash Hauling The hauling charges for the trash at the Street Barn and trash cans on Main Street ($660/year for Streets dumpster, free for Downtown trash). 03-09-00 495 330 660 1,085 1,000 11,434 12,327 15,060 12,155 15,400 Office Supplies, Computer Accessories & Consumable Items This includes items such as stationery, pens/pencils, folders, etc. as well as computer accessories, meeting supplies and general consumables. 05-01-00 769 623 800 520 800 Postage All postage and shipping costs, along with any incidental charges.05-02-00 1 Small Office Equipment Items such as printers, telephones, etc.05-20-00 327 500 167 500 Shop Supplies & Materials Miscellaneous small equipment purchases such as hedge trimmers, saws, brooms, etc.05-21-00 4,485 5,225 6,000 4,961 6,000 Uniforms Allowance provided for uniforms, including boots, winter apparel, and apparel with the City logo.05-31-00 2,316 2,822 2,600 2,935 2,600 7,570 8,998 9,900 8,582 9,900 Vehicle Repair & Maintenance No longer used. All maintenance and repair work for Street Division vehicles, such as brakes, tires, hydraulic problems, etc. Moved to Transportation Fund. 06-21-00 113 188 113 - - 188 - Off i c e E x p e n s e s Total Office Expenses General Fund (10) Streets (520) Ins u r a n c e Total Insurance Ut i l i t i e s Total Utilities Pe r s o n n e l Total Personnel Ma i n t e n a n c e Total Maintenance 74 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget General Fund (10) Streets (520) Street Repair Materials No longer used. For asphalt necessary to complete pothole repairs on City streets. This does not include asphalt overlay projects, crack seal material, dirt, and paint. Moved to Transportation Fund. 07-33-00 1,222 Clean up and Recycling Expenses All expenses pertaining to the semiannual cleanup events held during the spring and fall for residents, including the spring recycling extravaganza. 07-43-00 10,685 6,732 13,500 11,193 14,500 Recycling Extravaganza No longer used. All expenses pertaining to the annual Northland Recycling Extravaganza event held during the spring for residents. Was combined with Clean up and Recycling Expenses in 2016. 07-43-01 1,476 1,916 Household Hazardous Waste All expenses pertaining to the MARC Household Hazardous Waste Collection Program and local event ($6,547.84/year). The MARC HHW program allows residents to safely dispose of such waste at no charge. Previously in Administration Division. 07-43-02 400 7,106 6,548 Mosquito & Weed Control Chemicals used to abate weeds and mosquitoes around the City.07-51-00 849 1,181 2,000 1,189 2,000 Animal Control Supplies for animal control.07-55-00 100 20 100 13,009 11,051 16,000 19,507 23,148 NPDES II/Arcview Programming No Longer Used. The cost to upgrade and program the City's GIS software. Moved to Community Development.08-03-02 60 60 - - - - Miscellaneous Miscellaneous includes uncategorized expenses.09-21-00 121 361 250 74 250 121 361 250 74 250 340,633 356,757 399,656 373,379 422,576 Total Other ExpensesOth e r Exp . Total General Fund (10) Streets Expenses Total City Services Pro . F e e s Total Professional Fees Cit y S e r v i c e s 75 Operations Division: Parks The Operations Division consists of one operations director, one superintendent, and seven laborers. The Operations Division is responsible for general park and trail maintenance and repair. This includes trimming trees, picking up trash, mowing, weed eating, and cleaning restrooms. In the summer months the Operations Division works together to control weeds and mosquitoes in the right-of-ways and in City parks. Projects completed in 2016 include installation of the large dog park perimeter trail, replacement of the riverfront asphalt trail, installation of new trail marker signs installed throughout park system for new certified 5K & 10K races, and contract management of the park bathroom remodel. The restroom project included epoxy floor/walls, crown molding, all new fixtures, LED canister lighting, ADA sidewalk, drain system, and drinking fountain. 281,741 319,765 356,007 302,440 373,479 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year Total Operations: Parks Expenses Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Expenses 281,741 319,765 356,007 302,440 373,479 76 Category Personnel Maintenance Utilities Insurance City Services Office Expenses Other Budget Expenses 188,623 48,250 46,500 33,200 28,975 26,931 1,000 Personnel 51% Maintenance 13% City Services 12% Utilities 9% Office Expenses 8% Insurance 7% Other 0% 2017 Budget Operations: Parks Expenses by Category Personnel Maintenance City Services Utilities Office Expenses Insurance Other 77 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Salaries The total salaries for Parks employees.01-01-00 120,356 119,545 106,300 98,671 108,046 Overtime Any additional salary payment over the base rate of pay for department employees.01-03-00 3,627 3,704 6,000 3,488 4,000 Seasonal Landscape Maintenance Workers Four part-time seasonal employees are hired to maintain parks during the summer. Increased from 3 to 4 in 2016. 01-05-00 20,783 27,603 54,080 36,777 54,080 FICA & Medicare This is the City's share of FICA & Medicare cost for its employees.01-21-00 10,106 10,754 11,442 10,644 12,709 Retirement The City's LAGERS contribution for 2017 is 8.2% of general employee salaries.01-22-00 4,586 5,759 5,020 4,921 9,188 Membership Fees and Dues The fees associated with membership to organizations for Parks employees.01-41-00 100 100 Professional Development This includes the costs for educational seminars and conferences attended by Parks employees.01-41-02 26 500 100 500 159,458 167,390 183,442 154,601 188,623 Health, Life, & Dental The City offers health, dental, and life insurance to its employees and subsidizes a portion of the premium.02-02-00 17,222 22,621 22,440 20,344 18,931 Workers Compensation The workers compensation premium that covers all Parks employees.02-03-00 6,318 2,702 7,000 6,694 7,000 Unemployment This covers the cost of any unemployment insurance claims for the Parks Division.02-04-00 500 2,986 1,000 23,540 25,322 29,940 30,024 26,931 Telephone & Voicemail The charges for local and long distance telephone service for the Parks office.03-01-00 1,698 1,980 1,900 1,425 1,900 Electricity Electric utility charges for the Parks office.03-02-00 13,594 16,391 18,000 17,515 18,000 Gas Gas utility charges for the Parks office.03-03-00 1,398 953 1,500 859 1,500 Water Water utility charges and drinking water for the Parks office.03-04-00 7,851 6,207 9,000 6,638 9,000 Mobile Phones The cost of cellular phones and coverage for Parks employees.03-05-00 1,814 990 1,300 925 1,300 Trash Hauling Trash hauling for the City parks ($1,500/year).03-09-00 1,005 670 1,500 1,065 1,500 27,359 27,190 33,200 28,429 33,200 Office Supplies, Computer Accessories & Consumable Items Includes items such as stationery, pens/pencils, folders, etc. as well as computer accessories, meeting supplies, and general consumables. 05-01-00 455 567 500 188 500 Postage All postage and shipping costs, along with any incidental charges.05-02-00 37 0.42 75 3 75 Printing Expenses for printing work not performed by City personnel. It would include items such as business cards, forms, notices, letterhead, and books. 05-04-00 405 437 400 91 400 Publications Purchase of books and periodicals that are pertinent to City services and/or employee performance.05-05-00 100 100 Small Office Equipment Items such as printers, fax machines, etc. Funding in 2017 includes the purchase of a new printer for the Parks office. 05-20-00 400 400 Equipment & Hand Tools Any equipment or hand tools needed to carry out the work of the Parks Division.05-21-00 5,124 5,917 6,500 6,517 6,500 Uniforms Allowance provided for uniforms, including boots, winter apparel, and apparel with the City logo.05-31-00 888 1,859 2,000 1,883 2,000 Restroom Supplies Toiletries for the public restrooms in English Landing Park and Platte Landing Park. Funding in 2017 includes purchase of restroom supplies to operate the new ELP restroom year round following completeion of Restroom Improvements Phase II. 05-41-01 2,037 2,429 2,700 2,727 3,000 Trash Bags Trash and dog waste bags for the receptacles in City parks.05-41-02 3,533 4,707 4,300 4,288 4,700 Park Enhancements Amenity improvements for City parks. 05-41-03 1,758 6,743 5,000 5,065 7,000 Grass Seed & Fertilizer Grass seed and fertilizer for the City parks.05-42-00 307 2,249 2,800 2,465 3,800 Other Purchases Unbudgeted purchase of supplies.05-99-00 168 377 500 204 500 14,712 25,286 25,275 23,431 28,975 Off i c e E x p e n s e s Total Office Expenses General Fund (10) Parks (525) Ins u r a n c e Total Insurance Uti l i t i e s Total Utilities Pe r s o n n e l Total Personnel 78 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget General Fund (10) Parks (525) Building Maintenance & Repair Maintenance and repair of Parks office building and other park structures. 06-01-00 4,796 9,503 4,000 6,406 6,000 Restrooms Maintenance of the permanent public restrooms in English Landing Park and Platte Landing Park 06-03-00 1,867 1,587 4,900 1,604 3,000 Stage Maintenance Maintenance for the Maxine McKeon Stage in English Landing Park.06-05-01 150 97 150 Ball Field Maintenance Includes maintenance ball fields, volleyball courts, and related amenities. 06-05-02 817 5,868 4,000 2,995 4,000 Trail Maintenance Maintenance of park trails.06-05-03 1,558 1,153 3,600 456 3,600 Playground Equipment & Repair Maintenance for the playground at English Landing Park. Includes replacement of "rocket ship" playground toy in 2017. 06-12-00 1,061 433 2,000 2,275 5,000 Spirit Fountain Maintenance for the Gresham Spirit fountain by the Train Depot.06-13-00 510 4,124 2,500 3,508 2,500 Vehicle Repair & Maintenance Maintenance for the Parks Division vehicles. 06-21-00 5,445 5,148 6,500 4,007 6,000 Equipment Repair & Maintenance Repair and maintenance of Parks Division equipment. This does not include lawn mowers.06-21-01 3,461 4,592 3,500 4,480 3,500 Tractor Mowing Equipment Maintenance and repair of Parks Division lawn mowers and tractors.06-21-02 5,077 6,242 6,500 4,641 6,000 Vehicle Gas & Oil Fuel for Parks Division vehicles.06-22-00 6,805 4,162 7,500 2,644 5,000 Equipment Gas & Oil Fuel and oil for park mowing equipment.06-22-01 5,065 4,942 5,000 2,803 3,500 36,464 47,755 50,150 35,916 48,250 Rental of Portable Toilets Rental of portable toilets in convenient locations throughout English Landing Park. Funding in 2016 includes the rental of portable restrooms during the construction of the ELP restroom. 07-20-00 2,440 2,195 4,000 5,225 5,500 Mosquito & Weed Control Chemicals used to abate weeds and mosquitoes in City parks. Funding in 2017 includes the maintenance of the PLP wetland and native vegetation area. 07-51-00 1,087 6,132 6,000 7,730 12,000 Landscaping To purchase mulch, perennials, top soil, etc. for all Parks.07-51-01 1,093 5,000 2,639 5,000 Tree Trimming & Removal The trimming and removal of any unsafe and/or unhealthy trees in City parks. Helps to maintain Tree City USA status. Funding includes the local match associated with the MDC TRIM grant. 07-52-00 15,533 9,908 12,000 7,426 18,000 Tree Planting The cost of planting new trees in City parks. Funding includes the local match associated with the MDC TRIM grant. 07-53-00 5,870 5,000 4,949 5,000 Rental Equipment Rental costs for equipment needed but not owned by the City, such as a lift to accommodate in-house tree pruning. 07-60-00 181 866 1,000 1,299 1,000 19,241 26,065 33,000 29,267 46,500 Miscellaneous Miscellaneous includes uncategorized expenses.09-21-00 966 757 1,000 772 1,000 966 757 1,000 772 1,000 281,741 319,765 356,007 302,440 373,479 Total Other ExpensesOth e r Exp . Total General Fund (10) Parks Expenses Ma i n t e n a n c e Total Maintenance Cit y S e r v i c e s Total City Services 79 Nature Sanctuary The Parkville Nature Sanctuary is comprised 115 acres of natural forest land. This includes 46 acres of City owned land and 69 acres of land leased by the City from the Missouri Department of Conservation. The Parkville Nature Sanctuary is primarily three contiguous tracts of land adjacent to Riss Lake, Park University and Highway 9. In addition, the city maintains the smaller Sullivan Nature Sanctuary, which is just north of Platte Landing Park on the west side of Main Street. The Nature Sanctuary consists of one part-time director and one part-time assistant director. Their duties include maintaining and developing the lands, trails and other facilities for use by the public, organizing special events, and coordinating fundraising activities. Program expenses are partially offset by nature sanctuary donations and program fees. The 2016 budget and 2017 budget are essentially flat. 27,156 29,834 39,681 33,031 40,201 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year Total Nature Sanctuary Expenses Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Expenses 27,156 29,834 39,681 33,031 40,201 80 Category Personnel Maintenance Office Expenses Other Expenses Budget Expenses 27,431 6,750 4,770 1,250 Personnel 68% Maintenance 17% Office Expenses 12% Other Expenses 3% 2017 Budget Nature Sanctuary Expenses by Category Personnel Maintenance Office Expenses Other Expenses 81 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Salaries Includes salaries for Nature Sanctuary employees.01-01-00 15,001 18,967 25,064 19,164 25,064 Overtime Any additional salary payment over the base rate of pay for department employees.01-03-00 248 231 250 FICA & Medicare This is the City's share of FICA & Medicare cost for its employees.01-21-00 1,148 1,493 1,917 1,496 1,917 Expense Allowance - Other Reimbursement of incidental expenses.01-31-00 200 200 16,149 20,708 27,181 20,891 27,431 Electricity Electric utility charges for the Nature Sanctuary.03-02-00 58 600 218 600 58 600 218 600 Office Supplies, Computer Accessories & Consumable Items Includes items such as stationery, pens/pencils, folders, etc. as well as computer accessories, meeting supplies, and general consumables. 05-01-00 45 119 100 90 100 Postage All postage and shipping costs, along with any incidental charges.05-02-00 14 5 50 37 70 Printing Expenses for printing work not performed by City personnel. This includes items such as business cards, forms, letterhead, and books. 05-04-00 532 500 103 500 Equipment & Hand Tools Equipment and hand tools necessary to completing work for the Nature Sanctuary. 05-21-00 540 253 400 146 400 Materials Hardware, mulch, signs, and other miscellaneous materials.05-41-00 110 91 1,000 1,610 1,000 Program Expenses Costs associated with the Day Camps, Ghost Stories, and other events held in the Nature Sanctuary throughout the year. Offset by program fees. 05-42-00 2,868 3,548 2,700 3,144 2,700 4,109 4,018 4,750 5,130 4,770 Building Maintenance & Repair Maintenance and repair charges for the maintenance shed and Girl Scout shelter. Also includes portable restroom facilities. 06-01-00 1,216 885 950 1,080 1,200 Trail Maintenance Maintenance of trails in the Nature Sanctuary, including tree trimming and removal. 06-05-03 4,152 2,979 3,500 4,429 4,000 Vehicle Repair and Maintenance All maintenance and repair work for Nature Sanctuary vehicles. Includes brakes, tires, hydraulic problems, etc. 06-21-00 389 412 1,500 754 1,000 Equipment Repair & Maintenance All maintenance and repair work for Nature Sanctuary equipment.06-21-01 187 72 150 111 200 Vehicle Gas and Oil Fuel for Nature Sanctuary vehicles.06-22-00 330 276 400 185 350 6,274 4,624 6,500 6,559 6,750 Mosquito & Weed Control Materials for mosquito and weed abatement in the Nature Sanctuary.07-51-00 160 38 150 55 150 160 38 150 55 150 Miscellaneous Miscellaneous includes uncategorized expenses.09-21-00 464 389 500 178 500 464 389 500 178 500 27,156 29,834 39,681 33,031 40,201 Total General Fund (10) Nature Sanctuary (535) Off i c e E x p e n s e s Total Office Expenses General Fund (10) Nature Sanctuary (535) Pe r s o n n e l Total Personnel Uti l i t i e s Total Other ExpensesOt h e r Exp . Ma i n t e n a n c e Total Maintenance Cit y Ser v i c e s Total City Services Total Utilities 82 Public Information Division The Public Information Division is responsible for community outreach via media sources. This includes live streaming and backup of public meetings, website management, and production and mailing of the City Newsletter. The Public Information budget and services are overseen by the Assistant to the City Administrator. Public meeting broadcast production and backup is contracted out to a third-party vendor. The City Newsletter is produced and mailed in-house and is funded by advertising revenue. Personnel expenses in the graph below represent the budgeted services contract with Curious Eye Projections. The 2016 budget and 2017 budget are essentially flat. 15,450 15,357 13,810 11,759 13,260 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year Total Public Information Expenses Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Expenses 15,450 15,357 13,810 11,759 13,260 83 Category Personnel Maintenance Office Expenses Capital Expenses Budget Expenses 12,300 660 200 100 Personnel 93% Maintenance 5% Office Expenses 1% Capital Expenses 1% 2017 Budget Public Information Expenses by Category Personnel Maintenance Office Expenses Capital Expenses 84 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Technical Consultant Contract with Curious Eye to manage filming and live streaming of Board of Aldermen and Planning Commission meetings ($850/month). 01-52-00 9,299 10,200 10,200 9,500 10,200 Production Assistant Cost for contract production assistants to film meetings ($50/meeting). Includes small buffer for additional meeting recording as needed. 01-53-00 1,750 1,850 2,100 1,500 2,100 11,049 12,050 12,300 11,000 12,300 Computers & Programming No longer used. Expense for live streaming one-time setup. 04-11-00 (299) Office Equipment The purchase of supplies for meeting recordings, such as DVDs.04-21-00 200 100 (299) - 200 - 100 Computer Equipment, Access & Programming The purchase of computer accessories, meeting recording accessories, and live stream accessories.05-03-00 150 140 500 200 150 140 500 - 200 Newsletter/Website No longer used. Costs associated with the twice per year resident newsletter. Contracted with the Platte County Citizen for newsletter services in fall 2015. Previously in Administration Department. 09-05-00 3,991 2,508 600 Website Maintenance Maintenance and upkeep charges for the City's website (www.parkvillemo.gov). Previously in Administration Department. 09-05-01 100 250 99 100 Computer Maintenance Annual subscription fees for live streaming ($500/year) and Vimeo video archive service ($60/year).06-31-00 559 559 560 60 560 4,550 3,167 810 759 660 15,450 15,357 13,810 11,759 13,260 Total General Fund (10) Public Information (540) Ma i n t e n a n c e Total Maintenance Off i c e Exp . Total Office Expenses General Fund (10) Public Information (540) Pe r s o n n e l Total Personnel Total Capital Expenses Ca p i t a l Exp . 85 Information Technology Division The Information Technology Division is responsible for providing secure, reliable, and responsive technology and business solutions that facilitate and enhance the City’s effectiveness in serving the citizens of Parkville. This includes hardware support, software trouble shooting, and other routine technical assistance. Information Technology services are currently provided by a third-party vendor on contract and overseen by the City Administrator. Personnel expenses in the graph below represent the budgeted IT Services contract with eNet, Inc. Annual maintenance costs of the City’s accounting software and spam blocker are included in the IT division. The budget increase in 2017 accounts for a city-wide upgrade to Office 2016. 34,167 34,185 43,974 44,907 49,907 0 10,000 20,000 30,000 40,000 50,000 60,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year Total Information Technology Expenses Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Expenses 34,167 34,185 43,974 44,907 49,907 86 Category IT Expenses Personnel Maintenance Budget Expenses 27,383 20,400 2,124 IT Expenses 55% Personnel 41% Maintenance 4% 2017 Budget Information Technology Expenses by Category IT Expenses Personnel Maintenance 87 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Information Technology Support Contract Information technology support annual contract with eNet, LLC. ($2,125/month maximum). 01-52-00 18,276 9,157 21,000 21,159 20,400 18,276 9,157 21,000 21,159 20,400 Equipment Purchase of any new IT related equipment such as computers (w/ software), servers, printers, copiers, etc. 02-01-00 494 6,212 5,500 3,122 2,000 Software Annual maintenance for Incode accounting program ($16,938), spam blocker ($880/yr), online Municipal Code ($695/yr), InDesign ($240/yr) and other miscellaneous computer software. Includes citywide upgrade to Office 2016 ($4,160) and antivirus software update ($1,620). 02-02-00 13,128 16,228 14,960 17,599 24,533 Domain Registrations Cost of domain registrations for parkvillemo.com and parkvillepolice.org ($24/year), parkvillemo.gov ($125/year), mail.parkvillemo.gov ($450/year) and website hosting with InfoDeli, LLC ($20/month). Previously in Administration Division. 02-04-00 125 464 390 904 850 13,747 22,904 20,850 21,624 27,383 Maintenance & Repair Offsite server backup and disaster recovery ($177/month).06-01-00 2,144 2,124 2,124 2,124 2,124 2,144 2,124 2,124 2,124 2,124 34,167 34,185 43,974 44,907 49,907 Total General Fund (10) Information Technology (555) Ma i n t . Total Maintenance General Fund (10) Information Technology (555) Pe r s o n n e l Total Personnel Total IT Expenses IT E x p e n s e s 88 Capital Outlay The Capital Outlay (General Fund) Division was created in 2015 to better report and record general fund capital outlay purchases. Prior General Fund capital outlay purchases were recorded individually within a division. This made it difficult to view a consolidated picture of the year’s major capital expenses from the general fund. Previous general fund capital outlay expenditures from 2014 have been moved into this division for comparison purposes. This results in an artificial reduction in expenditures to the other general fund divisions that are now reported here. In 2017, major general fund capital outlay expenses include budgeted expenses from Administration, Police Department, Public Works, Community Development, the Parks Division, and IT. 118,563 149,140 351,035 300,328 384,895 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year 2017 Budgeted Capital Outlay (General Fund) Expenses Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Expenses 118,563 149,140 351,035 300,328 384,895 89 Category Parks Public Works Administration Police IT Budget Expenses 151,000 94,000 83,745 41,150 6,000 Parks 40% Public Works 25% Administration 22% Police 11% IT 2% 2017 Budget Capital Outlay (General Fund) Expenses by Category Parks Public Works Administration Police IT 90 Type Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Unbudgeted item for 2016: Generator repair ($6,699). 2017: Phone system replacement ($30,000), Concrete Flatwork Repair ($6,735), Carpet Phase 1 ($23,021), Wallpaper ($6,139), Building Safety Upgrades Phase 1 ($17,850). 10-560-50-10-00 6,699 83,745 - - - 6,699 83,745 2017: AWD 2017 Police Ford Taurus Sedan and equipment ($37,075). Replacement of two existing in-car video systems with updated systems ($4,075). 10-560- 50-50-00 56,473 34,423 42,535 42,031 41,150 56,473 34,423 42,535 42,031 41,150 There is no capital outlay budgeted for the Municipal Court in 2017.10-560-51-00-00 - - - - - Unbudgeted items in 2016: Train Depot Roof ($28,277), downtown markers plaque and installation ($1,543), and PAC aerator ($2,350). 2017: PAC Pond Maintenance ($8,000), PAC Pond Reimbursement to QT ($50,000), and Storm Sewer Evaluation ($36,000). 10-560-51-50-00 89,752 31,855 94,000 - 89,752 - 31,855 94,000 2017: Plotter Replacement ($9,000)10-560-51-80-00 35,000 24,964 109,000 98,241 9,000 35,000 24,964 109,000 98,241 9,000 There is no capital outlay budgeted for the Streets Division in 2016.10-560-52-00-00 - - - - - Unbudgeted items in 2016: ELP Restroom ($35,900) 2017: Commercial Drill Seeder ($8,000), ELP Restroom Phase 2 (70,000), Maintenance and Equipment Storage Facility Design ($50,000), Zero Turn Mower ($18,000), Replace Spirit Fountain Lighting ($5,000). 10-560-52-50-00 27,090 194,500 116,578 151,000 27,090 - 194,500 116,578 151,000 There is no capital outlay budgeted for the Nature Sanctuary Division in 2017.10-560-53-50-00 - - - - - There is no capital outlay budgeted for the Public Information Division in 2016.10-560-54-00-00 - - - - - 2017: Computer Replacement Cycle ($6,000)10-560-55-50-00 5,000 4,925 6,000 - - 5,000 4,925 6,000 118,563 149,140 351,035 300,328 384,895 Pu b l i c W o r k s General Fund (10) Capital Outlay (560) Po l i c e Ad m i n . Co u r t Co m m u n i t y De v e l o p m e n t Na t u r e San c t u a r y Str e e t s Par ks Pu b l i c Inf o r m a t i o n IT General Fund (10) Capital Outlay (560) 91 Debt Service Funds The Debt Service Funds are comprised of five funds that are used to account for the accumulation of resources for the payment of principal, interest, and related costs on the debt. REVENUES – The City uses property taxes, special assessments, and sewer service charges to fund debt service payments. The City collects these revenues to make bond payments for the current year. EXPENSES – The expenses for the budget year include only the bond payments and fees that will be due and payable. Active Debt Funds: • General Debt Fund (22): 2006 Certificate of Participation (COPS), which includes the new City Hall and voter-approved projects from the 2004 ballot measure. Was refunded in late 2015 to reduce interest costs and General Fund impact. • Sewer Debt Service Fund (30): State Revolving Loan (SRF) projects that are supported by sewer fees. Retires in 2025. The reduction in 2016 from 2015 was a result of an early retirement of a lease purchase loan for the sewer plant. • Neighborhood Improvement Districts (21, 23, 24): Supported by assessments on benefitting properties. o River Park Neighborhood Improvement District (NID) financed infrastructure in The National. Retires in 2020. o Brush Creek Drainage Area Neighborhood Improvement District (NID) financed sewer expansion at the intersection of I-435 and Route 45. Retires in 2034. o Brink Meyer Road Neighborhood Improvement District (NID) financed road improvements and a retaining wall on Brink-Myers Road. Retires in 2034. 0 200000 400000 600000 800000 1000000 1200000 1400000 1600000 1800000 Projected Total Debt Payments Principal and Interest (excludes fees) Brink Myers NID Brush Creek NID Sewer SRF Sewer Lease Purchase COPs River Park NID 92 The General Obligation Debt Limit is 10% of the assessed value of the taxable tangible property. There is an additional 10% available for street and sewer expansions, or construction of utility plants. Total G.O. indebtedness may not exceed 20% of the assessed valuation of taxable property. By policy (Resolution No. 09-01-14), the Board has limited itself to no more than that 80% of the statutory limit. The 2017 Operating Budget and the 2017 – 2022 Capital Improvement Program include enhanced funding for (1) street maintenance and (2) Route 9 Improvements. The anticipated debt levels with newly the proposed transportation projects are below. The Board of Aldermen is anticipated to approve this debt in March 2017. Sewer Debt 1,160,000 3% COPS 3,383,722 8% River Park NID 1,200,000 3% Brink Meyer NID 3,675,000 9% Brush Creek NID 5,375,000 13% General Debt Capacity 6,155,753 14% Limited Per Debt Policy 8,379,790 20% Additional Debt Capacity (limited uses) 12,569,685 30% Total Debt and Debt Capacity (Dec. 2016) Based on 2016 Assessed Valuation Principal Only 93 Sewer Debt 1,160,000 3% COPS 3,383,722 8% River Park NID 1,200,000 3% Brink Meyer NID 3,675,000 9% Brush Creek NID 5,375,000 13% Route 9 1,345,000 3% Street Maintenance 1,020,000 2% General Debt Capacity 3,790,753 9% Limited Per Debt Policy 8,379,790 20% Additional Debt Capacity (limited uses) 12,569,685 30% Total Debt and Debt Capacity Based on 2016 Assessed Valuation (includes transportation projects) Principal Only 0 500000 1000000 1500000 2000000 2500000 3000000 Projected Total Debt Payments (includes transportation projects) Principal and Interest (excludes fees) Street Maintenance Loan Route 9 Loan Brink Myers NID Brush Creek NID Sewer SRF Sewer Lease Purchase COPs River Park NID 94 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget River Park Special Assessment Assessment levied on property owners in the River Park NID.41001-00 323,803 319,746 321,100 320,483 320,994 Interest Income Interest earned from general fund investments.41701-00 167 179 200 167 200 323,969 319,925 321,300 320,650 321,194 Bond Principal Payment of bond principal.10-01-00 270,000 275,000 280,000 280,000 285,000 Bond Interest Payment of bond interest. Drop in interest payments is due to refinancing of bond issue at lower interest rates.10-02-00 51,363 46,256 40,700 40,700 33,275 Bond Fees Payment of bond fees.10-03-00 424 424 600 265 424 River Park NID Reserve Transfer of outstanding balance to be held in reserve for future debt payments. 20-01-00 2,183 (1,755) (315) 2,495 323,969 319,925 321,300 320,650 321,194 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Property Taxes Property taxes collected for debt service.41001-00 332,383 338,662 330,536 338,407 366,316 Interest Income Interest earned from investments.41701-00 2,854 613 100 127 - Interest on COPS Reserved Funds Interest earned from investments.41701-01 8,227 8,618 Gain on Investment Gain on Investment 41710-00 3,313 Transfer from General Fund This fund transfer covers the lease payment on City Hall.42020-00 221,000 217,500 4,366 564,464 568,707 330,636 338,534 370,682 COI Expenses COI Expenses 01-00-00 37,439 Underwriter FCC, Expenses Underwriter FCC, Expenses 02-00-00 12,640 Loss on Investments Loss on Investments 09-50-00 1,367 2006/2015 COPS Bond Principal Payment of bond principal.10-01-00 250,000 270,000 270,000 270,000 297,114 2006/2015 COPS Bond Interest Payment of bond interest.10-02-00 215,098 204,890 56,636 56,636 72,468 2006/2015 COPS Bond Fees Payment of bond fees.10-03-00 3,025 2,350 4,000 1,100 1,100 COPs Debt Reserve Monies transferred to the General Debt Reserve; anticipated for early debt retirement.20-01-00 91,852 40,021 10,798 559,975 568,707 330,636 338,534 370,682 Exp e n s e s Total River Park NID Bonds (21) Expenses River Park NID Bonds (21) Revenues and Expenses Re v e n u e s Total River Park NID Bonds (21) Revenues Total COPs (22) Revenues Re v e n u e s Certificates of Participation (COPs) (22) Revenues and Expenses Total COPs (22) Expenses Exp e n s e s 95 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Brush Creek Special Assessment Assessment levied on property owners in the Brush Creek NID.41001-00 2,083 248,497 248,497 253,647 251,029 Penalties Fees collected by the County and remitted to the City for assessments that are collected after the deadline. 41002-00 843 87 Reserve applied to Bond Payment Reserve applied to Bond Payment 42001-00 78,480 Transfers Transfer from Emergency Reserve Fund (or other sources) to cover shortfalls in assessment collections. 41901-00 69,658 Interest Income Interest earned from debt service reserve fund investments.41701-00 6,318 4,500 4,443 6,500 2,083 255,658 252,997 258,177 405,667 Loss on Investments 09-50-00 2,563 35 Bond Principal Payment of bond principal.10-01-00 210,000 Bond Interest Payment of bond interest. Drop in interest payments is due to refinancing of bond issue at lower interest rates.10-02-00 228,663 187,088 187,088 183,938 Bond Fees Payment of bond fees.10-03-00 2,000 2,000 2,000 2,000 Brush Creek NID Reserve Transfer of outstanding balance to be held in reserve for future debt payments. 20-01-00 12,704 54,181 59,326 Brush Creek Maintenance Reserve Transfer of portion of assessments designated for maintenance on the improvements during the life of the bonds. 20-02-00 9,728 9,728 9,728 9,728 - 255,658 252,997 258,177 405,666 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Brink Meyer Special Assessment Assessment levied on property owners in the Brink Meyer NID.41001-00 1,522 91 3,774 1,790 Transfers Transfer from Emergency Reserve Fund (or other sources) to cover shortfalls in assessment collections. 41902-00 180,130 146,758 144,431 278,661 Interest Income Interest earned from general fund investments.41701-00 4,617 3,230 3,246 4,750 Carry over applied to Bond Payment Carry over applied to Bond Payment N/A 1,522 2,782 1,522 184,837 149,988 151,451 287,983 Loss on Investments Loss on Investments 09-50-00 1,873 26 Bond Principal Payment of bond principal.10-01-00 140,000 Bond Interest Payment of bond interest. 10-02-00 180,874 147,988 147,988 145,888 Bond Fees Payment of bond fees.10-03-00 2,000 2,000 2,000 2,000 Brink Meyer NID Reserve Transfer of outstanding balance to be held in reserve for future debt payments. 20-01-00 1,522 91 1,438 Brink Meyer Maintenance Reserve Transfer of portion of assessments designated for maintenance on the improvements during the life of the bonds. 20-02-00 95 1,522 184,837 149,988 151,451 287,983 Re v e n u e s Total Brink Meyer NID Bonds(24) Revenues Total Brush Creek NID Bonds (23) Expenses Brink Meyer NID Bonds (24) Revenues and Expenses Exp e n s e s Total Brink Meyer NID Bonds (24) Expenses Brush Creek NID Bonds (23) Revenues and Expenses Re v e n u e s Total Brush Creek NID Bonds (23) Revenues Exp e n s e s 96 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Re v e n u e s Sewer Fund Transfer to pay all Sewer Fund debt.41901-00 191,504 357,870 185,495 184,768 180,965 191,504 357,870 185,495 184,768 180,965 System Renewal Lease Lease payment on sewer plant.10-04-00 18,456 151,063 SRF Principal Payment of bond principal.12-11-00 140,000 157,083 150,000 150,000 150,000 SRF Interest Payment of bond interest.12-11-01 32,684 32,552 26,975 26,975 23,931 SRF Administration Fee Payment of bond fees.12-11-02 364 17,171 8,520 7,793 7,034 191,504 357,870 185,495 184,768 180,965 Total Sewer Service Debt (30) Expenses Sewer Service Debt (30) Revenues and Expenses Total Sewer Service Debt (30) Revenues Exp e n s e s 97 1,914,263 2,208,107 1,892,404 1,851,688 1,491,563 812,533 1,413,002 1,665,821 1,412,893 1,304,641 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 2014 Actual 2015 2016 Budget 2016 2017 Budget Do l l a r s Year 2017 Sewer Fund Revenues and Expenditures Revenues Expenses Ending Balance Sewer Fund The Sewer Fund is an enterprise fund used to operate and maintain the City’s sewer service system. It is funded by the revenue collected from charges on customers using the service. REVENUES –Revenues includes sewer service charges on utility customers, including connections fees and grinder pump fees. EXPENSES – Most of the expenses are for debt service, the operation of the waste water treatment plant, and maintenance of the sewer collection system. The sewer department's day-to-day operations are handled by contract with Alliance Water Resources. The City’s contract provides for one local plant manager, one full-time operator, and one part-time operator. Under the supervision of the Public Works Director, Alliance oversees the collection of sewage and day-to-day operations at the waste water treatment plant. The 2017 budget includes carryover for Sanitary Sewer Phase 3 manhole repairs. New projects include 2017 CCTV & Cleaning, design of Downtown Manhole Reconstruction Phase 2, and repairs to the Riverchase Sewer Main. A 10.00% rate sewer increase is recommended in 2017. This is 7.0% higher than the projections that were presented during the 2016 budget process. Over the past 2 years, the Sewer Fund has experienced several emergency expenditures for maintenance at the sewer plant, sewer pump Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Revenues 1,914,263 2,208,107 1,892,404 1,851,688 1,491,563 Expenses 812,533 1,413,002 1,665,821 1,412,893 1,304,641 Ending Balance 1,101,730 795,105 226,583 438,796 186,922 98 stations and sewer collection system. One example of an unplanned emergency expenditure was the repairs needed to the water service line from the water main on FF Hwy to the wastewater treatment plant. Approximately 1,100 lineal feet of water service line was replaced after extreme cracking occurred in the existing pipe. This repair resulted in additional costs of about $24,000 that was not anticipated. The impact to the average residential household of a 10.00% rate increase in 2017 would be approximately $3.80 per month. Based on an operating budget in 2017 with a 3% rate increase, the working capital will be $66,412, which is below the target working capital of $349,186. It is the City’s policy to maintain a target working capital of at least 3 months of operations plus current fiscal year debt service payment for sewer-related emergencies. To assist with the reduced working capital, staff proposes a reduced capital outlay (CIP) program in 2017, deferring $50,300 from 2017 to 2018. In 2016, the City contracted with Springsted, Inc. to study the sewer allocation transfer from the Sewer Fund to the General Fund. Springsted polled each City staff member about their work activities to determine how much time was spent on sewer-related work versus non-sewer-related work. The report compiled by Springsted is included in Attachment 5. Several employees who are paid out of the General Fund assist with sewer-related functions. • The City Administrator oversees and directs issues that are related to sewer-related projects. • The Public Works Director assists with the contract administration and management of sewer projects. • The Director of Operations spends a portion of his time, along with his staff of laborers, to assist the Sewer Department with property maintenance of the City’s sewer plant and pump stations. • The Public Works Administrative Assistant assists with the creation of the contract documents for sewer-related projects. • The Public Works Construction Inspector inspects the installation of new sewer systems and assists with the inspections for sewer projects. • The front desk staff answer and direct phone calls related to sewer inquiries and sewer- related issues. • The financial team (Finance Director, City Treasurer and Billing Clerk) spend a portion of their time processing sewer-related invoices. • Community Development staff perform sewer utility locates. • Other administrative staff perform a portion of their daily duties that result in sewer-related activities (i.e. posting information on social media about an upcoming sewer project or lane closures related to a sewer repair). The study suggested that a reasonable transfer of $365,644 could be made from the Sewer Fund to the General Fund to cover personnel costs, as well as direct and indirect costs for sewer-related expenses funded by the General Fund. In an effort to assist with the reduced working capital in 2017, staff proposes to limit the allocation from the Sewer Fund to the General Fund to $150,000. 99 Professional Fees 35% Capital Outlay 35% Transfers 14% City Services 7% Utilities 3% Maintenance 3% Personnel 1% Office Expenses 1% Office Expenses 1% 2017 Budget Sewer Expenses by Category Professional Fees Capital Outlay Transfers City Services Utilities Maintenance Personnel Office Expenses Office Expenses Sewer Charges 94% Impact Fees 3% Sewer Tap Fees 2% Other 1% 2017 Budget Sewer Revenue by Category Sewer Charges Impact Fees Sewer Tap Fees Other Category Professional Fees Capital Outlay Transfers City Services Utilities Maintenance Personnel Office Expenses Office Expenses Budget Expenses 456,800 453,000 181,701 86,000 45,980 45,000 17,893 10,017 8,250 Category Sewer Charges Impact Fees Sewer Tap Fees Other Budget Revenues 1,103,300 34,000 30,000 10,220 100 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget (amended) 2016 Unaudited 2017 Budget Beginning Fund Balance Projected carryover from prior year. 516,873 1,101,730 797,784 795,105 314,043 Sewer Charges Charges levied on all utility customers for use of the City's sewer system.41501-00 1,006,362 1,020,684 1,014,750 981,723 1,103,300 Sewer Tap Fees Fees required to connect to the City's sewer system ($1,500/new home). 41502-00 43,500 39,000 36,000 33,000 30,000 Sewer Impact Fees Fees required to compensate the City for the increased demand on the sewer system ($1,400/new home). 41502-01 42,000 36,400 33,600 32,300 34,000 MOAW Bill Collection Payment Money received from Missouri American Water for accepting water bills at City Hall.41503-00 562 643 650 431 550 Grinder Pump Administration Fee A fee paid by the Riss Lake Home Owner's Association for collecting and remitting monthly Riss Lake Subdivision grinder pump maintenance fees. 41504-00 4,620 4,620 4,620 4,620 4,620 Transfer from Sewer CIP No longer used. Transfer from Sewer CIP to close out fund in 2014.41902-00 294,984 1,908,901 2,203,077 1,089,620 1,847,179 1,172,470 Interest Income Interest earned from sewer fund investments.41701-00 4,362 4,956 4,800 4,499 5,000 4,362 4,956 4,800 4,499 5,000 Miscellaneous Includes reimbursements from Viking Football Club for water usage at Viking Field. 41804-00 1,000 74 200 10 50 1,000 74 200 10 50 1,914,263 2,208,107 1,892,404 1,851,688 1,491,563 Total Sewer Fund (30) Revenues Re v : S e w e r Sewer Fund (30) Revenues and Expenses Revenues: Sewer Re v : Int e r e s t Revenues: Interest Income Re v : Mi s c Revenues: Misc 101 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget (amended) 2016 Unaudited 2017 Budget Sewer Fund (30) Revenues and Expenses Salaries The total salaries for sewer billing duties. A portion of staff salaries are covered by the Sewer Administrative Fee, as related to sewer work performed. 01-01-00 10,283 11,691 13,824 16,789 15,000 FICA & Medicare This is the City's share of FICA & Medicare cost for its employees.01-21-00 770 839 1,058 1,347 1,248 Professional Development Cost of educational seminars and conferences attended by Sewer employees.01-41-00 1,416 500 Retirement The City's LAGERS contribution for 2016 is 5.9% of general employee salaries. 01-22-00 816 1,145 11,053 13,946 15,698 18,136 17,893 Property & Liability Premium payment for the City's property & liability coverage.02-01-00 2,432 2,689 2,850 6,033 1,610 Health, Life, & Dental The City offers health, dental, and life insurance to its employees and subsidizes a portion of the premium. Reflects premium increases for employees. 02-02-00 1,622 2,955 3,203 3,407 Workers Compensation The workers compensation premium that covers all sewer employees.02-03-00 500 (47) 500 Unemployment This covers the cost of any unemployment insurance claims for the Sewer Department.02-04-00 500 500 2,432 4,312 6,805 9,188 6,017 Telephone & Voicemail The charges for local and long distance telephone service for the sewer plant and lift station dialers.03-01-00 2,394 2,278 1,600 1,404 1,600 Electricity Electric utility charges for the sewer plant and pump stations.03-02-00 36,499 37,783 46,000 39,884 40,000 Water Water utility charges for the sewer plant.03-04-00 2,083 1,606 3,500 2,665 3,500 Wi-Fi The cost of the Wi-Fi hotspot at the sewer plant for internet access.03-06-00 440 480 480 589 480 Trash Hauling The charges for trash hauling at the sewer plant ($70/year for Main Lift Station dumpster and $356.52/year for Sewer Plant dumpster). 03-09-00 297 392 600 354 400 41,713 42,539 52,180 44,897 45,980 Office Supplies This includes items such as stationery, pens/pencils, folders, etc. as well as computer accessories, meeting supplies and general consumables. 05-01-00 229 257 150 258 250 Postage All postage and shipping costs, along with any incidental charges.05-02-00 6,868 5,805 7,000 5,019 6,000 Delinquencies Administrative costs related to delinquency collections such as water shut off costs, filing property liens, and certified letters. 05-06-00 826 2,000 2,980 2,000 Printing Expenses for printing work not performed by City personnel. This includes items such as business cards, forms, letterhead, and books. 05-04-00 1,032 1,055 1,300 758 8,130 7,943 10,450 9,015 8,250 Exp : P e r s o n n e l Expenses: Personnel Exp : O f f i c e E x p e n s e s Expenses: Office Expenses Expenses: Insurance Exp : U t i l i t i e s Expenses: Utilities Exp : Ins u r a n c e 102 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget (amended) 2016 Unaudited 2017 Budget Sewer Fund (30) Revenues and Expenses Building Maintenance & Repair General maintenance for the sewer plant. Includes crane for the new storage building, installation of yard hydrant, and containment for diesel storage. 06-01-00 4,787 6,863 36,480 60,210 18,000 Pump Stations Maintenance General maintenance for six pump stations in the City.06-12-00 7,968 12,992 14,000 33,156 18,000 Vehicle Repair & Maintenance Maintenance for sewer vehicles.06-21-00 105 41 500 1,434 500 Tractor / Lawn Mowing Equipment Maintenance for the sewer plant tractor and lawn equipment. Includes $2,000 for hydraulic hoses and ram gate for honey wagon in 2017. 06-21-02 1,024 484 1,000 319 3,000 Vehicle Gas & Oil Fuel for sewer division vehicles.06-22-00 1,254 802 3,000 780 2,000 Equipment Gas & Oil Fuel for sewer equipment, including the tractor, mower, and generator.06-22-01 1,198 868 1,500 40 1,500 Software Support Agreement Annual software maintenance for Data Tech Summit sewer billing software.06-33-00 1,768 1,910 2,000 4,342 2,000 18,103 23,959 58,480 100,280 45,000 Line Repairs This covers emergency repairs to sewer lines and manholes. Root control and unexpected clogs. It does not cover repairs budgeted in the sewer CIP. 07-34-00 5,522 24,708 20,000 17,796 20,000 One Call Utility Locating This is a fee charged to the City for every One Call sewer utility locate requested in the City limits.07-42-00 2,366 3,180 2,000 1,051 2,000 KC Water Dept. Fees paid to the KCMO Water Department for sewer service provided to some Parkville residents The decrease in 2016 is a result of the decommission of Eastside Pump station. 07-82-00 62,521 53,304 26,000 19,647 26,000 Platte County Regional Sewer District Fees paid to the PCRSD for wastewater treatment for Parkville residents formerly served by Eastside Pump station. 3,961 16,000 3,961 16,000 Odor Control Chemical used to mitigate odors from sewer lines. 07-91-00 18,138 18,851 22,000 20,065 22,000 88,546 104,004 86,000 62,520 86,000 Attorney Fees Fees associated with contract reviews and sewer related legal questions.08-01-00 7,049 2,500 2,100 2,500 Engineering Fees This covers the fees for work performed by the City Contract Engineer for the sewer system, including SSES Program engineering and management. 08-03-00 1,600 9,900 10,000 13,824 10,000 Management Contract Contract with Alliance Water Resources to operate the sewer plant.08-04-00 275,395 282,245 290,483 290,483 293,400 Administration Fee Administrative salaries for sewer related work, Missouri One Call services, and other sewer related administrative functions. 08-06-00 100,000 101,500 103,530 103,530 150,000 Credit Card Fees Costs associated with processing credit card transactions.08-07-00 546 2,732 2,000 3,976 Sewer Refunds Refunds for bill over payments 08-08-00 321 1,333 900 384,590 396,698 408,513 415,247 456,800 Miscellaneous Miscellaneous includes uncategorized expenses.09-21-00 4,833 851 2,000 2,646 2,000 DNR Fees Annual fee to the Missouri Department of Natural Resources based on the number of sewer connections in the City. 09-22-00 1,641 1,792 2,000 1,789 2,000 6,474 2,643 4,000 4,435 4,000 Exp : M a i n t e n a n c e Expenses: Maintenance Exp : C i t y S e r v i c e s Expenses: City Services Expenditures: Other Expenditures Exp : Oth e r E x p . Exp : P r o f e s s i o n a l F e e s Expenses: Professional Fees 103 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget (amended) 2016 Unaudited 2017 Budget Sewer Fund (30) Revenues and Expenses Equipment & Machinery For the purchase of operating equipment for the Sewer Plant. Includes replacement of two tires and four rims on tractor ($7,000). 04-31-00 14,398 6,615 3,000 375 7,000 Sewer Plant Improvements Improvements and enhancements to the sewer plant. Includes rebuilding of the bar screen ($47,000), rebuilding of two clarifier drives ($15,000). Building improvements include new doors and door jams ($6,000) and site improvements include access drive and fence ($13,000). 04-51-00 407 156,200 134,049 81,000 Pump Station Improvements Improvements to pump stations. New projects include FF Hwy and McAfee pump station modifications planned for 2017 ($9,000), improvements to 45 Hwy Pump Station ($66,000), improvements to S. National Pump Station ($67,000), and rebuilding of one pump at McAfee Pump Station ($9,000). 04-61-00 27,694 185,637 37,700 8,952 151,000 Line Maintenance Includes carry-over for Sanitary Sewer Phase 3 manhole repairs ($60,000). New projects include 2017 CCTV & Cleaning ($56,000), design of Downtown Manhole Reconstruction Phase 2 ($8,000), and repairs to the Riverchase Sewer Main ($40,000). 06-42-00 11,566 197,854 636,300 420,304 164,000 Other Maintenance Includes repairs to the levee next to the sewer plant and the stabilization of the streambank along the access drive to the sewer plant. 06-99-00 6,330 68,575 5,000 50,000 59,988 459,088 838,200 563,680 453,000 Transfer to Debt Service Fund (for Bonds) No longer used. Funds are transferred to Debt Service for bond payments. Paid off in 2015.20-02-02 18,456 151,063 Transfer to Debt Service Fund (for SRF)Funds are transferred to Debt Service for SRF payments.20-02-03 173,048 206,807 185,495 185,495 181,701 191,504 357,870 185,495 185,495 181,701 812,533 1,413,002 1,665,821 1,412,893 1,304,641 1,101,730 795,105 226,583 438,796 186,922 Ending Fund Balance Sewer Fund (30) Total Sewer Fund (30) Expenditures Exp : Tra n s f e r s Expenditures: Transfers Expenditures: Capital Outlay Exp : C a p i t a l O u t l a y 104 Transportation Fund The Transportation Fund accounts for most resources used to promote and improve the City’s transportation network. Transportation Fund revenues are allocated specifically to pay for transportation projects and expenses. REVENUES – The City receives funds through sales taxes and intergovernmental grants. The Motor Fuel Tax and the City Transportation Sales Tax can be used for any transportation-related purpose. The County Transportation Sales Tax and the Parkville Special Road District revenue are received for major capital transportation projects. EXPENSES – Most of the expenses are for capital improvements, streetlights, and a transfer to the General Fund to help subsidize personnel expenses for the Street Division of the Public Works Department. The 2017 budget includes enhanced funding for (1) street maintenance and (2) Route 9 Improvements. • This includes $1,279,112 for Phase 1 and 2a of Route 9 (Route 45 to Clark Ave.) in 2017 (Design) -2018 (Construction). The City intends to pay the debt service for the Route 9 Improvement Project from a one percent (1.0%) Community Improvement District Sales Tax and from a federal grant in the amount of $966,112. The grant award of $966,112 will not be available until federal fiscal year 2019-20. Staff consulted with MARC and the Missouri Department of Transportation (MODOT) to determine if the project can be accelerated to 2017 if the City finances the costs through a grant anticipation loan. MODOT confirmed this could be done for Route 9 Improvements, as other communities have used this approach. The Community Improvement District is anticipated to encompass an area generally fronting 9 Highway from 45 Highway/Tom Watson Drive/NW 64th Street to Main Street. It is further anticipated that the Community Improvement District sales tax will be submitted to the qualified voters of the District in June 2017. The collection of the CID Sales Tax would begin on October 1, 2017. The first principal payment for the Route 9 portion of the project is due in 2019, which gives the CID time to generate the needed revenue for payment. The 9-highway CID revenue projection is $147,300 per year. • $1,000,000 for an enhanced street maintenance program in 2017. The funding from the debt financing will assist with improving the streets that are deteriorating at faster rate than basic maintenance funding can fix. As part of the budget process, the City’s financial advisor Springsted, Inc. provided the net present value of the pay as you go strategy vs. the debt Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Revenues 1,078,170 1,267,614 1,152,524 1,244,187 3,486,268 Expenses 750,173 1,035,846 1,114,000 1,008,517 3,144,112 Ending Balance 327,997 231,767 38,524 235,670 342,156 105 financing strategy to the Board of Aldermen. The analysis concluded that over six years, the debt financing strategy will be able to complete 6,660 more linear feet (≈$180,000 - $192,000) of roadway than the pay as you go approach with a similar present value. The City intends to pay the debt service for the Capital Road Improvement Project from City Transportation Sales Tax, City share of the Platte County Sales Tax and Motor Fuel Tax receipts. The first principal payment for the street maintenance portion of the project is due in 2018. • The total street maintenance program totals $1,130,000 in improvements for 2017. This option included the one-million-dollar debt-financing package reflected above. The 2017 plan includes an estimated $888,824 for mill and overlay projects with the remainder for curb and sidewalk. The actual dollars figure of streets to be repaired will be determined when bids are received in mid-March. This number does not include a first quarter- transfer of any personnel savings that is also anticipated. Staff targeted a $1 million project for 2017 since that is the level of maintenance that can be reasonably implemented and overseen by staff (inspections, traffic control, contract administration, etc.) in a single construction season. This investment would triple the level of street work completed in 2017 and would improve the street ratings of some of the City’s heaviest traveled but poorest condition streets. • This tentative program would repair 33 streets and provide 41,686 linear feet of street repair (17.5% of the street system, 54% of the streets on the five-year mill and overlay forecast in 2017). All 33 streets included in the program would be improved to a street rating of 1.5. With a conservative projection of roadway degradation, the overall City street ratings would improve to a 2.85 (from a 3.06). There would be more limited level of funding for additional street maintenance over the following 5-year period. 1,078,170 1,267,614 1,152,524 1,244,187 3,486,268 750,173 1,035,846 1,114,000 1,008,517 3,144,112 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 4,000,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year 2017 Transportation Fund Revenues and Expenditures Revenues Expenses Ending Balance 106 CIP 81% Streets 12% Transfers 7% 2017 Budget Transporation Expenses by Category CIP Streets Transfers Bond Proceeds 69% City Transportation Sales Tax 14% County Transportation Sales Tax 7% Motor Fuel Tax 5% Parkville Special Road District 4% Other 1% 2017 Budget Transporation Revenue by Category Bond Proceeds City Transportation Sales Tax County Transportation Sales TaxMotor Fuel Tax Category CIP Streets Transfers Budget Revenues 2,536,112 383,000 225,000 Category Bond Proceeds City Transportation Sales Tax County Transportation Sales Tax Motor Fuel Tax Parkville Special Road District Other Budget Revenues 2,279,112 472,000 240,000 145,000 134,000 30,804 107 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Beginning Fund Balance Projected carryover from prior year. 162,683 327,997 217,699 231,767 185,352 Parkville Special Road District The City's percentage of property tax assessed by the County for the Special Road District.41006-00 124,328 128,588 132,000 134,675 134,000 City Transportation Sales Tax The City levies a 0.5% sales tax to fund transportation projects.41404-00 438,160 456,397 456,000 472,771 472,000 Motor Fuel Tax The State collects a tax on motor fuel and remits a portion to the City.41405-00 143,352 146,671 144,000 147,908 145,000 County Transportation Sales Tax This is the City's portion of the County sales tax for transportation projects.41406-00 178,948 194,587 190,000 239,661 240,000 Project Cost Share Funding from private entities or other sources for partial components of public projects.41504-00 10,000 2,300 5,325 11,525 5,304 Leased Properties Revenue from City-owned properties. 41802-00 5,880 Sale of Transportation Fund Equipment Revenue generated from the sale of transportation related equipment.41805-00 8,275 11,075 7,500 25,500 Bond Proceeds Construction funds for transportation projects generated from bond proceeds.2,279,112 Refunds Miscellaneous reimbursements. 41901-00 4,300 Transfers from Other Funds Transfers from Other Funds.42001-00 8,125 1,078,170 1,267,614 1,152,524 1,244,187 3,486,268 Transportation Fund (40) Revenues and Expenses Total Transportation Fund (40) Revenues Re v : T r a n s p o r t a t i o n 108 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Transportation Fund (40) Revenues and Expenses Building Maintenance & Repair Maintenance and repairs for the street barn including security system, minor roof repairs, HVAC, etc. 06-01-00 1,656 5,526 5,000 575 5,000 Vehicle & Equipment Maintenance Maintenance work for Streets Division vehicles and equipment such as brakes, tires, hydraulic problems, etc.06-21-00 8,226 18,530 10,500 6,362 10,500 Vehicle & Equipment Gas & Oil Fuel for Streets Division vehicles and equipment. 06-22-00 23,028 15,835 25,500 12,087 20,000 Emergency Snow Removal Purchase of sand and salt to spread on roads during snow removal. 07-20-00 29,300 29,920 40,000 30,205 40,000 Storm Sewers - General Repair All general repairs on the City's storm sewer system. 07-32-00 2,762 5,928 2,500 5,781 5,000 Street Repair Materials For asphalt necessary to complete simple repairs on city streets. This does not include asphalt overlay projects, crack seal materials, dirt, and paint. 07-33-00 9,010 7,020 15,000 4,178 15,000 Street Lights Utility charges for city street lights and costs for routine repair and maintenance. The 2016 utility costs include the new street lights on Route 9. 07-41-00 228,634 239,477 260,000 236,162 260,000 Street Signs Purchase of new and replacement street signs needed for City streets.07-44-00 1,424 1,490 2,500 1,946 2,500 Street Sweeping Street sweeping of all roads citywide; will be performed twice annually in 2017. 07-45-00 6,780 7,200 15,000 9,464 15,000 Tree Trimming & Removal Maintenance of trees located within rights-of-way on City streets. 07-52-00 2,203 4,075 6,000 3,455 6,000 Rental Equipment Rental costs for equipment not owned by the City such as air compressors, tractor with extendable arm for ROW tree trimming, and bucket trucks. 07-60-00 184 147 3,000 3,000 Miscellaneous Miscellaneous uncategorized expenses related to the maintenance of the City's street network.09-21-00 1,000 1,000 313,207 335,150 386,000 310,214 383,000 Street Programs Expenses related to capital improvements for street maintenance. Funding in 2017 is for first phase of Route 9 improvements. 04-71-00 27 1,279,112 Equipment Includes one truck/snowplowing equipment ($57,000) and uniloader ($70,000). 04-85-01 49,689 104,758 128,000 116,954 127,000 Crack Seal Project Annual Crack Seal project 04-81-00 17,564 16,080 15,000 10,155 15,000 Street Striping Annual Street Striping Project 04-83-00 6,902 13,866 20,000 13,833 15,000 Asphalt Overlay Program Materials and service for the Asphalt Overlay Program 04-85-00 220,243 225,000 260,432 888,824 Curb & Sidewalk Program Materials and service for the Curb & Sidewalk Program 04-90-00 7,784 100,750 100,000 106,928 211,176 81,966 455,697 488,000 508,302 2,536,112 Transfer to General Fund Fund transfer to reimburse Streets Division for transportation related expenses.20-10-00 355,000 245,000 240,000 190,000 225,000 Transfer to Equipment Fund No longer used. Fund transfer to purchase transportation related equipment.20-42-00 355,000 245,000 240,000 190,000 225,000 750,173 1,035,846 1,114,000 1,008,517 3,144,112 327,997 231,767 38,524 235,670 342,156 Total Transportation Fund (40) Expenses Ending Fund Balance Transportation Fund (40) Exp : Tra n s f e r s Expenses: Transfers (550) Exp : S t r e e t s Expenses: Streets (520) Exp : C a p i t a l O u t l a y Expenses: CIP 109 Fewson Fund In 1998, Parkville resident George W. Fewson left a portion of his estate in trust to the City of Parkville. The original Fewson Trust documents direct that 50% of annual proceeds be distributed to the City for “general projects for the City of Parkville, Missouri.” Therefore, the City has reserved 50% of the Fewson earnings each year for capital projects. REVENUES – Primarily interest earned on investments. George Fewson stipulated that half of earnings be retained in the fund. EXPENSES – In 2015, the primary expense will be a Fewson Fund project loan that will require repayment from the General Fund in future years. Other expenses include loss on investment, fees, and interest distribution to the city. By adopting the Fewson Fund Policy in 2013 the Board of Aldermen expressed its intent to utilize these funds for specific projects in the future. The advantage of taking a loan from this fund is that the City recoups some of its interest payments as earnings to the Fewson Fund. In 2015, the budget identified the English Landing Park restroom project as a project for a Fewson Fund loan. However, after bids came in too high, the restroom as renovated instead of reconstructed. There are no projects planned for 2017. 563,938 570,876 576,337 575,369 576,833 6,047 1,672 6,478 2,493 7,600 0 100,000 200,000 300,000 400,000 500,000 600,000 700,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year 2017 Fewson Fund Revenues and Expenses Revenues Expenses Ending Balance Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Revenues 563,938 570,876 576,337 575,369 576,833 Expenses 6,047 1,672 6,478 2,493 7,600 Ending Balance 557,891 569,204 569,859 572,876 569,233 110 Interest Income 100% 2017 Budget Fewson Revenues by Category Interest Income Distribution to City (50% of proceeds) 78% Loss on Investment 20% Trust/Bank Fees 2% 2017 Budget Fewson Expenses by Categor Distribution to City (50% of proceeds) Loss on Investment Trust/Bank Fees Category Distribution to City (50% of proceeds) Loss on Investment Trust/Bank Fees Budget Expenses 5,950 1,500 150 Category Interest Income Budget Revenues 4,429 111 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Beginning Fund Balance Projected carryover from prior year. 557,014 557,891 570,887 569,204 572,404 Interest Income Interest earned on investments. George Fewson stipulated that 1/2 of earnings be retained in the fund.41701-01 5,937 4,510 5,450 5,470 4,429 Miscellaneous Miscellaneous revenues including donations, tax refunds, etc.41801-00 Gain on Investment Any capital gains on investments from the previous year.41804-00 987 8,475 695 Earned on Investments Monies earned on investments through CD's and cash on hand for the purpose of loans to fund specific projects.41901-00 563,938 570,876 576,337 575,369 576,833 Loss on Investment Losses on investments from the previous year.09-50-00 3,042 1,575 1,000 835 1,500 Trust/Bank Fees Fees deducted prior to receiving the gain on investment. 09-50-01 73 97 100 93 150 Distribution to City (50% of proceeds) Per trust requirements, 50% of interest earnings plus any gain on investment (minus administrative fees) is returned to the City for eligible projects. 20-01-00 2,675 1,566 5,950 Distribution to City (Reserved from prior years) Distribution proceeds held from prior years due to lack of an eligible project. 20-02-00 2,932 2,703 Project Loans Interest bearing loan to support eligible capital projects of the City. 6,047 1,672 6,478 2,493 7,600 557,891 569,204 569,859 572,876 569,233 Total Fewson Fund (45) Revenues Re v e n u e s Fewson Fund (45) Revenues and Expenses Total Fewson Fund (45) Expenses Ending Fund Balance Fewson Fund (45) Exp e n s e s 112 Economic Developm ent 100% 2017 Budget Eco Devo Expenses by Category Guest Tax 100% 2017 Budget Eco Devo Revenue by Category Economic Development Fund The Economic Development Fund is a special revenue fund comprised of revenues from a hotel tax imposed on transient guest rooms. These dollars are allocated at the Board’s discretion for economic development or marketing initiatives to promote tourism and business development in Parkville. Unanticipated 2015 expenses were a result of the City’s participation at the Platte County economic development expo. REVENUES – Proceeds from the 5% guest room tax applied to overnight hotel/motel room stays. EXPENSES –There are no major anticipated projects in 2017. 22,312 5,404 1,812 3,315 2,054 20,000 5,000 0 2,776 0 0 5,000 10,000 15,000 20,000 25,000 2013 Actual 2014 Actual 2015 Budget 2015 Unaudited 2016 Budget Do l l a r s Year 2017 Eco Devo Fund Revenues and Expenses Revenues Expenses Ending Balance Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Revenues 5,404 3,658 2,397 2,279 2,582 Expenses 5,000 2,776 1,000 1,000 2,582 Ending Balance 404 882 1,397 1,279 - Category Guest Tax Budget Revenues 60,000 Category Economic Development Budget Expenses 146,758 113 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget (amended) 2016 Projected 2017 Budget Beginning Fund Balance Projected carryover from prior year. 2,312 404 882 882 1,082 Guest Room Tax Proceeds from the 5% guest room tax applied to overnight hotel/motel room stays.41001-00 1,592 3,254 1,515 1,397 1,500 Parkville EDC Contribution Partnership funding from the EDC for joint projects such as feasibility studies and outside consultants.41201-00 Transfers Transfers from other funds. 41003-00 1,500 5,404 3,658 2,397 2,279 2,582 Exp e n s e s Economic Development - Other Other miscellaneous economic development projects, studies, fees, etc. 07-03-00 5,000 2,776 1,000 1,000 2,582 5,000 2,776 1,000 1,000 2,582 404 882 1,397 1,279 - Economic Development Fund (46) Revenues and Expenses Total Economic Development Fund (46) Revenues Re v e n u e s Total Economic Development Fund (46) Expenses Ending Fund Balance Economic Development Fund (46) 114 Transfer from General Fund 100% 2017 Budget Emergency Reserve Revenues by Category Brink Myers Road NID 68% Brush Creek NID 32% 2017 Budget Emergency Reserve Expenses by Category Brink Myers Road NID Brush Creek NID Emergency Reserve Fund The Emergency Reserve Fund is intended to protect the City against emergency costs related to natural disasters, declared states of emergency, or other major unforeseen financial obligations. REVENUES – Fund transfers from the General Fund. EXPENSES – In 2016, anticipated expenses are funds to backstop special assessment delinquencies for the Brush Creek and Brink Meyer Neighborhood Improvement Districts (NIDs). A $317,500 transfer from the General Fund to the Emergency Reserve Fund is planned in 2017 to make the balance of the Emergency Reserve Fund nearly $1.42 million, which is approximately 31% of 2017 budgeted general fund expenditures. This balance exceeds the Board’s goal to maintain at least 25% of annual General Fund expenditures in reserve. The City requires healthy reserves to support the NID financing strategy. 2017 represents the first year of NID principal payments (more Debt Fund section). 1,387,966 1,447,966 1,602,706 1,602,706 1,775,775 0 178,124 146,758 144,431 348,224 0 500,000 1,000,000 1,500,000 2,000,000 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Do l l a r s Year 2017 Emergency Reserve Revenues and Expenses Revenues Expenses Ending Balance Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Revenues 1,387,966 1,447,966 1,602,706 1,602,706 1,775,775 Expenses - 178,124 146,758 144,431 348,224 Ending Balance 1,387,966 1,269,842 1,455,948 1,458,275 1,427,551 Category Transfer Budget Revenues 317,500 Category Brink Myers NID Brush Creek NID Budget Expenses 146,758 69,658 115 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Beginning Fund Balance Projected carryover from prior year. 1,070,966 1,387,966 1,269,842 1,269,842 1,458,275 Temporary Operating Levy Excess funds from the temporary operating levy approved in 2004.42000-00 15,364 15,364 Transfer from General Fund Fund transfer from the General Fund.42001-00 317,000 60,000 317,500 317,500 317,500 1,387,966 1,447,966 1,602,706 1,602,706 1,775,775 Brush Creek Drainage NID Unanticipated costs related to financing for the Brush Creek NID.01-01-00 69,658 Brink Myers Road NID Unanticipated costs related to financing for the Brink Myers NID.01-01-01 178,124 146,758 144,431 278,566 Miscellaneous Emergency expenses that are unfunded and uncategorized.09-21-00 - 178,124 146,758 144,431 348,224 1,387,966 1,269,842 1,455,948 1,458,275 1,427,551 Total Emergency Reserve (50) Revenues Re v e n u e s Emergency Reserve (50) Revenues and Expenses Total Emergency Reserve (50) Expenses Ending Fund Balance Emergency Reserve (50) Exp e n s e s 116 Special Projects 83% FOPNS Match 17% 2017 Nature Santuary Donation Fund Expenses by Category Special Projects FOPNS Match Grants 70% Donations 16% Programs 14% 2017 Nature Santuary Donation Fund Revenues by Category Grants Donations Programs Nature Sanctuary Donation Fund The Nature Sanctuary Donation Fund (60) is a special revenue fund that contains donations made specifically for the Nature Sanctuary. REVENUES – Primarily donations from private citizens, special events, and grants. EXPENSES – Primarily for equipment and improvements for Nature Sanctuary properties. Funds in 2017 are planned to assist with the local match for a TRIM grant for tree removal and a local match of a Friends of Parkville Nature Sanctuary butterfly garden project. 47,360 49,158 45,581 48,393 52,683 4,579 14,450 6,200 4,900 12,000 0 10,000 20,000 30,000 40,000 50,000 60,000 2014 Actual 2015 2016 Budget 2016 2017 Budget Do l l a r s Year 2017 Nature Santuary Donation Fund Revenues and Expenses Revenues Expenses Ending Balance Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Revenues 47,360 49,158 45,581 48,393 52,683 Expenses 4,579 14,450 6,200 4,900 12,000 Ending Balance 42,781 34,708 39,381 43,493 40,683 Category Special Projects FOPNS Match Budget Expenses 10,000 2,000 Category Grants Donations Programs Budget Revenues 7,500 1,750 1,500 117 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Beginning Fund Balance Projected carryover from prior year. 40,821 42,781 42,581 34,708 41,933 Donations Gifts from private citizens or groups. 40901-00 6,539 4,877 1,500 4,760 1,750 Programs Registration fees for events and programs.40903-00 1,500 1,500 1,500 1,500 Grant Grant monies received for various projects in the Donation Fund. Funds in 2017 includes TRIM grant match. 40910-00 7,425 7,500 47,360 49,158 45,581 48,393 52,683 Special Projects Special improvement amenities for Nature Sanctuary grounds and facilities such as benches, picnic tables, etc. Funds in 2017 are planned to assist with the local match for a TRIM grant for tree removal. 15-00-00 11,510 2,500 10,000 Friends of Parkville Nature Sanctuary Partnership Program Cost share projects with the Friends of Parkville Nature Sanctuary. 2017 possibilities include butterfly garden with native plantings and a beehive project. 2,000 - 11,510 2,500 - 12,000 CIP Equipment Funding in 2016 included new tractor to replace existing 25-year old tractor. None planned in 2017.04-31-00 4,225 3,700 4,900 CIP Projects Permanent capital improvements in the Nature Sanctuary, such as trail extensions, roadway repairs, and utility improvements. None planned in 2017. 04-41-00 354 2,940 4,579 2,940 3,700 4,900 - 4,579 14,450 6,200 4,900 12,000 42,781 34,708 39,381 43,493 40,683 Total PNS Donation Fund (60) Revenues PNS Donation Fund (60) Revenues and Expenses Total PNS Donation Fund (60) Expenses Ending Fund Balance PNS Donation Fund (60) Exp : P N S Do n a t i o n F u n d Expenses: PNS Donation Fund Exp : C a p i t a l O u t l a y Expenses: CIP Re v e n u e s 118 Donations 100% 2017 Parks Donation Fund Revenues by Category Donations Park Expenses 50% Transfer to Project Fund 50% 2017 Budgeted PNS Don. Expenses by Category Park Expenses Transfer to Project Fund Parks Donation Fund The Park Donations Fund contains donations made specifically for the Park system from private citizens, organizations, and businesses. It helps to ensure that donations will be used for the purpose intended by the donor. REVENUES – Primarily donations from private citizens, special events, and grants. EXPENSES – Primarily for equipment and improvements to City parks. Expenses in 2017 are budgeted for the Friends of Parkville Parks Shelter match and the Friends Field project. 45,794 53,555 33,703 56,345 49,995 0 28,352 6,500 6,383 50,000 0 10,000 20,000 30,000 40,000 50,000 60,000 2014 Actual 2015 2016 Budget 2016 2017 Budget Do l l a r s Year 2017 Parks Donation Fund Revenues and Expenses Revenues Expenses Ending Balance Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Revenues 45,794 53,555 33,703 56,345 49,995 Expenses - 28,352 6,500 6,383 50,000 Ending Balance 45,794 25,203 27,203 49,962 (5) Category Donations Budget Revenues 25,000 Category Park Expenses Transfer to Project Fund Budget Expenses 25,000 25,000 119 Type Account Description Account 2014 Actual 2015 Actual 2016 Amended 2016 Uaudited 2017 Budget Beginning Fund Balance Projected carryover from prior year. 45,462 45,794 25,203 25,203 24,995 Transfer from Park Reservations & Fees No longer used. Now included in Donations.41901-00 Transfer from Parkland Dedication Fund No longer used. Now included in Donations.41901-00 Donations Miscellaneous grants and private donations to Parkville parks.40901-00 332 7,761 8,500 31,142 25,000 45,794 53,555 33,703 56,345 49,995 Park Expenses Parks improvements and projects funded in part of whole with parks donations. Examples including English Landing Park restroom renovations, trail enhancements, ball fields enhancements, low water bridge crossing, equipment, etc. 05-41-00 26,484 6,500 25,000 Park Benches Expenses related to Park Bench installation 07-01-00 1,868 6,383 Transfer to Projects Fund Transfer to Projects Fund to supplement eligible projects.20-20-00 25,000 - 28,352 6,500 6,383 50,000 45,794 25,203 27,203 49,962 (5) Parks Donation Fund (63) Revenues and Expenses Total Park Donations Fund (63) Revenues Re v e n u e s Total Park Donations Fund (63) Expenses Ending Fund Balance Park Donations Fund (63) Exp e n s e s 120 Equipment Reserve Fund The Equipment Reserve Fund was previously used for large or small equipment purchases necessary to assist departments in their service to the citizenry and the operational needs of the department. Since the Equipment Reserve Fund does not have dedicated revenue source, equipment purchases are now funded as capital outlay expenses from source funds as indicated in the CIP. This fund is dormant with no planned revenues and expenses in 2017. Projects Fund The Projects Fund was previously used for larger capital improvement projects. Since there is not a dedicated revenue stream for the Project Fund, capital improvements are now funded as capital outlay +expenses from source funds as indicated in the CIP. The Projects Fund is still used to account for one- time revenues, such as significant grant revenues, associated with major capital projects in order to avoid irregular fluctuations in the General Fund. A 2017 projected column was added due to a later discovered discrepancy with the 2017 budget numbers. A budget amendment will be approved to account for the differences later in the year. Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget Revenues 3,281 1,751 (0) (0) (0) Expenses 1,530 1,751 - - - Ending Balance 1,751 (0) (0) (0) (0) Year 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget 2017 Projected Revenues 111,423 130,039 380,967 281,268 751,000 771,758 Expenses 95,453 73,295 380,651 275,510 41,000 71,000 Ending Balance 15,970 56,744 316 5,758 710,000 700,758 121 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget 2017 Projected Beginning Fund Balance Projected carryover from prior year. 69,604 16,922 41,967 56,744 - 5,758 Transfer from Park Donation Fund Transfer from the Park Donation Fund to cover expenses relating to the Parks/Sewer building façade improvements and DRJP project materials. 41601-00 25,000 40,000 Transfer from Sewer Fund Transfer from the Sewer Fund to assist in funding expenses relating to parks projects.41631-00 Transfer from General Fund Transfer from the General Fund to assist in funding eligible projects. Funding in 2015 is for the Route 9 Downtown Entryway Project. 41621-00 4,577 15,910 Transfers of Fewson Fund Distribution Transfer from Fewson Fund for eligible projects. 41641-00 17,221 155,000 1,566 Grants/Donations Grant monies received for various projects in the Project Fund 41751-00 12,500 134,000 146,299 Grant for Livable Communities No longer used. Grant monies received to cover Livable Communities project costs. 41781-00 416 Grant for Planning Sustainable Places MARC Planning Sustainable Places Grant funds. Grant awarded for Vision Downtown Parkville in 2013-14; 2015 funding anticipated for the Route 9 Corridor Study. 41781-01 17,682 Platte County Outreach Grants Platte County Outreach Grant monies to be applied toward eligible parks projects.41781-03 5,000 40,000 50,749 19,000 19,000 Partner Contributions Contributions pledged from project partners for local match.41806-00 1,500 96,040 10,000 10,000 707,000 707,000 111,423 130,039 380,967 281,268 751,000 771,758 Projects Fund (95) Revenues and Expenses Total Projects Fund (95) Revenues Re v e n u e s 122 Type Account Description Account 2014 Actual 2015 Actual 2016 Budget 2016 Unaudited 2017 Budget 2017 Projected Projects Fund (95) Revenues and Expenses Grants/Donations Expenses Grant monies used for eligible street projects.04-11-00 1,040 - 1,040 - - - - Livable Communities Study No longer used. Expenses relating to the Livable Communities Study covered by the Livable Communities Grant. 04-12-00 TE Projects/Route 9 Bicycle- Pedestrian Trail No longer used. Expenses relating to the design and engineering of the Route 9 Bicycle-Pedestrian Trail.04-13-00 Route 9 Corridor Study Expenses related to the Route 9 Corridor Study funded through a Planning Sustainable Places Grant. Will be paired with $15,000 of local match from the General Fund. 04-14-00 60,000 Downtown/Entryway Improvement Design Expenses relating to the downtown/entryway improvement design covered by a grant.04-24-00 15,000 2,797 170,995 200,291 15,000 62,797 170,995 200,291 - - 45 Highway Corridor Plan No longer used. Expenses relating to the 45 Highway Corridor Plan.04-17-00 PSP Downtown Master Plan No longer used. Expenses relating to the PSP Downtown Master Plan.04-20-00 250 250 - - - - - Parks/Sewer Building Façade Improvements Expenses related to installing a new roof, new doors and windows and making other designed building improvements. 04-22-00 72,954 15,647 English Landing Park Improvements Grant or donation funded improvements to English Landing and Platte Landing Parks including restroom upgrades, low water bridge crossing repair, trail improvements, ball field improvements, etc. Projects 04-24-00 1,172 205,000 37,438 41,000 71,000 DRJP Project Materials No longer used. To fund materials for additional DRJP projects.04-23-00 952 Outreach Grant Projects Expenses related to Platte County outreach grant projects.04-25-00 952 22,135 74,859 1,172 205,000 75,219 41,000 71,000 Fewson Fund Projects Expenses related Fewson Fund projects. 04-01-00 5,344 8,286 4,656 5,344 8,286 4,656 - - - Transfer to General Fund Transfer of surplus funds from prior projects to General Fund.20-10-00 - - - - - - 95,453 73,295 380,651 275,510 41,000 71,000 15,970 56,744 316 5,758 710,000 700,758 Exp : Str e e t s Ending Fund Balance Projects Fund (95) Exp : Few s o n Expenses: Sewer Exp : Tra n s f e r s Expenses: Transfers Expenses: Sewer Total Projects Fund (95) Expenses Exp : P u b l i c W o r k s Expenses: Public Works Exp : C o m m u n i t y De v e l o p m e n t Expenses: Community Development Exp : P a r k s Expenses: Parks 123 Capital Improvement Program (CIP) Summary A Capital Improvement Program (CIP) is a major public infrastructure and planning tool for municipalities. The CIP identifies capital projects and major equipment purchases and their anticipated funding sources to plan for and schedule the financing for significant community needs. Typically a CIP project has a dollar amount over $5,000. The first year of the 6-year CIP is referred to as the annual capital budget or annual capital outlay, while the remaining five “out years” represent the long-term plan. The CIP will be reevaluated each year to determine the projects and equipment that are most fundamentally important for the City. The 2017 CIP budget year includes $3,416,007 for capital projects and equipment. Sewer and street maintenance make up approximately 87% of the 2017 CIP. Category Streets Sewer Parks Public Works Administration/IT Police Community Development 2016 CIP 2,536,112 453,000 193,000 94,000 89,745 41,150 9,000 Streets 74% Sewer 13% Parks 6% Public Works 3% Administration/IT 3% Police 1% Community Development 0% 2017 Capital Improvement Program (CIP) Summary Streets Sewer Parks Public Works Administration/IT Police Community Development Year 2017 2018 2019 2020 2021 2022 Expenses 3,416,007 1,225,872 926,427 1,013,449 634,227 636,423 124 Capital Improvement Program FY 2017 Division Account Code Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Admin/IT Equipment Replacement Phone System Upgrade of the aging phone system at City Hall. The current system is no longer supported, and it is difficult to find parts for maintenance. 100% General Fund $ 30,000 $ 30,000 Admin/IT Equipment Replacement Computer Replacement Cycle Begin a cycle to replace 25% of office computers each year in order to maintain a four-year replacement cycle for software, hardware, operating systems, and warranties. 100% General Fund $ 6,000 $ 6,000 Admin/IT Project Maintenance City Hall Building Repairs Maintenance improvements for City Hall as identified in the building reserve study including concrete flatwork, wallpaper replacement, and phase one of carpet replacement. 100% General Fund $ 35,895 $ 35,895 Admin/IT Project Year 1 of 4 Building Safety Upgrades Install bulletproof glass panels and dais protection throughout the building in phases. Phase 1: Police Department and Dias. 100% General Fund (52% MPR Safety Grant) $ 17,850 $ 17,850 Admin/IT Total $ 89,745 $ 89,745 Com Dev Equipment Replacement Plotter The existing plotter is 10 years old, and it can no longer be serviced. Staff has evaluated options and concluded that replacing the plotter with a combination plotter scanner would best serve the City and would pay for itself within a 10 year life of the equipment. 100% General Fund $ 9,000 $ 9,000 Com Dev Total $ 9,000 $ 9,000 Parks Project New Maintenance and Equipment Storage Facility Phase 1 Storage and shop area to protect and maintain equipment. Shop location is proposed in conjunction with the proposed ELP Restroom Facility. The cost includes the site improvements associated with the building (access drive, fence, etc.) 100% General Fund $ 120,000 $ 50,000 Parks Project New Friends Field Construct new practice fields in Platte Landing Park 60% Parks Donations Fund, 40% Grant $ 25,000 $ 15,000 Parks Project New ELP Restroom Rehabilitation This project includes the second phase of the rehabilitation of the existing restroom. The improvements include replacement of the roof, installation of HVAC system, and exterior improvements. 86% General Fund; 14% Donations Fund $ 70,000 $ 70,000 Parks Multi-year Project Year 2 of 3 ELP Low Water Crossing Improvement This project would raise the low water crossing in English Landing Park to reduce the amount of time the park is closed due to backwater from the Missouri River flooding out the crossing. 100% Projects Fund $ 500,000 $ 12,000 Parks Project New Dog Park Trail Complete walking trail around the perimeter fence in the small dog park in Platte Landing Park 100% County Outreach Grant (in-kind city labor) $ 4,000 $ - Parks Project New FOPP Shelter Construct a new shelter near Grigsby field. Using donated FOPP funds to leverage Platte County Outreach Grant Dollars 50% FOPP Grant 50% Outreach Grant $ 30,000 $ 15,000 Parks Equipment New Commercial soil/drill seeder Purchase Frontier 58" PTO Driven Seeder that seeds more efficiently and maximizes seed germination for better long-term results. 100% General Fund $ 8,000 $ 8,000 Parks Project New Spirit Fountain LED Lighting This project includes the replacement of the can lighting around the Spirit Fountain and installation of LED lighting. 100% General Fund $ 5,000 $ 5,000 Parks Equipment Replacement Zero Turn Mower Mowing of ELP/PLP/Small Parks/ Right-of- ways. Trade in existing two mowers at a approximate value of $2,500 per mower. 100% General Fund $ 18,000 $ 18,000 Parks Total $ 780,000 $ 193,000 Public Works Project Maintenance PAC Pond Maintenance Part 1 Improvements include installation of riprap around the perimeter of the water surface of the pond are needed to assist with future pond maintenance. 100% General Fund $ 8,000 $ 8,000 Public Works Payment New PAC Pond Maintenance Part 2 Payment to QuikTrip for maintenance repairs and improvements in 2016. According to agreement, payment is due in Dec 2017. 100% General Fund $ 50,000 $ 50,000 Public Works Project Maintenance Storm Sewer Evaluation and Repair Evaluate the existing storm sewer pipe and structures. Based on data acquired, point repairs can be made to the storm sewer. 100% General Fund $ 551,000 $ 36,000 Public Works Total $ 609,000 $ 94,000 125 Capital Improvement Program FY 2017 Division Account Code Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Police Equipment Replacement In-Car Video Systems Replace existing in-car video system with updated system. Purchase two systems in 2016 and one in 2017. Will be on a five-year maintenance cycle to match warranty pending wear and tear. 100% General Fund $ 4,075 $ 4,075 Police Equipment Replacement Patrol Vehicle 2017 AWD Police Ford Taurus Sedan including emergency equipment, video, radio, etc.100% General Fund $ 37,075 $ 37,075 Police Total $ 41,150 $ 41,150 Sewer Multi-Year Project Year 2 of 2 WWTP Headworks Screen Rebuild Rebuild the influent mechanical bar screen at the WWTP. Screen is used to filter out plastics, rags and debris. Includes replacing the screen links, media shafts, and drive chain links. Begin design/bidding in 2016, construct in 2017.100% Sewer Fund $ 47,000 $ 47,000 Sewer Equipment Replacement Sludge Application Equipment Equipment replacement for the tractor (two tires and four wheel rims) and wagon (hoes and hydraulic ram gate) that are used to haul and distribute biosolids on agricultural fields.100% Sewer Fund $ 7,000 $ 7,000 Sewer Project Replacement WWTP Building Improvements Replace existing doors and door jams on the main building at the WWTF.100% Sewer Fund $6,000 $6,000 Sewer Equipment Replacement Clarifier Drives Onsite rebuild of the two hydraulic drive units that make the clarifier mechanisms rotate. 100% Sewer Fund $ 15,000 $ 15,000 Sewer Project Maintenance WWTP Access Road Replace existing gravel access roadway from FF Hwy to the WWTP.100% Sewer Fund $ 13,000 $ 13,000 Sewer Equipment Replacement Misc. Pump Station Improvements Includes installation of FF Hwy Pump Station valves and mission unit, Pinecrest Valve pit lid, and McAfee level transducer.100% Sewer Fund $9,000 $9,000 Sewer Project Replacement 45 Hwy Pump Station Install new pumps and controls. Begin design in 2016, construct in 2017.100% Sewer Fund $66,000 $66,000 Sewer Project Replacement South National P.S. Equipment Replacement. Replace pumps, base elbows, rails, along with electrical work.100% Sewer Fund $67,000 $67,000 Sewer Equipment Replacement McAfee Pump Rebuild one existing pump at McAfee Pump Station 100% Sewer Fund $9,000 $9,000 Sewer Project New CCTV Program to clean and televise a portion of the 15,000 feet per year of the City's sewers.100% Sewer Fund $56,000 $ 56,000 Sewer Project Replacement Downtown Manhole Reconstruction Phase 2 Second phase of manhole project started in 2016. This involves the reconstruction of existing manholes.100% Sewer Fund $8,000 $8,000 Sewer Project Replacement Sanitary Sewer Phase 3 Phase 3 repairs to repair manholes and install new manholes to access areas in downtown 100% Sewer Fund $60,000 $60,000 Sewer Project Replacement Riverchase Sewer Repair Remove and replace sewer main in the Riverchase Subdivision 100% Sewer Fund $40,000 $40,000 Sewer Project Replacement Levee Repair / Bank Stabilization Repair two location of breeches in the levee and the streambank failure along the creek adjacent to the entrance to the sewer plant. 100% Sewer Fund $50,000 $50,000 Sewer Total $ 453,000 $ 453,000 126 Capital Improvement Program FY 2017 Division Account Code Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Streets Equipment Replacement Dumptruck, 1-ton, 4-wheel Drive, Snowplow and Salt Spreader Replacement of older trucks and snowplowing equipment. Will replace next truck in line. Trade-in value approximately $7,000 100% Transportation Fund $ 57,000 $ 57,000 Streets Equipment New Case SR-270 Uniloader and 24" mini-milling machine attachment Purchase new Case SR270 uniloader and milling attachment to be used for street patching and repairs, dirt work, etc. 100% Transportation Fund $ 70,000 $ 70,000 Streets Maintenance New 2" Asphalt Mill and Overlay Contractor to mill and overlay existing asphalt streets in the City that have become deteriorated. 100% Transportation Fund $ 1,000,000 $ 1,000,000 Streets Maintenance New Curb Repair Repair defective sections of curb due to general deterioration of the curb.100% Transportation Fund $ 80,000 $ 80,000 Streets Maintenance New Sidewalk Repair Repair defective sections of sidewalk due to offsets and settlement in the sidewalk. Also includes repair of ADA ramps in mill and overlay areas. 100% Transportation Fund $ 20,000 $ 20,000 Streets Maintenance New Crack Sealing Crack sealing of existing street in the City. Includes rental of crack sealing machine and crack seal material. 100% Transportation Fund $ 15,000 $ 15,000 Streets Maintenance New Street Striping Needed to re-paint areas on the pavement such as centerlines and stop bars for traffic safety. 100% Transportation Fund $ 15,000 $ 15,000 Project New Major Project Improvements - Route 9 Phase 1 and 2a Phase 1: Route 45 to 62nd St, Phase 2a: 62nd St. to past Clark Ave. Upgrade to a 3-lane urban section with enclosed storm system and complete street elements 100% Transportation Fund $ 1,279,112 $ 1,279,112 Streets Total $ 2,536,112 $ 2,536,112 Grand Total $ 4,518,007 $ 3,416,007 2017 Budget Impact By Funding Source General Fund $ 384,895 Sewer Fund $ 453,000 Transportation Fund $ 2,536,112 Other Fund $ 42,000 TOTAL $ 3,416,007 127 Capital Improvement Program FY 2018 Division Account Code Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Admin/IT Equipment Replacement Computer Replacement Cycle Continue cycle to replace 25% of office computers each year in order to maintain a four-year replacement cycle for software, hardware, operating systems, and warranties. 100% General Fund $ 6,000 $ 6,000 Admin/IT Project Year 2 of 4 Building Safety Upgrades Install bulletproof glass panels and dais protection throughout the building in phases. Phase 2: Municipal Court 100% General Fund $ 8,920 $ 8,920 Admin/IT Project Maintenance City Hall Building Repairs Maintenance improvements for City Hall as identified in the building reserve study including vinyl tile replacement and phase two of carpet replacement. 100% General Fund $ 32,385 $ 32,385 Admin/IT Project Maintenance Train Depot Building Repairs Maintenance improvements for the Train Depot as identified in the building reserve study including trim and stucco repairs 100% General Fund $ 9,433 $ 9,433 Admin/IT Total $ 56,738 $ 56,738 Com Dev Equipment New Building Permit Software Acquire building permit software with greater functionality to help manage workflow, record-keeping, inspections and reporting for the Building Safety Division. This includes the purchase of software, installation, conversion of existing files, implementation and staff training. 100% General Fund $ 15,000 $ 15,000 Com Dev Total $ 15,000 $ 15,000 Parks Project New Maintenance and Equipment Storage Facility Phase 1 Storage and shop area to protect and maintain equipment. Shop location is proposed in conjunction with the proposed ELP Restroom Facility. The cost includes the site improvements associated with the building (access drive, fence, etc.) 100% General Fund $ 120,000 $ 70,000 Parks Multi-year Project Year 3 of 3 ELP Low Water Crossing Improvement This project would raise the low water crossing in English Landing Park to reduce the amount of time the park is closed due to backwater from the Missouri River flooding out the crossing. 96% Projects Fund; 4% Outreach Grant $ 500,000 $ 468,000 Parks Total $ 620,000 $ 538,000 Police Equipment Replacement Patrol Vehicle 2018 AWD Police Ford Taurus Sedan including emergency equipment, video, radio, etc.100% General Fund $ 36,534 $ 36,534 Police Total $ 36,534 $ 36,534 Sewer Equipment Replacement RAS Pump AFD's Replacement of three RAS Pump drives that control the pump speed at WWTP.100% Sewer Fund $5,200 $5,200 Sewer Equipment Replacement RAS Pump Drives Replacement Replacement of three RAS Pump adjustable frequency drives that control the pump speed at the WWTP (one per year for three years).100% Sewer Fund $ 5,000 $ 5,000 Sewer Equipment Replacement UV bulbs, ballasts, tubes. Replace the components of the UV disinfection system, including amalgam bulbs, ballasts, and quartz tubes.100% Sewer Fund $12,400 $12,400 Sewer Equipment Replacement Digester Blowers Replacement of two digester blowers at WWTP.100% Sewer Fund $17,000 $17,000 Sewer Equipment Replacement Aeration Blowers Rebuild/Replace two aeration blowers at the WWTP 100% Sewer Fund $10,000 $10,000 Sewer Project Replacement Clarifier Floor Replacement of Clarifier Floor. One in 2016 and the other in 2018.100% Sewer Fund $50,000 $50,000 Sewer Materials New Fencing around Pump Stations Install new fencing around Pinecrest Pump Station and FF Hwy Pump Station 100% Sewer Fund $13,000 $13,000 Sewer Project New Sewer Manhole Inspections Locate, open, inspect, and assess condition of manholes. Enter information into database and record photos. Update GIS map and database.100% Sewer Fund $29,000 $29,000 Sewer Project New CCTV Program to clean and televise a portion of the 15,000 feet per year of the City's sewers.100% Sewer Fund $57,000 $57,000 Sewer Project Replacement Downtown Manhole Reconstruction Phase 2 Second phase of manhole project started in 2016. This involves the reconstruction of existing manholes.100% Sewer Fund $77,000 $77,000 128 Capital Improvement Program FY 2018 Division Account Code Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Sewer Project Replacement Sanitary Sewer Phase 4 Phase 4 repairs focus on repairing aged and poor condition sewer pipes, prioritized in the line database. Includes lines discovered in the last two years of CCTV work.100% Sewer Fund $15,000 $15,000 Sewer Total $ 290,600 $ 290,600 Streets Maintenance New 2" Asphalt Mill and Overlay Contractor to mill and overlay existing asphalt streets in the City that have become deteriorated. 100% Transportation Fund $ 150,000 $ 150,000 Streets Maintenance New Curb Repair Repair defective sections of curb due to general deterioration of the curb.100% Transportation Fund $ 30,000 $ 30,000 Streets Maintenance New Sidewalk Repair Repair defective sections of sidewalk due to offsets and settlement in the sidewalk. Also includes repair of ADA ramps in mill and overlay areas. 100% Transportation Fund $ 20,000 $ 20,000 Streets Maintenance New Crack Sealing Crack sealing of existing street in the City. Includes rental of crack sealing machine and crack seal material. 100% Transportation Fund $ 15,000 $ 15,000 Streets Maintenance New Street Striping Needed to re-paint areas on the pavement such as centerlines and stop bars for traffic safety. 100% Transportation Fund $ 15,000 $ 15,000 Streets Equipment Replacement Street Department Truck/Plow/Spreader Replacement of older trucks and snowplowing equipment. Will replace next truck in line. Trade-in value approximately $7,000 100% Transportation Fund $ 59,000 $ 59,000 Streets Total $ 289,000 $ 289,000 Grand Total $ 1,307,872 $ 1,225,872 2018 Budget Impact By Funding Source General Fund $ 168,272 Sewer Fund $ 290,600 Transportation Fund $ 289,000 Other Fund $ 478,000 TOTAL $ 1,225,872 129 Capital Improvement Program FY 2019 Division Account Code Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Admin/IT Equipment Replacement Computer Replacement Cycle Continue cycle to replace 25% of office computers each year in order to maintain a four-year replacement cycle for software, hardware, operating systems, and warranties. 100% General Fund $ 6,000 $ 6,000 Admin/IT Equipment Replacement Copier The PD copier will be reaching end-of-life service in the next few years and will need to be replaced. The existing plan is to replace the Admin copier and rotate the existing machine to PD. Purchasing has previously been determined to provide significant savings over leasing. 100% General Fund $ 9,000 $ 9,000 Admin/IT Project Maintenance City Hall Building Repairs Maintenance improvements for City Hall as identified in the building reserve study including internal/external paint finishes and phase three of carpet replacement. 100% General Fund $ 52,221 $ 52,221 Admin/IT Project Year 3 of 4 Building Safety Upgrades Install bulletproof glass panels and dais protection throughout the building in phases. Phase 3: Administration Part 1 100% General Fund $ 13,500 $ 13,500 Admin/IT Project Maintenance Train Depot Building Repairs Maintenance improvements for the Train Depot as identified in the building reserve study including HVAC Replacement, Paver/Repair Replacement, and Fence Repair/Replacement 100% General Fund $ 67,580 $ 67,580 IT Total $ 148,301 $ 148,301 Parks Equipment Replacement JD 6-Series Tractor with Turf Tires Replacement for aging (30+ years) tractor in fleet used primarily to mow riverfront parks. Can also handle a boom mower (shared with Streets) for mowing medians and riverbank. 50% General Fund; 50% Outreach Grant $ 40,000 $20,000 Parks Equipment New Brush Hog Mower Attachment Attachment to 6-series tractor used for mowing wetland area and river bank. 100% General Fund $ 25,000 $25,000 Parks Project Replacement Office, Renovations (Incl. Finishes, Furnishings and Appliances) Vinyl floor coverings, Paint finishes, plumbing fixtures, light fixtures, Kitchenette with cabinetry and minor appliances, furnishings including a desk, chairs and bookcase 100% General Fund $ 10,612 $10,612 Parks Total $75,612 $55,612 Police Equipment Replacement Patrol Vehicle 2019 AWD Police Ford Taurus Sedan including emergency equipment, video, radio, etc.100% General Fund $37,264 $37,264 Police Total $ 37,264 $ 37,264 Public Works Project New Thousand Oaks Tornado Siren Construct new tornado siren to cover the gap in service on the west side of Parkville around Thousand Oaks. 75% County, Developer, SPCPD; 25% General Fund $23,000 $5,750 Public Works Total $23,000 $5,750 Sewer Equipment Replacement RAS Pump Replacement Replace RAS Pump at WWTP 100% Sewer Fund $11,500 $11,500 Sewer Equipment Replacement Self Priming Pump Engine Driven Trash Pump for By-Pass and Tank Cleaning. Can be used for flood response and system overflow bypasses.100% Sewer Fund $26,000 $26,000 Sewer Project New CCTV Program to clean and televise a portion of the 15,000 feet per year of the City's sewers.100% Sewer Fund $58,000 $58,000 Sewer Project Replacement Sanitary Sewer Phase 4 Phase 4 repairs focus on repairing aged and poor condition sewer pipes, prioritized in the line database. Includes lines discovered in the last two years of CCTV work.100% Sewer Fund $288,000 $288,000 Sewer Total $ 383,500 $ 383,500 130 Capital Improvement Program FY 2019 Division Account Code Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Streets Maintenance New 2" Asphalt Mill and Overlay Contractor to mill and overlay existing asphalt streets in the City that have become deteriorated. 100% Transportation Fund $ 155,000 $ 155,500 Streets Maintenance New Curb Repair Repair defective sections of curb due to general deterioration of the curb.100% Transportation Fund $ 30,000 $ 30,000 Streets Maintenance New Sidewalk Repair Repair defective sections of sidewalk due to offsets and settlement in the sidewalk. Also includes repair of ADA ramps in mill and overlay areas. 100% Transportation Fund $ 20,000 $ 20,000 Streets Maintenance New Crack Sealing Crack sealing of existing street in the City. Includes rental of crack sealing machine and crack seal material. 100% Transportation Fund $ 15,000 $ 15,000 Streets Maintenance New Street Striping Needed to re-paint areas on the pavement such as centerlines and stop bars for traffic safety. 100% Transportation Fund $ 15,000 $ 15,000 Streets Equipment Replacement Street Department Truck/Plow/Spreader Replacement of older trucks and snowplowing equipment. Will replace next truck in line. Trade-in value approximately $7,000 100% Transportation Fund $ 61,000 $ 61,000 Streets Total $ 296,000 $ 296,500 Grand Total $ 963,677 $ 926,927 2019 Budget Impact By Funding Source General Fund $ 246,927 Sewer Fund $ 383,500 Transportation Fund $ 296,500 Other Fund $ - TOTAL $ 926,927 131 Capital Improvement Program FY 2020 Division Account Code Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Admin/IT Equipment Replacement Computer Replacement Cycle Continue cycle to replace 25% of office computers each year in order to maintain a four-year replacement cycle for software, hardware, operating systems, and warranties. 100% General Fund $ 6,000 $ 6,000 Admin/IT Project Maintenance City Hall Building Repairs Maintenance improvements for City Hall as identified in the building reserve study including masonry inspection/repair, Phased replacement of ceiling-mounted cassettes, and phase four of carpet replacement. 100% General Fund $ 62,439 $ 62,439 Admin/IT Project Year 4 of 4 Building Safety Upgrades Install bulletproof glass panels and dais protection throughout the building in phases. Phase 4: Administration Part 2 100% General Fund $ 10,500 $ 10,500 IT Total $ 78,939 $ 78,939 Com Dev Project Replacement Master Plan Update The Master Plan is recommended for update at least once every 10 years to ensure data (e.g., population, economic development, housing, land use, public facilities and transportation) is current. The Parkville Master Plan was adopted in 2009 and, based on a 10-year timeline, is scheduled to be updated in 2019 or shortly thereafter. 100% General Fund $ 175,000 $175,000 Com Dev Total $ 175,000 $175,000 Parks Project New Dog Park Shade Structure Construct a shade structure at the entrance of the two dog parks in Platte Landing Park. 50% Outreach Grant 50% Donations $ 40,000 $20,000 Parks Multi-year Project New Alloe Creek/English Landing Park Flood Berm (Stream bank upgrade) Multi-year project to construct the White Alloe Creek flood berm in phases. Will involve flat rock creek banks between railroad tracks and Alloe crossing. 100% General Fund $ 150,000 $50,000 Parks Total $190,000 $70,000 Police Equipment Replacement Patrol Vehicle 2020 AWD Police Ford Taurus Sedan including emergency equipment, video, radio, etc.100% General Fund $ 38,010 $ 38,010 Police Total $ 38,010 $ 38,010 Sewer Equipment Replacement Aeration Blowers Rebuild/Replace two aeration blowers at the WWTP 100% Sewer Fund $ 10,000 $ 10,000 Sewer Equipment Replacement Pinecrest Pump Rebuild existing pump at Pinecrest Pump Station 100% Sewer Fund $ 4,500 $ 4,500 Sewer Project New CCTV Program to clean and televise a portion of the 15,000 feet per year of the City's sewers.100% Sewer Fund $ 59,000 $ 59,000 Sewer Project Replacement Sanitary Sewer Phase 5 Phase 4 repairs focus on repairing more lines, based on priority. Will include rebuild of small lines in old downtown areas.100% Sewer Fund $ 275,000 $ 275,000 Sewer Total $ 348,500 $ 348,500 132 Capital Improvement Program FY 2020 Division Account Code Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Streets Maintenance New 2" Asphalt Mill and Overlay Contractor to mill and overlay existing asphalt streets in the City that have become deteriorated. 100% Transportation Fund $ 160,000 $ 160,000 Streets Maintenance New Curb Repair Repair defective sections of curb due to general deterioration of the curb.100% Transportation Fund $ 30,000 $ 30,000 Streets Maintenance New Sidewalk Repair Repair defective sections of sidewalk due to offsets and settlement in the sidewalk. Also includes repair of ADA ramps in mill and overlay areas. 100% Transportation Fund $ 20,000 $ 20,000 Streets Maintenance New Crack Sealing Crack sealing of existing street in the City. Includes rental of crack sealing machine and crack seal material. 100% Transportation Fund $ 15,000 $ 15,000 Streets Maintenance New Street Striping Needed to re-paint areas on the pavement such as centerlines and stop bars for traffic safety. 100% Transportation Fund $ 15,000 $ 15,000 Streets Equipment Replacement Street Department Truck/Plow/Spreader Replacement of older trucks and snowplowing equipment. Will replace next truck in line. Trade-in value approximately $7,000 100% Transportation Fund $ 63,000 $ 63,000 Streets Total $ 303,000 $ 303,000 Grand Total $ 1,133,449 $ 1,013,449 2020 Budget Impact By Funding Source General Fund $ 361,949 Sewer Fund $ 348,500 Transportation Fund $ 303,000 Other Fund $ - TOTAL $ 1,013,449 133 Capital Improvement Program FY 2021 Division Account Code Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Admin/IT Equipment Replacement Computer Replacement Cycle Continue cycle to replace 25% of office computers each year in order to maintain a four-year replacement cycle for software, hardware, operating systems, and warranties. 100% General Fund $ 6,000 $ 6,000 Admin/IT Equipment Replacement Security System Upgrade Security System Upgrade. Fifty percent (50%) of the security system.100% General Fund $ 11,041 $ 11,041 Admin/IT Project Maintenance Train Depot Building Repairs Maintenance improvements for the Train Depot as identified in the building reserve study including Bench Repairs 100% General Fund $ 4,416 $ 4,416 IT Total $ 21,457 $ 21,457 Police Equipment Replacement Patrol Vehicle 2021 AWD Police Ford Taurus Sedan including emergency equipment, video, radio, etc.100% General Fund $ 38,770 $ 38,770 Police Total $ 38,770 $ 38,770 Sewer Equipment Replacement McAfee Pump Rebuild one existing pump at McAfee Pump Station 100% Sewer Fund $9,000 $9,000 Sewer Equipment Replacement WWTP Headworks Screen Replacement. Replace the influent mechanical bar screen at the WWTP. Was installed in 2004.100% Sewer Fund $ 140,000 $ 140,000 Sewer Project New CCTV Program to clean and televise a portion of the 15,000 feet per year of the City's sewers.100% Sewer Fund $ 60,000 $ 60,000 Sewer Total $ 209,000 $ 209,000 Parks Multi-year Project New Alloe Creek/English Landing Park Flood Berm (Stream bank upgrade) Multi-year project to construct the White Alloe Creek flood berm in phases. Will involve flat rock creek banks between railroad tracks and Alloe crossing. 100% General Fund $150,000 $50,000 Parks Total $150,000 $50,000 Streets Maintenance New 2" Asphalt Mill and Overlay Contractor to mill and overlay existing asphalt streets in the City that have become deteriorated. 100% Transportation Fund $ 170,000 $ 170,000 Streets Maintenance New Curb Repair Repair defective sections of curb due to general deterioration of the curb.100% Transportation Fund $ 30,000 $ 30,000 Streets Maintenance New Sidewalk Repair Repair defective sections of sidewalk due to offsets and settlement in the sidewalk. Also includes repair of ADA ramps in mill and overlay areas. 100% Transportation Fund $ 20,000 $ 20,000 Streets Maintenance New Crack Sealing Crack sealing of existing street in the City. Includes rental of crack sealing machine and crack seal material. 100% Transportation Fund $ 15,000 $ 15,000 Streets Maintenance New Street Striping Needed to re-paint areas on the pavement such as centerlines and stop bars for traffic safety. 100% Transportation Fund $ 15,000 $ 15,000 Streets Equipment Replacement Street Department Truck/Plow/Spreader Replacement of older trucks and snowplowing equipment. Will replace next truck in line. Trade-in value approximately $7,000 100% Transportation Fund $ 65,000 $ 65,000 Streets Total $ 315,000 $ 315,000 Grand Total $ 734,227 $ 634,227 2021 Budget Impact By Funding Source General Fund $ 110,227 Sewer Fund $ 209,000 Transportation Fund $ 315,000 Other Fund $ - TOTAL $ 634,227 134 Capital Improvement Program FY 2022 Division Account Code Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Admin/IT Equipment Replacement Computer Replacement Cycle Continue cycle to replace 25% of office computers each year in order to maintain a four-year replacement cycle for software, hardware, operating systems, and warranties. 100% General Fund $ 6,000 $ 6,000 Admin/IT Project Maintenance City Hall Building Repairs Maintenance improvements for City Hall as identified in the building reserve study including holding cell repairs, IT room split system replacement, and concrete flatwork. 100% General Fund $ 25,883 $ 25,883 Admin/IT Project Maintenance Train Depot Building Repairs Maintenance improvements for the Train Depot as identified in the building reserve study including window and door replacement 100% General Fund $ 14,640 $ 14,640 IT Total $ 46,523 $ 46,523 Police Equipment Replacement Patrol Vehicle 2022 AWD Police Ford Taurus Sedan including emergency equipment, video, radio, etc.100% General Fund $ 39,000 $ 39,000 Police Total $ 39,000 $ 39,000 Sewer Equipment Replacement UV bulbs, ballasts, tubes. Replace the components of the UV disinfection system, including amalgam bulbs, ballasts, and quartz tubes.100% Sewer Fund $12,400 $12,400 Sewer Project Replacement South National P.S. Equipment Replacement. Replace pumps, base elbows, rails, along with electrical work.100% Sewer Fund $6,000 $6,000 Sewer Equipment Replacement Pinecrest Pump Rebuild existing pump at Pinecrest Pump Station 100% Sewer Fund $4,500 $4,500 Sewer Project New CCTV Program to clean and televise a portion of the 15,000 feet per year of the City's sewers.100% Sewer Fund $61,000 $61,000 Sewer Project Replacement Sanitary Sewer - Ongoing Renewal Once the five phases of repair are complete, City will focus on periodic projects to rebuild sewer pipes, using primarily the CIPP process.100% Sewer Fund $95,000 $95,000 Sewer Total $ 178,900 $ 178,900 Parks Multi-year Project New Alloe Creek/English Landing Park Flood Berm (Stream bank upgrade) Multi-year project to construct the White Alloe Creek flood berm in phases. Will involve flat rock creek banks between railroad tracks and Alloe crossing. 100% General Fund $150,000 $ 50,000 Parks Total $ 150,000 $ 50,000 Streets Maintenance New 2" Asphalt Mill and Overlay Contractor to mill and overlay existing asphalt streets in the City that have become deteriorated. 100% Transportation Fund $ 175,000 $ 175,000 Streets Maintenance New Curb Repair Repair defective sections of curb due to general deterioration of the curb.100% Transportation Fund $ 30,000 $ 30,000 Streets Maintenance New Sidewalk Repair Repair defective sections of sidewalk due to offsets and settlement in the sidewalk. Also includes repair of ADA ramps in mill and overlay areas. 100% Transportation Fund $ 20,000 $ 20,000 Streets Maintenance New Crack Sealing Crack sealing of existing street in the City. Includes rental of crack sealing machine and crack seal material. 100% Transportation Fund $ 15,000 $ 15,000 Streets Maintenance New Street Striping Needed to re-paint areas on the pavement such as centerlines and stop bars for traffic safety. 100% Transportation Fund $ 15,000 $ 15,000 Streets Equipment Replacement Street Department Truck/Plow/Spreader Replacement of older trucks and snowplowing equipment. Will replace next truck in line. Trade-in value approximately $7,000 100% Transportation Fund $ 67,000 $ 67,000 Streets Total $ 322,000 $ 322,000 Grand Total $ 736,423 $ 636,423 2021 Budget Impact By Funding Source General Fund $ 135,523 Sewer Fund $ 178,900 Transportation Fund $ 322,000 Other Fund $ - TOTAL $ 636,423 135 Capital Improvement Program Unfunded Future Projects Division Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Administration Equipment New Facility Reservation Management Software Software for parks and facility reservations to streamline online reservations and payments. 100% General Fund $25,917 $25,917 Administration Project Replacement Roof, Thermoplastic Roof replacement 100% General Fund $164,262 $164,262 Administration Equipment Replacement Court Dept. Break Room Furnishings add description and year/future 100% General Fund $21,848 $21,848 Administration Equipment Replacement Court Dept. Furnishings Replacement/Update of furnishings 100% General Fund $7,428 $7,428 Administration Equipment Replacement Police Department Furnishings Replacement/Update of furnishings 100% General Fund $7,283 $7,283 Administration Equipment Replacement Upstairs Administration Furnishings Replacement/Update of furnishings 100% General Fund $16,329 $16,329 Administration Equipment Replacement Holding Cell Repairs Replacement/Update of furnishings 100% General Fund $14,640 $14,640 Administration Equipment Replacement Upstairs Furnishings Replacement/Update of furnishings 100% General Fund $16,329 $16,329 Train Depot Project Replacement Carpet Replacement Replacement of 67 square yards of carpet 100% General Fund $4,161 $4,161 Train Depot Project Replacement Tile Floor Coverings Replacement of 90 square yards of tile floor coverings 100% General Fund $11,389 $11,389 Train Depot Project Replacement Kitchenette Renovation Replacement of countertops, cabinets and appliances 100% General Fund $5,272 $5,272 Train Depot Project Replacement Light Fixtures and Fans Replacement of Light Fixtures and Fans 100% General Fund $7,030 $7,030 Train Depot Project Replacement Paint Finishes Replacement of approximately 6,400 square feet of the interior paint finishes. 100% General Fund $7,499 $7,499 Train Depot Project Replacement Rest Room Renovation Replacement of restroom features including plumbing fixtures and furnishings 100% General Fund $3,515 $3,515 Train Depot Project Replacement Tile Floor Coverings Replacement of 90 square yards of tile floor coverings 100% General Fund $11,389 $11,389 Train Depot Project Replacement Kitchenette Renovation Replacement of countertops, cabinets and appliances 100% General Fund $5,272 $5,272 Train Depot Project Replacement Light Fixtures and Fans Replacement of Light Fixtures and Fans 100% General Fund $7,030 $7,030 Train Depot Project Replacement Paint Finishes Replacement of approximately 6,400 square feet of the interior paint finishes. 100% General Fund $7,499 $7,499 Train Depot Project Replacement Rest Room Renovation Replacement of restroom features including plumbing fixtures and furnishings 100% General Fund $3,515 $3,515 Court Equipment New Eticket System Electronic ticketing and organization system for Municipal Court 100% General Fund $20,000 $20,000 Community Development Project New Highway 45 Corridor Plan Improvements The Highway 45 Corridor Plan includes design guidance tools for the City, County, developers and landowners to implement as development occurs in the future. Project includes implementation of landscaping, pedestrian-level street lighting, and other pedestrian amenities along Hwy 45 throughout Parkville city limits. 100% General Fund $30,000 $30,000 136 Capital Improvement Program Unfunded Future Projects Division Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Administration Equipment New Facility Reservation Management Software Software for parks and facility reservations to streamline online reservations and payments. 100% General Fund $25,917 $25,917 Nature Sanctuary Project Nature Sanctuary Entry Pavilion Construct an interpretive center for the Nature Sanctuary. The shelter would be functional for three of the four seasons. It would hold picnic tables and storage space for the program supplies, tables and chairs. The shelter includes a small office space and family restroom. 80% Grants/Donation s; 20% Nature Sanctuary Fund $120,000 $24,000 Nature Sanctuary Project New Additional Access Points Provide additional access points to the Nature Sanctuary from Park University / Riss Lake. This includes improvements to parking areas and signage. 80% General Fund; 20% Nature Sanctuary Fund $80,000 $80,000 Parks Project New Grigsby Trail Widening Costs to purchase material to widen the existing trail around Grigsby Field. 100% General Fund $5,000 $5,000 Parks Project New Trail Lighting - Platte Landing Park Install solar lighting along the loop trail in Platte Landing Park. 100% General Fund $100,000 $100,000 Parks Maintenance New Southern Platte Pass Trail Maintenance The City is responsible for maintenance of the multi-modal trail along Route 45 that is beginning to show wear. Funds need to be budgeted for periodic routine maintenance. The need will grow with the completion of Route 45 - Phase C. 100% Transportation Fund $50,000 $50,000 Parks Project New Grigsby Field Bleacher Shade Canopy This project would add sun shades over the bleachers. 100% General Fund $20,000 $20,000 Parks Project Replacement Asphalt Pavement, Total Replacement 650 square yards of parking areas and access drives 100% General Fund $21,705 $21,705 Parks Project Replacement Fence Replace 510 linear feet of perimeter wood fence at the Parks Building. 100% General Fund $24,499 $24,499 Streets Equipment New Wood Chipper Purchase wood chipper to chip the tree limbs. This equipment can be used by Parks, Streets and Nature Sanctuary 100% Transportation Fund $25,000 $25,000 Streets Equipment New Mini-Excavator The mini-excavator is a multi-purpose piece of equipment that can be used frequently by all divisions, but primarily for projects in the streets department. With the smaller equipment, the crews can work in smaller areas. 100% Transportation Fund $100,000 $100,000 Streets Project New Lakeview Drive Dam Reconstruct Lakeview Drive along the dam to assist with the drainage, direct the stormwater to the inlets and prevent ponding. Project will include adjusting the elevation of the roadway and new curbs 75% Transportation Fund 25% County Stormwater Grant $400,000 $100,000 137 Capital Improvement Program Unfunded Future Projects Division Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Administration Equipment New Facility Reservation Management Software Software for parks and facility reservations to streamline online reservations and payments. 100% General Fund $25,917 $25,917 Streets Project Replacement Roof, Metal (Incl. Gutters and Downspouts) Roof and gutter replacement. Approx. 47 squares of corrugated sheet metal roofing with exposed fasteners 100% General Fund $41,075 $41,075 Streets Project Replacement Walls, Steel Siding Steel siding repair and replacement. Approximately 3,660 square feet of the exterior walls 100% General Fund $20,943 $20,943 Streets Project Replacement Windows and Doors, Metal Frames Replacement of approximately 60 square feet of metal frame windows and doors. 100% General Fund $2,872 $2,872 Streets Project Replacement Office, Renovations (Incl. Finishes, Furnishings and Appliances) Wood wall coverings, Paint finishes on the shop area walls, plumbing fixtures, light fixtures, cabinetry and minor appliances, Furnishings including desks and chairs 100% General Fund $16,646 $16,646 Streets Project Replacement Air Handling Unit Replacement of the two packaged terminal air conditioner (PTAC) units serve the Streets Barn. 100% General Fund $8,323 $8,323 Streets Project Replacement Unit Heaters Replacement of two gas-fired unit heaters provide heat to the shop during the winter months 100% General Fund $3,121 $3,121 Streets Project Replacement Septic System Septic system replacement/repair 100% General Fund $11,262 $11,262 Streets Project New Main Street Brick Sidewalk Improvements Reconstruct brick sidewalks along Main Street. Project includes providing a solid base course to prevent differential settlement. 100% Transportation Fund $500,000 $500,000 Streets Project Replacement Overhead Doors Garage Door Replacement 100% General Fund $10,924 $10,924 Streets Project Replacement Salt Storage Replacement of salt storage canopy and frame at the Streets Barn. The structure comprises a concrete base and 2,400 square feet of canvas coverings. The canopy was replaced in approximately 2006, is in fair overall condition, and has a useful life of 10- to 15-years. 100% General Fund $55,137 $55,137 Streets Project Replacement Asphalt Pavement, Total Replacement 420 square yards of parking areas and access drives at the Streets Barn. 100% General Fund $107,615 $107,615 Public Works Maintenance New Storm Sewer Evaluation and Repair Evaluate the existing storm sewer pipe and structures. Based on data acquired, point repairs can be made to the storm sewer. 100% Transportation fund $551,000 $551,000 Public Works Project New Elm Street Creek Crossing Improvement This project would reduce the likelihood of water overtopping Elm Street. Immediate project would repair culvert at 11th Street and improve guardrail/roadway 50% Transportation Fund 50% County Stormwater Grant $240,000 $120,000 138 Capital Improvement Program Unfunded Future Projects Division Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Administration Equipment New Facility Reservation Management Software Software for parks and facility reservations to streamline online reservations and payments. 100% General Fund $25,917 $25,917 Public Works Project New Mill Street Culvert Guardrail This project would add guardrails along Mill Street just west of Crooked Road. 100% Transportation Fund $50,000 $50,000 Public Works Project New River Road Ditch Work Reconstruct the ditch along River Road by Thousand Oaks. Allow additional discharge by railroad pipe. 50% Transportation Fund 50% County Stormwater Grant $50,000 $25,000 Public Works Project New 76th Street Bridge Reconstruction Reconstruct bridge along 76th Street that has deteriorated over time. Based on MoDOT bridge ratings, this bridge is one of the worst in Platte County. 20% Transportation Fund 80% BRO Funding from Platte County $800,000 $160,000 Public Works Project New 6th Street Spillway Reconstruct the spillway to increase the flow through the pipes and change profile of low water crossing to prevent overtopping 50% Transportation Fund 50% County Stormwater Grant $200,000 $100,000 Public Works Project Replacement Relocate Siren #4 Relocate existing tornado siren (Siren #4) to an accessible location for service. 100% General Fund $5,500 $5,500 Streets Project New Route 9 from Clark to Parkville Athletic Complex Construct a signal at Clark Avenue; coordinate signal with a pedestrian crossing across Route 9; allow for future connection on east side of intersection for development (Green property); traffic calming along 63rd St. 80% Grants, 20% Other sources TBD (Transportation Fund, General Fund, development costs, CID/TDD) $2,242,820 $448,564 Streets Project New Route 9 from Parkville Athletic Complex to Lakeview Drive Upgrade to a 3-lane urban section with complete street elements; define driveway access locations; provide frontage "slip" lane where possible; work with property owners for parking modifications 80% Grants, 20% Other sources TBD (Transportation Fund, General Fund, development costs, CID/TDD) $1,263,000 $252,600 Streets Project New Route 9 from Lakeview Drive to 13th St. Upgrade to a 3-lane urban section with complete street elements; extend Main St. and connect with Lakeview Dr. (includes property acquisition costs) 80% Grants, 20% Other sources TBD (Transportation Fund, General Fund, development costs, CID/TDD) $2,815,000 $563,000 139 Capital Improvement Program Unfunded Future Projects Division Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Administration Equipment New Facility Reservation Management Software Software for parks and facility reservations to streamline online reservations and payments. 100% General Fund $25,917 $25,917 Streets Project New Route 9 from 13th St. to 12th St. Upgrade to a complete urban section; retaining wall reconstruction; add side street sidewalks; add turn lanes. 80% Grants, 20% Other sources TBD (Transportation Fund, General Fund, development costs, CID/TDD) $393,700 $78,740 Streets Project New Route 9 from 12th St. to 7th St. Upgrade to a complete urban section; retaining wall reconstruction; add side street sidewalks; add turn lanes. 80% Grants, 20% Other sources TBD (Transportation Fund, General Fund, development costs, CID/TDD) $675,000 $135,000 Streets Project New Route 9 from 7th St. to 5th St. Upgrade to a complete urban section; retaining wall reconstruction; add side street sidewalks; interesection improvements at 6th St. 80% Grants, 20% Other sources TBD (Transportation Fund, General Fund, development costs, CID/TDD) $554,600 $110,920 Streets Project New Route 9 from 5th St. to 2nd St. Upgrade to a complete urban section; retaining wall reconstruction; side street sidewalks; extend the White Alloe Creek Trail connection from 6th St. to 1st St./Route 9. 80% Grants, 20% Other sources TBD (Transportation Fund, General Fund, development costs, CID/TDD) $290,600 $58,120 Streets Project New Route 9 from 2nd St. to White Alloe Creek Upgrade to a complete urban section; add a signalized intersection at 1st St.; must be coordinated with other project sections along Route 9. 80% Grants, 20% Other sources TBD (Transportation Fund, General Fund, development costs, CID/TDD) $707,500 $141,500 Streets Project New Route 9 from White Alloe Creek to Park University Dr. Upgrade to a complete urban section; lane widening; signal modifications; must be coordinated with other project sections. 80% Grants, 20% Other sources TBD (Transportation Fund, General Fund, development costs, CID/TDD) $258,500 $51,700 140 Capital Improvement Program Unfunded Future Projects Division Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Administration Equipment New Facility Reservation Management Software Software for parks and facility reservations to streamline online reservations and payments. 100% General Fund $25,917 $25,917 Streets Project New Route 9 from Park University Dr. to Coffey Rd. Lane widening; extended turn lanes at Coffey Rd.; trail extension 80% Grants, 20% Other sources TBD (Transportation Fund, General Fund, development costs, CID/TDD) $2,300,000 $460,000 Administration Equipment New Facility Reservation Management Software Software for parks and facility reservations to streamline online reservations and payments. 100% General Fund $26,000 $26,000 Community Development Project New OTD-R Zoning District and Guidelines In 2011 the City adopted the new Old Town District - Residential Zone and related guidelines to preserve the character of the downtown neighborhood. This project would rezone residential properties from R-4 Multi- Family to the new OTD-R. Costs include notifications, legal reviews, map and code updates, legal notices, etc. Public meetings and workshops are not included. 100% General Fund $10,000 $10,000 Parks Project New Perimeter Trail at Small Dog Park Construct a limestone screenings walking trail around the perimeter fence inside the Platte Landing Park small dog parks. Recommend cost-sharing with dog park donations or a Platte County Outreach Grant. 50% General Fund; 50% grants $7,000 $3,500 Parks Project New Dog Park Amenities Provide an obstacle course and play equipment for the dog park. Recommend cost-sharing with dog park donations or a Platte County Outreach Grant. 50% General Fund; 50% grants $10,000 $5,000 Parks Project New Trail Lighting - Platte Landing Park Install solar lighting along the loop trail in Platte Landing Park. 100% General Fund $50,000 $50,000 Parks Project New Platte Landing Park Playground This project would add a playground at Platte Landing Park. Could be funded in whole or part through an Outreach Grant. 100% General Fund $50,000 $50,000 Parks Maintenance New Southern Platte Pass Trail Maintenance The City is responsible for maintenance of the multi-modal trail along Route 45 that is beginning to show wear. Funds need to be budgeted for periodic routine maintenance. The need will grow with the completion of Route 45 - Phase C. 100% Transportation Fund $50,000 $50,000 Parks Project New Grigsby Field Bleacher Shade Canopy This project would add sun shades over the bleachers. 100% General Fund $20,000 $20,000 141 Capital Improvement Program Unfunded Future Projects Division Type New or Replacement?Name Project Description Funding Source Total Cost Budget Impact Administration Equipment New Facility Reservation Management Software Software for parks and facility reservations to streamline online reservations and payments. 100% General Fund $25,917 $25,917 Public Works Project New Railroad Quiet Zones Necessary improvements at East St. and Main St. to establish a railroad Quiet Zone in downtown Parkville. 100% General Fund $1,000,000 $1,000,000 Public Works Project New Livable Communities Recommendatio ns - Phase 1 Placeholder for Phase 1 intersection improvements as recommended in the Livable Communities Study to improve transportation flow through downtown. Improvements are subject to design but may include bump-out islands, landscaping, and crossing improvements. 100% General Fund $500,000 $500,000 Stormwater Project New Parkville Athletic Complex (PAC) Detention Pond Dredging Removal of unwanted silt in the bottom of the retention pond. 100% General Fund $100,000 $100,000 Public Works Project New City Entry Signage Improve entryway signage at key intersections. 100% General Fund $50,000 $50,000 Stormwater Project New Main Street Drainage Improvements This project would improve the stormwater drainage along Main Street from the river to approx. 12th Street. 100% General Fund $500,000 $500,000 Streets/Parks Project New Main Street Bridge Widening Current bridge width is only 1 1/2 lanes. This is a potential conflict area as activity in Platte Landing Park grows, particularly with heavy vehicle/truck traffic for the boat ramp. 100% General Fund $100,000 $100,000 Streets Project New Bell Road Improvements (63rd St. to 59th Terrace) This project would regrade the street, add curb and gutter, sidewalks, utilities, and lighting. 100% General Fund $1,500,000 $1,500,000 Streets Maintenance New Full Depth Patching and Street Replacement Street maintenance program currently does not include funding for complete street replacement. Staff recommends annual patching ($25,000) and bi-annual funding for major repairs ($300,000). 100% Transportation Fund $325,000 $325,000 Streets Project New Kelly Industrial Park Street Replacement Full Depth replacement of the concrete streets in the development that are in need of replacement. 100% Transportation Fund $300,000 $300,000 Administration Equipment Replacement HVAC Replacement Replacement of the 50 Ton RTU and 10 Ton RTU. 100% General Fund $90,000 $90,000 TOTAL $ 20,206,949 $ 9,716,873 Future Budget Impact By Funding Source General Fund $4,856,729 Sewer Fund $0 Transportation Fund $4,756,144 Other Fund $104,000 TOTAL $9,716,873 142 Department/Division 2013 2014 2015 2016 Percent +/- Administration-City Clerk Dog Licenses 145 185 134 141 5% New N/A N/A 18 29 61% Renewal N/A N/A 114 112 -2% Golf Carts Permits 42 50 52 20 -62% Park Reservations 229 242 294 366 24% Fingerprint Payments 96 58 118 54 -54% Public Information Requests 3 10 44 49 11% Solicitor/Peddler Permits N/A 5 19 15 -21% Total Business Licenses 439 429 501 504 1% New Business Licenses 86 77 109 94 -14% In Town N/A N/A 15 21 40% Out of Town N/A N/A 94 73 -22% Renewed Business Licenses N/A N/A 392 399 2% In Town N/A N/A 208 216 4% Out of Town N/A N/A 184 183 -1% Delinquent In Town Businesses N/A N/A 29 6 -79% Paid but not fulfilled all requirements N/A N/A 9 4 -56% Never renewed N/A N/A 4 2 -50% Total Liquor Licenses 28 29 34 32 -6% New N/A N/A 4 2 -50% Changed N/A N/A 2 3 50% Renewed N/A N/A 23 23 0% Picnic N/A N/A 5 5 0% Fishing Permits N/A N/A 9 5 -44% Administration-Finance Total salary and benefit expenditures jurisdiction-wide 1,940,319$ $2,007,096 $1,960,843 $2,161,441 10% Full-time regular employees on the payroll 35 34 35 36 3% Average years of service for all full-time regular jurisdiction employees 8.6 9.5 7 7.7 10% Employee Turnover Rate 23%31%20%19%-5% Avg. Days to Fill Open Positions N/A N/A 73 51 -30% Sick Leave Hour Utilization Rate 15%45%30%44%47% Non-Sewer Payments Collected by Credit Card N/A $5,638.14 $42,739.92 $68,209.87 60% Credit Card Processing Fees Paid (Jan. 1 - Oct. 31) N/A N/A $1,511.74 $2,410.30 59% Card Convenience Fee (Jan. 1 - Oct. 31) N/A N/A $1,312.50 $2,054.05 56% Convenience Fee Coverage of Processing Fees N/A N/A 87%85%-2% Administration-Misc. Facebook Page Likes 500 1800 2599 3,719 43% Number of Posts N/A N/A 325 822 153% Average Engaged User per Post N/A N/A 69 61 -12% Unique Facebook Post Reach N/A N/A 200,805 835,844 316% Average Post Reach per Post N/A N/A 618 998 62% Performance Statistics 143 Performance Statistics Total Facebook Post Impressions N/A N/A 396,936 1,710,637 331% Average Post Impressions per Post N/A N/A 1,221 2,086 71% Twitter Follows 650 1200 1623 2,023 25% Twitter Impressions N/A N/A N/A 352 N/A Twitter Retweets N/A N/A N/A 288 N/A Mail Chimp Subscribers N/A N/A N/A 644 0% Mail Chimp Messages Sent N/A N/A N/A 135 N/A Press Releases N/A N/A N/A 37 N/A Viemo Video Plays 793 879 1430 910 -36% Live Stream Plays N/A 681 1354 1287 -5% Court Total Citations Processed 1,657 2,021 1,603 1,387 -13% Speeding Citations 796 1,030 745 518 -30% Unregistered Vehicles 228 196 181 166 -8% Stop Sign Violations 63 153 94 92 -2% Operating a vehicle without insurance 53 88 49 50 2% Parking violation 14 67 48 46 -4% Shoplifting 42 46 26 24 -8% DWI 31 40 37 19 -49% Police Total Part 1 Crimes Taken N/A 133 132 127 -4% Total Part 1 Crimes Cleared N/A 80 70 77 10% Criminal Homicide 0 0 0 0 0% Forcible Rape 4 3 1 1 0% Robbery 2 0 2 0 0% Assault 16 18 22 28 27% Burglary 10 8 10 16 60% Larceny -Theft 52 104 90 75 -17% Motor Vehicle Theft 1 0 7 7 0% Parkville Cleared Violent Crimes N/A 95%92%100%9% National Average Cleared Violent Crimes N/A 40%46%N/A N/A Parkville Cleared Property Crimes N/A 54%44%49%11% National Average Cleared Property Crimes N/A 20%19%N/A N/A Park U. Deer Hunt 26 10 10 26 160% Children Supported w/ Shop with a Cop 14 18 15 16 7% Total Police Dispatch Calls for Service 2922 3059 3207 3158 -2% Custodial Arrests Per Year 324 323 406 360 -11% Vehicle Crashes in Parkville 163 144 130 144 11% Finger Print Card N/A N/A 127 137 8% Avg. Turnaround Time per Finger Print Card (hours)N/A N/A 0.25 0.25 0% Police Report Requests N/A N/A 99 148 49% Avg. Turnaround Time per Police Report Requests (hours)N/A N/A 0.41 0.41 0% Police Video Requests N/A N/A 19 6 -68% Avg. Turnaround Time per Police Video Requests (hours)N/A N/A 1 1 0% Avg. Police Miles Driven N/A N/A 24900 23900 -4% 144 Performance Statistics Public Works HHW Event Usage 25 16 7 80 1043% HHW Facility Usage (Cars)225 139 160 298 86% Recycling Extravaganza Attendance 310 458 346 67 -81% Clean Up Attendance 983 800 223 547 145% Parks Park Area (Approx.. Acres)70 210 210 210 0% Trees Planted N/A N/A 36 29 -19% Trees Removed N/A N/A 27 48 78% Number of 5K/10K Races N/A N/A 12 19 58% Funds spent on Park Tree Trimming/Removal 7,206.00$ 17,533.31$ 9,907.88$ 23,525.50$ 137% Streets Total Lineal Feet of Roadway 197,339 210,310 210,850 210,850 0% Total Lineal Feet of Cul-De-Sacs 21,070 21,070 22,230 22,230 0% # of Street Ratings 203 209 210 210 0% % of Street Ratings at or below a satisfactory Level 56.00%42.50%43.83%50.97%16% Community Development Missouri One Call Utility Locates 1,406 1,746 2,088 1,330 -36% Avg. Turnaround Time per Missouri One Call Utility (Hours)N/A N/A 1 1 0% Sign Permits Approved 22 24 19 29 53% Avg. Turnaround time per non-B4 sign permit (Hours)N/A N/A 1 N/A N/A Avg. Turnaround time per B4 sign permit (Hours)N/A N/A 3 3 0% Temporary Sign Permits Approved 12 19 8 22 175% Avg. Turnaround time per temporary sign permit (Hours)N/A N/A 0.5 .5 0% Illegal Signs Removed 271 282 570 180 -68% Total Inspections 1,541 2,398 1,738 1,716 -1% Building Permits Issued (All Permits)163 216 245 314 28% Building Permit Fees Collected 156,416.58$ 257,323.10$ 219,258.05$ 389,975.63$ 78% Occupancy Inspections 77 68 49 49 0% Improvement Fees Collected 24,869.01$ 44,934.75$ 21,959.69$ 40,651.25$ 85% New Single Family Permits 56 72 65 63 -3% Single Family Permit Fees Collected 129,647.00$ 171,506.00$ 149,440.00$ 151,090.75$ 1% New Single Family Valuation 15,963,534.00$ 23,207,846.00$ 17,631,256.00$ 17,804,859.00$ 1% New Townhome Units N/A 9 2 2 0% New Townhome Permits Fees Collected N/A 16,873.00$ 5,152.00$ 7,460.00$ 45% New Townhome Valuation N/A 1,313,000.00$ 1,450,000.00$ 1,008,000.00$ -30% Commercial Tenant Finish 14 11 11 7 -36% Commercial Tenant Finish Permit Fees 4,596.25$ 17,272.20$ 26,143.15$ 7,057.50$ -73% 145 Performance Statistics Commercial Tenant Improvements Valuation 17,272.20$ 2,695,490.00$ 5,292,100.00$ 330,002.00$ -94% New Commercial Units N/A 3 1 3 200% New Commercial Unit Fees Collected N/A 25,177.25$ 6,449.00$ 75,554.25$ 1072% New Commercial Unit Valuation N/A 5,540,527.00$ 1,147,847.00$ 45,500,000.00$ 3864% All Other Permit Valuation N/A N/A 2,668,176.00$ 1,820,515.00$ -32% All Other Permit Fees N/A N/A 32,627.05$ 25,351.95$ -22% Sewer Connection Fees 60,900.00$ 87,000.00$ 84,100.00$ 72,500.00$ -14% Code Enforcement Complaints 29 79 103 103 0% Code Enforcement Complaint Violations 21 65 74 62 -16% Code Enforcement Complaint Violations Abated 18 53 40 58 45% Code Enforcement Complaint Pending 3 12 34 4 -88% Code Enforcement Complaint Hearings 2 2 4 4 0% Other Code Enforcement Violations Abated N/A 116 83 83 0% Floodplain Compliance Reviews 9 7 4 4 0% Floodplain Permits issued 1 2 1 2 100% Sewer Sewer Payments Collected by Credit Card N/A 22,274.10$ 87,582.80$ 119,830.77$ 37% # Number of Parkville Sewer Customers 1704 1725 1800 1865 4% # of Gallons Treated Per Day (January)N/A N/A 427,581 561,097 31% Removal Efficiency for BOD (January)N/A N/A 98.10%97.90%0% Removal Efficiency for TSS (January)N/A N/A 95.60%97.20%2% # of Gallons Treated Per Day (February)N/A N/A 469,571 493,931 5% Removal Efficiency for BOD (February)N/A N/A 95.90%98.30%3% Removal Efficiency for TSS (February)N/A N/A 91.70%96.50%5% # of Gallons Treated Per Day (March)N/A N/A 421,548 475,323 13% Removal Efficiency for BOD (March)N/A N/A 97.80%98.70%1% Removal Efficiency for TSS (March)N/A N/A 93.70%96.40%3% # of Gallons Treated Per Day (April)N/A N/A 514,000 564,833 10% Removal Efficiency for BOD (April)N/A N/A 97.80%99.30%2% Removal Efficiency for TSS (April)N/A N/A 91.10%95.60%5% # of Gallons Treated Per Day (May)N/A 440,161 678,516 770,903 14% Removal Efficiency for BOD (May)N/A 96.00%97.60%98.50%1% Removal Efficiency for TSS (May)N/A 93.00%95.10%96.50%1% # of Gallons Treated Per Day (June)N/A 565,400 647,167 526,767 -19% Removal Efficiency for BOD (June)N/A 98.20%98.80%98.90%0% Removal Efficiency for TSS (June)N/A 95.70%96.80%98.00%1% # of Gallons Treated Per Day (July)N/A 422,484 499,065 496,194 -1% Removal Efficiency for BOD (July)N/A 99.10%99.10%98.90%0% Removal Efficiency for TSS (July)N/A 96.40%97.00%97.70%1% # of Gallons Treated Per Day (August)N/A 436,548 483,452 529,710 10% Removal Efficiency for BOD (August)N/A 98.70%99.10%99.50%0% Removal Efficiency for TSS (August)N/A 95.80%97.70%98.50%1% # of Gallons Treated Per Day (September)N/A 414,367 520,533 655,567 26% Removal Efficiency for BOD (September)N/A 99.20%99.30%99.10%0% 146 Performance Statistics Removal Efficiency for TSS (September)N/A 97.70%96.90%96.90%0% # of Gallons Treated Per Day (October)N/A 486,548 428,387 500,806 17% Removal Efficiency for BOD (October)N/A 98.90%99.40%98.60%-1% Removal Efficiency for TSS (October)N/A 97.70%97.80%94.90%-3% # of Gallons Treated Per Day (November)N/A 405,700 494,567 489,600 -1% Removal Efficiency for BOD (November)N/A 99.00%98.10%98.40%0% Removal Efficiency for TSS (November)N/A 97.30%95.50%96.40%1% # of Gallons Treated Per Day (December)N/A 422,533 624,032 462,548 -26% Removal Efficiency for BOD (December)N/A 98.50%97.70%97.70%0% Removal Efficiency for TSS (December)N/A 96.40%94.80%93.10%-2% Sewer Rate Increase 3.00%3.00%2.50%10.00%300% 147 Glossary A ACCOUNT NUMBER – A system of numbering or otherwise designating accounts, entries, invoices, vouchers, etc., in such a manner that the symbol used quickly reveals certain required information. APPROPRIATION – An authorization made by the Board of Aldermen that permits the City to incur obligations and to make expenditures of resources. AMERICAN MEDICAL RESPONSE (AMR) – Provides ambulance service to the Parkville area. ASSESSED VALUATION – This is the value of property. The assessed value is set by the Platte County Assessor, who is charged with determining the taxable value of property according to a formula set by the State of Missouri. B BOARD OF ALDERMEN – The Mayor and Aldermen (8 member’s), collectively acting as the legislative and policy-making body of the City. BOND – A written promise to pay a specified sum of money, called the face value of principal amount, at a specified date or dates in the future, called the maturity date(s), together with periodic interest at a specified rate. BUDGET CALENDAR – The schedule of key dates that the City follows in the preparation and adoption of the budget. BUDGET DOCUMENT – The instrument used by the budget-making authority to present a comprehensive financial plan of operations to the Board of Aldermen. BUDGET MESSAGE – The opening section of the budget from the City Administrator, which provides the City Council and the public with a general summary of the most important aspects of the budget. BUDGET ORDINANCE – The official enactment by the Board of Aldermen to legally authorize City staff to obligate and expend revenues. C CAPITAL IMPROVEMENT PROGRAM (CIP) – A multi-year plan or schedule for the acquisition of infrastructure, facilities and major equipment. CAPITAL OUTLAY EXPENDITURE – Expenditure incorporated within the CIP document to acquire, maintain, repair, or upgrade capital assets. Typically more than $5,000. CAPITAL OUTLAY DIVISION – A division created to account for general fund dollars to be used for the acquisition or the construction of major capital facilities or equipment. D DEBT SERVICE FUND – A fund established to account for the accumulation of resources for, and the payment of, long-term debt principal and interest. 148 DEPARTMENT – A major administrative organizational unit of the City that indicates overall management responsibility for one or more divisions. DIVISION – A major administrative organizational unit of the City that indicates overall management responsibility for one or more activities. E ENTERPRISE FUND – A fund established to account for operations of the sewer system. It is operated in a manner similar to private business enterprises where the intent is cost recovery. EXPENDITURES – A decrease in the net financial resources of the City due to the acquisition of goods and services. F FISCAL YEAR – A 12-month period to which the annual operating budget applies. The City of Parkville operates on a January 1 to December 31 as its fiscal year. FRANCHISE FEE – A fee paid by public service utilities for use of public property in providing their services to the citizens of a community. FRIENDS OF PARKVILLE ANIMAL SHELTER (FOPAS) – A not-for-profit corporation providing animal control for the city. FUND – An accounting entity with a self-balancing set of accounts that record financial transactions for specific activities or government function. FUND BALANCE – The excess of assets over liabilities. G GENERAL FUND – The fund used to account for all financial resources except those required to be accounted for in another fund. GENERAL OBLIGATION BONDS – Bonds that finance a variety of public projects that pledge the full faith and credit of the City. GRANT – A contribution by a government or other organization to support a particular function. I INTEREST EARNINGS/LOSSES – The earnings or losses from investments. L LICENSES, PERMITS, & FEES – Revenues collected by from individuals or business concerns for various rights or privileges granted by the government. M MAINTENANCE – All materials or contract expenditures covering repair and upkeep of City buildings, machinery and equipment, systems and land. 149 MATERIALS – Expendable materials and operating supplies necessary to conduct department activity. MID-AMERICA REGIONAL COUNCIL (MARC) – MARC is an organization that coordinates projects and provides representation for all of the Kansas City metropolitan area local governments. N NEIGHBORHOOD IMPROVEMENT DISTRICT (NID) – A NID may be created in an area desiring certain public-use improvements that are paid for by special tax assessments to property owners in the area in which the improvements are made. O OPERATING BUDGET – The annual budget and process that provides a financial plan for the operation of government and the provision of services for the year. P PERFORMANCE STATISTICS – Specific quantitative measures or work performed within an activity or program. PROPERTY TAXES – Used to describe all revenues received in a period from current taxes, delinquent taxes, penalties and interest on delinquent taxes. Property taxes are levied on both real and personal properties according to the property's valuation and tax rate. PUBLIC HEARING – The portions of open meetings held to present evidence and provide information on both sides of an issue. PURCHASE ORDER – A document issued to authorize a vendor or vendors to deliver specified merchandise or render a specified service for a stated estimated price. R RESERVE – An account used to indicate that a portion of a fund balance is restricted for a specific purpose or not available for appropriation and subsequent spending. REVENUE – Funds that the government receives as income. S SALES TAX – The tax placed on the value of goods sold within the City. SOUTH PLATTE FIRE PROTECTION DISTRICT (SPFPD) –Provides fire protection and to the Parkville area. T TAX INCREMENT FINANCING (TIF) - An economic tool used by cities to finance real estate development costs. Additional property taxes generated by new development within a district formed are used to finance these real estate and infrastructure costs. A tax increment is that portion of the property taxes generated by the development above what the taxes would have been had the development not occurred. 150