HomeMy Public PortalAboutD R Horton Special Utility Service AgreementSPECIAL UTILITY SERVICE AGREEMENT
for
WATER AND/OR WASTEWATER SERVICE
Invoice # LATSL-03132012-01
THIS AGREEMENT is made and entered into this II." day of 71u, , 2012,
by and between the City of Crestview, a governmental body, corporate and politic, of
the State of Florida, and D.R. Horton, Inc. (the "Developer");
WHEREAS, the Developer owns certain land in Okaloosa County, Florida, more
particularly described in Exhibit "A" to this Agreement (the "Property") and intends to
construct on the Property a Residential Development to be known as Redstone
Commons Phase I (the "Project"); and
WHEREAS, the Developer desires the City of Crestview to provide to the Project:
(check whichever is applicable)
A. Water Service -- Projected average daily flow: 101,700 gallons per day
B. Wastewater Service -- Projected average daily flow: 95,000 gallons per
day; and
WHEREAS, the City of Crestview is willing to provide such service upon the
terms and conditions hereinafter set forth;
NOW THEREFORE, in consideration of the premises and the mutual covenants
herein contained the Developer and the City of Crestview hereby agree as follows:
1. The Developer shall, at the sole cost and expense of the Developer:
A. Construct or cause to be constructed, on the Property as shown in
Exhibit "A", such mains, laterals, lift stations, force mains, fire hydrants and other
facilities as may be necessary for the City to provide such service to the Project.
Laterals to serve each lot or parcel within the Project shall be stubbed out to the
property or easement line.
B. Construct or cause to be constructed such other facilities outside the
Property as are generally described in Exhibit "B" to this Agreement.
2. The Developer shall commence construction of such facilities within 60
months after the date of this Agreement and shall complete construction of such
facilities within 120 months after the date of this Agreement. Provided, however, that
the time for completion of construction may be extended by the City once for twenty four
(24) months if construction was 50% or more complete within 120 months of the date of
this agreement and the Developer can demonstrate to the satisfaction of the City that
1 of 3
8. This Agreement may not be amended except by a writing executed by the
Developer and the City.
9. This Agreement shall be governed by the laws of the State of Florida.
Dated as of the date and year first above written.
DEVELOPER.
By
Title V S „ -A-
By
1:r% LORIE A. REED
: �� tn.MY COMMISSION # DD 781056
EXPIRES: August 21, 2012
• Co, Bonded Thru Notary Public Underwriters
CITY OF CRESTVIEW:
W itn -
d'O)".4 0,
4100:ULAd gia'i'a
By
By
David Cadle, Mayor
tsy Roy, City Clerk
3 of 3
Director
Brona D. Steele
City of Crestview
Department of Public Services
715 Ferdon Boulevard North
Crestview, Florida 32536
Telephone No. (850) 682-6132
Fax No. (850) 682-7359
E-Mail: psengineerOtvflorq.gccoxmail.com
INTEROFFICE MEMORANDUM
TO: Vicki Yaun, Planner
FROM: Fred Cook, Engineer
DATE: March 19, 2008 Wednesday 12:30 pm
COPY: Wayne Steele, Director
Eric Davis, Planning Official
SUBJECT: Redstone Commons Phase I — Sewer System Impacts
Development Order Stipulations
The following will be required of the Developer due to impacts of this project on the existing
sewer system:
1Jpgrade pumps in Iron Gate Phases 1 & 2 lift stations to 25 Hp from existing 10 and 15 Hp
pumps/motors (total of 4 pumps); Note that this is a result of the analysis performed by
DRMP Engineers and Rebol-Battle & Assoc. Engineers, which also indicated using VFD's
at both the Redstone Commons and New Schools lift stations;
' pgrade 8" gravity sewer line on Hospital Drive from discharge manhole to SR 85 (length =
approx. 810 ft.);
Participate in 14" bore under SR 85 fr m Hospital Drive to manhole location near Sonny's
BBQ on the west side; j'frict4eila Law7:5 p-efr'ej
participate in the construction of new 14" gravity sewer line from SR 85 to the RaslIert9
Road Lift Station (length = approx. 4,900 ft.); ai,J. 4.-7"5
--5—Eveluatc ire ift-S•tatie t+ag--l-GLferce-maiFr-arid-upgRade-as-
These items have been specifically discussed with representatives of the Developer in the
past, when the project was -first submitted, in late 2006 If you -have any -questions, please call
me or Wayne.