Loading...
HomeMy Public PortalAboutr 07:192 2f\eiolutiOlt af tIle ~ar01tgIr of illnrtcretj ~ ~ JJ. 07-192 No. Dale llJ Adoption Jt.lly12. 2007 APPROVING CHANGE ORDER No. 1 T. SLACK ENVIRONMENTAL SERVICES/CARTERET DPW . REMEDIAL ACfION WORK ( \VHEREAS, the Goveming Body of the Borough of Carteret has previously awarded a contract to T. Slack Environmental Services in the amount of$118,540.00 for Carteret DP~VRel11edial Action Work; and \VHEREAS, the Borough's Consulting Engineer for the project, CME.Associates, has advised the Goveming Body that a modification of the contract is reasonable and qecessary and has recommended that the aforesaid contract be modified in accordance with Contract 'cIlange Order No.1 (see attached); and 'VHEREAS, Change Order No.1 includes a change in the description of work to increase quantittes to reflect as-built conditions, and to provide for cCliain supplementary items; and 'VHEREAS, Change Order No.. 1 provides fo.r a net increase in the cantract price in the amount of$24,582.14, resulting in a reviscd contract price of$143,122.14 including all previausly approved change arders; an<;l \VHEREAS, the Barough's Cansulting Engineer, T & M Assaciates has advised that the abave.described changes and/or madificatio.ns to. the project were unforeseen at the time of the award afthe ariginal cantract. NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Borough af Carteret as folla\vs: I. That the Contract Change Order No. I attached hereto and made a part hereaf, resulting in anet increase af$24,582.14, and resulting in a revised contract price of$143,122.14 is hereby approved. 2. That the appropriate Borough Officials are hereby autharized to. execute Change Order No.. 1 based upan the recammen.datian afthe Baraugh Engi.neer. 3. That the Barough Purchasing Department is hereby autharized to. issue payment pursuant to. Payment Certificatian No.. 1 and Final (see attached). 4. A capy afthisreso.lutio.n and a fully executed capy o.f,Change Order No.. 1 ' be farwarded to. CME Asso.ciates fo.r distributian to. T. Slack Environmental. Adopted tIils 12''' day of July, 2007 and certified as a tme co.py o.fthe , original on July 13, 2007. KATHLEEN M. BARNEY, RMC/CMC Municipal Clerk RECORD OF COUNCIL VOTE COUNCILMAN VES NO NV A.n. COUNCILMAN YES NO NY A.O. BELL.INO ..- .- X NAPLES X DIAZ X RIOS X -- - :KRU~\ X . SITARZ X x - JIltHcale VOle AI]..Absenl NV. Nol VOllng XOR - rndlt:l1lc.~ VOle 11\ Overrule V1.'ltl ..-.-- . Adopted at a meeting. oflhe Municipal Council J;;;1;~;~2~2bCJi;;A, ~I ~ ~ - JOHN H.AllGAtR, P.E., P.P. (1983-2001) DAVID J. SAMUEL, P.E., P.P, JOHN J. STEFANI, P.E., L.S.. P.P. JAY B. CORNELL, P.E., P.P. MrCHAElJ. McCLELlAND, P.E., P.P. GREGORY R. VAlESl, P.E., P.P. TIMOTHYW. GILLEN, P.E., P.P. BRUCE M. KOCH, P.E" P.P. EANEST J, PETERS, JR.. P.E., P,P. ( July 10, 2007 Mayor Daniel Reiman and Borough Council Borough of Carteret Municipal Building 61 Cook Avenue Carteret, NJ 07008 Attn: Kathleen Barney Borough Clerk Re: Carleret DPW Remedial Action Work Plan Change Order No. 1 Our File: H-CA-00500-01 Dear Mayor Reiman and Council Members: For your consideration, attached please find proposed Change Order No.1 for the above-referenced project. The change order includes additional and suppiemental work ordered and required for the removal of additional contaminated soil encountered during excavation of the Area of Concern (AOC). The deleted contingent quantities were not required. The supplemental work for removal of additional non-hazardous contaminated soil and other associated work is a result of the area of contamination exceeding the limit anticipated by our office which is typical for this type of remediation project. This change order will result in an increase of the original contract price in the amount of $24,582.14 for a new total of $143,122.14. The supplemental work, in our opinion could not have reasonably been effectuated by a separately bid contract without unduly disrupting the basic work, or without imposing adverse cost consequences on the Borough. Should you wish to discuss this matter in greater detail, please do not hesitate to contact this office. . GRV/DMR/BM cc: John DuPont, PE, CME Enclosure S:\Carteret\Lelters\500-01 Mayor C01 7-9-07.doc CONSU.llNG!'ND MLI'lICJ'J'J. ENGINEERS 1460 ROUTE 9 SOUTH, HOWEll, NEW JERSEY 07731- (732) 462.7400 - FAX: (732) 409-0756 @ , - ow ASSOCIATES CONSULTING AND MUNICIPAL ENGINEERS 1460 Route 9 South, Howell, NJ 07731 (732) 462.7400 FAX: (732) 409-0766 CHANGE ORDER NO.1 PAGE-3- DATE PREPARED: June 6,2007 FILE NO.: HCA00500-01 17 Install new 2'-diameter pve Monitoring Well to approximately 15-leet below grade, Including ail associated labor, equipment, materials and necessary appurtenances (only il and wherll ordered) 1 UN $2,200.00 $2,200.00 Subtotal Addllionalltems: $72,727.30 CHANGE ORDER #1 TOTAL: $24,582.14 ORIGINAL CONTRACT VALUE: $118,540.00 ADJUSTED CONTRACT AMOUNT BASED ON CHANGE ORDER NO.1: $143,122.14 BY: BOROUGH OF CARTERET 61 COOKE AVENUE CARTERET, NJ 07008 APPROVED BY: T. SLACK ENVIRONMENTAL 4 MARK ROAD, STE. A KENILWORTH, NJ 033 BY: TITLE: DATE: G - :J.,5":-o '1 DATE:-"\~-~' DATE: S:\Carteret\eslimates\Pay Estimates\500.01 Change Order NO.1 6-6-07.doc