HomeMy Public PortalAboutTetra Tech Change Order#5 Well #94,01111110011116.01.111.11% • Via E-mail TETRA TECH September 12, 2013 Tt No. 200-08540-12001 Wayne Steele Public Services Director City of Crestview 715 N. Ferdon Blvd. Crestview, Florida 32536 Subject: Old Bethel Road Part I Change Order No. 5 Dear Mr. Steele: Enclosed, please find Change Order No. 5 from Speegle Construction, Inc. We have reviewed the proposed changes to the Contract and find them acceptable. This Change Order amounts to an increase of $108,214 and an additional 63 days of Contract Time. These changes are related to the work that must be performed to set the 24" surface casing an additional 200' below ground to the limestone bedrock. It is our impression that the approval of additional moneys to be allocated for this project by the City Council on September 9, 2013, has increased the project contingency and thus allowed for this Change Order to be approved. As was previously mentioned in the memo dated September 4, 2013, we do anticipate that site conditions will allow for a future change order which will effectively eliminate the 18" well casing from the project and potentially provide a credit back to the City of $74,850. Should you have questions or need additional information, please call. Timothy A. Vanderwalker, PE Project Manager Cc: Michael Bomar, PE, Tetra Tech Fred Cook, PE, City of Crestview Tetra Tech. Inc. 12815 Emerald Coast Parkway, Suite 110, Destin, FL 32550 850.837.9278 Fax 850.837.7269 www.tetratech.com P:201I\Crestview Well and Tank \ Construction\Review-ApprovanContractorCOs\Part I\Part I Change Order No. 5.docx. SECTION 00843 CHANGE ORDER FORM Project: City of Crestview Part I - Well No. 9 and Elevated Storage Tank CHANGE ORDER NO. 05 DATE OF ISSUANCE: CONTRACTOR: Speegle Construction, Inc. EFFECTIVE DATE: ENGINEER: Tetra Tech OWNER'S CONTRACT NO.:200-08540-12001 The following changes are hereby made to the Contract Documents: CHANGE IN CONTRACT PRICE: Original Contract Price $ 1,965,660.00 CHANGE IN CONTRACT TIMES: Original Contract Times Substantial Completion: 12/23/2013 Ready for final payment: days or dates Net changes from previous Change Orders No. 1 to Net change from previous Change Orders No. 1 to No. 4 No. 4 $ 6,658.00 10 days Contract Price prior to this Change Order 1,972,318.00 $Ready Contract Times prior to this Change Order Substantial Completion: 1 /2/2014 for final payment: days or dates Net Increase Change Order Net Increase Change Order (decrease) of this $ 108,214.00 (dcerea3c) of this 63 days Contract Price with all approved Change Orders 2,080,532.00 $Ready Contract Times with all approved Change Orders Substantial Completion: 3/6/2014 for final payment: days or dates MAD/s1m/specs/s-1 /00843 Tt#200-08540-12001 00843-1 050412 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The General Conditions, Supplementary Conditions, Specifications and all parts of the Project Manual listed in Article 1, Definitions, of the General Conditions apply to and govern all work under this change order. Change Order No. 05 II. REQUIRED CHANGES: Add 200 LF of 24" surface casing (total of approx. 400 LF). Upon completion of 24" casing, FOR to determine whether the 24" casing will be sufficient enough to replace the 18" well casing, in which case, a credit of approx. $74,850.00 will be due to the City of Crestview. III. JUSTIFICATION: Unforeseen conditions. IV. PAYMENT: MAD/slm/specs/s-1/00843 Tt#200-08540-12001 00843-2 050412 V. APPROVAL AND CHANGE AUTHORIZATION: Acknowledgments: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. Change Order Request by: Change(s) Ordered by: RECOMMENDED BY: thorized Signature) � 12oj�G`t` /14IQlt6�E� (Title) APPROVED BY: City of Crestview, Florida By: (der) Rl12i3 (Date) ACCEPTED BY: nstruction, inc. (Contractor) 9/10/2013 tith : 'zed Signature) (Date) President 9_ 23-/2' Ault Signature) (Date) END OF SECTION (Title) MAD/s Im/sp ecs/s-1 /00 84 3 Tt##200-08540-12001 00843-3 050412 SCONSTRUCTION INC. ccc-o62489 PEEGLE September 10, 2013 Mr. Tim Vanderwalker Tetra Tech 12815 Emerald Coast Pkwy, Suite 110 Destin, FL 32550 Dear Sir, Speegle Construction, Inc. Tel: (850) 729-2484 210 Government Avenue Fax: (850) 729-1993 Niceville, Florida 32578 WNW. speegleconstruction.com Dan Carruth Project Manager RE: Crestview Well No. 9 COR 1002-005 - Well Surface Casing, Revised Speegle Construction, Inc. respectfully submits the attached estimate for changes associated with the 24" surface casing. The below estimate reflects increasing the surface casing by 200 LF (total of approx. 400 LF) with an approximate 5-10' embedment into the limerock. In the event that the Engineer of Record determines that the 24" surface casing is sufficient enough to replace (i.e. delete) the 18" well casing, a credit will be offered back to the City of Crestview (see credits below). This estimate is based on our best understanding of the changes that are necessary to the scope of work. In the event that additional work is required due to unforseen conditions or impacts to other systems due to changing the size of the well, Speegle reserves the right to revisit this estimate. Total estimate for the above work: $ 108,214 Additional Contract Extension: 63 Calendar Days In the event that the FOR determines that the 18" well casing is not required, the following credits will be offered back to the City of Crestview: Optional Credit if 18" Well Casing is deleted'*: $ (59,920) (Final credit will be based on actual invoiced amounts) (Final credit will reflect actual qty used, if any) Estimated 20% restocking fee for piping mtls: $ 3,200 Optional Credit if 40 CY Cement Grout is deleted**: $ (17,120) Speegle credit for 3 less days associated with not installing/grouting the 18" casing: $ (1,010) Revised estimate based on the above credits and 54 calendar days: $ 33,364 **The 18" well casing and grouting unit price credits include all fuel, equipment, labor, OH&P, etc. associated with the install/grouting of the casing. In the event that the 18" well casing is not required, the credit offered (based on the unit price values) will be the final amount owed back to the City, with the exception of the $1,010 credit owed by Speegle for the estimated 3 day reduction. Should you require any additional information, please do not hesitate to contact Dan Carruth at 850-729-2484 or email dcarruth@speegleconstruction.com Sincerely, Dan Carruth cc: file Project Manager lv � � y.t N ck , �'r✓C •,sa-13 i; SEA REQUEST for CHANGE ORDER SUMMARY DESCRIPTION: Well Surface Casing REASON FOR CHANGE: Unforseen Conditions ARCH RFP# SCI RCO# QUOTE DATE 0 1002-005 9/10/2013 DIV SCOPE DESCRIPTION NOTES LABOR MATL EQUIPT SUBCONT SCI COSTS TOTAL SUBCONTRACTED TOTAL GRAND TOTAL 1 General Conditions $ 9,217.18 $ 3,406.10 $ - $ $ 12,623.28 $ $ 12,623.28 2 &Rework & Demolition $ $ $ $ 45,754.57 $ - $ 45,754.57 $ 45,754.57 3 Concrete $ $ $ $ $ $ $ 4 Masonry $ - $ $ $ - $ - $ - $ 5 Steel $ $ $ $ $ $ $ 6 Carpentry, Wood & Plastic $ $ $ $ $ $ $ 7 Thermal & Moisture Protection $ $ - $ - $ - $ $ - $ 8 Openings $ $ $ $ $ $ $ - 9 Finishes $ $ $ - $ - $ $ $ - 10 Specialties $ $ $ - $ $ - $ - $ 11 Equipment $ - $ - $ $ - $ $ $ 12 Furnishings $ $ - $ $ $ $ $ 13 Special Construction $ - $ $ - $ - $ $ - $ 14 Hoisting & Conveying $ $ - $ - $ - $ $ - $ 15 Fire Sprinklers $ $ - $ $ $ $ $ Plumbing $ - $ - $ $ $ - $ $ HVAC & Controls $ - $ - $ - $ - $ - $ - $ 16 Electrical $ $ - $ $ - $ $ $ 17 Commissioning $ - $ - $ $ - $ $ $ SubTotals Payroll Burden Sales Tax Sub Bond SubTotals General Liability Insurance Property (Builder's Risk)Insurance P & P Bond Gross Receipts Tax (City Bus Lic) SUBTOTAL Overhead/Profit Overhead/Profit SUBTOTAL Add l 200LF of 24" Surface Casing' GRAND TOTAL Extended General Overhead $ 9,217.18 $ 3,406.10 $ - $ 45,754.57 $ 12,623.28 $ 45,754.57 $ 58,377.85 45% $ 4,147.73 $ 4,147.73 $ - $ 4,147.73 6% $ 204.37 I $ • $ 204.37 $ - $ 204.37 0.00% $ - $ - $ - $ - $ 13,364.91 I $ 3,610.47 I $ - $ 45,754.57 $ 16,975.38 $ 45,754.57 $ 62,729.95 0.-4 00% of Subtotal of Subtotal rif Subtotal ' $ 11.50 $ 192.17 $ 203.67 0.6500% $ 17.81 $ 297.40 $ 315.21 \, 1.0000% $ 27.40 $ 457.55 $ 484.95 '00000% $ $ $ $ 12,554.81 $/ 46,701.69 $ 63,733.78 15.00% $ ,554.81 S2,554.81 5.00% $ $ 2,335.08 $r 2,335.08 $ 19,586.90 $ 49,036.77 $ 68,623.68 $197.95/LF1 $ - $ 39,590.00 $ 39,590.00 $ 19,586.90 $ 88,626.77 $ 108,213.68 $ $ E - $ _ $ $ $ 19.587 $ 83,627 $ 108,214 ime Extension 'This Proposal is for only the work identified by the above change description. • See reservation of rights language on the Detail backup. 63 Calendar days DETAIL PROPOSED CHANGE ORDER ESTIMATE DIRECT COST ASSOCIATED WITH CHANGE ORDER DESCRIPTION: Well Surface Casing REASON: Unforseen Conditions 0�. 9- P-13 ARCH RFP # SCI RCO# QUOTE DATE 1002-005 9/10/201 CODE SCOPE DESCRIPTION QUANT units L / U.P. LABOR M / U.P. MAT'L EQUIPMENT SUBCONT TOTAL 1 GENERAL CONDITIONS Project Manager 33% 8.14 wks 1,730.00 $ 4,690.52 $ - $ 4,690.52 Project Manager's Truck/Insurance/Gas 33% 1.90 months $ 650.00 $ 407.55 $ 407.55 Superintendent 33% 8.14 wks 1,550.00 $ 4,206.66 $ $ 4,206.66 Superintendent's Truck/Insurance/Gas 33% 1.90 months $ - 650.00 $ 407.55 $ 407.55 Office Trailer 1.90 months $ 200.00 $ 380.00 $ 380.00 Superintendent Cell Phone 33% 1.90 months $ 150.00 $ 94.05 $ 94.05 Temp Toilets 1.90 months $ 150.00 $ 285.00 $ 285.00 Asbuilt documentation 3 HRS 25.00 $ 75.00 $ $ 75.00 RFP Preparation 3 HRS 50.00 $ 150.00 $ $ 150.00 Temp Utilities 1.90 months 50.00 $ 95.00 $ $ 95.00 Backhoe 8.14 wks $ - 75.00 $ 610.65 $ 610.65 Loader/Dozer 8.14 wks $ - 150.00 $ 1,221.30 $ 1,221.30 Copying & Specifications $ - $ $ Mail & Express Postage $ $ _ $ _ Layout & Field Engineering $ _ $ _ $ _ Crane & Hoisting $ _ $ _ $ _ Schedule Study & Modification $ $ $ _ Prepare Fragnet $ - $ $ _ Material Handling Equipment $ $ $ _ Safety $ $ _ $ _ Clean-up & Debris Handling $ $ _ $ Dumpster Pulls $ $ $ _ Equipment Rental $ _ $ $ Trucking & Hauling $ _ $ $ Small Tools $ $ _ $ _ Other $ $ _ $ _ $ $ $ - Division 1 Subtotal $ 9,217.18 $ 3,406.10 $ - $ - $ 12,623.28 2 SITEWORK & DEMOLITION Rowe Drilling (See Quote) 1 LS $ $ $ 43,354.57 $ 43,354.57 Rowe Drilling - Daily Cost After 9/5/13, Assuming a Start Date of 9/10/13 1.2 Days $ 2,400.00 $ 2,400.00 Division 2 Subtotal $ - $ - $ - $ 45,754.57 $ 45,754.57 3 CONCRETE 0 EA 0.00 $ - $ $ _ $ $ - $ Division 3 Subtotal $ _ $ - $ - $ _ $ _ 4 MASONRY & STONE $ - $ - $ - $ - $ $ Division 4 Subtotal $ _ $ _ $ _ $ _ $ _ 5 STEEL & METALS EA $ $ $ - $ - $ - $ Division 5 Subtotal $ _ $ _ $ _ $ _ $ _ 6 WOOD & PLASTICS $ - $ - $ - $ $ - $ - $ - Division 6 Subtotal $ $ _ $ _ $ _ $ _ 7 THERMAL & MOIST PROTECT $ $ $ $ - $ - $ - Division 7 Subtotal $ - $ _ $ _ $ - $ _ 8 OPENINGS $ - $ $ - $ $ $ - Division 8 Subtotal $ _ $ - $ _ $ _ $ _ 9 FINISHES $ $ $ $ $ - $ Division 9 Subtotal $ $ $ $ $ _ 10 SPECIALTIES $ $ - $ - DESCRIPTION: REASON: DETAIL PROPOSED CHANGE ORDER ESTIMATE DIRECT COST ASSOCIATED WITH CHANGE ORDER Well Surface Casing ARCH RFP # SCI RCO# QUOTE DATE 1002-005 Unforseen Conditions 9/10/2013 CODE SCOPE DESCRIPTION QUANT units L / U.P. LABOR M / U.P. MAT'L EQUIPMENT SUBCONT TOTAL $ $ $ - Division 10 Subtotal $ - $ - $ - $ - $ - 11 EQUIPMENT $ $ $ $ - $ $ Division 11 Subtotal $ - $ - $ - $ - $ - 12 FURNISHINGS $ $ $ $ - $ $ Division 12 Subtotal $ - $ - $ - $ - $ - 13 SPECIAL CONSTRUCTION $ $ - $ Division 13 Subtotal $ - $ - $ - $ - $ - 14 HOISTING & CONVEYING $ - $ - $ $ - $ $ - Division 14 Subtotal $ - $ - $ - $ - $ - 15 FIRE PROTECTION $ - $ $ - $ - $ $ - Division 15 Fire Subtotal $ - $ - $ - $ - $ - 15 PLUMBING $ - $ - $ - $ $ $ - Division 15 Plumb Subtotal $ - $ - $ - $ - $ - 15 MECHANICAL & HVAC $ $ - $ - $ $ - $ - $ - Division 15 HVAC Subtotal $ - $ - $ - $ - $ - 16 ELECTRICAL $ - $ - $ - $ $ $ $ Division 16 Subtotal $ - $ - $ - $ - $ - 17 COMMISSIONING $ - $ - $ - $ $ $ - Division 17 Subtotal $ - $ - $ - $ $ SubTotals $ 9,217.18 $ 3,406.10 $ - $ 45,754.57 $ 58,377.85 " ROWE PRILLING COMPAY Water Wells, Pumps, Sales & Service Since 1946 TALLAHASSEE o SAVANNAH o LAKELAND August 22, 2013 Mr. Dan Carruth Speegle Construction, Inc. P.O. Box 1325 Niceville, FL 32588 RE: City of Crestview - Additional Costs Dear Mr. Carruth: In accordance with your request of today, we offer the following response to your questions: _ fir; �� - i97 ���� 5/'-F�� . 39, 50 Question 1 - Additional 24" surface casing above 200 LF (should be $175/LF). Response: The cost for the additional 24-inch surface casing is identified in item #2 in the schedule of values. (200' @ $175.00/foot = $35,000) Question 2 - Additional cement grout, if required for the additional surface casing (need estimated quantity at $400/CY). Response: There will be no additional grout required for the installation of the additional surface casing. The methodology for the installation of the casing does not required grout. Question 3 -Additional equipment required to complete the 24" casing to the increased depth ("shoe"; etc.). Response: There will be additional expenses for the installation of the additional surface casing. These expenses are the costs of the 24-inch drive shoe, drive hammer, air compressor fuel and additional days for the work. Question 4 - Any costs, if any, associated with changes to the well pump/motor in the event that the well changes to 24". Also, if the pump/motor may change, please advise if this will affect the electrical panel and the generator. Response: The original design of the well by Tetra Tech will not change other than the increase in diameter of the well casing from 18-inch to 24-inch. This increase in well size will not have an effect on the pump or motor selection presently specified in the project. As long as the motor size does not increase, there will be no modifications to the motor controls or the generator. If the static and pumping water levels are not significantly different than they estimated, the motor horsepower will not change. This cannot be determined until the testing of the well is complete. P.O. Drawer 1389 o Tallahassee, Florida 32302 7584 W, Tennessee Street o Tallahassee, Florida 32304 o 850-576-1271 Phone o 850-575-6636 Fax www.ROWEDRILLING.COM August 22, 20 Mr. Dan Carruth Speegle Construction, Inc. Page 2 Question 5 - Impact in workdays (M-F) this will cause Rowe. # of days impacted should be calculated starting from the day you stopped (Thursday?). Response: Our last day of work was Wednesday, August 14th. Beginning on Thursday, August 15th, we are stopped while decisions are made and then we must order the materials to resume work. From the date we receive notice we can begin ordering materials, that is assuming the process is to move forward with our recommendations, I anticipate it will take one week to acquire the materials. It will take approximately 30 working days to install the casing using the methodology proposed. Our request for change order #1 will only ask for compensation for 20 of these 30 days. Question 6 - Any other costs I may be missing. Response: Any additional costs I may have missed or failed to discuss will be identified in the attachment. Question 7 - Your estimate on any increase in County water supply required to complete this work. Response: There will be far less water required for this alternate method of drilling compared to the conventional mud and rotary method of drilling. Question 8 - Optional credit if the 18" well casing is to be deleted. Response: If the 18-inch well casing is not required, there will be a $56,000 savings minus a twenty percent (20%) restocking charge for the return of the casing (CASING INVOICE). NOTE: PLEASE KNOW, THE SPECIFICATIONS ARE VERY SPECIFIC IN DESCRIBING THE ACCEPTACE CONDITIONS FOR THE WELL AND PRODUCING SAND -FREE WATER. IT MAY STILL REQUIRE SETTING THE 18" WELL CASING TO PROVIDE ADEQUATE CONFINEMENT BETWEEN THE BOTTOM OF THE CASING AND THE SAND ABOVE THE ROCK IN ORDER TO MEET THE ACCEPTANCE CRITERIA IN THE SPECIFICATIONS AND PRODUCE SAND FREE WATER. EVERYONE SHOULD UNDERSTAND, THERE IS A GOOD POSSIBILITY THE 18" WELL CASING WILL NOT BE REQUIRED BUT THERE ARE NO GUARANTEES THE 18" WELL CASING WILL NOT BE REQUIRED. Question 9 - Optional credit for reduction in cement grout qty if the 18" well casing is deleted. Response: Deleting the 18-inch well casing and changing to the proposed method of drilling will result in reducing the amount of grout by approximately 40 CY of grout, or a savings of approximately $16,000. P.O. Drawer 1389 o Tallahassee, Florida 32302 7584 W. Tennessee Street o Tallahassee, Florida 32304 o 850-576-1271 Phone o 850-575-6636 Fax www.ROWEDRILLIMG.COM August 22, 20 Mr. Dan Carruth Speegle Construction, Inc. Page 3 NOTE: PLEASE READ THE NOTE ASSOCIATED WITH QUESTION 8 ABOVE, IF THE 18" WELL CASING IS INSTALLED, IT MUST BE GROUTED BACK TO SURFACE. Question 10 - Forest (FLWMD) was onsite this AM and indicated that they are in discussion with Rowe in regards to changing to a 24" well casing. He mentioned "friction loss" as a potential negative impact, which is what stemmed the above question about impacts to the pump/motor. Response: I met with Tom Brown and John Morrell of the NWFWMD this morning in my office to discuss the status of the project. I bring to your attention, it was me who contacted the water management personnel and requested we meet to discuss this project. I wanted to make sure they were on board with our assessment of the situation as well as agree there were no problems if we made this a 24-inch well in lieu of the specified 18-inch well. The NWFWMD is on board and fully agrees with our assessment and recommendations on how to move forward with this project construction. Our request for change order #1 is asking for the crews working hours for 20 days @ 10 hours per day. We are also asking for the fuel costs for these days as well as per diem for the men for these days. It would normally take from 5 - 7 days to open the borehole, install 400' of 24" surface casing and grout back to surface. I am allocating 10 days of these 30 days to Rowe Drilling and not asking for any additional compensation for these days. We would have used these days if we were using the conventional method of drilling and the City would be paying twice if they were ask to pay for these days. I am only asking for compensation for the ADDITIONAL labor, materials used by different method of drilling, fuel and expenses. We are not asking for additional compensation for the drill rig, backhoe, welder, air compressor, mud system or ancillary equipment. Only fuel for this equipment. We are asking for the costs of the rental of the casing hammer though. We look forward to hearing from you and if you need further clarification or assistance, please do not hesitate to contact us. Sincerely, ROWE DRILLING COMPANY, Inc. 7 oAC c�Q Thomas Salter General Manager Attachment: P.O. Drawer 1389 Tallahassee, Florida 32302 7584 W. Tennessee Street o Tallahassee, Florida 32304 0 850-576-1271 Phone o 850-575-6636 Fax www.ROWEDRILLING.COM KVYYC LJKILLIPIU l.V1Y11'AIV T, IIVI.. CHANGE ORDER REQUES ,LUES Project: City of Crestview Well No. 9 - Additional Work DATE: August 22, 2013 NO DESCRIPTION OF ITEM MATERIALS ,✓`--' \ LABOR QTY Net Price/Unit Total Material lf�YS, -- Q_ -� ) Net Price/Unit Total Labor 1 Superintendent @ City of Crestview Well #9 $0.00 $0.00 50.0 $64.90 $3,245.00 2 Foreman @ City of Crestview Well #9 $0.00 $0.00 200.0 $37.80 $7,560.00 3 Helper @ City of Crestview Well #9 $0.00 $0.00 200.0 $28.80 $5,760.00 4 24-Inch Hardened, Weld -on Drive Shoe 1.0 $2,520.00 $2,520.00 $0.00 $0.00 5 Additional welding rods, oxygen and accetelyn which will be used duimg the installation process. This is above and beyond that which would be used for "Mud & Rotary" casing installation. 1.0 $300.00 $300.00 $0.00 $0.00 6 Casing Hammer Equipment Rental 20.0 $250.00 $5,000.00 $0.00 $0.00 7 Hotel and meal expense (2 Men @ $75.00/day/each = $150.00/Day) 20.0 $150.00 $3,000.00 $0.00 $0.00 8 Hotel and meal expense (Superintendent @ $75.00/day) 5.0 $75.00 $375.00 $0.00 $0.00 9 0.0 $0.00 $0.00 $0.00 $0.00 10 0.0 $0.00 $0.00 $0.00 $0.00 SUMMARY Subtotal General Materials $11,195.00 Tax on Materials @ 7.5% $839.63 Total General Materials $12,034.63 Total Labor $16,565.00 Subtotal General Materials & Labor $28,599.63 Fuel - Service Truck / 20 of 30 extra days 20 Days @ $75.00/Day $1,500.00 Fuel - Drill Rig / 20 of 30 extra days 20 Days @ $200.00/Day $4,000.00 Fuel - Air Compressor / 20 of 30 extra days 20 Days @ $150.00/Day $3,000.00 Fuel - Welder & Backhoe / 20 of 30 extra days 20 Days @ $30.00/Day S600.00 $0.00 Subtotal $37,699.63 Overhead @ 10% $3,769.96 Markup @ 5% $1,884.98 Subtotal $43,354.57 Bond @ 0.0% Moo FINAL TOTAL - - - $43,354.57 Atli it; Jj { )��H pt 6 e :e V w �-i h 0-'T Gos i is . V/ Page 1 of 1 Merchants Bond' Co 6/7/2013 11,47:35 AM PA'— 2/002 Fax Server MERCHANTS% BONDING COMPANY. MERCHANTS BONDING COMPANY (MUTUAL) • MERCHANTS NATIONAL BONDING, INC. 2100 FLEUR DRIVE - DES MOINES, IOWA 50321-1158 • (800) 678-8171 • (515) 243-3854 FAX EMAIL: jleonard@merchantsbonding.com 06/07/2013 City of Crestview Attn: Elizabeth M. Roy 198 North Wilson Street Crestview, FL 32536 The above referenced bond was issued on Wilson Street Public Parking Lot Re: FLC 78413 Utility Solutions Group LLC DcFuniak Spring, FL $357,980.00 08/28i2012 covering: This is a routine request to help ensure that the project being performed by: Utility Solutions Group LLC is being completed in a satisfactory manner. The easiest way to respond is online at https:/iprogress.merchantsbcnding.°ern<66y3yx Or you can complete the form below and email, mail or fax it to the address above —or call us and we will take your information over the phone. Thank you for your assistance. Underwriter Name Aaron Finken Title Contract Underwriter If the project is complete: Acceptance Date: 3///7-O/3 ; Final Contract Price (including retention): $ �' 303 q7/, If the proiect is not complete: Estimated Completion Date: Approximate percentage complete: Dollar Amount Paid to Date: $ Total Dollar Amount of All Change Orders: $ • Are you aware of claims for unpaid labor or material? ▪ Yes Flo If yes, please explain • Has work progressed satisfactorily? If no, please explain: Oes ▪ No • Additional comments: Complete`d�by/� f �Y p�, Date: 6/7//3 _ Check here if you prefer we contact you (or someone else) by another method other than mail: X Email — Please provide email address: elrza&e{./trotieDciL , err Cie Ttner,J,p,rci Phone — Please provide phone number including area code: ` `I Fax — Please provide fax number including area code. Merchants Bonding Company (Mutual) and Merchants National Bonding, Inc. hereby releases the person supplying the information contained on this form from any and all liability whatsoever which might in any way result from the accuracy or inaccuracy of the information requested and supplied on this form. CON 0684 (1/13) WARNING! FLORIDA'S CONSTRUCTION LIEN LAW ALLOWS SOME UNPAID CONTRACTORS, SUBCONTRACTORS AND MATERIAL SUPPLIERS TO FILE LIENS AGAINST YOUR PROPERTY EVEN IF YOU HAVE MADE PAYMENT IN FULL. UNDER FLORIDA LAW, YOUR FAILURE TO MAKE SURE THAT WE ARE PAID MAY RESULT IN A LIEN AGAINST YOUR PROPERTY AND YOUR PAYING TWICE. TO AVOID A LIEN AND PAYING TWICE, YOU MUST OBTAIN A WRITTEN RELEASE FROM: GRAYBAR ELECTRIC CO., INC (091) EVERY TIME YOU PAY YOUR CONTRACTOR. NOTICE TO OWNER / NOTICE TO CONTRACTOR 71901078999425394254 CITY OF CRESTVIEW 198 NORTH WILSON STREET CRESTVIEW FL, 32536 THE UNDERSIGNED HEREBY INFORMS YOU THAT HE HAS FURNISHED OR IS FURNISHING SERVICES OR MATERIALS AS FOLLOWS: ELECTRICAL SUPPLIES AND/OR MISC MATERIALS FOR THE IMPROVEMENT OF REAL PROPERTY IDENTIFIED AS: Crestview WWTP Phase 4 Expansion/ 5101 Arena Road / Crestview, Florida / As recorded in the public records of Okaloosa County, Florida / Property Control # 25-3N-24-0000-0002-0010 WD: OR BOOK 1687 Page 1533 Bond: Bond Number 016 047 349 PUBLIC; NE1/4 LYING S OF COUNTY RD ANNEXATION ORD #894 UNDER AN ORDER GIVEN BY: DAN MCCLELLAN ELECTRICAL Florida law prescribes the serving of the notice and restricts your rights to make payments under your contract in accordance with Section 713.06, Florida Statutes. If this job is bonded under Section 713.23 Florida Statutes, Section 255.05 Florida Statutes; Title 40 U.S.C. Section 270 or any other form of bond, this notice is also notice of intent to make a claim against any statutory or common law bond and the firm sending this notice will look to such bond for protection and payment. The undersigned requests a copy of the payment bond and a copy of any direct contracts relating to the improvements of the aforementioned real property and agrees to pay reasonable copy costs for same. IMPORTANT INFORMATION FOR YOUR PROTECTION Under Florida's laws, those who work on your property or provide materials and are not paid have a right to enforce their claim for payment against your property. This claim is known as a construction lien. If your contractor fails to pay sub -contractors or material suppliers or neglects to make other legally required payments, the people who are owed money may look to your property for payment, EVEN IF YOU HAVE PAID YOUR CONTRACTOR IN FULL. PROTECT YOURSELF RECOGNIZE that this Notice to Owner may result in a lien against your property unless all those supplying a Notice to Owner have been paid. LEARN more about the Construction Lien Law, Chapter 713, Part I, Florida Statutes, and the meaning of this notice by contacting an attorney or The Florida Department of Business and Professional Regulation. Agent For: By: George Iriban Graybar Electric Co., Inc (091) 197 Lurton Street Pensacola FL , 32505 850-549-2629 Contact: Elizabeth Wojtaszek Recipient Type Tracking ## Name Owner 71901078999425394254 CITY OF CRESTVIEW General Contractor 71901078999425395251 MORGAN CONTRACTING, Bond Company 71901078999425398252 LIBERTY MUTUAL INSUR Contractor Dan Mcclellan Electr MO: 258996 Job #: Jp8551200 Address 198 NORTH WILSON STR 6575 HWY 189 NORTH 175 BERKLEY ST. 719 Edge Street C_yt State CRESTVIEW FL Baker FL BOSTON MAINE Fort Walto FL 32536 32531 02116 32547 258996 - FL Nationwide Notice PO Box 542165 LW, FL 33454 i i i II I i 7190 1078 9994 2539 4254 CITY OF CRESTVIEW 198 NORTH WILSON STREET CRESTVIEW, FL 32536 I i Work Order # 258996 The Construction Notice printed on the reverse side of this document is only a notice and NOT A LIEN and is not recorded against your property. This notice is not a reflection of the credit worthiness or financial standing of any contractor nor is it an indication of their ability or desire to pay their bills. It is merely a letter informing the owner of the property and/or general contractor that Graybar Electric Co., Inc (091) has supplied or will supply services, equipment and/or materials. If you have paid or are about to pay your contractor, ask them for a release of lien to ensure their vendor is paid. Failure to ensure that their vendor is paid may result in a lien being placed on your property and your paying twice for the materials and/or services provided to you by the vendor listed on the opposite side of this notice. If you have any questions or require further clarification on this notice, please call Nationwide Notice at (561) 228-1114. All of your questions or concerns can be addressed. Note on Georgia and Ohio projects: Nationwide Notice on behalf of Graybar Electric Co., Inc (091) is requesting a copy of any Notice of Commencement recorded on the project listed on the reverse side along with a copy of the payment bond where applicable pursuant to (GA) O.C.G.A 44-14-361.5 and (OH) Ohio Revised Code 1311.04(D),(E) and (F). Please let us know if you have filed a Notice of Commencement by sending a copy via fax to 561-439-6614, by email to ento@nationwidenotice.com or by certified mail to Nationwide Notice, Inc. PO Box 542165, Lake Worth, FL 33454. If none is available now, this is an ongoing request should one become available in the future. Note on Bonded Projects: The undersigned requests a copy of the payment bond relating to the improvements of the property described on the reverse side of this document. If none is currently available, this is an ongoing request should one become available in the future. Please send a copy via fax to 561-439-6614, by email to ento@nationwidenotice.com or by certified mail to Nationwide Notice, inc. PO Box 542165, Lake Worth, FL 33454. If you require information regarding contractor payment status, please contact Graybar Electric Co., Inc (091) at the number located in the lower right hand corner of the notice. When calling to inquire about any aspect of this Notice, please reference work order number: 258996. Respectfully, Nationwide Notice, Inc Date: June 6, 2013 NOTICE TO OWNER/AND CONTRACTOR WARNING TO OWNER: UNDER FLORIDA LAW, YOUR FAILURE TO MAKE SURE THAT WE ARE PAID MAY RESULT IN A LIEN AGAINST YOUR PROPERTY AND YOU PAYING TWICE TO AVOID A LIEN AND PAYING TWICE, YOU MUST OBTAIN A WRITTEN RELEASE FROM US EVERY TIME YOU PAY YOUR CONTRACTOR TO: City of Crestview 198 N Wilson Street Crestview, FL 32536 Certified Mail Receipt No.:70122210000115122454 The undersigned hereby informs you that he or she has furnished or is furnishing service or material as follows: Construction Materials for the improvement of the real property identified as: Job named: Crestview WWTP Under an order given by: Daniel S McClellan Electrical Contractors, Inc. FLORIDA LAW PRESCRIBES THE SERVING OF THIS NOTICE AND RESTRICTS YOUR RIGHT TO MAKE PAYMENTS UNDER YOUR CONTRACT IN ACCORDANCE WITH 713.06, FLORIDA STATUTES. IMPORTANT INFORMATION FOR YOUR PROTECTION Under Florida's laws, those who work on your property or provide materials and are not paid have a right to enforce their claim for payment against your property. This claim is known as a construction lien. If your contractor fails to pay subcontractors or material suppliers or neglects to make other legally required payments the people who are owed money may look to your property for payment, EVEN IF YOUHAVE PAID YOUR CONTRACTOR IN FI 1L.,1_,, PROTECT YOURSELF: --RECOGNIZE that this Notice to Owner may result in a lien against your property unless all those supplying a Notice to Owner have been paid. --LEARN more about the Construction Lien Law, Chapter 713, Part 1, Florida Statutes, and the meaning of this notice by contacting an attorney of the Florida Department of Business and Professional Regulation. Utk hAr•(, Lienor's Signature Lienor's Name: Ram Tool & Supply Co. Lienor's Address: 3620 8`d Ave South, Birmingham, AL 35222 Phone Number: 205-599-7061 Page 2 COPIES FURNISHED BY CERTIFIED MAIL, RETURN RECEIPT REQUESTED TO: CONTRACTOR Name: Morgan Contracting Address: Post Office Box 5009 Knoxville, TN 37928 Certified Mail Receipt No.: 701222100001 15122447 SUB CONTRACTOR Name: Daniel S McClellan Electrical Contractors, Inc. Address: 719 Edge Street Fort Walton Beach, FL 32547 Certified Mail Receipt No.: None SUBCONTRACTOR Name: Ram Tool & Supply Company Address: 3620 8th Ave South Birmingham, AL 35222 Certified Mail Receipt No.: None