Loading...
HomeMy Public PortalAbout11-0269 Fair CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 05-10-2011 PERMIT#: 110269 WORK DESCRIPTION SHED&FENCE WORK LOCATION 1005 SECOND AVE OWNER NAME MARY FAIR ADDRESS PO BOX 30948 CITY,ST,ZIP SAVANNAH GA 31410 PHONE NUMBER CONTRACTOR NAME MARY FAIR ADDRESS PO BOX 30948 CITY STATE ZIP SAVANNAH GA 31410 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 100.00 PROPERTY IDENTIFICATION# PROJECT VALUATION $1,100.00 TOTAL BALANCE DUE: $ 100.00 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire, soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Z).A1 Signature of Building Inspector or Authorized Agent: P.O.Box 2749-403 Butler Avenue,Ty bee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 www.cityoftybee.org City of Tybee Island • Planning & Zoning Dept. .it•s•:-., lar% Inspection Report numalk 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 immilm.re- 'Nils/ANAL Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL MEMBER Permit No. I, / _ -24 Date Requested Owner's Name F7-7)/2=-7 Date Needed Gen. Contractor Subcontractor Contact Information Project Address , Scope of Work ie-->:I ,),'4,(ti. 4 1-AeT:i`,, ,,,?,- I) Inspector -.1/4 Date of Inspection Inspection }-= — 4- i--, ,.../A-I,- " I i r,-- Pass all 0 Fee --- ) . Inspection Pass 0 Fail El Fee Inspection Pass 0 Fail 0 Fee Inspection Pass Ei Fail 0 Fee defr CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT �QZ (09 Location: G6 , -e PIN# NAME ADDRESS TELEPHONE Owner 60 Krego _ Architect or Engineer Building �� ��,.� Contractor C d 42 3 -40'0 (Check all that apply) ❑ Repair ❑ Residential ❑ Footprint Changes ❑ Renovation [j2) Single Family n Discovery n Minor Addition � I Duplex n Demolition ❑ Substantial Addition ( � Multi-Family Other n �me < � Details of Project: Shea A),(4 1L4 acCe) Z �cm S oF Estimated Cost of Construction: $ Construction Type I (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other(please specify) (2) Wood &Masonry (5) Steel &Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms 01._ # Bathrooms Lot Area l©X VV Living space(total sq. ft.) /y, #Off-street parking spaces 3 Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building,exclusive of chimneys, heating units,ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: Iv lir On-site restroom facilities will be provided through On-site waste and debris containers will be provided by Construction debris will be disposed by by means of I understand that I must comply with zoning,flood damage control, building,fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: qb /I Signature of Applicant: 04 a.„ Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number:New Existing Is it in compliance with City map? If not,has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES Zoning Administrator Permit Code Enforcement Officer Inspections Water/Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL Yr < \ DEPT OF MSCURCES ' Cis �;% GEORGIA Permit Acknowledgement of Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition,Wrecking,or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Und- ed j Date 1)1/449— I / ( Printed Name Office Use Only: Project Address: Permit Number: w0S.— 2' . ' tub p N -ti- + c Q 'J J rat`s° j_ lbw s' ( mix 12-Pf y, r s id( et "if pf ,ce iiirwaamitiv-A■rmi"'kw/ 4 Pepkc did ' -tincescdan 'jam _ exotkri c 1 � 1 � f � 1 (B)Relocation permit. • - - . --- • --- . - .. . . - - . . . ... .. - _ . - -- ---- - - - - - - - -- - - - fr o m this requirement. A relocation permit is required any time a manufactured home, trailer, out building, house, structure, or component is moved to or from any lot or parcel within the City of Tybee Island. Electrical, mechanical and plumbing permits are not included within this permit. Dianne Otto From: diane_sch @yahoo.com Sent: Tuesday, May 10, 2011 10:29 AM To: Dianne Otto; Diane Schleicher Subject: Re: relocation permit Dianne, It makes sense to me to charge for the accessory only since the relocation is on the same property and not to another property. Thanks, Diane Sent from my Verizon Wireless BlackBerry From: Dianne Otto <Dotto@cityoftybee.org> Date: Tue, 10 May 2011 09:54:49 -0400 To: Diane Schleicher<dschleicher@cityoftybee.org> Subject: relocation permit Diane, Do you recall the application for a pre-made 10' by 12' storage building that I passed to you and you passed back (see attachment)? My question is about fees. The fee schedule has a $250 fee for a relocation permit. The fee for the accessory structure is $100. That's $350 in permit fees on a $1,100 project. Please advise. Dianne K. Otto, CFM City of Tybee Island phone 912.786.4573 ext. 136 fax 912.786.9539 From: oceprinter@aioce.com Imailto:oceprinter @oce.com] Sent: Tuesday, May 10, 2011 10:29 AM To: Dianne Otto Subject: Scan from Economic Development This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed.If you are not the named addressee you should not disseminate,distribute or copy this e-mail.Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system.Please note that any views or opinions presented in this email are solely those of the author and do not • necessarily represent those of The City of Tybee Island.The recipient should check this email and any attachments for the presence of viruses.The City of Tybee • • Island accepts no liability for any damage caused by any virus transmitted by this email.City of Tybee Island P.O.Box 2749 Tybee Island,GA 31328 1