Via E-mail
TETRA TECH
September 12, 2013
Tt No. 200-08540-12001
Wayne Steele
Public Services Director
City of Crestview
715 N. Ferdon Blvd.
Crestview, Florida 32536
Subject: Old Bethel Road Part I
Change Order No. 5
Dear Mr. Steele:
Enclosed, please find Change Order No. 5 from Speegle Construction, Inc. We have reviewed the proposed
changes to the Contract and find them acceptable. This Change Order amounts to an increase of $108,214 and an
additional 63 days of Contract Time. These changes are related to the work that must be performed to set the 24"
surface casing an additional 200' below ground to the limestone bedrock. It is our impression that the approval of
additional moneys to be allocated for this project by the City Council on September 9, 2013, has increased the
project contingency and thus allowed for this Change Order to be approved. As was previously mentioned in the
memo dated September 4, 2013, we do anticipate that site conditions will allow for a future change order which will
effectively eliminate the 18" well casing from the project and potentially provide a credit back to the City of $74,850.
Should you have questions or need additional information, please call.
Timothy A. Vanderwalker, PE
Project Manager
Cc: Michael Bomar, PE, Tetra Tech
Fred Cook, PE, City of Crestview
Tetra Tech. Inc.
12815 Emerald Coast Parkway, Suite
110, Destin, FL 32550 850.837.9278 Fax
850.837.7269 www.tetratech.com
P:201I\Crestview Well and Tank \ Construction\Review-ApprovanContractorCOs\Part I\Part I Change Order No. 5.docx.
SECTION 00843
CHANGE ORDER FORM
Project: City of Crestview
Part I - Well No. 9 and Elevated Storage Tank
CHANGE ORDER NO. 05
DATE OF ISSUANCE: CONTRACTOR: Speegle Construction, Inc.
EFFECTIVE DATE: ENGINEER: Tetra Tech
OWNER'S CONTRACT NO.:200-08540-12001
The following changes are hereby made to the Contract Documents:
CHANGE IN CONTRACT PRICE:
Original Contract Price
$ 1,965,660.00
CHANGE IN CONTRACT TIMES:
Original Contract Times
Substantial Completion: 12/23/2013
Ready for final payment:
days or dates
Net changes from previous Change Orders No. 1 to
Net change from previous Change Orders No. 1 to
No. 4
No. 4
$ 6,658.00
10
days
Contract Price prior to this Change Order
1,972,318.00
$Ready
Contract Times prior to this Change Order
Substantial Completion: 1 /2/2014
for final payment:
days or dates
Net Increase Change Order
Net Increase Change Order
(decrease) of this
$ 108,214.00
(dcerea3c) of this
63
days
Contract Price with all approved Change Orders
2,080,532.00
$Ready
Contract Times with all approved Change Orders
Substantial Completion: 3/6/2014
for final payment:
days or dates
MAD/s1m/specs/s-1 /00843
Tt#200-08540-12001
00843-1
050412
CHANGES ORDERED:
I. GENERAL This change order is necessary to cover changes in the work to be
performed under this Contract. The General Conditions, Supplementary Conditions,
Specifications and all parts of the Project Manual listed in Article 1, Definitions, of the
General Conditions apply to and govern all work under this change order.
Change Order No. 05
II. REQUIRED CHANGES:
Add 200 LF of 24" surface casing (total of approx. 400 LF).
Upon completion of 24" casing, FOR to determine whether
the 24" casing will be sufficient enough to replace the
18" well casing, in which case, a credit of approx.
$74,850.00 will be due to the City of Crestview.
III. JUSTIFICATION: Unforeseen conditions.
IV. PAYMENT:
MAD/slm/specs/s-1/00843
Tt#200-08540-12001 00843-2 050412
V. APPROVAL AND CHANGE AUTHORIZATION:
Acknowledgments:
The aforementioned change, and work affected thereby, is subject to all provisions of the
original contract not specifically changed by this Change Order; and,
It is expressly understood and agreed that the approval of the Change Order shall have no
effect on the original contract other than matters expressly provided herein.
Change Order Request by:
Change(s) Ordered by:
RECOMMENDED BY:
thorized Signature)
� 12oj�G`t` /14IQlt6�E�
(Title)
APPROVED BY:
City of Crestview, Florida
By:
(der)
Rl12i3
(Date)
ACCEPTED BY:
nstruction, inc.
(Contractor)
9/10/2013
tith : 'zed Signature) (Date)
President
9_ 23-/2'
Ault Signature) (Date)
END OF SECTION
(Title)
MAD/s Im/sp ecs/s-1 /00 84 3
Tt##200-08540-12001 00843-3 050412
SCONSTRUCTION INC.
ccc-o62489
PEEGLE
September 10, 2013
Mr. Tim Vanderwalker
Tetra Tech
12815 Emerald Coast Pkwy, Suite 110
Destin, FL 32550
Dear Sir,
Speegle Construction, Inc. Tel: (850) 729-2484
210 Government Avenue Fax: (850) 729-1993
Niceville, Florida 32578 WNW. speegleconstruction.com
Dan Carruth
Project Manager
RE: Crestview Well No. 9
COR 1002-005 - Well Surface Casing, Revised
Speegle Construction, Inc. respectfully submits the attached estimate for changes associated with the 24" surface casing.
The below estimate reflects increasing the surface casing by 200 LF (total of approx. 400 LF) with an approximate 5-10'
embedment into the limerock. In the event that the Engineer of Record determines that the 24" surface casing is sufficient
enough to replace (i.e. delete) the 18" well casing, a credit will be offered back to the City of Crestview (see credits below).
This estimate is based on our best understanding of the changes that are necessary to the scope of work. In the event
that additional work is required due to unforseen conditions or impacts to other systems due to changing the size of the
well, Speegle reserves the right to revisit this estimate.
Total estimate for the above work: $ 108,214
Additional Contract Extension: 63 Calendar Days
In the event that the FOR determines that the 18" well casing is not required, the following credits will be offered back to the City of Crestview:
Optional Credit if 18" Well Casing is deleted'*:
$ (59,920)
(Final credit will be based on actual invoiced amounts)
(Final credit will reflect actual qty used, if any)
Estimated 20% restocking fee for piping mtls:
$ 3,200
Optional Credit if 40 CY Cement Grout is deleted**:
$ (17,120)
Speegle credit for 3 less days associated with not
installing/grouting the 18" casing:
$ (1,010)
Revised estimate based on the above credits and 54
calendar days:
$ 33,364
**The 18" well casing and grouting unit price credits include all fuel, equipment, labor, OH&P, etc. associated with the install/grouting of the casing. In the
event that the 18" well casing is not required, the credit offered (based on the unit price values) will be the final amount owed back to the City, with the
exception of the $1,010 credit owed by Speegle for the estimated 3 day reduction.
Should you require any additional information, please do not hesitate to contact Dan Carruth at
850-729-2484 or email dcarruth@speegleconstruction.com
Sincerely,
Dan Carruth
cc: file Project Manager
lv � � y.t N
ck ,
�'r✓C
•,sa-13
i;
SEA
REQUEST for CHANGE ORDER SUMMARY
DESCRIPTION: Well Surface Casing
REASON FOR CHANGE: Unforseen Conditions
ARCH RFP#
SCI RCO#
QUOTE DATE
0
1002-005
9/10/2013
DIV
SCOPE DESCRIPTION
NOTES
LABOR
MATL
EQUIPT
SUBCONT
SCI COSTS TOTAL
SUBCONTRACTED TOTAL
GRAND TOTAL
1
General Conditions
$ 9,217.18
$ 3,406.10
$ -
$
$ 12,623.28
$
$ 12,623.28
2
&Rework & Demolition
$
$
$
$ 45,754.57
$ -
$ 45,754.57
$ 45,754.57
3
Concrete
$
$
$
$
$
$
$
4
Masonry
$ -
$
$
$ -
$ -
$ -
$
5
Steel
$
$
$
$
$
$
$
6
Carpentry, Wood & Plastic
$
$
$
$
$
$
$
7
Thermal & Moisture Protection
$
$ -
$ -
$ -
$
$ -
$
8
Openings
$
$
$
$
$
$
$ -
9
Finishes
$
$
$ -
$ -
$
$
$ -
10
Specialties
$
$
$ -
$
$ -
$ -
$
11
Equipment
$ -
$ -
$
$ -
$
$
$
12
Furnishings
$
$ -
$
$
$
$
$
13
Special Construction
$ -
$
$ -
$ -
$
$ -
$
14
Hoisting & Conveying
$
$ -
$ -
$ -
$
$ -
$
15
Fire Sprinklers
$
$ -
$
$
$
$
$
Plumbing
$ -
$ -
$
$
$ -
$
$
HVAC & Controls
$ -
$ -
$ -
$ -
$ -
$ -
$
16
Electrical
$
$ -
$
$ -
$
$
$
17
Commissioning
$ -
$ -
$
$ -
$
$
$
SubTotals
Payroll Burden
Sales Tax
Sub Bond
SubTotals
General Liability Insurance
Property (Builder's Risk)Insurance
P & P Bond
Gross Receipts Tax (City Bus Lic)
SUBTOTAL
Overhead/Profit
Overhead/Profit
SUBTOTAL
Add l 200LF of 24" Surface Casing'
GRAND TOTAL
Extended General Overhead
$ 9,217.18
$ 3,406.10
$ -
$ 45,754.57
$ 12,623.28
$ 45,754.57
$ 58,377.85
45%
$ 4,147.73
$ 4,147.73
$ -
$ 4,147.73
6%
$ 204.37 I $ •
$ 204.37
$ -
$ 204.37
0.00%
$ -
$ -
$ -
$ -
$ 13,364.91 I $ 3,610.47 I $ -
$ 45,754.57
$ 16,975.38
$ 45,754.57
$ 62,729.95
0.-4 00%
of Subtotal
of Subtotal
rif Subtotal
'
$ 11.50
$ 192.17
$ 203.67
0.6500%
$ 17.81
$ 297.40
$ 315.21
\, 1.0000%
$ 27.40
$ 457.55
$ 484.95
'00000%
$
$
$
$ 12,554.81
$/ 46,701.69
$ 63,733.78
15.00%
$ ,554.81
S2,554.81
5.00%
$
$ 2,335.08
$r 2,335.08
$ 19,586.90
$ 49,036.77
$ 68,623.68
$197.95/LF1
$ -
$ 39,590.00
$ 39,590.00
$ 19,586.90
$ 88,626.77
$ 108,213.68
$
$
E -
$ _
$
$
$ 19.587
$ 83,627
$ 108,214
ime Extension
'This Proposal is for only the work identified by the above change description.
• See reservation of rights language on the Detail backup.
63 Calendar days
DETAIL PROPOSED CHANGE ORDER ESTIMATE
DIRECT COST ASSOCIATED WITH CHANGE ORDER
DESCRIPTION: Well Surface Casing
REASON: Unforseen Conditions
0�.
9- P-13
ARCH RFP #
SCI RCO#
QUOTE DATE
1002-005
9/10/201
CODE
SCOPE DESCRIPTION
QUANT
units
L / U.P.
LABOR
M / U.P.
MAT'L
EQUIPMENT
SUBCONT
TOTAL
1
GENERAL CONDITIONS
Project Manager 33%
8.14
wks
1,730.00
$ 4,690.52
$ -
$ 4,690.52
Project Manager's Truck/Insurance/Gas 33%
1.90
months
$
650.00
$ 407.55
$ 407.55
Superintendent 33%
8.14
wks
1,550.00
$ 4,206.66
$
$ 4,206.66
Superintendent's Truck/Insurance/Gas 33%
1.90
months
$ -
650.00
$ 407.55
$ 407.55
Office Trailer
1.90
months
$
200.00
$ 380.00
$ 380.00
Superintendent Cell Phone 33%
1.90
months
$
150.00
$ 94.05
$ 94.05
Temp Toilets
1.90
months
$
150.00
$ 285.00
$ 285.00
Asbuilt documentation
3
HRS
25.00
$ 75.00
$
$ 75.00
RFP Preparation
3
HRS
50.00
$ 150.00
$
$ 150.00
Temp Utilities
1.90
months
50.00
$ 95.00
$
$ 95.00
Backhoe
8.14
wks
$ -
75.00
$ 610.65
$ 610.65
Loader/Dozer
8.14
wks
$ -
150.00
$ 1,221.30
$ 1,221.30
Copying & Specifications
$ -
$
$
Mail & Express Postage
$
$ _
$ _
Layout & Field Engineering
$ _
$ _
$ _
Crane & Hoisting
$ _
$ _
$ _
Schedule Study & Modification
$
$
$ _
Prepare Fragnet
$ -
$
$ _
Material Handling Equipment
$
$
$ _
Safety
$
$ _
$ _
Clean-up & Debris Handling
$
$ _
$
Dumpster Pulls
$
$
$ _
Equipment Rental
$ _
$
$
Trucking & Hauling
$ _
$
$
Small Tools
$
$ _
$ _
Other
$
$ _
$ _
$
$
$ -
Division 1 Subtotal
$ 9,217.18
$ 3,406.10
$ -
$ -
$ 12,623.28
2
SITEWORK & DEMOLITION
Rowe Drilling (See Quote)
1
LS
$
$
$ 43,354.57
$ 43,354.57
Rowe Drilling - Daily Cost After 9/5/13,
Assuming a Start Date of 9/10/13
1.2
Days
$ 2,400.00
$ 2,400.00
Division 2 Subtotal
$ -
$ -
$ -
$ 45,754.57
$ 45,754.57
3
CONCRETE
0
EA
0.00
$ -
$
$ _
$
$ -
$
Division 3 Subtotal
$ _
$ -
$ -
$ _
$ _
4
MASONRY & STONE
$ -
$ -
$ -
$ -
$
$
Division 4 Subtotal
$ _
$ _
$ _
$ _
$ _
5
STEEL & METALS
EA
$
$
$ -
$ -
$ -
$
Division 5 Subtotal
$ _
$ _
$ _
$ _
$ _
6
WOOD & PLASTICS
$ -
$ -
$ -
$
$ -
$ -
$ -
Division 6 Subtotal
$
$ _
$ _
$ _
$ _
7
THERMAL & MOIST PROTECT
$
$
$
$ -
$ -
$ -
Division 7 Subtotal
$ -
$ _
$ _
$ -
$ _
8
OPENINGS
$ -
$
$ -
$
$
$ -
Division 8 Subtotal
$ _
$ -
$ _
$ _
$ _
9
FINISHES
$
$
$
$
$ -
$
Division 9 Subtotal
$
$
$
$
$ _
10
SPECIALTIES
$
$ -
$ -
DESCRIPTION:
REASON:
DETAIL PROPOSED CHANGE ORDER ESTIMATE
DIRECT COST ASSOCIATED WITH CHANGE ORDER
Well Surface Casing
ARCH RFP #
SCI RCO#
QUOTE DATE
1002-005
Unforseen Conditions
9/10/2013
CODE
SCOPE DESCRIPTION
QUANT
units
L / U.P.
LABOR
M / U.P.
MAT'L
EQUIPMENT
SUBCONT
TOTAL
$
$
$ -
Division 10 Subtotal
$ -
$ -
$ -
$ -
$ -
11
EQUIPMENT
$
$
$
$ -
$
$
Division 11 Subtotal
$ -
$ -
$ -
$ -
$ -
12
FURNISHINGS
$
$
$
$ -
$
$
Division 12 Subtotal
$ -
$ -
$ -
$ -
$ -
13
SPECIAL CONSTRUCTION
$
$ -
$
Division 13 Subtotal
$ -
$ -
$ -
$ -
$ -
14
HOISTING & CONVEYING
$ -
$ -
$
$ -
$
$ -
Division 14 Subtotal
$ -
$ -
$ -
$ -
$ -
15
FIRE PROTECTION
$ -
$
$ -
$ -
$
$ -
Division 15 Fire Subtotal
$ -
$ -
$ -
$ -
$ -
15
PLUMBING
$ -
$ -
$ -
$
$
$ -
Division 15 Plumb Subtotal
$ -
$ -
$ -
$ -
$ -
15
MECHANICAL & HVAC
$
$ -
$ -
$
$ -
$ -
$ -
Division 15 HVAC Subtotal
$ -
$ -
$ -
$ -
$ -
16
ELECTRICAL
$ -
$ -
$ -
$
$
$
$
Division 16 Subtotal
$ -
$ -
$ -
$ -
$ -
17
COMMISSIONING
$ -
$ -
$ -
$
$
$ -
Division 17 Subtotal
$ -
$ -
$ -
$
$
SubTotals
$ 9,217.18
$ 3,406.10
$ -
$ 45,754.57
$ 58,377.85
" R O W E P R I L L I N G
C O M P A Y
W a t e r W e l l s , P u m p s , S a l e s &